Sei sulla pagina 1di 1

C

1. This drawing to be read in conjunction with all


relevant Structural, Architectural and Services
drawings.
2. For General Notes refer to Drawing Number
ER.XXX.DGE.S.0001.
3. All steel/steel connections to be confirmed by
contractor
600 Secant
pile wall

900 Secant pile wall

Slab reinforcement.

Raft slab.
Hydrophilic strip

B3 Gallery Support Level


SSL -5.020 m

1200
3

900 Secant pile wall

50

Top reinforcement.

Reinforcement to
pass through holes
pre-drilled in column.

Bottom
reinforcement.

Hydrophilic strip

-1.000

B2 Gallery Level
SSL -1.100 m

Recess formed
in pile.

6no. B25 L-Bars with


couplers (3 top , 3 bottom)
cast into male piles.

125

300x100mm Deep recess


at slab edge to
accomodate channel drain
(TBC by contractor)

B2 Gallery Level
SSL -1.100 m

Raft reinforcement.
Raft slab.

300

B3 Gallery Support Level


SSL -5.020 m

Lining wall

300x100mm Deep recess


at slab edge to
accomodate channel drain
(TBC by contractor)

Lining wall

Lining wall

Shear links.

Lining wall
reinforcement.

UC254x254x107
Plunge column.

Notes

F
400x400 sq. reinforced
concrete encasement.

Raft
reinforcement.

17/03/2015 10:00:42

300

300

SSL Varies

Hydrophilic
strip

200

A0

Pile reinforcement.

4no. B25 bars (2 top, 2 bottom) post-drilled


into male piles. Minimum penetration
300mm grouted with Hilti HIT-RE-500 OSA,
lapping with slab reinforcement.

Hydrophilic strip

1500

1500

Lining wall
Additional reinforcement
in column drop.

1200

Pile Cut-off
Level

350x350x30mm thk.
bearing plate.

Shear links.
75

UC254x254x107
Plunge column.

Blinding

Plunge column extends minimum


3m below pile cut-off level.

Pile
reinforcement.

1200 R.C. pile

Blinding

400x400 sq. reinforced


concrete encasement.

Reinforcement connected
to couplers and lapping
with raft reinforcement.

Pile reinforcement.

Blinding

Raft reinforcement.

6no. B25 bars (3 top, 3 bottom)


post-drilled into male piles.
Minimum penetration 300mm
grouted with Hilti HIT-RE-500 OSA,
lapping with raft reinforcement.

Typical B2 Slab Connection to Pile Wall


1 : 20

Typical B2 Column Head Detail


1 : 20

Pile reinforcement.

Typical Bearing Pile Head Detail

1 : 20

Typical Connection of Raft to 900mm Diameter Piled Wall

1 : 20

Typical Connection of Raft to 600mm Diameter Secant Piles


4

1 : 20

11a
ER.XXX.DDE.S.6101

A
RC Lining wall.

Male Pile.

600
SSL -5.020

SSL -5.020
B2 Gallery Level
SSL -1.100 m

11b

RC Lining wall, acts as


retaining structure in
permanent condition.

ER.XXX.DDE.S.6101

B2 Gallery Level
SSL -1.100 m

300 R.C. slab in shaded area


constructed with the B2 slab
to be broken out after fin wall
constructed below

1200

L-Bar reinforcement
dowelled into male
piles at 3m centres
vertically, tying rc
lining wall to piles.

1200

600mm diameter piles


provide temporary
retaining support and
vertical capacity.

Pile reinforcement.

Lining wall
reinforcement.

Lining wall
reinforcement.

Pile reinforcement.

200

Drainage
pipe cast
into raft slab

Min.

For invert level


refer to B3 plans

Fin wall under

Blinding

Blinding

Drainage pipe cast


into raft slab

Dog-Leg Area Only

1 : 20

Typical Manhole at B3 level


1 : 20

Typical Connection of RC Lining Wall to Pile

10

1 : 20

Typical Drainage Pipe Cast Into Raft Slab


1 : 20

11

20

Construction joint

B2 Vent Openings - Temp. Infill Slab During Construction


1 : 50

SSL -5.020

B1 Technical Level
SSL +2.765 m

600 x1200
opening

Infill slab demolished


after fin wall constructed
B2 Gallery Level
SSL -1.100 m

SSL -5.020

1200

First
pour

1200

Slab not
shown for
clarity

8 No. 25mm holes for rebar to


pass through webb & flanges

Fin wall
under

Hydrophilic strip
10

Blinding

Hydrophilic strip

8mm Plate
welded to column

1850
400

Construction joint

400

11a

Blinding

Construction joint

400mm Thick
mass concrete surround
to sump pump

Hydrophilic strip

13

Typical Raft Construction Joint

15a

SSL -9.220
400

11

1 : 20

14

Typical R.C. Lining Wall Horizontal Construction Joint


1 : 20

17

1 : 50
C3

B1 - UC to Slab Detail 15a

C2

1 : 10

DSP

AB

CB

13/02/14

SFS

AB

CB

AB

CB

Chkd

Appd

Issued for Construction


C1

B2 Gallery Level
SSL -1.100 m

Cast In GRP Foul Sump 2

15/11/13

KDE

Issued for Contract

Infill slab demolished


after fin wall constructed

Issue

By

Date

Upstand

1 : 50

TOC +3.065

12

Beam continues
through fin wall zone

Typical R.C. Lining Wall Vertical Construction Joint

Fin wall

1 : 20

10/03/15

Manhole details updated.

20

12

Section 11a-11a

13 Fitzroy Street
London W1T 4BQ
Tel +44 (0)20 7636 1531 Fax +44 (0)20 7580 3924
www.arup.com

(North of Gridline 14 and on Wall


Elevation on Gridline A)

Client

11b

Victoria & Albert Museum

Section 11b-11b
1 : 50

13
Job Title

Exhibition Road Building


Main Works
B3 Gallery Support Level
SSL -5.020 m

B3 Gallery Support Level


SSL -5.020 m

12

13
Key Plan

Holes drilled in web for


rebar to pass through

SSL +2.765

SSL -5.020
Web plate
1200

600

1200

1200

1200

14

-6.040

-6.040

600

600

300

ER.XXX.DDE.S.6101

300

400

400

15a

SSL -6.900

15
550

Basement Details
Sheet 1

1200

400

-6.672
Sloped starts at
face of outer face
of manhole

Blinding

TOC +3.065
Upstand
Scale at A0
Discipline

16

16
Do not scale

Basement Manhole Type A


1 : 20

16a

Basement Thickening Detail


1 : 20

15

B1 - UC to Slab Detail
1 : 10

18

Sumps in Lift Pits

As indicated
Structural

Job No

Drawing Status

216701

Construction

Drawing No

1 : 50

ER.XXX.DDE.S.6101

Issue

C3
Arup