NO. YJ:
Start time d/ m/ y/ h/ min; finish time: d/ m/ y/ h/ min
Page: 1 /2
Content
Safety measures
1
2
Operators should be in good spiritual mood and familiar with the system.
Operation measures
Check all maintenance and installation work of station transformer #1 has been
finished.
10
Check all parts of station transformer #1 is in good condition, and are ready for
charge.
11
12
13
14
15
Check station transformer protection has been put into service correctly.
16
17
Check station transformer cable protection has been put into service correctly.
18
19
20
Rema
rk:
Time
Page: 2/2
Content
21
22
23
24
25
26
27
Check isolator 0601 of station transformer #1 low voltage side is open and ready
for charge.
28
29
30
31
32
Check switch 209 three phase of station transformer #1 high voltage side is closed.
33
34
35
36
37
38
Check the current on section 00BCA and 00BCB of station 6.6KV bus is normal.
39
Rema
rk:
Operator
Guardian
Shift supervisor
Shift in charge
Time