Sei sulla pagina 1di 32767

Type

Drawing/ Document
Name

Table
Table
Table
Table
Table
GRIHA Template 18.2.1
Table
Table
GRIHA Template 18.2.3 Table
GRIHA Template 14.2.2

13.1
13.2
13.3
18.2.1
18.2.2
18.2.3
18.2.4
18.2.3

Description

Project: Lotus Arena 2 - MEP


Date
Deadline

Energy conversion factors of LDO , HSD & LPG


EPI (Energy Simulation Report)
Dissatisfied hours in non air-conditioned areas
Total internal + external lighting load
Total space conditioning load
Annual Energy Requirement for internal lighting
Total Energy Generated from Renewable System
List of loads other than lighting powered by renewable energy

EP
Status
Pending
Pending
Pending
NA
NA
NA
NA
NA

Responsibility

GreenTree
GreenTree
GreenTree
GreenTree
GreenTree
GreenTree
GreenTree
GreenTree

Type

Drawing/ Document Name


Approval Letter from Electricity Board for
Sanctioned Load
Approval Letter from Energy Consultant

Project: Lotus Arena 2 - MEP


Description
Date
Deadline

ect: Lotus Arena 2 - MEP


Responsibility
Status
Pending
Pending

Client
GreenTree

Type

Service
Drawings
(Buildings)

Project: Lotus Arena 2 - M&E


Drawing/ Document Name

Electric layout with street, landscape, architecture lighting proposed


Renewable energy site layout and locations
MEP Drawings (All Floors ) of each Tower
Electric schematics circuit diagram
HVAC schematic diagram
Water supply and sewage schematics
Solar Hot Water Schematic
Terrace Plans with Proposed Installed Capacity of each tower

a 2 - M&E
Date
Deadline

Status
NA

NA

Responsibility
Electrical Consultant
Electrical Consultant
Service Consultants
Electrical Consultant
HVAC Consultant
Plumbing Consultant
Plumbing Consultant
Plumbing Consultant

Type

GRIHA Template F
Outdoor Lighting

GRIHA Template I ECBC


Compaliance

GRIHA Template O
Renewable Energy

GRIHA Template p
Renewable Energy -Hot
Water

GRIHA Template S
Operation & Maintaince

Project: Lotus Arena 2 - MEP


Drawing/ Document Name

List of External Lighting Fixtures with details for wattage, efficacy(lumen/watt)


Brochures (if available)
Controls for Lighting
Narrative on Glass ,wall, roof specifications with u factor
Narrative on HVAC (Heating, Ventilation, Air Conditioning System )/air
cooling/fans
Narrative on Control for Internal Lighting and HVAC
Narrative on Electrical power
Narrative on Strategies on achieving the GRIHA EPI (Energy Performance Index)
benchmark
Provide supporting calculations for EPI (Simulation result(preferred res built
report))
Narrative on Solar water heating
Narrative for proposed RE system
Area calculation for RE system being used
Power generated by proposed RE system
On-site/Off-site RE system for 100% internal energy consumption
Narrative on Hot Water Requirement
Area calculation for Hot system being used
Energy calculation for heating the required amount of hot water
Quantity of hot water being heated with RE system
Declaration for conducting energy audit within two years of full occupancy
Declaration for conducting waste and water audit within two years of full
occupancy
Declaration for conducting comfort audit within two years of full occupancy
Declaration for conducting sound level audit within two years of full occupancy
Declaration for provision of metering /sub-metering of energy and water as per
GRIHA standard
Complete list of operation and maintenance protocols for various system
installed in the building.

Date
Deadline

Status

Responsibility

Pending
Pending
Pending
Pending

Electrical Consultant
GreenTree
Electrical Consultant
GreenTree

NA
NA
Pending

GreenTree
Service Consultant
GreenTree

Pending

GreenTree

Pending
Pending
NA
NA
NA
NA
Pending
Pending
Pending
Pending

GreenTree
GreenTree
GreenTree
GreenTree
GreenTree
GreenTree
GreenTree
Plumbing Consultant
GreenTree
GreenTree

Pending

Client

Pending

Client

Pending

Client

Pending

Client

Pending

Client

Pending

Client

Pending

Potrebbero piacerti anche