Name of Work:
Beautification of C.C drain body wall at Achanta vari streetfrom Prakasam road to bypass road in 23' rd
ward
Kovvur(Town) W.G.Dt
S.No
Description
1-7
May-15
Program
199.00 Cum
8-15
16-22
23-30
1-7
8-15
199.00
Progress
2
P.C.C (1:4:8)
Program
250.00 Cum
250.00
Progress
3
C.C (1:3:6)
Jun-15
Quantity
Program
Progress
3.00 Cum
3.00
16-22 23-31
1-7
8-15
16-22
23-30
Construction of 300mm dia and 450mm dia section CC Drain in RTC Colony Main Road and West
Side 3 Cross Roads in 1st and 2nd Wards .
Kovvur(Town) W.G.Dt
S.No
Description
1-7
May-15
Program
199.00 Cum
8-15
16-22
23-30
1-7
8-15
199.00
Progress
2
P.C.C (1:4:8)
Program
250.00 Cum
250.00
Progress
3
C.C (1:3:6)
Jun-15
Quantity
Program
Progress
3.00 Cum
3.00
16-22 23-31
1-7
8-15
16-22
23-30
Construction of CC Drain and Providing 170mm thick CC Road in Harijana Peta Two Wells Street to
Pulapoarthi Vari Street 6 Cross Roads in 3rd Ward (SC Area).
Kovvur(Town) W.G.Dt
S.No
Description
1-7
May-15
Program
199.00 Cum
8-15
16-22
23-30
1-7
8-15
199.00
Progress
2
P.C.C (1:4:8)
Program
250.00 Cum
250.00
Progress
3
C.C (1:3:6)
Jun-15
Quantity
Program
Progress
3.00 Cum
3.00
16-22 23-31
1-7
8-15
16-22
23-30
Construction of 450mm dia Section and 600mm dia Section CC Drains in Srinivasapuram and New
Bridge Peta Main Road and Disposal in 15th Ward.
Kovvur(Town) W.G.Dt
S.No
Description
1-7
May-15
Jun-15
Quantity
Program
108.00 Cum
8-15
16-22 23-30
1-7
8-15
16-22
23-31
1-7
108.00 Cum
Progress
2
P.C.C (1:4:8)
Program
108.00 Cum
108.00 Cum
Progress
3
C.C (1:3:6)
Program
207.00 Cum
207.00 Cum
Progress
4
M20 concrete
Program
45.00 Cum
45.00 Cum
30.00 Cum
30.00 Cum
Progress
5
M30 concrete
Program
Progress
Plastering
Program
1620.00 Sqm
1620.00 Sqm
Progress
7
Steel
Program
Progress
5400.00 Kg
5400.00 Kg
8-15
16-22
23-30
Construction of 450mm dia section CC Drain in Sri Rama Colony Main Road from 1st Cross Road to
4th Cross Road in 2nd Ward.
Kovvur(Town) W.G.Dt
S.No
Description
1-7
Program
18.00 Cum
Progress
2
P.C.C (1:4:8)
Program
C.C (1:3:6)
Program
18.00 Cum
M 20 concrete
Program
16-22
23-30
1-7
18.00 Cum
18.00 Cum
100%
50.01 Cum
Progress
4
8-15
100%
Progress
3
May-15
50.01 Cum
100%
5.50 Cum
5.50 Cum
Progress
5
Plastering
Program
100%
280.00 sqm
Progress
6
Steel
Jun-15
Quantity
Program
Progress
280.00 sqm
100%
770.00 Kg
770.00 Kg
100%
8-15
16-22 23-31
1-7
8-15
16-22
23-30
Construction of 300mm dia and 450mm dia section CC Drain in RTC Colony Main Road and West
Side 3 Cross Roads in 1st and 2nd Wards.
Kovvur(Town) W.G.Dt
S.No
Description
1-7
Program
78.00 Cum
Progress
2
P.C.C (1:4:8)
Program
C.C (1:3:6)
Program
78.00 Cum
M 20 concrete
Program
16-22
23-30
1-7
8-15
78.00 Cum
78.00 Cum
80%
234.80 Cum
Progress
4
8-15
80%
Progress
3
May-15
234.80 Cum
70%
8.00 Cum
8.00 Cum
Progress
5
Plastering
Program
1370.00 sqm
Progress
6
Steel
Jun-15
Quantity
Program
Progress
1370.00 sqm
45%
1120.00 Kg
1120.00 Kg
16-22 23-31
1-7
8-15
16-22
23-30
Construction of CC Drain and Providing 170mm thick CC Road in Harijana Peta Two Wells Street to
Pulapoarthi Vari Street 6 Cross Roads in 3rd Ward (SC Area).
Kovvur(Town) W.G.Dt
S.No
Description
1-7
Program
36.00 Cum
Progress
2
P.C.C (1:4:8)
May-15
Jun-15
Quantity
Program
8-15
16-22
23-30
1-7
8-15
16-22
23-31
36.00 Cum
20%
144.00 Cum
144.00 Cum
Progress
3
C.C (1:3:6)
Program
84.00 Cum
84.00 Cum
Progress
4
M 20 concrete
Program
170.00 Cum
170.00 Cum
193.00 Cum
193.00 Cum
Progress
5
M 30 concrete
Program
Progress
Plastering
Program
960.00 sqm
960.00 sqm
Progress
7
Steel
Program
Progress
430.00 Kg
430.00 Kg
1-7
8-15
16-22
23-30
Construction of CC Drain and Providing 170mm thick CC Road in Harijana Peta Two Wells Street to
Pulapoarthi Vari Street 6 Cross Roads in 3rd Ward (SC Area).
Kovvur(Town) W.G.Dt
S.No
Description
1-7
Program
36.00 Cum
Progress
2
P.C.C (1:4:8)
May-15
Jun-15
Quantity
Program
8-15
16-22
23-30
1-7
8-15
16-22
23-31
36.00 Cum
20%
144.00 Cum
144.00 Cum
Progress
3
C.C (1:3:6)
Program
84.00 Cum
84.00 Cum
Progress
4
M 20 concrete
Program
170.00 Cum
170.00 Cum
193.00 Cum
193.00 Cum
Progress
5
M 30 concrete
Program
Progress
Plastering
Program
960.00 sqm
960.00 sqm
Progress
7
Steel
Program
Progress
430.00 Kg
430.00 Kg
1-7
8-15
16-22
23-30