CHINA "PRE-FAB" INSTANT HOME PROGRAMME (FOR FLOOD VICTIMS)

{if 25ft x 30ft, then = 750 sq ft.} ==>> can adjust size of house . . . . .
R.C. Foundation Floor Slabs (for kampong-style "stilt houses" )
{about 7.65m x 9.15m = 70 sq m. }

As of . . .
April~05~2015

### By "Simple Rule-of-Thumb" as is Oral discussions . . . ###

Proposed R.C. 'ship-based' foundation slab with 4-feet column stumps

Malaysian
Ringgit (RM)

Abbr'v := { R.C. = Reinforced Concrete }


1. allow back-hoe machine for platform levelling, foundation
slab exvation and backfilling, + boundary set-up

L/Sum

2. R.C. strip tie beam (say 12" x 6" thk) all-round


(add 2 x 12mm dia m.s. bars x 110' L)
6" timber planks form-work

1.5075
59.5609756
68

## 3. 6" thick ship-based foundation slab concrete


~allow 2 layers wire-mesh brc reinforcement
:: workmen + hoist + profile rack >>>

per hse

10.5
140

4. 6 nos. "leg-stands" (r.c col. Stumps with ms bars).


~ 4 nos. 12mm diam. ms bars, 1 bolt-&-nut
4a. Allow for "C-channel" beam support house structure

m3
kg
mr

240.00
2.80
3.00

361.80
166.77
204.00

m3
m2
allow

240.00
2.50

2,520.00
350.00
580.00

nos

100.00

600.00

L/Sum

per hse

1,500.00

L/Sum

per hse

200.00

110

feet

2.50

275.00

110

feet

2.00

220.00

RM

7,277.57

sq ft

5.50

5,984.00 ??

sq ft

2.80

3,046.40

To complete the foundation concrete slabs with stands :


Roof // Ceiling :
7. Allow simple asbestos roof cover & timber rafters
## check if supplier include Roof-cover ##
8. Ceiling sheets,approx 2 x 34 x 16

## add m'chnery =$650/day . . .

4,050.00

5. Must allow for underground discharge pipes


( discharge to septic tank or STP or main drains ).
6a. 6" p.c. small drains to Perimeter of each house
{ if rain-water can free-fall, then can take out . . . .}
6b. 2-feet conc. Aprons surrounding house

300.00

1088
approx.

1088

##

9. Workmanship to erect one pre-fab house (2 days)

1,000.00 ??

L/Sum

To add in roof and ceiling . . . . .

RM

17,307.97

25.00
80.00

1,800.00
175.00
560.00

IMPORTANT :
1. Allow PAINTing to each hse : normal emulsion paint . . .
2. Locksets for each door (frt/bck; 2 tlts; 3 rms=7nos)
3. All 4 sides, 4ft x 4ft lourves windows & glass panes
( wdw frame alrdy in-built . . . )
4. '5~6 steps' to enter house (cement-sand bricks stairs)
## Any rain-water down-pipes to divert rainwater from roof??

7
7

L/Sum
nos
sets

per hse

sets

200.00

200.00

1
1
1
1

set
set
set
set
L/Sum

160.00
150.00
120.00
80.00

160.00
150.00
120.00
80.00
300.00

RM

810.00

Internal Sanitary-wares fittings only . . .


1.
2.
3.
4.
5.

1 set sitting W.C. with flush cistern, local supply


1 set wah-basin c/w std local tap
1 set kitchen alum sink c/w local tap
1 set shower c/w tap
Workmanship for plumber ( housing project basis )
Internal house Sanitary-wares Fittings per hse:

STP (Sewerage Treatment plant, for big shceme only)

Now, using Septic-tanks for individual house . . .


1. Supply, excavation, install Septic-tank 5PE size
2. Allow to lay 6" sewer pipes discharge from house
to the septic tanks (say 6 to 8 feet)

L/Sum

1,300.00

per hse

150.00

For Septic Tank supply install each house:

RM

1,450.00

Electrical~ Light Fittings to each house:


1. Allow 4ft long flourescent light fittings
(( guest dining=1; kitchen=1; toilet=1; bath=1; front=1 ))
(( 3 bedrooms=1 each ))
2. Allow 13 Amp power sockets
(( kitchen=2; guest=2; bedrm=1 each; ))

sets

80.00

640.00

pts

80.00

400.00

3. Main switch and fuse box


Electrical~ Light Fittings to each house:

EXTERNAL Works (outside house ):


1. Whole project site already clear of trees/bushes
2. Access road to the project site already existing
3. Sub-station & electric supply to site provided by
the authorites/ local government.
4. application for electricity (TNB) and water (JBA)
and install respective billing meters by others.
5. The internal roads and main drains servicing the site.
6. The street lightings, any small bridges or concrete
slabs over main drains and conc culverts road crossings
shall be by others.
7. As-built project layout plans & submissions by others.
8. The applying for C.F. inspection are by others.

set

200.00

200.00
1,240.00

## WARNING : : : ##
All figures are only for
un-official discussions.
Every item subjected to
change to suit supplier's design.
Site conditions may vary . .
( on site variations not allowed . . .)