Sei sulla pagina 1di 6

CERRO VERDE PRODUCTION UNIT EXPANSION (CVPUE)

SMI/CONTRACTORS QA WEEKLY MEETING MINUTE


Meeting Subject:

QAQC Alignment

CVPUE Contract #:

Project:
Meeting Date:
Next Meeting Date:

CVPUE

Location:
Meeting No.:

January 06th , 2014


January 13th , 2014

Distributed:
ATTENDEES
CONTRACTOR

SMI/Fluor

David Velarde ( K005)


Dunia Luque ( K004 )
Aldo Gutierrez ( K004 )
Rosario Prez ( K122 )
Pablo Celis ( K122 )
Alexander Serruto ( K121)
Daniel Tallerico (K162)
Carlos Vargas ( K109 )
Javier Jordn ( K062 ) BV
Joseph Muoz (K154)
Marco Daz ( K101 )

SMI
Jess Correa
Claudio Gallardo
Andrs Diaz
Denis Paredes
Edwin Marin
Daria Mora
German Lpez

Prepared By:
Daria Mora
DISTRIBUTION (plus attendees)
SMI/Fluor
Others

Evert Valencia
Cesar Romero
Alejandro Peceros
Rogger Puican
Marco Falcn
Jorge Grados
Jorge Bravo
Milton Pino
Saturnino Flix
Alan Aldave
Williams Merzthal
Pedro Astorga
Erasmo Cabanillas
Jssica Delgado

08.00 a.m to 08.45 a.m.

2.0

001

Ana Gamero ( K154 )


Jos Fernndez (K101)
Beatriz Huapaya ( K136 )
Juan Ipince ( K141 )
Pamela SantaCruz ( K136)

PURPOSE OF MEETING: QAQC Project Program Alignment


Summary Of Meeting

Item

1.0

K004,K005,K062,K101,
K109,K121,K122,K136,
K141,K162
Conference No. 3

1.1 Safety Topic / Tpico de Seguridad


Stress management at workplace / Manejo del
estrs en el lugar de trabajo.
2.1 General Topics / Tpicos Generales
Implement revision 2 of concrete form F71001
effective December 21st / Se les recuerda
implementar el formato de concreto F71001 en
revisin 2 el cual se encuentra vigente desde
la charla del sbado 21 de diciembre 2013.
Keep in mind that during pre-installation
inspection of structures SMI personnel will ask
for topographical records of pre and post
concrete pour. Post pour verification must take
place as soon as possible to aid in corrections
if need it. / Se les recuerda que durante las
inspecciones previas a la instalacin de
estructuras se pedir la topografa pre y post
vaciado de elementos embebidos. La
verificacin post debe hacerse lo ms rpido
posible despus del vaciado para facilitar las
correcciones en el concreto fresco en caso se
necesiten.

QA Weekly Meeting

Responsibility

Date
Opened

Due Date

Date
Opened

Due Date

K154

Responsibility

SMI/ All
contractors

SMI / All
contractors

Page 1

Supermix concrete test results send to


contractors must be recorded in form F71007 /
Los resultados de resistencia de concreto
suministrados por Supermix y enviados a los
contratistas por QA SMI deben ser pasados al
formato F71007.
Documents already reviewed by SMI and
approved in status A, whenever reissued with
any modification they must have changes
identified to facilitate revision of the new
document / Los documentos que ya han sido
revisados por SMI y aprobados en estatus A,
si son reenviados con alguna modificacin
deben contar con un historial de cambios o la
identificacin de los mismos por cualquier
medio que facilite la revisin del nuevo
documento.
SMI PDDM does not accepted that contractor
issued documents in Rev. 0 without previous
approval on status A and still when have been
solve all observations and comments. Jess
Correa will coordinate with PDDM to avoid an
additional step in the process of reviewing
documentation. SMI PDDM no acepta que el
contratista someta los documentos en revisin
cero sin previa aprobacin en estatus A aun
cuando ya se hayan integrado todos los
comentarios y observaciones. Jess Correa
coordinar con PDDM para evitar un paso
adicional en el proceso de revisin.
Contract K004
Contractor continues with following works at
Sub-Station 9 and 12 as :
- Transformers and panel board assembly
Contratista sigue con los trabajos en la
subestacin 9 y 12 segn:
- Montaje de transformadores y tableros.
SMI QA issued an NCR (bentonita), contractor
informed that they are going to change the
design of the grounding well. To be closed
verification by Alejandro Peceros/ SMI QA
emiti una NCR acerca de la bentonita,
contratista inform el cambio en su diseo del
pozo a tierra. Las acciones fueron tomadas
verificacin por Alejandro Peceros.
Contract K005
nd
Contractor is sending on Monday 2 Dec. the
following documentation and will reissue ITP
rejected:
- Tensile bolts test
- Chemical bolt test
Partially accepted. Pending information for
remaining bolts.
Contratista enviar el lunes 2 de diciembre la

QA Weekly Meeting

All contractors

All contractors

All contractors

K004

K004

K005

Page 2

siguiente documentacin y reenviar el ITP


rechazado:
- Pruebas de traccin de los pernos
- Ensayos qumicos a los pernos.
Parcialmente aceptado. Pendiente informacin
de los pernos restantes.
Work pending in P2 tower: bolt torque
wrenching and equipment connection /
Trabajos pendientes en torre P2: torqueo de
pernos y conexionado de equipos.
Contract K101
Contractor informed of a scratch at HDPE
pipe 16 (access road area). SR report was
issued and a hydrostatic test leaking
performed to check it. Test done and
approved. Verify closure with Milton Pino /
Contratista inform de un rasguo en la
tubera de 16 HDPE ( zona access road ),
se emiti un SR reporte y se levantar con
la prueba hidrosttica. Prueba realizada y
aprobada. Verificar cierre con Milton Pino.

Contractor informed of a fissure on a weld


seam next to a flange at crushing area,
Bureau Veritas performed MT and
determined it is not a material problem.
Flange and pipe 1 heated by welding will
be cut off and new flange installed.
Contractor to advise status / Contratista
inform de fisura en un cordn de
soldadura colindante a una brida en la
zona de molienda, Bureau Veritas realizo
MT y determino que no es un problema de
material. La brida y tubera de 1 afectada
por el calor de la soldadura ser cortada y
una nueva brida ser instalada. Contratista
informar estatus.
Contractor informed that is left 02
accessories to perform Holiday inspection
by IMCO. Verify with Milton Pino /
Contratista inform que falta ubicar 02
accesorios para realizar la prueba de
Holiday por IMCO. Verificar con Milton
Pino
Contractor to inform about status of SR028 / Contratista debe informar sobre el
status del SR-028
QA SMI audit to start on January 28th.

Contract K109
Contractor needs to issue design for
formwork, shoring and construction joints
location for elevated slab / Contratista
deber enviar el diseo de encofrado,
apuntalamiento y ubicacion de juntas de
construccin para vaciado de losa
elevada.
Observations
for
embed
fabrication

QA Weekly Meeting

K005

SMI / K101

SMI / K101

SMI / K101

K101

SMI

K109

Page 3

(Ingemetales) have completed by sending


an Engineering RFI. NCR for installed
embeds closed with RFI-053 response /
Observaciones encontradas en el taller de
fabricacin
de
embebidos
fueron
completadas a travs de un RFI a
Ingeniera. NCR embebidos instalados fue
cerrado con respuesta RFI-053.
Require contractor update concrete log and
brakes test as work moves forward to avoid
paperwork from building up / Se require que
el contratista actualice el log de concreto y
los ensayos de rotura a medida que el
trabajo avanza para evitar atraso en la
documentacin
Submit grout placement procedure for prior
to starting of such activity / Presentar
procedimiento de colocacin de grout antes
de iniciar esta actividad.

Contract K121
Contractor is issuing this week the solution
for backfilled material last lifts. It was
agreed with SMI FE that no RFI will be
issued. Change will be reflected in a red
line drawing instead / Contratista enviar
sta semana la solucin para el material
de relleno de la ltimas capas. Se acord
con SMI FE que no se emitir un RFI sino
que el cambio se reflejar en un dibujo red
line.
Contractor submitted general concrete
procedure
with
concrete
repairs
considerations. Document rejected, needs
to reissue / Contratista incluy la
reparacin de defectos de concreto en el
procedimiento general de concreto.
Documento fue rechazado y necesita ser
reenviado.
Contract K122
Still pending complete information of ABB
report specially dates for spare parts.
Contractor will send to SMI QA manager. /
Sigue pendiente completar la informacin
del reporte de ABB especialmente de
fechas de envio de repuestos. Esta
informacin ser enviada al Gerente QA
SMI.
Pablo Celis was introduced as the new QC
manager for K122. Contractor to send
updated org chart. / Pablo Celis fue
presentado como el nuevo jefe de QC del
K122. El contratista enviar organigrama
actualizado.

K109

K109

K109

K121

K121

K122

K122

Contract K136 ( absent )


For geomembrane, contractor must send
personnel qualification and installation
Subcontractor
and
procedure.

QA Weekly Meeting

Page 4

documentation still pending / Contratista


debe enviar calificacion de personal y
procedimiento
de
instalacion
de
geomembrana. Todavia pendiente definir
subcontratista y enviar documentacin
Groundwater
management
procedure
preliminary version submitted and review by
Denis Paredes. Pending formal issue for
approval
/
Versin
preliminar
del
procedimiento de manejo de aguas
subterrneas fue presentado y revisado por
Denis
Paredes.
Pendiente
enviarlo
formalmente para aprobacin
Areas to be turned over to Skanska must
include complete documentation. Contractor
to make sure there are no outstanding
observations. For Area IX to be turned over
th
Jan 12 (Area IX) documentation must be
th
submitted by Jan 10 / Las areas a ser
entregadas a Skanska deben incluir toda la
documentacin completa. Contratista debe
asegurarse que no hayan observaciones
pendientes. Para el rea a ser entregada el
12 de enero (Area IX) la documentacin
debe presentarse el dia 10 de enero.

Contract K141 (absent)


For priorities of Non destructive testing shall
be coordinate with NIT company./ Las
prioridades de ensayos no destructivos
tienen que ser coordinadas con la
compaia NIT.
Company UT Ademinsa are not well
preparing joints for testing. / Compaa UT
Ademinsa no est preparando las juntas
para los ensayos.
Contract K154
Pending the post concrete anchor bolts
topographical verification procedure (form)
/ Pendiente el procedimiento (formato a
utilizar) de verificacin topogrfica de
pernos de anclaje post vaciado.
Contract K162
There has been a temperature delta in
massive concrete pours. Contractor
consulted its specialist who issued a report
on the subject. Report to be send to SMI
FE / Se present un Delta de temperatura
dentro
de
los
vaciados
masivos.
Contratista consult a su especialista quien
emiti un reporte que ser enviado a SMI
FE.
Pending to issue structural steel erection
procedure this week / Pendiente emitir esta
semana procedimiento de montaje de
estructuras.

QA Weekly Meeting

K136

K136

K136

K141

K141

K154

K162

K162

Page 5

3.0

Others Topics / Otros Temas

QA Weekly Meeting

Page 6