Sei sulla pagina 1di 9

ACCOMPLISHMENT FOR THE PERIOD OF MARCH 0

Cusromer Service Zone: BULACAN AREA

ACTIVITY ACCOMPLISHMENT SUPPLEMENT


DATE

WORK ORDER
INCIDENT NO

SCOPE OF WORK /
ACTIVITY
CATEGORY

4/1/2014

2014RBCN0003

CABINET ACTIVITY
(BAL 010)

4/2/2014

2014RBCN0003

CABINET ACTIVITY
(BAL 010)

4/3/2014

2014RBCN0003

CABINET ACTIVITY
(BAL 010)

4/4/2014

2014RBCN0003

SECONDARY
ACTIVITY (BAL 010)

4/5/2014

2014RBCN0003

SECONDARY
ACTIVITY (BAL 010)

4/7/2014

2014RBCN0003

SECONDARY
ACTIVITY (BAL 010)

4/8/2014

2014RBCN0003

SECONDARY
ACTIVITY (BAL 010)

4/9/2014

2014RBCN0003

SECONDARY
ACTIVITY (BAL 010)

4/10/2014

2014RBCN0003

SECONDARY
ACTIVITY (BAL 010)

4/11/2014

2014RBCN0003

SECONDARY
ACTIVITY (BAL 010)

4/12/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/14/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/15/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/16/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/17/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/18/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/19/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/21/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/22/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/23/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/24/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/25/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/26/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/28/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/29/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

4/30/2014

2014RBCN0003

SUBSLOOP
ACTIVITY (BAL 010)

MENT FOR THE PERIOD OF MARCH 03 TO MARCH 22,2014


Contractor/OAOP : UTELCO

TY ACCOMPLISHMENT SUPPLEMENTARY DETAILS


ACTIVITY DESCRIPTION

ACTUAL RESOURCE DEPLOYMENT


M.POWER
QTY

HRS
HRS

Worked on DP 039: Replaced DP ; Spliced One


(1) closure (2x19); Provide buckles,stainless
strap,bridle ring,uy connectors, wpt b1, tie rap

Worked on DP 057: Replaced DP ; Spliced One


(1) closure (2x19); Provide buckles,stainless
strap,bridle ring,uy connectors, wpt b1, tie rap

Worked on DP 058: Replaced DP ; Spliced One


(1) closure (2x19); Provide buckles,stainless
strap,bridle ring,uy connectors, wpt b1, tie rap

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP 003-004. Provide hook with
nut on pole clamp, parallel wires for 3 span, pclamp, cable clip, tox, tox screw & span clamp

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP 060. Provide hook with nut
on pole clamp, parallel wires for 1 span

Taken pictures on Cabinet (BAL 010) BEFORE


re-grooming. Identification of working lines.
Testing & call thru on working lines
Re-jumpering of Cross Connect Cabinet.
Removing of dead jumper wires. Replacement
of defective breakstrip. Provide sealant
Re-jumpering of Cross Connect Cabinet.
Removing of dead jumper wires. Replacement
of defective breakstrip. Provide sealant.
Grunding of cabinet & Taken pictures AFTER
the
re-grooming
PLDT
MALOLOS & our group simultaneously
conduct pre survey for 8 DP's (029, 030, 034,
038, 039, 057, 058, 069. Taken pictures on DP
's 034,038,039,
057-058, 069 Replaced DP ;
Worked
on DP 029,030,069:
Spliced One (1) closure (2x19); Provide
buckles,stainless strap,bridle ring,uy
connectors, wpt b1, tie rap
Worked on DP 034: Replaced DP ; Spliced One
(1) closure (2x19); Provide buckles,stainless
strap,bridle ring,uy connectors, wpt b1, tie rap
Worked on DP 038: Replaced DP ; Spliced One
(1) closure (2x19); Provide buckles,stainless
strap,bridle ring,uy connectors, wpt b1, tie rap

VEHICLE
QTY
HRS

ADDITIONAL
QTY

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP 060. Provide hook with nut
on pole clamp, parallel wires for 3
span,protector, p-clamp, cable clip, tox, tox
screw & span clamp
Removing of dead line wires and straightening
of line wires. Re-splicing of subsloop, rearrange "Q" on DP 060. Provide hook with nut
on pole clamp, parallel wires for 1
span,protector, p-clamp, cable clip, tox, tox
screw & span clamp
Removing of dead line wires and straightening
of line wires. Re-splicing of subsloop, rearrange "Q" on DP 002. Provide hook with nut
on pole clamp, cable clip, tox, tox screw

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP 005. Provide hook with nut
on pole clamp, cable clip, tox, tox screw

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP 029. Provide hook with nut
on pole clamp, cable clip, tox, tox screw

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP. Provide hook with nut on
pole clamp, cable clip, tox, tox screw

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP . Provide hook with nut on
pole clamp, cable clip, tox, tox screw

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP 046. Provide hook with nut
on pole clamp, cable clip, tox, tox screw

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP 049. Provide hook with nut
on pole clamp, cable clip, tox, tox screw
Removing of dead line wires and straightening
of line wires. Re-splicing of subsloop, rearrange "Q" on DP 049. Provide hook with nut
on pole clamp, parallel wires for 3 span, pclamp, cable clip, tox, tox screw & span clamp
Removing of dead line wires and straightening
of line wires. Re-splicing of subsloop, rearrange "Q" on DP 060. Provide hook with nut
on pole clamp, cable clip, tox, tox screw
Removing of dead line wires and straightening
of line wires. Re-splicing of subsloop, rearrange "Q" on DP 063. Provide hook with nut
on pole clamp, cable clip, tox, tox screw

0
3

Removing of dead line wires and straightening


of line wires. Re-splicing of subsloop, rearrange "Q" on DP 057. Provide hook with nut
on pole clamp, parallel wires for 3 span, pclamp,
cable
clip, tox,
screw
span clamp
Removing
of dead
line tox
wires
and&
straightening
of line wires. Re-splicing of subsloop, rearrange "Q" on DP. Provide hook with nut on
pole clamp, parallel wires for 2 span, p-clamp,
cable clip, tox, tox screw & span clamp

P : UTELCO

OYMENT
ADDITIONAL
HRS
Arnulfo Alegre
Edagar Luz
Marvin Cierva