11.8
1.9
Volume of concrete(V)
17.94 m3
57.32 m2
0.313 m
Effective V/S
1.03 feet
1.75 feet
=
103.0 oF
(Fig-2) of Report on Concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16
Cement content
H
0.8
1.9
(from charts)
360 Kg/m3
29 oC
4990000 psi
Grade of concrete
25
28500 Mpa
=
multiplier(m)
4132500 psi
1/(1+(AgEc/AfEf)
0.751
L/H
6.21 >2.5
mKR
KR
((L/H-2)/(L/H+1))h/H
1.9
KR
0.32
KRE
0.241
for L/H>=2.5
28.41/KRE
117.67 oF
6 x sqrt(fc)
323.11 psi
0.00000528 /oF
Crack-width factor
0.004
clear cover
50
0.2 mm
0.0079 inches
CALCULATION OF REINFORCEMENT
Dia of bar used
36 mm
Effective cover(dc)
68 mm
2.68 inches
spacing of bars
Spacing of bars
5.512 inches
140.00 mm
0.0079 in
=
=
w x 106/(0.076 x (dcA)1/3)
(psi)
24144.85 psi
w/18(KRECTTE-f't/Ec)
f't/Ec
-23.403 ft
L'/2H'
-1.877
B(Width of RC element)
12 inches
0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')
NB
=
=
=
=
No of bars in width B
2.177
3.2920 sq.in per given spacing of 5.512 inches
75.93 cm2/m
Min renf
=
9.11 cm2/m
(cl.6.4.4 of Report on concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)
(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)
flexure renf from output
1.66%
32.1
1.325
Volume of concrete(V)
m3
m2
Effective V/S
15.7
1.325 m
4.35 feet
7.40 feet
=
110.0 oF
(Fig-2) of Report on Concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16
Cement content
H
2.25
(from charts)
360 Kg/m3
23 oC
4990000 psi
Grade of concrete
25
28500 Mpa
=
multiplier(m)
4132500 psi
1/(1+(AgEc/AfEf)
0.751
L/H
14.27 >2.5
mKR
KR
((L/H-2)/(L/H+1))h/H
2.25
KR
0.80
for L/H>=2.5
KRE
0.604
28.41/KRE
47.07 oF
6 x sqrt(fc)
323.11 psi
0.00000528 /oF
Crack-width factor
0.004
clear cover
75
0.3 mm
0.0118 inches
CALCULATION OF REINFORCEMENT
Dia of bar used
36 mm
Effective cover(dc)
93 mm
3.66 inches
spacing of bars
Spacing of bars
8.858 inches
0.0118 in
=
=
f't/Ec
L'/2H'
225.00 mm
w x 106/(0.076 x (dcA)1/3)
(psi)
25094.67 psi
w/18(KRECTTE-f't/Ec)
0.00015 (for Seasonal Cracking)
3.272 ft
0.376
B(Width of RC element)
12 inches
0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')
No of bars in width B
NB
=
Temp Renf as per calculations
=
=
1.355
0.7980 sq.in per given spacing of 8.858 inches
22.90 cm2/m
Min renf
=
23.97 cm2/m
(cl.6.4.4 of Report on concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)
(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)
flexure renf from output
32.17 cm2/m
56.14 cm2/m
32.1
1.325
Volume of concrete(V)
m3
m2
Effective V/S
15.7
1.325 m
4.35 feet
7.40 feet
=
97.0 oF
(Fig-2) of Report on Concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16
Cement content
H
2.25
(from charts)
360 Kg/m3
19 oC
4990000 psi
Grade of concrete
25
28500 Mpa
=
multiplier(m)
4132500 psi
1/(1+(AgEc/AfEf)
0.751
L/H
14.27 >2.5
mKR
KR
((L/H-2)/(L/H+1))h/H
2.25
KR
0.80
for L/H>=2.5
KRE
0.604
28.41/KRE
47.07 oF
6 x sqrt(fc)
323.11 psi
0.00000528 /oF
Crack-width factor
0.004
clear cover
75
0.3 mm
0.0118 inches
CALCULATION OF REINFORCEMENT
Dia of bar used
36 mm
Effective cover(dc)
93 mm
3.66 inches
spacing of bars
Spacing of bars
8.858 inches
0.0118 in
=
=
f't/Ec
L'/2H'
225.00 mm
w x 106/(0.076 x (dcA)1/3)
(psi)
25094.67 psi
w/18(KRECTTE-f't/Ec)
0.00015 (for Seasonal Cracking)
4.124 ft
0.474
B(Width of RC element)
12 inches
0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')
No of bars in width B
NB
=
Temp Renf as per calculations
=
=
1.355
0.6726 sq.in per given spacing of 8.858 inches
19.31 cm2/m
Min renf
=
23.97 cm2/m
(cl.6.4.4 of Report on concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)
(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)
flexure renf from output
32.17 cm2/m
56.14 cm2/m
32.1
1.325
Volume of concrete(V)
m3
m2
Effective V/S
15.7
1.325 m
4.35 feet
7.40 feet
=
133.0 oF
(Fig-2) of Report on Concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16
Cement content
H
2.25
(from charts)
360 Kg/m3
29 oC
4990000 psi
Grade of concrete
25
28500 Mpa
=
multiplier(m)
4132500 psi
1/(1+(AgEc/AfEf)
0.751
L/H
14.27 >2.5
mKR
KR
((L/H-2)/(L/H+1))h/H
2.25
KR
0.80
for L/H>=2.5
KRE
0.604
28.41/KRE
47.07 oF
6 x sqrt(fc)
323.11 psi
0.00000528 /oF
Crack-width factor
0.005
clear cover
75
=
=
0.375 mm
0.0148 inches
CALCULATION OF REINFORCEMENT
Dia of bar used
36 mm
Effective cover(dc)
93 mm
3.66 inches
spacing of bars
Spacing of bars
8.858 inches
0.0148 in
=
=
f't/Ec
L'/2H'
225.00 mm
w x 106/(0.076 x (dcA)1/3)
(psi)
31368.34 psi
w/18(KRECTTE-f't/Ec)
0.00015 (for Seasonal Cracking)
2.995 ft
0.345
B(Width of RC element)
12 inches
0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')
No of bars in width B
NB
=
Temp Renf as per calculations
=
=
1.355
0.6710 sq.in per given spacing of 8.858 inches
19.26 cm2/m
Min renf
=
19.18 cm2/m
(cl.6.4.4 of Report on concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)
(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)
flexure renf from output
32.17 cm2/m
51.43 cm2/m
32.1
1.325
Volume of concrete(V)
m3
m2
Effective V/S
15.7
1.325 m
4.35 feet
7.40 feet
=
110.0 oF
(Fig-2) of Report on Concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16
Cement content
H
2.25
(from charts)
360 Kg/m3
23 oC
4990000 psi
Grade of concrete
25
28500 Mpa
=
multiplier(m)
4132500 psi
1/(1+(AgEc/AfEf)
0.751
L/H
14.27 >2.5
mKR
KR
((L/H-2)/(L/H+1))h/H
2.25
KR
0.80
for L/H>=2.5
KRE
0.604
28.41/KRE
47.07 oF
6 x sqrt(fc)
323.11 psi
0.00000528 /oF
Crack-width factor
0.005
clear cover
75
=
=
0.375 mm
0.0148 inches
CALCULATION OF REINFORCEMENT
Dia of bar used
36 mm
Effective cover(dc)
93 mm
3.66 inches
spacing of bars
Spacing of bars
8.858 inches
0.0148 in
=
=
f't/Ec
L'/2H'
225.00 mm
w x 106/(0.076 x (dcA)1/3)
(psi)
31368.34 psi
w/18(KRECTTE-f't/Ec)
0.00015 (for Seasonal Cracking)
4.090 ft
0.470
B(Width of RC element)
12 inches
0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')
No of bars in width B
NB
=
Temp Renf as per calculations
=
=
1.355
0.5421 sq.in per given spacing of 8.858 inches
15.56 cm2/m
Min renf
=
19.18 cm2/m
(cl.6.4.4 of Report on concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)
(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)
flexure renf from output
32.17 cm2/m
51.35 cm2/m
32.1
1.325
Volume of concrete(V)
m3
m2
Effective V/S
15.7
1.325 m
4.35 feet
7.40 feet
=
97.0 oF
(Fig-2) of Report on Concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16
Cement content
H
2.25
(from charts)
360 Kg/m3
19 oC
4990000 psi
Grade of concrete
25
28500 Mpa
=
multiplier(m)
4132500 psi
1/(1+(AgEc/AfEf)
0.751
L/H
14.27 >2.5
mKR
KR
((L/H-2)/(L/H+1))h/H
2.25
KR
0.80
for L/H>=2.5
KRE
0.604
28.41/KRE
47.07 oF
6 x sqrt(fc)
323.11 psi
0.00000528 /oF
Crack-width factor
0.005
clear cover
75
=
=
0.375 mm
0.0148 inches
CALCULATION OF REINFORCEMENT
Dia of bar used
36 mm
Effective cover(dc)
93 mm
3.66 inches
spacing of bars
Spacing of bars
8.858 inches
0.0148 in
=
=
f't/Ec
L'/2H'
225.00 mm
w x 106/(0.076 x (dcA)1/3)
(psi)
31368.34 psi
w/18(KRECTTE-f't/Ec)
0.00015 (for Seasonal Cracking)
5.155 ft
0.593
B(Width of RC element)
12 inches
0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')
No of bars in width B
NB
=
Temp Renf as per calculations
=
=
1.355
0.4167 sq.in per given spacing of 8.858 inches
11.96 cm2/m
Min renf
=
19.18 cm2/m
(cl.6.4.4 of Report on concrete placement temperature and pour thickness
TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)
(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)
flexure renf from output
32.17 cm2/m
51.35 cm2/m