Item No.

03-12-c
03-16-a
03-23-b
03-23-d
06-05-f
06-05-h
06-05-i
06-06-a-02
06-06-a-03
06-06-e
06-07-b
06-22-a-02

Item Description
Excavation in hard rock requiring blasting and disposal
upto 25m & dressing : Grade III
Filling, watering and ramming earth under floor with surplus
earth from foundation, etc
Excavation in foundation of building, bridges etc complete :
In ordinary soil
### Excavation in foundation of building, bridges etc
complete : In shingle/gravel
Plain Cement Concrete incl. placing, compacting, finishing
& curing (Ratio 1:2:4)
Plain Cement Concrete incl. placing, compacting, finishing
& curing (Ratio 1:3:6)
Plain Cement Concrete incl. placing, compacting, finishing
& curing (Ratio 1:4:8)
RCC in roof slab, beam, column & other structural
members, insitu or precast. Type B (1:1.5:3)
RCC in roof slab, beam, column & other structural
members, insitu or precast. Type C (1:2:4)
Add extra labour for RCC in 2nd & subsequent storeys
Supply & fabricate M.S. reinforcement for cement concrete
(Deformed bars)
Damp proof of cem. conc. 1:2:4 i/c bitumen coat, 1 layer
polythene & 1 coat bitumen (2" thick)
Pacca brick work in foundation and plinth in Cement, sand
mortar 1:6

Unit

Fata

m3

557.69

m3

109.80

m3

228.18

m3

287.21

m3

7398.32

m3

6018.51

m3

5385.03

m3

11187.12

m3
m3

10094.84
772.20

tonne

120459.13

m2

602.59

m3

7352.89

07-05-a-03 Pucca brick work in ground floor Cement, sand mortar 1:4

m3

8230.64

07-05-a-05 Pucca brick work in ground floor Cement, sand mortar 1:6
Add extra labour on item No.07-05 for brickwork in First
floor
07-06-a

m3

7827.28

m3

283.66

07-30

m3

2664.37

07-04-a-05

Supplying and filling sand under floor or plugging in wells


Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1"
09-05
mud plaster on top of RC roof slab
09-15
Khuras on roof 2'x2'x6"
Bottom khuras of brick masonry in c/s mortar 1:6,4'x2'x4.5"
over 3" cem. concrete 1:4:8
09-16
Cast iron rain water down pipe fixed in position excl. heads
& shoes : 4" dia
09-19-a
Shoes, bends or offsets for cast iron ran water down pipe,
incl. fixing & painting
09-21
Laying 1/2" thick deodar ceiling complete, incl. sawing,
planing & fixing
09-23
Lay floor of white glazed tile 1/4" thick in white cement 1:2
over 3/4" thick cement mortar 1:2
10-24
Provide & lay marble fine dressed stone flooring on surface
in white cement complete: 3/4" thick
10-26-a
Provide & lay marble fine dressed stone dado or skirting in
white cement complete : 1/2" thick
10-41-b
11-09-b
Cement plaster 1:4 upto 20' height 1/2" thick
Cement pointing struck joints, on walls, upto 20' height :
Ratio 1:3
11-18-b
MS flat 1/2"x1/8" grill in windows of approved design incl.
painting 3 coats, complete
12-50
Prepare & Paint new surface, doors & windows Priming
13-06-c-01 coat
Prepare & Paint new surface, doors & windows Each
13-06-c-02 subsequent coat of paint
Preparing surface and painting with emulsion paint : First
coat
13-30-a

m2
Each

945.23
525.15

Each

1260.07

2582.52

Each

380.80

m2

1555.68

m2

1786.66

m2

3189.19

m2
m2

2952.16
201.25

m2

180.78

m2

1589.05

m2

87.89

m2

56.34

m2

118.66

Item No.
13-30-b
14-03-a
14-05-a-01
14-10-a
14-16-a
14-17
14-20-a
14-20-d
14-21-b
14-22-b
14-24-b
14-31-b
14-32-b
14-34-b-01
14-34-b-02
15-02-b-02
15-02-b-03
15-05-c
15-09-a
15-09-e
15-14
15-42
15-50
15-51
15-61-a
15-62
15-68-c
15-69-a
15-71-a
15-71-d

Item Description
Preparing surface and painting with emulsion paint : 2nd &
each subsequent coat.
P&F glazed earthern ware WC squatting type with built-in
foot rests : White
P&F glazed earthern ware WHB complete Size 22"x16" :
White with pedestal
P&F glazed earthern ware low down flushing cistern 3
gallons capacity : White
P&F CP towel rail : 24" long, 3/4" dia
P&F best quality 5mm mirror 22"x16" size
P&F Plastic soap dish.
P&F Plastic shelf 24"x5" with
P&F CP pillar-cock, heavy type : 1/2"
P&F CP stop-cock, heavy type : 1/2"
P&F CP bib-cock, heavy type : 1/2"
P&F CI floor trap incl. CI grating & concrete chamber all
round : 4"x3"
P&F 'P' trap incl. GI grating & PCC chamber 4" glazed
Providing and fitting CI soil pipe with : Cement caulked joint
: 4" dia
Providing and fitting CI soil pipe with : Cement caulked joint
: 2" dia
S&E PVC pipe for wiring purpose complete Recessed in
walls incl. chase etc : 3/4" i/d
S&E PVC pipe for wiring purpose complete Recessed in
walls incl. chase etc : 1" i/d
S&E single core PVC insulated copper conductor 250/440
V grade cable : 7/0.029"
S&E MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 4"x4"
S&E MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 10"x12"
S&E 9" long swan neck plain brass/steel/brass oxidised
bracket lamp holder, complete
S&E 2'x2'x1/8" copper plate incl. rivetting to copper tape &
placing in mixture of salt etc
Wiring of light/fan/call-bell point in 3/0.029 PVC insulated
bare cable in PVC pipe recessed
Wiring of 2/3-pin 5-Amp. plug point in 3/0.029 PVC
insulated bare cable in PVC pipe recessed
S&E fluorescent tube light fitting incl. 4' rod, choke, starter,
flexible wire etc : Single
S&E porch-light fitting round/square type with gallery,
holder & 40 W bulb
S&E best quality AC ceiling fan complete with GI rod,
canopy, blades & regulator : 56" sweep
S&E best quality exhaust fan complete with shutter &
regulator : 12"sweep
S&E single phase imported auto circuit breaker 6 Amp.

S&E single phase imported auto circuit breaker 30 Amp.


### S&E cubical type factory fabricated floor/wall mounting
steel main board comp. : Recessed
15-75-b
P&L RCC pipe, moulded with cement concrete 1:1.5:3,
incl. cost of reinfcnt, testing etc : 4"
23-01-a
P&L RCC pipe, moulded with cement concrete 1:1.5:3,
incl. cost of reinfcnt, testing etc : 6"
23-01-b
P&L RCC pipe, moulded with cement concrete 1:1.5:3,
incl. cost of reinfcnt, testing etc : 9"
23-01-c
P&L, cut, joint, test & disinfect GI pipe line Using light
24-16-c-01 quality GI Pipe : 1/2" i/d

Unit
m2

Fata
58.01

Each

3343.73

Each

3441.90

Each
Each
Each
Each
Each
Each
Each
Each

2697.04
580.71
1733.94
358.95
289.65
753.96
795.54
740.10

Each
Each

486.95
264.31

860.45

577.57

131.18

141.22

44.06

Each

238.57

Each

711.16

Each

127.21

Each

6705.20

Each

1200.55

Each

893.26

Each

1369.14

Each

1035.52

Each

5375.66

Each
Each

3552.09
1000.87

Each

1243.42

Each

23038.32

440.67

592.39

787.52

208.01

Item No.
24-16-c-02
24-16-c-03
24-16-c-06
24-33
25-36
25-39-b-03
25-41
26-17
21-01-a-01
21-01-a-02
21-01-a-03
21-01-c-01
21-01-c-02
21-01-c-03
26-15
10-45
12-53-d-02
14-69-b-04
15-05-a

Item Description
P&L, cut, joint, test & disinfect GI pipe line Using light
quality GI Pipe : 3/4" i/d
P&L, cut, joint, test & disinfect GI pipe line Using light
quality GI Pipe : 1" i/d
P&L, cut, joint, test & disinfect GI pipe line Using light
quality GI Pipe : 2" i/d
### S/F MS manhole cover of 0.25" thick sheet & angle
iron frame 2"x2"x0.25" with lock complete
P&F MS angle iron 1"x1"x1/4" edge protector nozing of
steps of stairs, complete
P&F steel windows with openable glazed panels With 22
SWG wire gauze : Glass pane 3mm
P&F angle iron railing, using 2.5"x2.5"x3/8" angle iron post
4.5'long, 5'to 6" apart, complete
Making notice board 1/2" thick of c/s mortar 1:3 with
2"x1/2" beading
Excavate well in dry & dispose of soil within 50m In
ordinary soil or sand : Upto 1.5 m depth
Excavate well in dry & dispose of soil within 50m In
ordinary soil or sand : 1.5 to 3 m depth
Excavate well in dry & dispose of soil within 50m In
ordinary soil or sand : 3 to 4.5 m depth
Excavate well in dry & dispose of soil within 50m In hard
strata like shingle : Upto 1.5 m depth
Excavate well in dry & dispose of soil within 50m In hard
strata like shingle :1.5 to 3 m depth
Excavate well in dry & dispose of soil within 50m In hard
strata like shingle : 3 to 4.5 m depth
Spraying anti-termite liquid mixed with water in the ratio of
1:40
### P/F Precast Concrete 7000 psi TUFF Tiles over bed of
2" thick sand & 4" thick brick ballast comp
S&F aluminium door/window, Premium 4" sect. Hinges
window
### P/F Polyethylene Water Tank (Super Tuff) 1000
gallons (Vertical)
S&E single core PVC insulated copper conductor 250/440
V grade cable : 3/0.029"

Unit

Fata

280.11

377.74

531.00

m2

6055.79

435.54

m2

5785.34

3497.03

m2

983.25

m3

156.64

m3

163.60

m3

184.46

m3

411.52

m3

426.28

m3

444.41

m2/spray

33.29

m2

1381.66

m2

10355.73

Each

70856.66

38.47

Abstract of Cost Lab's/Resource Room &


Multipurpose Hall, GEC For Girls
S. No.

Descriptions

Amount (Rs)

Main Building

9,085,671

Internal Water Supply

250,967

Internal Electrification

313,010

Septic Tank

98,909

Soakage Pit

37,772

Total:

9,786,329

S. No.

Description

Unit

Qty

Rate (Rs.)

Amount (Rs.)

Lab's/Resource Rooms & Multipurpose Hall, GEC for GIRLS


1

Excavation in foundation of building, bridges etc


complete : In shingle gravel

m3

186.98

557.69

104,276

Filling, watering and ramming earth under floor with


surplus earth from foundation, etc.

m3

148.13

109.80

16,264

Plain Cement Concrete incl. placing, compacting,


finishing & curing (Ratio 1:4:8).

m3

57.12

5,385.03

307,572

Plain Cement Concrete incl. placing, compacting,


finishing & curing (Ratio 1:2:4).

m3

36.69

7,398.32

271,431

RCC in roof slab, beam, column & other structural


members, insitu or precast. 3000 PSI.

m3

73.07

11,187.12

817,496

Supply & fabricate M.S. reinforcement for cement


concrete (Deformed bars)

tonne

11.09

120,459.13

1,335,529

Damp proof of cem. conc. 1:2:4 i/c bitumen coat, 1


layer polythene & 1 coat bitumen (2" thick).

m2

5.16

602.59

3,108

Pacca brick work in foundation and plinth in Cement,


sand mortar 1:6.

m3

46.46

7,352.89

341,586

Pucca brick work in ground floor Cement, sand mortar m3


1:6.

73.17

7,827.28

572,689

10

Supplying and filling sand under floor or plugging in


wells.

m3

32.92

2,664.37

87,706

11

Supplying Shingle under floor.

m3

32.92

480.09

15,804

12

Single layer of tiles of approved size laid over 4" earth m2


and 1" mud plaster on top of RC roof slab.

324.07

945.23

306,322

13

P&L of polythene sheet on roof.

m2

324.07

40.00

12,963

14

P&L of Jumbolon on roof.

m2

324.07

807.00

261,525

15

Khuras on roof 2'x2'x6" .

Each

525.15

3,676

16

Bottom khuras of brick masonry in c/s mortar


1:6,4'x2'x4.5" over 3" cem. concrete 1:4:8.

Each

1,260.07

8,820

17

Cast iron rain water down pipe/PVC Polyfit fixed in


position excl. heads & shoes : 4" dia.

100

2,582.52

258,252

S. No.

Description

Unit

18

Shoes, bends or offsets for cast iron ran water down


pipe, incl. fixing & painting.

Each

19

Provide & lay marble fine dressed stone flooring on


surface cement complete: 3/4" thick.

m2

20

Provide and lay marble fine dressed stone dado or


skirting in white cement complete: 1/2" thick.

21

Qty
40

Rate (Rs.)

Amount (Rs.)

380.80

15,232

370.19

3,189.19

1,180,595

m2

19.01

2,952.16

56,108

Cement plaster 1:4 upto 20' height 1/2" thick.

m2

1323.70

201.25

266,395

22

MS flat 1/2"x1/8" grill in windows of approved design


incl. painting 3 coats, complete or as approved.

m2

54.65

1,589.05

86,836

23

Prepare & Paint new surface in joinery where required, m2


Priming coat.

85.50

87.89

7,514

24

Prepare & Paint new surface in joinery where required, m2


First coat.

85.50

56.34

4,817

25

Prepare & Paint new surface in joinery where required, m2


2nd coat.

85.50

56.34

4,817

26

Prepare & Paint new surface in joinery where required, m3


3rd coat.

85.50

56.34

4,817

27

Preparing surface and painting with emulsion paint :


Priming coat.

m1

884.20

118.66

104,919

28

Preparing surface and painting with emulsion paint :


First coat.

m2

884.20

58.01

51,295

29

Preparing surface and painting with emulsion paint :


2nd coat.

m2

884.20

58.01

51,295

30

Preparing surface and painting with emulsion paint :


3rd coat.

m2

884.20

58.01

51,295

31

Making and fixing deodar doors with frames and lasani m2


panels.

42.75

9,146.00

391,000

32

P&F Aluminium windows

m2

54.65

10,355.73

565,908

33

Providing wire mesh.

m2

135.87

645.60

87,720

34

Providing and applying Grafiato on exterior wall


surfaces.

m2

135.87

538.00

73,100

35

Providing Pre-cast slab.

m2

324.07

2,152.00

697,400

S. No.

Description

Unit

Qty

Rate (Rs.)

Amount (Rs.)

36

Providing and fixing gypsem board false ceiling.

m2

324.07

1,555.68

504,152

37

Providing Tuff Tiles as per approved source and


design.

m2

58.55

1,381.66

80,897

38

Providing ceramic tiles.

m2

35.13

1,786.66

62,766

39

Spraying Anti-termite liquid in foundation.

m2

353.72

33.29

11,774

Total:

9,085,671

S. No.

Description

Unit

Qty

Rate (Rs.)

Amount (Rs.)

Internal Water Supply


1

P&F glazed earthern ware WC squatting type with


built-in foot rests : White

Each

3,343.73

6,687

P&F glazed earthern ware WHB complete Size


22"x16" : White with pedestal

Each

3,441.90

6,884

P&F glazed earthern ware low down flushing cistern 3 Each


gallons capacity : White

2,697.04

5,394

P&F CP towel rail : 24" long, 3/4" dia

Each

580.71

1,161

P&F best quality 5mm mirror 22"x16" size

Each

1,733.94

3,468

P&F Plastic soap dish.

Each

358.95

718

P&F Plastic shelf 24"x5" with

Each

289.65

579

P&F CP pillar-cock, heavy type : 1/2"

Each

753.96

3,770

P&F CP stop-cock, heavy type : 1/2"

Each

795.54

3,182

10

P&F CP bib-cock, heavy type : 1/2"

Each

740.10

3,701

11

P&F CI floor trap incl. CI grating & concrete chamber


all round : 4"x3"

Each

486.95

974

12

P&F 'P' trap incl. GI grating & PCC chamber 4" glazed Each

264.31

529

13

Providing and fitting CI soil pipe with : Cement caulked m


joint : 4" dia

13

860.45

11,186

14

Providing and fitting CI soil pipe with : Cement caulked m


joint : 2" dia

10

577.57

5,776

15

P&L, cut, joint, test & disinfect GI pipe line Using light
quality GI Pipe : 1/2" i/d

30

208.01

6,240

16

P&L, cut, joint, test & disinfect GI pipe line Using light
quality GI Pipe : 3/4" i/d

30

280.11

8,403

17

P&L, cut, joint, test & disinfect GI pipe line Using light
quality GI Pipe : 1" i/d

30

377.74

11,332

S. No.

Description

18

Construction of Main Hole 18"

19

Unit
Each

Qty

Rate (Rs.)

Amount (Rs.)

2,500.00

10,000

P&L RCC pipe, moulded with cement concrete 1:1.5:3, m


incl. cost of reinfcnt, testing etc : 9"

70

787.52

55,126

20

P&F Polythylene water tank (super tuff) 1000 Gallons. Each

70,856.66

70,857

21

Providing and fixing Muslim shower.

Each

1,000.00

5,000

22

Water Pump (1 hp) assembly with all accessories

Each

15,000.00

30,000

23

Providing and fixing sink.

Each

5000

Total:

250,967

S. No.

Description

Unit

Qty

Rate (Rs.)

Amount (Rs.)

Internal Electrification
1

S&E PVC pipe for wiring purpose complete Recessed m


in walls incl. chase etc : 1" i/d

170

141.22

24,007

S&E single core PVC insulated copper conductor m


250/440 V grade cable : 3/0.029"

380

38.47

14,620

S&E single core PVC insulated copper conductor m


250/440 V grade cable : 7/0.029"

270

44.06

11,897

S&E MS sheet box of 16 SWG, 4"deep with 3/16" thick Each


bakelite sheet top etc. complete : 10"x12"

711.16

4,267

S&E MS sheet box of 16 SWG, 4"deep with 3/16" thick Each


bakelite sheet top etc. complete : 4"x4"

238.57

954

S&E 2'x2'x1/8" copper plate incl. rivetting to copper


tape & placing in mixture of salt etc

Each

6,705.20

6,705

Wiring of 2/3-pin 5-Amp. plug point in 3/0.029 PVC


insulated bare cable in PVC pipe recessed

Each

12

893.26

10,719

Wiring of light/fan/call-bell point in 3/0.029 PVC


insulated bare cable in PVC pipe recessed

Each

41

1,200.55

49,223

S&E fluorescent tube light fitting incl. 4' rod, choke,


starter, flexible wire etc : Single

Each

18

1,369.14

24,644

10

S & E Verandah Light fitting round/square type with


gallery , holder and 40 w bulb

Each

1,035.52

9,320

11

S&E best quality AC ceiling fan complete with GI rod,


canopy, blades & regulator : 56" sweep

Each

14

5,375.66

75,259

12

S&E best quality exhaust fan complete with shutter &


regulator : 12"sweep

Each

3,552.09

7,104

13

S&E single phase imported auto circuit breaker 6 Amp. Each

10

1,000.87

10,009

14

S&E single phase imported auto circuit breaker 30


Amp.

Each

1,243.42

1,243

15

### S&E cubical type factory fabricated floor/wall


mounting steel main board comp. : Recessed

Each

23,038.32

23,038

16

PVC 4 Core Cable 25mm

40

1,000.00

40,000

Total:

313,010

Estimate of Lab's/Resource room, GEC For GIRLS


1. Excavation in foundation
No

Length (ft) Depth (ft)

Width (ft)

Quantity (cft)

Wall footing section - A

64

3.00

3.50

672.00

Wall footing section - B

20

1.50

2.50

75.00

Column footing -F1

11

4.00

5.00

1100.00

Column footing -F2

4.00

6.00

1008.00

Column footing -F3

4.00

7.00

1372.00

Column footing -F4

4.00

8.00

1024.00

Column footing -F5

4.00

5.00

300.00

Plinth protection

210

0.67

3.00

420.00

Toe wall

210

1.25

0.375

98.44

Drain

210

1.33

1.50

418.95

Front steps

115

0.33

3.00

113.85

Total (1):

6602.24 cft
186.98 m3

2. PCC (1:4:8) in foundation


No

Length (ft)

Depth (ft)

Width (ft)

Quantity (cft)

Wall footing section - A

64

0.75

3.50

168.00

Wall footing section - B

20

0.25

2.50

12.50

Column footing -F1

11

0.25

5.00

68.75

Column footing -F2

0.25

6.00

63.00

Column footing -F3

0.25

7.00

85.75

Column footing -F4

0.25

8.00

64.00

Column footing -F5

0.25

5.00

18.75

Plinth protection

210

0.25

3.00

157.50

Toe wall

210

0.33

0.375

25.99

Drain

210

0.33

1.50

103.95

10

Front steps

115

0.25

3.00
Total (2):

86.25
854.44 cft
24.20 m3

3. RCC (1:1.5:3) in Foundation


No

Length (ft)

Depth (ft)

Width (ft)

Column footing -F1

11

0.75

5.00

18.75

Column footing -F2

1.00

6.00

36

Column footing -F3

1.00

7.00

49

Column footing -F4

1.25

8.00

80

Column footing -F5

0.75

5.00

18.75

1.00

660.00

1.25

1.00

825

Plinth Beam

S.Total:
Wastage @ 5%

51.38

Quantity (cft)

1027.50 cft
51.38 cft

S.Total:
Total (3):

51.38 cft
1078.88 cft
30.55 m3

4. BB work in CSM (1:6) in Plinth


Brick work

No

Length (ft)

Depth (ft)

Width (ft)

Wall section - A (1'-10.5" step)

64

0.5

1.875

60.00

Wall section - A (1'-6" step)

64

0.5

1.500

48.00

Wall section - A (13" step)

64

0.5

1.125

36.00

Wall section - A (9" step)

64

2.75

0.75

132.00

Wall section - B (13" step)

20

0.5

1.125

11.25

Wall section - B (9" step)

20

0.75

0.75

11.25

Wall section - B (4.5" step)

20

0.75

30.00

Wall b/w NSL & Plinth level

290

1.13

652.50

S.Total:

Quantity (cft)

981.00 cft

11

BB work in front Steps

No

Length (ft)

Depth (ft)

Width (ft)

Step 1

115

0.5

172.50

Step 2

115

0.5

115.00

Step 3

115

0.5

57.50

S.Total:
BB work in Drain & Toe wall

Quantity (cft)

345.00 cft

No

Length (ft)

Depth (ft)

Width (ft)

Toe wall

210

0.375

78.75

Drain

210

0.375

157.50

S.Total:
Wastage @ 5%

78.11

Quantity (cft)

236.25 cft
78.11 cft

S.Total:
Total (4):

78.11 cft
1640.36 cft
46.46 m3

5. BB work in CSM (1:6) in Ground Floor (9" thick)


No

Length (ft)

Depth (ft)

Width (ft)

External walls 9" thick

10.00

0.75

0.00

Internal walls 9" thick

380

10.00

0.75

2850.00

Internal walls 4.5" thick

20

10.00

0.375

75.00

Above bond beam

230

1.75

0.375

150.94

S.Total:
Wastage @ 5%

153.80

3075.94 cft
153.80 cft

S.Total:
Parapet wall

Quantity (cft)

No

Length (ft)

Depth (ft)

Width (ft)

310

0.75
S.Total:

153.80 cft
Quantity (cft)
465.00 cft
465.00 cft

Deductions

No

Length (ft)

Depth (ft)

Width (ft)

Quantity (cft)

Columns

32

10

320.00

D1

10

0.75

240.00

12

D2

3.5

10

0.75

52.50

D4

2.5

0.75

26.25

D3

0.75

31.50

W1

16

0.75

432.00

Ventilators

0.75

9.00

S.Total:
Total (5):

1111.25 cft
2583.48 cft
73.17 m3

6. RCC (1:1.5:3) in Columns, beams, lintels etc.


Level - 1

No

Length (ft)

Depth (ft)

Width (ft)

Quantity (cft)

Column (C1)

20

6.0

120.00

Column (C2)

6.0

48.00

Column (C3)

6.0

24.00

Column (C1)

20

10.0

200.00

Column (C2)

10.0

80.00

Column (C3)

0.75

10.0

0.75

22.50

Bond Beam (BB1)

305

2.0

610.00

Bond Beam (BB2)

100

1.0

0.75

75.00

Bond Beam (BB3)

44

2.0

88.00

Projections

280

Level - 2

0.58

162.40
S.Total:

Wastage @ 5%

71.50

1429.90 cft
71.50 cft

S.Total:
Total (6):

71.50 cft
1501.40 cft
42.52 m3

13

7. Steel Reinforcement
In foundation

No

Length of
bars

Bar #

wt (lb/rft)

Footing - F1

11

95.86

0.668

704.36

Footing - F2

184.60

0.668

863.19

Footing - F3

249.00

0.668

1164.32

Footing - F4

208.25

0.668

556.44

Footing - F5

95.86

0.668

192.10

3961

0.376

1489.15

4026

1.502

6047.05

No

Length of
bars

Bar #

wt (lb/rft)

20

29.17

0.376

219.33

20

28.4543

1.502

854.77

29.17

0.376

87.73

24

0.668

128.26

24

1.502

288.38

29.17

0.376

32.90

24

1.502

108.14

20

47.83

0.376

359.71

20

40

1.502

1201.60

29.17

0.376

87.73

40

0.668

213.76

40

1.502

480.64

34.17

0.376

38.54

40

1.502

180.24

Plinth Beam

S.Total:
In slabs, beams, columns etc.

Quantity (lbs)

11016.61 lbs
Quantity (lbs)

Level - 1
Columns - C1

Columns - C2

Columns - C3

Level - 2
Columns - C1

Columns - C2

Columns - C3

14

Bond beam (BB1)

Bond beam (BB2)

Bond beam (BB3)

Column dowel

2876.50

0.376

1081.56

2440

1.502

3664.88

401

0.376

150.78

400

1.502

600.80

415.642857

0.376

156.28

352

1.502

528.70

530

1.502

796.06

Projetions

994.70
S.Total:

Wastage @ 5%

1163.61

12255.50 lbs
1163.61 lbs

S.Total:
Total (7):

1163.61 lbs
24435.72 lbs
11.09 tonne

8. Filling and compacting of earth under floors


No
Under floor

Length (ft)

Width (ft)

3487

Depth (ft)
1.50
Total (8):

Quantity (cft)
5230.50
5230.50 cft
148.13 m3

9. Sand Cushion Under floor (4" thick)


No
Under floor

Length (ft)

Width (ft)

3487

Depth (ft)
0.33
Total (9):

Quantity (cft)
1162.33
1162.33 cft
32.92 m3

10. Brick Ballast under floors (4" thick)


No
Under floor

Length (ft)

Width (ft)

3487

Depth (ft)
0.33
Total (10):

Quantity (cft)
1162.33
1162.33 cft
32.92 m3

15

11. PCC (1:4:8) under floor 4" thick


No
Under floor

Length (ft)

Width (ft)

Depth (ft)

3487

0.33
Total (11):

Quantity (cft)
1162.33
1162.33 cft
32.92 m3

12. PCC (1:2:4) under floor 4" thick


No
Under floor

Length (ft)

Width (ft)

Depth (ft)

3487

0.17
Total (12):

Quantity (cft)
581.17
581.17 cft
16.46 m3

13. Marble Flooring


No
Under floor

Length (ft)

Width (ft)

Quantity (sft)

3395

3395.00
S.Total:

Front steps

3395.00 sft

No

Length (ft)

Width (ft)

Quantity (sft)

Treads

115

1.08

372.60

Risers

115

0.46

211.60

Sides of steps

4.00
S.Total:
Total (13):

588.20 sft
3983.20 sft
370.19 m2

14. PCC (1:2:4) filling in doors/windows frames


Ground Floor

No

Length (ft)

Depth (ft)

Width (ft)

Quantity (cft)

D1

18

0.25

0.75

27.00

D2

23.5

0.25

0.75

8.81

D3

35

0.25

0.75

13.13

D4

22.5

0.25

0.75

8.44

W1

16

24

0.25

0.75

72.00

16

Ventilators

10

0.25

0.75
Total (14):

3.75
133.13 cft
3.77 m3

15. Plaster in CS mortar (1:4) 1/2 " thick


Sides

No.

Length (ft)

Height (ft)

External walls 9" thick

10.00

Internal walls 9" thick

380

10.00

7600

Above bond beam

380.00

1.75

Internal walls 4.5" thick

10.00

Wall b/w NSL & Plinth level

315

0.75

2
S.Total:

Columns & beams

Quantity (sft)

472.5
8073 sft

Sides

No.

Length (ft)

Height (ft)

Columns

32

16

2048.00

Beams

510

4.00

2040.00

Projections

280.00

560.00

S.Total:
Parapet wall

Sides

No.

Length (ft)

Width (ft)

310

6.75
S.Total:

Front steps

Quantity (sft)

4648.00 sft
Quantity (sft)
2092.50
2092.50 sft

Sides

No.

Length (ft)

Width (ft)

Threads

115

1.00

452.00

Risers

115

0.5

339.00

S.Total:
Drain

Sides

No.

Length (ft)

Width (ft)

210

3.5
S.Total:

Deductions
D1

Sides

No.

Length (ft)

Height (ft)

10

Quantity (sft)

791.00 sft
Quantity (sft)
735.00
735.00 sft
Quantity (sft)
640

17

D2

3.5

10

140

D3

2.5

70

D4

2.5

70

W1

16

1152

Ventilators

24

S.Total:
Total (15):

2096.00 sft
14243.00 sft
1323.70 m2

16. Painting of new surfaces


Sides

No.

Length (ft)

Height (ft)

External walls 9" thick

10

Internal walls 9" thick

380

10

7600

Internal walls 4.5" thick

20

10

400

S.Total:
Columns, beams, projections etc

Quantity (sft)

8000 sft

Sides

No.

Length (ft)

Height (ft)

Columns

32

10

1280.00

Beams

510

2040.00

Projections

145

2.00

290.00

S.Total:
Deductions

Quantity (sft)

3610.00 sft

Sides

No.

Length (ft)

Height (ft)

D1

10

640

D2

3.5

10

140

D3

2.5

70

D4

2.5

70

W1

16

1152

Ventilators

24

S.Total:
Total (16):

Quantity (sft)

2096.00 sft
9514.00 sft

18

Total (16):
884.20 m2
17. P/F wooden Doors
No.

Width (ft)

Height (ft)

D1

10

320

D2

3.5

10

70

D3

2.5

35

D4

2.5

35

Total (17):

Quantity (sft)

460.00 sft
42.75 m2

18. P/F Aluminium Windows with wire guaze


No.

Width (ft)

Height (ft)

Windows

16

576

Ventilators

12

Total (18):

Quantity (sft)

588.00 sft
54.65 m2

19. P/F Steel Windows Grill


No.

Width (ft)

Height (ft)

Windows

16

576

Ventilators

12

Total (19):

Quantity (sft)

588.00 sft
54.65 m2

20. Painting of doors


Sides

No.

Width (ft)

Height (ft)

Quantity (sft)

D1

10

640

D2

3.5

10

140

D3

2.5

70

D4

2.5

70

Total (20):

920.00 sft

19

Total (20):
85.50 m2

20

21. 1/2" thick marble skirting


No.

Length (ft)

Height (ft)

Science Lab

100

0.50

50.00

Computer Lab

100

0.50

50.00

Office

45

0.50

45.00

Store

33

0.50

33.00

Verandah 12 ft

36

0.50

18.00

Verandah 9 ft

33

0.50

33.00

S.Total:
Deductions

Quantity (sft)

229.00 sft

No.

Length (ft)

Height (ft)

Quantity (sft)

D1

0.50

16.00

D2

3.5

0.50

3.50

D3

2.5

0.50

2.50

D4

2.5

0.50

2.50

S.Total:
Total (21):

24.50 sft
204.50 sft
19.01 m2

22. Single Layers of tiles 10"x5"x1.25" laid over 4" earth and 1" mud plaster on roof
Length (ft)

Width (ft)

Quantity (sft)
3487

Total (22):

3487
324.07 m2

23. P/L of polythene sheet on roof


Length (ft)

Width (ft)

Roof

Quantity (sft)
3487

Total (23):

3487.00 sft
324.07 m2

21

24. PCC 1:2:4 on roof


Length (ft)
Roof

Width (ft)

3487

Quantity (cft)

0.17

581.17
581.17 cft

Total (24):

16.46 m3
25. P/L of Jumbolon on roof
Length (ft)

Width (ft)

Quantity (sft)

Roof

3487
3487.00 sft

Total (25):

324.07 m2
26. Making Khurras on roof 2' x 2' x 6"
Total (26):

7 Nos

27. Bottom Khurass of brick masonry in Cement Mortar (1:6) 4' x 2' x 4.5"
Total (27):

7 Nos

28. Wire mesh


No

Area (sft)

1462.00 sft

Quantity (sft)
1462
Total (28):

1462.00 sft
135.87 m2

29. Providing and applying Graiato on exterior walls


External walls
External walls 9" thick

Sides

No.

Length (ft)

Height (ft)

205

10
S.Total:

Deduction

Quantity (sft)
2050.00
2050.00 sft

Sides

No.

Length (ft)

Height (ft)

Windows

16

576.00

Ventilators

12.00

S.Total:
Total (29):

Quantity (sft)

588.00 sft
1462.00 sft

22

Total (29):
135.87 m2
30. 2" thick DPC of PCC (1:2:4)
No.

Length (ft)

Width (ft)

Wall footing section - A

64

0.75

48.00

Wall footing section - B

20

0.375

7.50

Total (30):

Quantity (sft)

55.50 sft
5.16 m2

31. Providing Pre-cast slab


No.

Length (ft)

Width (ft)

3487

Quantity (sft)
3487.00

Total (31):

3487.00 sft
324.07 m2

32. Providing and fixing gypsum board false ceiling


No.
False ceiling

Length (ft)

Width (ft)

3487

Quantity (sft)
3487.00

Total (32):

3487.00 sft
324.07 m2

33. Providing tuff tiles for plinth protection

Tuff tiles

No.

Length (ft)

Width (ft)

210

3
Total (33):

Quantity (sft)
630.00
630.00 sft
58.55 m2

34. Providing ceramic tiles


No.

Length (ft)

Height (ft)

Toilet walls

57

Toilet floors

93

Quantity (sft)
285.00
93.00

Total (34):

378.00 sft
35.13 m2

23

35. Spraying Anti-termite liquid in foundation.


No.

Length (ft) Perimeter (ft)

Quantity (sft)

Wall-A

64

9.5

608.00

Wall-B

20

5.5

110.00

Column footing -F1

11

20

880.00

Column footing -F2

24

672.00

Column footing -F3

28

784.00

Column footing -F4

32

512.00

Column footing -F5

20

240.00

Total (35):

3806.00 sft
353.72 m2

24

S.
No.

Description

Unit

Qty

Rate (Rs.)

Amount
(Rs.)

Septic Tank (10 ft x 4 ft)


1

Filling, watering and ramming earth under


floor with surplus earth from foundation, etc

m3

0.398

109.80

43.65

Excavation in foundation of building, bridges


etc complete :

m3

22.688

557.69

12,652.97

Plain Cement Concrete incl. placing,


compacting, finishing & curing (Ratio 1:4:8)

m3

1.161

5,385.03

6,252.79

Plain Cement Concrete incl. placing,


compacting, finishing & curing (Ratio 1:2:4)

m3

0.247

7,398.32

1,827.61

RCC in roof slab, beam, column & other


structural members, insitu or precast

m3

0.733

11,187.12

8,197.87

Supply & fabricate M.S. reinforcement for


cement concrete (Deformed bars)

tonne

0.0396

120,459.13

4,767.65

Pacca brick work in foundation and plinth in


Cement, sand mortar 1:6

m3

4.869

7,352.89

35,803.96

Supplying and filling sand under floor or


plugging in wells

m3

0.284

2,664.37

756.14

Cement plaster 1:4 upto 20' height 1/2" thick

m2

96.190

201.25

19,358.20

10

P&L RCC pipe, moulded with cement


m
concrete 1:1.5:3, incl. cost of reinfcnt, testing
etc : 6"
Providing and fitting CI soil pipe with : Cement m
caulked joint : 2" dia

9.144

787.52

7,200.73

1.000

577.57

577.39

Providing 2" coping (1:2:4)

2.440

602.59

1,470.08

Total:

98,909

11
12

m2

Estimation for Septic Tank (10 ft x 4 ft)


1. Excavation for Septic Tank
No
Size: Internal (10 ft x 4 ft)

Length (ft)
1

Depth (ft)

14.5

6.5

Width (ft)

Quantity (cft)

8.5
Total (1):

801.13
801.13 cft
22.69 m3

2. PCC (1:4:8) in foundation


No

Length (ft)

Depth (ft)

Width (ft)

Quantity (cft)

Long wall

12.75

0.5

25.5

Short wall

2.75

0.5

5.5

Base

10

0.25

10

Total (2):

41.00 cft
1.16 m3

3. Back filling of earth in base


No
Base

Length (ft)
1

Depth (ft)

8.75

0.583

Width (ft)
2.75
Total (3):

Quantity (cft)
14.04
14.04 cft
0.40 m3

4. Sand Filling under base


No
Base

Length (ft)
1

Depth (ft)

9.25

0.333

Width (ft)
3.25
Total (4):

Quantity (cft)
10.021
10.02 cft
0.28 m3

5. PCC (1:2:4) in base


No
Base

Length (ft)
1

9.625

Depth (ft)
0.25

Width (ft)
3.625
Total (5):

Quantity (cft)
8.723
8.72 cft
0.25 m3

24

6. RCC (1:2:4)
No

Length (ft)

Top slab
Baffle wall

Depth (ft)

Width (ft)

Quantity (cft)

12

0.333

24

1.500

0.25

1.875

Total (6):

25.88 cft
0.73 m3

7. Steel in slab
Spacing

No.

Length(ft)

Wt. (lb/ft)

Quantity
(lbs)

Main steel

#3@8"c/c 19

0.376

42.86

Distribution steel

#3@12"c/c 7

12

0.376

31.58

34

0.376

12.78

Baffle wall

Total (7):

87.23 lbs
0.0396 tonne

8. BB work in CSM (1:6)


18 " thick wall

No

Length (ft)

Depth (ft)

Width (ft)

Quantity (cft)

Long wall

12.25

0.5

1.5

18.375

Short wall

3.25

0.5

1.5

4.875

S.Total:

23.25 cft

13.5 " thick wall

No

Length (ft)

Depth (ft)

Width (ft)

Quantity (cft)

Long wall

11.875

0.5

1.125

13.359

Short wall

3.625

0.5

1.125

4.078

S.Total:

17.44 cft

9 " thick wall

No

Length (ft)

Depth (ft)

Width (ft)

Quantity (cft)

Long wall

11.5

0.75

86.25

Short wall

0.75

30.00

S.Total:

116.25 cft

25

4.5" thick

No

Internal baffel walls

Length (ft)
2

Depth (ft)

Width (ft)
5

Quantity (cft)

0.375

15.00

S.Total:

15.00 cft
171.94 cft

Total (8):

4.87 m3
9. 2" Coping (1:2:4)
No

Length (ft)

Depth (ft)

Width (Ft) Quantity (sft)

Long wall

11.5

0.75

17.25

Short wall

0.75

Baffle wall

0.375

3
26.3 sft

Total (9):

2.44 m2
10. Plaster in CS mortar (1:4) 1/2 " thick
Sides

No

Length(ft)

Height(ft)

Quantity (sft)

Long wall

10.75

860.00

Short wall

4.75

95.00

Baffle walls

80.00

Total (10):

1035.0 sft
96.19 m2

11. Providing and laying CI soil Pipe 2 " dia with cement caulked joint

Total (11):

3.3 ft
1.00 m

12. Providing and laying RCC 4" dia in septic tank

Total (12):

30.0 ft
9.14 m

26

S. No.

Description

Unit

Qty

Rate (Rs.) Amount (Rs.)

Soakage Pit (5 ft internal dia)


1

Excavate well in dry & dispose of soil within 50m In


hard strata like shingle : Upto 1.5 m depth

m3

4.622

411.52

1,902.26

Excavate well in dry & dispose of soil within 50m In


hard strata like shingle :1.5 to 3 m depth

m3

2.735

426.28

1,165.95

Excavate well in dry & dispose of soil within 50m In


hard strata like shingle : 3 to 4.5 m depth

m3

6.577

444.41

2,922.99

Plain Cement Concrete incl. placing, compacting,


finishing & curing (Ratio 1:4:8)

m3

0.096

5,385.03

516.28

Plain Cement Concrete incl. placing, compacting,


finishing & curing (Ratio 1:3:6)

m3

0.096

6,018.51

577.02

RCC in roof slab, beam, column & other structural


members, insitu or precast. Type C (1:2:4)

m3

0.313

11,187.12

3,502.64

Supply & fabricate M.S. reinforcement for cement


concrete (Deformed bars)

tonne

0.016

120,459.13

1,927.35

Pacca brick work in foundation and plinth in


Cement, sand mortar 1:6

m3

2.173

7,352.89

15,979.84

P&L RCC pipe, moulded with cement concrete


1:1.5:3, incl. cost of reinfcnt, testing etc : 6"

4.572

787.52

3,600.37

10

P/L of bricks bats in Soakage pit

m3

11.116

510.74

5,677.34

Total:

37,772

Estimate for Soakage pit (5 ft internal dia, 22 ft deep)


1. Excavation (Sinking) for Soakage pit
Dry Sinking ( up to 1.5 m)

No

Area (sft)

6.5' dia

Depth (ft)

33.166

4.921
Total:

Dry Sinking (1.5 m - 3 m)

No

Area (sft)

5' dia

Depth (ft)

19.625

4.921
Total:

Dry Sinking (3 m - 6.607 m)

No

Area (sft)

5' dia

Depth (ft)

19.625

11.834
Total:

2. PCC (1:4:8)
Length (ft) Depth (ft) Width (ft)

No

13.541

0.2500
Total (2):

3. RCC (1:2:4)
Length (ft) Depth (ft) Width (ft)

No
Top slab

33.17

0.333
Total (3):

Quantity (cft)
163.22
163.22 cft
4.62 m3
Quantity (cft)
96.58
96.58 cft
2.74 m3
Quantity (cft)
232.24
232.24 cft
6.58 m3
Quantity (cft)
3.385
3.39 cft
0.10 m3
Quantity (cft)
11.055
11.06 cft
0.31 m3

4. Steel in cover slab


Spacing
Steel

No.

Length

Wt lb/ft

#3@8"c/c B/W

0.376
Total (4):

35.26 lbs
0.016 tonne

5. BB work in CSM (1:6)


Height
(ft)
Walls

Area (sft)

5.667

Quantity (cft)
13.541

76.738
Total (5):

76.74 cft
2.17 m3

6. Coping 3" thick (1:3:6) over brickwork


Height
(ft)
0.25

Area (sft)

Quantity (cft)
13.541

3.385
Total (6):

3.39 cft

27

Total (6):

0.10 m3

7. P/L Brick bats filling in soakage pit (5 ft dia)


Height
(ft)
Walls

20

Area (sft)

Quantity (cft)
19.625

392.500
Total (7):

392.50 cft
11.12 m3

8. Providing and laying RCC 4" dia in Soakage pit


Total (8):

15.0 ft
4.57 m

28