Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
KSRB 200-8. Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, sapling
means, in area of light jungle, removal of stumps stacking of serviceable materials earth filling in the depr
specifications. MORTH / Chapter 2. (PWD SR 2013-2014 Bellary Circle Page No. 146, Item No. 18.11)
Sqm
2.2
145.00
2.4
209.00
5, 7
2.4, 2.21
186.00
8.31
KSRB 2-2.4 : Excavation 1.5m and above in width in soft rock without blasting for foundation of buildings wate
either in pits or trenches not exceeding 1.5m in depth, stacking the excavated stuff from edges of excavation with
equipment complete as per specifications. specification. No. KBS 2.1.C / 2.9.4 / 2.18 / 2.19. (PWD SR 2013-2014
Cum
KSRB 2-2.2: Earthwork excavation for foundation of buildings, water supply, sanitary lines and electrical con
above in width, in hard soil, from 1.50m to 3.0m in depth including dressing the bottom and sides of pits and tre
edges of excavation with lead up to 50m. after breaking of clods complete as per specifications. specification. N
Bellary Circle Page No. 5, Item No. 2.4)
Cum
4.70
KSRB 2-2.2: Earthwork excavation for foundation of buildings, water supply, sanitary lines and electrical con
above in width, in hard soil, not exceeding 1.50m in depth including dressing the bottom and sides of pits and tre
edges of excavation with lead up to 50m. after breaking of clods complete as per specifications. specification. N
Bellary Page No. 5, Item No. 2.4)
Cum
18.11
KSRB 2-1.2: Earth work in surface excavation in hard soil for leveling and lowering the ground manually (othe
drains and trenches of pipe lines and cables) and removing the excavated stuff to distance not exceeding 50m an
and neatly dressed, disposed earth to be leveled after braking of clods and neatly dressed as per specifications. sp
2012-2013 Gulbarga Circle Page No. 5, Item No. 2.2)
Cum
146
2.6
650.00
KSRB 2-2.6 : Excavation 1.5m and above in width in Hard rock by Chiselling and / or wedging, where blasting i
supply, sanitary lines and electrical conduits either in pits or trenches 1.5m in depth, stacking the excavated stuff
lead up to 50m including cost labour complete as per specifications. specification. No. KBS (PWD SR 2013-2014
Cum
2.8
932.00
1 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
7
ITEM OF WORK
Unit
Lift
Charges
(in Rs)
(b)
2.10
93.90
2.12
187.00
KSRRB M300-19. Removal of unserviceable soil including excavation, loading and disposal but excluding rep
separately as per clause 300.5 complete as per specifications. Morth Specification. No. 301. (PWD SR 2013-2
19.2)
Cum
10
Basic
Rate
(in Rs)
(a)
KSRB 2.5 : Earthwork excavation ( in deposited soil ) and filling sides of foundation upto plinth in layers not e
deposited layer by ramming after watering with all lead and lift including cost of all labour complete as per s
2.9.10.1 / 2.1.1
Cum
Sl. No
as per
SR
Book
KSRB 2.3: Filling available excavated earth ( excluding rock ) in sides of foundation up to plinth in layers no
deposited layer by ramming after watering with all lead and lift including cost of all labour complete as per spec
SR 2013-2014 Bellary Circle Page No. 6, Item No. 2.1)
Cum
Page
No.
152
19.20
34.43
KSRRB 300-26.2. When lead is more than 60m up to 500m by any means of conveyance including loading and u
including cost all labour complete as per specifications. MORTH chapter 3. (PWD SR 2013-2014 Bellary Circle
Cum
152
19.31
2.63
ANTITERMITE TREATMENT
11
KSRB 3.2: Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating c
the Column pits, walls, trenches, stilt excavation, top surface of the plinth filling, junction of wall and floor,
expansion joints, over the top surface of the consolidated earth on which the apron to be laid, surrounding
emulsifible concentrates of 20% concentration, including cost of chemical, diluting in water to one percent
complete as per specifications. (Plinth area of the building at ground floor only shall be measured) Specification.
Bellary Page No. 9, Item No. 3.2)
Sqm
3.2
97.00
KSRB 4-1.2: Providing and laying in position plain cement concrete of mix M10 with OPC cement @ 220 kg
metal coarse aggregates @ 0.892cum and fine aggregates @ 0.465cum machine mixed, concrete laid in layers no
foundation and plinth, cost of all materials, labour, HOM of machinery, curing, complete as per specifications.
2013-2014 Bellary Circle Page No. 12, Item No. 4.2)
Cum
12
4.2
3,973.00
2 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
13
a
b
c
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
KSRB 4-1.6: Providing and laying in position plain cement concrete of mix M15 with OPC cement @ 240 kg
metal coarse aggregates @ 0.878cum and fine aggregates @ 0.459cum, machine mixed, concrete laid in layers n
foundation, plinth and cills including cost of all materials, labour, HOM of machinery, curing, complete as per sp
(PWD SR 2013-2014 Bellary Circle Page No. 12&13, Item No. 4.6)
Ground Floor
Cum
12
4.6
4,258.00
First Floor
Cum
12, 22
4.6, 7
4,258.00
50.00
Terrace Floor
Cum
12, 22
4.6, 7
4,258.00
100.00
STONE MASONARY
14
KSRB 5.2-2: Providing and constructing granite / trap / basalt size stone masonry in foundation with cement mor
not less than 20cms high, bond stones at two m. apart in each course including cost of materials, labour, curing, et
(PWD SR 2013-2014 Bellary Circle Page No. 25, Item No. 5.5)
Cum
15
25
5.5
3,011.00
KSRB 5.3-3: Providing and constructing granite / trap / basalt size stone masonry in basement with cement mor
less than 15cms high, bond stones at two m. apart in each course including cost of materials, labour, curing, etc
(PWD SR 2013-2014 Bellary Circle Page No. 25, Item No. 5.9)
Ground Floor
Cum
26
5.9
3,813.00
3 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
KSRB 4.2.2: Providing and laying in position reinforced cement concrete of design mix M20 with OPC cement
granite metal coarse aggregates @ 0.878cum and fine aggregates @ 0.459cum, with superplastisiser @ 3lts c
machine mixed, concrete laid in layers not exceeding 15cms thick, vibrated for all works in foundation plinth an
lintels, retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutmen
lacing courses, parapets, coping, bed blocks, plain window cills, fillets etc., including cost of all materials, labour
specifications. Specification No. KBS 4.1, 4.6. (PWD SR 2013-2014 Bellary Circle Page No. 13, Item No. 4.11)
a
b
c
Ground Floor
Cum
13
4.11
4,963.00
First Floor
Cum
13, 22
4.11
4,963.00
50.00
Terrace Floor
Cum
13, 22
4.11
4,963.00
100.00
17
KSRB 4.2.8: Providing and laying in position reinforced cement concrete of design mix M20 with OPC cement
granite metal coarse aggregates @ 0.69cum and fine aggregates @ 0.46cum, with superplastisiser @ 3lts c
machine mixed, concrete laid in layers not exceeding 15cms thick, vibrated for RCC beams, columns of all sizes i
floor level for roof, slabs, staircase, lintels, columns including cost of all materials, labour, HOM of machi
Specification No. KBS 4.1, 4.6. (PWD SR 2013-2014 Bellary Circle Page No. 15, Item No. 4.17)
a
b
c
18
a
b
c
Ground Floor
Cum
15
4.17
4,963.00
First Floor
Cum
15, 22
4.17
4,963.00
50.00
Terrace Floor
Cum
15, 22
4.17
4,963.00
100.00
KSRB 4.2.10 : Providing and laying in position reinforced cement concrete of design mix M20 with OPC cemen
granite metal coarse aggregates @ 0.5175cum and fine aggregates @ 0.345cum, with superplastisiser @ 0.225l
chajja of 7.5 cms. average thickness, up to ground floor level including cost of all materials, labour, HOM of mac
Specification No. KBS 4.1, 4.6. (PWD SR 2013-2014 Bellary Circle Page No. 15, Item No. 4.19)
Ground Floor
Sqm
15
4.19
366.00
First Floor
Sqm
15
4.19, 7
366.00
3.00
Terrace Floor
Sqm
15
4.19, 7
366.00
6.00
19 KSRB 4-4.2 : Extra for use of water proofing compound in Cement concrete of mix M20, at one kg of compoun
(PWD SR 2013-2014 Bellary Circle Page No. 16, Item No. 4.25)
a
All Floors
Cum
16
4.25
189.00
-
4 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
Providing and casting reinforced cement concrete racks with design mix M20, granite or trap jelly 12mm a
reinforcements of 6mm dia MS bars at 15 cms. Centre to centre for main reinforcement and at 30cms centre
wherever necessary with burnt brick in CM 1:8 and plastered with CM 1:4 or composite mortar 1:6 includin
(inclusive of cost of steel and fabrication charges)
Ground Floor
Sqm
20
4.53
575.00
First Floor
Sqm
20, 22
4.53, 7
558.00
3.00
Terrace Floor
Sqm
20, 22
4.53, 7
558.00
6.00
21
a
b
c
22
a
b
c
23
Providing RCC loft (atta) 7.5cms thick with cement concrete design mix M20 using clean granite or trap je
reinforcements at 20cms centre to centre as per design including form work, centring, curing, finishing the e
complete (exclusive of cost of steel and fabrication charges).
Ground Floor
Sqm
20
4.54
404.00
First Floor
Sqm
20, 22
4.54, 7
404.00
3.00
Terrace Floor
Sqm
20, 22
4.54, 7
404.00
6.00
Providing and fixing RCC slabs 5cms thick for walls shelves with 12mm and down size jelly cement concrete desi
finishing, curing etc., complete (inclusive of cost of steel and fabrication charges). (PWD SR 2013-2014 Bellary
Ground Floor
Sqm
20
4.55
424.00
First Floor
Sqm
20, 22
4.55, 7
424.00
3.00
Terrace Floor
Sqm
20, 22
4.55, 7
424.00
6.00
Providing RCC design mix M20 using granite metal 20mm and down size for 7.5cms thick solid parapet or
directions. (exclusive of cost of steel and fabrication charges) including necessary centering, form work and fin
(PWD SR 2013-2014 Bellary Circle Page No. 20, Item No. 4.56)
All Floors
Sqm
20
4.56.1
351.00
24 KSRB 4-6.1: Providing and removing centering, shuttering, strutting, propping etc., and removal of form wor
for mass concrete including cost of all materials, labour complete as per specifications. Specification No. KBS
Page No. 16, Item No. 4.28)
a
All Floors
Sqm
16
4.28
203.00
5 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
25
a
b
c
26
a
b
c
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
KSRB 4.6.2: Providing and removing centering, shuttering, strutting, propping etc., and removal of form work fo
landings, balconies and likes, thickness up to 200mm including cost of all materials, labour complete as per s
(PWD SR 2013-2014 Bellary Circle Page No. 16, Item No. 4.29)
Ground Floor
Sqm
16
4.29
261.00
First Floor
Sqm
16, 22
4.29, 7
261.00
3.00
Terrace Floor
Sqm
16, 22
4.29, 7
261.00
6.00
KSRB 4-6.5: Providing and removing centering, shuttering, strutting, propping etc., Columns, pillars, pi
rectangular / polygon in plan including cost of all materials, labour compete as per specifications. Specific
Bellary Circle Page No. 17, Item No. 4.32)
Ground Floor
Sqm
17
4.32
311.00
First Floor
Sqm
17
4.32
311.00
3.00
Terrace Floor
Sqm
17
4.32
311.00
6.00
6 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
27
a
28
a
b
c
29
a
b
c
30
a
b
c
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
KSRB 4-6.6 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form w
struts, circular or curved in plan including cost of all materials, labour compete as per specifications. Specifi
Bellary Circle Page No. 17, Item No. 4.33)
All Floors
Sqm
17
4.33
678.00
KSRB 4.6.7: Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for
cantilever girders, bressumers and lintels not exceeding 1m in depth including cost of all materials, labour com
KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 17, Item No. 4.34)
Ground Floor
Sqm
17
4.34
226.00
First Floor
Sqm
17, 22
4.34
226.00
3.00
Terrace Floor
Sqm
17, 22
4.34
226.00
6.00
KSRB 4.6.9: Providing and removing centering, shuttering, strutting, propping etc., for edges of slabs and bre
material, labour complete as per specification. Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle
Ground Floor
Sqm
17, 22
4.36, 7
533.00
First Floor
Sqm
17, 22
4.36, 7
533.00
3.00
Terrace Floor
Sqm
17, 22
4.36, 7
533.00
6.00
KSRB 4.6.10: Providing and removing centering, shuttering, strutting, propping etc., for chajjas, corbels etc., incl
complete as per specification. Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 17, It
Ground Floor
Sqm
17
4.37
223.00
First Floor
Sqm
17
4.37
223.00
3.00
Terrace Floor
Sqm
17
4.37
223.00
6.00
31 KSRB 4.6.11: Providing and removing centering, shuttering, strutting, propping etc., and removal of form wor
staircase including cost of all materials, labour complete as per specification. Specification No. KBS 4.6.2. (PWD
Item No. 4.38)
a
b
c
Ground Floor
Sqm
17
4.38
398.00
First Floor
Sqm
17
4.38
398.00
3.00
Terrace Floor
Sqm
17
4.38
398.00
6.00
7 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
32
KSRB 4.9.2: Providing T.M.T Steel reinforcement for R.C.C work including straightening, cutting, bending,
welding wherever required, tying with binding wire and anchoring to the adjoining members wherever neces
wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per spec
Charges for steel of all diameter for additional floors over ground floor per floor height of 3.5 m. or apart thereof
Specification No. KBS. (PWD SR 22013-2014 Bellary Circle Page No. 19, Item No. 4.46)
a
b
c
Ground Floor
19
4.46
6,894.00
First Floor
19
4.46, 4.47
6,894.00
35.30
Terrace Floor
19
4.46, 4.47
6,894.00
35.30
MASONARY WORK
33
a
b
c
KSRB 6-2.3: Providing and constructing burnt brick masonry with approved quality of non-modular bricks of
molded) with cement mortar 1:6 for basement and superstructure including the cost of materials, labour charg
specifications. Specification No. KBS 6.2. (PWD SR 2013-2014 Bellary Circle Page No. 30, Item No. 6.6)
Ground Floor
Cum
30, 34
6.6
4,469.00
First Floor
Cum
30, 34
6.6, 4
4,469.00
25.00
Terrace Floor
Cum
30, 34
6.6, 4
4,469.00
50.00
34 KSRB 6-7.4: Construction of Partition wall 11.2cms thick with non-modular ground molded burnt bricks of
including cost of material, labour charges, scaffolding, curing complete as per specifications. Specification No. K
Page No. 33, Item No. 6.26)
a
b
c
Ground Floor
Sqm
33, 34
6.26
600.00
First Floor
Sqm
33, 34
6.26, 4
600.00
2.50
Terrace Floor
Sqm
33, 34
6.26, 4
600.00
5.00
DOORS
35
KSRB 9.4-4 : Providing Sal wood frames of doors, windows, clerestory windows, ventilators and other fram
making plaster grooves (excluding cost of cement concrete and side clamps), but including cost of all materials,
specifications. Specification No. KBS 9.33. (PWD SR 2013-2014 Bellary Circle Page No. 55, Item No. 9.13)
All Floors
Cum
56
9.13
47,561.00
8 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
36
Providing and fixing factory made 35mm thick solid core flush door comprising of commercial ply finish kutty b
seasoned wooden reapers with 6mm thick solid teak wood external lipping around the shutter affixed by gluing u
with 125mm MS oxidized heavy duty hinges 4nos., 30cm long powder coated tower bolts 2nos., 150mm oxid
locking etc., complete including cost of material, labour charges HOM of machineries, supply to respective wo
per KREIS Date Rate ).
a
37
a
38
All Floors
Sqm
Data
rate
2,950.00
Providing and fixing door frame made out of MS angle of size 50x50x6mm on three sides, 20x20x3mm at bottom
both sides 2nos. Each, 100mm MS hinges 3 nos. with necessary locking arrangements including one coat of antic
labour charges for cutting, welding, grinding loading and unloading, transportation to work spot etc., complete as
).
All Floors
Data
rate
435.00
Providing and fixing factory made Cladded Door shutter 29mm thick manufactured out of 25mm thick boiled
commercial ply laminated with 2mm thick PVC sheet on back side and 2mm thick prelaminated PVC sheet o
lipping all round using PVC solvent cement etc., including cost of material, transportation, including fixtures 1
tower bolt 1no., MS aldrop 1 no., with necessary screws etc., complete as per specification. ( As per KREIS Date
All Floors
Sqm
Data
rate
3,360.00
9 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
KSRB 7.10 : Providing and fixing in position aluminum windows and ventilators as per approved drawings wit
frame section of size 61.85x31.75mm. with 1.2mm thick, bottom section weight 0.695 kg/m, sides and top sec
shutter comprising top and bottom section of size 40mmx18mm, 1.25mm thick 0.417 kg/m; shutter outer side 40m
shutter interlock section 40mmx26.7mm, 1.1mm thick, weight 0.469 kg/m. the shutters mounted on nylon rolle
aluminum handles tower bolts etc.; and providing and fixing 5.5mm. thick plain glass for shutters fitted with
cutting to required length, joints mitered subdividing the frame tenonned and riveted in the assembled frame stiffe
fixed to the walls, lintels, floor beams/cills as the case may be with necessary steel screws, rail plugs, or tea
concrete and making good the original surface using cement mortar, using aluminum sections pretreated for rem
to 12 - 15 microns. (PWD SR 2013-2014 Bellary Circle Page No. 38, Item No. 7.10.1)
a
b
c
Ground Floor
Sqm
38
7.10.1
2,861.00
First Floor
Sqm
38, 48
7.10.1, 2
2,861.00
2.50
Terrace Floor
Sqm
38, 48
7.10.1, 2
2,861.00
5.00
40
KSRB 7.8 : Providing and fixing in position in cement concrete 1:3:6 steel glazed windows and ventilators side
approved drawings using Z angles of 25x33x33mm, weighing 1.419kg/m both for inner and outer frames an
weighing 2.28kg/m all duty providing T section 19x19x3mm weighing 0.839kg/for glazing of windows, not mor
fixing 4mm thick reeded glass with teak wood beading of required size all steel section should confirm to I.S 745
section should be cut to length welded and grinded electrically subdividing frames of unit shall be tenonned an
steel surface shall be thoroughly cleaned free of rust and painted with one coat of anti-corrosive paint and finish
colour and make including cost of materials, fixtures, labour charges and HOM of machinery complete as per s
Circle Page No. 37, Item No. 7.8)
a
All Floors
Sqm
37
7.8
2,609.00
MS GRILL
41
a
b
c
KSRB 7.9: Providing and fixing M.S. grill work for windows and ventilators weighing approximately 21 kg
combination of M.S. flats and square rods as per approved design, drawing including cutting steel sections and we
of red lead primer, cost of materials, fixtures, labour and HOM of machinery complete as per specifications. Sp
2013 Gulbarga Circle Page No. 37, Item No. 7.9)
Ground Floor
kgs
37
7.9
87.10
First Floor
kgs
37, 48
7.9, 2
87.10
2.50
Terrace Floor
kgs
37, 48
7.9, 2
87.10
5.00
10 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
PLASTERING WORKS
42
KSRB 15.1.3: Providing ruled pointing to coursed stone masonry with cement mortar 1:3, 20mm deep, after
including cost of materials, labour, curing, etc., complete as per specifications. (PWD SR 2013-2014 Bellary Cir
a
43
a
b
c
44
a
b
c
45
a
b
c
46
Ground Floor
Sqm
120
15.3
65.40
KSRB 15-3.5: Providing 15mm thick cement plaster in single coat with cement mortar 1:4 to brick mason
required smooth rendering, : Providing and removing scaffolding, including cost of materials labour curing com
2013 Gulbarga Circle Page No. 120, Item No. 15.13)
Ground Floor
Sqm
First Floor
Terrace Floor
120
15.13
128.00
15.13, 1
128.00
3.50
15.13, 1
128.00
7.00
KSRB 15-3.11: Providing 20 mm thick cement plaster in single coat cement mortar 1:4, to stone masonry
corners wherever required smooth rendering, providing and removing scaffolding, including cost of mate
specifications. (PWD SR 2013-2014 Bellary Circle Page No. 121, Item No. 15.19)
Ground Floor
15.19
162.00
First Floor
15.19
162.00
3.50
Terrace Floor
15.19
162.00
7.00
KSRB 15-3.14: Providing 12mm thick cement plaster to ceiling, single coat in cement mortar 1:4, to ceil
required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing, e
2013-2014 BellaryCircle Page No. 121, Item No. 15.22)
Ground Floor
Sqm
First Floor
Terrace Floor
121
15.22
122.00
15.22, 1
122.00
3.50
15.22, 1
122.00
7.00
KSRB 15-5.1: Providing rough cement plastering 15mm thick in single coat cement mortar 1:4, to brick mas
approved quality, providing and removing scaffolding, including cost of materials, labour, curing, etc., complete
Bellary Circle Page No. 122, Item No. 15.30)
Ground Floor
Sqm
122
15.30
122.00
11 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
b
c
47
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
First Floor
15.30, 1
122.00
3.50
Terrace Floor
15.30, 1
122.00
7.00
KSRB 15.8.2 : Providing and fixing plaster mesh 150mm wide manufactured out of hot galvanized iron of nom
120gms per sqm width, along route of walls chipped for services junction between RCC and brick walls including
as per specification. (length of mesh only be measured for payment). (PWD SR 2012-2013 Gulbarga Circle Pag
All Floors
122
15.35
30.60
48 KSRB 15-7: Providing lime rendering for plastering to wall and ceiling , including cost of materials, labour,
SR 2013-2014 Bellary Circle Page No. 122, Item No. 15.33)
a
Ground Floor
Sqm
122
15.33
15.82
b
c
49
a
b
c
First Floor
15.33, 1
15.82
3.50
Terrace Floor
15.33, 1
15.82
7.00
KSRB 4-5: Providing lath plaster with cement mortar 1:3, 5 cms thick with 6mm dia mild steel bars at 20cms
chicken mesh for drop chejja, fascia, backing of cup boards including cost of all materials, labour, providing an
curing, complete as per specifications. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No. 16
Ground Floor
Sqm
16, 22
4.27, 7
758.00
First Floor
Sqm
16, 22
4.27, 7
758.00
3.50
Terrace Floor
Sqm
16, 22
4.27, 7
758.00
7.00
50 KSRB 4-2.12: Extra for providing throting or drip molding to RCC chajja with plastering ( labour charges only )
(PWD SR 2013-2014 Bellary Circle Page No. 16, Item No. 4.21)
a
All Floors
m
16
4.21
12.88
-
51 Providing groves in plastering on walls 25 to 40mm wide and to the required depth as per design and finished
scaffolding and curing etc., complete as directed by PMC/EIC.
Basic Rate
12 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
a
ITEM OF WORK
All Floors
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
37.85
Lift
Charges
(in Rs)
(b)
-
52 Providing 12mm thick Patti with CM 1:3 to the parapet wall. Providing and removing scaffolding, including
complete as directed by PMC/EIC
Basic Rate
All Floors
37.85
FLOORING
53
a
b
c
54
a
55
a
56
KSRB 14.10-1: Flooring with 25mm to 40mm thick polished tandur blue stone slabs using cement mortar 1:6, 2
or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of
curing, polishing complete as per specifications. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Pa
Ground Floor
Sqm
First Floor
Terrace Floor
110
14.15
792.00
792.00
1.50
792.00
3.00
KSRB 14.14-5: Providing Ceramic tiles of size 30x30 cms of approved make, shade and size for flooring, tre
mm thick, cement mortar 1:3 mix, flush pointing with white cement using colour pigment , including cost o
specifications. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No. 114, Item No. 14.36.2)
All Floors
Sqm
114
14.36.2
724.00
KSRB 14-17.2: Providing skirting, dado, rises of Steps with colour glazed tiles of size 30 cms x 45 cms 6 mm t
10mm thick cement plaster 1:3 and jointed with white cement slurry over rough plaster surface (excluding cos
measured and paid separately) using glazed tiles of approved make and size including cost of materials, labour,
No. KBS 14.16, 14.17. (PWD SR 2013-2014 Bellary Circle Page No. 115, Item No. 14.41.3)
All Floors
Sqm
115
14.41.3
1,142.00
Providing and laying flooring using prepolished, water cut/gang saw 19mm thick grey granite laid over exist
and pointed with white / grey pigment etc., complete. (PWD SR 2013-2014 Bellary Circle Page No. 116, Item N
13 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
a
57
a
b
c
58
ITEM OF WORK
All Floors
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Sqm
116
14.47.1
1,726.00
Lift
Charges
(in Rs)
(b)
-
Providing and laying platform using prepolished, water cut/gang saw 40mm thick telephonic Black Granite l
CM 1:3 proportion. including cutting to required shape, pattern with papper joints, including full rounding for
with colour pigments to match the colour of slab making through lointing with sealent, making holes 25mm x 12 m
SR 2013-2014 Bellary Circle Page No. 116, Item No. 14.52)
Ground Floor
Sqm
116
14.52
2,212.00
First Floor
Sqm
116,
118
14.52
2,212.00
1.50
Terrace Floor
Sqm
116,
118
14.52
2,212.00
3.00
Providing half nosing for 20mm thick granite slab using required machinery including cost and conveyance of all
of equipment etc., complete as per specifications. (PWD SR 2013-2014 Bellary Circle Page No. 117, Item No. 1
All Floors
117
14.56
118.00
59 Providing Vitrified tiles 60 x 60cms of approved make, shade and size for flooring laid on a bed of 12 mm thic
white cement using colour pigment , including cost of materials, labour, curing, complete as per specifications. (P
115, Item No. 14.45)
a
b
c
Ground Floor
Sqm
115
14.45
951.00
First Floor
Sqm
115
14.45
951.00
Terrace Floor
Sqm
115
14.45
951.00
60
Providing and laying screed concrete average 50mm thick over roof using cement concrete of mix M20 with O
graded granite metal course aggregate @ 0.64cum and fine aggregate @ 0.43 cum with superplastisiser @ 3ltrs c
machine mixed concrete laid in layers not exceeding 15cms thick well compacted by using one kg water proofing
of all materials, labour for HOM of machinery curing etc., complete as per specifications. ( As per KREIS Data R
a
All Floors
Sqm
Data
rate
229.65
14 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
61
a
62
a
63
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
KSRB 10-2: Providing and laying in position yelahanka tiles of size 250x250mm of approved quality and make
thickness 25mm over weather proof course and pointed with cement mortar 1:3 mix with red oxide including cu
specification. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No. 68, Item No. 10.1)
All Floors
Sqm
68
10.1
666.00
KSRB 8.5 : Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal ga
slope compacting, including cost of materials, labour, curing complete as per specifications.
All Floors
Cum
51
8.4
1,487.00
Providing and laying heavy duty cobble stones 80mm thick interlock pavers, using cement and course sand for m
and colour with a minimum compressive strength of 281 kg per sqm over 50mm thick sand bed (average thicknes
3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compacti
including cost of materials, labour and HOM of machineries complete as per specifications.
Ground Floor
Sqm
118
14.66.2
822.00
PAINTING WORKS
64
KSRB 15-14.1: Providing and applying painting in two coats with oil bound washable distemper of approved
priming coat with distemper primer after thoroughly brooming the surface free from mortar drops and other foreig
and sand paper smooth, cost of materials, labour, complete as per specifications. (PWD SR 2013-2014 Bellary C
All Floors
Sqm
124
15.49
49.88
65 KSRB 15-14.2 : Extra over Item 15.14.1 for applying one coat with oil bound washable distemper on ceiling and
SR 2012-2013 Gulbarga Circle Page No. 124, Item No. 15.49)
a
15.49,
All Floors
Sqm
124
3.13
15.49.2
66
KSRB 15-16.1: Providing and finishing external walls in two coats with waterproof cement paint of approved
thoroughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and oth
labour, complete as per specifications - with primer. (PWD SR 2013-2014 Bellary Circle Page No. 125, Item No
a
b
c
67
Ground Floor
Sqm
First Floor
Terrace Floor
125
15.53.2
62.00
62.00
1.50
62.00
3.00
KSRB 15-17.4: Applying priming coat over new wood surface and / or wood based surface, after brushing wi
preparing the surface after thoroughly cleaning oil, grease, dirt and foreign matter, sand papering and knotting a
labour, complete as per specifications. (PWD SR 2013-2014 Bellary Circle Page No. 126, Item No. 15.58)
All Floors
Sqm
126
15.58
22.90
15 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
68
a
69
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
KSRB 15-17.6: Providing and applying painting two coats (excluding priming coat) on new wood surface and /
give even shade cleaning the surface of all dirt, dust and foreign matter, sand papering including cost of mate
(PWD SR 2013-2014 Bellary Circle Page No. 126, Item No. 15.60)
All Floors
Sqm
126
15.60
70.97
KSRB 15-18.2 Providing and applying enamel metal paint two coats (excluding priming coat) on new steel or oth
after cleaning oil, grease, dirt, dust and foreign matter, sand papering including cost of materials, labour, complet
Bellary Circle Page No. 128, Item No. 15.74)
All Floors
Sqm
128
15.74
69.12
SS HAND RAIL
70
Providing and fixing Stainless steel staircase railing as per Chief Architect Drawing No.11520/HRSC with hand
to vertical hollow 50 mm dia pipe of 16 gauge, stainless steel vertical pipe spaced at 1.20m regular intervals, a
horizontal pipe are welded to vertical 50mm dia hollow pipe. The entire assembly is fixed to staircase concrete
etc., complete including cost of materials, labour, HOM of machineries and electrical charges, etc., complete
Bellary Circle Page No.48, Item No.7.38)
a
All Floors
Sqm
48
7.38
5,246.00
71
Providing and fixing 304 - grade stainless steel hand rails of 14 - gauge pipes for Ramps or Staircase are made ou
dia for verticals @ 1.60mtr c/c are fixed to the ramps or steps by drilling with bolts and 100mm dia base plates 1
anchor bolt and 40mm dia pipes are fixed horizontally for two rows top, one pipes are fixed with vertical pipes
pipes are fixed horizontally for 2 rows below top measure @ equal intervals including cutting, welding, bending w
bottoms and corners finishing with mat / shining etc., complete including cost and conveyance of all materi
equipment with all lead and lift, loading and unloading transportation charges and all other incidental charges etc.
of the Engineer- In-charge of the work. Ramps or Staircase for physically challenged. (PWD SR 2013-2014 Bella
All Floors
Sqm
48
7.39
5,246.00
72
KSRB 10-3: Providing and laying integral cement based waterproofing treatment including preparation
roofs,balconies,terrace etc.,consisting of following application.(a)Applying and grouting a slurry coat of neat c
with proprietary water proofing compound conforming to IS:2645 over the RCC slab after cleaning the surface
using broken brickbats 25mm to 100mm size with 50% of cement mortar 1:5 admixed with proprietary waterp
20mm thick layer of cement mortar 1:5 admixed with proprietary waterproofing compound to required slope an
300mm height including rounding off junctions of walls and slabs.(c)After two day of proper curing, applying
proprietary waterproofing compound(d)Finishing the surface with 20mm thick joint less cement cement m
waterproofing compound and finally finishing the surface with trowel and neat cement slurry and making of
finished shall be flooded with water for a minimum period of two weeks for curing and for final test includ
specifications. (PWD SR 2012-2013 Gulbarga Circle Page No. 68, Item No. 10.2)
16 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
a
ITEM OF WORK
All Floors
Unit
Page
No.
Sl. No
as per
SR
Book
Sqm
68
10.2
Basic
Rate
(in Rs)
(a)
631.00
Lift
Charges
(in Rs)
(b)
-
WRITING BOARD
73
Supplying and fixing P3 grade ceramic steel magnetic writing green board with vitreous enameled steel top surf
2% minimum gloss at 60 degree lead of size 8'x4'. The core material of the board is medium density fiber (
weighing 750kg per cubic meter as per IS : 12406-2003 Edition 2.2 with ceramic steel sheet of 0.3 to 0.4mm top
aluminum frame section, front 20mm side 16mm and thickness 1.20mm weight of the board is 12kg per s
specifications. ( As per KREIS Data Rate Sheet )
a
All Floors
No
Data
rate
12,300.00
74
Providing and fixing of Pin up board / notice board with 19mm thick MDF board as base and top fixed with pinu
fixing of readymade teak wood beading alround as border etc. complete as directed by PMC / EIC ( As per KREI
a
All Floors
Sqm
Data
rate
2,000.00
17 of 208
ProMax Management Consultants Pvt. Ltd
RATE ANALYSIS
Sl.
No
ITEM OF WORK
Unit
Page
No.
Sl. No
as per
SR
Book
Basic
Rate
(in Rs)
(a)
Lift
Charges
(in Rs)
(b)
LOGO
75
a
76
Creating LOGO of KREIS and name of the school in cement plastering work on the plastered surface including p
of wall primer including cost of providing and removing of scaffolding, form work, material, labour complete as d
All Floors
Sqm
MR
495.00
Providing and fixing Flag post. including excavation, brick masonry, plastering painting and ms pipe with one co
of PMC / EIC ( As per KREIS Data Rate Sheet )
All Floors
Sqm
MR
25,000.00
18 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
0.24
4.94
ing the ground manually (other than foundation of buildings, culverts, road
distance not exceeding 50m and lift up to 1.50m, excavated surface leveled
ressed as per specifications. specification. No. KBS 2.1(a) / 2.3.1 (PWD SR
145.00
7.25
152.25
nitary lines and electrical conduits either in pits or in trenches 1.50m and
ottom and sides of pits and trenches, stacking the excavated soil clear from
specifications. specification. No. KBS 2.1(b) / 2.3.5. (PWD SR 2013-2014
209.00
10.45
219.45
nitary lines and electrical conduits either in pits or in trenches 1.50m and
ottom and sides of pits and trenches, stacking the excavated soil clear from
specifications. specification. No. KBS 2.1(a) / 2.3.5. (PWD SR 2013-2014
194.31
9.72
204.03
32.50
682.50
46.60
978.60
19 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
93.90
4.70
98.60
tion upto plinth in layers not exceeding 20 cms. in depth, compacting each
f all labour complete as per specifications. specification. No. KBS 2.9.9 /
187.00
9.35
196.35
1.72
36.15
yance including loading and unloading for all kind of soils except hard rock
SR 2013-2014 Bellary Circle Page No. 152, Item No. 19.31)
2.63
0.13
2.76
97.00
4.85
101.85
with OPC cement @ 220 kgs, using 40mm and down size graded granite
ixed, concrete laid in layers not exceeding 150mm thick, well compacted in
complete as per specifications. Specification. No. KBS 4.1, 4.2. (PWD SR
3,973.00
198.65
4,171.65
20 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
with OPC cement @ 240 kgs, using 20mm and down size graded granite
mixed, concrete laid in layers not exceeding 15cms thick, well compacted in
ery, curing, complete as per specifications. Specification. No. KBS 4.1, 4.2.
4,258.00
212.90
4,470.90
4,308.00
215.40
4,523.40
4,358.00
217.90
4,575.90
3,011.00
150.55
3,161.55
in basement with cement mortar 1:6, stones chistle dressed in courses not
f materials, labour, curing, etc., complete as per specification. KBS 5.1.13.
3,813.00
190.65
4,003.65
21 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
n mix M20 with OPC cement @ 320kgs, with 20mm and down size graded
with superplastisiser @ 3lts confirming to IS9103-1999 Reaffirmed-2008,
works in foundation plinth and ground floor level for roof slabs, Staircase,
sters, columns, piers, abutments, pillars, posts, struts, buttresses, string or
ng cost of all materials, labour, HOM of machinery, curing, complete as per
le Page No. 13, Item No. 4.11)
4,963.00
248.15
5,211.15
5,013.00
250.65
5,263.65
5,063.00
253.15
5,316.15
n mix M20 with OPC cement @ 320kgs, with 20mm and down size graded
with superplastisiser @ 3lts confirming to IS9103-1999 Reaffirmed-2008,
C beams, columns of all sizes in foundation plinth and superstructure ground
rials, labour, HOM of machinery, curing, complete as per specifications.
Item No. 4.17)
4,963.00
248.15
5,211.15
5,013.00
250.65
5,263.65
5,063.00
253.15
5,316.15
gn mix M20 with OPC cement @ 24kgs, with 12mm and down size graded
with superplastisiser @ 0.225lts, machine mixed, well compacted for plain
materials, labour, HOM of machinery, curing, complete as per specifications.
Item No. 4.19)
366.00
18.30
384.30
369.00
18.45
387.45
372.00
18.60
390.60
9.45
198.45
22 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
granite or trap jelly 12mm and down size 5 cms thick and below with
orcement and at 30cms centre to centre for distribution including supports
omposite mortar 1:6 including centring, form work, curing etc., complete
575.00
28.75
603.75
561.00
28.05
589.05
564.00
28.20
592.20
using clean granite or trap jelly of 20mm and down size with necessary
ntring, curing, finishing the exposed faces with cement mortar (1:3) etc.,
404.00
20.20
424.20
407.00
20.35
427.35
410.00
20.50
430.50
size jelly cement concrete design mix M20 including CM 1:3 plaster
(PWD SR 2013-2014 Bellary Circle Page No. 20, Item No. 4.55)
424.00
21.20
445.20
427.00
21.35
448.35
430.00
21.50
451.50
351.00
17.55
368.55
etc., and removal of form work for foundations, footings, bases of columns
ations. Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle
203.00
10.15
213.15
23 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
, and removal of form work for flat surface such as suspended floors, roofs,
rials, labour complete as per specifications. Specification No. KBS 4.6.2.
261.00
13.05
274.05
264.00
13.20
277.20
267.00
13.35
280.35
311.00
15.55
326.55
314.00
15.70
329.70
317.00
15.85
332.85
24 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
etc., and removal of form work for Columns, pillars, piers, posts and
as per specifications. Specification No. KBS 4.6.2. (PWD SR 2013-2014
678.00
33.90
711.90
and removal of form work for sides and soffits of beams, beam haunchings,
st of all materials, labour complete as per specifications. Specification No.
226.00
11.30
237.30
229.00
11.45
240.45
232.00
11.60
243.60
c., for edges of slabs and breaks in floors, cills, plinth including cost of
SR 2013-2014 Bellary Circle Page No. 17, Item No. 4.36)
533.00
26.65
559.65
536.00
26.80
562.80
539.00
26.95
565.95
c., for chajjas, corbels etc., including edges including cost of material, labour
Bellary Circle Page No. 17, Item No. 4.37)
223.00
11.15
234.15
226.00
11.30
237.30
229.00
11.45
240.45
etc., and removal of form work for Stairs (excluding landing) except spiral
fication No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 17,
398.00
19.90
417.90
401.00
20.05
421.05
404.00
20.20
424.20
25 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
6,894.00
344.70
7,238.70
6,929.30
346.47
7,275.77
6,929.30
346.47
7,275.77
223.45
4,692.45
4,494.00
224.70
4,718.70
4,519.00
225.95
4,744.95
ound molded burnt bricks of class designation 50 with cement mortar 1:4
ifications. Specification No. KBS 6.2. (PWD SR 2013-2014 Bellary Circle
600.00
30.00
630.00
602.50
30.13
632.63
605.00
30.25
635.25
2,378.05
49,939.05
26 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
commercial ply finish kutty bond wood or equivalent make filled with kiln
the shutter affixed by gluing under pressure (machine pressed) shutter fixed
ower bolts 2nos., 150mm oxidized MS handles 2nos., with one aldrop for
neries, supply to respective work spot fixing in position etc., complete. ( As
2,950.00
147.50
3,097.50
435.00
21.75
456.75
ed out of 25mm thick boiled water proof solid core single leaf composite
ick prelaminated PVC sheet on front side, 10mm thick PVC sheet bottom
portation, including fixtures 150mm powder coated handles 2nos., 150mm
fication. ( As per KREIS Date Rate ).
3,360.00
168.00
3,528.00
27 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
as per approved drawings with sliding shutters using double track window
0.695 kg/m, sides and top sections 1.3 mm. thick weight 0.659 kg/m; and
17 kg/m; shutter outer side 40mmx18mm, 1.25mm.thick weight 0.417 kg/m,
hutters mounted on nylon rollers with approved quality of fixtures such as
glass for shutters fitted with rubber beading aluminum sections including
ed in the assembled frame stiffened with end clips at corners angles etc., and
teel screws, rail plugs, or teak wood gatties including cutting masonry or
um sections pretreated for removal of any Specification No. KBS- anodized
10.1)
2,861.00
143.05
3,004.05
2,863.50
143.18
3,006.68
2,866.00
143.30
3,009.30
windows and ventilators side hung/top hung 2/3 open able 1/3 fixed as per
for inner and outer frames and center mullion section of size25x46x3mm
r glazing of windows, not more than 34cms, c to c including providing and
ction should confirm to I.S 7452:1990, 4 nos. of hold fasts of approved size,
es of unit shall be tenonned and riveted into the frames electrically. All the
anti-corrosive paint and finishing two coats of ready mix paint of approved
of machinery complete as per specifications. (PWD SR 2013-2014 Bellary
2,609.00
130.45
2,739.45
87.10
4.36
91.46
89.60
4.48
94.08
92.10
4.61
96.71
28 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
mortar 1:3, 20mm deep, after raking joints to depth of 20mm nicely lining,
WD SR 2013-2014 Bellary Circle Page No. 120, Item No. 15.3)
65.40
3.27
68.67
ent mortar 1:4 to brick masonry including rounding off corners wherever
of materials labour curing complete as per specifications. (PWD SR 2012-
128.00
6.40
134.40
131.50
6.58
138.08
135.00
6.75
141.75
mortar 1:4, to stone masonry and concrete surface including rounding off
ding, including cost of materials, labour, curing, etc., complete as per
)
162.00
8.10
170.10
165.50
8.28
173.78
169.00
8.45
177.45
122.00
6.10
128.10
125.50
6.28
131.78
129.00
6.45
135.45
ment mortar 1:4, to brick masonry for base of dadoing works with sand of
, labour, curing, etc., complete as per specifications. (PWD SR 2013-2014
122.00
6.10
128.10
29 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
125.50
6.28
131.78
129.00
6.45
135.45
1.53
32.13
0.79
16.61
19.32
0.97
20.29
22.82
1.14
23.96
m dia mild steel bars at 20cms c to c both horizontally and vertically fixing
materials, labour, providing and removing form work HOM of machineries,
14 Bellary Circle Page No. 16, Item No. 4.27)
758.00
37.90
795.90
761.50
38.08
799.58
765.00
38.25
803.25
0.64
13.52
30 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
1.89
Amount
(in Rs.)
39.74
moving scaffolding, including cost of all materials, labour and curing etc.,
30.00
4.50
3.00
0.30
0.05
37.85
37.85
1.89
39.74
bs using cement mortar 1:6, 25mm thick over existing cement concrete bed
igment to match the shade of the slab, including cost of materials, labour,
2013-2014 Bellary Circle Page No. 110, Item No. 14.15)
792.00
39.60
831.60
793.50
39.68
833.18
795.00
39.75
834.75
hade and size for flooring, treads of steps and landings laid on a bed of 12
ur pigment , including cost of materials, labour, curing, complete as per
No. 114, Item No. 14.36.2)
724.00
36.20
760.20
57.10
1,199.10
ck grey granite laid over existing floor in CM 1:4 at 20mm thick (average)
y Circle Page No. 116, Item No. 14.47.1)
31 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
1,726.00
86.30
Amount
(in Rs.)
1,812.30
2,212.00
110.60
2,322.60
2,213.50
110.68
2,324.18
2,215.00
110.75
2,325.75
ing cost and conveyance of all materials labour for all items of works HOM
rcle Page No. 117, Item No. 14.56)
118.00
5.90
123.90
ng laid on a bed of 12 mm thick, cement mortar 1:3 mix, flush pointing with
mplete as per specifications. (PWD SR 2013-2014 Bellary Circle Page No.
951.00
47.55
998.55
951.00
47.55
998.55
951.00
47.55
998.55
t concrete of mix M20 with OPC cement @ 300kgs, 20mm and down size
with superplastisiser @ 3ltrs confirming to IS : 9103-1999 reaffirmed-2008
by using one kg water proofing compound per bag of cement, including cost
ations. ( As per KREIS Data Rate Sheet )
229.65
11.48
241.13
32 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
of approved quality and make, over a bed of cement mortar 1:3 an average
mix with red oxide including curing cost of material, labour complete as per
No. 68, Item No. 10.1)
666.00
33.30
699.30
74.35
1,561.35
cement and course sand for manufacture of blocks of approved size, shape
ick sand bed (average thickness) and compacting with plate vibrator having
between joints, final compaction of paver surface joints into its final level
ications.
822.00
41.10
863.10
2.49
52.37
0.16
3.29
oof cement paint of approved brand and shade to give an even shade after
ree from mortar drops and other foreign matter including cost of materials,
Circle Page No. 125, Item No. 15.53)
62.00
3.10
65.10
63.50
3.18
66.68
65.00
3.25
68.25
sed surface, after brushing with ready mix enamel priming paint including
, sand papering and knotting already mix paint including cost of materials,
No. 126, Item No. 15.58)
22.90
1.15
24.05
33 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
at) on new wood surface and / or wood based surface with enamel paint to
apering including cost of materials, labour, complete as per specifications.
70.97
3.55
74.52
iming coat) on new steel or other metal surface brushing to give even shade
st of materials, labour, complete as per specifications. (PWD SR 2013-2014
69.12
3.46
72.58
5,246.00
262.30
5,508.30
Ramps or Staircase are made out of stainless steel hollow pipes using 50mm
s and 100mm dia base plates 10mm gauge for fixing of Vertical pipes 4nos.
s are fixed with vertical pipes another one fixed with elbows and 25mm dia
ing cutting, welding, bending wherever necessary with suitable caps @ tops,
and conveyance of all materials, labour for all items of works, HOM of
ll other incidental charges etc., complete as per specifications and directions
d. (PWD SR 2013-2014 Bellary Circle Page No. 48, Item No. 7.39)
5,246.00
262.30
5,508.30
34 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
31.55
Amount
(in Rs.)
662.55
treous enameled steel top surface board, green colour writing with chalk of
ard is medium density fiber (MDF) board grade - 1 with 9mm thickness,
steel sheet of 0.3 to 0.4mm top and galvanized steel of 0.25mm at back with
ht of the board is 12kg per square meter (Aprox.) etc., complete as per
12,300.00
615.00
12,915.00
as base and top fixed with pinup board velvet cloth including providing and
by PMC / EIC ( As per KREIS Data Rate Sheet )
2,000.00
100.00
2,100.00
35 of 208
ProMax Management Consultants Pvt. Ltd
AW@
5% on (c)
(In Rs.)
Amount
(in Rs.)
he plastered surface including painting with two coats of enamel over a coat
material, labour complete as directed by PMC/EIC
495.00
24.75
519.75
inting and ms pipe with one coat rust proof paint complete as per directions
25,000.00
1,250.00
26,250.00
36 of 208
ProMax Management Consultants Pvt. Ltd
37 of 208
ProMax Management Consultants Pvt. Ltd
38 of 208
ProMax Management Consultants Pvt. Ltd
39 of 208
ProMax Management Consultants Pvt. Ltd
40 of 208
ProMax Management Consultants Pvt. Ltd
41 of 208
ProMax Management Consultants Pvt. Ltd
42 of 208
ProMax Management Consultants Pvt. Ltd
43 of 208
ProMax Management Consultants Pvt. Ltd
44 of 208
ProMax Management Consultants Pvt. Ltd
45 of 208
ProMax Management Consultants Pvt. Ltd
46 of 208
ProMax Management Consultants Pvt. Ltd
47 of 208
ProMax Management Consultants Pvt. Ltd
48 of 208
ProMax Management Consultants Pvt. Ltd
49 of 208
ProMax Management Consultants Pvt. Ltd
50 of 208
ProMax Management Consultants Pvt. Ltd
51 of 208
ProMax Management Consultants Pvt. Ltd
52 of 208
ProMax Management Consultants Pvt. Ltd
53 of 208
ProMax Management Consultants Pvt. Ltd
54 of 208
ProMax Management Consultants Pvt. Ltd
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
KSRB 200-8. Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and tr
means, in area of light jungle, removal of stumps stacking of serviceable materials earth filling in the depressions
specifications. MORTH / Chapter 2. (PWD SR 2013-2014 Bellary Circle Page No. 146, Item No. 18.11)
Front portion
Front portion
Front portion
Inside at Stage location
1
1
1
1
7.000
5.400
5.400
4.300
339.50
190.08
156.60
104.92
791.10
KSRB 2-1.2: Earth work in surface excavation in hard soil for leveling and lowering the ground manually (other than fo
drains and trenches of pipe lines and cables) and removing the excavated stuff to distance not exceeding 50m and lift up
and neatly dressed, disposed earth to be leveled after braking of clods and neatly dressed as per specifications. specific
SR 2012-2013 Gulbarga Circle Page No. 5, Item No. 2.2)
Front portion
Front portion
Front portion
Inside at Stage location
48.500
35.200
29.000
24.400
1
1
1
1
48.500
35.200
29.000
24.400
7.000
5.400
5.400
4.300
0.300
0.300
0.300
0.300
101.85
57.02
46.98
31.48
237.33
KSRB 2-2.2: Earthwork excavation for foundation of buildings, water supply, sanitary lines and electrical conduits eit
above in width, in hard soil, not exceeding 1.50m in depth including dressing the bottom and sides of pits and trenche
from edges of excavation with lead up to 50m. after breaking of clods complete as per specifications. specification. No.
2014 Bellary Page No. 5, Item No. 2.4)
for Footings
10
30
10
2.600
3.200
3.600
2.400
2.400
2.900
1.500
1.500
1.500
93.60
345.60
156.60
surrounding
134.500
0.650
0.550
48.08
2
2
2
14.950
24.400
4.050
0.650
0.650
0.650
0.550
0.550
0.550
10.69
17.45
2.90
674.91
67.49
55 of 208
ESTIMATE
Sl.
Length
Breadth
Depth
ITEM OF WORK
No.
Quantity
No
(m)
(m)
(m)
5 KSRB 2-2.4 : Excavation 1.5m and above in width in soft rock without blasting for foundation of buildings water
conduits either in pits or trenches not exceeding 1.5m in depth, stacking the excavated stuff from edges of excavation w
and HOM of equipment complete as per specifications. specification. No. KBS 2.1.C / 2.9.4 / 2.18 / 2.19. (PWD SR 201
2.6)
70% of total excavation quantity
472.44
472.44
KSRB 2-2.6 : Excavation 1.5m and above in width in Hard rock by Chiselling and / or wedging, where blasting is pr
water supply, sanitary lines and electrical conduits either in pits or trenches 1.5m in depth, stacking the excavated
excavation with lead up to 50m including cost labour complete as per specifications. specification. No. KBS (PWD SR 2
Item No. 2.8)
20% of total excavation quantity
134.98
134.98
KSRB 2.3: Filling available excavated earth ( excluding rock ) in sides of foundation up to plinth in layers not exceedi
deposited layer by ramming after watering with all lead and lift including cost of all labour complete as per specification
SR 2013-2014 Bellary Circle Page No. 6, Item No. 2.1)
Foundation Excavated Qty
(Sl. No. 3)
Flooring Area
Ent lobby
Principal
Office / Record
Staircase area
Library
Class Room - 1 & 2
Corridor
1
1
1
1
1
2
1
7.800
5.000
7.500
5.300
6.000 6.000
7.500
3.250
8.030
6.000
6.000
9.000
6.000
29.000
0.900
0.900
0.900
0.900
0.900
0.900
0.900
35.10
35.78
32.40
21.94
43.36
97.20
156.60
5.000
0.900
25.65
6.000 6.000
0.900
64.80
Toilets
Platform
Entry Landing (Area from Autocadd
dwg)
Stage
2
1
6.000
6.000
4.100
7.500
0.900
0.900
44.28
40.50
50.800
0.900
45.72
12.500
5.000
0.900
56.25
3.600
4.525
0.900
14.66
3.600
6.435
0.900
20.85
674.91
2.850
(135.03)
(33.29)
(177.84)
56 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
(8.78)
1,055.06
67.49
8
KSRB 2.5 : Earthwork excavation ( in deposited soil ) and filling sides of foundation upto plinth in layers not exceedin
deposited layer by ramming after watering with all lead and lift including cost of all labour complete as per specificat
2.9.10.1 / 2.1.1
Total filling Qty - avail Qty
987.57
57 of 208
ESTIMATE
Sl.
Length
Breadth
Depth
ITEM OF WORK
No.
Quantity
No
(m)
(m)
(m)
9 KSRRB M300-19. Removal of unserviceable soil including excavation, loading and disposal but excluding replacemen
separately as per clause 300.5 complete as per specifications. Morth Specification. No. 301. (PWD SR 2013-2014 Be
19.2)
Surface Excavated Hard Soil Qty (Sl.
No. 2)
237.33
67.49
472.44
134.98
(67.49)
844.75
ANTITERMITE TREATMENT
11
KSRB 3.2: Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuou
the Column pits, walls, trenches, stilt excavation, top surface of the plinth filling, junction of wall and floor, along th
expansion joints, over the top surface of the consolidated earth on which the apron to be laid, surrounding of pipes
emulsifible concentrates of 20% concentration, including cost of chemical, diluting in water to one percent concent
complete as per specifications. (Plinth area of the building at ground floor only shall be measured) Specification. No.
2014 Bellary Page No. 9, Item No. 3.2)
Plinth Area
618.000
618.00
618.00
2.200
2.800
2.000
2.500
0.100
0.100
4.40
21.00
10
3.200
3.200
0.100
10.24
134.500
0.650
0.100
8.74
14.950
0.650
0.100
1.94
3.90
3.98
3.60
2.44
4.82
7.8
7.5
6
7.5
8.03
5
5.3
6
3.25
6
0.100
0.100
0.100
0.100
0.100
58 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
Length
(m)
No.
Breadth
(m)
Depth
(m)
0.100
0.100
Quantity
2
1
6
6
9
29
2.85
0.100
2.85
0.100
7.20
Toilets
2
Platform
1
Entry Landing (Area from Autocadd
1
dwg)
Stage
1
6
6
4.1
7.5
0.100
0.100
4.92
4.50
50.8
0.100
12.5
0.100
6.25
3.6
4.525
0.100
1.63
3.6
6.435
0.100
2.32
0.100
12.11
Building
concrete
Surrounding
Flagging
134.500
0.900
10.80
17.40
135.03
13
KSRB 4-1.6: Providing and laying in position plain cement concrete of mix M15 with OPC cement @ 240 kgs, using
metal coarse aggregates @ 0.878cum and fine aggregates @ 0.459cum, machine mixed, concrete laid in layers not excee
foundation, plinth and cills including cost of all materials, labour, HOM of machinery, curing, complete as per specifi
4.2. (PWD SR 2013-2014 Bellary Circle Page No. 12&13, Item No. 4.6)
Ground Floor
Size Stone Masonry Coping
Building Front area surrounding
length
Open court yard
Window Cills
Building Surrounding Window cills
concrete
Ventilator Cills
V
V1
V2
V3
V4
V5
Building
Surrounding
Flagging
concrete
134.500
0.450
0.075
4.54
14.950
0.450
0.075
1.01
-
174.520
0.230
0.100
4.01
2
7
11
1
6
10
1.200
1.500
2.100
1.800
0.750
0.900
0.230
0.230
0.230
0.230
0.230
0.230
0.100
0.100
0.100
0.100
0.100
0.100
0.06
0.24
0.53
0.04
0.10
0.21
134.500
0.900
0.050
6.05
16.79
59 of 208
ESTIMATE
Sl.
ITEM OF WORK
No
b First Floor
Open court yard surrounding wall
coping
Portico parapet wall coping
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
29.800
0.115
0.100
0.34
18.680
0.115
0.100
0.21
21.220
0.230
0.100
0.49
0.450
0.230
0.900
0.37
Window Cills
Building Surrounding Window cills
concrete
Ventilator Cills
V
V1
V2
V3
V5
174.520
0.230
0.100
4.01
4
8
11
2
4
1.200
1.500
2.100
1.800
0.900
0.230
0.230
0.230
0.230
0.230
0.100
0.100
0.100
0.100
0.100
0.11
0.28
0.53
0.08
0.08
6.52
Terrace Floor
Parapet wall Coping
Open court yard surrounding wall
coping
94.550
0.230
0.100
2.17
29.800
0.115
0.100
0.34
2.52
STONE MASONARY
14 KSRB 5.2-2: Providing and constructing granite / trap / basalt size stone masonry in foundation with cement mortar 1:8,
not less than 20cms high, bond stones at two m. apart in each course including cost of materials, labour, curing, etc.,
5.1.13. (PWD SR 2013-2014 Bellary Circle Page No. 25, Item No. 5.5)
for Plinth beam
Building Front
length
Open court yard
area
surrounding
134.500
0.450
0.450
27.24
14.950
0.450
0.450
6.05
33.29
15 KSRB 5.3-3: Providing and constructing granite / trap / basalt size stone masonry in basement with cement mortar 1:6,
less than 15cms high, bond stones at two m. apart in each course including cost of materials, labour, curing, etc., compl
(PWD SR 2013-2014 Bellary Circle Page No. 25, Item No. 5.9)
a
Ground Floor
Building Surrounding
134.500
0.450 0.450
27.24
29.800
0.450 0.450
6.03
33.27
60 of 208
ESTIMATE
Sl.
No
16
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
KSRB 4.2.2: Providing and laying in position reinforced cement concrete of design mix M20 with OPC cement @ 320k
granite metal coarse aggregates @ 0.878cum and fine aggregates @ 0.459cum, with superplastisiser @ 3lts confirmin
machine mixed, concrete laid in layers not exceeding 15cms thick, vibrated for all works in foundation plinth and groun
lintels, retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pilla
lacing courses, parapets, coping, bed blocks, plain window cills, fillets etc., including cost of all materials, labour, HO
per specifications. Specification No. KBS 4.1, 4.6. (PWD SR 2013-2014 Bellary Circle Page No. 13, Item No. 4.11)
a
Ground Floor
Footings
F1
F2
10
30
2.000
2.600
F3
10
3.000 3.000
10
30
10
0.450
0.600
0.750
1.800
2.300
0.450
0.600
16.20
107.64
0.600
54.00
1.400
1.250
1.250
10
0.45
0.23
3.600
1.45
5.18
2.16
3.73
30
0.6
0.23
3.600
14.90
10
0.75
0.23
3.600
6.21
Plith Beam
Class room (1x2)
Class room
2
4
6.460
9.000
0.230
0.230
0.450
0.450
1.34
3.73
7.955
0.230
0.450
4.94
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
Internal walls at computer room to
staff room
Gents toilet
Gents toilet Partician
L toilet
L toilet Partician
Partician at staff room
2
2
1
2
2
2
2
2
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
1.66
0.68
0.52
1.10
1.24
1.04
0.59
6.00
6.000
0.230
0.450
4.35
2
2
2
2
1
4.100
1.500
4.100
1.500
6.000
0.230
0.230
0.230
0.230
0.230
0.450
0.450
0.450
0.450
0.450
0.85
0.31
0.85
0.31
0.62
61 of 208
ESTIMATE
Sl.
No
1
1
2
1
1
1
1
Length
(m)
1.310
24.400
4.060
5.000
2.190
6.900
2.190
1.500
0.115
0.450
0.08
Stage entry
For Internal walls
1
4
12.500
3.600
0.230
0.230
0.450
0.450
1.29
1.49
ITEM OF WORK
No.
Breadth
(m)
0.230
0.230
0.230
0.230
0.115
0.230
0.115
Depth
(m)
0.450
0.450
0.450
0.450
0.450
0.450
0.450
Lintel
Quantity
0.14
2.53
0.84
0.52
0.11
0.71
0.11
2
4
6.46
9
0.230
0.230
0.230
0.230
0.68
1.90
7.955
0.230
0.230
2.52
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
Internal walls at computer room to
staff room
Gents toilet
Gents toilet Partician
L toilet
L toilet Partician
Partician at staff room
Partician at staff room
Stage
Stage
Girls toilet
Internal partician
Boys toilet
Internal partician
2
2
1
2
2
2
2
2
8.03
3.285
5
5.31
6
5
2.85
29
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.85
0.35
0.26
0.56
0.63
0.53
0.30
3.07
0.230
0.230
2.22
2
2
2
2
1
1
1
2
1
1
1
1
4.1
1.5
4.1
1.5
6
1.31
24.4
4.06
5
2.19
6.9
2.19
0.230
0.230
0.230
0.230
0.115
0.230
0.230
0.230
0.230
0.115
0.230
0.115
1.230
2.230
3.230
4.230
5.230
6.230
7.230
8.230
9.230
10.230
11.230
12.230
2.32
1.54
6.09
2.92
3.61
1.88
40.57
15.37
10.61
2.58
17.82
3.08
1.5
0.115
13.230
2.28
Stage entry
For Internal walls
1
4
12.5
3.6
0.230
0.230
14.230
15.230
40.91
50.44
62 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
465.32
First Floor
Columns in First Floor
10
0.450
0.230
3.600
3.73
30
0.600
0.230
3.600
14.90
Lintel
Class room (1x2)
Class room
2
4
6.460
9.000
0.230
0.230
0.200
0.200
0.59
1.66
7.955
0.230
0.200
2.20
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
For Internal walls
2
2
1
2
2
2
2
2
4
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
3.600
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.74
0.30
0.23
0.49
0.55
0.46
0.26
2.67
0.66
29.44
Terrace Floor
Columns in Terrace Floor Staircase
head room
2
2
0.600
0.750
0.230
0.230
2.400
2.400
2
2
0.230
0.230
0.230
0.230
0.200
0.200
Lintel
0.66
0.83
0.02
0.02
1.53
17
KSRB 4.2.8: Providing and laying in position reinforced cement concrete of design mix M20 with OPC cement @ 320k
granite metal coarse aggregates @ 0.69cum and fine aggregates @ 0.46cum, with superplastisiser @ 3lts confirmin
machine mixed, concrete laid in layers not exceeding 15cms thick, vibrated for RCC beams, columns of all sizes in
ground floor level for roof, slabs, staircase, lintels, columns including cost of all materials, labour, HOM of m
specifications. Specification No. KBS 4.1, 4.6. (PWD SR 2013-2014 Bellary Circle Page No. 15, Item No. 4.17)
a
Ground Floor
Roof Beam
Class room (1x2)
Class room
2
4
6.46
9
0.230
0.230
0.450
0.450
1.34
3.73
7.955
0.230
0.450
4.94
Library
8.03
0.230
0.450
1.66
63 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Staircase
2
Entrance
1
Principal room
2
Office/record
2
Opp to class room
2
Opp to class room
2
Platform location both side
2
Internal walls at computer room to
7
staff room
Gents toilet
2
Gents toilet Partician
2
L toilet
2
L toilet Partician
2
Partician at staff room
1
Partician at staff room
1
Stage
1
Stage
2
Girls toilet
1
Internal partician
1
Boys toilet
1
Internal partician
1
Length
(m)
3.285
5
5.31
6
5
2.85
29
Breadth
(m)
0.230
0.230
0.230
0.230
0.230
0.230
0.230
Depth
(m)
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.230
0.530
5.12
4.1
1.5
4.1
1.5
6
1.31
24.4
4.06
5
2.19
6.9
2.19
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.530
0.530
0.530
0.530
0.450
0.600
0.450
0.450
0.300
0.450
0.300
0.450
1.00
0.37
1.00
0.37
0.62
0.18
2.53
0.84
0.35
0.23
0.48
0.23
Quantity
0.68
0.52
1.10
1.24
1.04
0.59
6.00
1.5
0.230
0.300
0.10
Stage entry
For Internal walls
Roof Slab
#REF!
1
4
12.5
3.6
0.230
0.230
0.450
0.530
1.29
1.76
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.125
0.150
0.125
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Entry Landing
Portico
Staircase
Weist slab
Steps
Mid Landing
5.970
1.420
5.635
2
11.0
1
1.000
1.000
2.000
4.025
0.300
1.270
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
5.05
1.01
0.50
0.32
64 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
#REF!
First Floor
Roof Beam
Class rom & satilite edu center
6.460
0.230
0.450
1.34
Class room
9.000
0.230
0.450
3.73
7.955
0.230
0.450
4.94
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
Internal walls at computer room to
staff room
Roof Slab
Library / Reading room
2
2
1
2
2
2
2
2
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
1.66
0.68
0.52
1.10
1.24
1.04
0.59
6.00
6.000
0.230
0.530
5.12
#REF!
#REF!
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
#REF!
Computer lab
Store / Record
Yoga / Common Hall
#REF!
#VALUE!
#VALUE!
Staircase
Weist slab
Steps
Mid Landing
2
11
1
1.000
1.000
2.000
4.025
0.300
1.270
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1.01
0.50
0.32
-
0.125
0.150
0.125
#VALUE!
18
Terrace Floor
Roof Slab
Staircase Head room slab
2.760
6.540
0.150
2.71
2.71
KSRB 4.2.10 : Providing and laying in position reinforced cement concrete of design mix M20 with OPC cement @ 24k
granite metal coarse aggregates @ 0.5175cum and fine aggregates @ 0.345cum, with superplastisiser @ 0.225lts, mach
chajja of 7.5 cms. average thickness, up to ground floor level including cost of all materials, labour, HOM of
specifications. Specification No. KBS 4.1, 4.6. (PWD SR 2013-2014 Bellary Circle Page No. 15, Item No. 4.19)
65 of 208
ESTIMATE
Sl.
ITEM OF WORK
No
a Ground Floor
Window Chajja
W
W1
W2
W3
SW
S
No.
2
7
11
1
1
Length
(m)
1.500
1.800
2.400
2.100
1.800
Breadth
(m)
Depth
(m)
0.600
0.600
0.600
0.600
0.600
First Floor
Window Chajja
W
W1
W2
W3
SW
3
8
11
2
1
1.500
1.800
2.400
2.100
1.800
0.600
0.600
0.600
0.600
0.600
Terrace Floor
Door Chajja
D2
1.200
0.600
Quantity
1.80
7.56
15.84
1.26
1.08
27.54
2.70
8.64
15.84
2.52
1.08
30.78
0.72
0.72
66 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
20 Providing and casting reinforced cement concrete racks with design mix M20, granite or trap jelly 12mm and dow
reinforcements of 6mm dia MS bars at 15 cms. Centre to centre for main reinforcement and at 30cms centre to centr
wherever necessary with burnt brick in CM 1:8 and plastered with CM 1:4 or composite mortar 1:6 including centrin
(inclusive of cost of steel and fabrication charges)
a
Ground Floor
Lab working platform
Sink
WB
sundries
1
1
3
6.000
4.000
1.800
0.600
0.600
0.600
3.60
2.40
3.24
1.00
10.24
First Floor
Lab working platform
Library
Sink
WB
sundries
1
4
1
2
6.000
7.500
4.000
1.800
0.600
0.600
0.600
0.600
3.60
18.00
2.40
2.16
1.00
27.16
Terrace Floor
-
21 Providing RCC loft (atta) 7.5cms thick with cement concrete design mix M20 using clean granite or trap jelly of 2
reinforcements at 20cms centre to centre as per design including form work, centring, curing, finishing the exposed
complete (exclusive of cost of steel and fabrication charges).
a
Ground Floor
Laboratory room, principal room,
staff room
6.000
0.600
10.80
10.80
First Floor
-
Terrace Floor
-
22
Providing and fixing RCC slabs 5cms thick for walls shelves with 12mm and down size jelly cement concrete design
finishing, curing etc., complete (inclusive of cost of steel and fabrication charges). (PWD SR 2013-2014 Bellary Circle P
Ground Floor
-
67 of 208
ESTIMATE
Sl.
ITEM OF WORK
No
b First Floor
S
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
-
Terrace Floor
-
23 Providing RCC design mix M20 using granite metal 20mm and down size for 7.5cms thick solid parapet or perfora
directions. (exclusive of cost of steel and fabrication charges) including necessary centering, form work and finishing s
(PWD SR 2013-2014 Bellary Circle Page No. 20, Item No. 4.56)
a
All Floors
CENTRING AND SHUTTERING
24 KSRB 4-6.1: Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for fou
for mass concrete including cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2.
Page No. 16, Item No. 4.28)
a
All Floors
Footings
F1
F2
10
30
7.600
9.800
0.450
0.600
34.20
176.40
F3
10
12.000
0.600
72.00
10
30
10
1.360
1.660
1.960
1.400
1.250
1.250
19.04
62.25
24.50
388.39
25 KSRB 4.6.2: Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for fl
roofs, landings, balconies and likes, thickness up to 200mm including cost of all materials, labour complete as per sp
4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 16, Item No. 4.29)
a
Ground Floor
Roof Slab
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Entry Landing
Portico
5.970
1.420
5.635
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
33.64
68 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
Staircase
Mid Landing
No.
Length
(m)
Breadth
(m)
2.000
Depth
(m)
Quantity
2.54
1.270
#REF!
First Floor
Roof Slab
Library / Reading room
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
Computer lab
Store / Record
Yoga / Common Hall
#REF!
#VALUE!
#VALUE!
Staircase
Mid Landing
2.000
2.54
1.270
#VALUE!
Terrace Floor
Roof Slab
Staircase Head room slab
2.760
6.540
18.05
18.05
26 KSRB 4-6.5: Providing and removing centering, shuttering, strutting, propping etc., Columns, pillars, piers, abutments, p
polygon in plan including cost of all materials, labour compete as per specifications. Specification No. KBS 4.6.2. (PW
No. 17, Item No. 4.32)
a
Ground Floor
Columns above Plinth
0
10
1.360
3.600
48.96
30
1.660
3.600
179.28
0
0
#REF!
10
1.960
0
#REF! #REF!
3.600
#REF!
#REF!
70.56
-
#REF!
b
First Floor
Columns in First Floor
10
1.360
3.600
48.96
30
1.660
3.600
179.28
228.24
69 of 208
ESTIMATE
Sl.
ITEM OF WORK
No
c Terrace Floor
Columns in Terrace Floor Staircase
head room
S
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
2
2
1.660
1.960
2.400
2.400
7.97
9.41
-
27 KSRB 4-6.6 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Col
circular or curved in plan including cost of all materials, labour compete as per specifications. Specification No. KBS
Circle Page No. 17, Item No. 4.33)
a
All Floors
Ground Floor
#REF!
#REF!
0.942
0.723
#REF!
#REF!
First Floor
#REF!
#REF!
0.723
#REF!
#REF!
#REF!
28 KSRB 4.6.7: Providing and removing centering, shuttering, strutting, propping etc., and removal of form work fo
haunchings, cantilever girders, bressumers and lintels not exceeding 1m in depth including cost of all materials, lab
Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 17, Item No. 4.34)
a
Ground Floor
Plith Beam
Class room (1x2)
Class room
2
4
6.460
9.000
0.900
0.900
11.63
32.40
7.955
0.900
42.96
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
Internal walls at computer room to
staff room
Gents toilet
Gents toilet Partician
L toilet
L toilet Partician
Partician at staff room
Partician at staff room
Girls toilet
2
2
1
2
2
2
2
2
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
14.45
5.91
4.50
9.56
10.80
9.00
5.13
52.20
6.000
0.900
37.80
2
2
2
2
1
1
1
4.100
1.500
4.100
1.500
6.000
1.310
5.000
0.900
0.900
0.900
0.900
0.900
0.900
0.900
7.38
2.70
7.38
2.70
5.40
1.18
4.50
70 of 208
ESTIMATE
Sl.
No
Boys toilet
Stage entry
Roof Beam
Class room (1x2)
Class room
1
1
Length
(m)
6.900
12.500
2
4
6.460
9.000
0.880
0.880
11.37
31.68
7.955
0.880
42.00
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
Internal walls at computer room to
staff room
Gents toilet
Gents toilet Partician
L toilet
L toilet Partician
Partician at staff room
Partician at staff room
Stage
Stage
Girls toilet
Internal partician
Boys toilet
Internal partician
2
2
1
2
2
2
2
2
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
0.880
0.880
0.880
0.880
0.880
0.880
0.880
0.880
14.13
5.78
4.40
9.35
10.56
8.80
5.02
51.04
6.000
1.040
43.68
2
2
2
2
1
1
1
2
1
1
1
1
4.100
1.500
4.100
1.500
6.000
1.310
24.400
4.060
5.000
2.190
6.900
2.190
1.040
1.040
1.040
1.040
0.880
1.180
0.880
0.880
0.580
0.880
0.580
0.880
8.53
3.12
8.53
3.12
5.28
1.55
21.47
7.15
2.90
1.93
4.00
1.93
1.500
0.580
0.87
Stage entry
For Internal walls
1
4
12.500
3.600
0.880
1.040
11.00
14.98
619.19
6.460
0.880
11.37
Class room
9.000
0.880
31.68
7.955
0.880
42.00
Library
Staircase
2
2
8.030
3.285
0.880
0.880
14.13
5.78
ITEM OF WORK
No.
Breadth
(m)
Depth
(m)
0.900
0.900
Quantity
6.21
11.25
First Floor
Roof Beam
71 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
Internal walls at computer room to
staff room
1
2
2
2
2
2
Length
(m)
5.000
5.310
6.000
5.000
2.850
29.000
6.000
Breadth
(m)
Depth
(m)
0.880
0.880
0.880
0.880
0.880
0.880
1.040
Quantity
4.40
9.35
10.56
8.80
5.02
51.04
43.68
237.81
Terrace Floor
-
29
KSRB 4.6.9: Providing and removing centering, shuttering, strutting, propping etc., for edges of slabs and breaks in
material, labour complete as per specification. Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page N
Ground Floor
For all round outer edge of Slab
107.390
0.150
16.11
1
1
59.600
12.680
0.150
0.150
8.94
1.90
-
174.520
0.100
34.90
4
14
22
2
12
20
1.200
1.500
2.100
1.800
0.750
0.900
0.100
0.100
0.100
0.100
0.100
0.100
4
8
6.460
9.000
0.230
0.230
0.48
2.10
4.62
0.36
0.90
1.80
5.94
16.56
12
7.955
0.230
21.96
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
4
4
2
4
4
4
4
4
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
7.39
3.02
2.30
4.89
5.52
4.60
2.62
26.68
72 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
14
6.000
0.230
19.32
4
4
4
4
2
2
2
4
2
2
2
2
4.100
1.500
4.100
1.500
6.000
1.310
24.400
4.060
5.000
2.190
6.900
2.190
1.230
2.230
3.230
4.230
5.230
6.230
7.230
8.230
9.230
10.230
11.230
12.230
20.17
13.38
52.97
25.38
62.76
16.32
352.82
133.66
92.30
44.81
154.97
53.57
1.500
94.550
0.150
14.18
1
1
59.600
12.680
0.150
0.150
8.94
1.90
-
174.520
0.100
34.90
1,216.03
Stage entry
For Internal walls
First Floor
8
16
22
4
8
1.200
1.500
2.100
1.800
0.900
0.100
0.100
0.100
0.100
0.100
4
8
6.460
9.000
0.200
0.200
0.96
2.40
4.62
0.72
0.72
5.17
14.40
12
7.955
0.200
19.09
Library
Staircase
Entrance
Principal room
Office/record
4
4
2
4
4
8.030
3.285
5.000
5.310
6.000
0.200
0.200
0.200
0.200
0.200
6.42
2.63
2.00
4.25
4.80
73 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
4
4
4
8
Length
(m)
5.000
2.850
29.000
3.600
18.600
No.
Breadth
(m)
Depth
(m)
0.200
0.200
0.200
0.200
Quantity
4.00
2.28
23.20
5.76
163.35
Terrace Floor
For all round outer edge of Slab
Lintel
0
0
Parapet wall Coping
4
4
2
0.230
0.230
94.550
0.150
2.79
0.200
0.200
0.100
0.18
0.18
18.91
22.07
30
KSRB 4.6.10: Providing and removing centering, shuttering, strutting, propping etc., for chajjas, corbels etc., includi
labour complete as per specification. Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 17, Item
Ground Floor
Window Chajja
W
W1
W2
W3
SW
First Floor
Window Chajja
W
W1
W2
W3
SW
Terrace Floor
Door Chajja
D2
2
7
11
1
1
3
8
11
2
1
1.500
1.800
2.400
2.100
1.800
1.500
1.800
2.400
2.100
1.800
1.200
0.600
0.600
0.600
0.600
0.600
1.80
7.56
15.84
1.26
1.08
27.54
0.600
0.600
0.600
0.600
0.600
2.70
8.64
15.84
2.52
1.08
30.78
0.600
0.72
0.72
31 KSRB 4.6.11: Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for Sta
staircase including cost of all materials, labour complete as per specification. Specification No. KBS 4.6.2. (PWD SR 20
Item No. 4.38)
a
Ground Floor
Staircase
Weist slab
1.000
4.025
8.05
74 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
Steps
No.
24
First Floor
Staircase
Weist slab
Steps
2
24
Length
(m)
1.000
1.000
1.000
Breadth
(m)
Depth
(m)
0.150
4.025
0.150
Quantity
3.60
11.65
8.05
3.60
11.65
Terrace Floor
-
32
KSRB 4.9.2: Providing T.M.T Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking,
welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary com
wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specification
Charges for steel of all diameter for additional floors over ground floor per floor height of 3.5 m. or apart ther
specifications. Specification No. KBS. (PWD SR 22013-2014 Bellary Circle Page No. 19, Item No. 4.46)
a
Ground Floor
518*10.764*4.5/100
250.91
250.91
First Floor
427.17*10.764*4/100
183.92
183.92
Terrace Floor
16.96*10.764*4/100
7.30
7.30
MASONARY WORK
33
KSRB 6-2.3: Providing and constructing burnt brick masonry with approved quality of non-modular bricks of standar
molded) with cement mortar 1:6 for basement and superstructure including the cost of materials, labour charges, scaf
specifications. Specification No. KBS 6.2. (PWD SR 2013-2014 Bellary Circle Page No. 30, Item No. 6.6)
Ground Floor
Class room (1x2)
Class room
2
4
6.46
9
0.230
0.230
3.150
3.150
9.36
26.08
7.955
0.230
3.150
34.58
Library
Staircase
Entrance
Principal room
Office/record
2
2
1
2
2
8.03
3.285
5
5.31
6
0.230
0.230
0.230
0.230
0.230
3.150
3.150
3.070
3.070
3.070
11.64
4.76
3.53
7.50
8.47
75 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
2
2
2
Length
(m)
5
2.85
29
Breadth
(m)
0.230
0.230
0.230
Depth
(m)
3.150
3.000
3.600
0.230
3.600
34.78
2
2
2
2
1
1
1
2
1
1
1
1
4.1
1.5
4.1
1.5
6
1.31
24.4
4.06
5
2.19
6.9
2.19
0.230
0.230
0.230
0.230
0.115
0.230
0.230
0.230
0.230
0.115
0.230
0.115
3.600
3.600
3.600
3.600
3.600
3.600
3.600
3.600
3.600
3.600
3.600
3.600
6.79
2.48
6.79
2.48
2.48
1.08
20.20
6.72
4.14
0.91
5.71
0.91
1.5
0.115
3.600
0.62
Stage entry
For Internal walls
1
4
12.5
3.6
0.230
0.230
3.600
3.600
10.35
11.92
(2.90)
(1.74)
(1.74)
(2.87)
(0.75)
(3.26)
(7.17)
(0.56)
(0.72)
(0.25)
(1.09)
(2.39)
(0.19)
(0.47)
(0.93)
(0.68)
(1.90)
Deductions
Door
D
D1
D2
Grill
Window
W
W1
W2
W3
SW
Ventilator
V
V1
V2
V3
V4
V5
Lintel
Class room (1x2)
Class room
-4
-3
-4
-2.0
1.500
1.200
0.900
1.800
0.230
0.230
0.230
0.230
2.100
2.100
2.100
3.470
-2
-7
-11
-1
-1
1.200
1.500
2.100
1.800
1.500
0.230
0.230
0.230
0.230
0.230
1.350
1.350
1.350
1.350
2.100
-2
-7
-11
-1
-6
-10
1.200
1.500
2.100
1.800
0.750
0.900
0.230
0.230
0.230
0.230
0.230
0.230
0.450
0.450
0.450
0.450
0.450
0.450
-2
-4
6.460
9.000
0.230
0.230
0.230
0.230
Quantity
7.25
3.93
48.02
76 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
-6
7.955
0.230
0.230
(2.52)
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
Internal walls at computer room to
staff room
Gents toilet
Gents toilet Partician
L toilet
-2
-2
-1
-2
-2
-2
-2
-2
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
(0.85)
(0.35)
(0.26)
(0.56)
(0.63)
(0.53)
(0.30)
(3.07)
-7
6.000
0.230
0.230
(2.22)
-2
-2
-2
4.100
1.500
4.100
0.230
0.230
0.230
1.230
2.230
3.230
(2.32)
(1.54)
(6.09)
232.64
First Floor
Class room (1x2)
Class room
2
4
6.460
9.000
0.230
0.230
3.150
3.150
9.36
26.08
7.955
0.230
3.150
34.58
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
For Internal walls
Toilet terrace Parapet wall
Deductions
Door
D
D1
D2
Grill
Window
W
W1
W2
W3
SW
2
2
1
2
2
2
2
2
4
1
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
3.600
21.220
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
3.150
3.150
3.070
3.070
3.070
3.150
3.000
3.600
3.600
0.900
-4
-2
-1
-2.0
1.500
1.200
0.900
1.800
0.230
0.230
0.230
0.230
2.100
2.100
2.100
3.470
-3
-8
-11
-2
-1
1.200
1.500
2.100
1.800
1.500
0.230
0.230
0.230
0.230
0.230
1.350
1.350
1.350
1.350
2.100
11.64
4.76
3.53
7.50
8.47
7.25
3.93
48.02
11.92
4.39
(2.90)
(1.16)
(0.43)
(2.87)
(1.12)
(3.73)
(7.17)
(1.12)
(0.72)
77 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
Ventilator
V
V1
V2
V3
V5
Lintel
Class room (1x2)
Class room
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
-4
-8
-11
-2
-4
1.200
1.500
2.100
1.800
0.900
0.230
0.230
0.230
0.230
0.230
0.450
0.450
0.450
0.450
0.450
-2
-4
6.460
9.000
0.230
0.230
0.200
0.200
(0.50)
(1.24)
(2.39)
(0.37)
(0.37)
(0.59)
(1.66)
-6
7.955
0.230
0.200
(2.20)
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
For Internal walls
-2
-2
-1
-2
-2
-2
-2
-2
-4
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
3.600
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
0.200
(0.74)
(0.30)
(0.23)
(0.49)
(0.55)
(0.46)
(0.26)
(2.67)
(0.66)
144.53
0.230
2.270 #REF!
Terrace Floor
Grid 8E' - 10E' & 8F' - 10F'
#REF!
2
1
2.000
94.550
0.230
0.230
2.270
0.900
2.09
19.57
-
-1
0.900
0.230
2.100
(0.43)
(0.02)
(0.02)
-2
0.230
0.230
-2
0.230
0.230
#REF! #REF!
#REF!
0.200
0.200
0.900 #REF!
#REF!
34 KSRB 6-7.4: Construction of Partition wall 11.2cms thick with non-modular ground molded burnt bricks of class des
including cost of material, labour charges, scaffolding, curing complete as per specifications. Specification No. KBS 6.2.
Page No. 33, Item No. 6.26)
a
Ground Floor
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
Deductions
Mannalli - Bidar - SCMDRS
ProMax
Academic
Management Consultants Pvt. Ltd
3.470 #REF!
3.470
3.475 #VALUE!
3.475 #VALUE!
78 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
Openings
Door
D3
Lintel
-3
Length
(m)
0.750
-9
0.750
No.
-1
Breadth
(m)
Depth
(m)
3.475
Quantity
(7.82)
2.100
#REF!
#REF!
(14.18)
#REF!
#REF!
First Floor
Open court yard surrounding wall
29.800
0.900
26.82
18.680
0.900
16.81
-
-9
0.750
2.100
(14.18)
29.46
Terrace Floor
Open court yard surrounding wall
29.800
0.900
26.82
26.82
DOORS
35
KSRB 9.4-4 : Providing Sal wood frames of doors, windows, clerestory windows, ventilators and other frames, wrou
making plaster grooves (excluding cost of cement concrete and side clamps), but including cost of all materials, labour, H
specifications. Specification No. KBS 9.33. (PWD SR 2013-2014 Bellary Circle Page No. 55, Item No. 9.13)
All Floors
Ground Floor
D
D1
D2
4
3
4
7.200
5.400
5.100
0.125
0.150
0.125
0.065
0.075
0.065
0.23
0.18
0.17
First Floor
D
D1
D2
4
2
1
5.700
5.400
5.100
0.125
0.150
0.125
0.065
0.075
0.065
0.19
0.12
0.04
Terrace Floor
D2
5.100
0.125
0.065
0.04
0.97
79 of 208
ESTIMATE
Sl.
No
36
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
Providing and fixing factory made 35mm thick solid core flush door comprising of commercial ply finish kutty bond woo
seasoned wooden reapers with 6mm thick solid teak wood external lipping around the shutter affixed by gluing unde
fixed with 125mm MS oxidized heavy duty hinges 4nos., 30cm long powder coated tower bolts 2nos., 150mm oxidize
for locking etc., complete including cost of material, labour charges HOM of machineries, supply to respective work s
( As per KREIS Date Rate ).
All Floors
Ground Floor
D
D1
D2
4
3
4
1.500
1.200
0.900
2.100
2.100
2.100
12.60
7.56
7.56
First Floor
D
D1
D2
4
2
1
1.500
1.200
0.900
2.100
2.100
2.100
12.60
5.04
1.89
Terrace Floor
D2
0.900
2.100
1.89
49.14
37 Providing and fixing door frame made out of MS angle of size 50x50x6mm on three sides, 20x20x3mm at bottom, 20x20
both sides 2nos. Each, 100mm MS hinges 3 nos. with necessary locking arrangements including one coat of anticorros
all labour charges for cutting, welding, grinding loading and unloading, transportation to work spot etc., complete as pe
Rate ).
a
38
All Floors
Ground Floor
D3
4.950
44.55
44.55
Providing and fixing factory made Cladded Door shutter 29mm thick manufactured out of 25mm thick boiled water p
commercial ply laminated with 2mm thick PVC sheet on back side and 2mm thick prelaminated PVC sheet on front
lipping all round using PVC solvent cement etc., including cost of material, transportation, including fixtures 150mm p
tower bolt 1no., MS aldrop 1 no., with necessary screws etc., complete as per specification. ( As per KREIS Date Rate ).
All Floors
Ground Floor
D3
0.750
2.100
14.18
14.18
80 of 208
ESTIMATE
Sl.
No
39
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
KSRB 7.10 : Providing and fixing in position aluminum windows and ventilators as per approved drawings with sliding
frame section of size 61.85x31.75mm. with 1.2mm thick, bottom section weight 0.695 kg/m, sides and top sections 1.
shutter comprising top and bottom section of size 40mmx18mm, 1.25mm thick 0.417 kg/m; shutter outer side 40mm
kg/m, shutter interlock section 40mmx26.7mm, 1.1mm thick, weight 0.469 kg/m. the shutters mounted on nylon rollers w
as aluminum handles tower bolts etc.; and providing and fixing 5.5mm. thick plain glass for shutters fitted with rubber b
cutting to required length, joints mitered subdividing the frame tenonned and riveted in the assembled frame stiffened
and fixed to the walls, lintels, floor beams/cills as the case may be with necessary steel screws, rail plugs, or teak wood
concrete and making good the original surface using cement mortar, using aluminum sections pretreated for removal of a
to 12 - 15 microns. (PWD SR 2013-2014 Bellary Circle Page No. 38, Item No. 7.10.1)
a
Ground Floor
W
W1
W2
W3
SW
2
7
11
1
1
1.200
1.500
2.100
1.800
1.500
1.350
1.350
1.350
1.350
2.100
3.24
14.18
31.19
2.43
3.15
54.18
First Floor
W
W1
W2
W3
SW
3
8
11
2
1
1.200
1.500
2.100
1.800
1.500
1.350
1.350
1.350
1.350
2.100
4.86
16.20
31.19
4.86
3.15
60.26
Terrace Floor
-
40
KSRB 7.8 : Providing and fixing in position in cement concrete 1:3:6 steel glazed windows and ventilators side hung/to
approved drawings using Z angles of 25x33x33mm, weighing 1.419kg/m both for inner and outer frames and center
weighing 2.28kg/m all duty providing T section 19x19x3mm weighing 0.839kg/for glazing of windows, not more than 3
fixing 4mm thick reeded glass with teak wood beading of required size all steel section should confirm to I.S 7452:19
size, section should be cut to length welded and grinded electrically subdividing frames of unit shall be tenonned and ri
the steel surface shall be thoroughly cleaned free of rust and painted with one coat of anti-corrosive paint and finish
approved colour and make including cost of materials, fixtures, labour charges and HOM of machinery complete as per
Bellary Circle Page No. 37, Item No. 7.8)
a
All Floors
Ground Floor
V
V1
V2
V3
V4
2
7
11
1
6
1.200
1.500
2.100
1.800
0.750
0.450
0.450
0.450
0.450
0.450
1.08
4.73
10.40
0.81
2.03
81 of 208
ESTIMATE
Sl.
No
V5
10
Length
(m)
0.900
First Floor
V
V1
V2
V3
V5
4
8
11
2
4
1.200
1.500
2.100
1.800
0.900
ITEM OF WORK
No.
Breadth
(m)
Depth
(m)
0.450
0.450
0.450
0.450
0.450
0.450
Quantity
4.05
2.16
5.40
10.40
1.62
1.62
Terrace Floor
44.28
MS GRILL
41 KSRB 7.9: Providing and fixing M.S. grill work for windows and ventilators weighing approximately 21 kgs / sqm
combination of M.S. flats and square rods as per approved design, drawing including cutting steel sections and welding
coat of red lead primer, cost of materials, fixtures, labour and HOM of machinery complete as per specifications. Spe
2012-2013 Gulbarga Circle Page No. 37, Item No. 7.9)
a
Ground Floor
W
W1
W2
W3
SW
Total Area in Sqm
Weighing 21Kg/Sqm
2
7
11
1
1
1.200
1.500
2.100
1.800
1.500
1.350
1.350
1.350
1.350
2.100
3.24
14.18
31.19
2.43
3.15
54.18
1,137.78
1,137.78
First Floor
W
W1
W2
W3
SW
Total Area in Sqm
Weighing 21Kg/Sqm
3
8
11
2
1
1.200
1.500
2.100
1.800
1.500
1.350
1.350
1.350
1.350
2.100
4.86
16.20
31.19
4.86
3.15
60.26
1,265.36
1,265.36
Terrace Floor
PLASTERING WORKS
42
KSRB 15.1.3: Providing ruled pointing to coursed stone masonry with cement mortar 1:3, 20mm deep, after raking jo
including cost of materials, labour, curing, etc., complete as per specifications. (PWD SR 2013-2014 Bellary Circle Page
Ground Floor
Building Surrounding
134.500
0.450
60.53
82 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
1
Length
(m)
29.800
Breadth
(m)
Depth
(m)
0.450
Quantity
13.41
73.94
43 KSRB 15-3.5: Providing 15mm thick cement plaster in single coat with cement mortar 1:4 to brick masonry inclu
required smooth rendering, : Providing and removing scaffolding, including cost of materials labour curing complete as
2013 Gulbarga Circle Page No. 120, Item No. 15.13)
a
Ground Floor
Ent lobby
Principal
Office / Record
Staircase area
Library
Class Room - 1 & 2
Corridor
6
7
8
9
10
11
12
4.200
4.200
4.200
4.200
4.200
4.200
4.200
3.470
3.470
3.470
3.470
3.470
3.470
3.470
87.44
102.02
116.59
131.17
145.74
160.31
174.89
13
4.200
3.470
189.46
14
4.200
3.470
204.04
Toilets
Platform
Entry Landing (Area from Autocadd
dwg)
Stage
15
16
4.200
4.200
3.470
3.470
218.61
233.18
17
4.200
3.470
247.76
18
4.200
3.470
262.33
19
4.200
3.470
276.91
20
4.200
3.470
291.48
Deductions
Door
D
D1
D2
D3
Window
W
W1
W2
W3
SW
Ventilators
V
V1
V2
V3
-8.0
-2.0
-4.0
-9.0
1.500
1.200
0.900
0.750
2.100
2.100
2.100
2.100
-1.0
-3.5
-5.5
-0.5
-0.5
1.200
1.500
2.100
1.800
1.500
1.350
1.350
1.350
1.350
2.100
-1.0
-3.5
-5.5
-0.5
1.200
1.500
2.100
1.800
0.450
0.450
0.450
0.450
(25.20)
(5.04)
(7.56)
(14.18)
(1.62)
(7.09)
(15.59)
(1.22)
(1.58)
(0.54)
(2.36)
(5.20)
(0.41)
83 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
V4
Grill
Openings
Rough Plastering area
b
First Floor
Library / Reading room
Computer lab
Store / Record
Platform
Yoga / Common Hall
No.
-3.0
-2.0
-10.0
Length
(m)
0.750
1.800
0.750
9
10
11
12
15
16
17
#REF!
4.200
4.200
4.200
27.600
16.160
11.140
27.600
24.030
11.630
#REF!
Breadth
(m)
Depth
(m)
0.450
3.470
3.470
Quantity
(1.01)
(12.49)
(26.03)
(526.73)
2,188.11
3.470
131.17
3.470
145.74
3.470
160.31
3.470
1,149.26
3.470
841.13
3.470
618.49
3.470
1,628.12
#REF!
#REF!
#VALUE!
#VALUE!
29.800
2.115
-4.0
-2.0
-1.0
1.500
1.200
0.900
2.100
2.100
2.100
-1.5
-4.0
-5.5
-1.0
-0.5
1.200
1.500
2.100
1.800
1.500
1.350
1.350
1.350
1.350
2.100
-2.0
-4.0
-5.5
-1.0
-2.0
1.200
1.500
2.100
1.800
1.800
0.450
0.450
0.450
0.450
3.470
63.03
(12.60)
(5.04)
(1.89)
(2.43)
(8.10)
(15.59)
(2.43)
(1.58)
(1.08)
(2.70)
(5.20)
(0.81)
(12.49)
#REF!
Terrace Floor
Staircase Head room
Deductions
Door
D2
15.540
2.270
-0.5
0.900
2.100
35.28
(0.95)
84 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
34.33
44 KSRB 15-3.11: Providing 20 mm thick cement plaster in single coat cement mortar 1:4, to stone masonry and conc
corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, la
specifications. (PWD SR 2013-2014 Bellary Circle Page No. 121, Item No. 15.19)
a
Ground Floor
Building Surrounding Length
Deductions
Door
D1
Window
W
W1
W2
W3
SW
Ventilators
V
V1
V2
V3
V4
Grill
First Floor
Building Surrounding Length
Portico Parapet wall
Deductions
Window
W
W1
W2
W3
SW
Ventilators
V
V1
V2
V3
V5
Grill
107.390
4.200
-2.0
1.200
2.100
-2.0
-7.0
-11.0
-1.0
-1.0
1.200
1.500
2.100
1.800
1.500
1.350
1.350
1.350
1.350
2.100
-16.0
-7.0
-11.0
-1.0
-6.0
-2.0
1.200
1.500
2.100
1.800
0.750
1.800
0.450
0.450
0.450
0.450
0.450
3.470
1
1
94.550
18.680
3.600
2.115
-3.0
-8.0
-11.0
-2.0
-1.0
1.200
1.500
2.100
1.800
1.500
1.350
1.350
1.350
1.350
2.100
-18.0
-8.0
-11.0
-2.0
-4.0
-2.0
1.200
1.500
2.100
1.800
0.900
1.800
0.450
0.450
0.450
0.450
0.450
3.470
451.04
(5.04)
(3.24)
(14.18)
(31.19)
(2.43)
(3.15)
(8.64)
(4.73)
(10.40)
(0.81)
(2.03)
(12.49)
352.73
340.38
39.51
(4.86)
(16.20)
(31.19)
(4.86)
(3.15)
(9.72)
(5.40)
(10.40)
(1.62)
(1.62)
(12.49)
278.39
85 of 208
ESTIMATE
Sl.
ITEM OF WORK
No
c Terrace Floor
Staircase head room Surrounding
Length
Parapet wall
Open court yard surrounding wall
Deductions
Door
D2
S
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
17.400
2.275
39.59
1.0
94.550
2.230
210.85
1.0
29.800
2.115
63.03
2.100
(1.89)
311.57
-1.0
0.900
45 KSRB 15-3.14: Providing 12mm thick cement plaster to ceiling, single coat in cement mortar 1:4, to ceiling inclu
required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing, etc., com
2013-2014 BellaryCircle Page No. 121, Item No. 15.22)
a
Ground Floor
Ent lobby
Principal
Office / Record
Staircase area
Library
Class Room - 1 & 2
Corridor
6
7
8
1
1
1
#REF!
1.200
2.085
3.400
7.500
6.000
7.500
13
1.200
1.500
23.40
14
1.200
1.213
20.38
#REF!
#REF! #REF!
0.900
2.930
1.675
5.300
6.000
3.250
34.624
#REF!
6.48
42.76
45.56
39.75
36.00
24.38
#REF!
#REF!
#VALUE!
#VALUE!
18
1.800
1.200
38.88
19
2.085
1.200
47.54
#REF!
Entry Landing
Portico
Staircase weist slab
Staircase Midlanding
Window Chajja
W
W1
W2
#REF! #REF!
#REF!
1
2
1
6.430
1.000
2.000
1.420
6.465
4.025
1.270
2
7
11
1.500
1.800
2.400
0.600
0.600
0.600
#REF!
#VALUE!
#VALUE!
#VALUE!
41.57
2.00
2.00
1.80
7.56
15.84
86 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
W3
SW
No.
1
1
Length
(m)
2.100
1.800
Breadth
(m)
0.600
0.600
Depth
(m)
Quantity
1.26
1.08
#REF!
First Floor
Library / Reading room
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
Computer lab
Store / Record
Yoga / Common Hall
#REF!
#VALUE!
#VALUE!
Staircase
Weist slab
Mid Landing
Window Chajja
W
W1
W2
W3
SW
2
1
1.000
2.000
4.025
1.270
3
8
11
2
1
1.500
1.800
2.400
2.100
1.800
0.600
0.600
0.600
0.600
0.600
8.05
2.54
2.70
8.64
15.84
2.52
1.08
#VALUE!
Terrace Floor
Staircase Head room slab
2.760
6.540
18.05
18.05
87 of 208
ESTIMATE
Sl.
Length
Breadth
Depth
ITEM OF WORK
No.
Quantity
No
(m)
(m)
(m)
46 KSRB 15-5.1: Providing rough cement plastering 15mm thick in single coat cement mortar 1:4, to brick masonry for
approved quality, providing and removing scaffolding, including cost of materials, labour, curing, etc., complete as per
Bellary Circle Page No. 122, Item No. 15.30)
a
Ground Floor
Ent lobby
Principal
Office / Record
6
7
8
4.200
4.200
4.200
1.500
1.500
1.500
37.80
44.10
50.40
13
4.200
1.500
81.90
14
4.200
1.500
88.20
19
4.200
1.500
119.70
20
4.200
1.500
126.00
-9.0
-10.0
0.750
0.750
1.500
1.500
Deductions
D3
Openings
(10.13)
(11.25)
526.73
First Floor
-
c
47
Terrace Floor
KSRB 15.8.2 : Providing and fixing plaster mesh 150mm wide manufactured out of hot galvanized iron of nominal thic
120gms per sqm width, along route of walls chipped for services junction between RCC and brick walls including
complete as per specification. (length of mesh only be measured for payment). (PWD SR 2012-2013 Gulbarga Circle Pag
All Floors
Roof Beam Junction
Ground Floor
Class room (1x2)
Class room
4
8
6.460
9.000
25.84
72.00
12
7.955
95.46
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
4
4
2
4
4
4
4
4
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
32.12
13.14
10.00
21.24
24.00
20.00
11.40
116.00
88 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
8
Length
(m)
3.600
Breadth
(m)
Depth
(m)
Quantity
28.80
89 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
First Floor
Class room (1x2)
Class room
4
8
6.460
9.000
25.84
72.00
12
7.955
95.46
Library
Staircase
Entrance
Principal room
Office/record
Opp to class room
Opp to class room
Platform location both side
For Internal walls
Toilet terrace Parapet wall
Deductions
Door
D
D1
D2
Column Junction
Ground floor
Grid 1B
Grid 1B
Grid 1C
Grid 1D'
Grid 1F
Grid 1F
Grid 1H
Grid 1I
Grid 1I
Grid 2A
Grid 2J
Grid 3A
Grid 3A
Grid 3B
Grid 3B
Grid 3C'
Grid 3D'
Grid 3F
Grid 3F
Grid 3H
Grid 3I
Grid 3I
4
4
2
4
4
4
4
4
8
2
0
0
-8
-4
-2
8.030
3.285
5.000
5.310
6.000
5.000
2.850
29.000
3.600
21.220
1.500
1.200
0.900
32.12
13.14
10.00
21.24
24.00
20.00
11.40
116.00
28.80
42.44
(12.00)
(4.80)
(1.80)
-
2
2
4
4
2
4
4
2
2
4
4
2
2
2
4
4
4
2
4
4
2
4
3.000
3.300
3.300
3.300
3.000
3.300
3.300
3.000
3.300
3.150
3.150
3.150
3.220
3.000
3.220
3.220
3.220
3.000
3.220
3.220
3.000
3.220
6.00
6.60
13.20
13.20
6.00
13.20
13.20
6.00
6.60
12.60
12.60
6.30
6.44
6.00
12.88
12.88
12.88
6.00
12.88
12.88
6.00
12.88
90 of 208
ESTIMATE
Sl.
No
Grid 3J
Grid 3J
Grid 4A
Grid 4A
Grid 4C
Grid 4G1
Grid 4J
Grid 4J
Grid 5A
Grid 5C
Grid 5G1
Grid 5J
Grid 6A
Grid 6C
Grid 6G1
Grid 6J
Grid 7A
Grid 7A
Grid 7A
Grid 7C
Grid 7C
Grid 7G1
Grid 7G1
Grid 7J
Grid 7J
Grid 7J
Grid 8D
Grid 8F'
Grid 9A
Grid 9B
Grid 10D
Grid 10E'
Grid 10E'
Grid 10F'
Grid 9I
Grid 9I
Grid 9J
2
2
2
2
4
4
2
2
4
4
4
4
4
4
4
4
2
2
2
4
2
2
2
2
2
2
4
4
4
4
4
2
2
4
2
4
4
Length
(m)
3.150
3.220
3.150
3.070
3.150
3.150
3.150
3.070
3.150
3.150
3.150
3.150
3.150
3.150
3.150
3.150
3.150
3.070
3.000
3.150
3.000
3.150
3.000
3.150
3.070
3.000
3.070
3.070
3.070
3.070
3.070
3.150
3.070
3.070
3.000
3.070
3.070
First floor
Grid 1B
Grid 1B
Grid 1C
Grid 1D'
Grid 1F
2
2
4
4
2
3.000
3.300
3.300
3.300
3.000
ITEM OF WORK
No.
Breadth
(m)
Depth
(m)
Quantity
6.30
6.44
6.30
6.14
12.60
12.60
6.30
6.14
12.60
12.60
12.60
12.60
12.60
12.60
12.60
12.60
6.30
6.14
6.00
12.60
6.00
6.30
6.00
6.30
6.14
6.00
12.28
12.28
12.28
12.28
12.28
6.30
6.14
12.28
6.00
12.28
12.28
6.00
6.60
13.20
13.20
6.00
91 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
Grid 1F
Grid 1H
Grid 1I
Grid 1I
Grid 2A
Grid 2J
Grid 3A
Grid 3B
Grid 3B
Grid 3C'
Grid 3D'
Grid 3F
Grid 3F
Grid 3H
Grid 3I
Grid 3I
Grid 3J
Grid 4A
Grid 4A
Grid 4A
Grid 4C
Grid 4G1
Grid 4J
Grid 4J
Grid 4J
Grid 5A
Grid 5C
Grid 5G1
Grid 5J
Grid 6A
Grid 6C
Grid 6G1
Grid 6J
Grid 7A
Grid 7A
Grid 7A
Grid 7C
Grid 7C
Grid 7G1
Grid 7G1
Grid 7J
Grid 7J
Grid 7J
Grid 8D
No.
4
4
2
2
4
4
4
4
2
4
4
2
4
4
4
2
4
2
2
2
4
4
2
2
2
4
4
4
6
4
4
4
4
2
2
2
4
2
4
2
2
2
2
6
Length
(m)
3.300
3.300
3.000
3.300
0.900
0.900
0.900
3.000
3.220
3.220
3.220
3.000
3.220
3.220
3.000
3.220
0.900
3.150
0.900
3.070
3.150
3.150
3.150
0.900
3.070
3.150
3.150
3.150
3.150
3.150
3.150
3.150
3.150
3.150
3.070
3.000
3.150
3.000
3.150
3.000
3.150
3.070
3.000
3.070
Breadth
(m)
Depth
(m)
Quantity
13.20
13.20
6.00
6.60
3.60
3.60
3.60
12.00
6.44
12.88
12.88
6.00
12.88
12.88
12.00
6.44
3.60
6.30
1.80
6.14
12.60
12.60
6.30
1.80
6.14
12.60
12.60
12.60
18.90
12.60
12.60
12.60
12.60
6.30
6.14
6.00
12.60
6.00
12.60
6.00
6.30
6.14
6.00
18.42
92 of 208
ESTIMATE
Sl.
No
Grid 8E'
Grid 8E'
Grid 8F'
Grid 9A
Grid 9B
Grid 10D
Grid 10E'
Grid 10E'
Grid 10F'
Grid 9I
Grid 9I
Grid 9J
2
2
4
4
4
4
2
4
4
2
4
4
Length
(m)
3.150
3.070
3.070
3.070
3.070
3.070
3.150
3.070
3.070
3.000
3.070
3.070
Terrace floor
Grid 1B
Grid 1C
Grid 1D'
Grid 1F
Grid 1H
Grid 1I
Grid 3B
Grid 3I
Grid 4A
Grid 4J
Grid 5A
Grid 5J
Grid 6A
Grid 6J
Grid 7A
Grid 7J
Grid 8E'
Grid 8F'
Grid 9A
Grid 9B
Grid 10D
Grid 10E'
Grid 10E'
Grid 10F'
Grid 10F'
Grid 9I
Grid 9J
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
2
4
4
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
2.270
2.270
0.900
0.900
0.900
0.900
2.270
2.270
0.900
0.900
0.900
ITEM OF WORK
No.
Breadth
(m)
Depth
(m)
Quantity
6.30
6.14
12.28
12.28
12.28
12.28
6.30
12.28
12.28
6.00
12.28
12.28
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
9.08
9.08
3.60
3.60
3.60
3.60
9.08
9.08
1.80
3.60
3.60
2,215.52
93 of 208
ESTIMATE
Sl.
Length
Breadth
Depth
ITEM OF WORK
No.
Quantity
No
(m)
(m)
(m)
48 KSRB 15-7: Providing lime rendering for plastering to wall and ceiling , including cost of materials, labour, curing, com
2013-2014 Bellary Circle Page No. 122, Item No. 15.33)
a Ground Floor
Qty Same as Internal Plastering
2,188.11
#REF!
#REF!
First Floor
Qty Same as Internal Plastering
#REF!
#VALUE!
#REF!
Terrace Floor
Qty Same as Internal Plastering
34.33
18.05
52.38
49
KSRB 4-5: Providing lath plaster with cement mortar 1:3, 5 cms thick with 6mm dia mild steel bars at 20cms c to c b
chicken mesh for drop chejja, fascia, backing of cup boards including cost of all materials, labour, providing and remov
curing, complete as per specifications. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No. 16, Item N
Ground Floor
Open court yard surrounding
29.800
1.200
35.76
35.76
First Floor
Open court yard surrounding
29.800
1.200
35.76
35.76
Terrace Floor
50 KSRB 4-2.12: Extra for providing throting or drip molding to RCC chajja with plastering ( labour charges only ) as
KBS. (PWD SR 2013-2014 Bellary Circle Page No. 16, Item No. 4.21)
a All Floors
Ground floor
Window Chajja
W
2
2.700
5.40
W1
7
3.000
21.00
W2
11
3.600
39.60
Mannalli - Bidar - SCMDRS
ProMax
Academic
Management Consultants Pvt. Ltd
94 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
W3
SW
First floor
Window Chajja
W
W1
W2
W3
SW
Terrace floor
Door Chajja
D2
No.
1
1
3
8
11
2
1
Length
(m)
3.300
3.000
Breadth
(m)
Depth
(m)
Quantity
3.30
3.00
2.700
3.000
3.600
3.300
3.000
8.10
24.00
39.60
6.60
3.00
2.400
2.40
156.00
51 Providing groves in plastering on walls 25 to 40mm wide and to the required depth as per design and finished in CM
scaffolding and curing etc., complete as directed by PMC/EIC.
a All Floors
Ground floor
Building Surrounding Length
2
107.390
214.78
First floor
Building Surrounding Length
2
94.550
189.10
Terrace floor
Staircase head room Surrounding
2
17.400
34.80
Length
438.68
52 Providing 12mm thick Patti with CM 1:3 to the parapet wall. Providing and removing scaffolding, including cost of
complete as directed by PMC/EIC
a All Floors
Ground floor
First floor
Portico Parapet wall
Terrace floor
Parapet wall
18.680
18.68
-
94.550
94.55
113.23
95 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
FLOORING
53
KSRB 14.10-1: Flooring with 25mm to 40mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thi
or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab
curing, polishing complete as per specifications. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No. 1
Ground Floor
Staircase area
Library
Class Room - 1 & 2
1
1
1
First Floor
Library / Reading room
7.500
6.000
7.500
5.300
6.000
3.250
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
Computer lab
Store / Record
Yoga / Common Hall
39.75
36.00
24.38
100.13
#REF!
#VALUE!
#VALUE!
#VALUE!
c
Terrace Floor
-
54 KSRB 14.14-5: Providing Ceramic tiles of size 30x30 cms of approved make, shade and size for flooring, treads of st
mm thick, cement mortar 1:3 mix, flush pointing with white cement using colour pigment , including cost of mater
specifications. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No. 114, Item No. 14.36.2)
a
All Floors
Ground floor
Ent lobby
Principal
Office / Record
6
7
8
1.200
2.085
3.400
0.900
2.930
1.675
6.48
42.76
45.56
13
1.200
1.500
23.40
14
1.200
1.213
20.38
18
1.800
1.200
38.88
19
2.085
1.200
47.54
First floor
Mannalli - Bidar - SCMDRS
ProMax
Academic
Management Consultants Pvt. Ltd
96 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
225.00
55
KSRB 14-17.2: Providing skirting, dado, rises of Steps with colour glazed tiles of size 30 cms x 45 cms 6 mm thick wit
10mm thick cement plaster 1:3 and jointed with white cement slurry over rough plaster surface (excluding cost of roug
measured and paid separately) using glazed tiles of approved make and size including cost of materials, labour, complet
No. KBS 14.16, 14.17. (PWD SR 2013-2014 Bellary Circle Page No. 115, Item No. 14.41.3)
All Floors
Ground floor
Ent lobby
Principal
Office / Record
6
7
8
4.200
4.200
4.200
1.500
1.500
1.500
37.80
44.10
50.40
13
4.200
1.500
81.90
14
4.200
1.500
88.20
19
4.200
1.500
119.70
20
4.200
1.500
126.00
-9.0
-10.0
0.750
0.750
1.500
1.500
Deductions
D3
Openings
First floor
56
(10.13)
(11.25)
526.73
Providing and laying flooring using prepolished, water cut/gang saw 19mm thick grey granite laid over existing floor in
pointed with white / grey pigment etc., complete. (PWD SR 2013-2014 Bellary Circle Page No. 116, Item No. 14.47.1)
All Floors
Ground Floor
#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
Staircase Treads
Staircase Riser
Staircase Midlanding
Entry Landing
Entrance Steps Treads
Entrance Steps Riser
22
24
1
1.000
1.000
2.000
2
3
1.500
1.500
1.200
#REF!
#REF!
#REF!
#VALUE!
#VALUE!
0.300
6.60
3.60
2.54
0.150
1.270
1.420
0.300
#VALUE!
0.150
0.300
0.90
0.68
1.44
97 of 208
ESTIMATE
Sl.
No
Length
(m)
1.200
First Floor
Staircase Treads
Staircase Riser
Mid Landing
Terrace floor level Landing
22
24
1
1
1.000
1.000
2.000
2.000
ITEM OF WORK
No.
Breadth
(m)
Depth
(m)
0.150
Quantity
1.08
0.300
6.60
3.60
2.54
2.40
-
0.150
1.270
1.200
#REF!
57
Providing and laying platform using prepolished, water cut/gang saw 40mm thick telephonic Black Granite laid on ex
CM 1:3 proportion. including cutting to required shape, pattern with papper joints, including full rounding for nosing,
with colour pigments to match the colour of slab making through lointing with sealent, making holes 25mm x 12 mm
(PWD SR 2013-2014 Bellary Circle Page No. 116, Item No. 14.52)
Ground Floor
Toilet wash basin platform
Toilet wash basin platform
2
2
2.385
2.930
0.600
0.600
2.86
3.52
6.38
First Floor
-
Terrace Floor
-
98 of 208
ESTIMATE
Sl.
No
58
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
Providing half nosing for 20mm thick granite slab using required machinery including cost and conveyance of all ma
HOM of equipment etc., complete as per specifications. (PWD SR 2013-2014 Bellary Circle Page No. 117, Item No. 14.
All Floors
Ground Floor
#REF!
Staircase Treads
Staircase Midlanding
Entry Landing
Entrance Steps Treads
#REF! #REF!
#VALUE!
#VALUE!
22
1.000
1
2.000
#REF!
#VALUE!
#VALUE!
22.00
2.00
#VALUE!
1.500
3.00
1.200
4.80
First Floor
Staircase Treads
Mid Landing
Terrace floor level Landing
22
1
1
1.000
2.000
2.000
22.00
2.00
2.00
#REF!
59 Providing Vitrified tiles 60 x 60cms of approved make, shade and size for flooring laid on a bed of 12 mm thick, cemen
white cement using colour pigment , including cost of materials, labour, curing, complete as per specifications. (PWD
No. 115, Item No. 14.45)
a
Ground Floor
Corridor
#REF!
34.624
#REF!
#VALUE!
#VALUE!
#REF!
First Floor
Terrace Floor
60
Providing and laying screed concrete average 50mm thick over roof using cement concrete of mix M20 with OPC cem
graded granite metal course aggregate @ 0.64cum and fine aggregate @ 0.43 cum with superplastisiser @ 3ltrs confi
2008 machine mixed concrete laid in layers not exceeding 15cms thick well compacted by using one kg water proo
including cost of all materials, labour for HOM of machinery curing etc., complete as per specifications. ( As per KREIS
All Floors
First Floor
For Portico Terrace, as a base of
Yelahanka tiles
Toilet terrace
6.430
5.865
37.71
3.630
6.980
50.67
99 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
Terrace Floor
For Terrace, as a base of Yelahanka
tiles (Area from Autocadd dwg)
458.540
458.54
546.93
100 of 208
ESTIMATE
Sl.
No
61
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
KSRB 10-2: Providing and laying in position yelahanka tiles of size 250x250mm of approved quality and make, over a
thickness 25mm over weather proof course and pointed with cement mortar 1:3 mix with red oxide including curing cos
specification. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No. 68, Item No. 10.1)
All Floors
First Floor
For Portico Terrace, as a base of
Yelahanka tiles
Toilet terrace
Terrace Floor
6.430
5.865
37.71
3.630
6.980
50.67
458.540
458.54
546.93
62
KSRB 8.5 : Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on
slope compacting, including cost of materials, labour, curing complete as per specifications.
All Floors
-
63
Providing and laying heavy duty cobble stones 80mm thick interlock pavers, using cement and course sand for manufact
and colour with a minimum compressive strength of 281 kg per sqm over 50mm thick sand bed (average thickness)
having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction
level including cost of materials, labour and HOM of machineries complete as per specifications.
a
Ground Floor
Portico
5.970
5.635
33.64
5.000
4.000
40.00
73.64
PAINTING WORKS
64
KSRB 15-14.1: Providing and applying painting in two coats with oil bound washable distemper of approved brand
priming coat with distemper primer after thoroughly brooming the surface free from mortar drops and other foreign m
even and sand paper smooth, cost of materials, labour, complete as per specifications. (PWD SR 2013-2014 Bellary Circ
All Floors
Ground floor
Qty Same as Internal Plastering
Qty Same as Ceiling Plastering
2,188.11
#REF!
First Floor
101 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
#REF!
#VALUE!
Terrace Floor
Qty Same as Internal Plastering
34.33
18.05
#REF!
65 KSRB 15-14.2 : Extra over Item 15.14.1 for applying one coat with oil bound washable distemper on ceiling and / o
(PWD SR 2012-2013 Gulbarga Circle Page No. 124, Item No. 15.49)
a All Floors
Ground floor
Qty Same as Ceiling Plastering
#REF!
First Floor
Qty Same as Ceiling Plastering
#VALUE!
Terrace Floor
Qty Same as Ceiling Plastering
18.05
#REF!
66
KSRB 15-16.1: Providing and finishing external walls in two coats with waterproof cement paint of approved brand a
thoroughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreig
labour, complete as per specifications - with primer. (PWD SR 2013-2014 Bellary Circle Page No. 125, Item No. 15.53)
Ground Floor
Qty Same as External Plastering
352.73
352.73
First Floor
Qty Same as External Plastering
278.39
278.39
Terrace Floor
Qty Same as External Plastering
311.57
102 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
311.57
67
KSRB 15-17.4: Applying priming coat over new wood surface and / or wood based surface, after brushing with ready
preparing the surface after thoroughly cleaning oil, grease, dirt and foreign matter, sand papering and knotting already m
labour, complete as per specifications. (PWD SR 2013-2014 Bellary Circle Page No. 126, Item No. 15.58)
All Floors
Ground Floor
D
D1
D2
First Floor
D1
D2
Terrace Floor
D2
4
3
4
2
1
1.500
1.200
0.900
1.200
0.900
0.900
2.100
2.100
2.100
12.60
7.56
7.56
2.100
2.100
5.04
1.89
2.100
1.89
36.54
68
KSRB 15-17.6: Providing and applying painting two coats (excluding priming coat) on new wood surface and / or woo
give even shade cleaning the surface of all dirt, dust and foreign matter, sand papering including cost of materials, la
(PWD SR 2013-2014 Bellary Circle Page No. 126, Item No. 15.60)
All Floors
Ground Floor
D
D1
D2
First Floor
D1
D2
Terrace Floor
D2
4
3
4
2
1
1.500
1.200
0.900
1.200
0.900
0.900
2.100
2.100
2.100
12.60
7.56
7.56
2.100
2.100
5.04
1.89
2.100
1.89
36.54
69 KSRB 15-18.2 Providing and applying enamel metal paint two coats (excluding priming coat) on new steel or other
shade after cleaning oil, grease, dirt, dust and foreign matter, sand papering including cost of materials, labour, comp
2013-2014 Bellary Circle Page No. 128, Item No. 15.74)
a
All Floors
Ground Floor
W
1.200
1.350
3.24
103 of 208
ESTIMATE
Sl.
No
W1
W2
W3
SW
V
V1
V2
V3
V4
V5
7
11
1
1
2
7
11
1
6
10
Length
(m)
1.500
2.100
1.800
1.500
1.200
1.500
2.100
1.800
0.750
0.900
First Floor
W
W1
W2
W3
SW
V
V1
V2
V3
V5
3
8
11
2
1
4
8
11
2
4
1.200
1.500
2.100
1.800
1.500
1.200
1.500
2.100
1.800
0.900
ITEM OF WORK
No.
Breadth
(m)
Depth
(m)
1.350
1.350
1.350
2.100
0.450
0.450
0.450
0.450
0.450
0.450
1.350
1.350
1.350
1.350
2.100
0.450
0.450
0.450
0.450
0.450
Quantity
14.18
31.19
2.43
3.15
1.08
4.73
10.40
0.81
2.03
4.05
4.86
16.20
31.19
4.86
3.15
2.16
5.40
10.40
1.62
1.62
158.72
104 of 208
ESTIMATE
Sl.
No
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
SS HAND RAIL
70
Providing and fixing Stainless steel staircase railing as per Chief Architect Drawing No.11520/HRSC with hand rail 50 m
to vertical hollow 50 mm dia pipe of 16 gauge, stainless steel vertical pipe spaced at 1.20m regular intervals, and 5 nos
horizontal pipe are welded to vertical 50mm dia hollow pipe. The entire assembly is fixed to staircase concrete by using
etc., complete including cost of materials, labour, HOM of machineries and electrical charges, etc., complete as per
Bellary Circle Page No.48, Item No.7.38)
All Floors
Ground floor
For Staircase
4.025
1.000
8.05
First floor
For Staircase
4.025
1.000
8.05
16.10
71
Providing and fixing 304 - grade stainless steel hand rails of 14 - gauge pipes for Ramps or Staircase are made out o
50mm dia for verticals @ 1.60mtr c/c are fixed to the ramps or steps by drilling with bolts and 100mm dia base plate
pipes 4nos. anchor bolt and 40mm dia pipes are fixed horizontally for two rows top, one pipes are fixed with vertical pip
25mm dia pipes are fixed horizontally for 2 rows below top measure @ equal intervals including cutting, welding, bend
caps @ tops, bottoms and corners finishing with mat / shining etc., complete including cost and conveyance of all ma
HOM of equipment with all lead and lift, loading and unloading transportation charges and all other incidental charge
and directions of the Engineer- In-charge of the work. Ramps or Staircase for physically challenged. (PWD SR 2013-20
No. 7.39)
a
All Floors
For Ramp
7.500
1.000
7.50
7.50
72
KSRB 10-3: Providing and laying integral cement based waterproofing treatment including preparation of sur
roofs,balconies,terrace etc.,consisting of following application.(a)Applying and grouting a slurry coat of neat cement u
with proprietary water proofing compound conforming to IS:2645 over the RCC slab after cleaning the surface before
using broken brickbats 25mm to 100mm size with 50% of cement mortar 1:5 admixed with proprietary waterproofing
20mm thick layer of cement mortar 1:5 admixed with proprietary waterproofing compound to required slope and treatin
300mm height including rounding off junctions of walls and slabs.(c)After two day of proper curing, applying a secon
proprietary waterproofing compound(d)Finishing the surface with 20mm thick joint less cement cement mortar of
waterproofing compound and finally finishing the surface with trowel and neat cement slurry and making of 300x300
finished shall be flooded with water for a minimum period of two weeks for curing and for final test including cost
specifications. (PWD SR 2012-2013 Gulbarga Circle Page No. 68, Item No. 10.2)
All Floors
WRITING BOARD
105 of 208
ESTIMATE
Sl.
No
73
S
ITEM OF WORK
No.
Length
(m)
Breadth
(m)
Depth
(m)
Quantity
Supplying and fixing P3 grade ceramic steel magnetic writing green board with vitreous enameled steel top surface boar
2% minimum gloss at 60 degree lead of size 8'x4'. The core material of the board is medium density fiber (MDF) b
weighing 750kg per cubic meter as per IS : 12406-2003 Edition 2.2 with ceramic steel sheet of 0.3 to 0.4mm top and
with aluminum frame section, front 20mm side 16mm and thickness 1.20mm weight of the board is 12kg per square
specifications. ( As per KREIS Data Rate Sheet )
a
74
All Floors
Ground Floor
Class rooms & laboratary
First Floor
Class rooms
8.00
2.00
10.00
Providing and fixing of Pin up board / notice board with 19mm thick MDF board as base and top fixed with pinup board
fixing of readymade teak wood beading alround as border etc. complete as directed by PMC / EIC ( As per KREIS Data R
All Floors
1
2.100
1.200
2.52
2.52
LOGO
75
Creating LOGO of KREIS and name of the school in cement plastering work on the plastered surface including painting
of wall primer including cost of providing and removing of scaffolding, form work, material, labour complete as directed
All Floors
1
3.850
2.000
7.70
7.70
76
Providing and fixing Flag post. including excavation, brick masonry, plastering painting and ms pipe with one coat rust p
of PMC / EIC ( As per KREIS Data Rate Sheet )
All Floors
1
3.850
2.000
7.70
7.70
106 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
4.94
3,908.03
Cum
152.25
36,133.49
Cum
219.45
14,811.00
107 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Cum
682.50
322,440.52
Cum
978.60
132,094.31
108 of 208
Cum
Rate
(in Rs.)
98.60
Amount
(in Rs.)
6,654.66
Cum
196.35
193,909.34
109 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Cum
36.15
30,537.83
Sqm
101.85
62,943.30
cement @ 220 kgs, using 40mm and down size graded granite
te laid in layers not exceeding 150mm thick, well compacted in
per specifications. Specification. No. KBS 4.1, 4.2. (PWD SR
110 of 208
Cum
Rate
(in Rs.)
4,171.65
Amount
(in Rs.)
563,285.80
cement @ 240 kgs, using 20mm and down size graded granite
ete laid in layers not exceeding 15cms thick, well compacted in
g, complete as per specifications. Specification. No. KBS 4.1,
Cum
4,470.90
75,088.14
111 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Cum
4,523.40
29,471.94
Cum
4,575.90
11,519.14
Cum
3,161.55
105,251.16
Cum
4,003.65
133,204.44
112 of 208
Rate
(in Rs.)
Amount
(in Rs.)
with OPC cement @ 320kgs, with 20mm and down size graded
astisiser @ 3lts confirming to IS9103-1999 Reaffirmed-2008,
undation plinth and ground floor level for roof slabs, Staircase,
ns, piers, abutments, pillars, posts, struts, buttresses, string or
all materials, labour, HOM of machinery, curing, complete as
No. 13, Item No. 4.11)
113 of 208
Rate
(in Rs.)
Amount
(in Rs.)
114 of 208
Cum
Rate
(in Rs.)
5,211.15
Amount
(in Rs.)
2,424,851.79
Cum
5,263.65
154,961.86
Cum
5,316.15
8,148.17
Unit
with OPC cement @ 320kgs, with 20mm and down size graded
astisiser @ 3lts confirming to IS9103-1999 Reaffirmed-2008,
, columns of all sizes in foundation plinth and superstructure
rials, labour, HOM of machinery, curing, complete as per
15, Item No. 4.17)
115 of 208
Rate
(in Rs.)
Amount
(in Rs.)
116 of 208
Cum
Rate
(in Rs.)
5,211.15
Amount
(in Rs.)
#REF!
Cum
5,263.65
#VALUE!
Cum
5,316.15
14,393.80
Unit
0 with OPC cement @ 24kgs, with 12mm and down size graded
astisiser @ 0.225lts, machine mixed, well compacted for plain
erials, labour, HOM of machinery, curing, complete as per
15, Item No. 4.19)
117 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
384.30
10,583.62
Sqm
387.45
11,925.71
Sqm
390.60
281.23
118 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Cum
198.45
trap jelly 12mm and down size 5 cms thick and below with
d at 30cms centre to centre for distribution including supports
ortar 1:6 including centring, form work, curing etc., complete
Sqm
603.75
6,182.40
Sqm
589.05
15,998.60
Sqm
592.20
Sqm
424.20
4,581.36
Sqm
427.35
Sqm
430.50
445.20
119 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
448.35
Sqm
451.50
Sqm
368.55
Sqm
213.15
82,785.33
120 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
274.05
#REF!
Sqm
277.20
#VALUE!
Sqm
280.35
5,060.43
Sqm
326.55
#REF!
Sqm
329.70
75,250.73
121 of 208
Sqm
Rate
(in Rs.)
332.85
Amount
(in Rs.)
oval of form work for Columns, pillars, piers, posts and struts,
s. Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary
Sqm
711.90
#REF!
122 of 208
Sqm
Rate
(in Rs.)
237.30
Amount
(in Rs.)
146,933.50
123 of 208
Rate
(in Rs.)
Sqm
240.45
Sqm
243.60
Amount
(in Rs.)
57,180.93
124 of 208
Sqm
Rate
(in Rs.)
559.65
Amount
(in Rs.)
680,548.45
125 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
562.80
91,932.54
Sqm
565.95
12,489.38
Sqm
234.15
6,448.49
Sqm
237.30
7,304.09
Sqm
240.45
173.12
126 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
417.90
4,868.47
Sqm
421.05
4,905.17
Sqm
424.20
7,238.70
1,816,253.82
7,275.77
1,338,176.46
7,275.77
53,129.84
127 of 208
Rate
(in Rs.)
Amount
(in Rs.)
128 of 208
Cum
Rate
(in Rs.)
4,692.45
Amount
(in Rs.)
1,091,653.88
129 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Cum
4,718.70
681,993.81
Cum
4,744.95
#REF!
130 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
630.00
#REF!
Sqm
632.63
18,635.38
Sqm
635.25
17,037.41
Cum
49,939.05
48,522.03
131 of 208
Rate
(in Rs.)
Amount
(in Rs.)
ply finish kutty bond wood or equivalent make filled with kiln
er affixed by gluing under pressure (machine pressed) shutter
olts 2nos., 150mm oxidized MS handles 2nos., with one aldrop
upply to respective work spot fixing in position etc., complete.
Sqm
3,097.50
152,211.15
456.75
20,348.21
5mm thick boiled water proof solid core single leaf composite
ated PVC sheet on front side, 10mm thick PVC sheet bottom
cluding fixtures 150mm powder coated handles 2nos., 150mm
As per KREIS Date Rate ).
Sqm
3,528.00
50,009.40
132 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
3,004.05
162,759.43
Sqm
3,006.68
181,167.50
Sqm
3,009.30
d ventilators side hung/top hung 2/3 open able 1/3 fixed as per
d outer frames and center mullion section of size25x46x3mm
windows, not more than 34cms, c to c including providing and
uld confirm to I.S 7452:1990, 4 nos. of hold fasts of approved
it shall be tenonned and riveted into the frames electrically. All
corrosive paint and finishing two coats of ready mix paint of
machinery complete as per specifications. (PWD SR 2013-2014
133 of 208
Sqm
Rate
(in Rs.)
2,739.45
Amount
(in Rs.)
121,302.85
kgs
91.46
104,061.36
kgs
94.08
119,044.60
kgs
96.71
134 of 208
Sqm
Rate
(in Rs.)
68.67
Amount
(in Rs.)
5,077.12
135 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
134.40
294,081.38
Sqm
138.08
#REF!
136 of 208
Rate
(in Rs.)
141.75
Amount
(in Rs.)
4,866.39
Sqm
170.10
59,999.54
Sqm
173.78
48,377.95
137 of 208
Sqm
Rate
(in Rs.)
177.45
Amount
(in Rs.)
55,287.83
138 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
128.10
#REF!
Sqm
131.78
#VALUE!
Sqm
135.45
2,444.93
139 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
128.10
67,473.47
Sqm
131.78
Sqm
135.45
140 of 208
Rate
(in Rs.)
Amount
(in Rs.)
141 of 208
Rate
(in Rs.)
Amount
(in Rs.)
142 of 208
Rate
(in Rs.)
Amount
(in Rs.)
143 of 208
Rate
(in Rs.)
Amount
(in Rs.)
144 of 208
Rate
(in Rs.)
32.13
Amount
(in Rs.)
71,184.66
145 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
16.61
#REF!
Sqm
20.29
#REF!
Sqm
23.96
1,255.05
Sqm
795.90
28,461.38
Sqm
799.58
28,592.98
Sqm
803.25
labour charges only ) as per specifications. Specification No.
146 of 208
Rate
(in Rs.)
13.52
Amount
(in Rs.)
2,109.12
m
39.74
17,430.95
olding, including cost of all materials, labour and curing etc.,
39.74
4,499.19
147 of 208
Rate
(in Rs.)
Amount
(in Rs.)
ment mortar 1:6, 25mm thick over existing cement concrete bed
atch the shade of the slab, including cost of materials, labour,
Bellary Circle Page No. 110, Item No. 14.15)
Sqm
831.60
83,263.95
Sqm
833.18
#VALUE!
Sqm
834.75
148 of 208
Rate
(in Rs.)
760.20
Amount
(in Rs.)
171,044.81
Sqm
1,199.10
631,595.95
149 of 208
Sqm
Rate
(in Rs.)
1,812.30
Amount
(in Rs.)
#REF!
Sqm
2,322.60
14,813.54
Sqm
2,324.18
Sqm
2,325.75
150 of 208
Rate
(in Rs.)
Amount
(in Rs.)
123.90
#REF!
Sqm
998.55
#REF!
Sqm
998.55
Sqm
998.55
f mix M20 with OPC cement @ 300kgs, 20mm and down size
erplastisiser @ 3ltrs confirming to IS : 9103-1999 reaffirmedy using one kg water proofing compound per bag of cement,
fications. ( As per KREIS Data Rate Sheet )
151 of 208
Sqm
Rate
(in Rs.)
241.13
Amount
(in Rs.)
131,880.45
152 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
699.30
382,465.88
Cum
1,561.35
Sqm
863.10
63,559.50
153 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
52.37
#REF!
stemper on ceiling and / or sloping roof as per specifications.
Sqm
3.29
#REF!
Sqm
65.10
22,962.79
Sqm
66.68
18,562.79
154 of 208
Rate
(in Rs.)
68.25
Amount
(in Rs.)
21,264.55
Sqm
24.05
878.79
Sqm
74.52
2,722.96
155 of 208
Sqm
Rate
(in Rs.)
72.58
Amount
(in Rs.)
11,519.53
156 of 208
Rate
(in Rs.)
Amount
(in Rs.)
Sqm
5,508.30
88,681.92
Sqm
5,508.30
41,312.25
Sqm
662.55
157 of 208
Rate
(in Rs.)
Amount
(in Rs.)
eled steel top surface board, green colour writing with chalk of
um density fiber (MDF) board grade - 1 with 9mm thickness,
t of 0.3 to 0.4mm top and galvanized steel of 0.25mm at back
board is 12kg per square meter (Aprox.) etc., complete as per
No
12,915.00
129,150.00
Sqm
2,100.00
5,292.00
Sqm
519.75
4,002.08
s pipe with one coat rust proof paint complete as per directions
Sqm
26,250.00
202,125.00
200,000.00
#REF!
#REF!
10,356.37
#REF!
158 of 208
ITEM OF WORK
Unit
159 of 208
ABSTRACT SHEET
Sl.
No
5
ITEM OF WORK
Unit
KSRB 2-2.4 : Excavation 1.5m and above in width in soft rock without blasting for
foundation of buildings water supply, sanitary lines and electrical conduits either in pits
or trenches not exceeding 1.5m in depth, stacking the excavated stuff from edges of
excavation with lead up to 50m including labour and HOM of equipment complete as
per specifications. specification. No. KBS 2.1.C / 2.9.4 / 2.18 / 2.19. (PWD SR 20132014 Bellary Page No. 5, Item No. 2.6)
Cum
6
KSRB 2-2.6 : Excavation 1.5m and above in width in Hard rock by Chiselling and / or
wedging, where blasting is prohibited for foundation of buildings water supply, sanitary
lines and electrical conduits either in pits or trenches 1.5m in depth, stacking the
excavated stuff clear from from the edges of excavation with lead up to 50m including
cost labour complete as per specifications. specification. No. KBS (PWD SR 20132014 Bellary Circle Page No. 5, Item No. 2.8)
Cum
7
KSRB 2.3: Filling available excavated earth ( excluding rock ) in sides of foundation
up to plinth in layers not exceeding 20cms in depth, compacting each deposited layer
by ramming after watering with all lead and lift including cost of all labour complete as
per specifications. Specification. No. KBS 2.9. (PWD SR 2013-2014 Bellary Circle
Page No. 6, Item No. 2.1)
Cum
8
KSRB 2.5 : Earthwork excavation ( in deposited soil ) and filling sides of foundation
upto plinth in layers not exceeding 20 cms. in depth, compacting each deposited layer
by ramming after watering with all lead and lift including cost of all labour complete as
per specifications. specification. No. KBS 2.9.9 / 2.9.10.1 / 2.1.1
Cum
10
KSRRB 300-26.2. When lead is more than 60m up to 500m by any means of
conveyance including loading and unloading for all kind of soils except hard rock
including cost all labour complete as per specifications. MORTH chapter 3. (PWD SR
2013-2014 Bellary Circle Page No. 152, Item No. 19.31)
Cum
ANTITERMITE TREATMENT
160 of 208
ABSTRACT SHEET
Sl.
No
11
ITEM OF WORK
Unit
KSRB 3.2: Providing and injecting chemical emulsion for Pre-constructional AntiTermite Treatment, creating continuous chemical barrier under and around the Column
pits, walls, trenches, stilt excavation, top surface of the plinth filling, junction of wall
and floor, along the external perimeter of the building, expansion joints, over the top
surface of the consolidated earth on which the apron to be laid, surrounding of pipes
and conduits, with Chloropyriphos emulsifible concentrates of 20% concentration,
including cost of chemical, diluting in water to one percent concentration, labour,
HOM of equipments, complete as per specifications. (Plinth area of the building at
ground floor only shall be measured) Specification. No. KBS 3.2.6 / 3.2.7. (PWD SR
2013-2014 Bellary Page No. 9, Item No. 3.2)
Sqm
161 of 208
ABSTRACT SHEET
Sl.
No
ITEM OF WORK
Unit
Ground Floor
First Floor
Terrace Floor
STONE MASONARY
Cum
Cum
Cum
14
KSRB 5.2-2: Providing and constructing granite / trap / basalt size stone masonry in
foundation with cement mortar 1:8, stones hammered dressed in courses not less than
20cms high, bond stones at two m. apart in each course including cost of materials,
labour, curing, etc., complete as per specification. KBS 5.1.13. (PWD SR 2013-2014
Bellary Circle Page No. 25, Item No. 5.5)
Cum
15
KSRB 5.3-3: Providing and constructing granite / trap / basalt size stone masonry in
basement with cement mortar 1:6, stones chistle dressed in courses not less than 15cms
high, bond stones at two m. apart in each course including cost of materials, labour,
curing, etc., complete as per specification. KBS 5.1.13. (PWD SR 2013-2014 Bellary
Circle Page No. 25, Item No. 5.9)
a
Ground Floor
REINFORCED CEMENT CONCRETE
Cum
162 of 208
ABSTRACT SHEET
Sl.
No
16
ITEM OF WORK
Unit
KSRB 4.2.2: Providing and laying in position reinforced cement concrete of design mix
M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @ 0.878cum and fine aggregates @ 0.459cum, with superplastisiser
@ 3lts confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in
layers not exceeding 15cms thick, vibrated for all works in foundation plinth and
ground floor level for roof slabs, Staircase, lintels, retaining walls, return walls, walls
(any thickness) including attached plasters, columns, piers, abutments, pillars, posts,
struts, buttresses, string or lacing courses, parapets, coping, bed blocks, plain window
cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing,
complete as per specifications. Specification No. KBS 4.1, 4.6. (PWD SR 2013-2014
Bellary Circle Page No. 13, Item No. 4.11)
a Ground Floor
b First Floor
c Terrace Floor
17
Cum
Cum
Cum
KSRB 4.2.8: Providing and laying in position reinforced cement concrete of design mix
M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @ 0.69cum and fine aggregates @ 0.46cum, with superplastisiser @
3lts confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in
layers not exceeding 15cms thick, vibrated for RCC beams, columns of all sizes in
foundation plinth and superstructure ground floor level for roof, slabs, staircase, lintels,
columns including cost of all materials, labour, HOM of machinery, curing, complete as
per specifications. Specification No. KBS 4.1, 4.6. (PWD SR 2013-2014 Bellary Circle
Page No. 15, Item No. 4.17)
a Ground Floor
b First Floor
c Terrace Floor
18
Cum
Cum
Cum
KSRB 4.2.10 : Providing and laying in position reinforced cement concrete of design
mix M20 with OPC cement @ 24kgs, with 12mm and down size graded granite metal
coarse aggregates @ 0.5175cum and fine aggregates @ 0.345cum, with superplastisiser
@ 0.225lts, machine mixed, well compacted for plain chajja of 7.5 cms. average
thickness, up to ground floor level including cost of all materials, labour, HOM of
machinery, curing, complete as per specifications. Specification No. KBS 4.1, 4.6.
(PWD SR 2013-2014 Bellary Circle Page No. 15, Item No. 4.19)
a
b
c
Ground Floor
First Floor
Terrace Floor
WATER PROOFING COMPOUND
Sqm
Sqm
Sqm
163 of 208
ABSTRACT SHEET
Sl.
No
19
ITEM OF WORK
Unit
KSRB 4-4.2 : Extra for use of water proofing compound in Cement concrete of mix
M20, at one kg of compound per bag of cement. Specification No. KBS. (PWD SR
2013-2014 Bellary Circle Page No. 16, Item No. 4.25)
All Floors
RCC SHELVES AND LOFTS (ATTA)
Cum
20
Providing and casting reinforced cement concrete racks with design mix M20, granite
or trap jelly 12mm and down size 5 cms thick and below with reinforcements of 6mm
dia MS bars at 15 cms. Centre to centre for main reinforcement and at 30cms centre to
centre for distribution including supports wherever necessary with burnt brick in CM
1:8 and plastered with CM 1:4 or composite mortar 1:6 including centring, form work,
curing etc., complete (inclusive of cost of steel and fabrication charges)
a Ground Floor
b First Floor
c Terrace Floor
21
Providing RCC loft (atta) 7.5cms thick with cement concrete design mix M20 using
clean granite or trap jelly of 20mm and down size with necessary reinforcements at
20cms centre to centre as per design including form work, centring, curing, finishing
the exposed faces with cement mortar (1:3) etc., complete (exclusive of cost of steel
and fabrication charges).
Sqm
Sqm
Sqm
a
b
c
Sqm
Sqm
Sqm
Ground Floor
First Floor
Terrace Floor
164 of 208
ABSTRACT SHEET
Sl.
No
22
ITEM OF WORK
Unit
Providing and fixing RCC slabs 5cms thick for walls shelves with 12mm and down size
jelly cement concrete design mix M20 including CM 1:3 plaster finishing, curing etc.,
complete (inclusive of cost of steel and fabrication charges). (PWD SR 2013-2014
Bellary Circle Page No. 20, Item No. 4.55)
a Ground Floor
b First Floor
c Terrace Floor
23
Providing RCC design mix M20 using granite metal 20mm and down size for 7.5cms
thick solid parapet or perforated as per design, specification and directions. (exclusive
of cost of steel and fabrication charges) including necessary centering, form work and
finishing smooth with CM (1:3) etc., complete. (PWD SR 2013-2014 Bellary Circle
Page No. 20, Item No. 4.56)
Sqm
Sqm
Sqm
a All Floors
Sqm
24
KSRB 4-6.1: Providing and removing centering, shuttering, strutting, propping etc.,
and removal of form work for foundations, footings, bases of columns for mass
concrete including cost of all materials, labour complete as per specifications.
Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 16, Item
No. 4.28)
a All Floors
Sqm
25
KSRB 4.6.2: Providing and removing centering, shuttering, strutting, propping etc., and
removal of form work for flat surface such as suspended floors, roofs, landings,
balconies and likes, thickness up to 200mm including cost of all materials, labour
complete as per specifications. Specification No. KBS 4.6.2. (PWD SR 2013-2014
Bellary Circle Page No. 16, Item No. 4.29)
a Ground Floor
b First Floor
c Terrace Floor
26
KSRB 4-6.5: Providing and removing centering, shuttering, strutting, propping etc.,
Columns, pillars, piers, abutments, posts and struts, square / rectangular / polygon in
plan including cost of all materials, labour compete as per specifications. Specification
No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 17, Item No. 4.32)
Sqm
Sqm
Sqm
a Ground Floor
Sqm
b First Floor
Sqm
c Terrace Floor
Sqm
27
KSRB 4-6.6 : Providing and removing centering, shuttering, strutting, propping etc.,
and removal of form work for Columns, pillars, piers, posts and struts, circular or
curved in plan including cost of all materials, labour compete as per specifications.
Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 17, Item
No. 4.33)
165 of 208
ABSTRACT SHEET
Sl.
ITEM OF WORK
Unit
No
a All Floors
Sqm
28
KSRB 4.6.7: Providing and removing centering, shuttering, strutting, propping etc., and
removal of form work for sides and soffits of beams, beam haunchings, cantilever
girders, bressumers and lintels not exceeding 1m in depth including cost of all
materials, labour complete as per specifications. Specification No. KBS 4.6.2. (PWD
SR 2013-2014 Bellary Circle Page No. 17, Item No. 4.34)
a Ground Floor
b First Floor
c Terrace Floor
29
KSRB 4.6.9: Providing and removing centering, shuttering, strutting, propping etc., for
edges of slabs and breaks in floors, cills, plinth including cost of material, labour
complete as per specification. Specification No. KBS 4.6.2. (PWD SR 2013-2014
Bellary Circle Page No. 17, Item No. 4.36)
Sqm
Sqm
Sqm
a Ground Floor
b First Floor
c Terrace Floor
30
KSRB 4.6.10: Providing and removing centering, shuttering, strutting, propping etc.,
for chajjas, corbels etc., including edges including cost of material, labour complete as
per specification. Specification No. KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle
Page No. 17, Item No. 4.37)
Sqm
Sqm
Sqm
a Ground Floor
b First Floor
c Terrace Floor
31
KSRB 4.6.11: Providing and removing centering, shuttering, strutting, propping etc.,
and removal of form work for Stairs (excluding landing) except spiral staircase
including cost of all materials, labour complete as per specification. Specification No.
KBS 4.6.2. (PWD SR 2013-2014 Bellary Circle Page No. 17, Item No. 4.38)
Sqm
Sqm
Sqm
a
b
c
Sqm
Sqm
Sqm
Ground Floor
First Floor
Terrace Floor
166 of 208
ABSTRACT SHEET
Sl.
No
32
ITEM OF WORK
Unit
KSRB 4.9.2: Providing T.M.T Steel reinforcement for R.C.C work including
straightening, cutting, bending, hooking, placing in position, lapping and/ or welding
wherever required, tying with binding wire and anchoring to the adjoining members
wherever necessary complete as per design(laps, hooks and wastage shall not be
measured and paid) cost of materials, labour, HOM of machinery complete as per
specifications. Specification No. KBS 4.6.3. Lift Charges for steel of all diameter for
additional floors over ground floor per floor height of 3.5 m. or apart thereof cost of
labour complete as per specifications. Specification No. KBS. (PWD SR 22013-2014
Bellary Circle Page No. 19, Item No. 4.46)
a
b
c
Ground Floor
First Floor
Terrace Floor
MASONARY WORK
q
q
q
33
KSRB 6-2.3: Providing and constructing burnt brick masonry with approved quality of
non-modular bricks of standard size of class designation 50 (table molded) with cement
mortar 1:6 for basement and superstructure including the cost of materials, labour
charges, scaffolding, cuing etc., complete as per specifications. Specification No. KBS
6.2. (PWD SR 2013-2014 Bellary Circle Page No. 30, Item No. 6.6)
a Ground Floor
Cum
b First Floor
Cum
c Terrace Floor
Cum
34
KSRB 6-7.4: Construction of Partition wall 11.2cms thick with non-modular ground
molded burnt bricks of class designation 50 with cement mortar 1:4 including cost of
material, labour charges, scaffolding, curing complete as per specifications.
Specification No. KBS 6.2. (PWD SR 2013-2014 Bellary Circle Page No. 33, Item No.
6.26)
a
b
c
Ground Floor
First Floor
Terrace Floor
DOORS
Sqm
Sqm
Sqm
35
KSRB 9.4-4 : Providing Sal wood frames of doors, windows, clerestory windows,
ventilators and other frames, wrought, framed or assembled including making plaster
grooves (excluding cost of cement concrete and side clamps), but including cost of all
materials, labour, HOM of machineries complete as per specifications. Specification
No. KBS 9.33. (PWD SR 2013-2014 Bellary Circle Page No. 55, Item No. 9.13)
a
All Floors
Cum
167 of 208
ABSTRACT SHEET
Sl.
No
36
ITEM OF WORK
Unit
Providing and fixing factory made 35mm thick solid core flush door comprising of
commercial ply finish kutty bond wood or equivalent make filled with kiln seasoned
wooden reapers with 6mm thick solid teak wood external lipping around the shutter
affixed by gluing under pressure (machine pressed) shutter fixed with 125mm MS
oxidized heavy duty hinges 4nos., 30cm long powder coated tower bolts 2nos., 150mm
oxidized MS handles 2nos., with one aldrop for locking etc., complete including cost
of material, labour charges HOM of machineries, supply to respective work spot fixing
in position etc., complete. ( As per KREIS Date Rate ).
a All Floors
37
Sqm
Providing and fixing door frame made out of MS angle of size 50x50x6mm on three
sides, 20x20x3mm at bottom, 20x20x3mm hold fasts of 0.23m length on both sides
2nos. Each, 100mm MS hinges 3 nos. with necessary locking arrangements including
one coat of anticorrosive red lead ready-mix priming coat, all labour charges for
cutting, welding, grinding loading and unloading, transportation to work spot etc.,
complete as per specification. ( As per KREIS Date Rate ).
a All Floors
38
Providing and fixing factory made Cladded Door shutter 29mm thick manufactured out
of 25mm thick boiled water proof solid core single leaf composite commercial ply
laminated with 2mm thick PVC sheet on back side and 2mm thick prelaminated PVC
sheet on front side, 10mm thick PVC sheet bottom lipping all round using PVC solvent
cement etc., including cost of material, transportation, including fixtures 150mm
powder coated handles 2nos., 150mm tower bolt 1no., MS aldrop 1 no., with necessary
screws etc., complete as per specification. ( As per KREIS Date Rate ).
a
All Floors
Sqm
168 of 208
ABSTRACT SHEET
Sl.
No
ITEM OF WORK
Unit
KSRB 7.10 : Providing and fixing in position aluminum windows and ventilators as per
approved drawings with sliding shutters using double track window frame section of
size 61.85x31.75mm. with 1.2mm thick, bottom section weight 0.695 kg/m, sides and
top sections 1.3 mm. thick weight 0.659 kg/m; and shutter comprising top and bottom
section of size 40mmx18mm, 1.25mm thick 0.417 kg/m; shutter outer side
40mmx18mm, 1.25mm.thick weight 0.417 kg/m, shutter interlock section
40mmx26.7mm, 1.1mm thick, weight 0.469 kg/m. the shutters mounted on nylon
rollers with approved quality of fixtures such as aluminum handles tower bolts etc.; and
providing and fixing 5.5mm. thick plain glass for shutters fitted with rubber beading
aluminum sections including cutting to required length, joints mitered subdividing the
frame tenonned and riveted in the assembled frame stiffened with end clips at corners
angles etc., and fixed to the walls, lintels, floor beams/cills as the case may be with
necessary steel screws, rail plugs, or teak wood gatties including cutting masonry or
concrete and making good the original surface using cement mortar, using aluminum
sections pretreated for removal of any Specification No. KBS- anodized to 12 - 15
microns. (PWD SR 2013-2014 Bellary Circle Page No. 38, Item No. 7.10.1)
a Ground Floor
b First Floor
c Terrace Floor
40
Sqm
Sqm
Sqm
KSRB 7.8 : Providing and fixing in position in cement concrete 1:3:6 steel glazed
windows and ventilators side hung/top hung 2/3 open able 1/3 fixed as per approved
drawings using Z angles of 25x33x33mm, weighing 1.419kg/m both for inner and outer
frames and center mullion section of size25x46x3mm weighing 2.28kg/m all duty
providing T section 19x19x3mm weighing 0.839kg/for glazing of windows, not more
than 34cms, c to c including providing and fixing 4mm thick reeded glass with teak
wood beading of required size all steel section should confirm to I.S 7452:1990, 4 nos.
of hold fasts of approved size, section should be cut to length welded and grinded
electrically subdividing frames of unit shall be tenonned and riveted into the frames
electrically. All the steel surface shall be thoroughly cleaned free of rust and painted
with one coat of anti-corrosive paint and finishing two coats of ready mix paint of
approved colour and make including cost of materials, fixtures, labour charges and
HOM of machinery complete as per specifications. (PWD SR 2013-2014 Bellary Circle
Page No. 37, Item No. 7.8)
All Floors
MS GRILL
Sqm
169 of 208
ABSTRACT SHEET
Sl.
No
41
ITEM OF WORK
Unit
KSRB 7.9: Providing and fixing M.S. grill work for windows and ventilators weighing
approximately 21 kgs / sqm using M.S. flats or square rods or combination of M.S.
flats and square rods as per approved design, drawing including cutting steel sections
and welding the same to required pattern with a coat of red lead primer, cost of
materials, fixtures, labour and HOM of machinery complete as per specifications.
Specification No. KBS 7.12. (PWD SR 2012-2013 Gulbarga Circle Page No. 37, Item
No. 7.9)
a
b
c
42
Ground Floor
First Floor
Terrace Floor
PLASTERING WORKS
kgs
kgs
kgs
KSRB 15.1.3: Providing ruled pointing to coursed stone masonry with cement mortar
1:3, 20mm deep, after raking joints to depth of 20mm nicely lining, including cost of
materials, labour, curing, etc., complete as per specifications. (PWD SR 2013-2014
Bellary Circle Page No. 120, Item No. 15.3)
a Ground Floor
43
KSRB 15-3.5: Providing 15mm thick cement plaster in single coat with cement mortar
1:4 to brick masonry including rounding off corners wherever required smooth
rendering, : Providing and removing scaffolding, including cost of materials labour
curing complete as per specifications. (PWD SR 2012-2013 Gulbarga Circle Page No.
120, Item No. 15.13)
Sqm
a Ground Floor
b First Floor
c Terrace Floor
44
KSRB 15-3.11: Providing 20 mm thick cement plaster in single coat cement mortar
1:4, to stone masonry and concrete surface including rounding off corners wherever
required smooth rendering, providing and removing scaffolding, including cost of
materials, labour, curing, etc., complete as per specifications. (PWD SR 2013-2014
Bellary Circle Page No. 121, Item No. 15.19)
Sqm
Sqm
Sqm
a Ground Floor
Sqm
b First Floor
Sqm
c Terrace Floor
Sqm
45
KSRB 15-3.14: Providing 12mm thick cement plaster to ceiling, single coat in cement
mortar 1:4, to ceiling including rounding off corners wherever required smooth
rendering, : Providing and removing scaffolding, including cost of materials, labour,
curing, etc., complete as per specification. (PWD SR 2013-2014 BellaryCircle Page
No. 121, Item No. 15.22)
a
b
Ground Floor
First Floor
Sqm
Sqm
170 of 208
ABSTRACT SHEET
Sl.
ITEM OF WORK
Unit
No
c Terrace Floor
Sqm
46
KSRB 15-5.1: Providing rough cement plastering 15mm thick in single coat cement
mortar 1:4, to brick masonry for base of dadoing works with sand of approved quality,
providing and removing scaffolding, including cost of materials, labour, curing, etc.,
complete as per specifications. (PWD SR 2013-2014 Bellary Circle Page No. 122, Item
No. 15.30)
a Ground Floor
Sqm
b First Floor
Sqm
c Terrace Floor
Sqm
47
KSRB 15.8.2 : Providing and fixing plaster mesh 150mm wide manufactured out of hot
galvanized iron of nominal thickness 0.35mm with a zinc costing of 120gms per sqm
width, along route of walls chipped for services junction between RCC and brick walls
including cost of materials, labours for fixing complete as per specification. (length of
mesh only be measured for payment). (PWD SR 2012-2013 Gulbarga Circle Page No.
122, Item No. 15.35)
a All Floors
48
KSRB 15-7: Providing lime rendering for plastering to wall and ceiling , including cost
of materials, labour, curing, complete as per specifications. (PWD SR 2013-2014
Bellary Circle Page No. 122, Item No. 15.33)
a Ground Floor
b First Floor
c Terrace Floor
49
KSRB 4-5: Providing lath plaster with cement mortar 1:3, 5 cms thick with 6mm dia
mild steel bars at 20cms c to c both horizontally and vertically fixing chicken mesh for
drop chejja, fascia, backing of cup boards including cost of all materials, labour,
providing and removing form work HOM of machineries, curing, complete as per
specifications. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No.
16, Item No. 4.27)
Sqm
Sqm
Sqm
a Ground Floor
b First Floor
c Terrace Floor
50
KSRB 4-2.12: Extra for providing throting or drip molding to RCC chajja with
plastering ( labour charges only ) as per specifications. Specification No. KBS. (PWD
SR 2013-2014 Bellary Circle Page No. 16, Item No. 4.21)
Sqm
Sqm
Sqm
a All Floors
51
Providing groves in plastering on walls 25 to 40mm wide and to the required depth as
per design and finished in CM 1: 4 including all labours, materials, scaffolding and
curing etc., complete as directed by PMC/EIC.
171 of 208
ABSTRACT SHEET
Sl.
ITEM OF WORK
Unit
No
a All Floors
m
52 Providing 12mm thick Patti with CM 1:3 to the parapet wall. Providing and removing
scaffolding, including cost of all materials, labour and curing etc., complete as directed
by PMC/EIC
a
All Floors
FLOORING
53
KSRB 14.10-1: Flooring with 25mm to 40mm thick polished tandur blue stone slabs
using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof
laid to line and level and jointed with cement slurry mixed with pigment to match the
shade of the slab, including cost of materials, labour, curing, polishing complete as per
specifications. Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No.
110, Item No. 14.15)
a Ground Floor
b First Floor
c Terrace Floor
54
Sqm
Sqm
Sqm
KSRB 14.14-5: Providing Ceramic tiles of size 30x30 cms of approved make, shade
and size for flooring, treads of steps and landings laid on a bed of 12 mm thick, cement
mortar 1:3 mix, flush pointing with white cement using colour pigment , including cost
of materials, labour, curing, complete as per specifications. Specification No. KBS.
(PWD SR 2013-2014 Bellary Circle Page No. 114, Item No. 14.36.2)
a All Floors
55
Sqm
KSRB 14-17.2: Providing skirting, dado, rises of Steps with colour glazed tiles of size
30 cms x 45 cms 6 mm thick with border of size 30 cms x 10 cms on 10mm thick
cement plaster 1:3 and jointed with white cement slurry over rough plaster surface
(excluding cost of rough plastered surface which should be measured and paid
separately) using glazed tiles of approved make and size including cost of materials,
labour, complete as per specifications. Specification No. KBS 14.16, 14.17. (PWD SR
2013-2014 Bellary Circle Page No. 115, Item No. 14.41.3)
a All Floors
Sqm
56
Providing and laying flooring using prepolished, water cut/gang saw 19mm thick grey
granite laid over existing floor in CM 1:4 at 20mm thick (average) and pointed with
white / grey pigment etc., complete. (PWD SR 2013-2014 Bellary Circle Page No. 116,
Item No. 14.47.1)
a
All Floors
Sqm
172 of 208
ABSTRACT SHEET
Sl.
No
57
ITEM OF WORK
Unit
Providing and laying platform using prepolished, water cut/gang saw 40mm thick
telephonic Black Granite laid on existing vertical supports and fixing in CM 1:3
proportion. including cutting to required shape, pattern with papper joints, including
full rounding for nosing, finished with cement mortar, pointed with colour pigments to
match the colour of slab making through lointing with sealent, making holes 25mm x
12 mm grooves in joints including curing. (PWD SR 2013-2014 Bellary Circle Page
No. 116, Item No. 14.52)
a Ground Floor
b First Floor
c Terrace Floor
58
Providing half nosing for 20mm thick granite slab using required machinery including
cost and conveyance of all materials labour for all items of works HOM of equipment
etc., complete as per specifications. (PWD SR 2013-2014 Bellary Circle Page No. 117,
Item No. 14.56)
Sqm
Sqm
Sqm
a All Floors
59
Providing Vitrified tiles 60 x 60cms of approved make, shade and size for flooring laid
on a bed of 12 mm thick, cement mortar 1:3 mix, flush pointing with white cement
using colour pigment , including cost of materials, labour, curing, complete as per
specifications. (PWD SR 2013-2014 Bellary Circle Page No. 115, Item No. 14.45)
a Ground Floor
b First Floor
c Terrace Floor
60
Sqm
Sqm
Sqm
Providing and laying screed concrete average 50mm thick over roof using cement
concrete of mix M20 with OPC cement @ 300kgs, 20mm and down size graded granite
metal course aggregate @ 0.64cum and fine aggregate @ 0.43 cum with
superplastisiser @ 3ltrs confirming to IS : 9103-1999 reaffirmed-2008 machine mixed
concrete laid in layers not exceeding 15cms thick well compacted by using one kg
water proofing compound per bag of cement, including cost of all materials, labour for
HOM of machinery curing etc., complete as per specifications. ( As per KREIS Data
Rate Sheet )
a All Floors
61
KSRB 10-2: Providing and laying in position yelahanka tiles of size 250x250mm of
approved quality and make, over a bed of cement mortar 1:3 an average thickness
25mm over weather proof course and pointed with cement mortar 1:3 mix with red
oxide including curing cost of material, labour complete as per specification.
Specification No. KBS. (PWD SR 2013-2014 Bellary Circle Page No. 68, Item No.
10.1)
Sqm
Sqm
All Floors
173 of 208
ABSTRACT SHEET
Sl.
No
62
ITEM OF WORK
Unit
KSRB 8.5 : Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder
of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting,
including cost of materials, labour, curing complete as per specifications.
a All Floors
63
Cum
Providing and laying heavy duty cobble stones 80mm thick interlock pavers, using
cement and course sand for manufacture of blocks of approved size, shape and colour
with a minimum compressive strength of 281 kg per sqm over 50mm thick sand bed
(average thickness) and compacting with plate vibrator having 3 tons compaction force
thereby forcing part of sand underneath to come up in between joints, final compaction
of paver surface joints into its final level including cost of materials, labour and HOM
of machineries complete as per specifications.
a
Ground Floor
PAINTING WORKS
Sqm
64
KSRB 15-14.1: Providing and applying painting in two coats with oil bound washable
distemper of approved brand and shade on wall surface including priming coat with
distemper primer after thoroughly brooming the surface free from mortar drops and
other foreign matter including preparing the surface even and sand paper smooth, cost
of materials, labour, complete as per specifications. (PWD SR 2013-2014 Bellary
Circle Page No. 124, Item No. 15.49)
a All Floors
65
KSRB 15-14.2 : Extra over Item 15.14.1 for applying one coat with oil bound washable
distemper on ceiling and / or sloping roof as per specifications. (PWD SR 2012-2013
Gulbarga Circle Page No. 124, Item No. 15.49)
Sqm
a All Floors
Sqm
66
KSRB 15-16.1: Providing and finishing external walls in two coats with waterproof
cement paint of approved brand and shade to give an even shade after thoroughly
brooming the surface to remove all dirt and loose powdered material, free from mortar
drops and other foreign matter including cost of materials, labour, complete as per
specifications - with primer. (PWD SR 2013-2014 Bellary Circle Page No. 125, Item
No. 15.53)
a
b
c
Ground Floor
First Floor
Terrace Floor
Sqm
Sqm
Sqm
174 of 208
ABSTRACT SHEET
Sl.
No
67
ITEM OF WORK
Unit
KSRB 15-17.4: Applying priming coat over new wood surface and / or wood based
surface, after brushing with ready mix enamel priming paint including preparing the
surface after thoroughly cleaning oil, grease, dirt and foreign matter, sand papering and
knotting already mix paint including cost of materials, labour, complete as per
specifications. (PWD SR 2013-2014 Bellary Circle Page No. 126, Item No. 15.58)
a All Floors
68
KSRB 15-17.6: Providing and applying painting two coats (excluding priming coat) on
new wood surface and / or wood based surface with enamel paint to give even shade
cleaning the surface of all dirt, dust and foreign matter, sand papering including cost of
materials, labour, complete as per specifications. (PWD SR 2013-2014 Bellary Circle
Page No. 126, Item No. 15.60)
Sqm
a All Floors
69
KSRB 15-18.2 Providing and applying enamel metal paint two coats (excluding
priming coat) on new steel or other metal surface brushing to give even shade after
cleaning oil, grease, dirt, dust and foreign matter, sand papering including cost of
materials, labour, complete as per specifications. (PWD SR 2013-2014 Bellary Circle
Page No. 128, Item No. 15.74)
Sqm
Sqm
All Floors
SS HAND RAIL
70
Providing and fixing Stainless steel staircase railing as per Chief Architect Drawing
No.11520/HRSC with hand rail 50 mm dia 16 Gauge hollow pipe welded to vertical
hollow 50 mm dia pipe of 16 gauge, stainless steel vertical pipe spaced at 1.20m
regular intervals, and 5 nos of 25 mm dia stainless steel hollow horizontal pipe are
welded to vertical 50mm dia hollow pipe. The entire assembly is fixed to staircase
concrete by using expansion bolts by drilling concrete etc., complete including cost of
materials, labour, HOM of machineries and electrical charges, etc., complete as per
specifications. (PWD SR 2013-2014 Bellary Circle Page No.48, Item No.7.38)
All Floors
Sqm
175 of 208
ABSTRACT SHEET
Sl.
No
71
ITEM OF WORK
Unit
Providing and fixing 304 - grade stainless steel hand rails of 14 - gauge pipes for
Ramps or Staircase are made out of stainless steel hollow pipes using 50mm dia for
verticals @ 1.60mtr c/c are fixed to the ramps or steps by drilling with bolts and
100mm dia base plates 10mm gauge for fixing of Vertical pipes 4nos. anchor bolt and
40mm dia pipes are fixed horizontally for two rows top, one pipes are fixed with
vertical pipes another one fixed with elbows and 25mm dia pipes are fixed horizontally
for 2 rows below top measure @ equal intervals including cutting, welding, bending
wherever necessary with suitable caps @ tops, bottoms and corners finishing with mat /
shining etc., complete including cost and conveyance of all materials, labour for all
items of works, HOM of equipment with all lead and lift, loading and unloading
transportation charges and all other incidental charges etc., complete as per
specifications and directions of the Engineer- In-charge of the work. Ramps or
Staircase for physically challenged. (PWD SR 2013-2014 Bellary Circle Page No. 48,
Item No. 7.39)
a All Floors
Sqm
72
KSRB 10-3: Providing and laying integral cement based waterproofing treatment
including preparation of surface as required for treatment of roofs,balconies,terrace
etc.,consisting of following application.(a)Applying and grouting a slurry coat of neat
cement using 2.75kg/sqm of cement admixed with proprietary water proofing
compound conforming to IS:2645 over the RCC slab after cleaning the surface before
treatment.(b)Laying cement concrete using broken brickbats 25mm to 100mm size with
50% of cement mortar 1:5 admixed with proprietary waterproofing compound
conforming IS:2645 over 20mm thick layer of cement mortar 1:5 admixed with
proprietary waterproofing compound to required slope and treating similarly the
adjoining walls up to 300mm height including rounding off junctions of walls and
slabs.(c)After two day of proper curing, applying a second coat of cement lorry
admixed with proprietary waterproofing compound(d)Finishing the surface with 20mm
thick joint less cement cement mortar of mix 1:4 admixed with proprietary
waterproofing compound and finally finishing the surface with trowel and neat cement
slurry and making of 300x300mm square.(e)The whole terrace so finished shall be
flooded with water for a minimum period of two weeks for curing and for final test
including cost of material, labour complete as per specifications. (PWD SR 2012-2013
Gulbarga Circle Page No. 68, Item No. 10.2)
a
All Floors
WRITING BOARD
Sqm
176 of 208
ABSTRACT SHEET
Sl.
No
73
ITEM OF WORK
Unit
Supplying and fixing P3 grade ceramic steel magnetic writing green board with
vitreous enameled steel top surface board, green colour writing with chalk of 2%
minimum gloss at 60 degree lead of size 8'x4'. The core material of the board is
medium density fiber (MDF) board grade - 1 with 9mm thickness, weighing 750kg per
cubic meter as per IS : 12406-2003 Edition 2.2 with ceramic steel sheet of 0.3 to
0.4mm top and galvanized steel of 0.25mm at back with aluminum frame section, front
20mm side 16mm and thickness 1.20mm weight of the board is 12kg per square meter
(Aprox.) etc., complete as per specifications. ( As per KREIS Data Rate Sheet )
a All Floors
74
Providing and fixing of Pin up board / notice board with 19mm thick MDF board as
base and top fixed with pinup board velvet cloth including providing and fixing of
readymade teak wood beading alround as border etc. complete as directed by PMC /
EIC ( As per KREIS Data Rate Sheet )
No
Sqm
75
All Floors
LOGO
Creating LOGO of KREIS and name of the school in cement plastering work on the
plastered surface including painting with two coats of enamel over a coat of wall
primer including cost of providing and removing of scaffolding, form work, material,
labour complete as directed by PMC/EIC
a All Floors
76
Providing and fixing Flag post. including excavation, brick masonry, plastering
painting and ms pipe with one coat rust proof paint complete as per directions of
PMC / EIC ( As per KREIS Data Rate Sheet )
Sqm
Sqm
All Floors
Over head Tank amount
ADD FOR ROUNDING OFF, MISCALLANEOUS & UNFORSEEN
Total Amount
Total Built up Area 962.13 Sqm x 10.76 = 10,356.37 Sq Ft
Cost Per Sq Ft
177 of 208
791.100
Rate
(in Rs.)
4.94
Amount
(in Rs.)
3,908.03
237.330
152.25
36,133.49
67.491
219.45
14,811.00
R.O
204.03
178 of 208
Rate
(in Rs.)
Amount
(in Rs.)
472.440
682.50
322,440.52
134.983
978.60
132,094.31
67.491
98.60
6,654.66
987.570
196.35
193,909.34
844.753
36.15
30,537.83
2.76
179 of 208
Rate
(in Rs.)
Amount
(in Rs.)
618.000
101.85
62,943.30
180 of 208
Rate
(in Rs.)
Amount
(in Rs.)
-
135.027
4,171.65
563,285.80
16.795
6.515
2.517
4,470.90
4,523.40
4,575.90
75,088.14
29,471.94
11,519.14
-
33.291
3,161.55
105,251.16
33.271
4,003.65
133,204.44
-
181 of 208
Rate
(in Rs.)
Amount
(in Rs.)
465.320
29.440
1.533
5,211.15
5,263.65
5,316.15
2,424,851.79
154,961.86
8,148.17
#REF!
#VALUE!
2.708
5,211.15
5,263.65
5,316.15
#REF!
#VALUE!
14,393.80
27.540
30.780
0.720
384.30
387.45
390.60
10,583.62
11,925.71
281.23
-
182 of 208
Rate
(in Rs.)
Amount
(in Rs.)
-
198.45
10.240
27.160
603.75
589.05
592.20
6,182.40
15,998.60
-
10.800
424.20
427.35
430.50
4,581.36
-
183 of 208
Rate
(in Rs.)
Amount
(in Rs.)
445.20
448.35
451.50
368.55
388.390
213.15
82,785.33
#REF!
#VALUE!
18.050
274.05
277.20
280.35
#REF!
#VALUE!
5,060.43
#REF!
228.240
-
326.55
329.70
332.85
#REF!
75,250.73
-
184 of 208
Rate
(in Rs.)
711.90
Amount
(in Rs.)
#REF!
619.189
237.808
-
237.30
240.45
243.60
146,933.50
57,180.93
-
1,216.025
163.349
22.068
559.65
562.80
565.95
680,548.45
91,932.54
12,489.38
27.540
30.780
0.720
234.15
237.30
240.45
6,448.49
7,304.09
173.12
11.650
11.650
-
417.90
421.05
424.20
4,868.47
4,905.17
-
185 of 208
Rate
(in Rs.)
Amount
(in Rs.)
250.909
183.922
7.302
7,238.70
7,275.77
7,275.77
1,816,253.82
1,338,176.46
53,129.84
-
232.640
144.530
#REF!
4,692.45
4,718.70
4,744.95
1,091,653.88
681,993.81
#REF!
#REF!
29.457
26.820
630.00
632.63
635.25
#REF!
18,635.38
17,037.41
-
0.972
49,939.05
48,522.03
186 of 208
Rate
(in Rs.)
Amount
(in Rs.)
49.140
3,097.50
152,211.15
44.550
456.75
20,348.21
14.175
3,528.00
50,009.40
187 of 208
Rate
(in Rs.)
Amount
(in Rs.)
-
54.180
60.255
-
3,004.05
3,006.68
3,009.30
162,759.43
181,167.50
-
44.280
2,739.45
121,302.85
-
188 of 208
Rate
(in Rs.)
Amount
(in Rs.)
1,137.780
1,265.355
-
91.46
94.08
96.71
104,061.36
119,044.60
-
73.935
68.67
5,077.12
2,188.106
#REF!
34.331
134.40
138.08
141.75
294,081.38
#REF!
4,866.39
352.731
278.386
311.569
170.10
173.78
177.45
59,999.54
48,377.95
55,287.83
#REF!
#VALUE!
128.10
131.78
#REF!
#VALUE!
189 of 208
Rate
(in Rs.)
135.45
Amount
(in Rs.)
2,444.93
526.725
-
128.10
131.78
135.45
67,473.47
-
2,215.520
32.13
71,184.66
-
#REF!
#REF!
52.381
16.61
20.29
23.96
#REF!
#REF!
1,255.05
35.760
35.760
-
795.90
799.58
803.25
28,461.38
28,592.98
-
156.000
13.52
2,109.12
-
190 of 208
Rate
(in Rs.)
39.74
Amount
(in Rs.)
17,430.95
-
113.230
39.74
4,499.19
-
100.125
#VALUE!
-
831.60
833.18
834.75
83,263.95
#VALUE!
-
225.000
760.20
171,044.81
526.725
1,199.10
631,595.95
#REF!
1,812.30
#REF!
191 of 208
Rate
(in Rs.)
Amount
(in Rs.)
6.378
-
2,322.60
2,324.18
2,325.75
14,813.54
-
#REF!
123.90
#REF!
#REF!
-
998.55
998.55
998.55
#REF!
-
546.927
241.13
131,880.45
546.927
699.30
382,465.88
192 of 208
Rate
(in Rs.)
Amount
(in Rs.)
-
1,561.35
73.641
863.10
63,559.50
-
#REF!
52.37
#REF!
-
#REF!
3.29
#REF!
352.731
278.386
311.569
65.10
66.68
68.25
22,962.79
18,562.79
21,264.55
193 of 208
Rate
(in Rs.)
Amount
(in Rs.)
36.540
24.05
878.79
36.540
74.52
2,722.96
158.715
72.58
11,519.53
-
16.100
5,508.30
88,681.92
194 of 208
Rate
(in Rs.)
Amount
(in Rs.)
7.500
5,508.30
41,312.25
662.55
195 of 208
Rate
(in Rs.)
Amount
(in Rs.)
10.000
12,915.00
129,150.00
2.520
2,100.00
5,292.00
-
7.700
519.75
4,002.08
-
7.700
26,250.00
202,125.00
200,000.00
#REF!
#REF!
10,356.37
#REF!
196 of 208
PARTICULARS
ACADEMIC BLOCK
PRINCIPAL QUARTERS
GRAND TOTAL
197 of 208
#REF!
#REF!
198 of 208
Sl. No
Ref.
Sl. No
Sl. No as
per KSRB
1
2
3
4
5
6
7
8
9
10
11
12
4.1.2
13
4.1.7
14
15
16
12
4.2.2
17
13
4.2.8
18
14
4.2.10
22
15
4.6.1
23
16
4.6.2
24
17
4.6.5
25
18
4.6.6
26
19
4.6.7
27
20
4.6.9
28
21
4.6.10
29
22
4.6.11
30
24
4.9.2
19
20
21
31
Ref.
Sl. No
25
Sl. No as
per KSRB
6.2.3
32
26
6.7.4
33
29
9.4.4
Sl. No
34
35
30
36
32
37
7.10
38
33
7.8
39
34
7.9
40
43
15.3.11
41
42
15.3.5
42
43
15.3.11
43
44
15.3.14
44
45
15.5.1
45
46
15.8.2
46
48
15.7
47
48
4.5
47
4.2.12
49
50
64
51
37
14.10.1
52
38
14.14.5
53
39
14.7.2
54
40
55
40
56
41
57
58
59
56
10.2
60
49
15.14.1
61
50
15.14.2
62
Ref.
Sl. No
51
Sl. No as
per KSRB
15.16.1
63
52
15.17.4
64
53
15.17.6
65
54
15.18.2
66
63
67
55
Sl. No
68
69
70
10.3
Short Description
Clearing Clearing and grubbing
surface excavation
excavation for foundation not exceeding 1.50m in depth (20% of Total Excavation Qty)
excavation for foundation from 1.50m to 3.0m in depth (R.O)
Excavation in soft rock not exceeding 1.5m in depth (80% of Total Excavation Qty)
Excavation in Hard rock (R.O)
Filling available excavated earth
Filling Barrowed excavated earth
Removal of unserviceable soil
lead is more than 60m up to 500m by any means of conveyance
Anti-Termite Treatment
40mm PCC : Footing Bed, SSM Bed, Flooring Bed
20mm PCC : Cill, Coping in SSM, Coping In Parapet wall, Dummy Column
size stone masonry foundation
size stone masonry basement
M20 : Footing, Column upto plinth, Column above plinth, Plinth Beam, Lintel
M20 : Roof Beam, Roof Slab, Staircase
M20 : Chajja
Extra for use of water proofing compound in Cement concrete of mix M20
RCC slabs 5cms thick : Loft, Atta (as per Dwg)
7.5cms thick solid parapet
Shuttering Upto Plinth
Roof Slab
Column
Circular Column
Beam
Edges of Slabs, Cills, Lintel, Coping
Chajja Bottom
Staircase
Short Description
BBM or Laterite Block Masonry
BBM 115 or Laterite Block Masonry
Sal wood frames : ED, D, D1
35mm thick solid core flush door : ED, D, D1
door frame made out of MS angle : D2 (Toilet Door)
25mm thick boiled water proof Door shutter : D2 (Toilet Door)
aluminum windows : W, W1, W2, SW
Z angles : V, V1, V2
M.S. grill work for windows : W, W1, W2, SW
Ruled Pointing
Internal plastering
External plastering
Ceiling plastering, Chajja
rough plastering : Toilet, Kitchen, Bath
plaster mesh : RCC & Wall Junction
lime rendering : Internal plastering, Ceiling plastering
lath plaster
drip molding Chajja
Groves in External plastering : Surrounding Building Window Top & Bottom level
12mm thick Patti : Portico & Corridor parapet wall, Ventilator, window where chajja not came
25mm to 40mm thick polished tandur blue stone slabs : Entrance Steps, Landing & staircase
Ceramic tiles of size 30x30 : Toilet, Bath, Kitchen 2.1-.075=1.35-window
skirting, dado, rises of Steps with colour glazed tiles : Toilet, Bath
19mm thick grey granite : Wash Basin
40mm thick telephonic Black Granite : Kitchen Platform
half nosing : Steps & Landing in staircase & Entrance in Grey granite
Vitrified tiles 60 x 60 : Office, Staff & Principae room, All rooms in Quarters
screed concrete : For Terrace, as a base of Yelahanka tiles, Balcony
Yelahanka tiles for Terrace, Portico
oil bound washable distemper : Internal plastering, Ceiling plastering
Extra oil bound distemper on ceiling : Ceiling plastering
Short Description
external walls waterproof cement paint : External plastering
priming coat over wood surface : ED, D, D1
painting on wood surface : ED, D, D1
enamel metal paint : W, W1, W2, SW, Grill, V (Z angle)
Stainless steel staircase railing : Staircase
stainless steel hand rails for Ramps : Ramp, Staircase
waterproofing treatment : roofs,balconies,terrace etc
P3 grade ceramic steel magnetic writing green board
LOGO of KREIS
Obs.
No
Observation
Obs.
Observation Aca kit BH
No
GH TS TS2 NTS