The errored transactions are listed as per the example below. The exception status are clearly
identifiable by red (error) green (complete) or void (clear).
The scenario column gives a brief outline of what the transaction relates to with the source and
destination in both JDE and SAP codes. It is also possible to see the various reference numbers, i.e.
local PO numbers and delivery references.
The system will show the error in the following format, in this case a material has been ordered in
the IMEX which does not exist in SAP,
Every AHQ transaction will be shown for the dates specified. To view in detail double click on the
line.
In contrast to the first example, it is possible here to see the AHQ transactions which have been
created for the inter-company buy-sell process. Each of these can be looked at separately by
double-clicking into the document.
Looking at the below PO for example, the vendor, plant, materials and quantities have all populated
as per the transaction details.
The PO history tab at item level shows the user the subsequent goods receipt and invoice document.
These in turn can also be drilled into.
For the inter-company buy/sell purchase order to create successfully a valid source list must be in
place at material/plant level. This must contain the vendor and the relevant purchasing organisation
to ensure the system knows where the stock is being supplied from for a certain validity period.
These can be displayed through ME0M
Back to the buy/sell transactions the Sales order can also be displayed, drilling into each material
will show the selling price.
And also the user can look at the delivery and the status (C = completely processed).
The above transaction shows a receipt against the external manufacturer purchase order, the link
symbol links this transcation back to the original PO create
Once clicked, the system will take the user through to the PO create transaction.
As above, the purchase order requires a source list, in this scenario the souce list must include a
reference to a contract. ALL external manufacture purchase orders will be created with reference to
a contract. This contract must also include the FIX flag as highlighted below.
The contract which has been created and referenced must be in a released status, PO creation will
fail if the contract is blocked and/or it is not referenced on the source list with a fix flag.