01-03-15

16853

CHP

PVS-1,BC5,BC1

02-03-15

16854

CHP

PSV 1

03-03-15

CHP

04-03-15

16858 &
16857
&16856

05-03-15

PVS 1 Mesh replacement work done,

15

12

BC1 Pm work the motor bed & gear box bed plumber block fluid coupling bolt tightness,DE/NDE
bearing grease condition,gear box & fluid coupling oil level,discharge chute leakage,scraper belt
6
condition,take off pulley bearing & grease condition all checked,Coal Bunker 2 chute grill welding
work

24

Reverse gear problem work under progress

11

77

12

Coal bunker unit 1 1 inch fire line welding work done,PVS 2 pm work the screen cloth tension &
jamming checked,motor casing bolts & jack bolt tightness checked,screen mat condition,bearing
Coal Bunker unit 1,PVS-2 housing bolt tightness checked,bearing grese checked,bearing condition & clearance,belt guard 6
cover bolts,pedestal spring condition,dischrge chute leakage checked,marsh melloe spring
condition,all spporting of screens,dust sealing cloth fastners checked

30

BC1,Coal Bunker 2

BC5 Belt Patch work done;BC1 3 Rollers Replaced & pull chord checking work & control room
pm work done by instrumentation,PVS 1 pm work the motor casing bolts & jack bolt tightness
checked,bearing housing bolt tightness checked,bearing grease checked,bearing condition &
clearance,belt guard cover bolts,pedestal spring condition,dischrge chute leakage checked,all
BC5 & BC1,PVS1,Crusher spporting of screens,Crusher 1 pm work the v-belt pulley,motor & mother base bolts & jack bolt
CHP
1,Tunnel vibro feeder 1&2 tightness,plumber block base fasteners,crusher foundation bolts,coupling condition,bearing
housing & grese,liner bolt tightness,crushing hmmer tooth condition,inlet & discharge chute
leakage,roller & liner adjusting bolts tightness all checked,Vibro feeder 1& 2 the Motor counter
weight angle condition,sling & spring condition,chute leakage bolt tightness,spring tension all
checked

CHP

Total Man
hours

Doser 34

16859 &
4135

No of
Persons

Doser 34

Time
Taken

PVS 1 Full jam condition cleaning work done,PVS 2 lubrication work done,BC5 2 Return &
Carrying rollers changed,BC1 2 return & Ider rollers changed

JCB FL,BEML FL,Doser JCB FL full water service & grease service,BEML FL Doser 34 & 35 pm work greasing of joints
34 & 35
transmission filter changing,transmission oil engine oil top
4132 &
16855

Planned
time

Job Description

Doser 34

Doser 34 reverse gear problem gearing assembly bearing heavy wear and tear work under
progress

Doser 34 reverse gear problem gearing assembly lifting hydra needed so work stalled other
minor checking going on

06-03-15

4139 &
16866

CHP

BC5 & BC6

BC6 belt patch up work done,BC5 pm work the motor bed & gear box bed plumber block fluid
coupling bolt tightness,DE/NDE bearing grease condition,gear box & fluid coupling oil
4
level,discharge chute leakage,scraper belt condition,take off pulley bearing & grease condition all
checked

12

Doser 34

Doser 34 transmission is lifted using hydra nd work under progress on the mechanical workshop 4

12

SITE:M/S IND BARATH

Date:1-6 March,2015

Spares used

Name of

Persons

Navaneethan,Vallinayagam,d
urai
Charles,Navaneethan,Durai
Rajesh,Manickam
Charles,Vallinayagam,Durai,
Pramoth
Rajesh,Manickam

Charles,Vallinayagam,Durai,
Ganesh(inst),CL 7

Rajesh,NavaneethaKrishnan,
Manickam

Charles,Vallinayagam,Durai,
Pramoth+1

Rajesh,Manickam

Charles,Durai,Vallinayagam

RajeshNavaneethaKrishnan,
Manickam