Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
LTD
POWER GEN COM 3 X 63 MW ,IPP 250 TPH/110 KSC/540 DEG C
Date
Work
Permit No.
Area
Equipment
01-03-15
16853
CHP
PVS-1,BC5,BC1
02-03-15
16854
CHP
PSV 1
03-03-15
CHP
04-03-15
16858 &
16857
&16856
05-03-15
15
12
BC1 Pm work the motor bed & gear box bed plumber block fluid coupling bolt tightness,DE/NDE
bearing grease condition,gear box & fluid coupling oil level,discharge chute leakage,scraper belt
6
condition,take off pulley bearing & grease condition all checked,Coal Bunker 2 chute grill welding
work
24
11
77
12
Coal bunker unit 1 1 inch fire line welding work done,PVS 2 pm work the screen cloth tension &
jamming checked,motor casing bolts & jack bolt tightness checked,screen mat condition,bearing
Coal Bunker unit 1,PVS-2 housing bolt tightness checked,bearing grese checked,bearing condition & clearance,belt guard 6
cover bolts,pedestal spring condition,dischrge chute leakage checked,marsh melloe spring
condition,all spporting of screens,dust sealing cloth fastners checked
30
BC1,Coal Bunker 2
BC5 Belt Patch work done;BC1 3 Rollers Replaced & pull chord checking work & control room
pm work done by instrumentation,PVS 1 pm work the motor casing bolts & jack bolt tightness
checked,bearing housing bolt tightness checked,bearing grease checked,bearing condition &
clearance,belt guard cover bolts,pedestal spring condition,dischrge chute leakage checked,all
BC5 & BC1,PVS1,Crusher spporting of screens,Crusher 1 pm work the v-belt pulley,motor & mother base bolts & jack bolt
CHP
1,Tunnel vibro feeder 1&2 tightness,plumber block base fasteners,crusher foundation bolts,coupling condition,bearing
housing & grese,liner bolt tightness,crushing hmmer tooth condition,inlet & discharge chute
leakage,roller & liner adjusting bolts tightness all checked,Vibro feeder 1& 2 the Motor counter
weight angle condition,sling & spring condition,chute leakage bolt tightness,spring tension all
checked
CHP
Total Man
hours
Doser 34
16859 &
4135
No of
Persons
Doser 34
Time
Taken
PVS 1 Full jam condition cleaning work done,PVS 2 lubrication work done,BC5 2 Return &
Carrying rollers changed,BC1 2 return & Ider rollers changed
JCB FL,BEML FL,Doser JCB FL full water service & grease service,BEML FL Doser 34 & 35 pm work greasing of joints
34 & 35
transmission filter changing,transmission oil engine oil top
4132 &
16855
Planned
time
Job Description
Doser 34
Doser 34 reverse gear problem gearing assembly bearing heavy wear and tear work under
progress
Doser 34 reverse gear problem gearing assembly lifting hydra needed so work stalled other
minor checking going on
06-03-15
4139 &
16866
CHP
BC6 belt patch up work done,BC5 pm work the motor bed & gear box bed plumber block fluid
coupling bolt tightness,DE/NDE bearing grease condition,gear box & fluid coupling oil
4
level,discharge chute leakage,scraper belt condition,take off pulley bearing & grease condition all
checked
12
Doser 34
Doser 34 transmission is lifted using hydra nd work under progress on the mechanical workshop 4
12
Date:1-6 March,2015
Spares used
Name of
Persons
Navaneethan,Vallinayagam,d
urai
Charles,Navaneethan,Durai
Rajesh,Manickam
Charles,Vallinayagam,Durai,
Pramoth
Rajesh,Manickam
Charles,Vallinayagam,Durai,
Ganesh(inst),CL 7
Rajesh,NavaneethaKrishnan,
Manickam
Charles,Vallinayagam,Durai,
Pramoth+1
Rajesh,Manickam
Charles,Durai,Vallinayagam
RajeshNavaneethaKrishnan,
Manickam