Project Outline
Scope of work
Process Capacity
Time Schedule
Layouts
Plant Description
Conclusions
Scope of Work
Design &
Engineering
Signing of
Contact
IN ESTONIA
AT SITE
Procurement
Modules
Construction
Installation of
equipment
IQ & GMP
Inspection
Plant
Disassembly
Signing of
Contract
Warehouse &
Shipment
Administr. bldg
Reassembly
Foundation and
of Plant
sewage system
Operator
Electricity and
Training
water supply
Commissioning
IQ OQ
Validation/PQ
Operation
Production
Risk assesment
GMP and containment
Protect the product
Protect the employees
Potency OEL
General Recomendations
Dispensing
API dispensing in isolator
Excipients dispensing under LAF
Sieving
Tabletting
Coating
Sorting
Blister Packaging
Detail design in 3D
Equipment Installations
Utility Installations
Transport
Site Assembly
Time Schedule
Important features
Value proposition
Time
Shorter time to market
(6-24 months faster than conventional)
Deferred investment decision
More time for process development