MECHANICAL
SPECIFICATION WRITNGS
ARBU O4
SARANG, WENDELL D.
BSA 3A
REPORTER
SECTION
MECHANICAL
DIVISION 15 -
Definition:
MECHANICAL EQUIPMENT
The kinds of equipment that are classified under the headings of heating,
air conditioning, plumbing, electrical work and gasfitting.
MECHANICAL ROOMS
A room or space in a building dedicated to the mechanical equipment and
its associated electrical equipment as opposed to rooms intended for
human occupancy or storage.
MECHANICAL ROOMS TYPICALLY HOUSE THE FOLLOWING
EQUIPMENT:
Air handlers
Boilers
Chillers
Elevator machinery
Heat exchangers
Water heater and tanks
Water pumps
Main distribution piping and valves
Sprinkler distribution piping and pumps
Back-up electrical generators
HVAC
HVAC (heating, ventilating, and air conditioning; also heating, ventilation,
and air conditioning)[1] is the technology of indoor and vehicular
environmental comfort. Its goal is to provide thermal comfort and
acceptable indoor air quality.
MECHANICAL
DIVISION 15 -
PSVARE
The Philippine Society of Ventilating, Air Conditioning and Refrigerating
Engineers (PSVARE) along with Philippine Society of Mechanical
Engineers (PSME) govern on the codes and standards for HVAC / MVAC in
the Philippines.
AIRCONDITIONER
Air conditioning (often referred to as A/C, AC or aircon) is the process of
altering the properties of air (primarily temperatureand humidity) to more
comfortable conditions, typically with the aim of distributing the conditioned
air to an occupied space to improve thermal comfort and indoor air quality.
USUAL AIR CONDITIONER TYPE FOR RESIDENTIAL
WINDOW UNIT
PORTABLE UNIT
EXAMPLE:
2.5HP, Anti-corrosive Gold Fin Condenser,
Energy Saving (High EER),
Nano Gold Filter, Air Deflection Control,
Auto Swing
Key Features:
DIVISION 15 - MECHANICAL
MECHANICAL
DIVISION 15 -
MECHANICAL
DIVISION 15 -
connection not shown on the drawings or deviation thereof but required for
the work. The Contractor shall certify that the drawings have been
checked for dimensions, materials, erection details and conform to the
intent of the drawings and specifications.
6. Record Drawings
6.1 The Contractor shall during the progress of work, keep a record of the
actual installation from that shown on the contract drawings.
6.2 Upon completion of the work, the Contractor shall submit four (4)
copies of as-built drawings indicating the work as actually and finally
installed.
7. Guarantee - The Contractor shall guarantee that the plumbing system is
free form all defective workmanship and materials and will remain so for a
period of one (1) year from the date of acceptance of the work. Any
defects, appearing within the aforesaid period shall be remedied by the
Contractor at his own expense.
8. Permits - The Contractor shall be responsible for securing all the
required construction and operation permits and pay all necessary fees
thereof. Copies of inspections shall be submitted to the Owner.
9. Codes and Standards - The work under this contract is to be installed
with reference to the latest requirements of the following:
9.1 PHILIPPINE NATIONAL BUILDING CODE
9.2 REGULATION OF LOCAL WATERWORKS & SEWERAGE
AUTHORITY
9.3 UNIFORM PLUMBING CODE (UPC)
9.4 AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
9.5 AMERICAN NATIONAL STANDARD INSTITUTE (ANSI)
9.6 AMERICAN WATER WORKS ASSOCIATION (AWWA)
9.7 NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
9.8 UNDERWRITER'S LABORATORIES (UL)
9.9 FACTORY MUTUAL (FM)
MECHANICAL
DIVISION 15 -
MECHANICAL
DIVISION 15 -
MECHANICAL
DIVISION 15 -
MECHANICAL
DIVISION 15 -
1. Workmanship
1.1 The work throughout shall be executed in the best and most thorough
manner to the satisfaction of the Architect and the Engineers, who will
jointly interpret the meaning of the drawings and specifications and shall
have power to reject any work and materials which in their judgment, are
not in full accordance therewith.
1.2 This Contractor shall assume unit responsibility and shall provide the
services for a qualified Engineer to supervise the complete installation of
equipment and systems and who shall be available for conducting the
finial acceptance tests.
1.3 All equipment shall be installed in accordance with the manufacturer's
standard. Certificate of compliance by the manufacturer's representative
shall be submitted to the Owner.
2. Excavating, Pipe Laying and Packfilling
2.1 Excavating
Trenches for all underground pipe lines shall be excavated to the required
depth and grades. Bell holes shall be provided so that the pipe shall rest
on well tamped solid for its entire length.
Where rock is encountered, excavation shall extend to depth 150 mm
below the pipe bottom, and before pipe is laid, the space between the
bottom of pipe shall be filled with approved filling materials.
2.2 Pipe Laying
Pipes in trenches shall be laid true line and grade on a stable or suitably
prepared foundation, each section of the pipe being bedded and bottom of
the trench shaped to fit the lowest quadrant of the pipe circumference.
Pipe shall not pass through columns, footings, beams of ribs, except
where noted on the drawings.
Slopes of all sewage and storm drainage pipings shall be maintained at
1% minimum unless otherwise noted or required.
2.3 Backfilling
After pipe lines have been tested, inspected and approved by the Architect
and prior to backfilling, all forms and bracings shall be removed and the
excavation shall be cleaned from trash and debris. Materials for backfilling
MECHANICAL
DIVISION 15 -
4.2 Trap - Each fixture trap except those cast integral or in combination
with fixtures in which the trap seal is readily accessible or if the trap is
removable shall have an accessible brass trap screw of ample size.
MECHANICAL
DIVISION 15 -
Floor, Wall and Ceiling Plates - Provide chromium plated metal plates of
the same materials as the pipe for all exposed piping passes through
floors, walls and ceilings.
Supports, Sleeves and Hangers
6.1 Fixture Support. All fixtures and equipment shall be supported and
fastened in a safe and satisfactory manner.
6.2 Pipe sleeves shall be installed and properly secured in place at all
points where pipes pass through masonry or concrete, except unframed
floors on earth.
6.3 Pipe Hangers, Supports & Inserts
Horizontal runs of pipe shall be hung with adjustable pipe hangers spaced
not over 3.0 meters apart, except bell and spigot pipes which shall have
hangers spaced not over 1.5 meters apart and located near the bell.
Trapeze hangers may be used in lieu of separate hangers on pipes
running parallel to and close to each other.
Inserts shall be securely anchored and the anchor shall be properly
slushed with mortar. Inserts shall be completely concealed when the
fixtures are installed.
Vertical pipe riser shall be supported at every floor unless additional
supports are required.
Provide isolation for pipe and hanger of different materials.
Provide auxiliary structural steel members required for supporting and
anchoring of pipes and accessories.
7. Cleaning and Painting
MECHANICAL
DIVISION 15 -
All equipment, pipes, valves and fittings shall be cleaned of grease and
sludge which may have accumulated. Any stoppage of discoloration or
other damage to the parts of the building, its finish or furnishings due to
the system shall be repaired by the Contractor.
7.2 Painting
All exterior surfaces of pipings to be installed in or through concrete floor
fill or the tile floors and underground shall be given one coat of acid
resisting paint having a bituminous base.
Pipe hangers supports and all other iron work in concealed spaces shall
be thoroughly cleaned and painted with one coat of asphalt varnished.
All pipings shall be painted with two coats of enamel finish paints after
cleaning. Color code shall be submitted to the Engineer and Architect for
approval prior to painting. Directional markers shall be spaced no more
than 5.0 m apart.
8. Testing and Disinfection
8.1 Testing
Water line - Upon completion of the roughing in and before setting fixtures,
the entire water piping system shall be tested at a hydrostatic pressure
one and one-half times the expected pressure in the system when in
operation or 1034 Kpa minimum, for at least 2 hours.
Others - Apply the water to the system either in its entirety or in sections
after rough piping has been installed. If applied to the entire system, all
openings in the piping shall be tightly closed, except the highest opening,
and the system filled with water to the point of overflow. Keep the water in
the system or in the portion under test for at least thirty (30) minutes
during which time there shall be no drop greater than 100 mm.
Where portion of the piping system is to be concealed before completion,
this portion shall be tested separately in a manner similar to that described
for the entire system.
8.2 Disinfection
The entire system shall be thoroughly flushed and disinfected with chloride
before it is placed in operation.
MECHANICAL
DIVISION 15 -
MECHANICAL
DIVISION 15 -
.11 Air filters provided for use in Fan Coil Units adhere to the following:
MECHANICAL
DIVISION 15 -
.1 Where practicable, cartridge filters for use in Fan Coil Units should
be a nominal trade size such as 12 x 24 x 1 and have an
efficiency rating of MERV 8.
.12 Buildings with no air conditioning shall have cooling circulation air
increased by minimum of 25% or have sufficient volume to meet WCB
requirements with respect to maximum space temperature, whichever is
greater. Consider additional costs of construction and compare to cost
of adding and operating an air conditioning plant.
.13 Radiant heating panels shall not face windows.
.14 Provide separate exhaust to all photocopier rooms or areas. Exhaust to
outdoors.
.15 Ensure sufficient air mixing within the occupied space on VAV systems
under all operating conditions.
.16 VAV systems shall have reheat coils at all VAV boxes.
.17 Window mounted air conditioners and exhaust fans are not acceptable,
except for temporary buildings.
.18 All exhaust ductwork within the building shall be under negative pressure.
.19 Specify separate ventilation systems for Mechanical Rooms.
.20 Do not specify sidewall supply registers for classroom applications.
.21 Controls specifications shall meet UBC guidelines. Overall responsibility
of Mechanical system design and necessary controls shall be
Mechanical Consultants responsibility.
.22 Each floor or Zone within floor space is to be provided with CO2 sensors
connected to the building BMS.
.23 Provide minimum of 10 air changes per hour for all laboratories. Alternate
proposals to be reviewed with UBC Technical Services and approved by
UBS Risk Management Services/Health Safety and Environment.
.24 Return and supply fans requiring volumetric tracking shall have same
type devices for volume control, i.e. inlet dampers must be only used
with inlet dampers, VFDs with VFDs etc.
MECHANICAL
DIVISION 15 -
.25 If fume hood exhaust systems are located in mechanical penthouses they
shall be located in separate self contained area within the Mechanical
Penthouse.
.26 Where fume hood fans are contained within mechanical penthouses,
pressurize the penthouse with supply air from the building from a safe
outside source to avoid the possibility of recirculation exhaust air into
the service space and to provide flushing of contaminants if a minor
duct leak occurs.
2.3 Air Outlets and Inlets
.1 Do not specify balancing dampers at the face of air outlets and inlets.
Locate balancing dampers sufficient distance into the ductwork to
maintain acceptable sound level within the conditioned space. (NC 30
35 or less)
.2 Co-ordinate with architectural discipline.
2.4 Outside Air Intake Louvers
.1 Locate outside air intake louvers as far away as practical from all sources
of contamination; avoid locating intakes at loading docks, fume hood
exhausts, generator exhausts. Outside air intake louvers are not to be
located on roof tops where fume hood exhausts are located.
.2 Locate outside air intake louvers as high as possible above grade and
shall not be at grade level.
.3 Where below grade intakes are unavoidable install bird/debris screen on
outside of the louvers.
2.5 Tests
.1 Insulate or conceal work only after testing and approval by UBC Inspector.
.2 Conduct tests in presence of UBC Inspector.
.3 Piping .1 General: maintain test pressure without loss for 48hr unless
otherwise specified.
.2 Hydraulically test steam and hydronic piping systems at 1-1/2 times
system operating pressure or minimum 1300 kPa, whichever is
greater.
MECHANICAL
DIVISION 15 -