Calculation
Output
X
hs
B
H
hw
hw
h
l
hs
Figure 01
Dimentional Properties
h
1.2
1.5
7.2
150 kN/m2
Section Thickness
Main R/F
Cover to R/F
Grade of Concrete
0.2
=
=
12 mm
45 mm
25 N/mm2
24 kN/m3
20
'
Soil Cover ,
( hw , h
span/(10 ~15))
Properties of Soil
kN/m3
9.81 kN/m3
25
1 - Permanent Loads
1.1
Dead Loads
The nominal dead doad consist of the weight of the materials and the
part of the structure
Structural
Engineering
Becouse of the arching of soil, check whether the depth above culvert is
Design in
preactice
(Roger -
westbrook)
3 x width
(page-94)
=
=
3 x width < =
Depth limited to
7.2
3
m
1.6
4.8
7.2
4.8 m
4.8
So
Surcharge on Roof
Surcharge Presure (qr)
qr
Soil
Engineering
(Spangler &
Handy)
96
20
kN/m2
Doc. No.
Designed
Checked
Job Code
C
E
B
Dam Safety
Environmental &
Civil Structure Maintanance
Reference
Calculation
S.M.P
Date 31.05.2010
Date
Page
1
Output
7.2
Surcharge on Roof
Surcharge Presure (qr)
(qr)
= Cd..Bd2
Cd
1-e-2K'(H/Bd)
2.K.'
'
tan '
1-sin
1+sin
'
Bd
Cd
So, K
1-sin
Bd =
1+sin
=
'
=
=
2.K.'.(H/Bd) =
Cd
Structural
1.2
0.406
tan '
0.466
0.76
1.403
(qr)
Cd..Bd2
(qr)
101.0
kN/m2
Engineering
Design in
preactice
(Roger westbrook)
K0
1-sin '
0.577
(page-94)
Ka
0.406
( = 0 )
q max
= .Ka.h
=
20 x 0.41 x
= 73.9 kN/m2
qep
=
20 x 0.41 x
= 15.42
kN/m2
q
q
= qmax - qep
=
58.44 kN/m2
Doc. No.
Designed
Checked
Job Code
C
E
B
Dam Safety
Environmental &
Civil Structure Maintanance
Reference
Calculation
9.1
1.9
S.M.P
Date 31.05.2010
Date
Page
1
Output
AASHTO
3.7.1
For Fill Depths H 8 feet (2400 mm) and Culvert Clear Span Length,
The effect of live load is neglected in design when the depth of fill is more than
8 feet
3 - Hydrostatic Pressure (Internal)
q ip
= C.h
= 9.81 x
1.7
= 16.68
kN/m2
4 - Analysis
Reinforced
Concrete
Constant K
Designers
hs
hw
Manual
(ref-5.1)
1.21
k1
k3
=
=
K+1
K+3
=
=
2.21
4.21
k5
k7
2K+3
5.43
=
=
2K+7
9.43
3K+8
11.64
k8
4.1
MB = qip.h .K.k7
60.k1.k3
= 0.99 kN.m/m
MC =
MD = Ma. K8
k7
= 1.217 kN.m/m
Concrete
qip
Designers
MA =
Manual
C
(ref-5.1)
q = qip
Pressures
B.M.D
=
=
hw..h
q1 = 2.G
l.hw
8.2 kN/m
10.20 kN/m2
Reinforced
A
Concrete
MA =
2
MB = q1.l .K
12.k1.k3
= 0.22 kN.m/m
MC =
MD = Ma. K5
K
=
-0.97
Designers
G
Manual
(ref-5.1)
D
q1
Pressures
B.M.D
kN.m/m
C
E
B
hs.c
4.8
Doc. No.
Designed
Checked
Job Code
Dam Safety
Environmental &
Civil Structure Maintanance
Reference
Calculation
A
kN/m2
S.M.P
Date 31.05.2010
Date
Page
2
Output
MA =
MC =
MD
= q.l
12.k1
=
-0.35
D
q = q1
Pressures
MB =
B.M.D
kN.m/m
Hydrostatic
ulsMb
Walls
Roof
Walls +
Roof
ulsMb
Total
uls
A and B
0.99
1.4
1.38
0.22
-0.35
-0.14
1.4
-0.19
1.19
C and D
1.22
1.4
1.70
-0.97
-0.35
-1.32
1.4
-1.85
-0.15
Roof midSpan
0.99
1.4
1.38
0.22
1.04
1.4
1.45
2.83
Base midSpan
1.22
1.4
1.70
**
1.53
0.82
2.35
1.4
3.29
5.00
Walls
middle
*
-2.06
1.4
-2.88
-0.38
-0.35
-0.73
1.4
-1.02
-3.90
**
0.82
**
Table - 01
Fixed end mement of the wall for Hydrostatic load
MA
MC
W.L
W.L
2.41 kN.m/m
W.L
15
=
10
1.607 kN.m/m
23.3
=
-1.0 kN.m/m
0.26 m
MA =
2
MB = qep.h .K.k7
60.k1.k3
= -0.91 kN.m/m
MC =
MD = MA. K8
k7
= -1.13 kN.m/m
Designers
Manual
(ref-5.1)
qep
qep
C
E
B
Pressures
B.M.D
Doc. No.
Designed
Checked
Job Code
Dam Safety
Environmental &
Civil Structure Maintanance
Reference
S.M.P
Calculation
4.2.2 Surcharge on walls,q
MA =
MB =
MC =
MD
Date 31.05.2010
Date
Page
3
Output
Reinforced
Concrete
Designers
Manual
(ref-5.1)
2
= q.h .K
12.k1
= -7.72 kN.m/m
4.2.3 Surcharge on Roof ,qr
MA = MB = MC = MD
2
= q.l
12.k1
=
-7.45 kN.m/m
Addition of moment for Load Case 2
D
B.M.D
Pressures
A
D
B.M.D
Pressures
Total
Walls & Surcharg Roof(LC-1) e (Roof) (Survice)
Posotion
qep
A and B
-0.91
-7.72
-0.14
-7.45
-16.22
1.4
-22.70
C and D
-1.13
-7.72
-1.32
-7.45
-17.62
1.4
-24.66
Roof mid-Span
-0.91
-7.72
1.04
17.29
9.70
1.4
13.58
Base midSpan
-1.13
-7.72
2.35
17.29
10.80
1.4
15.12
-0.73
-7.45
6.65
1.4
9.31
Walls middle
**
1.43
13.39
Total
U.L.S.
MC
W.L
15
=
10
1.486 kN.m/m
2.229 kN.m/m
W.L
23.3
=
4.2
W.L
-1.0 kN.m/m
C
E
B
Posotion
L.C.02
(Service)
Hydrost.
(Service)
Total
(Service)
L.C.02
(U.L.S.)
Hydrost.
(U.L.S.)
A and B
-16.22
0.99
-15.23
-22.70
1.38
-21.32
C and D
-17.62
1.22
-16.40
-24.66
1.70
-22.96
Roof mid-Span
9.70
0.99
10.69
13.58
1.38
14.96
Base midSpan
10.80
1.22
12.02
15.12
1.70
16.83
Walls middle
6.65
-2.06
4.59
9.31
-2.88
6.43
Doc. No.
Designed
Checked
Job Code
Dam Safety
Environmental &
Civil Structure Maintanance
Reference
Calculation
5 - Check on ground safe bearing pressure
5.1
Total
(U.L.S.)
S.M.P
Date 31.05.2010
Date
Page
4
Output
Hydrostatic Pressure
16.68
kN/m2
Weight of walls
10.20
kN/m2
9.60
kN/m2
Total Pressure
36.48
Weight of walls
10.20
kN/m2
9.60
kN/m2
Surcharge on Roof
Total Pressure
=
=
96.00
kN/m2
115.80
Weight of walls
10.20
kN/m2
9.60
kN/m2
Surcharge on Roof
Hydrostatic Pressure
=
=
96.00
kN/m2
16.68
kN/m2
Total Pressure
122.28
Total Pressure
5.2
kN/m2
hence ok
150 kN/m2
Total Pressure
5.3
<
<
kN/m2
hence ok
150 kN/m2
Total Pressure
<
150 kN/m2
kN/m2
hence ok
6 - U.L.S. of Flexture
Maximum Moments kN.m/m
Member
Hogging
Roof
-22.70
(L.C-01)
Walls
-24.66
Base
-24.66
Sagging
14.96
(L.C-03)
(L.C-02)
9.31
(L.C-02)
(L.C-02)
16.83
(L.C-03)
i - Slabs
Maximum Moment
C
E
B
kN.m/m
Doc. No.
Designed
Checked
Job Code
Dam Safety
Environmental &
Civil Structure Maintanance
Reference
24.15
Calculation
66.1
Analysis was carried out for several load cases of various loading
S.M.P
Date 31.05.2010
Date
Page
5
Output
Section Thickness
mm
mm
200 mm
12
12
24.15
Effective depth, d
200
45 -
kN.m/m
mm
= 149
mm
= 149
k
mm
2
M
/
(bd
fcu)
=
0.044
< 0.156
= (0.87fy)Asz
= (1 - 1.1fyAs/ fcubd) d
z
z
equation 1
equation 5
= d (0.5+(0.25-k/0.9)1/2
1/2
= d [0.5+(0.25-0.044/0.9)
=
141.41
Take Z as 0.95d
Z = 0.95
= 0.95
< 0.950 d
149
= 142
mm
As req
mm /m
12 @ 250
( As
426
=
mm2/m
426
=
452
mm2/m
As pro
452
Minimum area of main rainforcement for slabs
100As / bad
= 100x452/(1000x149)
= 0.30
## 0.13
mm2/m
Main r/f
T
12
250
Hence o.k
6.2
C
E
B
109.08 x 1.2 /2
65.45 kN/m
Doc. No.
Designed
Checked
Job Code
Dam Safety
Environmental &
Civil Structure Maintanance
Reference
Calculation
Design shear force, V design
65.45 kN/m
=
149 mm
Tension steel across shear plane = Y12 -250 c/c
Effective depth, d
100 As/bd
100 x 452
S.M.P
Date 31.05.2010
Date
Page
6
Output
=
BS 8110
Effective depth
vc
Part 01
table 3.1
Design shear stress
= 149 mm
1/3.
1/4
= 0.79x{(100As/bd) (400/d) /1.25
= 0.54
= V/bd
= (65.45x103)/(1000x149)
=
6.3
Bs 8110
1000x149
0.30
0.44 N/mm2
<
vc
Hence o.k
Check in U.L.S. on the ability of the wall to trasmit the axial loads
Check h/hw
3.9.3.6.2
3.4.4.1
=
=
1.7 /
0.2
8.5 <
12
hence column is short
BS 8110 indicates that the effect of the axial load may be ignored if this force does
not exceed 0.1.fcu.(c.s.a.)
hence
0.1.fcu.(C.S.A)
=
=
0.1 x
30
600
kN/m
200
1/2( 96.0 x
+
1.7
0.2
x 1.4
1.7
x 24x1.4 )
600 kN/m
hence o.k.
The above calculation assumes that the wall is cosidered as reignfoced and not
mass concrete
vertical R/F provided
so Area
Percentage of Concrete area
12
1131.0 mm2
1131.0 x
1000 x
=
This is
C
E
B
>
100
0.4 %
hence o.k.
Doc. No.
Designed
Checked
Job Code
Environmental &
Civil Structure Maintanance
Calculation
2 Layers
149
0.759 % >
Minimum of 0.4%
Dam Safety
Reference
200
S.M.P
Date 31.05.2010
Date
Page
7
Output
C
E
B
Dam Safety
Environmental &
Civil Structure Maintanance
Doc. No.
Designed
Checked
Job Code
S.M.P
Date 31.05.2010
Date
Page
8