Boiler Techuology -I
[TIME:
10-00
A.M.
to 1-00
P.M.]
two sections.
SECTION-l
Answers all questions
Marks
1.
(a)
10
on~
(ii)
(c)
(d)
(6) Mounting
(iii)
(iv)
(c)
Decorative
(d)
Gate valve
(b)
Globe valve
(c)
Butterfly valve
(d)
Safety valve.
Presence of oxygen in it
[ Turn over
CON
1329
Marks
(v)
(vi)
Function of Deaerator is to
(a)
(b)
(c)
(d)
improves combustion
(vii)
(viii)
(6)
(ix)
(x)
HGI of coal
3 Ts.
10
CON
1329
Marks
SECTION-2
Answer any lour questions. Answer should be short and to the point only:-
2.
(a)
(b) How air preheater improves boiler performance? Describe the work-
4
5
5
6
at 100C.
3.
(i)
(ii)
(b)
(iii)
(iv)
(c) Explain
5
6
(ii)
(iii)
4.
Degree of superheat
Enthalpy of the steam.
Buckstay
(iii)
(iv)
Fusible plug.
What are the various methods used for flow control of a fan? Among
these which are energy efficient methods?
(c) Explain the term supercritical. What are the main differences in
(b)
CON
1329
Marks
5.
(al
(b)
(i)
(ii)
(iii)
Carbon-53%
Sulpher--2%
(iii)
Hydrogen-2(fo
(tv)
02-1.5%.
20
(6) Describe
process .....
..
Softener
DM Plant
o
RO Plant
CON
1330
Boiler Technology - II
[TIM/<: : 2-30
P.M:.
to 5-30 p.M.l
(MAx. MARKS
TuLe
.--(1)
100)
SECTION-l
Answer all questions
1.
;',\3
....
(ii)
(iii)
(iv)
(v)
(c)
1330
CON
lilal" S
s 'e'
N-2
Al ,:;VIer any jour questions. Answer should be short and to the point only.
2.
3.
(a)
(b)
(c)
(d)
(a)
(b)
(c)
~.g(c_m2,
Cd) Specific fuel consumption of a 300 TPH boiler is 0.2 kg of fuel per leg
of steam. Cakulate yearly llet financial burden to the company if
cost of fuel increased by 50 rupees per ton. Con.sider average 90%
loading of the boiler and 300 running days in a year.
(a)
(6 )
required?
(i)
Steam drum
(ii)
4.
i~)
(iii)
(iv)
Cl\?eratlcm.
5.
(c)
Explain how scaling takes place in boiler tube and How it affects
Boiler performance?
(d)
(a)
(i)
(i i)
(b)
(iii)
(iv)
List out some important field instruments used at boiler along with
its purpose.
CON
1330
Marks
6.
(c)
Cd)
:~
(d)
(e)
Hydro
te~3t
20
CON
1331
Engineering Drawing
[TIME:
10-00
A.M.
to 1-00
(MAX. MARKS :
P.M.]
100)
2.
Draw general arrangement of a water tube boiler and show following :(a)
Water wall
(b)
Bank tube
(c)
Primary superheater
(d)
Final superheater
(e)
Economiser
(f)
Air preheater.
20
20
important components.
3.
(b)
(c)
(a)
10
(b)
10
a)
b)
c)
d}
e)
~
I
I
'yi
...
0)
~
i)
Level transmitter
ill
Steam trap
iii)
Gate valve
iv)
Pneumatic
operated control
valve
v)
Y -type strainer
r Turn over
CON 1331
lVi
4.
5.
30
(lL)
(l
(l~)
fl.
k."
Globe valve
(t,)
Single
(c)
~.
F ontview
.\
obj~;d
given below :-
20