DESIGN OF SINGLE BOX CULVERT NO MODEL

BRIDGE NO :

MODEL

CHAINAGE:

6,364

Date :

05/04/15

Time :

11:51

Straight

DATA FOR DESIGN


Clear Span

2.000 m

Straight or Skew

Clear Height

1.500 m

Size of Haunch

Bed Level(Top of W.C)

152.610 m

Barrel length C/L to u/s side

5.525 m

Formation Level

155.390 m

Barrel length C/L to d/s side

5.750 m

Distance between box & drop wall

GENERAL DATA
Bed Slope

H.F.L

1 IN 100

200 mm

3.469 m

Distance between box & curtain wall

3.333 m

Length of curtain & drop wall

9.540 m

ASSUMPTIONS
Grade of Concrete

Density of Soil (Saturated)

1.900 t/cum

Weight of Track & Ballast

5.500 t/m

Density of Concrete

2.500 t/cum

Ballast Cushion

0.350 m

Angle of Internal friction

Loading Standard

Thickness of Wearing Coat

Grade of Steel
Equivalent U.D.L
Formation Width

M 25

HMLS

35 Degrees

Density of Water

0.150 m

Clear cover on all faces

50 mm

Fe 415

Intensity of Surcharge

15.800 t/m

60.000 t

Spacing of Haunch bars

Thickness & Projection of L.C

6.950 m

1.000 t/cum

200 mm
0.10 m

RESULTS
Thickness of Top Slab

35 cm

Depth of Over-burden soil @ Centre

Thickness of Bottom Slab

35 cm

Maximum Foundation Pressure

Thickness of Vertical Wall

35 cm

Length of Barrel

1.080 m
15 t/sq.m
11.275 m

SECTION OF SQUARE RETURN WALL


Effective Span

2.350 m

Effective Height

1.850 m

GENERAL
Length of return wall

TOTAL QUANTITIES
Description

3.400

Offset 1

0.450

1.925

Offset 2

0.450

Depth of surcharge (u/s side)

1.010

Total bottom width

2.250

Clear ht of wall
Quantity

Appr. Rate

Unit

Amount

Earthwork excavation

67.122

14.60

CUM

980

9.628

OTHER SIDE

M.C.C. in Foundation

44.916

190.70

CUM

8,566

Top width

0.450

Slope 3

M.C.C.in super structure

13.443

190.70

CUM

2,564

Foundation depth

1.300

R.C.C.in foundation

12.064

583.40

CUM

7,038

EARTH SIDE

R.C.C.in super structure

21.534

583.40

CUM

12,563

No of footings

Boulder filling

15.708

90.60

CUM

1,423

Stone pitching

68.001

75.75

SQM

5,151

Cement
Steel

40.405

2,500.00

MT

101,013

2.439

15,000.00

MT

36,588

Bearing pressure

Vertical

Slope 4

Vertical

Offset 1

0.450

Offset 2

0.450

Depth of footing

0.650

Ht for slope 1

1.000

Slope 1

Vertical

SHEAR KEY

Slope 2

Vertical

Width
depth

V
W

BAR BENDING SCHEDULE LENGTHS


Approximate cost involved

175,885.99

a1

2.088

1.005

1.005

2.600

a2

2.588

0.843

0.843

2.600

2.588

0.843

0.843

2.100

f1

1.031

0.128

0.128

552

f2

1.031

0.128

0.128

460

g1

0.242

0.096

0.096

368

g2

0.242

0.096

0.096

g3

0.242

0.096

0.096

DEVELOPMENT LENGTHS OF BARS (Ld)


36 =

1656

20 =

920

32 =

1472

16 =

736

28 =

1288

12 =

25 =

1150

10 =

22 =

1012

8=

REINFORCEMENT
DESCRIPTION SPACING OF BARS
a1

DIAMETER

LENGTH

NOS

12

4.098

5.00

20.490

0.889

18.214
18.997

200

TOTAL LENGTH UNIT WEIGHT

TOTAL WEIGHT

a2

200

12

4.274

5.00

21.370

0.889

100

12

2.600

10.00

26.000

0.889

23.113

200

12

4.274

5.00

21.370

0.889

18.997

100

12

0.889

23.113

2.600

10.00

26.000

200

12

2.100

5.00

10.500

0.889

9.334

f1

200

12

1.287

5.00

6.434

0.889

5.720

f2

200

12

1.287

5.00

6.434

0.889

5.720

ALONG BARREL
ALONG SPAN
g1

200

200

0.434

50.00

21.700

0.395

8.573

g2

200

200

0.434

50.00

21.700

0.395

8.573

g3

200

200

0.434

37.50

16.275

0.395

200

10

1.000

96.00

96.000

0.617

6.430
59.263
206.046

TOTAL QUANTITY OF STEEL (Incl. 5 % extra for wastage)

2.439 MT

SBOX.WQ1

Page 3