Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
UNIDAD
PRECIO
UNITARIO
1.00
35,000.00
Expediente
1.00
10,000.00
Global
Global
Global
Global
Global
Global
Global
Global
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Unidad
Unidad
1.00
4.00
350,000.00
180,000.00
Documento
1.00
5,000.00
Eventos
Programas
3.00
2.00
8,200.00
7,513.00
B.- INVERSION
B.1- EXPEDIENTE TECNICO
1 Formulacin del Expediente Tcnico
Estudio
CANTIDAD
PRECIO
TOTAL
35,000.00
35,000.00
5,221,193.45
10,000.00
10,000.00
3,754,994.05
341,730.52
2,172,991.16
95,204.74
185,950.86
72,118.27
103,950.00
5,775.00
777,273.50
1,070,000.00
350,000.00
720,000.00
5,000.00
5,000.00
39,626.00
24,600.00
15,026.00
292,777.20
48,796.20
5,256,193.45
ANEXO
PRESUPUESTO DE OBRAS DE INFRAESTRUCTURA
Item
Descripcin
Unidad
01.00.00 OBRAS PRELIMINARES
01.02.00 ADQUISICION DE TERRENO
M2.
01.03.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X UND
01.04.00 LIMPIEZA DE TERRENO MANUAL
M2
01.05.00 TRAZO Y REPLANTEO
M2
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACION MASIVA C/MAQUINARIA MATERIAL SU M3.
02.02.00 EXCAVACION MASIVA C/MAQUINARIA ROCA SUELT M3.
02.03.00 EXCAVACION MANUAL EN MATERIAL SUELTO
M3
03.00.00 OBRAS DE CONCRETO
03.01.00 CERCO PERIMETRICO
03.01.01 CIMIENTOS MEZCLA 1:10 CEMENTO-HORMIGON + M3
03.01.02 ENCOFRADO Y DESENCOFRADO
M2
03.01.03 CONCRETO F'C=175 KG/CM2. PARA COLUMNAS
M3.
03.01.04 ACERO FY=4200KG/CM2
KG
03.01.05 ALAMBRADO DE PUAS
m
03.01.06 PUERTA DE ENTRADA
UND
03.02.00 MURO DE CONTENCION
03.02.01 CONCRETO CICLOPEO F'C=140 KG/CM2
M3.
03.02.02 ENCOFRADO Y DESENCOFRADO
M2
03.02.03 JUNTAS DE DILATACIN E=0.05M
ML
03.03.00 CANAL DE CONCRETO
03.03.01 ENCOFRADO Y DESENCOFRADO
M2
03.03.02 CONCRETO F'C=175 KG/CM2.
M3.
03.03.03 JUNTAS DE DILATACIN E=0.05M
ML
03.04.00 CONSTRUCCIN DE CASETAS Y ALMACN
03.04.01 CONSTRUCCION DE CASETA DE CONTROL
M2
03.04.02 CONSTRUCCION DE ALMACN
M2
03.04.03 CONSTRUCCION DE CASETA DE SELECCION-ALM M2
03.05.00 CONSTRUCCIN DE TANQUE SEPTICO
03.05.01 CONSTRUCCION TANQUE SEPTICO
UND
04.00.00 TRABAJOS DE MITIGACION DE IMPACTO AMBIENTAL
04.01.00 IMPERMEABILIZACIN
M2.
04.02.00 DRENAJE DE LIXIVIADOS
M3
04.03.00 DRENAJE DE GASES
ML
04.04.00 ARBORIZACION
M2
04.05.00 CLAUSURA DEL BATADERO ACTUAL
04.05.01 FUMIGACION DEL LUGAR
GLB
04.05.02 ACARREO DE MATERIAL PARA COBERTURA
M3
04.05.03 CONFORMACION Y COMPACTACION DE MATERIAL M2.
04.05.04 SIEMBRA DE VEGETACIN
M2.
04.05.05 DIFUSION DE CLAUSURA DE ACTUAL BOTADERO GLB
04.05.06 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X UND
COSTO DIRECTO
Metrado
Precio
52,659.03
1.00
52,659.03
52,659.03
5.00
500.00
0.89
0.59
210,574.07
145,361.95
417.67
356,353.69
1.80
12.28
21.34
13.89
260.40
9.77
1,720.27
7,764.21
1.00
179.62
30.27
227.12
4.45
9.60
416.93
522.53
1,254.14
235.20
271.93
30.27
25.07
1,400.88
99.21
286.44
30.27
227.12
25.07
50.00
50.00
200.00
346.50
346.50
346.50
20.00
288.75
39,494.27
4,979.24
1,053.18
1,712.05
6.20
39.28
30.95
4.32
1.00 1,657.50
7,500.00
10.69
30,000.00
6.20
30,000.00
0.87
1.00 2,400.00
1.00
500.00
Parcial
263,295.15
500.00
46,866.54
31,068.83
0.00
379,033.33
1,785,044.75
8,913.08
0.00
0.00
2,494.92
7,882.31
2,218.96
7,655.20
74,536.42
416.93
0.00
142,091.58
37,962.82
5,896.46
0.00
42,404.64
22,532.58
7,181.05
0.00
17,325.00
17,325.00
69,300.00
0.00
5,775.00
0.00
244,864.47
195,584.55
32,595.92
7,396.06
0.00
1,657.50
80,175.00
186,000.00
26,100.00
2,400.00
500.00
Total
341,730.52
2,172,991.16
95,204.74
185,950.86
72,118.27
103,950.00
5,775.00
777,273.50
3,754,994.05
ANEXO N05
COSTO DE INVERSIONES - ALTERNATIVA I
EN LA SITUACION CON PROYECTO
A PRECIOS SOCIALES
(En Nuevos Soles)
FACTOR DE
PRECIOS
CORRECCION
PARTIDAS
PRIVADOS
A.- PRE INVERSION
1.- Estudio de Prefactibilidad
B.- INVERSION
B.1- EXPEDIENTE TECNICO
1.- Formulacin del Expediente Tcnico
B.2- OBRAS DE INFRAESTRUCTURA
1.- Mano de Obra
2.- Materiales y Herramientas
3.- Equipos
B.3- ADQUISICION DE MAQUINARIA Y EQUIPO
1.- Adquisicin de Rodillo Compactador
2.- Adquisicin de Equipos de Recoleccin
B.4- REDISEO DE RUTAS
1.- Rediseo de Rutas
B.5- CAPACITACION Y SENSIBILIZACION
1.- Capacitacin al Personal
2.- Programa de sensibilizacin a la poblacin
B.6- GASTOS GENERALES (6%)
B.7- IMPREVISTOS ( 1%)
TOTAL
FUENTE : Elaboracin Proyectista.
PRECIOS
SOCIALES
35,000.00
35,000.00 0.8952551477
31,333.93
31,333.93
5,221,193.45
10,000.00
10,000.00 0.8952551477
4,381,293.11
8,952.55
8,952.55
3,754,994.05
425,449.43
1,219,478.41
2,110,066.21
1,070,000.00
350,000.00
720,000.00
0.8103241297
0.8103241297
3,178,822.45
380,885.79
1,024,771.77
1,773,164.88
867,046.82
283,613.45
583,433.37
5,000.00
5,000.00 0.8928571429
4,464.29
4,464.29
39,626.00
24,600.00 0.8928571429
15,026.00 0.8928571429
35,380.36
21,964.29
13,416.07
0.8952551477
0.8403361345
0.8403361345
292,777.20
245,679.99
48,796.20
40,946.66
5,256,193.45
4,412,627.04
ANEXO N 06
COSTO DE INVERSIONES - ALTERNATIVA II
EN LA SITUACION CON PROYECTO
A PRECIOS SOCIALES
(En Nuevos Soles)
FACTOR DE
PRECIOS
CORRECCION
PARTIDAS
PRIVADOS
A.- PRE INVERSION
1.- Estudio de Prefactibilidad
B.- INVERSION
B.1- EXPEDIENTE TECNICO
1.- Formulacin del Expediente Tcnico
B.2- OBRAS DE INFRAESTRUCTURA
1.- Mano de Obra
2.- Materiales y Herramientas
3.- Equipos
B.3- REDISEO DE RUTAS
1.- Rediseo de Rutas
B.4- CAPACITACION Y SENSIBILIZACION
1.- Capacitacin al Personal
2.- Programa de sensibilizacin a la poblacin
B.5- GASTOS GENERALES (8%)
B.6- IMPREVISTOS ( 1%)
TOTAL
FUENTE : Elaboracin Proyectista.
PRECIOS
SOCIALES
35,000.00
35,000.00 0.8952551477
31,333.93
31,333.93
4,152,485.85
10,000.00
10,000.00 0.8952551477
3,518,105.41
8,952.55
8,952.55
3,754,994.05
425,449.43 0.8952551477
1,219,478.41 0.8403361345
2,110,066.21 0.8403361345
3,178,822.45
380,885.79
1,024,771.77
1,773,164.88
5,000.00
5,000.00 0.8928571429
4,464.29
4,464.29
39,626.00
24,600.00 0.8928571429
15,026.00 0.8928571429
35,380.36
21,964.29
13,416.07
304,769.60
258,209.57
38,096.20
32,276.20
4,187,485.85
3,549,439.34
CUADRO N 10
COSTOS DE OPERACIN Y MANTENIMIENTO
EN LA SITUACION SIN PROYECTO
A PRECIOS PRIVADOS
(En Nuevos Soles)
PARTIDAS
UNIDAD
PRECIO
UNITARIO
PARCIAL
1,953,415.34
1,390,784.52
14,635.75
490.00
240,997.04
165,558.33
30,524.53
14,573.89
2,831.50
93,019.78
Global
Global
Global
Global
Global
Global
Global
Global
TOTAL
FUENTE : Estados Financieros de las Municipalidades Involucradas . Anexo 1
1,953,415.34
CUADRO N 13
COSTOS DE OPERACIN Y MANTENIMIENTO - ALTERNATIVA I
EN LA SITUACION CON PROYECTO
A PRECIOS PRIVADOS
(En Nuevos Soles)
PARTIDAS
UNIDAD
Global
Global
Global
Global
Global
Global
Global
Global
Global
PARCIAL
TOTAL
2,718,059.17
1,759,298.28
22,635.75
490.00
557,715.50
240,997.04
164,263.68
152,454.78
197,058.33
30,524.53
14,573.89
6,331.50
129,431.39
2,718,059.17
CUADRO N 14
COSTOS DE OPERACIN Y MANTENIMIENTO - ALTERNATIVA II
EN LA SITUACION CON PROYECTO
A PRECIOS PRIVADOS
(En Nuevos Soles)
PARTIDAS
UNIDAD
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
PARCIAL
TOTAL
3,078,571.98
1,669,298.28
22,635.75
490.00
240,997.04
165,558.33
785,063.99
324,263.99
460,800.00
30,524.53
14,573.89
2,831.50
146,598.67
3,078,571.98
ANEXO N 07
CONCEPTO
1,953,415.34
1,390,784.52
14,635.75
490.00
240,997.04
165,558.33
30,524.53
14,573.89
2,831.50
93,019.78
TOTAL
FUENTE : Elaboracin Proyectista.
1,953,415.34
0.8952551477
0.8403361345
1
0.66
0.8403361345
0.8403361345
0.8403361345
0.8403361345
COSTO TOTAL
A PRECIOS SOCIALES
1,676,173.68
1,245,107.00
12,298.95
490.00
159,058.05
139,124.65
25,650.87
12,246.97
2,379.41
79,817.79
1,676,173.68
ANEXO N 08
COSTOS DE OPERACIN Y MANTENIMIENTO - ALTERNATIVA I
EN LA SITUACION CON PROYECTO
A PRECIOS SOCIALES
(En Nuevos Soles)
FACTOR DE
PRECIOS
CORRECCION
CONCEPTO
PRIVADOS
COSTOS DE OPERACIN Y MANTENIMIENTO
PERSONAL Y OBLIGACIONES SOCIALES
VESTUARIO
VIATICOS Y ASIGNACIONES
COMBUSTIBLE Y LUBRICANTES
OTROS BIENES Y SERVICIOS
OTROS SERVICIOS DE TERCEROS
EQUIPAMIENTO Y BIENES DURADERO
SEGUROS
OTROS GASTOS 5%
2,718,059.17
1,759,298.28
22,635.75
490.00
557,715.50
197,058.33
30,524.53
14,573.89
6,331.50
129,431.39
TOTAL
FUENTE : Elaboracin Proyectista.
2,718,059.17
0.8952551477
0.8403361345
1
0.66
0.8403361345
0.8403361345
0.8952551477
0.8403361345
COSTO TOTAL
A PRECIOS SOCIALES
2,280,850.69
1,575,020.84
19,021.64
490.00
368,092.23
165,595.24
25,650.87
13,047.35
5,320.59
108,611.94
2,280,850.69
ANEXO N 9
COSTOS DE OPERACIN Y MANTENIMIENTO - ALTERNATIVA II
EN LA SITUACION CON PROYECTO
A PRECIOS SOCIALES
(En Nuevos Soles)
FACTOR DE
COSTO TOTAL
PRECIOS
CORRECCION A PRECIOS SOCIALES
CONCEPTO
PRIVADOS
3,078,571.98
1,669,298.28
22,635.75
490.00
240,997.04
165,558.33
785,063.99
30,524.53
14,573.89
2,831.50
146,598.67
TOTAL
FUENTE : Elaboracin Proyectista.
3,078,571.98
0.8952551477
0.8403361345
1
0.66
0.8403361345
0.8403361345
0.8403361345
0.8952551477
0.8403361345
2,638,584.35
1,494,447.88
19,021.64
490.00
159,058.05
139,124.65
659,717.64
25,650.87
13,047.35
2,379.41
125,646.87
2,638,584.35
ANEXO N 10
COSTO TOTAL EN EL HORIZONTE DEL PROYECTO - ALTERNATIVA I
EN LA SITUACION CON PROYECTO
A PRECIOS PRIVADOS
(En Nuevos Soles)
RUBROS
AO
0
AO
1
AO
2
AO
3
AO
4
AO
5
AO
6
AO
7
AO
8
AO
9
AO
10
35,000
35,000
5,221,193
10,000
4,824,994
5,000
39,626
292,777
48,796
0
5,256,193
ANEXO N 11
COSTO TOTAL EN EL HORIZONTE DEL PROYECTO - ALTERNATIVA II
EN LA SITUACION CON PROYECTO
A PRECIOS PRIVADOS
(En Nuevos Soles)
RUBROS
AO
0
AO
1
AO
2
AO
3
AO
4
AO
5
AO
6
AO
7
AO
8
AO
9
AO
10
35,000
35,000
4,152,486
10,000
3,754,994
5,000
39,626
304,770
38,096
4,187,486
ANEXO N 12
COSTO TOTAL EN EL HORIZONTE DEL PROYECTO - ALTERNATIVA I
EN LA SITUACION CON PROYECTO
A PRECIOS SOCIALES
(En Nuevos Soles)
RUBROS
AO
0
AO
1
AO
2
AO
3
AO
4
AO
5
AO
6
AO
7
AO
8
AO
9
31,334
31,334
4,381,293
8,953
4,045,869
4,464
35,380
245,680
40,947
0
4,412,627
ANEXO N 13
COSTO TOTAL EN EL HORIZONTE DEL PROYECTO - ALTERNATIVA II
EN LA SITUACION CON PROYECTO
A PRECIOS SOCIALES
(En Nuevos Soles)
RUBROS
AO
0
AO
1
AO
2
AO
3
AO
4
AO
5
AO
6
AO
7
AO
8
AO
9
31,334
31,334
3,518,105
8,953
3,178,822
4,464
35,380
258,210
32,276
3,549,439
ANEXO N 12
2,646,440
2,646,440
2,646,440
ANEXO N 13
2,950,546
2,950,546
2,950,546
ANEXO N 14
TARIFA TRIMESTRAL DE ARBITRIOS DE LIMPIEZA PUBLICA - AO 2004
(En Nuevos Soles)
CARACTERISTICAS
ZONA - COSTO M2
DEL PREDIO
CENTRO
INTERMEDIA
PERIFERIA
Casa Habitacin
Establecimientos Comerciales
Comercio Primera
Comercio Segunda
Comercio Tercera
Instituciones Educativas
Instituciones Educativas Estatales
Instituciones Educativas Particulares
Instituciones
Beneficas y Religiosas
Instituciones Pblicas
Instituciones Privadas
Terrenos Sin Construir
26.25
19.69
13.13
187.50
75.00
33.75
168.75
60.00
27.19
150.00
52.50
24.38
75.00
150.00
65.63
140.63
56.25
131.25
250.00
262.50
450.00
16.75
231.25
253.13
431.25
15.94
212.50
243.75
412.50
15.00
CARACTERISTICAS
DEL PREDIO
Casa Habitacin
Establecimientos Comerciales
Comercio Primera
Comercio Segunda
Comercio Tercera
Instituciones Educativas
Instituciones Educativas Estatales
Instituciones Educativas Particulares
Instituciones
Beneficas y Religiosas
Instituciones Pblicas
Instituciones Privadas
Terrenos Sin Construir
ANEXO N 15
TARIFA TRIMESTRAL DE ARBITRIOS DE LIMPIEZA PUBLICA - AO 2004
(En Nuevos Soles)
ZONA - COSTO M2
CENTRO
INTERMEDIA
PERIFERIA
TARIFA
N
PAGO
TARIFA
N
PAGO
TARIFA
N
PAGO
PREDIOS
ANUAL
PREDIOS ANUAL
PREDIOS
ANUAL
26.25
3,919 411,495.00
19.69
7,365 580,067.40
13.13
10,643 558,970.36
INGRESO
ANUAL
1,550,532.76
187.50
75.00
33.75
78
104
132
58,500.00
31,200.00
17,820.00
168.75
60.00
27.19
17
188
191
11,475.00
45,120.00
20,773.16
150.00
52.50
24.38
0
0
248
0.00
0.00
24,184.96
69,975.00
76,320.00
62,778.12
75.00
150.00
8
16
2,400.00
9,600.00
65.63
140.63
31
18
8,138.12
10,125.36
56.25
131.25
44
8
9,900.00
4,200.00
20,438.12
23,925.36
250.00
262.50
450.00
16.75
23
27
12
42
23,000.00
28,350.00
21,600.00
2,814.00
231.25
253.13
431.25
15.94
18
24
38
187
16,650.00
24,300.48
65,550.00
11,923.12
212.50
243.75
412.50
15.00
28
14
49
1,004
23,800.00
13,650.00
80,850.00
60,240.00
63,450.00
66,300.48
168,000.00
74,977.12
12,038
775,795.32
2,176,696.96
TOTAL
4,361 606,779.00
Fuente: Tarifa Trimestral de arbitrios de Limpieza Pblica -Ao 2004.
Ordenanza Municipal N044-2004-MPH.
8,077 794,122.64
CUADRO N 17
INGRESOS PROVENIENTES DEL PAGO DE LOS SERVICIOS DE LIMPIEZA PUBLICA
EN LA SITUACION SIN PROYECTO
(En Nuevos Soles)
A O S
CONCEPTO
1,350,000.00
T O TAL
1,350,000.00
FUENTE : Elaboracin Proyectista.
CUADRO N 18
INGRESOS PROVENIENTES DEL PAGO DE LOS SERVICIOS DE LIMPIEZA PUBLICA
EN LA SITUACION CON PROYECTO
(En Nuevos Soles)
A O S
CONCEPTO
10
1,476,475.12
1,476,475.12
10
2,382,978.46
2,382,978.46
ANEXO N 16
BENEFICIOS PROCEDENTES DE LA PRESTACION DEL SERVICIO DE LIMPIEZA PBLICA
ALTERNATIVA I
(En Nuevos Soles a Precios Sociales)
CONCEPTO
10
1,350,000.00 1,363,500.00 1,377,135.00 1,390,906.35 1,404,815.41 1,418,863.57 1,433,052.20 1,447,382.73 1,461,856.55 1,476,475.12
1,676,173.68 1,692,935.42 1,709,864.77 1,726,963.42 1,744,233.05 1,761,675.39 1,779,292.14 1,797,085.06 1,815,055.91 1,833,206.47
-326,173.68 -329,435.42 -332,729.77 -336,057.07 -339,417.64 -342,811.82 -346,239.94 -349,702.34 -353,199.36 -356,731.35
222,019.95
224,240.15
226,482.55
228,747.38
207,535.23
185,640.96
163,048.36
139,740.85
115,701.50
93,270.08
ANEXO N 17
BENEFICIOS PROCEDENTES DE LA PRESTACION DEL SERVICIO DE LIMPIEZA PBLICA
ALTERNATIVA II
(En Nuevos Soles a Precios Sociales)
CONCEPTO
10
1,350,000.00 1,363,500.00 1,377,135.00 1,390,906.35 1,404,815.41 1,418,863.57 1,433,052.20 1,447,382.73 1,461,856.55 1,476,475.12
1,676,173.68 1,692,935.42 1,709,864.77 1,726,963.42 1,744,233.05 1,761,675.39 1,779,292.14 1,797,085.06 1,815,055.91 1,833,206.47
-326,173.68 -329,435.42 -332,729.77 -336,057.07 -339,417.64 -342,811.82 -346,239.94 -349,702.34 -353,199.36 -356,731.35
-135,713.71
-130,474.38
-125,133.19
-119,688.75
-134,377.63
-149,415.78
-164,809.73
-180,566.11
-196,691.68
-210,836.26
ANEXO N 18
COSTOS INCREMENTALES
En Miles de Soles a Precios Sociales
ALTERNATIVA I
Operacin y
AO
0
1
2
3
4
5
6
7
8
9
10
Inversin
Mantenimiento
4,412.63
2,280.85
2,303.66
2,326.70
2,349.96
2,396.96
2,444.90
2,493.80
2,543.68
2,594.55
2,646.44
TOTAL
4,412.63
2,280.85
2,303.66
2,326.70
2,349.96
2,396.96
2,444.90
2,493.80
2,543.68
2,594.55
2,646.44
ALTERNATIVA II
Sin
Costo
Proyecto
Incremental
1,676.17
1,692.94
1,709.86
1,726.96
1,744.23
1,761.68
1,779.29
1,797.09
1,815.06
1,833.21
4,412.63
604.68
610.72
616.83
623.00
652.73
683.23
714.51
746.59
779.49
813.23
Operacin y
Inversin
Mantenimiento
3,549.44
2,638.58
2,658.37
2,678.31
2,698.40
2,738.87
2,779.96
2,821.66
2,863.98
2,906.94
2,950.55
TOTAL
3,549.44
2,638.58
2,658.37
2,678.31
2,698.40
2,738.87
2,779.96
2,821.66
2,863.98
2,906.94
2,950.55
Sin
Costo
Proyecto
Incremental
1,676.17
1,692.94
1,709.86
1,726.96
1,744.23
1,761.68
1,779.29
1,797.09
1,815.06
1,833.21
3,549.44
962.41
965.44
968.45
971.44
994.64
1,018.28
1,042.37
1,066.90
1,091.89
1,117.34
ANEXO N 19
BENEFICIOS INCREMENTALES
En Miles de Soles a Precios Sociales
ALTERNATIVA I
AO
1
2
3
4
5
6
7
8
9
10
ALTERNATIVA II
INGRESOS CON
INGRESOS SIN
INGRESO
INGRESOS CON
INGRESOS SIN
INGRESO
PROYECTO
PROYECTO
INCREMENTAL
PROYECTO
PROYECTO
INCREMENTAL
2,176.70
2,198.46
2,220.45
2,242.65
2,265.08
2,287.73
2,310.61
2,333.71
2,357.05
2,382.98
1,350.00
1,363.50
1,377.14
1,390.91
1,404.82
1,418.86
1,433.05
1,447.38
1,461.86
1,476.48
826.70
834.96
843.31
851.75
860.26
868.87
877.56
886.33
895.19
906.50
2,176.70
2,198.46
2,220.45
2,242.65
2,265.08
2,287.73
2,310.61
2,333.71
2,357.05
2,382.98
1,350.00
1,363.50
1,377.14
1,390.91
1,404.82
1,418.86
1,433.05
1,447.38
1,461.86
1,476.48
826.70
834.96
843.31
851.75
860.26
868.87
877.56
886.33
895.19
906.50
CUADRO N 22
EVALUACION ECONOMICA
ALTERNATIVA I
A PRECIOS SOCIALES
(EN MILES DE NUEVOS SOLES)
INVERSION
COSTO
BENEFICIO
FLUJO
INCREMENTAL
INCREMENTAL
NETO
AO
0
1
2
3
4
5
6
7
8
9
10
4,369.51
604.68
610.72
616.83
623.00
652.73
683.23
714.51
746.59
779.49
813.23
826.70
834.96
843.31
851.75
860.26
868.87
877.56
886.33
895.19
906.50
VANS
-4,369.51
222.02
224.24
226.48
228.75
207.54
185.64
163.05
139.74
115.70
93.27
(S/. 3,346.65)
CUADRO N 23
EVALUACION ECONOMICA
ALTERNATIVA II
A PRECIOS SOCIALES
(EN MILES DE NUEVOS SOLES)
INVERSION
COSTO
BENEFICIO
FLUJO
INCREMENTAL
INCREMENTAL
NETO
AO
0
1
2
3
4
5
6
7
8
9
10
3,549.44
962.41
965.44
968.45
971.44
994.64
1,018.28
1,042.37
1,066.90
1,091.89
1,117.34
826.70
834.96
843.31
851.75
860.26
868.87
877.56
886.33
895.19
906.50
VANS
-3,549.44
-135.71
-130.47
-125.13
-119.69
-134.38
-149.42
-164.81
-180.57
-196.69
-210.84
(S/. 4,308.59)
ANEXO N 35
FLUJO DE COSTOS SOCIALES TOTALES
En Nuevos Soles a Precios Sociales
ALTERNATIVA
ALTERNATIVA
II
AO
0
1
2
3
4
5
6
7
8
9
10
VACST
4,412,627.04
2,280,850.69
2,303,659.20
2,326,695.79
2,349,962.75
2,396,962.00
2,444,901.24
2,493,799.27
2,543,675.25
2,594,548.76
2,646,439.73
3,549,439.34
2,638,584.35
2,658,373.73
2,678,311.54
2,698,398.87
2,738,874.86
2,779,957.98
2,821,657.35
2,863,982.21
2,906,941.94
2,950,546.07
16,906,584.00
17,825,403.02
VACT =
t=1
Alternativa I
VACST =
FC t
t
(1+COK )
VR
(1+COK )n
Alternativa II
VACST
ANEXO N 35
FLUJO DE COSTOS SOCIALES TOTALES
En Miles de Nuevos Soles a Precios Sociales
ALTERNATIVA
ALTERNATIVA
II
AO
0
1
2
3
4
5
6
7
8
9
10
VACST
4,412.63
604.68
610.72
616.83
623.00
652.73
683.23
714.51
746.59
779.49
813.23
3,549.44
962.41
965.44
968.45
971.44
994.64
1,018.28
1,042.37
1,066.90
1,091.89
1,117.34
7,854.79
8,773.61
VACT =
t=1
Alternativa I
VACST =
FC t
t
(1+COK )
VR
(1+COK )n
Alternativa II
VACST
ANEXO N
FLUJO DE COSTOS SOCIALES TOTALES
ALTERNATIVA I
En Nuevos Soles a Precios Sociales
AO
0
1
2
3
4
5
6
7
8
9
10
FLUJO DE COSTOS
INGRESOS GENERADOS
FLUJO DE COSTOS
SOCIALES TOTALES
POR EL PROYECTO
SOCIALES NETOS
4,412,627.04
2,280,850.69
2,303,659.20
2,326,695.79
2,349,962.75
2,396,962.00
2,444,901.24
2,493,799.27
2,543,675.25
2,594,548.76
2,646,439.73
2,176,696.96
2,198,463.93
2,220,448.57
2,242,653.05
2,265,079.59
2,287,730.38
2,310,607.68
2,333,713.76
2,357,050.90
2,382,978.46
VACSN
4,412,627.04
104,153.73
105,195.27
106,247.22
107,309.69
131,882.42
157,170.86
183,191.58
209,961.49
237,497.86
263,461.27
5,151,198.25
ANEXO N
FLUJO DE COSTOS SOCIALES TOTALES
ALTERNATIVA II
En Nuevos Soles a Precios Sociales
AO
0
1
2
3
4
5
6
7
8
9
10
FLUJO DE COSTOS
INGRESOS GENERADOS
FLUJO DE COSTOS
SOCIALES TOTALES
POR EL PROYECTO
SOCIALES NETOS
3,549,439.34
2,638,584.35
2,658,373.73
2,678,311.54
2,698,398.87
2,738,874.86
2,779,957.98
2,821,657.35
2,863,982.21
2,906,941.94
2,950,546.07
VACSN
FUENTE : Elaboracin Proyectista.
2,176,696.96
2,198,463.93
2,220,448.57
2,242,653.05
2,265,079.59
2,287,730.38
2,310,607.68
2,333,713.76
2,357,050.90
2,382,978.46
3,549,439.34
461,887.39
459,909.80
457,862.97
455,745.82
473,795.27
492,227.60
511,049.66
530,268.45
549,891.04
5,916,919.42
CUADRO N 24
FLUJO DE COSTOS SOCIALES TOTALES
ALTERNATIVA I
En Miles de Nuevos Soles a Precios Sociales
AO
0
1
2
3
4
5
6
7
8
9
10
FLUJO DE COSTOS
INGRESOS INCREMENTALES
FLUJO DE COSTOS
SOCIALES INCREMENTALES
SOCIALES NETOS
4,412.63
604.68
610.72
616.83
623.00
652.73
683.23
714.51
746.59
779.49
813.23
826.70
834.96
843.31
851.75
860.26
868.87
877.56
886.33
895.19
906.50
VACSN
4,412.63
-222.02
-224.24
-226.48
-228.75
-207.54
-185.64
-163.05
-139.74
-115.70
-93.27
3,389.77
CUADRO N 25
FLUJO DE COSTOS SOCIALES TOTALES
ALTERNATIVA II
En Miles de Nuevos Soles a Precios Sociales
AO
0
1
2
3
4
5
6
7
8
9
10
FLUJO DE COSTOS
INGRESOS GENERADOS
FLUJO DE COSTOS
SOCIALES TOTALES
POR EL PROYECTO
SOCIALES NETOS
3,549.44
962.41
965.44
968.45
971.44
994.64
1,018.28
1,042.37
1,066.90
1,091.89
1,117.34
VACSN
FUENTE : Elaboracin Proyectista.
826.70
834.96
843.31
851.75
860.26
868.87
877.56
886.33
895.19
906.50
3,549.44
135.71
130.47
125.13
119.69
134.38
149.42
164.81
180.57
196.69
210.84
4,308.59
ANEXO N
FLUJO DE COSTOS SOCIALES TOTALES
ALTERNATIVA I
En Nuevos Soles a Precios Sociales
AO
FLUJO DE COSTOS
INGRESOS GENERADOS
SOCIALES TOTALES
POR EL PROYECTO
0
1
2
3
4
5
6
7
8
9
10
4,412,627.04
2,280,850.69
2,303,659.20
2,326,695.79
2,349,962.75
2,396,962.00
2,444,901.24
2,493,799.27
2,543,675.25
2,594,548.76
2,646,439.73
2,176,696.96
2,198,463.93
2,220,448.57
2,242,653.05
2,265,079.59
2,287,730.38
2,310,607.68
2,333,713.76
2,357,050.90
2,382,978.46
VACSN
FUENTE : Elaboracin Proyectista.
ANEXO N
COSTO EFECTIVIDAD DE CADA ALTERNATIVA
VACSN
POBLACION ATENDIDA
COSTO EFECTIVIDAD
FUENTE : Elaboracin Proyectista.
ALTERNATIVA
ALTERNATIVA
II
3,389,772.50
4,308,591.53
1,353,383
1,353,383
2.50
3.18
CUADRO N 26
COSTO EFECTIVIDAD DE CADA ALTERNATIVA
VACSN
POBLACION ATENDIDA
COSTO EFECTIVIDAD
FUENTE : Elaboracin Proyectista.
ALTERNATIVA
ALTERNATIVA
3,389,772.50
4,308,591.53
1,353,383
1,353,383
2.50
3.18
CUADRO N 27
ANALISIS DE SENSIBILIDAD
Proyecto
Proyecto I
Proyecto II
Poblacin
Atendida (Hab)
1,353,383
1,353,383
VACNS
Ratio CE
3,389,772.50
4,308,591.53
Var. En %
N Pers.
CE I
C/Servicio
-50%
5.01
-40%
4.17
-30%
3.58
-20%
3.13
-10%
2.78
0%
2.50
10%
2.28
20%
2.09
30%
1.93
40%
1.79
50%
1.67
FUENTE : Elaboracin Proyectista.
2.50
3.18
CE II
6.37
5.31
4.55
3.98
3.54
3.18
2.89
2.65
2.45
2.27
2.12
GRAFICO N 2
ANALISIS DE SENSIBILIDAD
7.00
6.00
Ratio CE
5.00
4.00
3.00
2.00
1.00
0.00
-50%
-40%
-30%
-20%
-10%
0%
10%
% Habitantes
con CE
servicio
CE I
II
20%
30%
40%
50%
Comentario
40%
50%
ANALISIS DE SENSIBILIDAD
Var. En % N
Personas atendidas
-20%
-10%
0%
10%
20%
VANS I
VANS II
5,740,849.65
4,565,311.07
3,389,772.50
1,038,695.35
1,038,695.35
6,659,668.68
5,484,130.10
4,308,591.53
1,957,514.38
1,957,514.38
ANALISIS DE SENSIBILIDAD
8,000,000.00
6,000,000.00
VANS S/.
4,000,000.00
2,000,000.00
0.00
-30%
-20%
-10%
0%
10%
20%
30%
-2,000,000.00
VANS II
Comentario
De los resultados se tiene las siguientes conclusiones:
Comentario
De los resultados se tiene las siguientes conclusiones:
ANEXO
DETALLE DE LOS INSUMOS DE LAS OBRAS DE INFRAESTRUCTURA
Insumo
Unidad
Precio
Cantidad Presupuestado
MANO DE OBRA
425,449.43
HH
9.80
2,810.11
27,469.39
MANO DE OBRA 2.
ES
150.00
1.00
150.00
OPERARIO
HH
9.43
7,601.76
71,688.68
OFICIAL
HH
8.50
4,427.41
37,650.53
PEON
HH
7.62
28,820.82
218,110.15
PERFORISTA OFICIAL
HH
8.50
4,651.58
39,247.73
TOPOGRAFO
H.H
9.43
279.09
2,632.95
MANO DE OBRA
ES
90.00
300.00
27,000.00
MANO DE OBRA
EST
75.00
20.00
1,500.00
MIRA
UND
20.00
36.86
526.59
WINCHA DE 30m
HM
50.00
279.09
14,217.94
HM
140.00
924.27
129,259.34
CARGADOR FRONTAL
HM
140.00
125.25
17,550.00
VOLQUETE DE 8 M3
H.M
120.00
500.25
60,000.00
HM
140.00
2,325.79
325,610.77
HM
140.00
924.27
129,259.34
HM
150.00
4,651.58
697,737.36
TRACTOR D6
H.M
140.00
4,726.33
662,529.28
MOTONIVELADORA DE 130-135 HP
HM
140.00
465.61
65,324.61
HM
10.00
278.67
2,785.08
TEODOLITO
H.M
8.00
279.09
2,106.36
JALON
HM
2.00
563.45
1,053.18
NIVEL TOPOGRAFICO
H.M
8.00
279.09
2,106.36
GLN
55.00
5.27
294.89
KG
2.80
103.22
292.45
KG
2.80
874.62
2,448.96
MATERIALES1
ES
210.00
20.00
4,200.00
MATERIALES2
ES
1,500.00
1.00
1,500.00
KG
3.00
495.62
1,486.86
PLANTAS DE LA ZONA
UND
3.00
1,369.64
4,108.92
KG
3.00
1,840.69
5,522.07
ARCILLA
M3
12.00
8,339.31
100,071.75
M3
30.00
385.09
11,552.60
M3
30.00
270.17
8,104.83
ARENA GRUESA
M3
30.00
253.87
7,616.35
PIEDRA GRANDE
M3
30.00
5,975.09
179,252.64
ADQUISICION DE TERRENO
M2
5.00
52,659.03
263,295.15
GRAMPAS
KG
3.00
388.21
1,164.63
SPOT PUBLICITARIO
UND
3.00
300.00
900.00
BOLANTES
mll
300.00
5.00
1,500.00
GL
5.00
10.43
52.16
BLS
21.00
3,503.86
73,583.21
MECHA NARANJA
ML
0.45
87,217.17
39,247.73
FULMINANTE
UND
0.45
72,680.98
33,433.25
DINAMITA
KG
10.00
17,443.43
174,434.34
ESTOPA
KG
5.00
3.16
21.06
EQUIPOS
2,110,066.21
MATERIALES
1,219,478.41
BARRENO
UND
300.00
290.72
YESO DE 25 KG
BLS
5.00
105.32
87,217.17
526.59
KG.
0.30
110,044.82
33,013.45
HORMIGON
M3
30.00
12.64
379.20
AGUA
M3
1.00
79.03
80.60
MATERIALES
EST
252.00
300.00
75,600.00
GLB
500.00
2.00
1,000.00
PUERTA DE MADERA
PZA
400.00
1.00
400.00
P2
2.50
1,053.18
2,632.95
CORDEL
KG.
10.00
52.66
526.59
P2
2.50
14,577.10
36,442.75
ALAMBRE DE PUAS
ML
0.30
32,609.68
9,782.90
GRASS AMERICANO
KG.
30.00
300.00
9,000.00
UND
10.00
184.31
1,843.07
ML.
26.00
1,105.84
28,751.81
HERRAMIENTAS MANUALES
%MO
16,763.14
HERRAMIENTAS
%MO
1,434.34
3,754,994.05
AMUVRAE
ASOCIACIN DE MUNICIPALIDADES
DEL VALLE RIO APURIMAC Y ENE
COEF.
UNIDAD CANTIDAD
P.U.
P. PARCIAL
P. TOTAL
107,200.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
Meses
Meses
Meses
Meses
Meses
Meses
Meses
8.00
8.00
8.00
8.00
8.00
8.00
8.00
3,000.00
2,500.00
2,500.00
1,500.00
1,500.00
800.00
800.00
24,000.00
20,000.00
20,000.00
12,000.00
12,000.00
6,400.00
12,800.00
1,510.00
1.00
1.00
1.00
1.00
Millar
Und.
juego
Est.
7.00
8.00
10.00
1.00
50.00
120.00
10.00
100.00
350.00
960.00
100.00
100.00
70,301.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Meses
Meses
Meses
Est.
Est.
Und.
Und.
Und.
Rollo
Meses
8.00
150.00
8.00
250.00
8.00
200.19
3.00 3,500.00
1.00 55,000.00
20.00
20.00
2.00
200.00
1,200.00
0.15
2.00
20.00
8.00 4,500.00
TOTAL
1,200.00
2,000.00
1,601.50
10,500.00
55,000.00
400.00
200.00
151.23
40.00
36,000.00
179,011.50