PT.

TRAFOINDO PRIMA PERKASA


CT/VT INSTALLATION MANUAL
1. Checking upon arrival
1.1. Inspection must be made for any sign of damage such as crack, broken inccured during
shipment.
1.2. Check the completeness of test report, bolts.
1.3. In case CT/VT is shipped in wooden packing, start to open from the top and then side
packing. Use appropriate lifting equipment and never opposite to lift.
2. Storage
Place CT/VT in indoor securely, maximum temperature 400 C and avoid with water contact.
3. Installation
3.1. CT Primary terminal
3.1.1. Ensure bar toward P1 and P2 in flat condition
3.1.2. Tightening torque refers to table 1 below:
Table 1 Recommended torque
Bolt size
Torque (N.m)
M-12
60
M-10
25
M-5
3.5
When tightening, always use appropriate tool.
3.1.3. If hole of primary connection is more than one, the sequence of tightening may
follow figure 1:
Figure 1 The sequence of tightening
1

3.2. CT secondary terminal


3.2.1. Connect secondary terminal CT to appropriate load as shown in the name plate.
3.2.2. Important! Never open circuit the secondary of CT. Fail to do so will cause damage
to CT.
3.3. VT secondary terminal
3.3.1. Connect secondary terminal VT to appropriate load as shown in the name plate.
3.3.2. Important! Never short-circuited the secondary of VT. Fail to do so will cause
damage to VT.
3.4. Checking of Clearance
Recommended clearance refers to table 2 below.
Tabel 2 Electrical clearance
a
b
Voltage (kV)
a (mm)
b (mm)
7.2
90
90
12
120
120
24
220
220
If clearance is less than recommended value, additional barrier insulation may insert.

Page 1 of 5

PT. TRAFOINDO PRIMA PERKASA


3.5. CT multi ratio with series-parallel connection
3.5.1. At low ratio connection in series (C1- C2 to be connected)
Figure 2 CT Multi ratio in series
P1

C1 C2

P2

1S1

1S2 2S1

2S2

3.5.2.

High ratio connection in parallel (P1-C1 , P2-C2 to be connected)


Figure 3 CT Multi ratio in parallel
P1

C1 C2

P2

1S1

1S2 2S1

2S2

4. Grounding, HV Source Connection and Example of wiring


4.1. Connect base plate to grounding

Make sure the ground resistance shall be as small as possible and not exceed 5 ohm.
4.2. High voltage transformer connection (H1)
Step down HV

Step down MV

Power transformer

Distribution transformer

H1
VT 1B

VT 1B

VT primary cubicle

VT secondary cubicle

When connecting VT 1B in 3 phase system, always check the connection of H1 transformer.


Follow table 2 below for recommendation of wiring.

Page 2 of 5

PT. TRAFOINDO PRIMA PERKASA

Primary
connection
of H1
transformer

Secondary
connection
of H1
transformer

VT1B connection in 3 phase system


Result of
VT1B
VT1B
secondary VT
connection
connection
Primary

Remark

secondary

Page 3 of 5

L-N= balance
L-L=balance

Recommended

L-N= unbalance
L-L=balance

Not recommended

L-N= unbalance
L-L=balance

Not recommended

L-N= unbalance
L-L=balance

Not recommended

L-N= unbalance
L-L=balance

Not recommended

L-N= unbalance
L-L=balance

Not recommended

L-N= balance
L-L=balance

Recommended

L-N= balance
L-L=balance

Recommended

L-N= unbalance
L-L=balance

Not recommended

L-N= unbalance
L-L=unbalance

Not recommended

L-N= unbalance
L-L=unbalance

Not recommended

PT. TRAFOINDO PRIMA PERKASA

4.3. Example of wiring 3P4W CTVT with VT 1 Bushing (Ref: JIS C1210C)
L3
L2
L1
0

P1

A
A

P2

P1

1S1

1S2

1S2

1S2

1S1

1S1

P2

P2

P1

to metering

4.4. Example of wiring 3P3W CTVT with VT 2 Bushing (Ref: SPLN 57-1:1991)
T
S
R

P1

B
BA
A

1S1

P2
1S2

P2

P1
1S1

1S2

kWh single tariff

5. Electrical Inspection prior to energize CT/VT


5.1. Insulation resistance
Table 2 Insulation resistance
No. Result (MOhm)
Test set
1.
P-E =
VDC 1000/5000 V
2.
P-S =
VDC 1000/5000 V
3.
S-E =
VDC 1000/2500 V
4.
1S1-2S1=
VDC 1000/2500 V
5.
2S1-3S1=
VDC 1000/2500 V
Note:
1. Recommended value of insulation resistance should be more than 2000 Mohm, if lower
value is found, clean the body and terminal thoroughly using a dry and clean cloth.
2. Insulation resistance test at secondary by 5000 V will cause damage to CT/VT.
5.2. Ensure primary connection has been torqued properly.
5.3. Ensure secondary side has been connected to the appropriate load.
5.4. In case of high potential test on site, the reduced value of 80% shall be applied.
Page 4 of 5

PT. TRAFOINDO PRIMA PERKASA


6. Maintenance of CT/VT
6.1. CT and VT are made from resin which is no special maintenance required.
6.2. During annual maintenance, clean CT and VT and check the connection of primary and
secondary in good condition.
7. Contact detail
For further information and queries, please contact Marketing below:
PT. Trafoindo Prima Perkasa
Jl. Hayam Wuruk 4FX Jakarta 10120
Telp +62-21-3451384, 3850703
Fax +62-21-3850702, 3861869
Email: trafo@trafoindonesia.com
http://www.trafoindonesia.com

Page 5 of 5