EXECUTIVE SUMMARY
=============================================================
INSTRUMENT & CONTROL ENGINEER
=============================================================
ACHIEVEMENTS
Experienced in full project lifecycle including conceptual, detailed design, change
control, test, commissioning, support for Uthmaniyah Gas Plant, Sulfur Recovery Unit
EXPERIENCE SUMMARY
1 ESSAR Projects Pvt Ltd :July 2013- till Present
Designation: Manager .
Project Implementation of MB Lal recommendations for Indian Oil Marketing
terminals
Job Profile: Carrying out site survey, finding the safety gaps in line with OISD norms,
recommending changes to be in line with MB Lal &OISD norms. Preparing BOQ /Tender
specification for the entire terminal automation system
2 Jacobs Engineering Mumbai; From May 2012- till July 2013
Designation: Instrument & Control Engineer
Project SAGD system for Suncor
Job Profile: Preparing data sheets, Material requisitions for Quotation / Purchase, &
Technical Bid Evaluations for Various Instruments like
Ultrasonic/Vortex /Coriolis/Flow Elements
Shutdown Valves & Control Valves
Analyzers (Toxic, Combustible, H2S detectors)
Control Systems Like (DCS/ESD /F& G systems)
3 Tebodin & Co LLC, Muscat -:August 2011 Till March 2012, PDO
Designation: Instrument & Control Engineer
Project: On Plot Piping replacement for Saih rawal
To maintain Pipeline integrity against extreme rate of corrosion, and as per
recommendation of third party consultant it was decided by PDO to change the entire
piping along with in line instruments ,Piping spec was to be CS+3mm corrosion
allowance with FBE ,while inline instruments was CS+ DSS trims .
Job Profile Included
A. Visiting Site to Get all Relevant Information
B. Participating in Review meetings
C. Inter discipline co-ordination
D. Preparing RFQ for ESD On/Off , Control Valves, etc
E. Technical Bid Evaluation
F. Participating In FAT
Got well versed with Shell MESC SPE & DEP for making specification
=============================================================
INSTRUMENT & CONTROL ENGINEER
=============================================================
4 Mustang Al-Hejailan Consultant, Saudi Arabia. Feb 2010 to Feb 2011
Project: Tank Dewatering /Closed drain system for Jeddah Refinery, Client Saudi
Aramco
Job Profile: Preparing proposal Engineering package for the tank dewatering /closed
drain system
5
=============================================================
INSTRUMENT & CONTROL ENGINEER
=============================================================
Project Engineering& Construction Support activities for Calcinations Plant
Alumina plant was constructed by Hindalco with Consultant being Engineers India
Ltd, while licensor being Lurgi (Gmbh), Furnace Fabrica was the engineering
service provider for Lurgi.
Job Profile Included
A. Data sheets for different instruments
B. Technical Bid Evaluation
C. Reviewing Vendor drawings and putting comments as per specification
8 Jasubhai Engineers Ltd, July 04 to: March 06, Mumbai
In Line with NFPA requirements, fired equipments have to be provided with flame
scanners/Double Block &Bleed valve /PLC Panel (Burner Management system)
Job Profile Included
A. Creating function block diagram based on ISA 5.2
B. Based on function block diagram creating ladder logic diagram on RS Logix 500
C. Wiring diagrams for PLC panel
D. Data sheets for different instruments
E. Panel inspection and testing
F. Providing Commissioning assistance for Burner Management system
9 Gayatri Engineers Ltd, July 02 to July 04, Mumbai.
The above mentioned company was an instrument service provider for various
industries major focus was on calibration of process instruments
Instrument erection & construction support provided to various Clients like UHDE
India, Kravener etc