FEED MILL 4 PROJECT:

Date:10/09/2014
Daily manpower allotment report for Feed mill-04 Project
Sl.
No

Job Site location

Silo Sweep Augers

Silo Main Truss

Civil works

buoket elevators

conveyors assembly

soya warehose

main tower

painting works

Sand Blasting

10

Job Descripction

Total No.of Manpower alloted= 80


AWP =52

Contractor =28

angle frame fabricatio,and instalation

Full welding & vertical plate fixing

Foundation concreting

buoket assembly

Conveyor installation/chain fixing

11

welding works f.s bin , batch bin,stair case

painting of beams * columns

sand blastick of columns * beams

Electrical works

ELECTRICAL WORKS

11

forklift works

shifting of materials

12

general labours

painting of columns / belt assembly

13

motor/ hoppers
gearbox

trusses erection/fabrication

14

Supervisor/Foremans

Supervising the site

Total Summary

49

27

Total No.of
Manpower
8
3
3
7
10
11
12
4
4
2
2
6

Absent

AWP

Contractor

76

FEED MILL 4 PROJECT:


Date:20/09/2014
Daily manpower allotment report for Feed mill-04 Project
Sl.
No

Job Site location

Silo Main Truss

Elevators

Conveyor assembly

soya warehose

main tower building

painting works

Sand Blasting

10

Job Descripction

Total No.of Manpower alloted= 80


AWP =52

Contractor =28

Full welding & vertical plate fixing


Installation of elevator casing and manchine head

Conveyor installation/chain fixing at corn silo

6
0

trusses erection/fabrication
welding works f.s bin , batch bin,stair case,painting of bins

10

painting of beams * columns

sand blastick of columns * beams

Electrical works

ELECTRICAL WORKS

11

forklift works

shifting of materials

12

Corn Catwalk

Assembly of catwalk for corn silo upside support frames

11

31

28

14

Supervising the site

Total Summary

Total No.of
Manpower
0
8
7
0
18
2
4
2
2

Absent

13
3

AWP

Contractor

59

FEED MILL 4 PROJECT:


Date:18/09/2014
Daily manpower allotment report for Feed mill-04 Project
Sl.
No

Job Site location

Silo Main Truss

Elevators

Conveyor assembly

soya warehose

main tower building

painting works

Sand Blasting

10

Job Descripction

Total No.of Manpower alloted= 78


AWP =49

Contractor =29

Full welding & vertical plate fixing

Installation of elevator casing

Conveyor installation/chain fixing at corn silo

10

welding works f.s bin , batch bin,stair case,painting of bins

10

painting of beams * columns

sand blastick of columns * beams

Electrical works

ELECTRICAL WORKS

11

forklift works

shifting of materials

12

Corn Catwalk

Assembly of catwalk for corn silo upside

10

49

26

14

trusses erection/fabrication

Supervising the site

Total Summary

Total No.of
Manpower
8
8
6
10
18
2
4
2
2

Absent

12
3

AWP

Contractor

75

FEED MILL 4 PROJECT:


Date

28.09.2014

ment report for Feed mill-04 Project


Sl.
No

Job Site location

Job Descripction

Silo Main Truss

Full welding of stiffiner/transfer of cat walk in soya warehouse #2,fixing


of catwalk full welding

Conveyor assembly

soya warehose

main tower building

8
9

Sand Blasting

10

Electrical works

11

Painting

12

forklift works

13

general labors

14

Total No.of Manpower


alloted= 83
AWP =53
Contractor =30

10

assembly of chain conveyor and start assembly of chain conveyor in


soya ware house/3times are making in soya warehouse

trusses erection/fabrication/preparation of materials soya #2

stair case full welding/fixing of silo support full welding/painting of


beams and bin silo/assembly of one rotary distributor in batch bin/start
assembly of fines bin silo for corn or soya.fixing allignment of bucket
elevetor.

sand blasting of columns * beams

ELECTRICAL WORKS/

painting of beams/colums/pipe.

shifting of materials

helpers

10

Supervising the site

52

29

Total Summary

Total No.of Manpower

tor =30

11
14
8
16
4
5
2
3
14

Absent

AWP

Contractor

81