17 Apr 08
D. Perry
L. Albrecht
I. Smith
3 Mar 08
D. Perry
L. Albrecht
I. Smith
8 Oct 07
L. Albrecht
D. Perry
I. Smith
24 July 06
IFD
Al
Tansiongco
I. Mahmud
B.
Bradfield
6 Jun 06
IFD
A.
Tansiongco
I. Mahmud
B.
Bradfield
23 Jan 06
IFD
Al
Tansiongco
J. Britton
T. G.
Jayanth
Rev.
Date
By
KBR
KBR
CLIENT
Chkd
App
App
Description
CONTENTS
PURPOSE..................................................................................................... 4
2.0
GENERAL..................................................................................................... 4
3.0
4.0
DEFINITIONS................................................................................................ 5
5.0
RESPONSIBILITIES........................................................................................6
6.0
7.0
DOCUMENTATION SUBMITTALS...................................................................15
8.0
9.0
NAMEPLATES.............................................................................................24
10.0
11.0
12.0
13.0
ATTACHMENTS........................................................................................... 26
Page 2 of 59
KBR
ABBREVIATIONS
ARA
DPEM
SH
KBR
ITP
LNG
PSV
QCP
SDR
ONML
Page 3 of 59
KBR
1.0
PURPOSE
The purpose of this document is to define the Skikda New LNG Train Project
responsibilities for the coordination of all parties involved in the inspection and test
activities, at fabrication shops and jobsite that are subject to the approval and
acceptance of the Algerian Regulatory Authority (ARA), through agencies Direction du
Patrimoine Energie et des Mines (DPEM), and National Office of Legal Metrology
(ONML).
2.0
GENERAL
The requirements of this procedure apply to the equipment, devices and material that
are subject to ARA control. These requirements do not have any effect on the
inspections required by Purchaser and any waiver by ARA is not to be construed as a
waiver of any other requirements for inspection by Purchaser or any other obligation of
the Supplier noted elsewhere in the Purchase Order.
Supplier and Suppliers sub-suppliers will be subject to inspection of all materials and
equipment being manufactured or supplied.
The Supplier shall pass on the
requirements of these DPEM inspections to all of the Suppliers contracts (purchase
orders) to its sub-suppliers. These inspections are in addition to any other inspection
or testing requirements noted elsewhere.
The Supplier will undertake to facilitate all inspections made by ARA, Client personnel,
or other third parties related to ARA or Owner, under authority of ARA, on the premises.
The Supplier further undertakes to facilitate ARAs attendance at all inspection or
acceptance tests planned or required by contract to be conducted by the Supplier or
Sub-supplier.
REFERENCE: DPEM Circular No. 2 & 4, Algerian Decrees 90-245, 90-246 & 88-35
3.0
KBR
A Preliminary and a Final Dossier are required for all the equipment and material falling
within DPEMs scope.
For off-the-shelf, (stock) items of piping materials safety systems components,
electrical power cables or other electrical items (5.5 Kv and higher) that fall under the
DPEM criteria, the supplier shall submit a Technical File
The contents of the dossiers above are detailed in Sections 7.4, 7.5 and 7.7 of this
procedure.
All documents must be provided In French & English and in quantities shown in Section
10, and as summarized in Attachment 3.
4.0
DEFINITIONS
The definitions below refer to terms used in this procedure and are used for
convenience of reference in this procedure only. Contractual terms shall be as defined
in the Project Terms and Conditions of Purchase.
Preliminary & Final Dossier: A compilation of mandatory documents which provides a
record of quality checks performed by the Supplier throughout the design and
manufacture of the item. The Dossiers require Algerian Regulatory Authority
approval.
Direction du Patrimoine Energie et Mines (DPEM): An Algerian Regulatory Authority
Agency responsible for compliance with applicable decrees and regulatory technical
controls, and for performing independent Inspection and Witness of Equipment Test
at fabrication locations and Algerian construction Sites.
National Office of Legal Metrology (ONML): An Algerian Regulatory Authority Agency
responsible for compliance with applicable decrees and regulatory technical controls,
and for performing independent Inspection and Witness Testing of Fiscal Metering
Package at Suppliers location and Algerian construction Sites.
Quality Control Plan (Inspection & Test Plan): Purchase Order specific document that
clearly identifies in chronological and sequential order all manufacturing Inspection &
Testing requirements performed by the Supplier / Sub-supplier with facility for all
parties to indicate proposed Quality Control activities. The Quality Control Plan
identifies the witness and hold points for the Supplier, Purchaser, Owner and ARA.
Owner and ARA witness and hold points will be provided by Purchaser
Supplier Document Requirements (SDR): A listing of documents required to be
submitted to Purchaser including document submittal codes and target dates for
submittal.
Inspection and Test Plan (ITP): A Purchasers quality control form contained in
requisitions.
Page 5 of 59
KBR
Originals: The supplier document that contains wet stamp, signatories and endorsed
original from which copies are made. The originals of the Dossiers shall be delivered
to the Purchaser.
5.0
RESPONSIBILITIES
5.1
Purchaser
The Purchaser (KBR) is responsible for the following:
Facilitating the service agreement between Purchaser and the relevant ARA.
Advising the Supplier of relevant ARA involvement by including this procedure in the inquiry
(request for quotation) documents.
Ensuring Purchaser Inspector performs a review of Preliminary & Final Dossier at Supplier
location prior to submittal to Purchasers home office for processing and forwarding to
ARA.
Controlling and expediting the submission and distribution of the Suppliers Preliminary and Final
Dossier to the relevant ARA and Owner.
Ensuring the Purchasers inspector performs the required activities prior to the ARA Inspection.
Issuing all inspection and test notifications to relevant ARA per Section 11.0, and confirmation of
ARA inspection activities to the Supplier.
5.2
Supplier
The Supplier is responsible for the following:
5.2.1
Identifying, in the Bid, all items, components and/or appurtenances in the scope of
supply that meet the criteria of paragraph 6.0 and, hence, are subject to ARA
involvement. This is particularly important for equipment such as compressors, control
valve actuators, hydraulic power supplies and the like that contain piping,
accumulators, filters and other components and appurtenances that are dependant on
the Suppliers design.
5.2.2
Submitting to Purchaser an overall schedule, including tests, within the time shown
after receipt of Purchase Order in the Purchasers SDR included in the Purchase Order.
5.2.3
5.2.4
Page 6 of 59
KBR
5.2.5
5.2.6
Issuing to the Purchaser all inspection notifications for DPEM / ONML activities as
indicated in the agreed Quality Control Plan. Notifications shall be made at least 45
days in advance the tests in accordance with the production and testing schedule.
(See Section 11.0)
5.2.7
Ensuring the applicable documentation is prepared and available for DPEM inspectors
review prior to test, per Section 8.1.
5.2.8
Submitting Final Dossier to Purchaser within thirty (30) calendar days after successful
completion of scheduled works and prior to shipment.
5.2.9
Ensuring a French and English copy of each approved Preliminary Dossier is retained
for DPEM Inspectors review per paragraph 8.1.
5.3
DPEM / ONML
The DPEM/ONML is responsible for the following:
5.3.1
Approving the Preliminary and Final Dossier of designated equipment and materials as
indicated in the Convention (Contract).
5.3.2
Reviewing and approving Preliminary Dossier and issuing approval consent within forty
five (45) calendar days of submission.
5.3.3
5.3.4
ONML is responsible for the Independent Inspection and Witness calibration of Fiscal
Metering packages.
5.3.5
Endorsing all relevant Final Dossier documents at Suppliers facility (Documents 19, 20
& 22) during their visit.
Page 7 of 59
KBR
6.0
6.1
General:
If a device (pressure container) or material is within the DPEM scope as defined below,
the supplier is notified by the inclusion of this procedure in the procurement package.
Members of DPEM will conduct an inspection or witness testing. If DPEM does not
attend, they may request the Purchaser to assign a third party to inspect or witness on
their behalf.
6.2
6.2.1
6.2.2
The characteristic number; i.e. the product of the design pressure expressed in
BarG, multiplied by the capacity expressed in Liters, exceeds the number 80.
6.2.3
Storage Tanks
The hydrocarbon, hazardous product and fire water storage tanks are within the scope
of DPEM.
The water storage tanks (other than fire water) are not subject to DPEM inspection
Page 8 of 59
KBR
Tanks operating at atmospheric pressure, with direct access to the atmosphere, are
generally excluded from the scope of DPEM. Supplier is required to notify and obtain
the advice of the Purchaser for any tank designed to contain hazardous liquids which
could, under maximum overfill conditions, be subject to a hydrostatic pressure such that
the stress in any member is equal to, or exceeds, five eighths (5/8) of the elastic limit of
the material being used.
6.2.4
6.2.5
Turbines
DPEM does not witness the testing of the turbines but will witness its components that
are under DPEM jurisdiction (e.g. lube oil systems/piping systems).
6.2.6
B.
C.
6.2.7
Appurtenances
Supplier is reminded that electrical ancillaries, instruments, filters and interconnecting
pipe work will be subject to DPEM scrutiny if they exceed the characteristics defined in
the relevant paragraphs of this procedure.
6.2.8
5
Page 9 of 59
KBR
Five eights (5/8) of the yield stress (0.2% permanent elongation) of the metal at maximum
operating temperature.
If the operating conditions are likely to cause creep of the metal, the work rate must also be
limited according to the specified temperature and service life.
6.2.9
6.2.10
B.
Engines are not normally subject to DPEM scrutiny unless they drive, either directly
or indirectly, fire pumps or other essential or emergency service. In these cases
Preliminary and Final Dossiers shall be submitted.
C.
6.2.11
Transformers
B.
MCC
C. Switchgears
Page 10 of 59
KBR
Generators
F.
Motors
G. Cables
DPEM retains an interest in emergency power supplies and other safety related
aspects such as grounding arrangements, lightning protection, interlocks etc. Details of
emergency switchboards and safety related aspects may be required.
DPEM shall attend final acceptance tests of electrical appliance to confirm compliance
with IEEE, IEC and NEMA regulations
6.2.12
Instruments
With the exception of Pressure Safety valves, instruments and instrument material are
not normally subject to DPEM inspection.
A second Algerian Authority ONML (National Office of Legal Measurement) will be
concerned only with legal measuring components or systems, such as Fiscal Metering
devices.
A.
Pressure Safety Valves are within the scope of DPEM. These valves need to be
checked for opening and closing pressures and tightness. Their primary concerns will
be the disposition of PSVs within a system, the witnessing of off-line tests and correct
installation. Design appraisal and witnessing of tests of individual PSVs in the factory
will, if at all, be limited to large, novel or particularly critical applications. Supplier shall
notify Purchaser of any non -standard items and obtain advice. The valve body shall
be classified by the criteria shown for piping materials.
Control valves that will contain potentially hazardous gasses or liquids under pressure
may also be within the scope of DPEM, in which case the above requirements for
design appraisal and testing shall apply.
DPEM shall attend hydrostatic testing of Pressure Safety Valves and Control Valves.
(Functional Test, Pressure Setting, Leak Test).
B.
KBR
suitable for use in the area specified and defined by the Hazardous Area drawings, and
as stated in the Purchase Order or Subcontract and its attachments.
D. Certifications
Suitable internationally recognized Hazardous Area Certification shall be submitted to
PURCHASER for all explosion proof electrical instruments intended to be located in
hazardous areas.
6.2.13
The Characteristic Number, i.e., the product of the design pressure expressed
BarG, multiplied by the internal diameter expressed in mm, exceeds the number
1500.
B.
6.2.14
Valves
Valves, other than control valves and PSVs, made in accordance with internationally
recognized Codes and Standards are considered by DPEM as pipe fittings.
For non-standard valves, the criteria laid down for Pressure Vessels in Section 6.2.2 will
apply.
DPEM shall attend hydrostatic testing of valves within its scope (body hydro and leak
test).
6.2.15
Process Pipe & Pipe Fittings (Supplier shop fabrication and field fabrication)
Pipe and pipe fittings for use in services other than steam and water are within the
DPEM inspection scope if the following three (3) conditions are simultaneously met:
A.
Page 12 of 59
KBR
B.
Characteristic Number > 1500 (the product of the design pressure expressed in
BarG multiplied by the internal diameter expressed in mm, exceeds the number
1500)
Explosive, flammable, corrosive or toxic gases or liquids
C. Requirements for Steam and Super-heated water pipes are not applicable to the
Skikda New LNG Train Project due to the diameter of the pipe.
NOTE: Cold water pipes are not within the DPEM inspection scope.
6.2.16
Piping Specialties
Piping specialties are considered by DPEM as pressure retaining items. The criteria
laid down for pressure vessels in paragraph 6.2.2 of this procedure apply.
6.2.17
A.
Fire fighting systems are within the scope of DPEM. DPEM will appraise firewater
distribution, drawings, firewater demand calculations, the positions of hydrants,
monitors, hose-reels etc.
Fire extinguishers and other mobile or portable fire fighting devices shall also be
examined for suitability of design and construction as well as their disposition on site.
DPEM shall attend hydrostatic testing and functional testing for all fire fighting
equipment.
B.
Bottles of Carbon Dioxide, Nitrogen and other gasses are within the DPEM scope if the
following two conditions are simultaneously met:
The product of the design pressure expressed in BarG multiplied by the capacity
expressed in Liters; exceeds the number 10.
Page 13 of 59
KBR
NOTE: CO2 and N2 gas bottles are typically supplied to the Supplier direct from their
Sub-supplier, under the Suppliers responsibility, in accordance with the specification
provided. Supplier shall submit Preliminary and Final Dossiers in accordance with this
procedure. When the DPEM Engineer visits site and reviews the dossiers, they will
stamp the bottles alongside the supplied serial number, manufacturer name and date of
manufacture. These stamps are required to enable refilling of the bottles in Algeria.
C. Fire Extinguishers (with parts having a capacity greater that five (5) liters) are within the
DPEM scope if the following two (2) conditions are simultaneously met: (Ref Decree 90245, Article 2, item 5)
The product of the design pressure expressed in BarG, multiplied by the capacity
expressed in Liters, exceeds the number 80, or if the capacity is greater that one (1)
liter, the product is ten (10)
D. Fire & Gas Detection Equipment (in Plant Safety Dossier) gas, flame, smoke, cold
and heat detectors and alarms shall be subject to DPEM approval. Location
drawings and details of each detector type deployed shall be submitted.
The fire and gas system logic, panels, and data transmission is subject to DPEM
review.
6.2.18
DPEM shall attend functional tests of Fire and Gas Detection systems.
6.2.19
A.
B.
C.
D.
E.
Material used.
Flowline pipelines that connect either the wellhead to the center for hydrocarbon
gas processing or separation and processing centers to the re-injection facilities, or
the separation centers to the flow main centers (C.P.C).
B.
C. Sewers that connect either the processing centers to the main pipelines, or either
flowline main centers to main pipelines, processing and separation centers located
Page 14 of 59
KBR
For package units, skids and systems, the Supplier is to review the individual
components to see if they fall under DPEM regulations, if so, each individual item
requires a Dossier.
The Supplier shall supply KBR with a detailed list of each individual component and
their characteristics that relate to DPEM criteria for that type of equipment (ex.: design
temperature and pressure, flow rate, volume and size).
7.0
DOCUMENTATION SUBMITTALS
This Section details documents to be prepared and submitted by suppliers,
subcontractors and/or the contractor, and the general sequence of submittal. (See also
paragraph 10.0 and Attachment 5)
7.1
7.2
KBR
7.4
Preliminary Dossier
Supplier shall prepare Preliminary Dossier in accordance with this document and
submit to Purchaser. The Purchaser will check the Dossier and submit to DPEM for
approval.
Preliminary Dossier for items relevant to DPEM involvement is to be submitted to the
Purchaser preferably 6 weeks after purchase order / sub-order placement but no less
than 50 calendar days prior to commencement of fabrication of the relevant item.
Purchaser shall submit the Preliminary Dossier to the DPEM for approval on the
Suppliers behalf. Purchaser shall also expedite the required approval and inform the
Supplier when this has been obtained.
The Preliminary Dossier shall be composed of the documents mentioned below.
The Preliminary Dossiers shall be separate to the Final Dossier and shall be complete
with a cover sheet (per Attachment 1) and an index with clearly indicated section
dividers containing the relevant document number, indicating selected contents.
Provide a Table of Contents, (if more than one volume, each volume shall have Table
of Contents)
Section 1
Section 2
KBR
Section 3
Section 4
Section 5
Section 6
Section 7
Section 8
Quality Control Plan (Inspection and Test Plan) (Att 1, Doc 8).
The above Dossier, once completed per sample Attachment 1, shall be sent in
accordance with Purchase Order SDR to Purchasers Document Control Center, who
shall submit them to the relevant parties.
The Supplier shall not proceed with fabrication activities before obtaining DPEM
approval. Time frame for approval, including transmission period is 7 weeks after
receipt of the Preliminary Dossier by the Purchaser who checks it and sends it to
DPEM. After this period the Purchaser shall authorize the Supplier to commence
fabrication in the absence of a DPEM reply.
Notes:
1.
2.
3.
For equipment description (Section 4) for reactors, columns, heat exchangers, air
coolers exchangers, compressors, separators, filters, pressure vessels and tanks,
the DPEM model (Attachment 1, Document 4) shall be used.
For equipment description for other pressure devices (valves, pressure safety
valves), electrical equipment and material and for the overhead cranes, the DPEM
Page 17 of 59
KBR
5.
The Welding Procedure Specification (WPS) is required only for pressure devices,
tanks, valves and line pipes for pipeline.
6.
7.
8.
9.
10. The Preliminary Dossier is a separate document from the Final Dossier.
11. The Purchasers assigned inspector, where possible, will review and endorse the
Preliminary Dossier at the Supplier / Sub-supplier location to ensure correct
compilation prior to submittal to the Purchaser.
12. If changes to the work are made after approval of the Preliminary Dossier, for
example, item tagging, or instrument manufacturer or model number, a revised
dossier must be submitted in the same manner as the original.
13. The requirements for endorsement and stamping by the Chamber of Commerce,
Department of State or other such entity prior to stamping by the Algerian
Consulate vary from country to country. PURCHASER advises the Supplier to
verify the requirements in their country as soon as possible. In some areas the
Supplier may find a document authentication service provider to obtain the
endorsements and stamps.
7.5
Final Dossier
The Supplier shall prepare a Final Dossier in accordance with this procedure as per
Attachment 2. The Final Dossier is separate from the Preliminary Dossier and shall be
completed with a cover sheet (Attachment 2) and an index, with clearly indicated
section dividers containing the relevant document number, indicating section contents.
The Final Dossier for relevant items of DPEM involvement is to be submitted to the
Purchaser within 30 calendar days after successful completion of scheduled works and
prior to shipment.
Page 18 of 59
KBR
The Purchasers assigned inspector will review the Final Dossier at the Suppliers
location on successful completion of scheduled DPEM test activities to ensure correct
compilation prior to submittal to Purchaser.
Provide a Table of Contents (if more than one volume, each volume shall have Table of
Contents).
Section 10 Copy of DPEM letter of Preliminary Dossier approval (Att 2, Doc 10).
Section 11 Copy of letter or fax requesting the presence of DPEM Inspector (Att 2, Doc
11) (Purchaser will provide to Supplier).
Section 12 Copy of DPEM response to request (Att 2, Doc 12) (Purchaser will provide
to Supplier).
Section 13 Welding Procedure Qualification Record (PQR) (Att 2, Doc 13).
Section 14 Weld Maps, Welder Qualification Record and logs of welders who
performed on the equipment manufacture (Att 2, Doc 14).
Section 15 Material Test Certificates (MTRs): Legible certificates, identifying materials,
parts, components, including welding electrodes (Att 2, Doc 15).
Section 16 NDE reports (Att 2, Doc 16)
Section 17 Post Weld Heat Treatment chart, if applicable (Att 2, Doc 17)
Section 18 Internal & External Inspection certificate (Att 2, Doc 18) (2 originals in
English & French) signed by attending DPEM or his delegated
representative, Purchasers & Suppliers Inspector
Section 19 Hydrostatic Test Certificates (Att 2, Doc 19). (2 originals in English &
French) signed by attending DPEM or his delegated representative,
Purchasers & Supplier Inspector to also include Suppliers test certificates
or ASME U1A form or TEMA forms.
Section 20 Copy of DPEM Pro Forma nameplate (French) for Pressure Vessels, DPEM
Model 21, (Att 2, Doc 20) Note: only the French version is required to be
affixed to the pressure vessel.
Section 21 Test Certificate (Att 2, Doc 21) (2 originals in English and 1 French)
signed by attending DPEM or his delegated representative, Purchasers &
Suppliers Inspectors. For electrical equipment, identify the tests that were
conducted. (See paragraph 8.2.6) This form is Not Applicable if the only test
required for the equipment is a hydrostatic test which is evidenced by
Attachment 2 Document 19. (See paragraph 9.0)
Section 22 Copy of DPEM Pro Forma nameplate (French) for Heat Exchanger
equipment DPEM Model (Att 2, Doc 22) Note: only the French version is
required to be affixed to the heat exchanger.
Page 19 of 59
KBR
Section 23 Photocopy of DPEM French nameplate and other nameplates (i.e. ASME
Code Nameplate, TEMA nameplate, etc., if applicable).
Section 24 Copy of Supplier equipment Final/As-Built drawings. This shall include the
drawings in Section 6 of the Preliminary Dossier plus any other applicable
drawings.
7.6
B.
Flare network
7.7
E.
Grounding network
F.
Technical File (For Safety System Components and certain other items as
indicated in 7.6 )
To facilitate approval, the Supplier shall prepare a Technical File containing the
documents listed below as appropriate, and send them to the Purchaser. All
documents must be provided in French & English.
Section A A letter of request for approval of the Technical File (Attachment 1
Document 1). Supplier to complete and insert (2 originals in English &
French).
Section B Certification by the Chamber of Commerce of the Fabricators or Stockists
Signatures and Algerian Consulate Stamp (Att 1, Doc 2) (2 originals in
English & French). Requires endorsement and stamping by Chamber of
Commerce or State Dept. & Algerian Consulate. This document is the
Suppliers responsibility for completion including the signature of the local
Chamber of Commerce and the stamp of the nearest Algerian Consulate to
the place of fabrication.
Section C Certificate of Conformity and of Internal and External Inspections (Att 1,
Doc 3) (2 originals in English and French). It requires endorsement and
stamping by Chamber of Commerce & Algerian Consulate. This document
Page 20 of 59
KBR
8.0
8.1
At Suppliers Shop
8.1.1
DPEM will witness testing including, but not limited to, tests listed here.
A.
B.
KBR
All Hydrostatic Tests Pressures to be a minimum of one and a half (1.5X) times
the Design Pressure.
F.
8.1.2
For all inspections, Supplier shall make available for Purchasers & DPEM inspection,
the complete inspection, test records and certificates, whether witness or nonwitnessed.
8.1.3
The Supplier shall also have available a copy of each approved Preliminary Dossier (for
the DPEM Inspector).
8.1.4
If the results of the test are satisfactory, DPEM Inspector (or his delegate) witnessing
the testing shall sign the test certificates (Document 18, 19 and/or 21), jointly with
representatives of Purchaser and the Supplier. The DPEM Inspector shall then stamp
the inspected equipment.
8.1.5
In the event or non-reply or non-arrival of DPEM Inspector to the location of tests, these
shall be carried out as scheduled in the presence of Purchaser and the agreed
assigned Suppliers Third Party Inspectors. The test results shall be submitted to
Purchaser then forwarded to DPEM for review and approval.
8.2
Typical Tests
Typical DPEM Tests carried out which fulfill the criteria indicated in this procedure are
as follows:
8.2.1
8.2.2
B.
Hydrostatic Test
Reports on other field or shop tests and inspections, signed by Engineer and
Client, shall be made available to DPEM representative.
8.2.3
Gas Compressors:
hydrostatic test).
8.2.4
Relief Valves: Verify the opening and closing pressures and seat tightness.
8.2.5
8.2.6
KBR
A.
B.
Check of wiring
8.2.7
8.2.8
8.2.9
9.0
NAMEPLATES
Page 23 of 59
KBR
Supplier shall affix the Standard Code Stamped Nameplate for ASME or TEMA code
(as required). Additionally, Supplier is to affix a DPEM model Nameplate, in French, in
accordance with Attachment 2 Document 20 or 22 on all pressure-containing
equipment in accordance with the Purchase Order, and as follows:
10.0
Character and stamping to be preferably 6mm high but not less than 4mm high
with a depth of 0.5mm.
The DPEM Nameplate (French) is to be stamped by the DPEM, for equipment that
has been witnessed by DPEM.
Electrical equipment > 5.5 kV that has been involved with the DPEM does not
require the French nameplates.
10.1
Quantities
Documents identified for submittal to the Algerian Regulatory Authorities shall be
submitted to Purchaser in the following quantities and format:
10.1.1
If dossiers are in both a French version and an English Version, the following quantities
are required:
Preliminary Dossiers
For DPEM
1 original French
1 original French
For Client
For Purchaser
Totals:
Page 24 of 59
KBR
If bilingual dossiers are supplied then the following quantities are required:
Preliminary Dossiers
For DPEM
1 original
1 original
For Client
2 copies
2 copies
For Purchaser
Totals:
2 originals, 4
electronic copy
2 originals + 3 copies
electronic copy
10.2
copies.
One
(1)
One
(1)
Format
The Preliminary Dossier, Final Dossier, Technical File and Safety Dossier are all
separate and shall be in hard cover 3 or 4 ring binders.
Provide a general Table of Contents. If more than one (1) volume, each volume shall
have a Table of Contents.
These Dossiers shall have section dividers and numbered accordingly. Each section
shall have a title page. If a section is not relevant to a particular item of material or
equipment, the divider shall be included and the title page shall be annotated Not
Applicable.
10.3
11.0
Page 25 of 59
KBR
The Purchasers ARA Liaison coordinator, on receipt of the notifications from the
Supplier, will forward to the relevant ARA the request for Inspection per Attachment 4.
The relevant ARA will confirm their intention on the indicated inspection at least
fourteen (14) calendar days prior to the defined inspection date, Purchasers ARA
Liaison coordinator will relay it to the Supplier at least seven (7) days prior to Defined
Inspection date with a copy to Purchasers Project Quality Control Manager.
In the event of a non attendance reply from the ARA, the Purchasers ARA Liaison
coordinator may instruct the Supplier to assign a third party inspector to perform
activities on behalf of ARA on the schedule date.
The PURCHASER assigned third party inspector will not stamp nameplate on behalf of
the ARA.
12.0
13.0
ATTACHMENTS
Attachment 1
Documents 1 8
Attachment 2
Documents 10 24
Final Dossier
Attachment 3
Attachment 4
Attachment 5
Attachment 6
Attachment 7
Equipment Listing
Page 26 of 59
KBR
COMMANDE NO.. /
PURCHASE ORDER NO. _________________________
DOSSIER DETUDE PRELIMINAIRE
PRELIMINARY DESIGN DOSSIER
CONTRAT / CONTRACT
KBR
RAISON SOCIALE OU FOURNISSEUR / COMPANY OR VENDOR
Page 27 of 59
KBR
SOMMAIRE
TABLE OF CONTENTS
4. ETAT DESCRIPTIF
4. DESCRIPTION STATEMENT
5. NOTES DE CALCUL
5. DESIGN CALCULATIONS
7. SPECIFICATIONS DE PROCEDURES DE
SOUDAGE (W.P.S)
(9 Not used)
( 9 Not used)
Page 28 of 59
KBR
DOCUMENT No 1
DOCUMENT No 1
LETTRE DE DEMANDE
DAPPROBATION
MINISTERE DE LENERGIE
MINISTERE DE LENERGIE
N/Rf:
Our Ref :
V/Rf:
Your Ref :
Monsieur le Directeur,
Dear Sir,
lquipement..
repre
n.., destin tre incorpor aux
installations des ouvrages concentrs du projet
dcrit ci-dessus.
dagrer,
Monsieur
le
salutations.
Yours faithfully,
Project Director
Directeur du Projet
Page 29 of 59
KBR
DOCUMENT No. 2
DOCUMENT No. 2
FABRICANT :
FABRICATOR :
NOM :
NAME :
CACHET DE LA SOCIETE:
COMPANY STAMP :
Nom :
Name :
Signature :
Signature :
Nom :
Name :
Nom :
Name :
Nom :
Name :
Nom du Fabricant :
Fabricators Name :
Cachet :
Stamp :
CONSULAT ALGERIEN
ALGERIAN CONSULATE :
Date :
Date :
Signature :
Signature :
Timbres apposer
Stamp to be affixed
Page 30 of 59
KBR
DOCUMENT No 3
DOCUMENT No 3
Je soussign :
I, the undersigned :
Nom :
Prnom :
First Name :
Last Name :
Certify
that
the
equipment
(
no.
), destined to the
installations of
will be designed and
fabricated in accordance with the documents submitted
to the Direction of Energy and Mines Patrimony
Protection (DPEM) and in strict conformance with the
regulations applicable in Algeria.
In
Le,
on,
LE FABRICANT
FABRICATOR
CONSULAT ALGERIEN
ALGERIAN CONSULATE
Timbre apposer
Stamp to be affixed
Page 31 of 59
KBR
DOCUMENT No 4
DOCUMENT No 4
ETAT DESCRIPTIF
DESCRIPTION STATEMENT
Lieu :
SKIKDA / ALGERIE
ETAT DESCRIPTIF
DESCRIPTION STATEMENT
Ordre dAchat No :
No Item (repre) :
No Fabrication :
Service
:
Nom et Adresse du Fabricant :
Anne de Construction:
Purchase Order No :
Item Number (reference) :
Fabrication No :
Service :
Fabricators Name and Address :
Year of Fabrication
CARACTERISTIQUES TECHNIQUES
TECHNICAL CHARACTERISTICS
Dnomination de lappareil
Forme gnrale :
Fluide vhicul : hydrocarbure eau vapeur ou
autre
Pression de calcul :
Pression maximale de service :
Pression essai :
Temprature de calcul :
Temprature de service :
Temprature dessai :
Matriaux Utiliss :
Epaisseur(s) :
Charge limite de rupture :
Contrainte admissible :
Coefficient de joint :
Radiographie :
Traitement thermique :
Surpaisseur de corrosion :
Essais non destructifs :
Volume intrieur :
Page 32 of 59
KBR
DOCUMENT No. 5
DOCUMENT No. 5
NOTES DE CALCUL
DESIGN CALCULATIONS
Page 33 of 59
KBR
DOCUMENT No. 6
DOCUMENT No. 6
Page 34 of 59
KBR
Page 35 of 59
KBR
DOCUMENT No. 8
DOCUMENT No. 8
Dcrire :
Describe :
lpreuve hydrostatique
Test activities:
Page 36 of 59
KBR
COMMANDE No. /
PURCHASE ORDER No. _________________________
DOSSIER FINAL
FINAL DOSSIER
CONTRAT / CONTRACT
KBR
Page 37 of 59
KBR
SOMMAIRE
TABLE OF CONTENTS
10. LETTRE
DAPPROBATON
DU
DOSSIER
DETUDE PRELIMINAIRE EMISE PAR DPEM
11. LETTRE
OU
TELEX
EMIS
PAR
LENTREPRENEUR DEMANDANT LA PRESENCE
DE
L INSPECTEUR
DPEM
POUR
LES
EPREUVES ET CONTROLES EN USINE
11. LETTER
OR
TELEX
ISSUED
BY
THE
CONTRACTOR REQUESTING THE PRESENCE
OF THE DPEM INSPECTOR FOR TESTS AND
INSPECTIONS AT THE FABRICATOR SHOP
DES
13. QUALIFICATION
CERTIFICATES
WELDING PROCEDURES (PQR)
OF
THE
14. ATTESTATION
DE
QUALIFICATION
DES
SOUDEURS ET OPERATEURS DE SOUDAGE
VALIDES A LA DATE DES OPERATIONS DE
SOUDAGE
16. DETAILED
REPORTS
OF
THE
NON
DESTRUCTIVE EXAMINATION CARRIED OUT
ON EQUIPMENT WELDS OR SURFACES
AND/OR THEIR PARTS, PLUS REPORTS OF THE
DESTRUCTIVE TESTING PERFORMED DURING
THE FABRICATION.
18.
22. PRO-FORMA
EXCHANGER
Page 38 of 59
INTERNAL AND
CERTIFICATES
EXTERNAL
NAME
PLATE
INSPECTION
FOR
HEAT
KBR
DOCUMENT No 10
DOCUMENT No 10
Page 39 of 59
KBR
DOCUMENT No 11
DOCUMENT No 11
MINISTERE DE LENERGIE
MINISTERE DE LENERGIE
N/REF :
OBJET : P.O #
No :
MATERIEL :
VALEUR DU MATERIEL :
COMMANDE No :
OUR REF. :
SUBJECT : P.O. NUMBER
No :
MATERIAL :
MATERIAL VALUE
ORDER No :
Please
confirm
the
attendance
of
your
representative or advise of the reference of the
delegation approval.
Salutations respectueuses
Yours faithfully
Page 40 of 59
KBR
DOCUMENT No 12
DOCUMENT No 12
Page 41 of 59
KBR
DOCUMENT No 13
DOCUMENT No 13
Page 42 of 59
KBR
DOCUMENT No 14
DOCUMENT No 14
Page 43 of 59
KBR
DOCUMENT No 15
DOCUMENT No 15
Page 44 of 59
KBR
DOCUMENT No 16
DOCUMENT No 16
Page 45 of 59
KBR
DOCUMENT No 17
DOCUMENT No 17
Page 46 of 59
KBR
DOCUMENT No 18
DOCUMENT No 18
Equipement :
Equipment :
Dsignation :
Designation :
No dItem :
Item No :
Service :
Service :
Fabricator :
Plan(s) No. :
Drawing(s) :
Fabricant :
Nom Signature :
Name Signature
Date :
Date :
Visiteur Dlgu :
Delegated Inspector :
Nom Signature :
Name Signature
Date :
Date :
Page 47 of 59
KBR
DOCUMENT No 19
DOCUMENT No 19
HYDROSTATIC CERTIFICATE
Dsignation Equipement :
Equipment Designation :
No dItem :
Item No :
Service :
Service :
pressure of :
Bar effectif :
Active Bar :
Dure :
Duration :
Fabricant :
Fabricator :
Nom Signature :
Name Signature :
Date :
Date :
Visiteur Dlgu :
Delegated Inspector :
Nom Signature :
Name Signature :
Date :
Date :
Page 48 of 59
KBR
DOCUMENT No 20
DOCUMENT No 20
No. de
fabrication/Item
Volume
Fabrication/Item
No.
Volume
Fluide
Poids vide
Type of Fluid
Empty Weight
Code Utilis
Surepaisseur de
Corrosion
Code Used
Corrosion
Allowance
Traitement
Thermique
Radiographie
Thermal
Treatment
Radiography
Press Max
Service
Max Service
Pressure
Pression de
Calcul
Temperature de
Calcul
Design Pressure
Design
Temperature
Pression
dEpreuve
Hydrostatique
Date dEssai
Hydrotest Pressure
Test Date
Pour
For
Conu par
Designed by
Fabriqu par
Fabricated by
DOCUMENT No 21
DOCUMENT No 21
Page 49 of 59
KBR
Dsignation quipement :
Equipment Designation:
No Item :
Item No:
Service :
Service:
Bar effectif :
Active Bar:
Dure :
Duration:
(ou)
(or)
Dsignation dessai :
Fabricant :
Fabricator:
Date :
Signature :
Visiteur Dlgu
Delegated Inspector:
Date :
Signature :
Signature:
Date :
Date:
Signature :
Date :
Date:
Signature :
Note : (*)
certificats dessais pour les quipements
lectriques et de levage seront prpars et contresigns
Page 50 of 59
KBR
DOCUMENT No 22
MODELE DE PLAQUE DIDENTIFICATION POUR
ECHANGEUR DE CHALEUR
No dItem
Calandre
Tube
Shell
Tube
Fluides
Press Max Service
Press Calcul
Design Pressure
Max Service
Temperature
Surpaisseur de Corrosion
Corrosion Allowance
Hydrotest Pressure
Traitement
Thermique
Thermal Treatment
Radiographie
Radiography
Volume
Volume
Surface
Surface
No
No
Date dessai
Test Date
Poids vide/faisceau
Empty weight/bundle
Pour
For
Conu par
Designed by
Fabriqu par
Fabricate by
Page 51 of 59
KBR
DOCUMENT No 23
DOCUMENT No 23
PHOTOCOPY OF NAMEPLATES
DOCUMENT No 24
DOCUMENT No 24
Page 52 of 59
KBR
Page 53 of 59
KBR
The table below identifies the required documents required for the DPEM Preliminary Dossier
and necessary translations.
Doc No.
Description
1.
2.
3.
4.
5.
6.
7.
8.
9.
Design Calculations.
Detailed drawings with index.
Welding procedure specifications (WPS)
Inspection and testing plans
Deleted
Language
Translation
English &
French
English &
French
English &
French
English &
French
English
English
English
English
The stamp of the nearest Algerian consulate of the fabrication place is required for all documents
marked by an asterisk (*). The stamp may be on the back of the form or on a separate page duly
referenced.
The stamp of the Fabricators local Chamber of Commerce is required for all documents marked **
(as applicable) The stamp may be on the back of the form or on a separate page duly referenced.
Required Documents for DPEM Final Dossier.
Doc No.
Description
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Page 54 of 59
Language
Translation
French
English & French
French
English
English
English
English & / or
French
English
English & French ***
English & French ***
English & French
English & French ***
English & French
French for DPEM
KBR
Doc No.
Description
Language
Translation
nameplate, English
for manufacturers
nameplates
24
Final Drawings / As Built Drawings
English
(***) All documents marked by an asterisk are required to be signed by attending DPEM inspector or
his delegated representative (TPI), Purchaser and Suppliers Inspector.
Page 55 of 59
KBR
_______________________________________________________________________
_______________________________________________________________________
To:
MINISTERE DE LENERGIE
Monsieur le Directeur
Direction de la Protection du Patrimoine
80, Avenue Ahmed Ghermoul, Alger.
VIA:
KBR
P.O. Number
________________________________________________________
_____________________on_________________________________
Subject:
WE REQUEST THE PRESENCE OF A DPEM/ONML INSPECTOR FOR TEST AT THE PLANT LISTED
BELOW.
DESIGNATION
ITEM NO.
EQUIPMENT
MANUFACTURER
FACILITY
TEST DATE
FACILITY
ADDRESS
KBR
Commande No.
N/Rfrences:
_____________________________
FAX NO. ___________________ du __________________
Equipment
Fabrication
Date Essais
Lieu
KBR
ACTIVITY
RESPONSIBILITY
TIME FRAME
PROVIDE DESIGN TO
SUPPLIER
PURCHASER (KBR)
SET UP INSPECTION
COORDINATION SCHEDULE
SUPPLIER
PREPARE PRELIMINARY
DOSSIER & SUBMIT TO
PURCHASER
SUPPLIER
PROVIDE PURCHASER
WITH STAMPED FORMS
FOR PRELIMINARY DOSSIER
SUPPLIER
SUBMIT PRELIMINARY
DOSSIER TO DPEM FOR
APPROVAL
PURCHASER
APPROVE / REJECT
PRELIMINARY DOSSIER, W/
NOTIFICATION BY FAX
DPEM
SUPPLIER
PURCHASER
SUPPLIER
PURCHASER
DPEM
PURCHASER
SCHEDULE THIRD-PARTY
INSPECTION IF REQUIRED
PURCHASER
WITNESS TESTING
ALL PARTIES
SUPPLIER
Page 57 of 59
KBR
DPEM
PURCHASER (KBR-Houston)
PROJECT TEAM
(QA)
DCC
5
1
SUPPLIER
1.
2.
3.
4.
5.
Supplier will submit Preliminary Dossiers per paragraph 10.1.1 or 10.1.2 to the
Purchaser Document Control Center at least fifty (50) calendar days before
commencement of fabrication.
The Purchaser will transmit one French or one (1) bilingual original to DPEM for
approval at least forty five days before commencement of fabrication.
The Purchaser will retain one English or one (1) bilingual original and 2 French copies
for records, the Client will receive 1 English and 1 French or 2 bilingual copies via the
Purchaser.
DPEM will fax approval of the Preliminary Dossier to the Purchaser.
Purchaser will provide an electronic copy of the DPEM approval to the Supplier.
Page 58 of 59
KBR
Item
PR 101 Article
Vessels
6.2.2
6.2.2
6.2.17
Exchangers
6.2.2
6.2.7
6.2.11
6.2.17
Compressors
Generators
Fire Protection
Electrical
Pumps
Valve Bodies
Requirements
All Valves
Control Valve Actuators
Tanks
Heaters and Furnaces
Lifting Device
6.2.5
6.2.12
6.2.12
6.2.4
All
6.2.2
5T and larger
6.2.10
Page 59 of 59
KBR