Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
A B S T R A C T
SR. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
PARTICULAR
From
Page
To Page
[Chapter -Abs](Page-1)
BASIC RATES for Year 2013-14 SOR (PMGSY WORKS), Gujarat State
(Panchayat R&B Circle-2, Rajkot)
(A) Labour
Sl. No.
Description of Labour
Unit
Rate
L-01
L-02
L-03
L-04
L-05
L-06
L-07
L-08
L-09
L-10
L-11
L-12
L-13
L-14
L-15
L-16
L-17
L-18
L-19
L-20
L-21
Bhisti
Bitumen Sprayer
Blacksmith
Blaster
Carpenter 1st Class
Chips spreader
Chiseller
Dresser (Skilled)
Driller
Electrician
Fitter
Mason (1st class)
Mason (2nd Class)
Mate
Mazdoor (Unskilled)
Mazdoor (Semi skilled)
Mazdoor (Skilled)
Painter (Ist class)
Plumber
Surveyor
White Washer
PanchayatR B Circle-2,Rajkot
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
196.30
199.90
207.80
194.50
207.80
194.50
194.50
194.50
194.50
196.30
196.30
207.80
199.90
194.50
194.50
196.30
199.90
199.90
207.80
207.80
196.30
[Chapter -Labour](Page-1)
BASIC RATES for Year 2013-14 SOR (PMGSY WORKS), Gujarat State
(Panchayat R&B Circle-2, Rajkot)
(B) USAGE RATES OF PLANT & MACHINERY
Description of
Sr. No.
Machine
Output of Machine
Activity
Unit
Output
PM-001
Supplying compressed
air
cfm
PM-002
t/h
PM-003
t/h
PM-004
litre / h
litre / h
sqm/h
cum/h
cum/h
cum/h
Electricity generation
KVA
PM-010
PM-011
Spraying of Emulsion
Loading Aggregates
Loading Soil
Surface cleaning
Excavation
cum/h
cum/h
sqm/h
cum/h
per hour
45.00
per hour
100.00
1250.00 per hour
100.00 per hour
Surface Dressing
sqm/h
cum/h
PM-015
PM-016
PM-017
PM-018
Motor Grader
PM-019
Needle vibrator
PM-020
PM-021
PM-022
PM-023
Paver finisher
Plate compactor
Plate vibrator
Screed vibrator
Smooth wheeled 80-100 kN
tandem roller
Stone crusher (Integrated) of 200
TPH
Three wheel 80-100 kN Static
Roller
PM-024
PM-025
PM-026
9,000.00
7,150.00
Input Rate
Heating of bitumen
PM-014
300.00
PM-009
PM-012
PM-013
Rate
05. to 1
per hour
Cutting of Joints
per hour
Mixing of bituminous
materials
t/h
cum/h
200.00
per hour
50.00
cum/h
t/h
cum/h
cum/h
cum/h
cum/h
t/h
Vibrating cement
concrete mix
Laying/spreading
Compaction
Compaction
Compaction
Compaction of Subbase/ Asphalt
Crushing of Spalls
Compaction/ Rolling
Earth:- Embankment
or sub-grade
Sub-base G-I
Sub-base G-II/G-III
WMM
BUSG
BM 50/75 mm
Premix 20 mm
Seal Coat
PanchayatR B Circle-2,Rajkot
per hour
cum/h
cum/h
cum/h
cum/h
cum/h
cum/h
sqm/h
sqm/h
80/70
10.00
8.00
16.00
10.00
12.00
250.00
500.00
128.00
160.00
840.00
190.00
1,080.20
2,100.00
1,814.00
700.00
700.00
764.00
675.00
300.00
1,400.00
2,100.00
325.00
150.00
1,036.20
2,100.00
1,600.00
60.00
1,200.00
310.00
400.00
310.00
400.00
14,200.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
Description of
Sr. No.
PM-027
PM-028
PM-029
Machine
PM-030
PM-031
PM-032
PM-033
PM-034
PM-035
Output of Machine
Activity
Surface Dressing 1st
Coat
Surface Dressing
2ndCoat
Carriage
Pulverisation of soil
Ripping Pavements,
uprooting trees
Transportation of
materials
Scarifier
Carriage
Compaction of soil
WMM
Compaction of BM
Unit
Output
sqm/h
400.00
sqm/h
500.00
400.00
400.00
cum/trip
cum/h
cum/h
t/trip
cum/h
cum/trip
3 to 5
per hour
cum/h
100.00
cum/h
60.00
per hour
Carriage of water
litre / h
Wet Mix
cum/h
PanchayatR B Circle-2,Rajkot
Rate
250.00
300.00
300.00
300.00
300.00
300.00
1,200.00
1,200.00
300.00
1,000.00
Sr. No.
M-001
M-002
M-003
M-004
M-005
M-006
M-007
M-008
M-009
M-010
M-011
M-012
M-013
M-014
M-015
M-016
M-017
M-018
M-019
M-020
M-021
M-022
M-023
M-024
M-025
M-025
M-026
M-027
M-028
M-028
M-029
M-028
M-029
M-030
M-031
M-032
M-033
M-034
M-035
M-036
M-037
Description
Unit
AC pipe 100 mm
Aggregate - For 37.5 mm Maximum size - 22.4 mm to 5.6 mm
Aggregate - For 37.5 mm Maximum size - 45 mm to 22.5 mm
Aggregate - For 37.5 mm Maximum size - Below 5.6 mm
Aggregate - For 53 mm Maximum size - 22.5 mm to 5.6 mm
Aggregate - For 53 mm Maximum size - 63 mm to 45 mm
Aggregate - For 53 mm Maximum size - Below 5.6 mm
Aggregate - Grading I (40 mm nominal Size) 10 mm - 5 mm
Aggregate - Grading I (40 mm nominal Size) 25 mm 10 mm
Aggregate - Grading I (40 mm nominal Size) 37.25 mm - 25 mm
Aggregate - Grading I (40 mm nominal Size) 5 mm and below
Aggregate - Grading II (19 mm nominal Size) 10 mm - 5 mm
Aggregate - Grading II (19 mm nominal Size) 25 mm 10 mm
Aggregate - Grading II (19 mm nominal Size) 5 mm and below
Aggregate 10 mm
Aggregate 20 mm
Aggregate 40 mm
Aggregate- Crushable type such as moorum or Gravel for Grading I
Aggregate- Crushable type such as moorum or Gravel for Grading II
Aggregate- Crushable type such as moorum or Gravel for Grading III
Aggregate-Grading I 90 mm to 45 mm
Aggregate-Grading II 63 mm to 45 mm
Aggregate-Grading III 53 mm to 22.4 mm
Aggregates 22.4 mm to 2.36 mm for wet mix macadam
Aggregates 45 mm to 22.4 mm for wet mix macadam
Aluminium sheeting (1.5 mm thick)
*
Bamboo (1st Class) 85 mm - 100 mm dia, 2.5 m long *
Bamboo (1st Class) 85 mm - 100 mm dia, 3.0 m long *
Bamboo (1st Class) 85 mm - 100 mm dia, 2.0 m long
*
Bamboo (2nd Class) 75mm dia, 2.1 m - 3.0 m long*
Bamboo (2nd Class) 75mm dia, 1.8 m - 2.5 m long
Barbed wire
Binding Material
Binding wire
Bitumen (Crumb Rubber Modified)
Bitumen (Natural Rubber Modified)
Bitumen (Polymer Modified)
Bitumen (S-65)
Bitumen (S-90)
PanchayatR B Circle-2,Rajkot
m
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
sqm
Rate as on
23/10/13
42.70
525.00
525.00
365.00
525.00
380.00
365.00
365.00
745.28
793.28
365.00
442.05
440.00
442.05
597.05
627.05
502.05
120.00
120.00
120.00
467.05
390.00
470.00
457.50
470.00
3680.00
Nos.
230.00
No.
37.00
No.
42.00
No.
50.00
No.
100.00
No.
25.00
No.
45.00
kg
cum
kg
tonne
tonne
tonne
t
t
75.00
85.00
58.00
48775.00
49,565.0
48,775.0
44,966.0
44,543.8
t
t
litre
36,696.8
cum
kg
No.
No.
t
litre
185.00
34,096.8
70.00
60.00
34.90
4.69
7,670.20
110.00
35.00
[Chapter -Material](Page-2)
Sr. No.
Description
M-048
M-049
M-050
M-051
Unit
Copper plate
M-052
M-063
M-064
M-065
M-066
M-067
M-068
M-069
M-070
M-071
M-072
M-073
M-074
M-075
M-076
M-077
M-078
M-079
M-080
M-081
M-082
M-083
M-084
M-085
M-086
M-087
M-088
M-089
M-090
M-091
M-092
M-093
M-094
M-095
M-096
M-097
M-098
M-099
PMGSY SOR 13-14
*
Debonding strips *
Curing compound
*
Edge Stone (450 mm x 350 mm x 200 mm) *
Elastomeric bearing assembly *
Edge Stone (450 mm x 350 mm x 100 mm)
Electric Detonator*
Epoxy Paint*
Epoxy Primer*
Farmyard manure*
Fevicol adhesive*
Filter media
Fine aggregate/Crushed sand 2.36 mm to 75 micron
Galvanised angle*
Rate as on
23/10/13
cum
17.50
sqm
358.00
kg
390.00
No.
68.00
kg
60.00
cum
hour
cum
cum
185.00
8.00
376.81
330.00
cum
cum
cum
457.50
cum
365.00
cum
cum
440.00
litre
550.00
535.00
365.00
378.00
6.00
No.
66.00
No.
72.00
Nos.
38500.00
each
litre
litre
cum
kg
cum
cum
kg
kg
kg
m
m
kg
cum
cum
cum
kg
sqm
sqm
sqm
sqm
m
cum
t
t
No.
cum
cum
Nos.
t
kg
sqm
35.00
450.00
300.00
295.00
165.00
948.89
230.00
94.00
94.00
144.00
794.00
410.00
92.00
446.81
201.89
270.00
190.00
201.00
297.00
363.00
30.00
50.00
457.50
2000.00
2,750.00
6,545.00
25,000.0
185.00
45.00
50,600.6
75.20
690.00
[Chapter -Material](Page-3)
Sr. No.
M-100
M-101
M-102
M-103
M-104
M-105
M-106
M-107
M-108
M-109
M-110
M-111
M-112
M-113
M-114
M-115
M-116
M-117
M-118
M-119
M-120
M-121
M-122
M-123
M-124
M-125
M-126
M-127
M-128
M-129
M-130
M-131
M-132
M-133
M-134
M-135
M-136
M-137
M-138
M-139
M-140
M-141
M-142
M-143
M-144
M-145
M-146
M-147
M-148
M-149
M-150
M-151
M-152
M-153
M-154
M-155
M-156
M-157
Description
2
MS Sheet 2 mm thick
Nuts, Bolts and Rivets
Paint (Synthetic Enamel)
Plasticizer*
Polythene sheet (125 micron)*
Polythene Sheething*
Quarried Stone 150-200 mm size
RCC Pipe NP3 (1200 mm dia)*
RCC Pipe NP3 (1000 mm dia)*
RCC Pipe NP3 (750 mm dia)*
RCC Pipe NP3 (600 mm dia)*
RCC Pipe NP3 (500 mm dia)*
RCC Pipe NP4 (1200 mm dia)*
RCC Pipe NP4 (1000 mm dia)*
RCC Pipe NP4 (750 mm dia)*
RCC Pipe NP4 (600 mm dia)*
RCC Pipe NP4 (500 mm dia)*
Red-oxide Primer
Road marking paint*
Sand (Coarse)
Sand (Fine)
Seeds*
Steel Pipe 50 mm dia*
Steel Reinforcement (HYSD Bars)
Steel Reinforcement (MS Round Bars)
Steel Reinforcement (TMT Bars)
Stone Boulder of size 150 mm and below
Stone Chips 12 mm size
Stone Chips 13.2 mm to 5.6 mm*
Stone Crushed Aggregate 11.2 mm to 0.09 mm
Stone for Coarse Rubble Masonry 1st Sort
Stone for Coarse Rubble Masonry 2nd Sort
Stone for Random Rubble Masonry
Stone for Stone Set Pavement (300 mm x 200 mm x 150 mm)
Stone Screening - Type A 13.2 mm for Grading-1
Stone Screening - Type A 13.2 mm for Grading-2
Stone Screening - Type B 11.2 mm for Grading-2
Stone Screening - Type B 11.2 mm for Grading-3
Stone spall
Traffic cones *
Water*
PanchayatR B Circle-2,Rajkot
Unit
3
sqm
t
litre
litre
sqm
Nos.
cum
m
m
m
m
m
m
m
m
m
m
litre
litre
cum
cum
kg
m
t
t
t
cum
cum
cum
cum
cum
cum
cum
No.
cum
cum
cum
cum
cum
No.
kl
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
No.
Rate as on
23/10/13
920.00
71,500.0
210.00
81.00
17.00
4.00
339.73
4180.00
3,923.29
2,126.18
1,265.00
990.00
7,590.00
6,235.00
3,970.00
3,770.00
2,720.00
100.00
205.00
332.31
312.31
8.25
360.00
44,200.6
42,200.6
48,200.6
185.00
550.00
402.50
295.00
339.73
185.00
195.00
195.00
390.00
390.00
390.00
470.00
274.73
850.00
16.00
150.00
395.00
407.50
150.00
395.00
150.00
365.00
150.00
377.50
365.00
150.00
395.00
365.00
150.00
150.00
365.00
85.00
[Chapter -Material](Page-4)
Chapter-1
1.1
1.4
1.5
1.6
Rate
(Rs.)
4
cum
51.37
cum
25.68
(iii)
cum
25.68
(iv)
cum
13.65
(ii)
1.3
Unit
1.2
Description
cum
27.86
(ii)
cum
13.96
(iii)
cum
4.09
1000 Nos.
84.13
(ii)
Unloading and Stacking of Bricks by manual means including a lead upto 30 1000 Nos.
m
84.13
67.88
(ii)
67.88
74.67
(ii)
74.67
t
t
78.51
69.54
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-7)
Item
No.
1
1.7
1.8
113.01
(ii)
113.01
cum
174.80
cum
174.80
(ii)
A.
1000/1200 mm dia RCC Hume pipes
B.
750 mm dia Hume pipe
C.
600/450 mm dia Hume pipe
Unloading of RCC Hume pipes by mechanical means including a lead upto
(iii)
30 m
A.
1000/1200 mm dia Hume pipe
B.
750 mm dia Hume pipe
C.
600/450 mm dia Hume pipe
Haulage excluding Loading & Unloading
Haulage of materials by tipper excluding cost of loading, unloading and stacking.
Case-I : Surfaced Road
Case-II: Unsurfaced Gravel Road
Case-III: Katcha Track and Track in River Bed/Nallah Bed and Choe Bed
1.11
1.12
Rate
(Rs.)
4
(i)
(ii)
1.10
Unit
(i)
1.9
Description
per pipe
per pipe
per pipe
69.58
41.75
29.82
per pipe
per pipe
per pipe
222.36
185.30
138.98
per pipe
per pipe
per pipe
47.15
28.29
20.21
t.km
t.km
t.km
1.94
2.33
4.70
cum
693.49
(ii)
cum
761.76
(iii)
cum
830.03
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-8)
Item
No.
1
1.13
Description
Unit
cum
328.10
cum
336.20
cum
418.30
cum
440.31
hectare
9,102.60
hectare
hectare
34,472.25
46,188.00
hectare
hectare
24,872.76
30,221.64
Crushing of Stone Aggregates 100 per cent passing through 22.4 mm sieve
as per Table 500.6 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of
200 t/h capacity comprising of primary and secondary crushing units, belt conveyor
and vibrating screens to obtain stone aggregates 100 per cent passing through 22.4
mm sieve as per Table 500.6 of Technical Specifications including the cost of stone.
1.14
1.15
1.16
Setting Out
Chapter-2
2.1
2.2
SITE CLEARANCE
By Manual Means
Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees
cut earlier and disposal of unserviceable materials and stacking of serviceable
material to be used or auctioned, upto a lead of 1000 m including removal and
disposal of top organic soil not exceeding 150 mm in thickness as per Technical
Specification Clause 201.
By Manual Means
(A)
In area of non-thorny jungle
(B)
In area of thorny jungle
By Mechanical Means
(II)
(A)
In area of non-thorny jungle
(B)
In area of thorny jungle
Cutting of Trees including Cutting of Trunks, Branches and Removal of
Stumps
(I)
2.3
Rate
(Rs.)
4
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-9)
Item
No.
1
Description
Unit
Rate
(Rs.)
4
Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots, refilling, compaction of backfilling and stacking of serviceable material by
manual means with all lifts as per Technical Specification Clause 201.
A.
2.4
2.5
2.6
By Manual Means
(A)
Lime Concrete
(B)
Cement Concrete
(C)
Reinforced Cement Concrete
(II)
By Mechanical Means
(A)
Cement Concrete
(B)
Reinforced Cement Concrete
Dismantling Brick/Tile Work
Dismantling of existing structures like culverts, bridges, retaining walls and other
structures comprising of brick masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and lead of 1000 m as per Technical
Specification Clause 202.
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
each
each
each
each
each
each
160.16
275.68
549.63
1,052.01
2,158.02
6,364.13
each
each
each
each
each
each
170.29
306.06
590.13
1,112.76
2,225.52
6,532.88
each
each
each
each
each
each
97.10
153.41
326.24
643.24
1,296.60
3,666.60
each
each
each
each
each
each
99.46
161.85
336.37
656.74
1,313.47
3,750.98
cum
cum
cum
254.95
300.47
732.33
cum
cum
388.03
625.20
[SOR Summary](Page-10)
Item
No.
1
Description
Unit
3
cum
cum
cum
cum
163.93
209.44
145.72
136.62
cum
cum
cum
cum
cum
cum
182.13
209.44
163.93
154.82
145.72
163.93
2.8
Dismantling Wood Work Wrought and Planed Fixed in Frames of Trusses upto a
height of 5 m above Plinth Level as per Technical Specification Clause 202.
cum
341.46
2.9
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth
Level excluding Cutting of rivet as per Technical Specification Clause 202.
2.7
(A)
Lime mortar
(B)
Cement mortar
(C)
Mud Mortar
(D)
Dry Brick Pitching or Brick Soling
Dismantling Stone Masonry as per Technical Specification Clause 202.
Rate
(Rs.)
4
Dismantling of existing structures like culverts, bridges, retaining walls and other
structure comprising of stone masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and lead of 1000 m as per Technical
Specification Clause 202.
(A)
(B)
(C)
(D)
(E)
(F)
2.10
2.11
2.12
2.13
2.14
Including dismembering
(A)
t
(B)
Excluding dismembering
t
(C)
Extra over Items (A) and (B) for cutting rivets
t
Scraping of bricks dismantled from brick work including stacking as per Technical 1000 Nos.
Specification Clause 202.
Scraping of Stone from Dismantled Stone Masonry as per Technical Specification
Clause 202.
In Cement or Lime Mortar
Scraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as per
Technical Specification Clause 202.
cum
sqm
319.47
10.18
m
m
m
118.16
159.73
273.52
cum
cum
469.60
338.94
cum
199.29
Removing all types of Hume pipes and stacking within a lead of 1000 m including
Earthwork and Dismantling of Masonry Works as per Technical Specification Clause
202.
Upto 600 mm dia Hume pipe
(A)
(B)
Above 600 mm to 900 mm dia Hume pipe
(C)
Above 900 mm dia Hume pipe
Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials upto a lead
of 100 m, stacking serviceable and unserviceable materials separately as per
Technical Specification Clause 202
(I)
2.15
886.85
646.58
6.10
796.48
By Manual Means
(A)
Bituminous Courses
(B)
Granular Courses
(II)
By Mechanical Means
(A)
Bituminous Courses
Dismantling of Cement Concrete Pavements as per Technical Specification
Clause 202.
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-11)
Item
No.
1
Description
Unit
cum
2.16
2.17
2.18
2.19
2.20
2.21
5th km Stone
(A)
m
Ordinary km Stones
(B)
m
200 m Stones
(C)
m
Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing including posts, foundation running m
concrete, backfilling of pit by manual means including disposal of dismantled
material with all lifts and upto a lead of 1000 m, stacking serviceable material and
unserviceable material separately as per Technical Specification Clause 202.
Dismantling of CI Water Pipe Line
Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and lead running m
upto 1000 m and stacking of serviceable material and unserviceable material
separately under supervision of concerned department as per Technical Specification
Clause 202.
2.22
2.23
Chapter-3
3.1
each
Rate
(Rs.)
4
867.64
51.01
10.16
15.38
221.30
139.10
29.51
30.51
120.77
127.10
108.04
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-12)
Item
No.
1
3.2
3.3
Description
Unit
sqm
14.17
sqm
5.71
cum
39.30
cum
142.07
Excavation for roadway in soil using manual means for carrying of cut earth
to embankment site with a lift upto 1.5 m and lead upto 50 m as per
Technical Specification Clause 302.3
Excavation in Soil with Dozer with lead upto 100 m
cum
85.34
cum
49.78
cum
27.56
cum
36.30
cum
27.56
3.4
3.5
(i)
(ii)
(iii)
3.6
3.7
3.8
Rate
(Rs.)
4
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-13)
Item
No.
1
Description
Unit
3
cum
132.75
cum
53.57
cum
52.87
cum
161.86
cum
cum
525.89
267.35
cum
316.57
Stripping, storing and preservation of top soil by keeping it damp in stock piles and
keep wet till it is used by road side at 15 m internal and re-application on
embankment slopes, cut slopes and other areas in localities where the available
embankment material is not conducive to plant growth as per Technical
Specification Clause 302.3.2
Stripping, Storing and Relaying Top Soil from Borrow Areas in Agricultural
Fields
cum
244.28
(iii)
3.9
(i)
(ii)
(iii)
3.10
3.11
Rate
(Rs.)
4
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-14)
Item
No.
1
Description
Unit
Stripping of top soil from borrow areas located in agriculture fields, storing at a
suitable place, spreading and relaying after taking the borrow earth to maintain
fertility of the agricultural field, finishing it to the required levels to the satisfaction of
the farmer/land owner as per Technical Specification Clause 302.3.2.
cum
123.11
sqm
37.53
sqm
85.01
cum
132.33
cum
12.73
cum
40.95
sqm
1.10
sqm
270.31
cum
125.92
3.12
3.13
3.14
3.15
3.16
3.17
3.18
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
4
[SOR Summary](Page-15)
Item
No.
1
3.19
3.20
(i)
Rate
(Rs.)
4
45.51
11.99
m
m
68.27
27.13
(i)
For Grading I Material
(ii)
For Grading II Material
(iii)
For Grading III Material
Plant Mix Method
Construction of granular sub-base by providing well graded material,
mixing in a mechanical mix plant at OMC, carriage of mixed material to
work site upto lead of 1000 m spreading in uniform layers with motor
grader on prepared surface and compacting with smooth wheel roller to
achieve the desired density, complete as per Technical Specification Clause
401
(i)
For Grading I Material
(ii)
For Grading II Material
(iii)
For Grading III Material
Gravel/Soil-Aggregate Base (Table 400.2) Grading A
cum
cum
cum
564.20
538.27
446.13
cum
cum
cum
639.84
616.10
490.90
cum
625.34
Chapter-4
(B)
4.2
Unit
(A)
Manual Means
(B)
Mechanical Means
Surface Drains in Ordinary Rock
(ii)
Construction of unlined surface drain of average cross-sectional area 0.4
sqm in ordinary rock to specified lines, grades, levels and dimensions as per
approved design and Technical Specification Clause 307. Excavated
material to be used in embankment at site.
(A)
Manual Means
(B)
Mechanical Means
(iii)
Surface Drains in Hard Rock
Chute Drains
A.
Providing chute drains across embankment slopes in approches of bridges
and on horizontal curves as per drawings.
B.
4.1
Description
i)
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-16)
Item
No.
1
Description
Unit
4.3
4.4
Rate
(Rs.)
4
cum
601.40
cum
542.39
cum
325.29
cum
cum
148.92
160.22
cum
280.64
cum
727.17
cum
cum
995.91
894.61
4.5
4.6
4.7
By Manual Means
(A)
(B)
By Mechanical Means
Lime Treated Soil for Sub-Base
Providing, laying and spreading soil on a prepared sub-grade, pulverising, mixing the
spread soil in place with rotavator with 4 per cent slaked lime with minimum content
of 70 per cent of CaO, grading with motor grader and compacting with the road
roller at OMC to achieve atleast 98 per cent of the max dry density to form a layer
of sub-base as per Technical Specification Clause 403.
Cement Treated Soil Sub-Base/Base
Providing, laying and spreading soil on a prepared sub-grade, pulverising, adding the
designed quantity of cement to the spread soil, mixing in place with rotavator,
grading with the motor grader and compacting with the road roller at OMC to
achieve the desired unconfined compressive strength and to form a layer of subbase/base as per Technical Specification Clause 404.
For 4 per cent quantity of cement by weight of soil
Water Bound Macadam Sub-base/base
1)
WBM Grading 1
Providing, laying, spreading and compacting stone aggregates of specific
sizes to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with three wheel 80-100 kN static roller in
stages to proper grade and camber, applying and brooming, stone
screening/binding materials to fill-up the interstices of coarse aggregate,
watering and compacting to the required density Grading 1 as per
Technical Specification Clause 404.
(A)
By Manual Means
(B)
By Mechanical Means
2)
WBM Grading 2
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-17)
Item
No.
1
4.8
4.9
Description
Unit
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
4
cum
cum
900.83
799.53
cum
cum
1,011.97
910.67
cum
cum
910.30
809.00
cum
cum
815.76
714.46
cum
cum
924.66
823.36
[SOR Summary](Page-18)
Item
No.
1
4.10
4.12
4.13
4.14
4.15
4.16
Unit
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the material with water at OMC in
mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in
uniform layers in sub-base/base course on a well prepared sub-base and compacting
with smooth wheel roller of 80 to 100kN weight to achieve the desired density
including lighting, barricading and maintenance of diversion, etc as per Tables
400.11 & 400.12 and Technical Specification Clause 406.
By Mechanical Means with 1 km lead
Construction of Shoulders as per Technical Specification Clause 407.
A.
Earthen Shoulders
The rate as applicable for sub-grade construction may be adopted.
B.
Hard Shoulders
Rate as applicable for sub-base and/or base may be adopted as per
approved design.
Paved Shoulders
The rates may be adopted as applicable for different layers of pavement
depending upon approved design of paved shoulders.
C.
4.11
Description
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
4
cum
785.65
cum
cum
413.04
411.52
cum
418.80
cum
275.16
cum
597.52
cum
496.91
[SOR Summary](Page-19)
Item
No.
1
4.17
Description
Unit
Providing laying and spreading granulated blast furnace slag on a prepared subgrade pulverising adding the designed quantitity of cement to the spread granulated
blast furnace slag mixing in place with rotavator grading with the mortar grader and
compacting with smooth wheel roller 80-100 kN at OMC to achieve the desired
unconfined compressive strength and to form a layer of sub-base/base as per
Technical Specification Clauses 404.3 and 410.4.2.
Crusher Run Macadam Base
Providing crushed run stone aggregate greading conforming to table 400.20
depositing on a prepared surface by hauling vehicles, spreading and mixing with a
motor grader, watering and compacting with a three wheel 80-100 kN static roller
as per Technical Specification Clause 411 to form a layer of sub-base/base
cum
704.83
cum
cum
691.70
796.68
cum
cum
843.64
890.80
sqm
364.97
sqm
3,314.02
sqm
33.78
sqm
41.58
sqm
53.33
By mix-in-place method
(i)
With 53 mm maximum size of aggregates
(ii)
With 37.5 mm maximum size of aggregates
B)
By mixing plant method
(i)
With 53 mm maximum size of aggregates
(ii)
With 37.5 mm maximum size of aggregates
Brick Soling
Laying brick soling layer on prepared sub-grade with brick on end edging according
to lines, graded and cross-section shown on the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing
the same with three wheel road roller 80-100 kN as per Technical Specification
Clause 412
A)
4.18
4.19
Chapter-5
5.1
5.2
Rate
(Rs.)
4
Prime Coat
(i)
Low porosity
Providing and applying primer coat with bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as
per Technical Specification Clause 502
(ii)
Medium porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as
per Technical Specification Clause 502.
(iii)
High porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as
per Technical Specification Clause 502.
Tack Coat
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-20)
Item
No.
1
Description
Unit
(i)
Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared
bituminous surface cleaned with Hydraulic broom as per Technical
Specification Clause 503.
sqm
10.41
(ii)
Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared
dry and hungry bituminous surface cleaned with Hydraulic broom as per
Technical Specification Clause 503.
sqm
12.53
(iii)
Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared
granular surfaces treated with primer & cleaned with Hydraulic broom as
per Technical Specification Clause 503.
sqm
12.53
Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the
prepared non-bituminous surfaces (cement concrete pavement) cleaned
with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed
aggregates of grading as per Table 500.4 premixed with bituminous binder,
transported to site upto a lead of 1000 m laid over a previously prepared surface
with paver finisher to the required grade, level and alignment and rolled to achieve
the desired compaction as per Technical Specification Clause 504.
Built-Up Spray Grout
Providing, laying and rolling of built-up spray grout layer over prepared base
consisting of a two layer composite construction of crushed coarse aggregates using
motor grader for aggregates. Key stone chips spreader may be used with application
of bituminous binder after each layer, and with key aggregates placed on top of the
second layer to serve as a base, conforming to the line, grades and cross-section
specified, the compacted layer thickness being 75 mm as per Technical Specification
Clause 505.
By Manual Means
(A)
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(B)
By Mechanical Means
Modified Penetration Macadam
Construction of penetration macadam over prepared base by providing a layer of
compacted crushed coarse aggregate using chips spreader with alternate
applications of bituminous binder and key aggregates and rolling with a three wheel
80-100 kN static roller to achieve the desired degree of compaction as per Technical
Specification Clause 506.
(A)
50 mm thick
(I)
Bitumen (S-90)
(B)
75 mm thick
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
Surface Dressing using Bituminous (Penetrations grade / modified
Providing and laying surface dressing as wearing course consisting of a layer of
bituminous binder laid on the prepared surface, followed by a cover of crushed stone
aggregates of specified size and rolling with three wheel 80-100 kN static roller
including cleaning the road surface as per Technical Specification Clause 507.
sqm
14.66
cum
5,285.64
sqm
sqm
sqm
243.75
245.17
211.86
sqm
125.12
sqm
sqm
148.04
148.99
(iv)
5.3
5.4
5.5
5.6
Rate
(Rs.)
4
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-21)
Item
No.
1
Description
Unit
(A)
5.7
By Manual Means
Case I: Nominal chipping size 13.2 mm
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case II: Nominal chipping size 9.5 mm
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
(B)
By Mechanical Means
Case I: Nominal chipping size 13.2 mm
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case II: Nominal chipping size 9.5 mm
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Surface Dressing using Bitumen Emulsion
Providing and laying surface dressing as wearing course consisting of a layer of
bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone
chippings of specified size and rolling with 80-100 kN roller including cleaning the
road surface as per Technical Specification Clause 507.
Rate
(Rs.)
4
(A)
5.8
5.9
By Manual Means
Case I: Nominal aggregate size 13.2 mm
Case II: Nominal chipping size 9.5 mm
(B)
By Mechanical Means
Case I: Nominal chipping size 13.2 mm
Case II: Nominal chipping size 9.5 mm
Pre-coating Chips
Pre-coating of chips with 1 per cent of paving bitumen by weight of chips in a
suitable mixer duly heated to 160 degree C as per Technical Specification Clause
507.2.5
(I)
Bitumen (S-90)
Bitumen (S-65)
(II)
20mm thick Open-Graded Premix Carpet using Bituminous (penetration
grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness
composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen
or emulsion to required line, grade and level to serve as wearing course on a
previously prepared base, including mixing in a suitable plant, laying and rolling with
a three wheel 80-100 kN static roller capacity, finished to required level and grades
to be followed by seal coat of either Type A or Type B or Type C as per Technical
Specification Clause 508.
Case - I By Manual Means
(I)
Bitumen (S-90)
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
sqm
sqm
sqm
sqm
sqm
74.24
74.72
79.00
79.00
79.89
sqm
sqm
sqm
sqm
sqm
65.13
65.56
69.40
69.41
70.21
sqm
sqm
sqm
sqm
sqm
61.69
62.16
66.45
66.45
67.34
sqm
sqm
sqm
sqm
sqm
54.39
54.82
58.68
58.68
59.48
sqm
sqm
86.36
77.98
sqm
sqm
72.43
67.09
cum
cum
1,184.72
1,192.32
sqm
114.29
[SOR Summary](Page-22)
Item
No.
1
5.10
5.11
5.12
Description
Unit
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case - II By Mechanical Means
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per
Technical Specification Clause 508.2
sqm
sqm
sqm
sqm
114.99
121.24
121.22
122.52
sqm
sqm
sqm
sqm
sqm
sqm
108.78
109.47
115.72
115.72
117.02
113.54
sqm
sqm
sqm
sqm
sqm
153.11
154.15
163.58
163.58
165.53
sqm
sqm
sqm
sqm
sqm
138.07
138.97
147.12
147.12
148.80
sqm
sqm
sqm
sqm
sqm
138.79
139.83
149.26
149.26
151.22
sqm
sqm
sqm
sqm
sqm
123.78
124.66
132.80
132.80
134.49
sqm
sqm
sqm
60.01
60.47
64.67
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
4
[SOR Summary](Page-23)
Item
No.
1
5.13
Description
Unit
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case - II : Type B
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case - III : Type C
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
B.
By Mechanical Means
Case - I : Type A
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Bitumen pressure distributor
(V)
Natural Rubber Modified Bitumen
Case - II : Type B
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case - III : Type C
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Supply of Stone Aggregates for Pavement Courses
Supply of stone aggregates from approved sources conforming to the physical
requirement, specified in the respective clauses, including royalties, fees rents,
collection, transportation, stacking and testing and measured in cum as per Clause
511.5.
sqm
sqm
64.67
65.54
sqm
sqm
sqm
sqm
sqm
43.34
43.66
46.58
46.58
47.18
sqm
sqm
sqm
sqm
sqm
43.34
43.65
46.44
46.44
47.01
sqm
sqm
sqm
sqm
sqm
57.45
57.91
62.11
62.11
62.98
sqm
sqm
sqm
sqm
sqm
42.19
42.52
45.43
45.43
46.04
sqm
sqm
sqm
sqm
sqm
40.91
41.22
44.01
44.01
44.59
Note:
Chapter-6
6.1
6.2
6.3
cum
Granual Sub-base
Rate as per item No.4.1 of Chapter 4
Lime Treated Soil
Rate as per item No.4.5 of Chapter 4
Water Bound Macadam (WBM) - Sub-base
(A)
By Manual Means
As per item No.4.7 of Chapter 4
(B)
By Mechnical Means
Rate
(Rs.)
4
PanchayatR B Circle-2,Rajkot
564.20
280.64
995.91
[SOR Summary](Page-24)
Item
No.
1
6.4
Description
Unit
Rate
(Rs.)
4
894.61
cum
6,219.67
cum
5,389.40
sqm
540.06
6.5
6.6
6.7
sqm
374.88
(2)
sqm
260.83
cum
182.05
cum
3,732.80
cum
4,173.88
cum
2,722.19
Chapter-7
7.1
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-25)
Item
No.
1
(v)
7.2
7.3
7.4
7.5
7.6
7.8
7.9
7.10
8.2
8.3
Rate
(Rs.)
4
268.47
cum
12.73
cum
564.20
cum
995.91
cum
6,219.67
cum
524.62
cum
1,633.89
cum
3,807.46
cum
0.00
cum
3,732.80
cum
516.45
4,892.57
8,728.82
each
4,199.35
Chapter-8
8.1
Unit
7.7
Description
HILL ROADS
Site Clearance
As per Chapter-2
Setting Out
(1)
Construction of reference pillars (burjee) @ 20 m on both sides as per Fig.
1600.1 (b) and @ 8.33 m interval on curves
(2)
each
17,053.02
(3)
each
422.35
cum
113.78
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-26)
Item
No.
1
B)
(ii)
(iv)
(v)
8.4
Unit
(iii)
Description
cum
12.03
cum
91.86
cum
12.03
cum
250.32
B)
cum
18.82
cum
157.10
cum
307.39
B)
cum
23.63
cum
202.28
cum
3,611.23
cum
2,584.41
sqm
42.97
(vi)
8.5
Rate
(Rs.)
4
PanchayatR B Circle-2,Rajkot
268.47
1,520.22
506.32
0.00
[SOR Summary](Page-27)
Item
No.
1
Note:
8.6
Description
Unit
Note:
Construction of Scupper
Construction of scupper with dry stone masonry as per drawing and technical Running m
specifications as per Clause 1606.5.
8.8
Construction of RCC guide posts of 250 mm dia M15 grade cast-in-situ with 20 mm
nominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to
exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2
Earth work in excavation for structures
Rates as per item No. 11.1 of Chapter 11
(ii)
RCC M15 grade
Rate as per item No. 11.4 of Chapter 11
(iii)
HYSD steel bars
Rate as per item No. 12.6 of Chapter 12
Painting two coats including prime coat on new concrete surface
(iv)
Rate as per item No.10.5 of Chapter 10
Providing edge stones on valley side of formation as per drawing and Technical
Specification Clause 1608.2.6
(i)
8.10
8.11
Chapter-9
9.1
9.2
8.7
8.9
Rate
(Rs.)
4
3,489.33
cum
182.05
cum
3,732.80
54,567.69
sqm
m
73.91
229.53
sqm
30.89
sqm
88.83
cum
182.05
cum
3,732.80
PIPE CULVERTS
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-28)
Item
No.
1
Description
Unit
Rate
(Rs.)
4
cum
516.45
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class
bedding of granular material in single row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets Clause 1106.
9.4
9.5
9.6
(A)
1200 mm dia
(B)
1000 mm dia
(C)
750 mm dia
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design
in Single Row
m
m
m
4,892.57
4,518.86
2,454.93
m
m
m
8,728.82
7,119.53
4,529.23
m
m
m
9,828.61
9,065.34
4,909.78
(A)
1200 mm dia
(B)
1000 mm dia
(C)
750 mm dia
Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of
granular material including fixing collar with cement sand mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonary work in head wall
and parapets
m
m
m
17,501.11
14,266.69
9,058.37
500 mm dia
Laying Cement Concrete Pipe NP4 (burried conduits) on first class bedding of
granular material including fixing collar with cement sand mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonary work in head wall
and parapets
1,157.05
500 mm dia
3,103.30
Providing and laying reinforced cement concrete pipe NP4 for culverts on first class
bedding of granular material in single row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets Clause 1106.
(A)
1200 mm dia
(B)
1000 mm dia
(C)
750 mm dia
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design
in Double Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class
bedding of granular material in double row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets as per Clause 1106.
(A)
1200 mm dia
(B)
1000 mm dia
(C)
750 mm dia
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per Design
in Double Row
Providing and laying reinforced cement concrete pipe NP4 for culverts on first class
bedding of granular material in double row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets as per Clause 1106.
9.7
9.8
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-29)
Item
No.
1
9.9
9.10
Description
Unit
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open
foundation of Head walls as per drawings & Technical Specification Clause 1109
Rate as per item No.11.4 of Chapter 11
Brick Masonry Work in cement mortar in foundation of Head walls complete
exculding pointing and plastering as per drawing and technical specification Clause
1109
(A)
9.11
9.12
Rate
(Rs.)
4
cum
3,608.79
cum
4,173.88
cum
4,375.17
cum
2,454.05
cum
2,730.82
9.13
sqm
429.71
9.14
sqm
128.57
9.15
sqm
516.45
268.47
Chapter-10
10.1
10.2
PanchayatR B Circle-2,Rajkot
0.54
0.33
[SOR Summary](Page-30)
Item
No.
1
B.
Unit
(1)
Note:
(2)
Note:
(3)
Note:
Note:
10.3
Description
Rate
(Rs.)
4
each
1,256.56
each
1,960.91
each
1,283.02
each
1,765.11
Direction and Place Identification signs upto 0.9 sqm size board
A.
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-31)
Item
No.
1
Description
Unit
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on a mild steel single angle iron post 75 x 75 x 6 mm
firmly fixed to the ground by means of properly designed
foundation with M-15 grade cement concrete 450 x 450 x 600
mm, 600 mm below ground level as per approved drawing and
Technical Specification Clause 1701
(ii)
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on 2 inch dia GI Pipe firmly fixed to the ground by
means of properly designed foundation with M-15 grade cement
concrete 450 x 450 x 600 mm, 600 mm below ground level as per
approved drawing and Tehnical Specification Clause 1701.
(iii)
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on RCC Post 100 mm x 100 mm firmly fixed to the
ground by means of properly designed foundation with M-15
grade cement concrete 450 x 450 x 600 mm, 600 mm below
ground level as per approved drawing and Technical Specification
Clause 1701
Semi-Reflective Traffic signs
Direction and place indentification signs up to 0.9 sqm size board
sqm
6,305.48
sqm
5,816.84
sqm
4,944.56
sqm
30,415.05
sqm
6,704.74
(i)
B.
10.4
Rate
(Rs.)
4
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-32)
Item
No.
1
(ii)
(iii)
B.
10.5
Description
Unit
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9 sqm supported on
dia GI Pipe firmly fixed to the ground by means of properly
designed foundation with M-15 grade cement concrete 450 mm x
450 mm x 600 mm, 600 mm below ground level as per approved
drawing and Technical Specification Clause 1701
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9 sqm supported on
RCC Posts 100 mm x 100 mm firmly fixed to the ground by means
of properly designed foundation with M 15 grade cement concrete
450 mm x 450 mm x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification Clause 1701
sqm
6,925.10
sqm
5,101.53
sqm
3,419.53
sqm
73.91
sqm
64.36
sqm
98.45
sqm
82.39
10.6
10.7
10.8
Painting lines, Dashes, Arrows, etc. on Road in Two Coats on New Work
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready
mixed road marking paint conforming to IS:164 on bituminous/concrete surface,
including cleaning the surface of all dirt, dust and other foreign matter, demarcation
at site and traffic control as per drawing and Technical Specification Clause 1702
10.9
Rate
(Rs.)
4
Painting lines, Dashes, Arrows, etc. on Roads in Two Coats on Old Work
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-33)
Item
No.
1
10.10
10.11
10.12
10.13
10.14
10.15
Description
Unit
Painting lines, dashes, arrows, etc. on roads in two coats on old work with ready
mixed road marking paint conforming to IS:164 on bituminous/concrete surface,
including cleaning the surface of all dirt, dust and other foreign matter, demarcation
at site and traffic control as per drawing and technical specification Clause 1702
sqm
56.17
each
each
each
2,669.94
1,602.29
445.91
each
376.04
Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone/local stone of standard
design as per IRC:8 fixing in position including painting and printing, etc as per
drawing and Technical Specification Clause 1703
i)
5th Kilometre Stone (precast)
Ordinary Kilometer Stone (Precast)
ii)
200 m stone (precast)
iii)
Boundary Pillar
Reinforced cement concrete M15 grade boundary pillars/local stone of standard
design as per IRC:25, fixed in position including finishing and lettering but excluding
painting as per drawing and Technical Specification Clause 1704
361.32
485.20
2,044.93
Tubular Steel Railing on Precast RCC posts, 1.2 m high above Ground Level
Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on Running m
precast M-20 grade RCC vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m
above Gl) with 3 holes 50 mm dia for pipe, fixed 2 m centre-to- centre complete as
per approved drawings Clause 1706
10.16
Rate
(Rs.)
4
1,596.83
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-34)
Item
No.
1
10.17
Description
Unit
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD
specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate
duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate
will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron
frame of the lower most plate and flat iron frame of middle plate will be welded to 2
nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement
concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground
level. The top most diamond plate will be welded to middle plate by 47mm x 47mm
of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering
and printing arrows, border etc. will be painted with ready mixed synthetic enamel
paint of superior quality in required shade and colour. All sections of framed posts
and steel tube will be painted with primer and two coats of epoxy paint as per
drawing Clause 1701 and Annexure 1700 1
Traffic Cone
Provision of red fluorescent with white reflective sleeve traffic cone made of Low
Density Polyethylene (LDPE) material with a square base of 390 x 390 x 35 mm and
a height of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as per BS:873
each
11,403.34
each
958.42
10.18
Rumble Strips
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm
high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to
control speed, marked with white strips of road marking paint.
10.19
Note:
10.20
sqm
each
The rate for traffic signs are already worked out and given
elsewhere in this Chapter. The same may be adopted.
Chapter-11
11.1
Rate
(Rs.)
4
each
514.09
FOUNDATION
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-35)
Item
No.
1
Description
Unit
Rate
(Rs.)
4
11.2
11.3
11.4
P.C.C grade M 10
(i)
Nominal mix 1:3:6
(ii)
Nominal mix 1:3.6 (Hand mixing)
II.
P.C.C grade M 15
(i)
Nominal mix (1:2.5:5)
(ii)
Nominal mix 1:2.5:5 (Hand mixing)
III.
P.C.C. grade M 20
(i)
Nominal mix (1:2:4)
(ii)
Nominal mix 1:2:4 (Hand mixed)
IV.
R.C.C grade M 20
V.
R.C.C. grade M 25
Brick masonry work in cement mortar in foundation complete excluding pointing and
plastering as per drawing and technical specifications Clauses 600, 1202 & 1203
I.
11.5
11.6
I.
Brick masonry in 1:3 cement mortar
II.
Brick masonry in 1:4 cement mortar
III.
Brick masonry in cement-lime-mortar (1:0.5:4.5)
Stone masonry work in cement mortar in foundation complete as per drawing and
technical specifications Clauses 702, 704, 1202 & 1203.
I.
II.
III.
PanchayatR B Circle-2,Rajkot
cum
cum
182.05
216.19
cum
cum
cum
cum
227.57
413.80
451.28
341.35
cum
cum
516.45
116.70
cum
3,730.36
cum
cum
3,611.23
3,608.79
cum
cum
3,732.80
3,730.36
cum
cum
cum
cum
4,302.12
4,299.68
4,555.55
5,028.04
cum
cum
cum
4,443.11
4,173.88
4,375.17
cum
cum
cum
3,058.72
2,722.19
2,973.80
cum
cum
cum
2,949.11
2,454.05
2,730.82
cum
2,868.03
[SOR Summary](Page-36)
Item
No.
1
Description
Unit
(ii)
In cement mortar 1:4
(iii)
In cement lime mortar (1:0.5:4.5)
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per
drawings and technical specifications Clauses 1000 and 1202
cum
cum
t
2,660.67
2,937.44
54,471.41
11.8
65,455.00
11.9
59,196.41
11.7
Chapter-12
12.1
Rate
(Rs.)
4
SUBSTRUCTURE
cum
cum
cum
cum
10 sqm
4,635.21
4,382.58
4,230.36
4,593.93
429.71
12.3
10 sqm
1,285.71
12.4
Stone masonry in cement mortar for substructure complete as per drawing &
technical specification Clauses 702, 704, 1202 and 1204
cum
cum
cum
cum
3,211.66
2,858.30
2,608.24
3,122.49
cum
cum
cum
cum
3,206.23
2,817.54
2,608.24
3,108.14
cum
cum
cum
cum
3,182.39
2,793.70
2,584.41
3,084.31
(1:2.5:5)
1:2.5:5 (Hand mixing)
cum
cum
3,948.16
3,945.57
(1:2:4)
1:2:4 (Hand mixed)
cum
cum
cum
4,550.32
4,547.73
4,818.38
5,330.94
12.2
12.5
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-37)
Item
No.
1
Description
Unit
12.6
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue
complete as per drawings and technical specification Clauses 1002, 1005, 1010 &
1202
54,567.69
12.7
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue
complete as per drawings and technical specification Clauses 1002, 1005, 1010 &
1202
Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue
complete as per drawings and technical specification Clauses 1002, 1005, 1010 &
1202
59,292.69
52,205.19
12.9
Nos.
115.36
12.10
Backfilling behind abutment, wing wall and return wall complete as per drawings &
technical specification Clause 1204.3.8
I)
Granular material
II)
Sandy material
Providing and laying filter media with granular crushed aggregates as per
specification to a thickness of not less than 600 mm with smaller size towards the
soil and bigger size towards the wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height, compacted to firm condition
complete as per drawing and technical specification Clause 1204.3.8
cum
cum
cum
506.32
685.02
1,520.22
12.12
Supplying, fitting and fixing in position true to line and level elastomeric bearing
conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per
drawings and technical specification Clause 1207.1
cucm
2.30
12.13
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. Running m
complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
268.47
12.14
Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter
media base of 500 mm x 500 mm as per drawing and technical specification Clause
1205.5.7
Nos.
482.71
cum
cum
cum
cum
cum
t
5,207.81
5,221.72
5,049.31
5,682.08
6,736.71
55,282.06
12.8
12.11
Chapter-13
13.1
SUPERSTRUCTURE
13.2
Rate
(Rs.)
4
13.3
60,007.06
13.4
52,919.56
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-38)
Item
No.
1
13.5
Description
Unit
Rate
(Rs.)
4
9,592.15
13.7
Providing fitting and fixing mild steel railing complete as per drawing and technical Running m
specifications Clause 1208.2
2,795.16
13.8
Providing and fixing in position pipe railing consisting of IS Rolled steel joist posts Running m
designation IS MB 100 (100x75) at 2.5 m interval and three rows of 50 mm dia steel
pipes (light) including fixing in position on bridge deck complete as per drawing and
technical specifications Clause 1208.2
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and
cum
plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4
2,057.06
13.6
13.9
13.10
Drainage spouts complete as per drawing and technical specifications Clause 1209
13.11
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete
as per drawing and technical specifications Clauses 800 and 1211
13.12
13.13
13.14
13.15
13.16
Nos.
(i)
Nominal mix (1:2.5:5)
cum
(ii)
Nominal mix 1:2.5:5 (Hand mixing)
cum
cum
Reinforced Cement Concrete M 25 grade approach slab including reinforcement and
formwork complete as per drawing and technical specifications Clauses 800 and
1211
Providing and laying of an elastomeric slab seal expansion joint complete as per Running m
approved drawing and approved specifications to be installed by
manufacturer/supplier or their authorised representative ensuring compliance to the
manufacturers instructions for installlation and as per technical specifications Clause
1207.2.5
Providing and laying of compression seal joint consisting of steel armoured nosing at Running m
two edges of the joint gap suitably anchored to the deck concrete and a preformed
chloroprene elastomer or closed cell foam joint sealer compressed and formed into
the joint gap with special adhesive binder as per drawing, and technical
specifications Clause 1207.2.4
2,172.39
4,443.11
1,269.41
3,589.23
3,586.88
8,446.18
43,346.08
4,396.00
Providing and laying a buried expansion joint, covered with 12 mm thick, 200 mm Running m
wide galvanised weldable structrual steel plate as per IS:2062, placed symmetrical to
centre line of the joint, resting freely over the top surface of the deck concrete,
welding of 8 mm dia, 100 mm long galvanised nails spaced 300 mm c/c along the
centre line of the plate, as per technical specifications Clauses 1207.2.3
Filler Joint
Providing and fixing 2 mm thick corrugated copper plate in expansion joint Running m
I)
as per drawing and technical specifications Clause 1207.2.2
2,148.31
II)
106.90
III)
128.70
PanchayatR B Circle-2,Rajkot
2,010.29
[SOR Summary](Page-39)
Item
No.
1
IV)
13.17
Description
Unit
Providing and fillling joint sealing compound as per drawings and technical Running m
specifications with coarse sand and 6 per cent bitumen by weight.
Rate
(Rs.)
4
23.59
Stone masonry in cement mortar 1:3 for parapet complete as per drawing and
technical specifications Clauses 700 and 1208.4
Random rubble masonry
I.
II.
Coursed rubble masonry (1st sort)
Pointing with cement mortar (1:3) on brickwork in parapet as per technical
specifications Clauses 613.3 and 1208.4
cum
cum
10 sqm
3,182.39
3,211.66
429.71
13.19
10 sqm
128.57
13.20
Providing and laying parapet with PCC M 15 as per drawing & technical specifications
Clauses 800 and 1208.4
13.18
13.21
13.22
cum
cum
3,945.57
3,948.16
i.
sqm
0.00
ii.
Rate for seal coat Type B as per item No. 5.12 of Chapter 5
sqm
0.00
cum
0.00
ii.
sqm
0.00
iii.
sqm
0.00
13.23
cum
9,626.16
13.24
Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:4) complete
including centering etc. complete as per drawing and technical specifications Clauses
706 and 1205.1
cum
6,193.85
13.25
Providing & Laying reinforced cement concrete arch complete including centering
and shuttering excluding reinforcement as per drawings and technical specifications
Clauses 800, 900 and 1205.1
cum
cum
6,621.54
7,320.49
quintal
6,885.99
13.26
I.
RCC grade M20 (1:2.4) nominal mix
II.
RCC Grade M 25
Providing steel R.S.Js/built-up steel sections including cutting, welding/rivetting,
hoisting, fixing in position for composite girders with shear connectors complete with
painting as per drawing and technical specifications Clause 1205.6
A)
Steel section
Chapter-14
14.1
PROTECTION WORKS
Providing and laying boulder apron for bed protection with stone boulders of
minimum size and weight as per Table 1300.1, no fragment weighing less than 25
kg laid dry complete as per drawing and technical specifications Clause 1301
PanchayatR B Circle-2,Rajkot
cum
524.62
[SOR Summary](Page-40)
Item
No.
1
Description
Unit
14.2
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire
conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally)
including 10 per cent extra for laps and joints laid with stone boulders weighing not
less than 25 kg each as per drawing and technical specifications Clause 1301
cum
1,633.89
14.3
Providing and laying of apron with cement concrete blocks of size as per Table
1300.1 cast-in-situ and made with nominal mix of M-15 grade cement concrete as
per drawing and technical specifications Clause 1301
cum
3,807.46
14.4
Single bamboo palasiding / walling of whole 2nd class bamboo (Jati or Bethua)
75mm dia and closely packed & driven including fitting fixing with half bamboo kamis
horizontally in three rows with cane or tying with wire complete and struts 1.5 m
apart longitudinally and providing brush wood as per drawing and technical
specifications Clause 1302.5
A)
B)
14.5
Driven at least 900 mm below ground and 1200 mm above ground Running m
Driven at least 900 mm below ground and 900 mm above ground Running m
on average
Rate
(Rs.)
4
90.38
79.51
Providing and laying pitching on slopes laid over prepared filter media as per
drawing and technical specifications Clause 1302
I.
II.
14.6
14.7
Stone/Boulder
Cement concrete blocks of size as per Table 1300.2 cast in cement
concrete of grade M 15
cum
524.62
a)
Concrete grade M 15
III.
Brick pitchng set in cement mortar 1:4
Providing and laying filter material underneath pitching in slopes complete as per
drawing and technical specifications Clause 1302
cum
cum
cum
3,807.46
4,368.24
893.54
cum
2,398.55
cum
cum
cum
3,770.13
4,816.51
741.60
cum
cum
cum
cum
4,173.88
2,817.54
3,611.23
563.72
Providing and laying flooring laid over cement concrete bedding complete as per
drawing and technical specification Clause 1303
I.
Note:
II.
Cement conrete blocks grade M 15
Brick on edge laid in cement mortar (1:3)
III.
Providing and laying of dry rubble flooring complete as per drawings and technical
specifications Clause 1303.3
14.8
14.9
Providing and laying curtain walls complete as per drawing and technical
specification Clause 1304
14.10
14.11
cum
2,574.34
II.
cum
4,446.09
III.
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-41)
Item
No.
1
14.12
14.13
14.14
Description
Unit
Rate
(Rs.)
4
3,851.98
388.49
215.99
A)
Running m
415.06
B)
Driven at least 900 mm below ground and 900 mm above ground Running m
on average
237.56
C)
Driven at least 600 mm below ground and 1200 mm above ground Running m
on average.
223.68
Bamboo spur 'A' type with whole bamboo 85mm-100mm dia, placed 230 mm centre
to centre driven 900 mm below ground and 1200 mm to 1500 mm above ground
tied with 2nd class bamboo (jati or Bethua) on either side at 450 mm apart
horizontally with galvanised wire etc. complete as per drawings and technical
specifications
A)
B)
Running m
Running m
525.59
563.23
Providing 'A' type single spur with 1st class bamboo (Bholuka or Barua) 85 mm to Running m
100 mm dia. Driven closely placed 3m to 4m above ground and 1200 mm to 1500
mm below ground tied with cane or coir string, half 2nd class bamboo (jati or
Bethua) horizontally on both face placed not more than one metre apart including
whole bamboo struts inside one metre apart and 2 nos. of purlin at top and bottom
fitted with vertical struts at 1500 mm apart and filling with brushwood or jungle
wood inside the spur complete as per drawing and technical specifications
Providing close bamboo toe walling consisting of 65mm to 75mm dia bamboos of Running m
length ranging from 1.2 m to 3m driven at 150 mm centre to centre and provided
with three horizontal split bamboo runner fixed with nails. All bamboos to be duly
protected by coal tar painting.
1,653.32
14.17
Double timber spur with two rows at 800 mm c/c apart of 1st class local wood piles Running m
with timber of Azar/Nahar/Nageswar / Zarul wood 150 mm to 200 mm dia driven
2000 mm minimum below ground and 3600 mm above ground average placed at
800 mm belts, bracings etc. of 100 mm x 75 mm size 1st class local wood
longitudinally & crosswiswe at ends fitted with 10 mm dia bolts and nuts etc.
including coaltarring of timber members and cost of necessary bamboo stagings etc.
as directed by the Engineer as per drawing and technical specifications
130,195.62
14.18
Supplying and filling up hollows of the timber spur to an average height of 3600 mm Running m
above ground with jungle wood branches as per drawing and technical specifications
as directed by the Engineer.
54.98
14.15
14.16
Chapter-15
PMGSY SOR 13-14
454.85
MAINTENANCE OF ROADS
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-42)
Item
No.
1
15.1
15.2
15.3
Description
Unit
Rate
(Rs.)
4
1.
A.
Manual Means
B.
Mechanical Means
Maintenance of Earthen shoulder (filling with fresh selected soil)
cum
cum
255.93
205.09
sqm
34.32
2.
sqm
19.64
cum
6,649.55
sqm
182.69
sqm
192.19
iv.
sqm
191.48
sqm
126.92
sqm
112.02
15.4
15.5
15.6
Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping,
regrading, deepening of side drains as well as catch water drains as per technical
specification Clause 1907.
PanchayatR B Circle-2,Rajkot
1.82
[SOR Summary](Page-43)
Item
No.
1
15.7
Description
Unit
(I)
Maintenance of Culverts
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion One No.
repair, repairs to cracks, parapet wall and protection work as per drawing Hume Pipe
and technical specification Clause 1908
(II)
15.8
Maintenance of Causeway
Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts,
repair of flood gauges, removal of debris, providing boulders and protection work
and painting as per technical specification Clause 1909
15.9
15.10
15.11
15.12
15.13
15.14
Culvert
Rate
(Rs.)
4
780.54
1,706.40
37.08
km
822.93
Running m
255.32
RCC Railing
Maintenance of 200 metre and km stones
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with
cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km
stone as per drawing and technical specification Clause 1912
1,523.53
(i)
km
140.06
(ii)
Printing letters and figures of any shade with synthtic enamel paint of any
approved colour to give an even shade
km
508.87
(i)
Cutting of branches of trees and shrubs from the road way or with in
R.O.W including disposal of wood and leaves to suitable location as per
technical specification Clause 1914
one tree
(ii)
Cutting of shrubs from the road way or with in R.O.W and disposal of
shrubs to suitable locations as per technical specifications Clause 1914
each
4.55
(iii)
Trimming of grass and weeds from the shoulders/berms and disposing off
the same to suitable locations as per technical specifications Clause 1914
sqm
1.52
sqm
10.72
[SOR Summary](Page-44)
Item
No.
1
Description
Unit
Rate
(Rs.)
4
sqm
108.78
sqm
115.72
sqm
113.54
sqm
138.79
sqm
61.69
This is to certify that this Schedule Of Rates for the year 2013-2014 for Pradhan Mantri Gram Sadak Yojana of
Panchayat R & B Circle - 2 Rajkot is prepared on the basis of basic rates of labour, Plant & Machinery and material
are finalised by SOR committee of Gujarat State R&B Department and SOR committee of Rural Road Development
Agency Gandhinagar
PanchayatR B Circle-2,Rajkot
[SOR Summary](Page-45)
BASIC RATES for Year 2013-14 SOR (PMGSY WORKS), Gujarat State
(Panchayat R&B Circle-2, Rajkot)
(B) USAGE RATES OF PLANT & MACHINERY
Description of
Sr. No.
Machine
Output of Machine
Activity
Unit
Output
PM-001
Supplying compressed
air
cfm
PM-002
t/h
PM-003
t/h
PM-004
litre / h
litre / h
sqm/h
cum/h
cum/h
cum/h
Electricity generation
KVA
PM-010
PM-011
Spraying of Emulsion
Loading Aggregates
Loading Soil
Surface cleaning
Excavation
cum/h
cum/h
sqm/h
cum/h
per hour
45.00
per hour
100.00
1250.00 per hour
100.00 per hour
Surface Dressing
sqm/h
cum/h
PM-015
PM-016
PM-017
PM-018
Motor Grader
PM-019
Needle vibrator
PM-020
PM-021
PM-022
PM-023
Paver finisher
Plate compactor
Plate vibrator
Screed vibrator
Smooth wheeled 80-100 kN
tandem roller
Stone crusher (Integrated) of 200
TPH
Three wheel 80-100 kN Static
Roller
PM-024
PM-025
PM-026
9,000.00
7,150.00
Input Rate
Heating of bitumen
PM-014
300.00
PM-009
PM-012
PM-013
Rate
05. to 1
per hour
Cutting of Joints
per hour
Mixing of bituminous
materials
t/h
cum/h
200.00
per hour
50.00
cum/h
t/h
cum/h
cum/h
cum/h
cum/h
t/h
Vibrating cement
concrete mix
Laying/spreading
Compaction
Compaction
Compaction
Compaction of Subbase/ Asphalt
Crushing of Spalls
Compaction/ Rolling
Earth:- Embankment
or sub-grade
Sub-base G-I
Sub-base G-II/G-III
WMM
BUSG
BM 50/75 mm
Premix 20 mm
Seal Coat
PanchayatR B Circle-2,Rajkot
per hour
cum/h
cum/h
cum/h
cum/h
cum/h
cum/h
sqm/h
sqm/h
80/70
10.00
8.00
16.00
10.00
12.00
250.00
500.00
128.00
160.00
840.00
190.00
1,080.20
2,100.00
1,814.00
700.00
700.00
764.00
675.00
300.00
1,400.00
2,100.00
325.00
150.00
1,036.20
2,100.00
1,600.00
60.00
1,200.00
310.00
400.00
310.00
400.00
14,200.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
Description of
Sr. No.
PM-027
PM-028
PM-029
Machine
PM-030
PM-031
PM-032
PM-033
PM-034
PM-035
Output of Machine
Activity
Surface Dressing 1st
Coat
Surface Dressing
2ndCoat
Carriage
Pulverisation of soil
Ripping Pavements,
uprooting trees
Transportation of
materials
Scarifier
Carriage
Compaction of soil
WMM
Compaction of BM
Unit
Output
sqm/h
400.00
sqm/h
500.00
400.00
400.00
cum/trip
cum/h
cum/h
t/trip
cum/h
cum/trip
3 to 5
per hour
cum/h
100.00
cum/h
60.00
per hour
Carriage of water
litre / h
Wet Mix
cum/h
PanchayatR B Circle-2,Rajkot
Rate
250.00
300.00
300.00
300.00
300.00
300.00
1,200.00
1,200.00
300.00
1,000.00
Chapter 1
LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND SETTING OUT
Notes:
1 Rates are for net quantities after deduction of voids.
2 Part of km beyond 1 km will be payable for the full km.
Sr.
No.
1
1.1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
Loading and Unloading of Lime, Aggregate,
Stone Boulder, Brick Aggregate, Kankar,
Building Rubbish, Crushed Slag, Stone for
Masonry Work by Manual Means
Rate
(Rs.)
Amount
(Rs.)
0.02
0.50
194.50
194.50
3.89
97.25
0.50
300.00
150.00
31.39
282.53
51.37
0.01
0.25
194.50
194.50
1.95
48.63
0.25
300.00
75.00
15.70
141.27
25.68
0.01
0.25
194.50
194.50
1.95
48.63
0.25
300.00
75.00
15.70
141.27
25.68
Unit = cum
Taking output = 5.5 cum
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[Chapter -1](Page-49)
Sr.
No.
1
1.2
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 5.5 cum = a+b+c
Rate per cum = (a+b+c)/5.5
Loading and Unloading Lime, Aggregate, Stone
Boulder, Brick Aggregate, Kankar, Building
Rubbish, Crushed Slag, Stone for Masonry
Work by Mechanical Means
Rate
(Rs.)
Amount
(Rs.)
0.005
0.125
194.50
194.50
0.97
24.31
0.166
300.00
49.80
9.39
75.09
13.65
250.00
764.00
43.00
93.21
Min
Min
1.00
7.33
Min
2.00
Min
a) Machinery
(i) Tipper 10 t capacity
hour
(ii) Front end-loader 1 cum bucket capacity @
hour
45 cum per hour
b) OH & Contractor's profit @12.5 % on (a)
Cost for 5.5 cum = a+b
Rate per cum = (a+b) /5.5
(ii) Loading of Earth, Sand, Moorum, Manure, Flyash
by mechanical means including a lead upto 30
m.
10.33
0.172
0.122
17.03
153.23
27.86
Min
Min
Min
Min
a) Machinery
(i) Tipper 10 t capacity
hour
(ii) Front end-loader 1 cum bucket capacity @
hour
100 cum per hour
b) OH & Contractor's profit @12.5 % on (a)
Cost for 5.5 cum = a+b
Rate per cum = (a+b)/5.5
PanchayatR B Circle-2,Rajkot
1.00
3.30
2.00
6.30
0.105
0.055
250.00
764.00
26.25
42.02
8.53
76.80
13.96
[Chapter -1](Page-50)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
(iii) Unloading of Earth, Sand, Lime, Moorum,
Aggregate, Stone Boulder, Brick Aggregate,
Kankar, Building Rubbish, Manure, Crushed Slag,
Flyash, Stone for Masonry Work by mechanical
means.
Rate
(Rs.)
Amount
(Rs.)
Unit = cum
Taking output = 5.5 cum
Placing tipper at unloading point excluding time
for haulage and return trip
Time required for
i) Positioning of tipper at unloading point
ii) Manoeuvering, reversing, dumping and
turning for return
iii) Waiting time, unforeseen contingencies, etc.
1.3
Min
Min
1.00
2.00
Min
2.00
Total
Min
a) Machinery
Tipper 10 t capacity
hour
b) OH & Contractor's profit @12.5 % on (a)
Cost for 5.5 cum = a+b
Rate per cum = (a+b)/5.5
Loading, Unloading and Stacking of Bricks by
Manual Means
5.00
0.08
250.00
20.00
2.50
22.50
4.09
0.01
0.25
194.50
194.50
1.95
48.63
0.33
300.00
99.00
18.70
168.27
84.13
0.01
0.25
194.50
194.50
1.95
48.63
0.33
300.00
99.00
18.70
168.27
84.13
day
day
0.06
1.50
194.50
194.50
11.67
291.75
hour
1.00
300.00
300.00
1.4
PanchayatR B Circle-2,Rajkot
[Chapter -1](Page-51)
Sr.
No.
1
1.5
1.6
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
c) OH & Contractor's profit @12.5 % on(a+b)
Cost for 10 t = a+b+c
Rate per tonnes = (a+b+c)/10
(ii) Unloading of Cement by manual means including
a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per tonne = (a+b+c)/10
Loading and Unloading of Structural Steel and
Steel Bars by manual means
(i) Loading of Structural Steel, Steel Bars by manual
means including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per tonnes = (a+b+c)/10
(ii) Unloading of Structural Steel, Steel Bars by
manual means including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per t = (a+b+c)/10
Loading and Unloading of Bitumen Drums by
Manual Means
(i) Loading of Bitumen Drums by manual means
including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per tonnes = (a+b+c)/10
(ii) Unloading of Bitumen Drums by Manual Means
including a lead upto 30 m
Unit = t
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
6
Amount
(Rs.)
7
75.43
678.85
67.88
0.06
1.50
194.50
194.50
11.67
291.75
1.00
300.00
300.00
75.43
678.85
67.88
0.07
1.80
194.50
194.50
13.62
350.10
1.00
300.00
300.00
82.96
746.68
74.67
0.07
1.80
194.50
194.50
13.62
350.10
1.00
300.00
300.00
82.96
746.68
74.67
0.06
1.60
194.50
194.50
11.67
311.20
1.25
300.00
375.00
87.23
785.10
78.51
[Chapter -1](Page-52)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
4
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per t = (a+b+c)/10
The rate is inclusive of the self weight of drum
Note:
1.7
100
Unit Quantity
5
Rate
(Rs.)
Amount
(Rs.)
0.05
1.20
194.50
194.50
9.73
233.40
1.25
300.00
375.00
77.27
695.39
69.54
0.04
1.00
194.50
194.50
7.78
194.50
1.00
300.00
300.00
62.79
565.07
113.01
0.04
1.00
194.50
194.50
7.78
194.50
1.00
300.00
300.00
62.79
565.07
113.01
0.08
2.00
194.50
194.50
15.56
389.00
1.50
300.00
450.00
106.82
961.38
174.80
PanchayatR B Circle-2,Rajkot
[Chapter -1](Page-53)
Sr.
No.
1
1.9
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 5.5 cum = a+b+c
Rate per cum = (a+b+c)/5.5
Loading and Unloading of Hume Pipes
(i) Loading of RCC Hume pipes by mechanical
means including a lead upto 30 m
Rate
(Rs.)
Amount
(Rs.)
0.08
2.00
194.50
194.50
15.56
389.00
1.50
300.00
450.00
106.82
961.38
174.80
0.02
0.50
194.50
194.50
3.89
97.25
0.33
0.33
300.00
1,080.20
99.00
356.47
69.58
626.18
69.58
0.02
0.50
194.50
194.50
3.89
97.25
0.33
0.33
300.00
1,080.20
99.00
356.47
69.58
626.18
41.75
0.02
0.50
194.50
194.50
3.89
97.25
0.33
0.33
300.00
1,080.20
99.00
356.47
69.58
626.18
29.82
day
day
0.04
1.00
194.50
194.50
7.78
194.50
hour
2.00
300.00
600.00
A.
PanchayatR B Circle-2,Rajkot
[Chapter -1](Page-54)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
Material
Wooden sleepers 250mm x 250mm
x125mm hire charges 3 nos sleeper
Crow bars 2 nos not less than 40 mm dia
(hire-charges)
d) OH & Contractor's profit @12.5 % on
(a+b+c)
Cost for 5 pipes = (a+b+c+d)
Rate per pipe = (a+b+c+d)/5
B. 750 mm dia Hume pipe
Unit = per pipe
Taking output = 6 pipes
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Truck
c) Materials
Wooden sleepers 250mm x250mm x
125mm hire charges 3 nos. sleeper
Crow bars 2 nos not less than 40 mm dia
c)
Amount
(Rs.)
hour
2.00
85.00
170.00
hour
2.00
8.00
16.00
123.54
1,111.82
222.36
day
day
0.04
1.00
194.50
194.50
7.78
194.50
hour
2.00
300.00
600.00
hour
2.00
85.00
170.00
hour
2.00
8.00
16.00
Rate
(Rs.)
PanchayatR B Circle-2,Rajkot
123.54
1,111.82
185.30
0.04
1.00
194.50
194.50
7.78
194.50
2.00
300.00
600.00
2.00
85.00
170.00
2.00
8.00
16.00
123.54
1,111.82
138.98
0.02
0.50
194.50
194.50
3.89
97.25
0.20
0.20
300.00
1,080.20
60.00
216.04
47.15
424.33
47.15
[Chapter -1](Page-55)
Sr.
No.
1
1.10
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
Crane
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 15 pipes = a+b+c
Rate per pipe = (a+b+c)/15
C. 600/450 mm dia Hume pipe
Unit = per pipe
Taking output = 21 pipes
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
Crane
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 21 pipes = a+b+c
Rate per pipe = (a+b+c)/21
Haulage excluding Loading & Unloading
Haulage of materials by tipper excluding cost of
loading, unloading and stacking.
Unit = t.km
Taking output 10 t load and lead 10 km = 100 t.km
Case-I : Surfaced Road
Speed with load: 25 km per hour
Speed while returning empty: 35 km per hour
a) Machinery
Tipper 10 t capacity
Haulage with load
Empty return trip
b) OH & Contractor's profit @12.5 % on (a)
Cost for 100 t.km = a+b
Rate per t.km = (a+b)/100
Rate
(Rs.)
5
0.02
0.50
6
194.50
194.50
0.20
0.20
300.00
1,080.20
60.00
216.04
47.15
424.33
28.29
0.02
0.50
194.50
194.50
3.89
97.25
0.20
0.20
300.00
1,080.20
60.00
216.04
47.15
424.33
20.21
hour
hour
0.40
0.29
250.00
250.00
100.00
72.50
21.56
194.06
1.94
hour
hour
0.50
0.33
250.00
250.00
125.00
82.50
25.94
233.44
2.33
Amount
(Rs.)
3.89
97.25
PanchayatR B Circle-2,Rajkot
[Chapter -1](Page-56)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
Haulage with load
Empty return trip
b) OH & Contractor's profit @12.5 % on (a)
Cost for 100 t.km = a+b
Rate per t.km = (a+b)/100
4
hour
hour
Rate
(Rs.)
5
1.00
0.67
6
250.00
250.00
7
250.00
167.50
52.19
469.69
4.70
0.048
1.20
194.50
194.50
9.34
233.40
1.10
339.73
373.70
77.05
693.49
0.06
1.50
194.50
194.50
11.67
291.75
1.10
339.73
373.70
84.64
761.76
0.072
1.80
194.50
194.50
14.00
350.10
1.10
339.73
373.70
92.23
830.03
1.12
Amount
(Rs.)
PanchayatR B Circle-2,Rajkot
[Chapter -1](Page-57)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
Unit = cum
Taking output = 750 cum at crusher location
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Material
Stone Boulder of size 150 mm and below
c)
Machinery
Integrated stone crusher of 200 t/h including
belt conveyor and vibrating screens
Rate
(Rs.)
Amount
(Rs.)
day
day
day
0.76
2.00
17.00
194.50
199.90
194.50
147.82
399.80
3,306.50
cum
800.00
185.00
148,000.00
6.00 14,200.00
85,200.00
hour
20.00
20.00
764.00
250.00
15,280.00
5,000.00
32,166.77
246,075.75
328.10
day
day
day
0.76
2.00
17.00
194.50
199.90
194.50
147.82
399.80
3,306.50
cum
800.00
185.00
148,000.00
6.00 14,200.00
85,200.00
1.13
d)
Note:
hour
PanchayatR B Circle-2,Rajkot
10.00
10.00
764.00
250.00
7,640.00
2,500.00
30,899.27
250,284.05
336.20
[Chapter -1](Page-58)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
1.14
3
90 per cent of above cost will be attributed to
the production of 670 cum of stone aggregate
and balance 10 per cent will be for smaller size
aggregates and stone dust which comes out as a
by-product.
3
4
Rate
(Rs.)
Amount
(Rs.)
1.15
Unit Quantity
0.76
2.00
17.00
194.50
199.90
194.50
147.82
399.80
3,306.50
800.00
185.00
148,000.00
6.00 14,200.00
85,200.00
10.00
10.00
764.00
250.00
7,640.00
2,500.00
30,899.27
264,188.72
418.30
PanchayatR B Circle-2,Rajkot
[Chapter -1](Page-59)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
a)
b)
c)
Unit Quantity
3
Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Material
Stone Boulder of size 150 mm and below
Machinery
Integrated stone crusher of 200 t/h including
belt conveyor and vibrating screens
Amount
(Rs.)
day
day
day
0.76
2.00
17.00
194.50
199.90
194.50
147.82
399.80
3,306.50
cum
800.00
185.00
148,000.00
6.00 14,200.00
85,200.00
hour
Rate
(Rs.)
10.00
10.00
764.00
250.00
7,640.00
2,500.00
30,899.27
264,188.72
440.31
1.16
100
2.
3.
cum
0.325
182.05
59.17
cum
0.10
3,611.23
361.12
PanchayatR B Circle-2,Rajkot
[Chapter -1](Page-60)
Sr.
No.
1
Ref.
MORD
Specifn
2
Unit Quantity
Rate
(Rs.)
3
As per item No.11.5 of Chapter 11
Plastering with cement mortar 1:4, 15 mm
thick cement plaster on brick work as per
technical specifications.
4
cum
5
0.475
6
4,443.11
7
2,110.48
sqm
2.63
1,285.71
3,381.41
0.192
182.05
34.95
0.06
3,611.23
216.67
0.193
4,443.11
857.52
1.50
1,285.71
1,928.56
Description
4.
Amount
(Rs.)
2.
3.
4.
PanchayatR B Circle-2,Rajkot
[Chapter -1](Page-61)
Chapter 2
SITE CLEARANCE
Sr.
No.
1
2.1
2.2
Ref.
MORD
Description
Unit Quantity
n
Specif
2
3
4
5
201 Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance
of 30 m outside the periphery of the area as per
Technical Specification Clause 201.
201
By Manual Means
Unit = hectare
Taking output = 1 hectare
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5% on (a)
Rate per hectare = a+b
Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of
girth upto 300 mm, removal of stumps of such trees cut
earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned,
upto a lead of 1000 m including removal and disposal of
top organic soil not exceeding 150 mm in thickness as
per Technical Specification Clause 201.
day
day
Unit = hectare
Taking output = 1 hectare
(I) By Manual Means
(A) In area of non-thorny jungle
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate per hectare = a+b+c
(B) In area of thorny jungle
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate per hectare = a+b+c
(II) By Mechanical Means
(A) In area of non-thorny jungle
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Dozer D 50 with attachment or suitable
hour
machinery for removal of trees & stumps
Tractor with Trolley
hour
OH & Contractor's profit @ 12.5% on (a+b)
Rate per hectare = a+b+c
(B) In area of thorny jungle
a) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
1.60
40.00
194.50
194.50
311.20
7,780.00
1,011.40
9,102.60
6.00
150.00
194.50
194.50
1,167.00
29,175.00
1.00
300.00
300.00
3,830.25
34,472.25
8.00
200.00
194.50
194.50
1,556.00
38,900.00
2.00
300.00
600.00
5,132.00
46,188.00
0.16
4.00
194.50
194.50
31.12
778.00
10.00 2,100.00
21,000.00
1.00
300.00
300.00
2,763.64
24,872.76
0.24
6.00
194.50
194.50
46.68
1,167.00
[Chapter -2](Page-62)
Sr.
No.
1
2.3
Ref.
MORD
n
Specif
2
Description
3
Machinery
Dozer D 50 with attachment for removal of
hour
trees & stumps
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate per hectare = a+b+c
Note: The top soil removed during clearing and grubbing of
site, if suitable for re-use shall be transported,
conserved and stacked as directed by the Engineer and
shall be incidental to the work.
201
b)
Unit Quantity
5
Rate
(Rs.)
Amount
(Rs.)
12.00 2,100.00
25,200.00
1.50
300.00
450.00
3,357.96
30,221.64
0.024
0.60
194.50
194.50
4.67
116.70
0.07
300.00
21.00
17.80
160.16
0.036
0.90
194.50
194.50
7.00
175.05
0.21
300.00
63.00
30.63
275.68
0.08
2.00
194.50
194.50
15.56
389.00
0.28
300.00
84.00
61.07
549.63
0.16
4.00
194.50
194.50
31.12
778.00
0.42
300.00
126.00
116.89
1,052.01
0.32
8.00
194.50
194.50
62.24
1,556.00
1.00
300.00
300.00
239.78
[Chapter -2](Page-63)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
B.
Unit Quantity
3
4
Rate for each tree = a+b+c
(vi) Girth above 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
Lead upto 1000 m
Unit = each
(i) Girth above 300 mm to 600 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(ii) Girth above 600 mm to 900 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(iii) Girth above 900 mm to 1800 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(iv) Girth above 1800 mm to 2700 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(v) Girth above 2700 mm to 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(vi) Girth above 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
6
Amount
(Rs.)
7
2,158.02
1.00
25.00
194.50
194.50
194.50
4,862.50
2.00
300.00
600.00
707.13
6,364.13
0.024
0.60
194.50
194.50
4.67
116.70
0.10
300.00
30.00
18.92
170.29
0.036
0.90
194.50
194.50
7.00
175.05
0.30
300.00
90.00
34.01
306.06
0.08
2.00
194.50
194.50
15.56
389.00
0.40
300.00
120.00
65.57
590.13
0.16
4.00
194.50
194.50
31.12
778.00
0.60
300.00
180.00
123.64
1,112.76
0.32
8.00
194.50
194.50
62.24
1,556.00
1.20
300.00
360.00
247.28
2,225.52
1.00
25.00
194.50
194.50
194.50
4,862.50
2.50
300.00
750.00
725.88
6,532.88
[Chapter -2](Page-64)
Sr.
No.
1
2.4
Ref.
MORD
Description
n
Specif
2
3
201 Uprooting and Removing Stumps & Roots
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
B.
0.016
0.40
194.50
194.50
3.11
77.80
0.018
300.00
5.40
10.79
97.10
0.024
0.60
194.50
194.50
4.67
116.70
0.05
300.00
15.00
17.05
153.41
0.053
1.33
194.50
194.50
10.31
258.69
0.07
300.00
21.00
36.25
326.24
0.11
2.66
194.50
194.50
21.40
517.37
0.11
300.00
33.00
71.47
643.24
0.21
5.33
194.50
194.50
40.85
1,036.69
0.25
300.00
75.00
144.07
1,296.60
0.60
15.00
194.50
194.50
116.70
2,917.50
0.75
300.00
225.00
407.40
3,666.60
[Chapter -2](Page-65)
Sr.
No.
1
2.5
Ref.
MORD
n
Specif
2
202
Description
Unit Quantity
Rate
(Rs.)
4
day
day
5
0.016
0.40
6
194.50
194.50
0.025
300.00
7.50
11.05
99.46
0.024
0.60
194.50
194.50
4.67
116.70
0.075
300.00
22.50
17.98
161.85
0.053
1.33
194.50
194.50
10.31
258.69
0.10
300.00
30.00
37.37
336.37
0.11
2.66
194.50
194.50
21.40
517.37
0.15
300.00
45.00
72.97
656.74
0.21
5.33
194.50
194.50
40.85
1,036.69
0.30
300.00
90.00
145.94
1,313.47
0.60
15.00
194.50
194.50
116.70
2,917.50
1.00
300.00
300.00
416.78
3,750.98
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(ii) Girth above 600 mm to 900 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate for each stump & root = a+b+c
(iii) Girth above 900 mm to 1800 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(iv) Girth above 1800 mm to 2700 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(v) Girth above 2700 mm to 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(vi) Girth above 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
Dismantling of Structures
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of
masonry, cement concrete, wood work, steel work,
including T&P and scaffolding wherever necessary,
sorting
the
dismantled material,
disposal
of
unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 m as per
Technical Specification Clause 202.
Amount
(Rs.)
7
3.11
77.80
Unit = cum
Taking output = 1.25 cum
(I) By Manual Means
(A) Lime Concrete
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[Chapter -2](Page-66)
Sr.
No.
1
2.6
Ref.
MORD
n
Specif
2
202
Description
a)
Unit Quantity
Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(B) Cement Concrete
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(C) Reinforced Cement Concrete
a) Labour
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(II) By Mechanical Means
(A) Cement Concrete
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Air compressor 210 cfm with 2 leads of hour
pneumatic breaker @1.5 cum per hour
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(B) Reinforced Cement Concrete
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Blacksmith
day
b) Machinery
Air compressor 170-210 cfm working with 2
hour
Jack Hammers simultaneously @1.00 cum
per hour
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
Dismantling Brick/Tile Work
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
0.04
1.00
194.50
194.50
7.78
194.50
0.27
300.00
81.00
35.41
318.69
254.95
0.05
1.25
194.50
194.50
9.73
243.13
0.27
300.00
81.00
41.73
375.58
300.47
0.15
0.25
3.50
194.50
207.80
194.50
29.18
51.95
680.75
0.27
300.00
81.00
101.71
915.41
732.33
0.02
0.50
194.50
194.50
3.89
97.25
0.83
300.00
249.00
0.27
300.00
81.00
53.89
485.03
388.03
0.05
0.91
0.25
194.50
194.50
207.80
9.73
177.00
51.95
1.25
300.00
375.00
0.27
300.00
81.00
86.83
781.50
625.20
[Chapter -2](Page-67)
Sr.
No.
1
2.7
Ref.
MORD
n
Specif
2
202
Description
Unit Quantity
3
Dismantling of existing structures like culverts, bridges,
retaining walls and other structures comprising of brick
masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and
lead of 1000 m as per Technical Specification Clause
202.
Unit = cum
Taking output = 1.25
(A) Lime mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c) /1.25
(B) Cement mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(C) Mud Mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(D) Dry Brick Pitching or Brick Soling
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
Dismantling Stone Masonry as per Technical
Specification Clause 202.
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of stone
masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and
lead of 1000 m as per Technical Specification Clause
202.
Unit = cum
Taking ouput = 1.25 cum
(A) Rubble Stone Masonry in Lime Mortar
a) Labour
Mate
Mazdoor (Unskilled)
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
day
day
0.02
0.50
194.50
194.50
3.89
97.25
hour
0.27
300.00
81.00
22.77
204.91
163.93
day
day
0.03
0.75
194.50
194.50
5.84
145.88
hour
0.27
300.00
81.00
29.09
261.80
209.44
day
day
0.016
0.40
194.50
194.50
3.11
77.80
hour
0.27
300.00
81.00
20.24
182.15
145.72
day
day
0.014
0.35
194.50
194.50
2.72
68.08
hour
0.27
300.00
81.00
18.97
170.77
136.62
day
day
0.024
0.60
194.50
194.50
4.67
116.70
[Chapter -2](Page-68)
Sr.
No.
1
2.8
Ref.
MORD
n
Specif
2
202
Description
b)
Unit Quantity
Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(B) Rubble Stone Masonry in Cement Mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(C) Rubble Stone Masonry in Mud Mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(D) Dry Rubble Masonry
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(E) Dismantling Stone Pitching / Dry Stone Spalls
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(F) Dismantling boulders laid in wire crates
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
Dismantling Wood Work Wrought and Planed
Fixed in Frames of Trusses upto a height of 5 m
above Plinth Level as per Technical Specification
Clause 202.
Unit = cum
Taking output = 1.25 cum
a) Labour
Mate
Carpenter 1st Class
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
hour
0.27
300.00
81.00
25.30
227.66
182.13
day
day
0.03
0.75
194.50
194.50
5.84
145.88
hour
0.27
300.00
81.00
29.09
261.80
209.44
day
day
0.02
0.50
194.50
194.50
3.89
97.25
hour
0.27
300.00
81.00
22.77
204.91
163.93
day
day
0.018
0.45
194.50
194.50
3.50
87.53
hour
0.27
300.00
81.00
21.50
193.53
154.82
day
day
0.016
0.40
194.50
194.50
3.11
77.80
hour
0.27
300.00
81.00
20.24
182.15
145.72
day
day
0.02
0.50
194.50
194.50
3.89
97.25
hour
0.27
300.00
81.00
22.77
204.91
163.93
day
day
0.06
0.50
194.50
207.80
11.67
103.90
[Chapter -2](Page-69)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
Rate
(Rs.)
4
day
5
1.00
6
194.50
7
194.50
0.27
300.00
81.00
47.43
426.83
341.46
day
day
day
0.14
1.00
2.50
194.50
207.80
194.50
27.23
207.80
486.25
18.03
hour
0.17
300.00
51.00
96.54
886.85
day
day
day
0.10
2.00
0.50
194.50
194.50
207.80
19.45
389.00
103.90
12.81
0.17
300.00
51.00
70.42
646.58
day
day
day
0.01
0.13
0.13
194.50
207.80
194.50
1.95
27.01
25.29
6.78
61.02
6.10
day
day
0.14
3.50
194.50
194.50
27.23
680.75
88.50
796.48
Mazdoor (Unskilled)
Machinery
Tractor with trolley
hour
c)
OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
Dismantling Steel Work in all Types of Sections
upto a height of 5 m above Plinth Level excluding
Cutting of rivet as per Technical Specification
Clause 202.
b)
2.9
202
Unit = t
Taking output = 1
(A) Including dismembering
a) Labour
Mate
Blacksmith
Mazdoor (Unskilled)
Add 2.5 per cent of cost of labour for gas
cutting, ropes, pulleys, etc.
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per t = a+b+c
(B) Excluding dismembering
a) Labour
Mate
Mazdoor (Unskilled)
Blacksmith
Add 2.5 per cent of cost of labour for gas
cutting, ropes, pulleys, etc.
b)
Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per t = a+b+c
(C) Extra over Items (A) and (B) for cutting rivets
2.10
202
Unit = each
Taking output = 10 rivets
a) Labour
Mate
Blacksmith
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Cost for 10 rivets = a+b
Rate for each rivet = (a+b) /10
Scraping of bricks dismantled from brick work
including stacking as per Technical Specification
Clause 202.
Unit = Nos.
Taking output = 1000 Nos.
In Lime/ Cement Mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Rate per 1000 Nos. = a+b
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
[Chapter -2](Page-70)
Ref.
MORD
Description
Unit Quantity
n
Specif
1
2
3
4
5
2.11
202 Scraping of Stone from Dismantled Stone
Masonry as per Technical Specification Clause
202.
Unit = cum
Taking output = 1 cum
In Cement or Lime Mortar
a) Labour
Mate
day
0.06
Mazdoor (Unskilled)
day
1.40
b) OH & Contractor's profit @ 12.5%(a)
Rate per cum = a+b
2.12
202 Scraping Plaster in Lime or Cement Mortar from
Brick / Stone Masonry as per Technical
Specification Clause 202.
Unit = sqm
Taking ouput = 100 sqm
a) Labour
Mate
day
0.16
Mazdoor (Unskilled)
day
4.00
b) Machinery
0.32
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 100 sqm = a+b+c
Rate per sqm = (a+b+c)/100
2.13
202 Removing all types of Hume pipes and stacking
within a lead of 1000 m including Earthwork and
Dismantling of Masonry Works as per Technical
Specification Clause 202.
Sr.
No.
Unit = m
Taking output = 1m
(A) Upto 600 mm dia Hume pipe
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Rate per m = a+b
(B) Above 600 mm to 900 mm dia Hume pipe
a)
Note:
2.14
202
Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Rate per m = a+b
(C) Above 900 mm dia Hume pipe
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Rate per m = a+b
Rate
(Rs.)
Amount
(Rs.)
194.50
194.50
11.67
272.30
35.50
319.47
194.50
194.50
31.12
778.00
300.00
96.00
113.14
1,018.26
10.18
day
day
0.02
0.52
194.50
194.50
3.89
101.14
13.13
118.16
day
day
0.03
0.70
194.50
194.50
5.84
136.15
17.75
159.73
day
day
0.05
1.20
194.50
194.50
9.73
233.40
30.39
273.52
PanchayatR B Circle-2,Rajkot
[Chapter -2](Page-71)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
Dismantling of flexible pavements and disposal of
dismantled materials upto a lead of 100 m, stacking
serviceable and unserviceable materials separately as
per Technical Specification Clause 202
Unit = cum
Taking output = 1 cum
(I) By Manual Means
(A) Bituminous Courses
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per cum = a+b+c
(B) Granular Courses
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per cum = a+b+c
(II) By Mechanical Means
(A) Bituminous Courses
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
Tractor with ripper @ 60 cum per hour
Rate
(Rs.)
Amount
(Rs.)
day
day
0.06
1.50
194.50
194.50
11.67
291.75
hour
0.38
300.00
114.00
52.18
469.60
day
day
0.04
1.00
194.50
194.50
7.78
194.50
hour
0.33
300.00
99.00
37.66
338.94
day
day
0.01
0.30
194.50
194.50
1.95
58.35
hour
hour
0.38
0.016
300.00
300.00
114.00
4.80
c)
2.15
202
22.14
199.29
PanchayatR B Circle-2,Rajkot
0.03
0.50
0.50
194.50
196.30
194.50
5.84
98.15
97.25
1.00
300.00
300.00
0.40
1.00
300.00
150.00
120.00
150.00
96.40
867.64
[Chapter -2](Page-72)
Ref.
MORD
n
Specif
2
2.16
202
Sr.
No.
2.17
2.18
2.19
Description
Unit Quantity
202
202
202
Rate
(Rs.)
Amount
(Rs.)
0.006
0.15
194.50
194.50
1.17
29.18
0.05
300.00
15.00
5.67
51.01
0.006
0.15
194.50
194.50
1.17
29.18
0.20
300.00
60.00
11.29
101.63
10.16
0.015
0.225
194.50
194.50
2.92
43.76
0.30
300.00
90.00
17.09
153.77
15.38
Unit = each
Taking output = 1 km stone
(A) 5th km Stone
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[Chapter -2](Page-73)
Sr.
No.
1
2.20
2.21
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
4
Quantity of cement concrete = 0.392 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate for one 5th km stone = a+b+c
(B) Ordinary km Stones
Quantity of cement concrete = 0.269 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate for one ordinary km stone = a+b+c
(C) 200 m Stones
Quantity of cement concrete = 0.048 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate for one 200 m stone = a+b+c
Note: Rate for boundary pillar will be same as that of 200 m
stone
202
202
Rate
(Rs.)
Amount
(Rs.)
0.03
0.75
194.50
194.50
5.84
145.88
0.15
300.00
45.00
24.59
221.30
0.02
0.50
194.50
194.50
3.89
97.25
0.08
300.00
22.50
15.46
139.10
0.004
0.10
194.50
194.50
0.78
19.45
0.02
300.00
6.00
3.28
29.51
0.15
3.00
0.75
194.50
194.50
207.80
29.18
583.50
155.85
0.15
300.00
45.00
101.69
915.22
30.51
0.09
2.00
194.50
194.50
17.51
389.00
Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing
including posts, foundation concrete, backfilling of pit by
manual means including disposal of dismantled material
with all lifts and upto a lead of 1000 m, stacking
serviceable material and unserviceable material
separately as per Technical Specification Clause 202.
Unit = running m
Taking output = 30 m
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Blacksmith
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost of 30 m = a+b+c
Rate per m = (a+b+c)/30
Dismantling of CI Water Pipe Line
Dismantling of CI water pipe line 600 mm dia including
disposal with all lifts and lead upto 1000 m and stacking
of serviceable material and unserviceable material
separately under supervision of concerned department
as per Technical Specification Clause 202.
Unit = running m
Taking output = 10 m
a) Labour
Mate
Mazdoor (Unskilled)
day
day
PanchayatR B Circle-2,Rajkot
[Chapter -2](Page-74)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
Rate
(Rs.)
4
day
6
207.80
Plumber
Machinery
Truck 10 t capacity
hour
Crane upto 8 t capacity
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 10 m = a+b+c
Rate per m = (a+b+c)/10
Note: The rate analysis does not include any excavation in
earth or dismantling of masonry works which are to be
measured and paid separately.
b)
2.22
202
5
0.25
0.25 300.00
0.50 1,080.20
Amount
(Rs.)
7
51.95
75.00
540.10
134.19
1,207.75
120.77
Unit = running m
Taking output = 10 m
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Crane upto 8 t capacity
hour
Truck flat body 10 t
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 10 m = a+b+c
Rate per m = (a+b+c)/10
Note: The rate analysis does not include any excavation in
earth or dismantling of masonry works which are to be
measured and paid separately.
2.23
202
0.10
2.50
194.50
194.50
19.45
486.25
0.30 1,080.20
1.00 300.00
324.06
300.00
141.22
1,270.98
127.10
PanchayatR B Circle-2,Rajkot
day
day
day
0.48
10.00
2.00
194.50
194.50
196.30
93.36
1,945.00
392.60
hour
1.50
300.00
450.00
360.12
3,241.08
108.04
[Chapter -2](Page-75)
Chapter 3
EARTHWORK, EROSION CONTROL AND DRAINAGE
Sr.
No.
1
3.1
Ref.
MORD
Specifn
Description
3
Preparation of Foundation for Embankment
301.4 Scarifying Existing Granular Surface to a Depth of 50
mm by Manual Means
Scarifying existing granular surface to a depth of 50 mm and
disposal of scarified material with a lift upto 3 m and leads
upto 1000 m as per Technical Specification Clause 301.4.
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 100 sqm = a+b+c
Rate per sqm = (a+b+c)/100
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
0.16
4.00
194.50
194.50
31.12
778.00
hour
1.50
300.00
450.00
157.39
1,416.51
14.17
day
day
0.01
0.25
194.50
194.50
1.95
48.63
hour
hour
0.25
0.30
300.00
764.00
75.00
229.20
0.61
250.00
153.00
63.47
571.24
5.71
3.3
PanchayatR B Circle-2,Rajkot
[Chapter -3](Page-76)
Sr.
No.
Ref.
MORD
Specifn
Description
3
Mate
Mazdoor (Unskilled)
b) Machinery
Dozer D-50 for spreading @ 200 cum per hour
Motor grader for grading @ 200 cum per hour
Water tanker 6 kl capacity
Three wheel 80-100 kN Static Roller
c) Material
Water
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Rate for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d)/100
Unit Quantity
Rate
(Rs.)
4
day
day
5
0.02
0.50
6
194.50
194.50
hour
hour
hour
hour
0.50
0.50
2.00
1.25
2,100.00
2,100.00
300.00
400.00
1,050.00
1,050.00
600.00
500.00
12.00
16.00
192.00
436.64
3,929.78
39.30
0.04
1.00
194.50
194.50
7.78
194.50
1.67
1,400.00
2,338.00
kl
Note: In case the earth cutting is done by dozer and pushed for
filling in the embankment, the input of dozer in the cost of
embankment shall be deleted as the same is already
provided in the cost of excavation. However, if the earth is
dumped by tippers from roadway cutting, the input of dozer
for spreading is required to be provided.
3.4
Amount
(Rs.)
7
3.89
97.25
c)
hour
cum
cum
hour
hour
hour
hour
4.05
100.00
100.00
0.50
0.50
2.00
1.25
250.00
25.68
13.65
2,100.00
2,100.00
300.00
400.00
1,012.50
2,568.48
1,365.18
1,050.00
1,050.00
600.00
500.00
Material
Water
Compensation for earth taken from private land
kl
cum
12.00
100.00
16.00
17.50
192.00
1,750.00
PanchayatR B Circle-2,Rajkot
1,578.55
14,206.99
142.07
[Chapter -3](Page-77)
Sr.
No.
1
Ref.
MORD
Specifn
2
3.5
Description
3
Note:
302
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
1.80
45.00
194.50
194.50
350.10
8,752.50
1,137.83
10,240.43
85.34
0.08
2.00
194.50
194.50
15.56
389.00
3.60
2,100.00
7,560.00
995.57
8,960.13
49.78
day
PanchayatR B Circle-2,Rajkot
0.08
194.50
15.56
[Chapter -3](Page-78)
Sr.
No.
Ref.
MORD
Specifn
3.6
302.3.6
Description
Unit Quantity
3
4
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @
hour
100 cum per hour
Tipper 5.5 cum capacity, 4 trips per hour
hour
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 360 cum = a+b+c
Rate per cum = (a+b+c)/360
Excavation in Marshy Soil
Excavation for roadway in marshy soil with hydraulic
excavator 0.9 cum bucket capacity including cutting and
loading in tippers and disposal with a lift upto 1.5 m and
lead upto 1000 m, trimming of bottom and side slopes in
accordance with requirements of lines, grades and crosssections as per Technical Specification Clause 302.3.6.
3.7
302.3.5
Amount
(Rs.)
5
2.00
6
194.50
7
389.00
3.60
1,400.00
5,040.00
13.50
250.00
3,375.00
1,102.45
9,922.01
27.56
0.08
2.00
194.50
194.50
15.56
389.00
6.00
1,400.00
8,400.00
hour
11.25
250.00
2,812.50
1,452.13
13,069.19
36.30
day
day
0.08
2.00
194.50
194.50
15.56
389.00
hour
3.60
1,400.00
5,040.00
hour
13.50
250.00
3,375.00
1,102.45
9,922.01
27.56
Unit = cum
Taking output = 300 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic excavator 0.90 cum bucket capacity @ 50 hour
cum per hour
Tipper 5.5 cum capacity, 4 trips per hour.
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 300 cum = a+b+c
Rate per cum = (a+b+c)/300
302.3.11 Removal of Unsuitable Soil with Disposal upto 1000
m
Removal of unsuitable soil including excavation, loading and
disposal upto 1000 m lead but excluding compaction
ground supporting embankment subgrade replacement by
suitable soil, which shall be paid separately as per Clause
303.5.2 as per Technical Specification Clause 302.3.11
Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor
b) Machinery
Excavator 0.90 cum bucket capacity @ 100 cum per
hour
Rate
(Rs.)
PanchayatR B Circle-2,Rajkot
[Chapter -3](Page-79)
Sr.
No.
Ref.
MORD
Specifn
Description
3
Excavation in ordinary rock using manual means
including loading in a truck and carrying of excavated
material to embankment site with a lift upto 1.5 m and
lead upto 50 m as per Technical Specification Clause
302.3.5.
Unit = cum
Taking output = 120 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 120 cum = a+b
Rate per cum = (a+b)/120
(ii) Excavation in Ordinary Rock with Dozer with
lead upto 100 m
Excavation for roadway in ordinary rock by deploying a
dozer D-50 including cutting and pushing the cut earth
to site of embankment upto a distance of 100 m
(average lead 50 m), trimming bottom and side slopes
in accordance with the requirements of lines, grades
and cross-sections with lift upto 1.5 m.
Unit = cum
Taking output = 108 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Dozer D-50 @ 50% of 100 cum per hour
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 108 cum = a+b+c
Rate per cum = (a+b+c)/108
(iii) Excavation in Ordinary Rock using Hydraulic
Excavator and Tippers with disposal upto 1000
m
Excavation for roadway in ordinary rock with hydraulic
excavator of 0.9 cum bucket capacity including cutting
and loading in tippers, transporting to embankment site
with a lift upto 1.5 m and lead upto 1000 m, trimming
bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as per
Technical Specification Clause 302.3.5
Unit = cum
Taking output = 240 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity @
40 cum per hour
Tipper 5.5 cum capacity, 4 trips per hour.
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 240 cum = a+b+c
Rate per cum = (a+b+c)/240
PanchayatR B Circle-2,Rajkot
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
2.80
70.00
194.50
194.50
544.60
13,615.00
1,769.95
15,929.55
132.75
day
day
0.12
3.00
194.50
194.50
23.34
583.50
hour
2.16
2,100.00
4,536.00
642.86
5,785.70
53.57
day
day
0.08
2.00
194.50
194.50
15.56
389.00
hour
6.00
1,400.00
8,400.00
hour
9.90
250.00
2,475.00
1,409.95
12,689.51
52.87
[Chapter -3](Page-80)
Sr.
No.
1
3.9
Ref.
MORD
Specifn
2
302.3.5
Description
3
(i) Excavation in Hard Rock (requiring blasting)
with disposal upto 1000 m
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
day
day
0.22
3.00
2.00
0.25
194.50
194.50
194.50
194.50
42.79
583.50
389.00
48.63
hour
hour
6.00
6.00
2,100.00
300.00
12,600.00
1,800.00
6.00
764.00
4,584.00
hour
14.40
250.00
3,600.00
kg
each
70.00
252.00
144.00
35.00
10,080.00
8,820.00
cum
90.00
-185.00
-16,650.00
Note:
3,237.24
29,135.15
161.86
PanchayatR B Circle-2,Rajkot
[Chapter -3](Page-81)
Sr.
No.
Ref.
MORD
Specifn
Description
3
a) Labour
Mate
Mazdoor (Unskilled)
Chiseller
Blacksmith
b) Machinery
Tipper 5.5 cum capacity, 1 trip per hour
Note:
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
day
day
1.64
16.00
24.00
1.00
194.50
194.50
194.50
207.80
318.98
3,112.00
4,668.00
207.80
hour
2.61
250.00
652.50
cum
8.00
-185.00
-1,480.00
934.91
8,414.19
525.89
0.40
10.00
194.50
194.50
77.80
1,945.00
6.00
1,400.00
8,400.00
5.85
18.00
250.00
-185.00
1,462.50
-3,330.00
Note:
1,069.41
9,624.71
267.35
PanchayatR B Circle-2,Rajkot
[Chapter -3](Page-82)
Sr.
No.
Ref.
MORD
Specifn
Description
3
Excavation for roadway in hard rock with controlled
blasting by drilling, blasting and breaking, trimming of
bottom and side slopes in accordance with
requirements of lines, grades and cross-sections,
loading and disposal of cut rock with a lift upto 1.5 m
and leads upto 1000 m as per Technical Specification
Clause 302.3.5
Unit = cum
Taking output = 180 cum
a) Labour
Mate
Mazdoor (Unskilled)
Driller
Blaster
b) Machinery
Dozer D-50 @ 30 cum per hour
Air compressor, 210 cfm with 2 jack hammers
Rate
(Rs.)
Amount
(Rs.)
day
day
day
day
0.22
3.00
2.00
0.50
194.50
194.50
194.50
194.50
42.79
583.50
389.00
97.25
hour
hour
6.00
6.00
2,100.00
300.00
12,600.00
1,800.00
hour
hour
6.00
7.38
764.00
250.00
4,584.00
1,845.00
kg
each
70.00
1,008.00
144.00
35.00
10,080.00
35,280.00
90.00
-185.00
-16,650.00
Note:
Unit Quantity
6,331.44
56,982.98
316.57
302.3.2
PanchayatR B Circle-2,Rajkot
day
day
0.20
5.00
194.50
194.50
38.90
972.50
hour
0.10
2,100.00
210.00
1,221.40
2,442.80
244.28
[Chapter -3](Page-83)
Sr.
No.
1
3.11
3.12
Ref.
MORD
Specifn
2
302.3.2
309
Description
Unit Quantity
3
4
Stripping, Storing and Relaying Top Soil from Borrow
Areas in Agricultural Fields
Stripping of top soil from borrow areas located in agriculture
fields, storing at a suitable place, spreading and relaying
after taking the borrow earth to maintain fertility of the
agricultural field, finishing it to the required levels to the
satisfaction of the farmer/land owner as per Technical
Specification Clause 302.3.2.
Unit = cum
Taking output = 300 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Dozer D-50 with 100 cum per hour output (Initially hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 300 cum = a+b+c
Rate per sqm = (a+b+c)/300
Turfing with Sods
Furnishing and laying of the live sods of perennial turf
forming grass on embankment slope, verges or other
locations shown on the drawing or as directed by the
Engineer including preparation of ground, fetching of sods
and watering as per Technical Specification Clause 309.
Unit = sqm
Talking output = 100 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Water tanker including watering for 3 months
hour
Tractor with Trolley
hour
c) Material
Farmyard manure @ 0.18 cum per 100 sqm at site ocum
3.13
310
Water
kl
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
Seeding and Mulching
Preparation of seed bed on previously laid top soil,
furnishing and placing of seeds, fertilizer, mulching material,
applying bituminous emulsion @ 0.23 litre per sqm and
laying and fixing jute netting, including watering for 3
months all as per Technical Specification Clause 310.
Unit = sqm
Taking output = 240 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
day
day
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
4.00
100.00
194.50
194.50
778.00
19,450.00
6.00
2,100.00
12,600.00
4,103.50
36,931.50
123.11
0.12
3.00
194.50
194.50
23.34
583.50
6.00
300.00
1,800.00
1.00
300.00
300.00
0.18
295.00
53.10
36.00
16.00
576.00
416.99
3,752.93
37.53
0.40
10.00
194.50
194.50
77.80
1,945.00
[Chapter -3](Page-84)
Sr.
No.
Ref.
MORD
Specifn
Description
Rate
(Rs.)
Amount
(Rs.)
3
4
Water tanker 6 kl capacity including watering for 3 hour
months
5
14.00
6
300.00
7
4,200.00
2.40
300.00
720.00
3.60
0.43
8.25
295.00
29.70
126.85
0.052 34,096.81
264.00
30.00
1,773.03
7,920.00
Bitumen Emulsion
Jute netting, open weave, 25 mm square opening
3.14
Unit Quantity
t
sqm
84.00
16.00
1,344.00
2,267.05
20,403.43
85.01
0.04
1.00
194.50
194.50
7.78
194.50
1.00
1,400.00
1,400.00
4.05
100.00
100.00
0.50
0.50
2.00
1.43
250.00
25.68
13.65
2,100.00
2,100.00
300.00
400.00
1,012.50
2,568.48
1,365.18
1,050.00
1,050.00
600.00
572.00
12.00
100.00
16.00
17.50
192.00
1,750.00
3.15
PanchayatR B Circle-2,Rajkot
1,470.30
13,232.74
132.33
[Chapter -3](Page-85)
Sr.
No.
Ref.
MORD
Specifn
303
Description
3
Loosening, Levelling and Compacting original ground
supporting embankment to facilitate placement of first
layer of embankment, scarified to a depth of 150 mm,
mixed with water at OMC and then compacted by
rolling so as to achieve minimum dry density as given in
Tables 300.1 and 300.2 for embankment construction
as per Technical Specification Clause 301.4.1.
Unit Quantity
4
Unit = cum
Taking output = 600 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with ripper attachment
hour
Three wheel 80-100 kN Static Roller
hour
Water tanker 6 kl capacity
hour
c) Material
Water
kl
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 600 cum = a+b+c+d
Rate per sqm = (a+b+c+d)/600
(ii) Compacting original ground supporting subgrade
Rate
(Rs.)
Amount
(Rs.)
0.08
2.00
194.50
194.50
15.56
389.00
6.00
7.50
4.00
300.00
400.00
300.00
1,800.00
3,000.00
1,200.00
24.00
16.00
384.00
848.57
7,637.13
12.73
0.24
6.00
194.50
194.50
46.68
1,167.00
10.00
6.00
4.00
8.60
300.00
2,100.00
300.00
400.00
3,000.00
12,600.00
1,200.00
3,440.00
24.00
16.00
384.00
2,729.71
24,567.39
40.95
PanchayatR B Circle-2,Rajkot
[Chapter -3](Page-86)
Sr.
No.
Ref.
MORD
Specifn
3.17
Description
Unit Quantity
3
4
Taking output = 3500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor skilled
day
b) Machinery
Three wheel static roller 80-100 kN
hour
Water tanker 6 kl, one trip per hour
hour
c) Material
Water
kl
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 3500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/3500
304.3 Presplitting Rock Excavation Slopes
Carrying out excavation in hard rock to achive a specified
slope of the rock face by controlled use of explosives and
blasting accessories in properly aligned and spaced drill
holes, collection of the excavated rock by a D-50 dozer,
loading in tipper by a front end loader and disposing of the
material with a lift upto 1.5 m and lead upto 1000 m as per
Technical Specification Clause 304.3
Unit = sqm
Taking output = 400 sqm (120 cum considering 300
mm average depth of excavation over the existing rock
face)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Air compressor 210 cfm with 2 leads @ 20 cum per hour
hour
Dozer D-50
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 cum capacity 2 trip per hour
hour
c) Material
Gelatine 80 per cent
kg
Electric detonators @ 1 detonator for 2 gelatine each
sticks of 285 gm each
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 400 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/400
306
Rate
(Rs.)
Amount
(Rs.)
0.28
6.00
1.00
194.50
194.50
199.90
54.46
1,167.00
199.90
3.00
2.00
400.00
300.00
1,200.00
600.00
12.00
16.00
192.00
426.67
3,840.03
1.10
0.60
15.00
194.50
194.50
116.70
2,917.50
6.00
300.00
1,800.00
6.00
6.00
9.90
2,100.00
764.00
250.00
12,600.00
4,584.00
2,475.00
42.00
672.00
144.00
35.00
6,048.00
23,520.00
54,061.20
108,122.40
270.31
PanchayatR B Circle-2,Rajkot
[Chapter -3](Page-87)
Sr.
No.
Ref.
MORD
Specifn
Description
3
Construction of embankment with flyash conforming to
Table 1 of IRC:SP:58 obtained from coal or lignite burning
thermal power stations as waste material, spread and
compacted in layer of 200 mm thickness each at OMC, all as
specified in IRC:SP:58 and as per approved plans with lead
upto 1000 m as per Technical Specification Clause 306.
Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 60
cum per hour
Tipper 5.5 cum capacity, flyash 360 x 1.2 = 432 t
Note:
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
0.16
4.00
194.50
194.50
31.12
778.00
hour
6.00
1,400.00
8,400.00
hour
16.00
250.00
4,000.00
360.00
360.00
1.80
1.80
9.00
4.50
25.68
13.65
2,100.00
2,100.00
300.00
400.00
9,246.52
4,914.65
3,780.00
3,780.00
2,700.00
1,800.00
54.00
16.00
864.00
5,036.79
45,331.08
125.92
0.08
2.00
194.50
194.50
15.56
389.00
50.57
455.13
45.51
3.19
307
PanchayatR B Circle-2,Rajkot
[Chapter -3](Page-88)
Sr.
No.
1
Ref.
MORD
Specifn
Description
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
0.01
0.25
194.50
194.50
1.95
48.63
hour
0.04
1,400.00
56.00
13.32
119.89
11.99
day
day
0.12
3.00
194.50
194.50
23.34
583.50
75.86
682.70
68.27
day
day
0.02
0.50
194.50
194.50
3.89
97.25
hour
0.10
1,400.00
140.00
30.14
271.28
27.13
307
Chute Drains
A. Providing chute drains across embankment
slopes in approches of bridges and on horizontal
curves as per drawings.
Unit = 1 m
PanchayatR B Circle-2,Rajkot
[Chapter -3](Page-89)
Sr.
No.
Ref.
MORD
Specifn
Description
B.
3
(a) Earthwork in excavation for foundations of
structures as per drawings and technical
specifications Clause 307 including setting out
construction of shoring and bracing deleterious
matter, dressings of sides and bottom and
backfilling with approved material (By manual
means).
Rate as per item No.11.1 of Chapter 11.
(b) Providing and laying plain cement concrete M15
grade.
Rate as per item No.12.5 of Chapter 12.
(c) Brick Masonry in cement mortar 1:5.
Rate as per item No. 12.1(III) of Chapter 12.
(d) Plastering with cement mortar 1:4.
Rate as per item No. 12.3 of Chapter 12.
(e) Providing P.C.C. M.20 coping on the top of chute
walls.
As per item No. 12.13 of Chapter 12.
Rate per m = a+b+c+d+e
Providing chute drains across embankment
slopes in approches of bridges and on horizontal
curves as per drawings.
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
cum
182.05
0.00
cum
3,948.16
0.00
cum
4,230.36
0.00
sqm
128.57
0.00
268.47
0.00
0.00
cum
182.05
0.00
cum
3,948.16
0.00
cum
2,817.54
0.00
sqm
1,285.71
0.00
268.47
0.00
0.00
Unit = 1 m
(a) Earthwork in excavation for foundations of
structures as per drawings and technical
specifications Clause 307 including setting out
construction of shoring and bracing deleterious
matter, dressings of sides and bottom and
backfilling with approved material (By manual
means).
Rate as per item No.11.1 of Chapter 11.
(b) Providing and laying plain cement concrete M15
grade.
Rate as per item No.12.5 of Chapter 12.
(c) Coursed rubble stone masonry (2nd Sort) in
Rate as per item No. 12.4 II (ii) of Chapter 12.
(d) Plastering with cement mortar 1:4.
Rate as per item No. 12.3 of Chapter 12.
(e) Providing P.C.C. M.20 coping on the top of chute
walls.
As per item No. 12.13 of Chapter 12.
Rate per m = a+b+c+d+e
PanchayatR B Circle-2,Rajkot
[Chapter -3](Page-90)
Chapter 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
Sr.
No.
1
4.1
Ref.
MORD
Description
Unit Quantity
n
Specif
2
3
4
5
401 Granular Sub-base with Well Graded Material
(Table 400.1)
Rate
(Rs.)
Amount
(Rs.)
PanchayatR B Circle-2,Rajkot
0.48
2.00
10.00
194.50
199.90
194.50
93.36
399.80
1,945.00
6.00
30.00
2,100.00
400.00
12,600.00
12,000.00
12.00
5.00
300.00
300.00
3,600.00
1,500.00
192.00
77.00
115.00
30.00
377.50
365.00
150.00
16.00
72,480.00
28,105.00
17,250.00
480.00
18,806.65
169,259.81
564.20
0.48
2.00
10.00
194.50
199.90
194.50
93.36
399.80
1,945.00
6.00
30.00
2,100.00
400.00
12,600.00
12,000.00
12.00
5.00
300.00
300.00
3,600.00
1,500.00
134.00
96.00
153.00
30.00
395.00
365.00
150.00
16.00
52,930.00
35,040.00
22,950.00
480.00
17,942.27
161,480.43
[Chapter -4](Page-91)
Sr.
No.
1
Ref.
MORD
n
Specif
2
401
Description
Unit Quantity
3
4
Rate per cum = (a+b+c+d)/300
(iii) For Grading III Material
Unit = cum
Taking output = 300 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Motor Grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller @ 10 cum hour
per hour
Tractor with Rotavator 25 cum per hour
hour
Water tanker 6 kl capacity
hour
c) Material
Well graded granular sub-base material as per
Table 400.1
9.5 mm to 4.75 mm @ 35 per cent
cum
4.75 mm to 2.36 mm @ 12.5 per cent
cum
2.36 mm below @ 52.5 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
(B) Plant Mix Method
Construction of granular sub-base by providing well
graded material, mixing in a mechanical mix plant at
OMC, carriage of mixed material to work site upto
lead of 1000 m spreading in uniform layers with
motor grader on prepared surface and compacting
with smooth wheel roller to achieve the desired
density, complete as per Technical Specification
Clause 401
(i)
a)
b)
c)
d)
PMGSY SOR 13-14
Rate
(Rs.)
6
Amount
(Rs.)
7
538.27
0.48
2.00
10.00
194.50
199.90
194.50
93.36
399.80
1,945.00
6.00
30.00
2,100.00
400.00
12,600.00
12,000.00
12.00
5.00
300.00
300.00
3,600.00
1,500.00
134.00
48.00
201.60
30.00
365.00
150.00
150.00
16.00
48,910.00
7,200.00
30,240.00
480.00
14,871.02
133,839.18
446.13
0.40
2.00
8.00
194.50
199.90
194.50
77.80
399.80
1,556.00
7.50
4.00
1,000.00
300.00
7,500.00
1,200.00
9.00
764.00
6,876.00
13.60
4.50
22.50
250.00
2,100.00
400.00
3,400.00
9,450.00
9,000.00
144.00
57.00
86.40
24.00
377.50
365.00
150.00
16.00
54,360.00
20,805.00
12,960.00
384.00
15,996.08
[Chapter -4](Page-92)
Sr.
No.
1
4.2
Ref.
MORD
n
Specif
2
402
Description
i)
Unit Quantity
3
4
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
(ii) For Grading II Material
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Wet mix plant @ 60 t capacity per hour
hour
Water tanker 6 kl capacity 5 km lead with one hour
trip per hour
Front end loader 0.9 cum bucket capacity 25
hour
cum per hour
Tipper 5.5 cum, 3 trips per hour
hour
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller 10 cum
hour
output
c) Material
Well graded granular sub-base material as per
Table 400.1
26.5 mm to 9.5 mm @ 35 per cent
cum
9.5 mm to 2.36 mm @ 25 per cent
cum
2.36 mm below @ 40 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
(iii) For Grading III Material
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Wet mix plant @ 60 t capacity per hour
hour
Water tanker 6 kl capacity 5 km lead with one hour
trip per hour
Front end loader 0.9 cum bucket capacity 25
hour
cum per hour
Tipper 5.5 cum, 3 trips per hour
hour
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller 10 cum
hour
output
c) Material
Well graded granular sub-base material as per
Table 400.1
9.5 mm to 4.75 mm @ 35 per cent
cum
4.75 mm to 2.36 mm @ 12.5 per cent
cum
2.36 mm below @ 52.5 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
Gravel/Soil-Aggregate Base (Table 400.2)
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
6
Amount
(Rs.)
7
143,964.68
639.84
0.40
2.00
8.00
194.50
199.90
194.50
77.80
399.80
1,556.00
7.50
4.00
1,000.00
300.00
7,500.00
1,200.00
9.00
764.00
6,876.00
13.60
4.50
22.50
250.00
2,100.00
400.00
3,400.00
9,450.00
9,000.00
100.80
72.00
115.20
24.00
395.00
365.00
150.00
16.00
39,816.00
26,280.00
17,280.00
384.00
15,402.45
138,622.05
616.10
0.40
2.00
8.00
194.50
199.90
194.50
77.80
399.80
1,556.00
7.50
4.00
1,000.00
300.00
7,500.00
1,200.00
9.00
764.00
3,400.00
13.60
4.50
22.50
250.00
2,100.00
400.00
340.00
9,450.00
9,000.00
100.80
36.00
151.20
24.00
365.00
150.00
150.00
16.00
36,792.00
5,400.00
22,680.00
384.00
12,272.45
110,452.05
490.90
[Chapter -4](Page-93)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
Construction of gravel/soil-aggregate base by
providing well graded material, spreading in
uniform layers with motor grader on prepared
surface, mixing by mix in place method with
rotavator at OMC, and compacting with three wheel
80-100 kN static roller to achieve the desired
density, complete as per Technical Specifications
Clause 402
Unit = cum
Taking output = 300 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Motor grader 110 HP @ 50 cum per hour
Three wheel 80-100 kN static roller @ 10 cum
per hour
Water tanker 6 kl capacity
Tractor with Rotavator 25 cum per hour
c) Material
For well graded granular sub-base materials as
per Table 400.2
ii)
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
day
day
day
0.40
2.00
8.00
194.50
199.90
194.50
77.80
399.80
1,556.00
hour
hour
6.00
30.00
2,100.00
400.00
12,600.00
12,000.00
hour
hour
5.00
12.00
300.00
300.00
1,500.00
3,600.00
134.40
172.80
76.80
30.00
407.50
395.00
150.00
16.00
54,768.00
68,256.00
11,520.00
480.00
20,844.70
187,602.30
625.34
day
day
day
0.40
2.00
8.00
194.50
199.90
194.50
77.80
399.80
1,556.00
hour
hour
6.00
30.00
2,100.00
400.00
12,600.00
12,000.00
hour
hour
5.00
12.00
300.00
300.00
1,500.00
3,600.00
cum
288.00
395.00
113,760.00
Unit Quantity
[Chapter -4](Page-94)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
4
2.36 mm below @ 25 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
iii) Gravel/Soil-Aggregate Base (Table 400.2)
Construction of granular sub-base by providing well
graded material, spreading in uniform layers with
motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller
capacity to achieve the desired density, complete as
per Technical Specification Clause 402
c)
403
Rate
(Rs.)
Amount
(Rs.)
5
96.00
30.00
6
150.00
16.00
7
14,400.00
480.00
20,046.70
180,420.30
601.40
day
day
day
0.40
2.00
8.00
194.50
199.90
194.50
77.80
399.80
1,556.00
hour
hour
6.00
30.00
2,100.00
400.00
12,600.00
12,000.00
5.00
12.00
300.00
300.00
1,500.00
3,600.00
255.00
129.00
30.00
365.00
150.00
16.00
93,075.00
19,350.00
480.00
18,079.83
162,718.43
542.39
0.40
2.00
8.00
194.50
199.90
194.50
77.80
399.80
1,556.00
6.00
30.00
2,100.00
400.00
12,600.00
12,000.00
5.00
12.00
300.00
300.00
1,500.00
3,600.00
Unit = cum
Taking output = 300 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Motor grader 110 HP @ 50 cum per hour
Three wheel 80-100 kN static roller @ 10 cum
per hour
4.3
Unit Quantity
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-95)
Sr.
No.
1
4.4
4.5
Ref.
MORD
n
Specif
2
Description
Material
For well graded granular sub-base materials as
per Table 400.3
4.75 to 2.36 mm 40 per cent
cum
2.36 mm below @ 60 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
402 Lime Stabilisation for Improving Subgrade
Laying and spreading available soil in the subgrade on a
prepared surface, pulverising, mixing the spread soil in
place with rotavator with 2 per cent slaked lime having
minimum 70 per cent of contents of CaO, grading with
motor grader and compacting with the smooth wheel
road roller at OMC to the desired density to form a layer
of improved Sub-grade as per Technical Specification
Cluase 403.
(A) By Manual Means
Unit = cum
Taking output = 150 cum (263 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Three wheel 80-100 kN Static roller @ 70 cum hour
Water tanker 6 kl capacity
hour
c) Material
Lime
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 150 cum = a+b+c+d
Rate per cum = ( a+b+c+d)/150
(B) By Mechanical Means
Unit = cum
Taking output = 300 cum (525 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with ripper and rotavator attachments hour
@ 60 cum per hour for ripping and 25 cum per
hour for mixing
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller @ 70 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material
Lime
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Note: The exact quantity of lime shall be as per design.
403 Lime Treated Soil for Sub-Base
c)
Unit Quantity
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
153.60
210.40
30.00
150.00
150.00
16.00
23,040.00
31,560.00
480.00
10,851.70
97,587.50
325.29
1.44
1.00
35.00
194.50
199.90
194.50
280.08
199.90
6,807.50
2.15
3.00
400.00
300.00
860.00
900.00
5.26
18.00
2,000.00
16.00
10,520.00
288.00
2,481.94
22,337.42
148.92
0.36
1.00
8.00
194.50
199.90
194.50
70.02
199.90
1,556.00
12.00
300.00
3,600.00
6.00
4.30
2,100.00
400.00
12,600.00
1,720.00
5.00
300.00
1,500.00
10.50
30.00
2,000.00
16.00
21,000.00
480.00
5,340.74
48,066.66
160.22
[Chapter -4](Page-96)
Sr.
No.
1
4.6
Ref.
MORD
n
Specif
2
Description
3
Providing, laying and spreading soil on a prepared subgrade, pulverising, mixing the spread soil in place with
rotavator with 4 per cent slaked lime with minimum
content of 70 per cent of CaO, grading with motor grader
and compacting with the road roller at OMC to achieve
atleast 98 per cent of the max dry density to form a layer
of sub-base as per Technical Specification Clause 403.
Unit Quantity
4
Unit = cum
Taking output = 300 cum (525 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity hour
Tipper 5.5 cum 4 trips per hour
hour
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN Static roller @ 70 cum hour
per hour
Tractor with rotavator and blade @ 25 cum per hour
hour
Water tanker 6 kl capacity
hour
c) Material
Lime
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Note: The exact quantity of lime shall be as per design.
404 Cement Treated Soil Sub-Base/Base
Providing, laying and spreading soil on a prepared subgrade, pulverising, adding the designed quantity of
cement to the spread soil, mixing in place with rotavator,
grading with the motor grader and compacting with the
road roller at OMC to achieve the desired unconfined
compressive strength and to form a layer of subbase/base as per Technical Specification Clause 404.
Rate
(Rs.)
Amount
(Rs.)
0.48
2.00
10.00
194.50
199.90
194.50
93.36
399.80
1,945.00
5.00
14.00
6.00
4.30
1,400.00
250.00
2,100.00
400.00
7,000.00
3,500.00
12,600.00
1,720.00
12.00
300.00
3,600.00
5.00
300.00
1,500.00
21.00
30.00
2,000.00
16.00
42,000.00
480.00
9,354.77
84,192.93
280.64
day
day
day
0.48
2.00
10.00
194.50
199.90
194.50
93.36
399.80
1,945.00
hour
hour
hour
hour
5.00
14.00
6.00
4.30
1,400.00
250.00
2,100.00
400.00
7,000.00
3,500.00
12,600.00
1,720.00
hour
12.00
300.00
3,600.00
hour
5.00
300.00
1,500.00
Unit = cum
Taking output = 300 cum (525 t)
For 4 per cent quantity of cement by weight
of soil
a)
b)
c)
PMGSY SOR 13-14
Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Machinery
Hydraulic Excavator 0.90 cum bucket capacity
Tipper 5.5 cum
Motor grader 110 HP @ 50 cum per hour
Three wheel 80-100 kN static roller @ 70 cum
per hour
Tractor with rotavator and blade @ 25 cum per
hour
Water tanker 6 kl capacity
Material
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-97)
Sr.
No.
1
4.7
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
4
Cement at site @ 4% (of 525 t)
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum =(a+b+c+d)/300
Note: The exact quantity of cement shall be as per design.
405 Water Bound Macadam Sub-base/base
1) WBM Grading 1
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, stone
screening/binding materials to fill-up the interstices
of coarse aggregate, watering and compacting to the
required density Grading 1 as per Technical
Specification Clause 404.
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum
per hour
Water tanker 6 kl capacity
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per
10 sqm for compacted thickness of 100 mm
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
5
21.00
30.00
6
7,670.20
16.00
7
161,074.20
480.00
24,239.05
218,151.41
727.17
day
day
day
10.08
2.00
250.00
194.50
199.90
194.50
1,960.56
399.80
48,625.00
hour
36.00
400.00
14,400.00
hour
24.00
300.00
7,200.00
cum
435.60
467.05
203,446.98
97.20
390.00
37,908.00
28.80
85.00
2,448.00
144.00
16.00
2,304.00
39,836.54
358,528.88
995.91
0.68
2.00
15.00
194.50
199.90
194.50
132.26
399.80
2,917.50
7.20
2,100.00
15,120.00
36.00
400.00
14,400.00
24.00
300.00
7,200.00
Stone Screenings
Type A 13.2 mm for Grading-1 @ 0.27 cum cum
per 10 sqm
Binding Material
Binding Material @ 0.08 cum per 10 sqm for cum
grading 1 material
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Motor grader 110 HP @ 50 cum per hour for hour
spreading
Three wheel 80-100 kN static roller @ 10 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
PMGSY SOR 13-14
Rate
(Rs.)
[Chapter -4](Page-98)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
Unit Quantity
4
Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per cum
10 sqm for compacted thickness of 100 mm
2)
Stone Screening
Type A 13.2 mm for Grading-1 @ 0.27 cum cum
per 10 sqm
Binding Material
Binding Material @ 0.08 cum per 10 sqm for cum
Grading 2 material
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
WBM Grading 2
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and
camber,
applying
and
brooming,
stone
screening/binding materials to fill-up the interstices
of coarse aggregate, watering and compacting to the
required density grading 2 as per Technical
Specification Clause 405.
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Three wheel 80-100 kN static roller @ 8 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 cum
sqm for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum cum
per 10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for cum
Grading 2 material
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
435.60
467.05
203,446.98
97.20
390.00
37,908.00
28.80
85.00
2,448.00
144.00
16.00
2,304.00
35,784.57
322,061.11
894.61
10.08
2.00
250.00
194.50
199.90
194.50
1,960.56
399.80
48,625.00
45.00
400.00
18,000.00
24.00
300.00
7,200.00
435.60
390.00
169,884.00
96.01
390.00
37,443.90
28.80
85.00
2,448.00
144.00
16.00
2,304.00
36,033.16
324,298.42
900.83
0.68
2.00
15.00
194.50
199.90
194.50
132.26
399.80
2,917.50
[Chapter -4](Page-99)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
4
Motor grader 110 HP @ 50 cum per hour for hour
spreading
Three wheel 80-100 kN static roller @ 8 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 cum
sqm for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum cum
per 10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for cum
Grading 2 material
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Note: Type A Screening can be used in Grading 2
3) WBM Grading 3
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening to
fill-up the interstices of coarse aggregate, watering
and compacting to the required density Grading 3 as
per Technical Specification Clause 405.
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Three wheel 80-100 kN static roller @ 8 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per cum
10 sqm for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum cum
per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
5
7.20
6
2,100.00
7
15,120.00
45.00
400.00
18,000.00
24.00
300.00
7,200.00
435.60
390.00
169,884.00
96.01
390.00
37,443.90
28.80
85.00
2,448.00
144.00
16.00
2,304.00
31,981.18
287,830.64
799.53
10.08
2.00
250.00
194.50
199.90
194.50
1,960.56
399.80
48,625.00
45.00
400.00
18,000.00
24.00
300.00
7,200.00
435.60
470.00
204,732.00
86.40
470.00
40,608.00
144.00
16.00
2,304.00
40,478.67
364,308.03
1,011.97
0.68
194.50
132.26
[Chapter -4](Page-100)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
b)
c)
4.8
405
Mazdoor (Skilled)
Mazdoor (Unskilled)
Machinery
Motor grader 110 HP @ 50 cum per hour for
spreading
Three wheel 80-100 kN static roller @ 8 cum
per hour
Water tanker 6 kl capacity
Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per
10 sqm for compacted thickness of 75 mm
Unit Quantity
5
2.00
15.00
6
199.90
194.50
7
399.80
2,917.50
hour
7.20
2,100.00
15,120.00
hour
45.00
400.00
18,000.00
hour
24.00
300.00
7,200.00
cum
435.60
470.00
204,732.00
86.40
470.00
40,608.00
144.00
16.00
2,304.00
36,426.70
327,840.26
910.67
10.08
2.00
250.00
194.50
199.90
194.50
1,960.56
399.80
48,625.00
36.00
400.00
14,400.00
24.00
300.00
7,200.00
435.60
467.05
203,446.98
108.00
120.00
12,960.00
144.00
16.00
2,304.00
36,412.04
327,708.38
910.30
Amount
(Rs.)
4
day
day
Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum cum
per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Water Bound Macadam with Crushable Screenings
1) WBM Grading 1
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, crushable
screening to fill-up the interstices of coarse
aggregate, watering and compacting to the required
density Grading 1 as per Technical Specification
Clause 405.
Rate
(Rs.)
[Chapter -4](Page-101)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
Amount
(Rs.)
5
0.68
2.00
15.00
6
194.50
199.90
194.50
7
132.26
399.80
2,917.50
hour
7.20
2,100.00
15,120.00
hour
36.00
400.00
14,400.00
hour
24.00
300.00
7,200.00
cum
435.60
467.05
203,446.98
108.00
120.00
12,960.00
144.00
16.00
2,304.00
32,360.07
291,240.61
809.00
10.08
2.00
250.00
194.50
199.90
194.50
1,960.56
399.80
48,625.00
45.00
400.00
18,000.00
24.00
300.00
7,200.00
435.60
390.00
169,884.00
105.59
120.00
12,670.80
144.00
16.00
2,304.00
32,630.52
293,674.68
815.76
0.68
2.00
194.50
199.90
132.26
399.80
c)
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Machinery
Motor grader 110 HP @ 50 cum per hour for
spreading
Three wheel 80-100 kN static roller @ 10 cum
per hour
Water tanker 6 kl capacity
Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per
10 sqm for compacted thickness of 100 mm
Rate
(Rs.)
4
day
day
day
b)
2)
Unit Quantity
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-102)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3)
3
4
Mazdoor (Unskilled)
day
b) Machinery
Motor grader 110 HP @ 50 cum per hour for hour
spreading
Three wheel 80-100 kN @ static roller 8 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per cum
10 sqm for compacted thickness of 75 mm
Crushable type such as Moorum or gravel for cum
Grading 2 @ 0.22 cum per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
WBM Grading 3
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, crushable
screening to fill-up the interstices of coarse
aggregate, watering and compacting to the required
density Grading 3 as per Technical Specification
Clause 405.
Rate
(Rs.)
Amount
(Rs.)
5
15.00
6
194.50
7
2,917.50
7.20
2,100.00
15,120.00
45.00
400.00
18,000.00
24.00
300.00
7,200.00
435.60
390.00
169,884.00
105.59
120.00
12,670.80
144.00
16.00
2,304.00
28,578.55
257,206.91
714.46
day
day
day
10.08
2.00
250.00
194.50
199.90
194.50
1,960.56
399.80
48,625.00
hour
45.00
400.00
18,000.00
hour
24.00
300.00
7,200.00
cum
435.60
470.00
204,732.00
105.59
120.00
12,670.80
144.00
16.00
2,304.00
36,986.52
332,878.68
924.66
0.68
2.00
15.00
194.50
199.90
194.50
132.26
399.80
2,917.50
Unit Quantity
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-103)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
4.9
406
407
Amount
(Rs.)
5
7.20
6
2,100.00
7
15,120.00
hour
45.00
400.00
18,000.00
hour
24.00
300.00
7,200.00
cum
435.60
470.00
204,732.00
105.59
120.00
12,670.80
144.00
16.00
2,304.00
32,934.55
296,410.91
823.36
day
day
day
0.40
8.00
2.00
194.50
194.50
199.90
77.80
1,556.00
399.80
hour
hour
hour
hour
hour
hour
4.00
4.00
5.00
2.00
1.33
6.25
764.00
1,000.00
250.00
2,100.00
300.00
400.00
3,056.00
4,000.00
1,250.00
4,200.00
399.00
2,500.00
cum
39.90
470.00
18,753.00
cum
53.20
457.50
24,339.00
39.90
230.00
9,177.00
8.00
16.00
128.00
8,729.45
78,565.05
785.65
4.10
Rate
(Rs.)
4
hour
c)
3
Motor grader 110 HP @ 50 cum per hour for
spreading
Three wheel 80-100 kN @ Static roller 8 cum
per hour
Water tanker 6 kl capacity
Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per
10 sqm for compacted thickness of 75 mm
Unit Quantity
A.
PMGSY SOR 13-14
Earthen Shoulders
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-104)
Sr.
No.
1
4.11
Ref.
MORD
n
Specif
2
408
Description
3
The rate as applicable for sub-grade construction
may be adopted.
B.
Hard Shoulders
Rate as applicable for sub-base and/or base may be
adopted as per approved design.
C.
Paved Shoulders
The rates may be adopted as applicable for different
layers of pavement depending upon approved design
of paved shoulders.
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
day
0.48
2.00
10.00
194.50
199.90
194.50
93.36
399.80
1,945.00
hour
hour
6.00
30.00
2,100.00
400.00
12,600.00
12,000.00
hour
hour
12.00
5.00
300.00
300.00
3,600.00
1,500.00
384.00
30.00
201.89
16.00
77,525.76
480.00
13,767.99
123,911.91
413.04
0.40
2.00
8.00
194.50
199.90
194.50
77.80
399.80
1,556.00
6.00
30.00
2,100.00
400.00
12,600.00
12,000.00
5.00
12.00
300.00
300.00
1,500.00
3,600.00
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-105)
Ref.
MORD
n
Specif
2
4.12
408
Sr.
No.
Description
Unit Quantity
3
4
As per Item No.4.2 of Chapter 4
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Construction of Water Bound Macadam using
locally available material (Table 400.13)
Rate
(Rs.)
Amount
(Rs.)
5
384.00
30.00
6
201.89
16.00
7
77,525.76
480.00
13,717.42
123,456.78
411.52
day
day
day
0.68
2.00
15.00
194.50
199.90
194.50
132.26
399.80
2,917.50
hour
7.20
2,100.00
15,120.00
hour
45.00
400.00
18,000.00
hour
24.00
300.00
7,200.00
cum
435.60
201.89
87,943.28
144.00
16.00
2,304.00
16,752.11
150,768.95
418.80
4.13
409
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Lime-Flyash Stablised Soil Sub-base
Construction of sub-base using lime-flyash admixture with
granular soil, free from organic matter/deleterious
material or clayey silts and low plasticity clays having PI
between 5 and 20 and liquid limit less than 25 and
commercial dry lime, slaked at site or pre-slaked with CaO
content not less than 50 per cent, flyash to conform to
gradation as per Clause 4.3 of IRC:SP:20, lime+flyash
content ranging between 10 to 30 per cent, the minimum
un-confined compressive strength and CBR value after 28days curing and 4-days soaking to be 0.75 MPa and 25
per cent respectively, all as specified in IRC:88 including a
lead upto 1000 m as per Technical Specification Cluase
409.
Unit = cum
Taking output = 480 cum (720 t, density 1.50 t/cum)
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-106)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
Assumptions made
Total mass taken for analysis = 720 t
Lime+Flyash admixture
@ 20% = 0.2 x 720=144 t
Soil = 720-144 = 578 t
(578/1.6 = 360 cum)
Lime + Flyash = 144 t
Ratio Lime 4 : Flyash 16
Lime = 29 t
Flyash = 115 t
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity
@ 60 cum per hour for 360 cum soil
4.14
410
Rate
(Rs.)
Amount
(Rs.)
day
day
day
0.28
6.00
1.00
194.50
194.50
199.90
54.46
1,167.00
199.90
hour
6.00
1,400.00
8,400.00
hour
16.00
250.00
4,000.00
5.50
250.00
1,375.00
3.80
250.00
950.00
480.00
480.00
6.00
3.20
25.68
13.65
300.00
2,100.00
12,328.69
6,552.87
1,800.00
6,720.00
12.00
12.00
400.00
300.00
4,800.00
3,600.00
29.00
360.00
2,000.00
17.50
58,000.00
6,300.00
72.00
16.00
1,152.00
14,674.99
132,074.91
275.16
Note:
Unit Quantity
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-107)
Sr.
No.
1
4.15
4.16
Ref.
MORD
n
Specif
2
410
410
Description
3
Construction of Sub-base by providing crushed slag
spreading in uniform layer with motor grader on prepared
surface mixing by mix-in-place method with Rotavator @
OMC, and compacting with three wheel 80-100 kN static
roller to achieve the desired density complete as per
Technical Specifications Cluase 402.4 and 410.3.2
Unit Quantity
4
Unit = cum
Taking output = 300 cum
(a) Labour
As per Item No.4.1 of Chapter 4
(b) Machinery
As per Item No.4.1 of Chapter 4
(c) Material
Crushed slag as per Clause 410.4.2 (i)
As per Item No.4.2 of Chapter 4
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Water Bound Macadam using crushed slag
Providing, laying, spreading and compacting crushed slag
to water Bound Macadam specification including
spreading in uniform thickness, hand packing rolling with
smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming requisite type of
screening/binding materials to fill up the interstees of
crushed slag watering and compacting to the required
density as per Clause 405.3 and Technical Specification
Cluase 410.3.2.
Unit = cum
Taking output = 360 cum
(a) Labour
As per Item No. 4.7 of Chapter 4
(b) Machinery
As per Item No.4.7 of Chapter 4
(c) Material
As per Item No.4.8 (1)(A) of Chapter 4
Crushed slag as per Clause 410.4.2 (ii)
cum
Crushable screening
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Cement Bound Granular Material sub-base/base
Rate
(Rs.)
Amount
(Rs.)
2,438.16
29,700.00
384.00
30.00
330.00
16.00
126,720.00
480.00
19,917.27
179,255.43
597.52
435.60
108.00
144.00
330.00
120.00
16.00
143,748.00
12,960.00
2,304.00
19,876.50
178,888.50
496.91
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-108)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Note: (i)
Unit Quantity
3
4
For 4 per cent quantity of cement by wt of
granulated blast furnace slag
(a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
(b) Machinery
5.50 cum Tipper for carriage of GBFS add 10 hour
per cent of cost of carriage of cover cost of
loading and unloading
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller @ 70 cum hour
per hour
Tractor with rotavator and blade @ 25 cum per hour
hour
Water tanker 6 kl capacity
hour
(c) Material
Cement (4%)
t
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Rate
(Rs.)
Amount
(Rs.)
0.48
2.00
10.00
194.50
199.90
194.50
93.36
399.80
1,945.00
15.00
250.00
3,750.00
6.00
4.30
2,100.00
400.00
12,600.00
1,720.00
12.00
300.00
3,600.00
7.00
300.00
2,100.00
21.00
42.00
7,670.20
16.00
161,074.20
672.00
23,494.30
211,448.66
704.83
0.48
2.00
10.00
194.50
199.90
194.50
93.36
399.80
1,945.00
14.00
300.00
4,200.00
6.00
45.00
2,100.00
400.00
12,600.00
18,000.00
6.00
300.00
1,800.00
157.46
151.06
116.68
36.00
380.00
525.00
365.00
16.00
59,834.80
79,306.50
42,588.20
576.00
27,667.96
249,011.62
411
By mix-in-place method
(i) With 53 mm maximum size of aggregates
Unit = cum
Taking output = 360 cum
(a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
(b) Machinery
Tractor attached with rotavator @ 25 cum per hour
hour
Motor-Grader 110 H.P
hour
Three wheel 80-100 kN static roller @ 8 cum
hour
per hour
Water tanker 6 kl capacity
hour
(c) Material
Aggregate at site
For 53 mm maximum size
63 mm to 45 mm @ 33 per cent
cum
22.5 mm to 5.6 mm @ 32 per cent
cum
Below 5.6 mm @ 35 per cent
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
PanchayatR B Circle-2,Rajkot
[Chapter -4](Page-109)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
Rate per cum = (a+b+c+d)/360
(ii) With 37.5 mm maximum size of aggregates
B)
Unit Quantity
4
Unit = cum
Taking output = 360 cum
(a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
(b) Machinery
Tractor attached with rotavator @ 25 cum per hour
hour
Motor-Grader 110 H.P
hour
Three wheel 80-100 kN static roller @ 8 cum
hour
per hour
Water tanker 6 kl capacity
hour
(c) Material
Aggregate at site
For 37.5 mm maximum size
45 mm to 22.5 mm @ 5 per cent
cum
22.4 mm to 5.6 mm @ 50 per cent
cum
Below 5.6 mm @ 45 per cent
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
By mixing plant method
(i) With 53 mm maximum size of aggregates
Unit = cum
Taking output = 225 cum (450 t)
(a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
(b) Machinery
Wet mix plant @ 75 t per hour
hour
Electric generator set, 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Motor grader 110 HP
hour
Three wheel roller 80-100 kN @ 8 cum per hour
hour
Water tanker
hour
Tipper
hour
(c) Material
Aggreate at site
For 53 mm maximum size
63 mm to 45 mm @ 33 per cent
cum
22.4 mm to 5.6 mm @ 32 per cent
cum
Below 5.6 mm @ 35 per cent
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
(ii) With 37.5 mm maximum size of aggregates
Unit = cum
Taking output = 225 cum (450 t)
(a) Labour
Mate
day
Mazdoor (Skilled)
day
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
6
Amount
(Rs.)
7
691.70
0.48
2.00
10.00
194.50
199.90
194.50
93.36
399.80
1,945.00
14.00
300.00
4,200.00
6.00
45.00
2,100.00
400.00
12,600.00
18,000.00
6.00
300.00
1,800.00
24.12
237.60
213.48
36.00
525.00
525.00
365.00
16.00
12,663.00
124,740.00
77,920.20
576.00
31,867.17
286,804.53
796.68
0.28
1.00
6.00
194.50
199.90
194.50
54.46
199.90
1,167.00
6.00
6.00
6.00
6.00
28.13
1,000.00
700.00
764.00
2,100.00
400.00
6,000.00
4,200.00
4,584.00
12,600.00
11,252.00
3.00
10.00
300.00
250.00
900.00
2,500.00
98.40
94.41
104.18
18.00
380.00
525.00
365.00
16.00
37,392.00
49,565.25
38,025.70
288.00
21,091.04
189,819.35
843.64
0.28
1.00
194.50
199.90
54.46
199.90
[Chapter -4](Page-110)
Sr.
No.
1
4.18
4.19
Ref.
MORD
n
Specif
2
412
413
Description
Unit Quantity
3
4
Mazdoor (Unskilled)
day
(b) Machinery
Wet mix plant @ 75 t per hour
hour
Electric generator set, 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Mortar grader 110 HP
hour
Three wheel roller 80-100 kN @ 8 cum per hour
hour
Water tanker
hour
Tipper
hour
(c) Material
Aggreate at site
For 37.5 mm maximum size
45 mm to 22.5 mm @ 5 per cent
cum
22.4 mm to 5.6 mm @ 50 per cent
cum
Below 5.6 mm @ 45 per cent
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
Brick Soling
Laying brick soling layer on prepared sub-grade with brick
on end edging according to lines, graded and crosssection shown on the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick
soling, watering and rolliing the same with three wheel
road roller 80-100 kN as per Technical Specification
Clause 412
Unit = sqm
Taking ouput = 150 sqm
(a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mason 1st Class
day
(b) Machinery
Three wheel 80-100 kN static roller
hour
Water tanker
hour
(c) Material
Brick 1st Class
No.
Brick 1st Class on edging
No.
Fine Sand
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 150 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/150
Stone Set Pavement
Providing and laying stone set pavement on prepared
surface with sub-base 100 mm thick compacted Granular
Sub-base as per Clause 401.4 and base 75 mm thick
compacted water bound macadam grading 2 as per
Clause 405.3. The 150 mm thick hammer desired stones
are laid in the herring one or stretched bond pattern. The
stones are compacted into the bedding sand of 40 mm
over the WBM base bounded by edge stone using suitable
compacting device. The gaps are filled with fine sand
stone dust as per Technical Specification Clause 413.4
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
5
6.00
6
194.50
7
1,167.00
6.00
6.00
6.00
6.00
28.13
1,000.00
700.00
764.00
2,100.00
400.00
6,000.00
4,200.00
4,584.00
12,600.00
11,252.00
3.00
10.00
300.00
250.00
900.00
2,500.00
15.06
148.50
133.00
18.00
525.00
525.00
365.00
16.00
7,906.50
77,962.50
48,545.00
288.00
22,269.92
200,429.28
890.80
0.52
10.00
3.00
194.50
194.50
207.80
101.14
1,945.00
623.40
1.00
1.00
400.00
300.00
400.00
300.00
8,160.00
1,100.00
5.66
6.00
4.69
4.69
312.31
16.00
38,270.40
5,159.00
1,767.67
96.00
6,082.83
54,745.44
364.97
[Chapter -4](Page-111)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
Unit Quantity
4
Unit = sqm
Taking output = 360 sqm
(a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mason 2nd class for laying sett stone and edge day
stone
(b) Machinery
Three wheel 80-100 kN static roller
hour
Water tanker 6 kl capacity
hour
(c) Material
(1) Collection of fine sand
3.4x0.285x0.150x1.20 = 0.174
cum
(2) Coarse sand
96x3.35x0.04x1.20 = 15.437 cum
cum
(3) Collection of stone sett stone
300 mmx200 mmx150 mm
Nos
(4) Collection of edge stone
450 mmx200 mmx350 mm
Nos
(5) Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 360 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/360
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
2.16
51.00
13.00
194.50
194.50
199.90
420.12
9,919.50
2,598.70
2.00
1.00
400.00
300.00
800.00
300.00
0.174
312.31
54.34
15.437
332.31
5,129.87
5,168.00
195.00
1,007,760.00
464.00
6.00
72.00
16.00
33,408.00
96.00
132,560.82
1,193,047.35
3,314.02
[Chapter -4](Page-112)
Chapter 5
BASES AND SURFACE COURSES (BITUMINOUS)
Ref.
Sr.
MORD
No.
Specifn
1
5.1
2
502
Description
3
Prime Coat
(i) Low porosity
Providing and applying primer coat with bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 0.70-1.0 kg/sqm using mechanical means
as per Technical Specification Clause 502
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Bitumen emulsion pressure distributor @ 1750 sqm
per hour
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
0.04
1.00
194.50
194.50
7.78
194.50
hour
hour
hour
1.40
1.40
1.00
300.00
300.00
840.00
420.00
420.00
840.00
0.50
300.00
150.00
1.48 34,096.81
3.00
16.00
50,463.28
48.00
6,567.94
59,111.50
33.78
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Bitumen emulsion pressure distributor @ 1750 sqm
per hour
day
day
0.10
2.00
194.50
194.50
19.45
389.00
hour
hour
hour
1.40
1.40
1.00
300.00
300.00
840.00
420.00
420.00
840.00
0.50
300.00
150.00
1.83 34,096.81
3.00
16.00
62,397.16
48.00
8,085.45
72,769.06
41.58
PanchayatR B Circle-2,Rajkot
[Chapter -5](Page-113)
Ref.
Sr.
MORD
No.
Specifn
1
5.2
Description
503
3
Providing and applying primer coat with Bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 1.2-1.5 kg/sqm using mechanical means
as per Technical Specification Clause 502.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Bitumen emulsion pressure distributor @ 1750 sqm
per hour
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
0.12
3.00
194.50
194.50
23.34
583.50
hour
hour
hour
1.40
1.40
1.00
300.00
300.00
840.00
420.00
420.00
840.00
0.50
300.00
150.00
2.36 34,096.81
3.00
16.00
80,468.47
48.00
10,369.16
93,322.48
53.33
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Emulsion pressure distributor @1750 sqm per hour
day
day
0.04
1.00
194.50
194.50
7.78
194.50
hour
hour
hour
1.40
1.40
1.00
300.00
300.00
840.00
420.00
420.00
840.00
0.39 36,696.81
14,311.76
2,024.25
18,218.29
10.41
c) Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm
t
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1750
(ii) Providing and applying tack coat with Bitumen emulsion
(RS-1) using emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared dry and hungry
bituminous surface cleaned with Hydraulic broom as
per Technical Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
0.04
1.00
194.50
194.50
7.78
194.50
[Chapter -5](Page-114)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Emulsion pressure distributor @1750 sqm per hour hour
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm
t
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1750
(iii) Providing and applying tack coat with Bitumen emulsion
(RS-1) using emulsion distributor at the rate of 0.25
to 0.30 kg per sqm on the prepared granular surfaces
treated with primer & cleaned with Hydraulic broom as
per Technical Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Emulsion pressure distributor @1750 sqm per hour
300.00
300.00
840.00
420.00
420.00
840.00
0.48 36,696.81
17,614.47
2,437.09
21,933.84
12.53
0.04
1.00
194.50
194.50
7.78
194.50
hour
hour
hour
1.40
1.40
1.00
300.00
300.00
840.00
420.00
420.00
840.00
0.48 36,696.81
17,614.47
2,437.09
21,933.84
12.53
c) Material
Bitumen emulsion (RS-1) @ 0.325 kg per sqm
t
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d) / 1750
PanchayatR B Circle-2,Rajkot
1.40
1.40
1.00
Amount
(Rs.)
day
day
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm
t
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1750
(iv) Providing and applying tack coat with Bitumen emulsion
(RS-1) using emulsion pressure distributor at the rate
of 0.30 to 0.35 kg per sqm on the prepared nonbituminous surfaces (cement concrete pavement)
cleaned with Hydraulic broom as per Technical
Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Emulsion pressure distributor @1750 sqm per hour hour
Rate
(Rs.)
0.04
1.00
194.50
194.50
7.78
194.50
1.40
1.40
1.00
300.00
300.00
840.00
420.00
420.00
840.00
0.57 36,696.81
20,917.18
2,849.93
25,649.39
14.66
[Chapter -5](Page-115)
Ref.
Sr.
MORD
No.
Specifn
1
5.3
Description
504
Unit Quantity
4
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
day
day
day
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
hour
6.00
9,000.00
54,000.00
hour
hour
hour
hour
hour
hour
hour
hour
1.10
1.10
6.00
6.00
6.00
6.21
12.00
6.00
300.00
300.00
1,200.00
700.00
764.00
250.00
400.00
1,200.00
330.00
330.00
7,200.00
4,200.00
4,584.00
1,552.50
4,800.00
7,200.00
7.425 44,543.81
330,737.79
58.02
58.02
29.01
25,528.80
25,647.74
12,823.87
60,197.57
541,778.11
5,285.64
c) Material
i) Bitumen @ 3.3 per cent of mix
t
ii) Aggregate
Total weight of mix = 225 t
Weight of bitumen = 7.425 t
Weight of aggregate = 225 7.425 = 217.575 t
Taking density of aggregate = 1.5 t/cum
Volume of aggregate = 145.05 cum
(19 mm nominal size)
25 -10 mm - 40 per cent
cum
10 5 mm - 40 per cent
cum
5 mm and below - 20 per cent
cum
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 102.5 cum = a+b+c+d
Rate per cum = a+b+c+d/102.5
Rate
(Rs.)
440.00
442.05
442.05
[Chapter -5](Page-116)
Ref.
Sr.
MORD
No.
Specifn
1
5.4
Note:
505
Description
3
Unit Quantity
4
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
5.50
100.50
10.00
2.50
25.50
194.50
194.50
194.50
199.90
196.30
1,069.75
19,547.25
1,945.00
499.75
5,005.65
6.00
160.00
960.00
6.00
400.00
2,400.00
2.40 44,543.81
106,905.14
80.00
378.00
30,240.00
10.40
457.50
4,758.00
21,666.32
[Chapter -5](Page-117)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Cost of 800 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/800
(II) Bitumen (S-65)
a) Labour
Mate
Mazdoor (Unskilled)
Chips spreader
Bitumen Sprayer
Mazdoor (Semi-Skilled)
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted
with spray set
Unit Quantity
4
day
day
day
day
day
Amount
(Rs.)
7
194,996.86
243.75
5.50
100.50
10.00
2.50
25.50
194.50
194.50
194.50
199.90
196.30
1,069.75
19,547.25
1,945.00
499.75
5,005.65
hour
6.00
160.00
960.00
6.00
400.00
2,400.00
2.40 44,966.00
107,918.40
80.00
378.00
30,240.00
10.40
457.50
4,758.00
21,792.98
196,136.78
245.17
0.40
8.00
2.00
194.50
194.50
199.90
77.80
1,556.00
399.80
6.00
2,100.00
12,600.00
3.43
840.00
2,881.20
10.00
22.50
250.00
400.00
2,500.00
9,000.00
5.00
764.00
3,820.00
9.00 44,543.81
400,894.29
300.00
378.00
113,400.00
39.00
457.50
17,842.50
Rate
(Rs.)
PanchayatR B Circle-2,Rajkot
70,621.45
[Chapter -5](Page-118)
Ref.
Sr.
MORD
No.
Specifn
1
5.5
Description
3
Cost of 3000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/3000
Note: 2 tippers will be needed to match the capacity of hydraulic
chip spreader and front end loader.
506
Unit Quantity
4
Rate
(Rs.)
6
Amount
(Rs.)
7
635,593.04
211.86
day
day
day
0.32
6.00
2.00
194.50
194.50
199.90
62.24
1,167.00
399.80
hour
6.00
2,100.00
12,600.00
hour
2.57
840.00
2,158.80
10.00
250.00
2,500.00
22.50
6.00
400.00
764.00
9,000.00
4,584.00
7.87 44,543.81
270.00
270.00
350,559.78
72,900.00
PanchayatR B Circle-2,Rajkot
81.00
550.00
44,550.00
62,560.20
563,041.83
125.12
0.40
8.00
2.00
194.50
194.50
199.90
77.80
1,556.00
399.80
6.00
2,100.00
12,600.00
2.57
840.00
2,158.80
[Chapter -5](Page-119)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Tipper 5.5 cum capacity for carriage of aggregates
Three wheel 80-100 kN static roller
Front end loader 1 cum bucket capacity
c) Material
Bitumen @ 2 kg per sqm
40 mm size hand broken metal @ 0.09 cum per
sqm
Unit Quantity
4
hour
hour
hour
t
cum
5.6
507
5
10.00
33.75
6.00
Rate
(Rs.)
6
250.00
400.00
764.00
7
2,500.00
13,500.00
4,584.00
9.00 44,543.81
405.00
270.00
400,894.29
109,350.00
81.00
550.00
44,550.00
74,021.34
666,192.03
148.04
0.40
8.00
2.00
194.50
194.50
199.90
77.80
1,556.00
399.80
6.00
2,100.00
12,600.00
2.57
840.00
2,158.80
10.00
33.75
6.00
250.00
400.00
764.00
2,500.00
13,500.00
4,584.00
9.00 44,966.00
405.00
270.00
404,694.00
109,350.00
81.00
550.00
PanchayatR B Circle-2,Rajkot
day
day
day
day
Amount
(Rs.)
44,550.00
74,496.30
670,466.70
148.99
2.60
1.00
58.00
6.00
194.50
199.90
194.50
196.30
505.70
199.90
11,281.00
1,177.80
[Chapter -5](Page-120)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Bitumen boiler oil fired, capacity 1000 litre fitted
with spray set
Three wheel 80-100 kN static roller
Add: 0.5 per cent of (a) Labour for sundries
c) Material
Bitumen (S-90) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
Unit Quantity
5
2.25
6
160.00
7
360.00
hour
L.S.
2.25
400.00
900.00
65.82
t
cum
0.90 44,543.81
9.00
535.00
40,089.43
4,815.00
Amount
(Rs.)
4
hour
Rate
(Rs.)
7,424.33
66,818.98
74.24
2.60
1.00
58.00
6.00
194.50
199.90
194.50
196.30
505.70
199.90
11,281.00
1,177.80
2.25
160.00
360.00
2.25
400.00
900.00
65.822
0.90 44,966.00
9.00
535.00
40,469.40
4,815.00
7,471.83
67,246.45
74.72
2.60
1.00
58.00
6.00
194.50
199.90
194.50
196.30
505.70
199.90
11,281.00
1,177.80
2.25
160.00
360.00
2.25
400.00
900.00
65.822
0.90 48,775.00
9.00
535.00
43,897.50
4,815.00
7,900.34
71,103.06
79.00
[Chapter -5](Page-121)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Taking output = 900 sqm
a) Labour
Mate
Bitumen Sprayer
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b)Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted
with spray set
Three wheel 80-100 kN static roller
Add: 0.5 per cent of (a) Labour for sundries
c) Material
Crumb Rubber Modified Bitumen @ 1.00 kg per
sqm
Unit Quantity
4
2.60
1.00
58.00
6.00
194.50
199.90
194.50
196.30
505.70
199.90
11,281.00
1,177.80
hour
2.25
160.00
360.00
hour
L.S.
2.25
400.00
900.00
65.822
0.90 48,775.00
43,897.50
Amount
(Rs.)
day
day
day
day
Rate
(Rs.)
9.00
535.00
4,815.00
7,900.34
71,103.06
79.00
2.60
1.00
58.00
6.00
194.50
199.90
194.50
196.30
505.70
199.90
11,281.00
1,177.80
2.25
2.25
160.00
400.00
360.00
900.00
65.82
0.90 49,565.00
44,608.50
9.00
535.00
4,815.00
7,989.22
71,902.94
79.89
2.60
1.00
58.00
6.00
194.50
199.90
194.50
196.30
505.70
199.90
11,281.00
1,177.80
2.00
160.00
320.00
2.00
400.00
800.00
[Chapter -5](Page-122)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
c) Material
Bitumen (S-90) @ 0.90 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(II)Bitumen (S-65)
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 0.90 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 0.90 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
0.90 44,543.81
8.00
440.00
40,089.43
3,520.00
7,236.73
65,130.56
65.13
2.60
1.00
58.00
6.00
194.50
199.90
194.50
196.30
505.70
199.90
11,281.00
1,177.80
2.00
160.00
320.00
2.00
400.00
800.00
0.90 44,966.00
8.00
440.00
40,469.40
3,520.00
7,284.23
65,558.03
65.56
2.60
1.00
58.00
6.00
194.50
199.90
194.50
194.50
505.70
199.90
11,281.00
1,167.00
2.00
160.00
320.00
2.00
400.00
800.00
0.90 48,775.00
8.00
440.00
43,897.50
3,520.00
7,711.39
69,402.49
69.40
2.60
1.00
58.00
6.00
194.50
199.90
194.50
196.30
505.70
199.90
11,281.00
1,177.80
[Chapter -5](Page-123)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 0.90 kg per t
sqm
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 0.90 kg per t
sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(B) By Mechanical Means
Case I: Nominal chipping size 13.2 mm
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Hydraulic self propelled chip spreader @ 1500 sqm
per hour
Tipper 5.5 10 t capacity for carriage of stone chips
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
Bitumen pressure distributor
Three wheel 80-100 kN static roller weight
c) Material
PanchayatR B Circle-2,Rajkot
cum
Rate
(Rs.)
Amount
(Rs.)
2.00
160.00
320.00
2.00
400.00
800.00
0.90 48,775.00
43,897.50
8.00
440.00
3,520.00
7,712.74
69,414.64
69.41
2.60
1.00
58.00
6.00
194.50
199.90
194.50
196.30
505.70
199.90
11,281.00
1,177.80
2.00
160.00
320.00
2.00
400.00
800.00
0.90 49,565.00
44,608.50
8.00
440.00
3,520.00
7,801.61
70,214.51
70.21
day
day
day
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
hour
hour
hour
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
hour
6.00
250.00
1,500.00
hour
hour
hour
6.00
6.00
18.75
764.00
840.00
400.00
4,584.00
5,040.00
7,500.00
[Chapter -5](Page-124)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
Bitumen (S-90) @ 1.00 kg per sqm
t
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chip spreader @ 1500 sqm hour
per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller weight
hour
c) Material
Bitumen (S-65) @ 1.00 kg per sqm
t
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chip spreader @ 1500 sqm hour
per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller weight
hour
c) Material
Polymer Modified Bitumen @ 1.00 kg per sqm
t
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
5
6
7.50 44,543.81
75.00
535.00
Amount
(Rs.)
7
334,078.58
40,125.00
51,407.93
462,671.39
61.69
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
6.00
250.00
1,500.00
6.00
6.00
18.75
764.00
840.00
400.00
4,584.00
5,040.00
7,500.00
7.50 44,966.00
75.00
535.00
337,245.00
40,125.00
51,803.74
466,233.62
62.16
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
6.00
250.00
1,500.00
6.00
6.00
18.75
764.00
840.00
400.00
4,584.00
5,040.00
7,500.00
7.50 48,775.00
365,812.50
75.00
535.00
40,125.00
55,374.67
498,372.05
[Chapter -5](Page-125)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Rate per sqm = (a+b+c+d)/7500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Hydraulic self propelled chip spreader @ 1500 sqm
per hour
Tipper 5.5 10 t capacity for carriage of stone chips
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
Bitumen pressure distributor
Three wheel 80-100 kN static roller weight
c) Material
Crumb Rubber Modified Bitumen @ 1.00 kg per
sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
Unit Quantity
4
194.50
194.50
199.90
85.58
1,750.50
399.80
hour
hour
hour
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
hour
6.00
250.00
1,500.00
hour
hour
hour
6.00
6.00
18.75
764.00
840.00
400.00
4,584.00
5,040.00
7,500.00
7.50 48,775.00
365,812.50
t
cum
hour
hour
hour
t
cum
7
66.45
0.44
9.00
2.00
Amount
(Rs.)
day
day
day
Rate
(Rs.)
75.00
535.00
40,125.00
55,374.67
498,372.05
66.45
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
6.00
250.00
1,500.00
6.00
6.00
18.75
764.00
840.00
400.00
4,584.00
5,040.00
7,500.00
7.50 49,565.00
371,737.50
75.00
535.00
40,125.00
56,115.30
505,037.68
67.34
[Chapter -5](Page-126)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Hydraulic self propelled chips spreader @ 1500
sqm per hour
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
day
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
hour
hour
hour
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
6.00
250.00
1,500.00
hour
6.00
764.00
4,584.00
6.00
840.00
5,040.00
15.00
400.00
6,000.00
6.75 44,543.81
60.00
440.00
300,670.72
26,400.00
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
6.00
250.00
1,500.00
6.00
6.00
764.00
840.00
4,584.00
5,040.00
15.00
400.00
6,000.00
6.75 44,966.00
60.00
440.00
303,520.50
26,400.00
PanchayatR B Circle-2,Rajkot
45,328.82
407,959.42
54.39
45,685.05
411,165.43
54.82
[Chapter -5](Page-127)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chips spreader @ 1500 hour
sqm per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chips spreader
Rate
(Rs.)
Amount
(Rs.)
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
6.00
250.00
1,500.00
6.00
6.00
764.00
840.00
4,584.00
5,040.00
15.00
400.00
6,000.00
6.75 48,775.00
60.00
440.00
329,231.25
26,400.00
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
6.00
250.00
1,500.00
6.00
6.00
764.00
840.00
4,584.00
5,040.00
15.00
400.00
6,000.00
6.75 48,775.00
329,231.25
48,898.89
440,090.02
58.68
PanchayatR B Circle-2,Rajkot
60.00
440.00
26,400.00
48,898.89
440,090.02
[Chapter -5](Page-128)
Ref.
Sr.
MORD
No.
Specifn
1
5.7
507
Description
Unit Quantity
3
4
Rate per sqm = (a+b+c+d)/7500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chips spreader @ 1500 hour
sqm per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chips spreader
Rate
(Rs.)
6
Amount
(Rs.)
7
58.68
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
6.00
250.00
1,500.00
hour
Front end loader 1 cum bucket capacity
Bitumen pressure distributor @ 1750 sqm per hour hour
6.00
6.00
764.00
840.00
4,584.00
5,040.00
15.00
400.00
6,000.00
6.75 49,565.00
334,563.75
PanchayatR B Circle-2,Rajkot
60.00
440.00
26,400.00
49,565.45
446,089.08
59.48
2.36
1.00
58.00
194.50
199.90
194.50
459.02
199.90
11,281.00
2.25
840.00
1,890.00
2.25
400.00
900.00
0.5/100
1.35 36,696.81
49,540.69
[Chapter -5](Page-129)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 900 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/900
Case II: Nominal chipping size 9.5 mm
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
b) Machinery
Emulsion sprayer, capacity 1000 litre fitted with hour
spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(B) By Mechanical Means
Case I: Nominal chipping size 13.2 mm
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chip spreader @ 1500 sqm hour
per hour
PanchayatR B Circle-2,Rajkot
7
4,815.00
8,635.70
77,721.32
86.36
2.36
1.00
58.00
194.50
199.90
194.50
459.02
199.90
11,281.00
2.00
840.00
1,680.00
2.00
400.00
800.00
1.40 36,696.81
8.00
440.00
51,375.53
3,520.00
8,664.43
77,979.89
77.98
194.50
194.50
199.90
85.58
1,750.50
399.80
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
6.00
250.00
1,500.00
hour
hour
hour
6.00
6.00
18.75
764.00
840.00
400.00
4,584.00
5,040.00
7,500.00
t
cum
11.25 36,696.81
75.00
440.00
412,839.11
33,000.00
6
535.00
Amount
(Rs.)
0.44
9.00
2.00
5
9.00
Rate
(Rs.)
60,362.37
543,261.37
72.43
[Chapter -5](Page-130)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Hydraulic self propelled chip spreader @ 1500 sqm
per hour
Tipper 5.5 10 t capacity for carriage of stone chips
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
Bitumen emulsion pressure distributor @ 1750 sqm
per hour
Three wheel 80-100 kN static roller
c) Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
Rate
(Rs.)
Amount
(Rs.)
day
day
day
0.44
9.00
2.00
194.50
194.50
199.90
85.58
1,750.50
399.80
hour
hour
hour
6.00
6.00
6.00
300.00
300.00
2,100.00
1,800.00
1,800.00
12,600.00
hour
6.00
250.00
1,500.00
hour
hour
6.00
6.00
764.00
840.00
4,584.00
5,040.00
hour
15.00
400.00
6,000.00
t
cum
10.50 36,696.81
60.00
440.00
385,316.51
26,400.00
Note:
55,909.55
503,185.93
67.09
by
weight
of
day
day
0.60
15.00
194.50
194.50
116.70
2,917.50
hour
6.00
160.00
960.00
hour
6.00
1,036.20
6,217.20
0.48 44,543.81
21,381.03
chips t
PanchayatR B Circle-2,Rajkot
3,949.05
35,541.48
1,184.72
0.60
15.00
194.50
194.50
116.70
2,917.50
[Chapter -5](Page-131)
Ref.
Sr.
MORD
No.
Specifn
1
5.9
Description
508
Unit Quantity
3
4
Bitumen boiler oil fired, capacity 1000 litre itre
hour
Mixall 6-10 t capacity
hour
c) Material
Bitumen @1 per cent by weight of chips t
(30x1.6)/100
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 30 cum = a+b+c+d
Rate per cum = (a+b+c+d)/30
20mm thick Open-Graded Premix Carpet using
Bituminous (penetration grade/modified bitumen)
Binder
Providing, laying and rolling of open-graded premix carpet
of 20 mm thickness composed of 13.2 mm to 5.6 mm
aggregates either using penetration grade bitumen or
emulsion to required line, grade and level to serve as
wearing course on a previously prepared base, including
mixing in a suitable plant, laying and rolling with a three
wheel 80-100 kN static roller capacity, finished to required
level and grades to be followed by seal coat of either Type
A or Type B or Type C as per Technical Specification Clause
508.
Case - I By Manual Means
(I) Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 14.60 kg per 10 sqm
t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
PanchayatR B Circle-2,Rajkot
5
6.00
6.00
Rate
(Rs.)
Amount
(Rs.)
6
160.00
1,036.20
7
960.00
6,217.20
0.48 44,966.00
21,583.68
3,974.39
35,769.47
1,192.32
1.08
21.00
6.00
194.50
194.50
196.30
210.06
4,084.50
1,177.80
4.00
4.00
1,036.20
160.00
4,144.80
640.00
2.00
400.00
800.00
0.73 44,543.81
13.50
535.00
32,516.98
7,222.50
6,349.58
57,146.22
114.29
1.08
21.00
6.00
194.50
194.50
196.30
210.06
4,084.50
1,177.80
4.00
4.00
1,036.20
160.00
4,144.80
640.00
2.00
400.00
800.00
[Chapter -5](Page-132)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm
t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 14.60 kg per 10 sqm t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 14.60 kg per t
10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
0.73 44,966.00
13.50
535.00
32,825.18
7,222.50
6,388.11
57,492.95
114.99
1.08
21.00
6.00
194.50
194.50
196.30
210.06
4,084.50
1,177.80
4.00
4.00
1,036.20
160.00
4,144.80
640.00
2.00
400.00
800.00
0.73 48,775.00
35,605.75
13.50
535.00
7,222.50
6,735.68
60,621.09
121.24
1.08
21.00
6.00
194.50
194.50
194.50
210.06
4,084.50
1,167.00
4.00
4.00
1,036.20
160.00
4,144.80
640.00
2.00
400.00
800.00
0.73 48,775.00
35,605.75
13.50
535.00
7,222.50
6,734.33
60,608.94
121.22
1.08
194.50
210.06
[Chapter -5](Page-133)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 14.60 kg per t
10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
Case - II By Mechanical Means
(I) Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 14.60 kg per 10 sqm
t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(II)Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm
t
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
5
21.00
6.00
6
194.50
194.50
7
4,084.50
1,167.00
4.00
4.00
1,036.20
160.00
4,144.80
640.00
2.00
400.00
800.00
0.73 49,565.00
36,182.45
13.50
535.00
7,222.50
6,806.41
61,257.72
122.52
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.64
6.00
16.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00
5.84 44,543.81
108.00
535.00
260,135.85
57,780.00
48,344.46
435,100.15
108.78
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.64
6.00
16.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00
5.84 44,966.00
262,601.44
[Chapter -5](Page-134)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor skilled for checking line and levels
day
b) Machinery
HMP 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 14.60 kg per 10 sqm t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 14.60 kg per t
10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
PanchayatR B Circle-2,Rajkot
5
108.00
Rate
(Rs.)
6
535.00
Amount
(Rs.)
7
57,780.00
48,652.66
437,873.94
109.47
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.64
6.00
16.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00
5.84 48,775.00
284,846.00
108.00
535.00
57,780.00
51,433.23
462,899.07
115.72
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.64
6.00
16.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00
5.84 48,775.00
284,846.00
108.00
535.00
57,780.00
51,433.23
462,899.07
115.72
[Chapter -5](Page-135)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
HMP 30/40 t per hour
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Natural Rubber Modified Bitumen @ 14.60 kg per
10 sqm
Unit Quantity
5.11
509
5
0.52
10.00
3.00
6
194.50
194.50
199.90
7
101.14
1,945.00
599.70
hour
hour
hour
hour
hour
hour
6.00
6.00
6.00
3.64
6.00
16.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00
5.84 49,565.00
289,459.60
PanchayatR B Circle-2,Rajkot
108.00
535.00
57,780.00
52,009.93
468,089.37
117.02
day
day
day
0.80
18.00
2.00
194.50
194.50
199.90
155.60
3,501.00
399.80
hour
hour
6.00
3.60
190.00
400.00
1,140.00
1,440.00
1.94 36,696.81
71,191.81
Amount
(Rs.)
4
day
day
day
Rate
(Rs.)
24.30
535.00
13,000.50
11,353.59
102,182.30
113.54
[Chapter -5](Page-136)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Taking output = 500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b) Machinery
Mixall 6-10 t capacity
Oil fired bitumen boiler 1000 litre capacity fitted
with spray set
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-90) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @
0.27 cum per 10 sqm
Unit Quantity
4
1.40
21.00
7.00
194.50
194.50
196.30
272.30
4,084.50
1,374.10
hour
hour
6.00
6.00
1,036.20
160.00
6,217.20
960.00
hour
6.00
400.00
2,400.00
1.10 44,543.81
13.50
295.00
48,998.19
3,982.50
t
cum
Amount
(Rs.)
day
day
day
Rate
(Rs.)
8,536.10
76,552.59
153.11
1.40
21.00
7.00
194.50
194.50
196.30
272.30
4,084.50
1,374.10
6.00
6.00
1,036.20
160.00
6,217.20
960.00
6.00
400.00
2,400.00
1.10 44,966.00
13.50
295.00
49,462.60
3,982.50
8,594.15
77,075.05
154.15
1.40
21.00
7.00
194.50
194.50
196.30
272.30
4,084.50
1,374.10
6.00
6.00
1,036.20
160.00
6,217.20
960.00
6.00
400.00
2,400.00
1.10 48,775.00
13.50
295.00
53,652.50
3,982.50
9,117.89
[Chapter -5](Page-137)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b) Machinery
Mixall 6-10 t capacity
Oil fired bitumen boiler 1000 litre capacity fitted
with spray set
Three wheel 80-100 kN static roller
c) Material
Crumb Rubber Modified Bitumen @ 22 kg per 10
sqm
Unit Quantity
4
7
81,788.69
163.58
1.40
21.00
7.00
194.50
194.50
196.30
272.30
4,084.50
1,374.10
hour
hour
6.00
6.00
1,036.20
160.00
6,217.20
960.00
hour
6.00
400.00
2,400.00
1.10 48,775.00
53,652.50
Amount
(Rs.)
day
day
day
Rate
(Rs.)
13.50
295.00
3,982.50
9,117.89
81,788.69
163.58
1.40
21.00
7.00
194.50
194.50
196.30
272.30
4,084.50
1,374.10
6.00
6.00
1,036.20
160.00
6,217.20
960.00
6.00
400.00
2,400.00
1.10 49,565.00
54,521.50
13.50
295.00
3,982.50
9,226.51
82,766.31
165.53
1.40
21.00
7.00
194.50
194.50
196.30
272.30
4,084.50
1,374.10
6.00
1,036.20
6,217.20
[Chapter -5](Page-138)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
Amount
(Rs.)
3
4
Oil fired bitumen boiler 1000 litre capacity fitted hour
with spray set
5
6.00
6
160.00
7
960.00
6.00
400.00
2,400.00
0.95 44,543.81
13.50
295.00
42,316.62
3,982.50
1.40
21.00
7.00
194.50
194.50
196.30
272.30
4,084.50
1,374.10
6.00
6.00
1,036.20
160.00
6,217.20
960.00
6.00
400.00
2,400.00
0.95 44,966.00
13.50
295.00
42,717.70
3,982.50
7,751.04
69,487.04
138.97
194.50
194.50
196.30
272.30
4,084.50
1,374.10
6.00
6.00
1,036.20
160.00
6,217.20
960.00
hour
6.00
400.00
2,400.00
0.95 48,775.00
46,336.25
7,700.90
69,035.82
138.07
1.40
21.00
7.00
Rate
(Rs.)
13.50
295.00
3,982.50
8,203.36
73,557.91
147.12
[Chapter -5](Page-139)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b) Machinery
Mixall 6-10 t capacity
Oil fired bitumen boiler 1000 litre capacity fitted
with spray set
Three wheel 80-100 kN static roller
c) Material
Crumb Rubber Modified Bitumen @ 19 kg per 10
sqm
Unit Quantity
4
1.40
21.00
7.00
194.50
194.50
196.30
272.30
4,084.50
1,374.10
hour
hour
6.00
6.00
1,036.20
160.00
6,217.20
960.00
hour
6.00
400.00
2,400.00
0.95 48,775.00
46,336.25
Amount
(Rs.)
day
day
day
Rate
(Rs.)
13.50
295.00
3,982.50
8,203.36
73,557.91
147.12
1.40
21.00
7.00
194.50
194.50
196.30
272.30
4,084.50
1,374.10
6.00
6.00
1,036.20
160.00
6,217.20
960.00
6.00
400.00
2,400.00
0.95 49,565.00
47,086.75
13.50
295.00
3,982.50
8,297.17
74,402.22
148.80
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.60
6.00
7,150.00
700.00
764.00
250.00
1,200.00
42,900.00
4,200.00
4,584.00
900.00
7,200.00
[Chapter -5](Page-140)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 22 kg per 10 sqm
t
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(II)Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 22 kg per 10 sqm
t
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 22 kg per 10 sqm
t
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
PanchayatR B Circle-2,Rajkot
5
18.00
Rate
(Rs.)
Amount
(Rs.)
6
400.00
7
7,200.00
8.80 44,543.81
108.00
295.00
391,985.53
31,860.00
61,684.42
555,159.79
138.79
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.60
6.00
18.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00
8.80 44,966.00
108.00
295.00
395,700.80
31,860.00
62,148.83
559,339.47
139.83
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.60
6.00
18.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00
8.80 48,775.00
108.00
295.00
429,220.00
31,860.00
66,338.73
597,048.57
149.26
[Chapter -5](Page-141)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
HMP of appropriate capacity
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Crumb Rubber Modified Bitumen @ 22 kg per 10
sqm
Unit Quantity
4
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
hour
hour
hour
hour
hour
hour
6.00
6.00
6.00
3.60
6.00
18.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00
8.80 48,775.00
429,220.00
108.00
108.00
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
day
day
day
Rate
(Rs.)
295.00
31,860.00
66,338.73
597,048.57
149.26
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.60
6.00
18.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00
8.80 49,565.00
436,172.00
295.00
31,860.00
67,207.73
604,869.57
151.22
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
7,150.00
700.00
764.00
42,900.00
4,200.00
4,584.00
[Chapter -5](Page-142)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
Tipper 5.5 10 t capacity
hour
Add 10 per cent of cost of carriage to cover cost of
loading and unloading
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-90) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27 cum per 10 sqm
hour
hour
t
cum
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
5
3.60
6
250.00
7
900.00
90.00
6.00
18.00
1,200.00
400.00
7,200.00
7,200.00
7.60 44,543.81
108.00
295.00
338,532.96
31,860.00
55,014.10
495,126.90
123.78
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.60
6.00
18.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00
7.60 44,966.00
108.00
295.00
341,741.60
31,860.00
55,403.93
498,635.37
124.66
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.60
6.00
18.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00
7.60 48,775.00
370,690.00
108.00
295.00
31,860.00
59,022.48
[Chapter -5](Page-143)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
HMP of appropriate capacity
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Crumb Rubber Modified Bitumen @ 19 kg per 10
sqm
Unit Quantity
4
510
Amount
(Rs.)
7
531,202.32
132.80
day
day
day
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
hour
hour
hour
hour
hour
hour
6.00
6.00
6.00
3.60
6.00
18.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00
7.60 48,775.00
370,690.00
108.00
108.00
Rate
(Rs.)
295.00
31,860.00
59,022.48
531,202.32
132.80
0.52
10.00
3.00
194.50
194.50
199.90
101.14
1,945.00
599.70
6.00
6.00
6.00
3.60
6.00
18.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00
7.60 49,565.00
376,694.00
295.00
31,860.00
59,772.98
537,956.82
134.49
Seal Coat
Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall using Type A, Type B and Type C as per Technical
Specification Clause 510
PanchayatR B Circle-2,Rajkot
[Chapter -5](Page-144)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
A. By Manual Means
Case - I : Type A
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
Bitumen Sprayer
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted
with spray set
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-90) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
Unit Quantity
4
1.15
1.00
22.00
6.00
194.50
199.90
194.50
196.30
223.68
199.90
4,279.00
1,177.80
hour
2.20
128.00
281.60
hour
2.20
400.00
880.00
1.078 44,543.81
9.90
365.00
48,018.23
3,613.50
t
cum
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
day
day
day
day
Rate
(Rs.)
7,334.21
66,007.91
60.01
1.15
1.00
22.00
6.00
194.50
199.90
194.50
196.30
223.68
199.90
4,279.00
1,177.80
2.20
128.00
281.60
2.20
400.00
880.00
1.078 44,966.00
9.90
365.00
48,473.35
3,613.50
7,391.10
66,519.93
60.47
1.15
1.00
22.00
6.00
194.50
199.90
194.50
196.30
223.68
199.90
4,279.00
1,177.80
[Chapter -5](Page-145)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
c) Material
Polymer Modified Bitumen @ 9.80 kg per 10 sqm
hour
t
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
5
2.20
6
128.00
7
281.60
2.20
400.00
880.00
1.078 48,775.00
52,579.45
9.90
365.00
3,613.50
7,904.37
71,139.29
64.67
1.15
1.00
22.00
6.00
194.50
199.90
194.50
196.30
223.68
199.90
4,279.00
1,177.80
2.20
128.00
281.60
2.20
400.00
880.00
1.078 48,775.00
52,579.45
9.90
365.00
3,613.50
7,904.37
71,139.29
64.67
1.15
1.00
22.00
6.00
194.50
199.90
194.50
196.30
223.68
199.90
4,279.00
1,177.80
2.20
128.00
281.60
2.20
400.00
880.00
1.078 49,565.00
53,431.07
9.90
365.00
3,613.50
[Chapter -5](Page-146)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
Case - II : Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Three wheel 80-100 kN static roller
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
c) Material
Bitumen (S-90) @ 6.80 kg per 10 sqm
t
Crushed sand or grit as passing 2.36 mm sieve and cum
retained on 180 micron sieve applied @ 0.06 cum
per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1250 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1250
(II)Bitumen (S-65)
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Three wheel 80-100 kN static roller
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm
t
Crushed sand or grit as passing 2.36 mm sieve and cum
retained on 180 micron sieve applied @ 0.06 cum
per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1250 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1250
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
6
Amount
(Rs.)
7
8,010.82
72,097.36
65.54
0.85
15.00
2.00
194.50
194.50
196.30
165.33
2,917.50
392.60
2.50
2.50
2.50
1,036.20
400.00
160.00
2,590.50
1,000.00
400.00
0.85 44,543.81
7.50
376.81
37,862.24
2,826.08
6,019.28
54,173.52
43.34
0.85
15.00
2.00
194.50
194.50
196.30
165.33
2,917.50
392.60
2.50
2.50
2.50
1,036.20
400.00
160.00
2,590.50
1,000.00
400.00
0.85 44,966.00
7.50
376.81
38,221.10
2,826.08
6,064.14
54,577.24
43.66
0.85
15.00
2.00
194.50
194.50
196.30
165.33
2,917.50
392.60
2.50
1,036.20
2,590.50
[Chapter -5](Page-147)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
Three wheel 80-100 kN static roller
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
c) Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm t
5
2.50
2.50
7.50
c) Material
Crumb Rubber Modified Bitumen @ 6.80 kg per 10 t
sqm
Crushed sand or grit as passing 2.36 mm sieve and cum
retained on 180 micron sieve applied @ 0.06 cum
per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1250 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1250
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Three wheel 80-100 kN static roller
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
c) Material
Natural Rubber Modified Bitumen @ 6.80 kg per 10 t
sqm
Crushed sand or grit as passing 2.36 mm sieve and cum
retained on 180 micron sieve applied @ 0.06 cum
per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
6
400.00
160.00
7
1,000.00
400.00
0.85 48,775.00
41,458.75
376.81
2,826.08
6,468.84
58,219.59
46.58
0.85
15.00
2.00
194.50
194.50
196.30
165.33
2,917.50
392.60
2.50
2.50
2.50
1,036.20
400.00
160.00
2,590.50
1,000.00
400.00
0.85 48,775.00
41,458.75
7.50
376.81
2,826.08
6,468.84
58,219.59
46.58
0.85
15.00
2.00
194.50
194.50
196.30
165.33
2,917.50
392.60
2.50
2.50
2.50
1,036.20
400.00
160.00
2,590.50
1,000.00
400.00
0.85 49,565.00
42,130.25
7.50
376.81
2,826.08
6,552.78
[Chapter -5](Page-148)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
Cost of 1250 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1250
Case - III : Type C
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled) for carrying of chips & day
spraying
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 6.50 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(II)Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 6.50 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
6
Amount
(Rs.)
7
58,975.03
47.18
1.15
1.00
22.00
194.50
199.90
194.50
223.68
199.90
4,279.00
5.00
196.30
981.50
2.20
160.00
352.00
2.20
400.00
880.00
0.715 44,543.81
9.90
365.00
31,848.82
3,613.50
5,297.30
47,675.70
43.34
1.15
1.00
22.00
5.00
194.50
199.90
194.50
196.30
223.68
199.90
4,279.00
981.50
2.20
160.00
352.00
2.20
400.00
880.00
0.715 44,966.00
9.90
365.00
32,150.69
3,613.50
5,335.03
48,015.30
43.65
1.15
1.00
22.00
5.00
194.50
199.90
194.50
196.30
223.68
199.90
4,279.00
981.50
[Chapter -5](Page-149)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 6.50 kg per 10 sqm t
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm =(a+b+c+d)/1100
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 6.50 kg per 10 t
sqm
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 6.50 kg per 10 t
sqm
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
2.20
160.00
352.00
2.20
400.00
880.00
0.715 48,775.00
9.90
365.00
34,874.13
3,613.50
5,675.46
51,079.16
46.44
1.15
1.00
22.00
5.00
194.50
199.90
194.50
196.30
223.68
199.90
4,279.00
981.50
2.20
160.00
352.00
2.20
400.00
880.00
0.715 48,775.00
34,874.13
9.90
365.00
3,613.50
5,675.46
51,079.16
46.44
1.15
1.00
22.00
5.00
194.50
199.90
194.50
196.30
223.68
199.90
4,279.00
981.50
2.20
160.00
352.00
2.20
400.00
880.00
0.715 49,565.00
35,438.98
9.90
365.00
3,613.50
5,746.07
[Chapter -5](Page-150)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
Note: Since seal coat is provided immediately over the bituminous
layers, hydraulic broom for cleaning has not been catered.
Unit Quantity
4
B. By Mechanical Means
Case - I : Type A
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 9.80 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 9.80 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
6
Amount
(Rs.)
7
51,714.62
47.01
0.24
6.00
194.50
194.50
46.68
1,167.00
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
7.35 44,543.81
67.50
365.00
327,397.00
24,637.50
47,871.52
430,843.71
57.45
0.24
6.00
194.50
194.50
46.68
1,167.00
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
7.35 44,966.00
67.50
365.00
330,500.10
24,637.50
48,259.41
434,334.69
57.91
0.24
6.00
194.50
194.50
46.68
1,167.00
[Chapter -5](Page-151)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
b) Machinery
Hydraulic self propelled chips spreader
Tipper 5.5 cum capacity
Front end loader 1 cum bucket capacity
Bitumen pressure distributor
Three wheel 80-100 kN static roller
c) Material
Polymer Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
Unit Quantity
4
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
t
cum
7.35 48,775.00
67.50
365.00
358,496.25
24,637.50
Amount
(Rs.)
hour
hour
hour
hour
hour
Rate
(Rs.)
51,758.93
465,830.36
62.11
0.24
6.00
194.50
194.50
46.68
1,167.00
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
7.35 48,775.00
67.50
365.00
358,496.25
24,637.50
51,758.93
465,830.36
62.11
0.24
6.00
194.50
194.50
46.68
1,167.00
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
7.35 49,565.00
67.50
365.00
364,302.75
24,637.50
52,484.74
472,362.67
[Chapter -5](Page-152)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Rate per sqm = (a+b+c+d)/7500
Note: Since seal coat is provided immediately over the bituminous
layers, Hydraulic broom for cleaning has not been catered.
510
Case - II : Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
HMP of 30/40 t per hour
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-90) @ 6.80 kg per 10 sqm
Crushed sand defined as passing 2.36 mm sieve
and retained on 180 micron sieve applied @ 0.06
cum per 10 sqm
Unit Quantity
4
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
7
62.98
day
day
0.16
4.00
194.50
194.50
31.12
778.00
hour
hour
hour
hour
hour
hour
2.00
2.00
2.00
1.36
2.00
10.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00
t
cum
3.40 44,543.81
30.00
376.81
151,448.95
11,304.30
Rate
(Rs.)
23,441.30
210,971.67
42.19
0.16
4.00
194.50
194.50
31.12
778.00
2.00
2.00
2.00
1.36
2.00
10.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00
3.40 44,966.00
30.00
376.81
152,884.40
11,304.30
23,620.73
212,586.55
42.52
0.16
4.00
194.50
194.50
31.12
778.00
[Chapter -5](Page-153)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
HMP of 30/40 t per hour
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm
Crushed sand defined as passing 2.36 mm sieve
and retained on 180 micron sieve applied @ 0.06
cum per 10 sqm
Unit Quantity
Rate
(Rs.)
4
hour
hour
hour
hour
hour
hour
5
2.00
2.00
2.00
1.36
2.00
10.00
6
7,150.00
700.00
764.00
250.00
1,200.00
400.00
7
14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00
t
cum
3.40 48,775.00
30.00
376.81
165,835.00
11,304.30
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
25,239.55
227,155.97
45.43
0.16
4.00
194.50
194.50
31.12
778.00
2.00
2.00
2.00
1.36
2.00
10.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00
3.40 48,775.00
30.00
376.81
165,835.00
11,304.30
25,239.55
227,155.97
45.43
0.16
4.00
194.50
194.50
31.12
778.00
2.00
2.00
2.00
1.36
2.00
10.00
7,150.00
700.00
764.00
250.00
1,200.00
400.00
14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00
3.40 49,565.00
30.00
376.81
168,521.00
11,304.30
[Chapter -5](Page-154)
Ref.
Sr.
MORD
No.
Specifn
1
Description
Unit Quantity
3
4
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 5000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/5000
Note: Since seal coat is required to be provided over the premix
carpet on the same day, out of the 6 working hours of the
HMP, 4.00 hours are proposed to be utilised for the premix
carpet and the balance 2.00 hours have been considered for
this case.
Case - III : Type C
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 6.50 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 6.50 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
6
Amount
(Rs.)
7
25,575.30
230,177.72
46.04
0.20
5.00
194.50
194.50
38.90
972.50
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
4.88 44,543.81
67.50
365.00
217,373.79
24,637.50
34,093.34
306,840.03
40.91
0.20
5.00
194.50
194.50
38.90
972.50
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
4.88 44,966.00
67.50
365.00
219,434.08
24,637.50
34,350.87
309,157.85
41.22
[Chapter -5](Page-155)
Ref.
Sr.
MORD
No.
Specifn
1
Description
3
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic self propelled chips spreader
Tipper 5.5 cum capacity
Front end loader 1 cum bucket capacity
Bitumen pressure distributor
Three wheel 80-100 kN static roller
c) Material
Polymer Modified Bitumen @ 6.50 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per
cent passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
Unit Quantity
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
4
day
day
5
0.20
5.00
6
194.50
194.50
hour
hour
hour
hour
hour
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
t
cum
4.88 48,775.00
67.50
365.00
238,022.00
24,637.50
Rate
(Rs.)
38.90
972.50
36,674.36
330,069.26
44.01
0.20
5.00
194.50
194.50
38.90
972.50
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
4.88 48,775.00
67.50
365.00
238,022.00
24,637.50
36,674.36
330,069.26
44.01
0.20
5.00
194.50
194.50
38.90
972.50
6.00
6.00
6.00
6.00
15.00
2,100.00
250.00
764.00
840.00
400.00
12,600.00
1,500.00
4,584.00
5,040.00
6,000.00
4.88 49,565.00
67.50
365.00
241,877.20
24,637.50
[Chapter -5](Page-156)
Ref.
Sr.
MORD
No.
Specifn
1
5.13
Description
Unit Quantity
3
4
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
Note: Since seal coat is provided immediately over the bituminous
layers, Hydraulic broom for cleaning has not been catered.
511
Rate
(Rs.)
6
Amount
(Rs.)
7
37,156.26
334,406.36
44.59
PanchayatR B Circle-2,Rajkot
[Chapter -5](Page-157)
Chapter 6
CEMENT CONCRETE PAVEMENT
Ref.
MORD
Description
n
Specif
1
2
3
6.1
400 Granual Sub-base
Rate as per item No.4.1 of Chapter 4
6.2
400 Lime Treated Soil
Rate as per item No.4.5 of Chapter 4
6.3 500 & 40Water Bound Macadam (WBM) - Sub-base
(A) By Manual Means
Sr.
No.
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
7
564.20
280.64
995.91
894.61
and
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mate
Mason (1st class)
Mason (2nd class)
Mazdoor (Unskilled)
Mazdoor (Skilled)
Surveyor
Mazdoor (Semi-Skilled)
Bhisti
Blacksmith for cutting of dowel bars including
removal of burrs, fabrications & fixing of dowel
bars.
b) Machinery
PanchayatR B Circle-2,Rajkot
day
day
day
day
day
day
day
day
day
7.00
5.00
5.00
129.00
6.00
2.00
6.00
14.00
1.00
194.50
207.80
199.90
194.50
199.90
207.80
196.30
196.30
207.80
1,361.50
1,039.00
999.50
25,090.50
1,199.40
415.60
1,177.80
2,748.20
207.80
[Chapter -6](Page-158)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
4
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) hour
with weigh batcher and suitable capacity calibrated
water tank
c)
Rate
(Rs.)
Amount
(Rs.)
5
36.00
6
190.00
7
6,840.00
Needle vibrator
Screed vibrator
Plate vibrator
Concrete joint cutting machine for initial & final cuts
hour
hour
hour
hour
9.00
9.00
9.00
4.00
60.00
310.00
400.00
150.00
540.00
2,790.00
3,600.00
600.00
hour
hour
5.00
2.00
300.00
300.00
1,500.00
600.00
cum
cum
67.50
33.75
525.00
332.31
35,437.50
11,215.46
t
sqm
26.25
412.50
7,670.20
17.00
201,342.75
7,012.50
kg
t
117.60
42.20
0.005 34,096.81
4,962.79
170.48
6.5
Unit Quantity
litre
19.00
70.00
1,330.00
90.00
50.00
4,500.00
m
No.
litre
litre
90.00
483.00
122.00
131.25
6.00
4.00
81.00
550.00
540.00
1,932.00
9,882.00
72,187.50
kl
sqm
18.00
3.00
16.00
363.00
288.00
1,089.00
d) Formwork @ 3% of (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Cost for 75 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/75
1500 Roller Compacted Concrete Pavement
Construction of Roller Compacted Concrete Pavement
(RCCP) with coarse and fine aggregates conforming to
IS:383, the size of coarse aggregate not exceeding 25
mm with minimum aggregate cement ratio of 5:1 mm
and with minimum cemnt content of 310 kg per cum,
aggregate gradation to be as per Table 602.2 after
blending, mixing in concrete mixer at optimum moisture
content, transporting to site, laying with wheel barrows
or steel pans or with mechanical paver, compacting with
80-100 kN smooth wheel, tandem vibratory roller, to
achieve, the designed flexural strength, finishing and
curing as per drawings and Technical Specification Clause
1502
12,045.31
51,830.57
466,475.17
6,219.67
Unit = cum
Taking output = 75 cum
a) Labour
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[Chapter -6](Page-159)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
b)
Unit Quantity
5
6.00
132.00
4.00
4.00
2.00
14.00
6
194.50
194.50
207.80
199.90
207.80
196.30
7
1,167.00
25,674.00
831.20
799.60
415.60
2,748.20
hour
36.00
190.00
6,840.00
hour
6.00
1,200.00
7,200.00
hour
6.00
150.00
900.00
hour
hour
6.00
2.00
300.00
300.00
1,800.00
600.00
67.50
525.00
35,437.50
33.75
332.31
23.25 7,670.20
0.004 34,096.81
11,215.46
178,332.15
136.39
(i) Mate
(ii) Mazdoor (Unskilled)
(iii) Mason (1st class)
(iv) Mason (2nd class)
(v) Surveyor
(vi) Bhisti
Machinery
(i) Concrete mixer 0.28 / 0.04 cum capacity (6
mixers) with weigh batcher and suitable
capacity calibrated water tank
Material
(i) Crushed stone coarse aggregates grading as cum
per Clause 1501.2.4.1 (Table 1500.3) @ 0.90
cum/cum of concrete conforming to Clause
600.4.4
(ii) Sand as per IS:383 and conforming to Clause cum
(iii) Cement @ 310 kg/cum of concrete
t
(iv) Bitminous primer @ 200 ml per joint for 21
t
joints
m
(v) Jute rope 10 mm dia including 5 per cent
wastage
kg
(vi) Bituminous sealant @ 800 ml per joint for 21
joints
(vii) Curing compound @ 0.33 litre per sqm
l
(viii) Water for mixing and curing for 14-days
day
d) Formwork @ 2% of (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Cost for 75 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/75
Note: When curing compound is used 4-days water curing will
be done
1500 Rectangular Concrete Block Pavement
Manufacturing, laying of cement concrete blocks of size
0.450 m x 0.300 m x 0.15 m of Cement Concrete (C.C.)
M30 garde and spreading 25 mm thick sand under neath
and filling joints with sand on existing W.B.M. base as
per Technical Specification Clause 1503.
Unit = sqm
Taking output = 112.5 sqm
Concrete M30 grade for block, 700 x (0.450 x 0.300 x cum
0.150)
Concrete M30 for edge block, 2 x 100 x (0.300 x 0.300 x cum
0.150)
TOTAL
cum
a) Labour
Amount
(Rs.)
4
day
day
day
day
day
day
c)
6.6
Rate
(Rs.)
PanchayatR B Circle-2,Rajkot
90.00
50.00
4,500.00
16.80
70.00
1,176.00
131.25
18.00
550.00
16.00
72,187.50
288.00
7,044.97
44,911.70
404,205.27
5,389.40
14.18
1,836.24
26,028.70
2.70
1,836.24
4,957.85
16.88
[Chapter -6](Page-160)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
Labour for Manufacturing the Cement
Concrete Block :
Unit Quantity
4
(i) Mate
day
(ii) Mazdoor (Unskilled)
day
(iii) Mason (2nd class)
day
(iv) Bhisti
day
b) Machinery
Concrete mixer 0.28 / 0.4 cum
hour
Plate vibrator
hour
Water tanker 6 kl capacity
hour
c) Material
(i) Coarse aggregates (9.450 x 0.84)
cum
(ii) Sand (9.450 x 0.42)
cum
(iii) Cement
t
(iv) Sand as per Table 1500.5
cum
Bed = 60*0.025 = 1.5 cum
Joints = 1.5*0.15 = 0.225 cum
kl
(v) Cost of water
d) Formwork @ 3% of (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Cost for 112.5 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/112.5
Note: i. In case curing compound is used in places where
there is scarcity of water, the water curing will be
used for 4-days and rate analysis will be amended
accordingly
Rate
(Rs.)
Amount
(Rs.)
1.70
41.00
6.00
1.40
194.50
194.50
199.90
196.30
330.65
7,974.50
1,199.40
274.82
6.00
12.00
2.00
190.00
400.00
300.00
1,140.00
4,800.00
600.00
7.94
3.97
3.80
1.725
627.05
332.31
7,670.20
332.31
4,978.78
1,319.27
29,146.76
573.23
6.00
16.00
96.00
1,573.00
6,750.80
60,757.22
540.06
1.00
17.00
8.00
194.50
194.50
199.90
194.50
3,306.50
1,599.20
2.00
300.00
600.00
225.00
297.00
66,825.00
120.00
7.23
0.00
332.31
0.00
2,402.60
3.00
16.00
48.00
9,371.98
84,347.78
374.88
PanchayatR B Circle-2,Rajkot
[Chapter -6](Page-161)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
(2) Providing and Laying of Interlocking Concrete
Blcok Pavements having thickness 60 mm as
per drawing and Technical Specification
Clause 1504
Unit = sqm
Taking output = 225 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mason (2nd class)
day
b) Machinery
Water tanker 6 kl capacity
hour
c) Material
(i) Providing inter-locking blocks
sqm
(ii) Edge blocks
m
(iii) Sand as per Table 1500.5
cum
(iv) Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/225
Note: i. Carriage of interlocking blocks is payable seperately
as per Chapter of carriage of material from
manufacturing site to the site of work.
Rate
(Rs.)
Amount
(Rs.)
0.90
15.00
7.00
194.50
194.50
199.90
175.05
2,917.50
1,399.30
2.00
300.00
600.00
225.00
120.00
5.42
3.00
201.00
0.00
332.31
16.00
45,225.00
0.00
1,801.12
48.00
6,520.75
58,686.72
260.83
PanchayatR B Circle-2,Rajkot
[Chapter -6](Page-162)
Chapter 7
CAUSEWAY AND SUBMERSIBLE BRIDGES
Ref.
Description
MORD
n
Specif
1
2
3
7.1 1400, Construction of Cut-off Walls/Head Walls
300,
600
700 &
800
(i) Earthwork in excavation for structures as per drawing
and technical specification Clause 305.
Rate as per item No.11.1 of Chapter 11
(ii) Plain cement concrete M15 grade
Rate as per item No.11.4 (ii) of Chapter 11
(iii) Brick masonry in cement mortar 1:4
Rate as per item No.11.5 (ii) of Chapter 11
(iv) Stone masonry in cement mortar 1:4
Rate as per item No.11.6 (ii) of Chapter 11
(v) Providing P.C.C M20 architectural coping on top of
wall
Sr.
No.
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
cum
182.05
cum
3,732.80
cum
4,173.88
cum
2,722.19
268.47
taken in (i)
7.2
Preparation of Subgrade
Rate as per item No.3.15 of Chapter 3
400 Granular Sub-base
Rate as per item No.4.1 of Chapter 4
400 W.B.M. Base Course
Rate as per item No.4.7 of Chapter 4
1500 Cement Concrete Slab
Rate as per item No.6.4 of Chapter 6
1400 & (i) Providing and Laying Apron with Stone
Boulders as per Drawings & Technical
1300
Specification Clause 1301
Rate as per item No.14.1 of Chapter 14
(ii) Providing and Laying of Boulder Apron Laid in
Wire Crates as per Drawing and Technnical
Specification Clause 1301
300
cum
12.73
cum
564.20
cum
995.91
cum
6,219.67
cum
524.62
cum
Rate as per item No.14.2 of Chapter 14
(iii) Providing and Laying of Apron with Cement
Concrete Blocks as per Drawing and Technical
Specification Clause 1301
1,633.89
3,807.46
7.3
7.4
7.5
7.6
Note
PanchayatR B Circle-2,Rajkot
cum
cum
3,732.80
[Chapter -7](Page-163)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit
3
4
Type B (first class) Bedding Clause 1402.5
As per item No.9.2 of Chapter 9
cum
7.9 1400 & Laying Reinforced Cement Concrete Pipe NP3 as per
1100 drawing and technical specification Clause 1402.6
As per item No.9.3 of Chapter 9
m
7.10 1400 & Laying Reinforced Cement Concrete Pipe NP4 as per
1100 technical specification Clause 1402.6
As per item No.9.4 of Chapter 9
m
(ii)
PanchayatR B Circle-2,Rajkot
Quantity
Rate
(Rs.)
Amount
(Rs.)
7
516.45
4,892.57
8,728.82
[Chapter -7](Page-164)
Chapter 8
HILL ROADS
Ref.
Description
Unit
MORD
n
Specif
1
2
3
4
8.1 200
Site Clearance
As per Chapter 2
8.2 1600
Setting Out
Unit = 1km
The analysis of rate per km shall account for the
following:
Sr.
No.
Quantity
Rate
(Rs.)
Amount
(Rs.)
(a)
(b)
(c)
(2)
(a)
(b)
(c)
(3)
(a)
1.2
182.05
218.46
cum
1.2
2,722.19
3,266.63
sqm
4.00
128.57
514.28
199.97
4,199.35
cum
3.6
182.05
655.39
cum
3.6
2,722.19
9,799.90
sqm
45.00
128.57
5,785.69
812.05
17,053.02
cum
0.096
182.05
17.48
cum
PanchayatR B Circle-2,Rajkot
[Chapter -8](Page-165)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
4
Stone masonary work in cement mortar1:4 in
foundation complete as per drawing and
technical specification
Rate as per item No. 11.6 of Chapter 11
cum
(c) Plaster with cement mortar 1:4 as per
drawing and technical specification
Rate as per Item No.12.3 of Chapter 12
sqm
Add 5% of (a+b+c) for white washing,
Total Cost for each Job Pillar
The dimensions of reference pillars, back pillars
and job pillars are as per figure/site conditions.
The above items are covered under different
Chapters of MORD Specifications for payment.
(b)
Note: (i)
(ii)
8.3 1600
300
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.096
2,722.19
261.33
0.96
128.57
123.43
20.11
422.35
2.40
60.00
194.50
194.50
466.80
11,670.00
1,517.10
13,653.90
113.78
0.55
194.50
106.98
13.37
120.35
12.03
0.80
20.00
194.50
194.50
155.60
3,890.00
6.00
6.00
2,100.00
764.00
12,600.00
4,584.00
2,653.70
23,883.30
PanchayatR B Circle-2,Rajkot
[Chapter -8](Page-166)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Note: (i)
(ii)
Unit
3
4
Rate per cum = (a+b+c)/260
B) Extra for Every Additional Lift of 1.5 m
Excavation in Soil
Unit = cum
Taking output = 10 cum
a) Labour
Mazdoor (Unskilled)
day
b) OH & contractor's profit @ 12.5% on (a)
Cost for 10 cum = (a+b)
Rate per cum = (a+b)/10
In case the land on the valley side is barren and
there is no objection for disposing of excavated
earth on the valley side, the provision of front end
loader and tipper shall be deleted as excavated
earth shall be disposed off on the valley side.
For disposal of excavated surplus earth beyond 20
m, the relevant items of carriage be followed
Quantity
Rate
(Rs.)
Amount
(Rs.)
7
91.86
0.55
194.50
106.98
13.37
120.35
12.03
5.28
132.00
194.50
194.50
1,026.96
25,674.00
3,337.62
30,038.58
250.32
0.86
194.50
167.27
20.91
188.18
18.82
0.68
17.00
9.00
194.50
194.50
194.50
132.26
3,306.50
1,750.50
(iii) In
PanchayatR B Circle-2,Rajkot
[Chapter -8](Page-167)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit
3
4
Machinery
Dozer D-50 @ 28.32 cum per hour
hour
Hydraulic Excavator 0.9 cum bucket capacity hour
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 170 cum = a+b+c
Rate per cum = (a+b+c)/170
Note: (i) In case the land on the valley side is barren and
there is no objection for disposing of excavated
earth on the valley side, the provision of front end
loader and tipper shall be deleted as excavated
earth shall be disposed off on the valley side.
(ii) In case, alternative machine like hydraulic
excavator 0.9 cum bucket capacity is necessited
because of site conditions, the same can be used.
(v) Excavation in Hilly Areas in Hard Rock
requiring blasting
b)
A)
a)
b)
c)
d)
B)
a)
b)
PanchayatR B Circle-2,Rajkot
Quantity
Rate
(Rs.)
Amount
(Rs.)
6.00
4.25
2,100.00
1,400.00
12,600.00
5,950.00
2,967.41
26,706.67
157.10
1.36
22.00
2.00
10.00
194.50
194.50
194.50
194.50
264.52
4,279.00
389.00
1,945.00
3.00
2,100.00
6,300.00
5.00
1,400.00
7,000.00
28.00
300.00
8,400.00
67.00
235.00
144.00
35.00
9,648.00
8,225.00
5,806.32
52,256.84
307.39
1.08
194.50
210.06
26.26
236.32
23.63
[Chapter -8](Page-168)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Note: (1) In case the land on the valley side is barren and
there is no objection for disposing of excavated
earth on the valley side, the provision of front end
loader and tipper shall be deleted as excavated
earth shall be disposed off on the valley side.
(2) In case of hill roads, the altitude effect comes into
play. The output of men and machines decreases
progressively after 2100 m elevation leading to
increase in cost. High altitude effect has been
explained in the basic approach.
Note:
cum
182.05
cum
3,611.23
cum
2,584.41
sqm
429.71
268.47
1,520.22
506.32
8.5 1600,
700, 300
& 800
[Chapter -8](Page-169)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
(ii)
3
Rate as per item No.11.1 of Chapter 11
Plain cement concrete M10 grade
Rate as per item No.11.4 of Chapter 11
Stone masonry in cement mortar 1:5
Rate as per item No.12.4 (III) (iii) of Chapter 12
Plain cement concrete M15 grade
Rate as per item No.11.4 of Chapter 11
Cement plaster 15 mm thick 1:4 on stone
masonry
Unit
4
cum
Quantity
5
Rate
(Rs.)
6
182.05
Amount
(Rs.)
7
0.00
cum
3,611.23
0.00
cum
2,584.41
0.00
cum
3,732.80
0.00
128.57
0.00
268.47
0.00
0.00
cum
182.05
0.00
cum
3,611.23
0.00
cum
2,584.41
0.00
cum
3,732.80
0.00
sqm
128.57
0.00
m
m
268.47
0.00
0.00
(iii)
(iv)
(v)
8.6 1600,
300,
700
&
800
[Chapter -8](Page-170)
Ref.
Description
Unit
MORD
n
Specif
1
2
3
4
8.7 1600,
Construction of Scupper
300
&
700
Construction of scupper with dry stone masonry as per
drawing and technical specifications as per Clause
1606.5.
Unit = 1 m
Taking output = 6 m
(i) Earthwork in excavation for structures as per
drawing and technical specifications
Sr.
No.
Quantity
Rate
(Rs.)
Amount
(Rs.)
115.00
182.05
20,935.98
3,489.33
3.80
38.00
57.00
194.50
207.80
194.50
739.10
7,896.40
11,086.50
38.00
266.00
195.00
34.90
7,410.00
9,283.40
4,551.93
40,967.33
6,827.89
day
day
day
0.72
6.00
12.00
194.50
199.90
194.50
140.04
1,199.40
2,334.00
nos
1,335.00
68.00
90,780.00
PanchayatR B Circle-2,Rajkot
11,806.68
106,260.12
17,710.02
0.12
3.00
194.50
194.50
23.34
583.50
12.00
185.00
2,220.00
353.36
3,180.20
530.03
28,557.27
[Chapter -8](Page-171)
Sr.
No.
1
Ref.
MORD
Specifn
2
Note:
Description
3
Quantities of parapet are not included in the
quantities of scupper.
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
182.05
cum
3,732.80
54,567.69
Unit = sqm
Rate as per item No.10.5 of Chapter 10
sqm
Quantities are to be taken as per drawing
Providing edge stones on valley side of formation
Unit = 1 m
Taking Output = 45 m (100 no of edge stones of size
450 mm x 300 mm x 100 mm)
Note:
8.9 1600
a)
b)
c)
8.10 1600
309
cum
Labour
Mate
Mazdoor (Unskilled)
Mason (2nd class)
Materials
Stones of size 450 mmx300 mmx100 mm
Painting two coats including priming coat on
new concrete/stone surfaces
73.91
day
day
day
0.18
3.00
1.50
194.50
194.50
199.90
35.01
583.50
299.85
nos
100.00
66.00
6,600.00
22.50
73.91
1,662.95
1,147.66
10,328.98
229.53
45 x 0.500 = 22.50
Rate as per item No.10.5 of Chapter 10
sqm
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 45 m = a+b+c+d
Rate per m = (a+b+c+d)/45
& Turfing with Sods
Furnishing and laying of the live sods of perennial turf
forming grass on embankment slope, verges or other
locations shown on the drawing or as directed by the
Engineer including preparation of ground, stacking the
sods and watering as per Clause 309
Unit = sqm
PanchayatR B Circle-2,Rajkot
[Chapter -8](Page-172)
Sr.
No.
1
Ref.
MORD
Specifn
2
8.11 1600
300
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
3
Taking output = 100 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Water tanker including watering for 3 months
Tractor with Trolley
c) Materials
Farmyard manure @ 0.18 cum per 100 sqm at site
of work
day
day
0.16
4.00
194.50
194.50
31.12
778.00
hour
hour
4.00
1.00
300.00
300.00
1,200.00
300.00
cum
0.18
295.00
53.10
24.00
16.00
384.00
343.28
3,089.50
30.89
0.60
15.00
194.50
194.50
116.70
2,917.50
13.00
300.00
3,900.00
2.40
300.00
720.00
3.60
0.43
8.25
295.00
29.70
126.85
0.055
264.00
84.00
34,096.81
30.00
16.00
1,875.32
7,920.00
1,344.00
2,368.76
21,318.83
88.83
Water
kl
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
& Seeding and Mulching
Preparation of seed bed on previously laid top soil,
furnishing and placing of seeds, fertilizer, multching
material, applying bituminous emulsion at the rate of
0.23 l per sqm and laying and fixing jute netting,
including watering for 3 months all as per Clause 310.
Unit = sqm
Taking output = 240 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Water tanker 6 kl capacity including watering for 3 hour
months (for one hour per week)
Tractor with Trolley
hour
Materials
Seeds
kg
Sludge/Farm yard manure @ 0.18 cum per 100 cum
sqm
Bitumen Emulsion
t
Jute netting, open weave, 25 mm square opening sqm
Water for 3 months
kl
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 240 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/240
c)
PanchayatR B Circle-2,Rajkot
[Chapter -8](Page-173)
Chapter 9
PIPE CULVERTS
Sr.
No.
1
9.1
9.2
9.3
Ref.
MORD
Description
n
Specif
2
3
1100 & Excavation for Structures
300
Earthwork in excavation for foundation of structures
upto 3 m depth as per drawing and technical
specification Clause 1104 includding setting out,
construction of shoring and bracing, removal of stumps
and other deleterious matter, dressing of sides and
bottom and backfilling with approved material.
Unit = cum
Rate as per item No.11.1 of Chapter 11
Rate as applicable for the type of soil/rock are to be
taken
1100 & Bedding for Pipe
800
(i) Type A (Concrete Cradle) Bedding
Laying concrete cradle bedding with M15 Grade
Cement Concrete as per Clause 1105 (i)
Unit = cum
Rate as per Item No.11.4 (II)(i) of Chapter 11
Unit Quantity
4
cum
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
182.05
1100
Rate
(Rs.)
1.00 3,732.80
3,732.80
1.00
516.45
516.45
0.14
0.50
3.00
194.50
207.80
194.50
27.23
103.90
583.50
0.05
312.31
0.07 7,670.20
7.50 4,180.00
15.62
536.91
31,350.00
4,077.14
36,694.30
4,892.57
0.09
194.50
17.51
[Chapter -9](Page-174)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
b)
Unit Quantity
4
day
day
5
0.25
2.00
Rate
(Rs.)
6
207.80
194.50
0.04
312.31
0.03 7,670.20
7.50 3,923.29
51.95
389.00
12.49
230.11
29,424.68
3,765.72
33,891.44
4,518.86
day
day
day
cum
t
m
0.05
0.15
1.20
194.50
207.80
194.50
9.73
31.17
233.40
0.024
312.31
0.018 7,670.20
7.50 2,126.18
7.50
138.06
15,946.35
Amount
(Rs.)
2,045.78
18,411.98
2,454.93
1100
PanchayatR B Circle-2,Rajkot
0.14
0.50
3.00
194.50
207.80
194.50
27.23
103.90
583.50
0.05
312.31
0.07 7,670.20
7.50 7,590.00
15.62
536.91
56,925.00
7,274.02
65,466.18
8,728.82
0.09
0.25
194.50
207.80
17.51
51.95
[Chapter -9](Page-175)
Sr.
No.
1
Ref.
MORD
Specifn
2
Note:
9.5
Description
3
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP4 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(C) 750 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP4 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
The labour rate for 600 mm dia Hume pipe may be
derived from the rates for 750 dia by decreasing 20 per
cent
Unit Quantity
4
day
cum
t
m
5
2.00
Rate
(Rs.)
6
194.50
0.04
312.31
0.03 7,670.20
7.50 6,235.00
Amount
(Rs.)
7
389.00
12.49
230.11
46,762.50
5,932.94
53,396.50
7,119.53
day
day
day
cum
t
m
0.05
0.15
1.20
194.50
207.80
194.50
9.73
31.17
233.40
0.024
312.31
0.018 7,670.20
7.50 3,970.00
7.50
138.06
29,775.00
3,774.36
33,969.21
4,529.23
1100
day
day
day
cum
t
m
PanchayatR B Circle-2,Rajkot
0.34
1.20
7.20
194.50
207.80
194.50
66.13
249.36
1,400.40
0.11
312.31
0.14 7,670.20
15.00 4,180.00
34.35
1,073.83
62,700.00
8,190.51
73,714.58
9,828.61
0.22
0.60
194.50
207.80
42.79
124.68
[Chapter -9](Page-176)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP3 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(C) 750 mm dia
a) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP3 pipe including collar at site
Unit Quantity
Rate
(Rs.)
4
day
5
4.80
6
194.50
cum
t
m
0.08
312.31
0.06 7,670.20
15.00 3,923.29
933.60
24.98
460.21
58,849.35
7,554.45
67,990.07
9,065.34
day
day
day
cum
t
m
0.11
0.30
2.40
194.50
207.80
194.50
21.40
62.34
466.80
0.04
312.31
0.036 7,670.20
15.00 2,126.18
12.49
276.13
31,892.70
Amount
(Rs.)
4,091.48
36,823.34
4,909.78
1100
day
day
day
cum
t
m
PanchayatR B Circle-2,Rajkot
0.34
1.20
7.20
194.50
207.80
194.50
66.13
249.36
1,400.40
0.11
312.31
0.14 7,670.20
15.00 7,590.00
34.35
1,073.83
113,850.00
14,584.26
131,258.33
17,501.11
0.22
0.60
4.80
194.50
207.80
194.50
42.79
124.68
933.60
[Chapter -9](Page-177)
Sr.
No.
1
9.7
Ref.
MORD
Specifn
2
Description
b)
Material
Sand at site
Cement at site
RCC pipe NP4 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(C) 750 mm dia
a) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP4 pipe including collar at site
4
cum
t
m
Rate
(Rs.)
Amount
(Rs.)
0.08
312.31
0.06 7,670.20
15.00 6,235.00
24.98
460.21
93,525.00
11,888.91
107,000.18
14,266.69
day
day
day
cum
t
m
0.11
0.30
2.40
194.50
207.80
194.50
21.40
62.34
466.80
0.04
312.31
0.036 7,670.20
15.00 3,970.00
12.49
276.13
59,550.00
9.8
Unit Quantity
7,548.64
67,937.80
9,058.37
day
day
day
0.04
0.11
0.90
194.50
207.80
194.50
7.78
22.86
175.05
cum
t
m
0.02
312.31
0.01 7,670.20
7.50
990.00
6.25
76.70
7,425.00
964.20
8,677.84
1,157.05
PanchayatR B Circle-2,Rajkot
[Chapter -9](Page-178)
Sr.
No.
1
9.9
Ref.
MORD
Specifn
2
Description
Unit Quantity
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
500 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP4 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
Note: The labour rate for 300 mm dia shall be decreased by
20 per cent
Rate
(Rs.)
Amount
(Rs.)
day
day
day
0.04
0.11
0.90
194.50
207.80
194.50
7.78
22.86
175.05
cum
t
m
0.02
312.31
0.01 7,670.20
7.50 2,720.00
6.25
76.70
20,400.00
2,586.08
23,274.72
3,103.30
3,611.23
cum
4,173.88
4,375.17
mortar
2,454.05
2,730.82
10 sqm
429.71
1,285.71
PanchayatR B Circle-2,Rajkot
cum
516.45
[Chapter -9](Page-179)
Ref.
MORD
Description
Unit Quantity
Specifn
1
2
3
4
5
9.15 1100, Providing PCC M20 Architectural Coping on the top of
600, wing wall, return wall etc. complete as per drawing and
700 & technical specification Clause 615
1200
Rate as per Item No.12.13 of Chapter 12
m
Sr.
No.
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
268.47
[Chapter -9](Page-180)
Chapter 10
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
Sr.
No.
1
10.1
Ref.
Description
MORD
n
Specif
2
3
1700 Printing New Letters and Figures of any Shade
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
1700,
300,
800
194.50
199.90
194.50
23.34
399.80
194.50
0.70
210.00
147.00
95.58
860.22
0.54
0.07
1.25
0.50
194.50
199.90
194.50
13.62
249.88
97.25
0.50
210.00
105.00
58.22
523.96
0.33
10.2
0.12
2.00
1.00
Traffic Signs
A. Retro-reflectorised Traffic Signs
(1) Providing and fixing of retro-reflectorised
cautionary, mandatory and informatory sign as per
IRC:67 made of encapsulated lens type reflective
sheeting vide Clause 1701.2.3 fixed over aluminium
sheeting, 1.5 mm thick supported on a mild steel
angle iron post 75 mm x 75 mm x 6 mm firmly
fixed to the ground by means of properly designed
foundation with M15 grade cement concrete 450
mm x 450 mm x 600 mm, 600 mm below ground
level as per drawings and Technical Specification
Unit = each
Taking output = one traffic sign
PanchayatR B Circle-2,Rajkot
[Chapter -10](Page-181)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
Excavation for foundation
As per item No.11.1 of Chapter 11
ii) Cement concrete M15 grade
As per item No.11.4 of Chapter 11
iii) Painting Angle Iron Post with Primer
and two coats of Epoxy Paint as per
specifications
i)
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
cum
0.126
182.05
22.94
cum
0.126 3,732.80
470.33
0.887
98.45
87.32
0.01
0.25
194.50
194.50
1.95
48.63
20.00
50.60
3,680.00
1,012.01
0.00
30.36
0.35
0.156
0.283
0.48
0.27
0.36
0.672
0.08
300.00
24.00
139.62
1,256.56
cum
0.126
182.05
22.94
cum
0.126 3,732.80
470.33
PanchayatR B Circle-2,Rajkot
[Chapter -10](Page-182)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
b)
3
Mate
Mazdoor (Unskilled)
Material
50 mm dia GI Pipe 2.85 m long including 5
per cent wastage
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Add 3 per cent of cost of GI Pipe towards cost
of fabrication, drilling holes, nuts, bolts etc.
Unit Quantity
4
day
day
m
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
0.01
0.25
6
194.50
194.50
3.00
410.00
1,230.00
3,680.00
0.00
0.08
300.00
24.00
163.07
1,960.91
0.126
182.05
22.94
0.126 3,732.80
470.33
sqm
Rate
(Rs.)
1.95
48.63
0.35
0.156
0.283
0.48
0.27
0.36
0.672
0.90
98.45
88.60
0.01
0.25
194.50
194.50
1.95
48.63
0.0285 3,948.16
112.52
[Chapter -10](Page-183)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
4
As per item No.12.6 of Chapter 12
t
Aluminium sheeting fixed with encapsulated sqm
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Add 3 per cent of cost of RCC Post towards
cost of drilling holes, nuts, bolts, etc.
i) 900 mm equilateral triangle
sqm
OR
ii) 600 mm equilateral triangle
sqm
OR
iii) 600 mm circular
sqm
OR
iv) 800 mm x 600 mm rectangular
sqm
OR
v) 600 mm x 450 mm rectangular
sqm
OR
vi) 600 mm x 600 mm square
sqm
OR
vii) 900 mm sides octagon
sqm
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Rate per traffic sign = (i+ii+iii+a+b+c+e)
Note:
B.
Rate
(Rs.)
5
6
0.0077 54,567.69
3,680.00
Amount
(Rs.)
7
420.17
0.00
15.98
0.35
0.156
0.283
0.48
0.27
0.36
0.672
0.08
300.00
24.00
77.91
1,283.02
Unit = Each
Taking output = one traffic sign
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[Chapter -10](Page-184)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Note:
Description
3
4
(i) Excavation foundations
As per Item No. 1 to 11.1 of Chapter 11
cum
(ii) Cement concrete M-15 Grade
As per item no. 11.4 of Chapter 11
cum
(iii) Painting steel tube posts with primer and
two coats of epoxy paint as per
specifications
As per item no 10.7 of Chapter 11
sqm
a) Labour (For fixing at site)
Mate
day
Mazdoor (Unskilled)
day
b) Material
Support of M.S. Sheet tube
(I) 47 mm x 47 mm x 12 SWG Sheet
kg
3050 mm long
(II) Angle iron 50 x 50 x 6 mm for hold fast kg
including 5% wastage
(III 1.5 mm thick M.S. Sheet duly painted with sqm
) stove enamelled paint including lettering,
signs, border, message with reflective tape of
engineering grade required size, shade and
colour as per Technical Specifications
Add 3% cost of MS Sheet tube 12 SWG and
angle irons towards the cost of fabrication,
drilling holes, nuts and bolts etc.
i) 900 mm equilateral & triangle
sqm
OR
ii) 600 mm equilateral & triangle
sqm
OR
iii) 600 mm circular
sqm
OR
iv) 800 mm x 600 mm rectangular
sqm
OR
v) 600 mm x 450 mm rectangular
sqm
OR
vi) 600 mm x 600 mm
sqm
OR
vii) 900 mm side octagon
sqm
c) Machinery
Tractor with Trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Rate per traffic sign = (i+ii+iii+a+b+c+e)
Unit Quantity
PanchayatR B Circle-2,Rajkot
5
0.126
Rate
(Rs.)
Amount
(Rs.)
182.05
22.94
0.126 3,732.80
470.33
0.46
98.45
45.29
0.01
0.25
194.50
194.50
1.95
48.63
12.40
75.20
932.48
1.06
50.60
53.64
690.00
0.00
29.58
0.35
0.156
0.283
0.48
0.27
0.36
0.672
0.08
300.00
24.00
136.28
1,765.11
[Chapter -10](Page-185)
Sr.
No.
1
10.3
Ref.
Description
Unit Quantity
MORD
n
Specif
2
3
4
5
1700, Direction and Place Identification signs upto 0.9
800 & sqm size board
300
Rate
(Rs.)
Amount
(Rs.)
cum
0.126
182.05
22.94
cum
0.126 3,732.80
470.33
sqm
0.887
98.45
87.32
day
day
0.01
0.25
194.50
194.50
1.95
48.63
20.00
50.60
0.90 3,680.00
1,012.01
3,312.00
kg
sqm
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 0.9 sqm = (i+ii+iii+a+b+c+e)
Rate per sqm (for sign having area upto 0.9
sqm) = (i+ii+iii+a+b+c+e)/0.90
PanchayatR B Circle-2,Rajkot
129.72
0.08
300.00
24.00
566.04
5,674.93
6,305.48
[Chapter -10](Page-186)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
(ii) Providing and erecting direction and place
identification retro-reflectorised sign as per IRC:67
made of encapsulated lens type reflective sheeting
vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9
sqm supported on 2 inch dia GI Pipe firmly fixed to
the ground by means of properly designed
foundation with M-15 grade cement concrete 450 x
450 x 600 mm, 600 mm below ground level as per
approved drawing and Tehnical Specification
Clause 1701.
Unit = sqm
Taking output = 0.9 sqm
i) Excavation for foundation
As per item No.11.1 of Chapter 11
ii) Cement concrete M-15 grade
As per item No.11.4 of Chapter 11
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
50mm dia GI Pipe 2.85 m long including 5 per
cent wastage
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
cum
0.126
182.05
22.94
cum
0.126 3,732.80
470.33
day
day
0.01
0.25
194.50
194.50
1.95
48.63
3.00
410.00
1,230.00
sqm
0.90 3,680.00
3,312.00
PanchayatR B Circle-2,Rajkot
36.90
0.08
300.00
24.00
581.68
5,235.15
5,816.84
0.126
182.05
22.94
0.126 3,730.36
470.03
[Chapter -10](Page-187)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
Note:
Amount
(Rs.)
3
iii) Painting two coats including prime coat
on concrete surface with Epoxy Paint as
per specifications
sqm
0.90
98.45
88.60
day
day
0.01
0.25
194.50
194.50
1.95
48.63
cum
0.0285 3,948.16
112.52
t
sqm
0.0077 59,292.69
0.90 3,680.00
456.55
3,312.00
Rate
(Rs.)
0.08
300.00
24.00
494.46
4,450.10
4,944.56
PanchayatR B Circle-2,Rajkot
[Chapter -10](Page-188)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
4
Providing and erecting direction and place
identifications of semi reflective sign boards as per
IRC:67 made of 2 mm thick M.S. Sheet duly stove
enameled paint in white colour in front and grey
colour on back with red reflective border of 70 mm
width and required message, letters, figures with
reflective engineering grade tape as per MORD
specifications of required shade and colour.
Supported and welded on 47 mm x 47mm of 12
SWG Square tube of 3050 mm height duly
strengthened by 25 mm x 5 mm M/s flat iron on
edges on back firmly fixed to the ground by means
of properly designed foundations with M-15 grade
cement concrete 450 mm x 450 mm x 600 mm,
600 mm below ground level as per approved
drawing and Technical Specification Clause 1701
Unit = each
Take Output = 0.9 sqm
(i) Excavation for foundations
As per Item No. 11.1 of Chapter 11
cum
(ii) Cement Concrete M-15 grade
As per Item No. 11.4 of Chapter 11
cum
(iii) Painting on M.S. tube post with primer
and two coat of epoxy paint as per
specifications
As per item No.10.7 of Chapter 10
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Materials
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm
long
ii) Angle iron 50 x 50 x 6 mm for lugs including
5% wastage
PanchayatR B Circle-2,Rajkot
0.126
Amount
(Rs.)
182.05
22.94
0.126 3,732.80
470.33
sqm
0.59
98.45
58.08
day
day
0.01
0.25
194.50
194.50
1.95
48.63
kg
12.40
75.20
932.48
kg
1.06
50.60
53.64
0.90
920.00
828.00
Rate
(Rs.)
54.42
0.08
300.00
24.00
242.89
2,737.35
30,415.05
[Chapter -10](Page-189)
Sr.
No.
1
10.4
Ref.
Description
MORD
n
Specif
2
3
1700, Direction and Place Identification signs with size
800 & more than 0.9 sqm size board
300
Unit Quantity
4
PanchayatR B Circle-2,Rajkot
0.252
Amount
(Rs.)
182.05
45.88
0.252 3,732.80
940.67
sqm
1.774
98.45
174.65
day
day
0.02
0.50
194.50
194.50
3.89
97.25
kg
40.00
50.60
2,024.02
1.50 3,680.00
5,520.00
Rate
(Rs.)
226.32
0.12
300.00
36.00
988.44
10,057.11
6,704.74
[Chapter -10](Page-190)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
(ii) Providing and erecting direction and place
identification retro-reflectorised sign as per IRC:67
made of encapsulated lens type reflective sheeting
vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9
sqm supported on dia GI Pipe firmly fixed to the
ground by means of properly designed foundation
with M-15 grade cement concrete 450 mm x 450
mm x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification
Clause 1701
Unit = sqm
Taking output = 1.50 sqm
i) Excavation for foundation
As per item No.11.1 of Chapter 11
ii) Cement concrete M15 grade
As per item No.11.4 of Chapter 11
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
50 mm dia GI Pipe 2.85 m long including 5
per cent wastage
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Add 3 per cent of cost of GI Pipe towards cost
of fabrication, drilling holes, nuts, bolts, etc.
c)
d)
Unit Quantity
4
0.252
182.05
45.88
cum
0.252 3,732.80
940.67
day
day
0.02
0.50
194.50
194.50
3.89
97.25
6.00
410.00
2,460.00
sqm
1.50 3,680.00
5,520.00
Machinery
Tractor with trolley
hour
OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 1.50 sqm = i+ii+a+b+c+e
Rate per sqm ( for sign having area more
than 0.9 sqm) = (i+ii+a+b+c+e)/1.50
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
cum
Rate
(Rs.)
239.40
0.12
300.00
36.00
1,044.57
10,387.65
6,925.10
0.252
182.05
45.88
0.252 3,732.80
940.67
[Chapter -10](Page-191)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
3
iii) Painting two coats including prime coat
on concrete surface with Epoxy Paint as
per specifications
As per item No.10.7 of Chapter 10
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
RCC M-15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
Steel re-inforcement HYSD bars
As per item No.12.6 of Chapter 12
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
sqm
1.84
98.45
181.14
day
day
0.02
0.50
194.50
194.50
3.89
97.25
cum
0.057 3,948.16
225.04
t
sqm
0.0154 59,292.69
1.50 3,680.00
913.11
5,520.00
Note:
6.75
0.12
300.00
36.00
850.26
7,652.30
5,101.53
PanchayatR B Circle-2,Rajkot
[Chapter -10](Page-192)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
4
Providing and erecting direction and place
identification of semi reflective sign boards as per
IRC-67 made of 2 mm thick M.S. Sheet duly stove
enameled paint white colour in front and grey
colour on back with reflective border of 70 mm
width and required message, letters, figures with
reflective tape of engineering grade as per MORD
specifications of required shade and colour.
Supported and welded on two nos. 47 mm x 47
mm of 12 SWG square tube of 3050 mm height
duly strengthened by 25 mm x 5 mm MS flat iron
on edges on back firmly fixed to the ground by
means of properly designed foundations with M-15
grade cement concrete 450 mm x 450 mm x 600
mm, 600 mm below ground level as per approved
Unit = each
Taking output = 1.5 sqm
(i) Excavation for foundations as
As per item no. 11.1 Chapter 11
cum
(ii) Cement Concrete M15 grade
As per item No.11.4 of Chapter 11
cum
(iii) Painting M.S. tube posts with primer and
As per item No. 10.7 of chapter 10
sqm
a) Labour (fox fixing at site)
Mate
day
Mazdoor (Unskilled)
day
b) Material
Support of MS Sheet tubes 47 mm x 47 mm x kg
i)
12 SWG sheet 3050 mm long
ii) Angle iron 50 mm x 50 mm x 6 mm for lugs
kg
iii) 2 mm thick MS Sheet strengthened by 25 mm sqm
x 5 mm M.S. flat iron and painted with stove
enameled paint including lettering, signs,
messages, border with reflective tape of
engineering grade of required size, shade and
colour as per MORD specifications
Add 3% cost of MS sheet and angle iron
towards the cost of fabrications, drilling,
holes, nuts, bolts etc.
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 1.5 sqm board = (i+ii+iii+a+b+c)
Rate per sqm = (i+ii+iii+a+b+c) / 1.5
Rate
(Rs.)
Amount
(Rs.)
182.05
45.88
0.252 3,732.80
940.67
0.252
0.92
98.45
90.57
0.02
0.50
194.50
194.50
3.89
97.25
24.80
75.20
1,864.96
2.12
1.50
50.60
920.00
107.27
1,380.00
100.57
0.16
300.00
48.00
450.24
5,129.30
3,419.53
1700
PanchayatR B Circle-2,Rajkot
[Chapter -10](Page-193)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
b)
10.6
1700
3
Mate
Painter (1st Class)
Mazdoor (Unskilled)
Material
Cement Primer as per specifications
Paint conforming to requirement of Clause
1701.3.8
Add for scaffolding @ 1 per cent of labour
cost where required
1700
4
day
day
day
litre
litre
Rate
(Rs.)
Amount
(Rs.)
0.20
3.00
2.00
6
194.50
199.90
194.50
7
38.90
599.70
389.00
3.00
6.00
110.00
210.00
330.00
1,260.00
10.28
10.7
Unit Quantity
328.48
2,956.36
73.91
day
day
day
0.25
0.60
0.40
194.50
199.90
194.50
48.63
119.94
77.80
litre
litre
0.60
1.25
100.00
210.00
60.00
262.50
3.23
71.51
643.60
64.36
10.8
1700
day
day
day
0.25
0.60
0.40
194.50
199.90
194.50
48.63
119.94
77.80
litre
litre
0.60
1.25
100.00
450.00
60.00
562.50
6.23
109.39
984.48
98.45
[Chapter -10](Page-194)
Sr.
No.
1
10.9
10.10
Ref.
MORD
n
Specif
2
1700
1700
Description
3
Painting lines, dashes, arrows, etc. on roads in two
coats on new work with ready mixed road marking
paint conforming to IS:164 on bituminous/concrete
surface, including cleaning the surface of all dirt, dust
and other foreign matter, demarcation at site and traffic
control as per drawing and Technical Specification
Clause 1702
Unit Quantity
cum
kg
cum
Rate
(Rs.)
Amount
(Rs.)
0.09
0.55
1.55
194.50
199.90
194.50
17.51
109.95
301.48
1.48
205.00
303.40
91.54
823.87
82.39
0.06
0.30
1.25
194.50
199.90
194.50
11.67
59.97
243.13
0.90
205.00
184.50
62.41
561.67
56.17
2.35 3,948.16
9,278.17
22.08
54.57
1,204.85
1.68
182.05
305.85
[Chapter -10](Page-195)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
4
As per item No.10.5 of Chapter 10
sqm
e) lettering on km post (average 30 letters of 10
cm height each)
per
As per item No.10.1 of Chapter 10
cm
high
per
litre
Transportation and fixing
f) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
g) Machinery
50 HP Tractor with trolley
hour
h) OH & contractor's profit @ 12.5% on (f+g)
Cost for 6 Nos. 5th km stone = a+b+c+e+f+g+h
Rate for each 5th km stone =
(a+b+c+e+f+g+h)/6
ii)
cum
kg
Rate
(Rs.)
9.85
6
73.91
7
728.00
1,800.00
0.54
967.75
0.26
0.60
6.00
194.50
207.80
194.50
50.57
124.68
1,167.00
6.00
300.00
1,800.00
392.78
16,019.65
2,669.94
3.77 3,948.16
14,884.55
26.32
54.57
1,436.22
cum
2.77
182.05
504.28
sqm
11.41
73.91
843.30
1,680.00
0.54
903.23
0.32
1.00
7.00
194.50
207.80
194.50
62.24
207.80
1,361.50
6.00
300.00
1,800.00
428.94
22,432.07
per
cm
high
per
letter
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
1,602.29
cum
1.58 3,948.16
6,238.09
[Chapter -10](Page-196)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
b)
c)
d)
e)
Rate
(Rs.)
Amount
(Rs.)
66.00
54.57
3,601.47
cum
1.39
182.05
253.05
sqm
6.27
73.91
463.41
330.00
0.54
177.42
0.34
1.50
7.00
194.50
207.80
194.50
66.13
311.70
1,361.50
6.00
300.00
1,800.00
442.42
14,715.18
445.91
1.25 3,948.16
4,935.20
Unit Quantity
3
Steel reinforcement @ 5 kg per sqm
As per item No.12.6 of Chapter 12
Excavation in soil for foundation
As per item No.11.1 of Chapter 11
Painting two coats on concrete surface
As per item No.10.5 of Chapter 10
lettering on km post (average 1 letter of 10
As per item No. 10.1 of Chapter 10
4
kg
per
cm
per
litreet
ter
Note:
10.11
1700
Boundary Pillar
Reinforced cement concrete M15 grade boundary
pillars/local stone of standard design as per IRC:25,
fixed in position including finishing and lettering but
excluding painting as per drawing and Technical
Specification Clause 1704
Unit = each
Taking output = 57 Nos.
a) M-15 grade of Concrete
As per Item No. 12.5 of Chapter
b) Steel reinforcement
As per Item No. 12.6 of Chapter
c) Excavation in soil
As per Item No. 11.1 of Chapter
d) lettering, each 10 cm high
As per Item No. 10.1 of Chapter
12
cum
12
kg
79.80
54.57
4,354.50
11
cum
10.72
182.05
1,951.60
10
per
litre
per
cm
high
2,280.00
0.54
1,225.81
0.57
14.25
194.50
194.50
110.87
2,771.63
PanchayatR B Circle-2,Rajkot
day
day
[Chapter -10](Page-197)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Note:
Description
3
4
Tractor with trolley
hour
g) Material
Stone spall
cum
h) OH & contractor's profit @ 12.5% on (e+f+g)
Cost for 57 Nos. boundary pillar = a+b+c+e+f+g+h
Rate for each boundary pillar =
(a+b+c+e+f+g+h)/57
10.12
1700,
800 &
300
Unit Quantity
Amount
(Rs.)
6.00
6
300.00
7
1,800.00
11.97
274.73
3,288.52
996.38
21,434.49
376.04
day
day
day
0.09
0.25
2.00
194.50
207.80
194.50
17.51
51.95
389.00
kg
31.42
75.00
2,356.50
cum
0.526 3,948.16
2,076.73
103.84
0.074 54,567.69
4,038.01
Rate
(Rs.)
PanchayatR B Circle-2,Rajkot
[Chapter -10](Page-198)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
c)
Unit Quantity
3
Painting
Applying two coats of painting including
primer coat on exposed surface of RCC posts
1700,
800 &
300
Amount
(Rs.)
8.14
73.91
601.62
1,204.39
10,839.54
361.32
day
day
day
0.12
0.40
2.50
194.50
207.80
194.50
23.34
83.12
486.25
kg
40.15
75.00
3,011.25
cum
0.702 3,948.16
2,771.61
138.58
0.111 54,567.69
6,057.01
Rate
(Rs.)
Painting
PanchayatR B Circle-2,Rajkot
[Chapter -10](Page-199)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Rate
(Rs.)
Amount
(Rs.)
12.10
73.91
894.30
1,683.18
14,555.93
485.20
cum
1.296
182.052
235.94
cum
0.648 3,730.358
2,417.27
Unit Quantity
3
Applying two coats of painting including prime
coat on exposed surface of RCC posts
10.15
1700,
800
&300
1700,
800 &
300
sqm
4.71
64.360
303.14
sqm
2.16
64.360
139.02
day
day
day
0.01
0.25
0.01
194.50
194.50
207.80
1.95
48.63
2.08
30.00
410.00
12,300.00
104.33
50.60
5,279.16
PanchayatR B Circle-2,Rajkot
527.37
0.06
300.00
18.00
2,272.15
20,449.33
2,044.93
[Chapter -10](Page-200)
Sr.
No.
1
10.16
Ref.
MORD
n
Specif
2
1700
Description
3
Providing, fencing and erecting 50 mm dia painted steel
pipe railing in 3 rows on precast M-20 grade RCC
vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m
above Gl) with 3 holes 50 mm dia for pipe, fixed 2 m
centre-to- centre complete as per approved drawings
Clause 1706
Unit Quantity
4
Unit = Running m
Taking output = 10 m
i) Excavation for foundation (6 Nos.) 6 x 0.6 x
As per item No.11.1 of Chapter 11
cum
ii) Foundation concrete M15 grade PCC 6 x 0.6
As per item No. 11.4 of Chapter 11
cum
iii) RCC M20 for precast posts (6 nos.) of 1.8 m
As per item No.12.5 of Chapter 12
sqm
iv) Painting of pipe
As per item No.10.6 of this Chapter
sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Plumber
day
b) Material
Steel pipe 50 mm dia as per IS:1239
m
HYSD steel bars as per item No.12.6 of t
Chapter 12
c) Machinery
50 HP Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 10 m = a+b+c+d
Rate per m = (a+b+c+d)/10
Providing and Fixing 'Logo' of PMGSY Project
Providing and fixing of typical PMGSY informatory sign
board with Logo as per MORD specifications and
drawing. Three MS Plates of 1.6 mm thick, top and
middle plate duly welded with MS flat iron 25mm x 5m
size on back on edges. The lower plate will be welded
with MS angle iron frame of 25mm x 25mm x 5mm. The
angle iron frame of the lower most plate and flat iron
frame of middle plate will be welded to 2 nos. 75mm x
75 mm of 12 SWG sheet tubes posts duly embedded in
cement concrete M-15 grade blocks of 450mm x 450mm
x 600mm, 600mm below ground level. The top most
diamond plate will be welded to middle plate by 47mm x
47mm of 12 SWG steel plate tube. All M.S. will be stove
enameled on both sides. Lettering and printing arrows,
border etc. will be painted with ready mixed synthetic
enamel paint of superior quality in required shade and
colour. All sections of framed posts and steel tube will
be painted with primer and two coats of epoxy paint as
Unit = Each
Taking out put = one typical board
(i) Excavation for foundations
As per item No. 11.1 of Chapter 11
cum
(ii) Cement Concrete M15 grade
As per item No. 11.4 of Chapter 11
cum
PanchayatR B Circle-2,Rajkot
1.296
Rate
(Rs.)
Amount
(Rs.)
182.052
235.94
0.648 3,730.358
2,417.27
0.33 4,818.375
1,590.06
4.71
64.360
303.14
0.014
0.35
0.01
194.50
194.50
207.80
2.72
68.08
2.08
30.00
410.00
0.032 54,567.69
12,300.00
1,746.17
0.25
300.00
75.00
1,774.26
15,968.30
1,596.83
0.252
182.052
45.88
0.252 3,730.358
940.05
[Chapter -10](Page-201)
Sr.
No.
1
Ref.
MORD
n
Specif
2
Description
Unit Quantity
3
(iii) Painting on MS Steel tubes with primer and
two coats of epoxy paint
2x2.05x.30 = 1.23
1x1.10x188 = 0.21
As per item no. 10.7 of Chapter 10
sqm
1.80
iv) Printing new letters and figures of any shade
Logo Border 60x4x5 = 1200 per cm height per letter
Figure 60x10 = 600 per cm height per letter
Middle plate words 28x5 = 140 per cm height per letter
Bottom plate border 150x2x5 = 1500 per cm height per letter
Bottom plate border 60x2x5 = 600 per cm height per letter
Words 101x2.5 = 252.5
Words 80x3 = 240.00
Tota 4532.5 per cm height per letter
per
As per item No.10.1 of Chapter 10
4,532.50
cm
heigh
t per
litre
a) Labour (for fixing at site)
Mate
day
0.03
Mazdoor (Unskilled)
day
0.75
b) Material
2 nos. MS tubes 75mx75mm of 12 SWG sheet kg
63.15
2650 mm long
Rate
(Rs.)
Amount
(Rs.)
98.45
177.21
0.54
2,436.84
194.50
194.50
5.84
145.88
75.20
4,748.88
4.47
75.20
336.14
2.12
1.44
50.60
920.00
107.27
1,324.80
c)
Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for one Board= (i+ii+iii+iv+a+b+c+d)
195.51
0.24
300.00
72.00
867.04
11,403.34
Suggestive
Traffic Cone
Provision of red fluorescent with white reflective sleeve
traffic cone made of Low Density Polyethylene (LDPE)
material with a square base of 390 x 390 x 35 mm and
a height of 770 mm, 4 kg in weight, placed at 1.5 m
interval, all as per BS:873
Unit = Each
Taking output = 68 Nos.
a) Labour
PanchayatR B Circle-2,Rajkot
[Chapter -10](Page-202)
Sr.
No.
1
10.18
Ref.
MORD
n
Specif
2
Suggestive
Description
Unit Quantity
3
4
Mate
day
Mazdoor (Unskilled)
day
b) Material
Traffic cones with 150 mm reflective sleeve
Nos.
c) Machinery
50 HP Tractor with trolley
Hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 68 Nos. = a+b+c+d
Rate for each cone = (a+b+c+d)/68
Rumble Strips
Provision of 15 nos. rumble strips covered with premix
bituminous carpet, 15-20 mm high at centre, 250 mm
wide placed at 1 m centre-to-centre at approved
locations to control speed, marked with white strips of
road marking paint.
Rate
(Rs.)
Amount
(Rs.)
0.02
0.50
6
194.50
194.50
68.00
850.00
57,800.00
0.10
300.00
30.00
7,241.39
65,172.53
958.42
3.89
97.25
Unit = sqm
Taking output = 100 sqm (including gaps)
The rate per sqm of premix carpet and road marking
may be adopted from Chapters 5 & 10 respectively for
the quantities calculated from approved drawings.
10.19
Suggestive
Note:
[Chapter -10](Page-203)
Sr.
No.
1
10.20
Ref.
MORD
n
Specif
2
Suggestive
Description
3
Road Markers/Road Stud with Lens Reflector
Unit Quantity
4
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
0.04
1.00
194.50
194.50
7.78
194.50
50.00
230.00
11,500.00
1,150.00
12,852.28
25,704.56
514.09
[Chapter -10](Page-204)
Chapter 11
FOUNDATION
Sr.
No.
1
11.1
Ref.
MORD
Specifn
2
300
Description
3
Excavation for Structures
Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps
and other deleterious material and disposal upto a lead of
50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material.
I.
Note:
Note:
1
2
II.
Ordinary soil
(i) Upto 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 10 cum = a+b
Rate per cum = (a+b+c)/10
Unit Quantity
(ii) 3 m to 6 m depth
Unit = cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 10 cum = a+b
Rate per cum = (a+b+c)/10
Cost of dewatering may be added, when needed,
up to 15 per cent of labour cost.
Amount
(Rs.)
0.32
8.00
194.50
194.50
62.24
1,556.00
202.28
1,820.52
182.05
0.38
9.50
194.50
194.50
73.91
1,847.75
240.21
2,161.87
216.19
0.40
10.00
194.50
194.50
77.80
1,945.00
252.85
Rate
(Rs.)
PanchayatR B Circle-2,Rajkot
[Chapter -11](Page-204)
Sr.
No.
Ref.
MORD
Specifn
Description
Unit Quantity
3
Cost for 10 cum = a+b
Rate per cum = (a+b+c)/10
Note: Cost of dewatering upto 10 per cent of labour cost may
be added, where required as per site condition.
Rate
(Rs.)
6
Amount
(Rs.)
7
2,275.65
227.57
0.53
0.84
0.40
12.00
194.50
194.50
194.50
194.50
103.09
163.38
77.80
2,334.00
1.00
300.00
300.00
3.50
14.00
60.00
35.00
210.00
490.00
459.78
4,138.05
413.80
0.20
5.00
194.50
194.50
38.90
972.50
10.00
300.00
3,000.00
Note:
1
2
Marshy soil
Unit = cum
Taking output = 10 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 10 cum = a+b
Rate per cum = (a+b+c)/10
Cost of dewatering @ 30 per cent of (a) may be
added.
501.43
4,512.83
451.28
0.60
15.00
194.50
194.50
116.70
2,917.50
379.28
3,413.48
341.35
[Chapter -11](Page-205)
Sr.
No.
Ref.
MORD
Specifn
Description
11.2
Rate
(Rs.)
Amount
(Rs.)
II.
Note:
11.3
3
Since marshy soil cannot be used in filling in
trenches, it shall be removed and replaced by
approved quality of soil. The labour cost includes
labour input for disposal of marshy soil from
excavated pit with a lead upto 50 m lead.
Unit Quantity
Sand filling
Unit = cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Material
Sand (assuming 20 per cent voids)
cum
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Earth filling (For marshy soil)
Unit = cum
Taking output = 6 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 6 cum = a+b
Rate per cum = (a+b+c)/6
Cost of transportation of good quality earth has not
been included. Only labour for carrying carted
earth with a lead of 50 m to the foundation pits has
been taken in the rate. The cost of carted earth
may be worked out separately if the same is not
available from the adjoining area.
0.01
0.30
194.50
194.50
1.95
58.35
1.20
332.31
398.77
57.38
516.45
0.20
3.00
194.50
194.50
38.90
583.50
77.80
700.20
116.70
0.275 7,670.20
0.48
332.31
0.48
502.05
0.24
627.05
2,109.31
159.51
240.98
150.49
t
cum
cum
cum
PanchayatR B Circle-2,Rajkot
[Chapter -11](Page-206)
Sr.
No.
Ref.
MORD
Specifn
11.4
Description
Unit Quantity
3
4
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Formwork @ 4% on (a+b)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
800 & Providing concrete for plain/reinforced concrete in
1200 open foundations complete as per drawings and
technical specifications Clause 802, 803, 1202 &
1203
I.
P.C.C grade M 10
(i) Nominal mix 1:3:6
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Mechnical concrete mixer 0.4/0.28 cum hour
capacity fitted with water measuring device
and preferably also with load cell.
d) Formwork @ 4% on cost of material,
labour and machinery (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
(ii) Nominal mix 1:3.6 (Hand mixing)
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Formwork @ 4% on cost of material (a)
and labour (b)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
II. P.C.C grade M 15
(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
5
0.08
6
597.05
0.09
0.10
2.00
0.27
194.50
207.80
194.50
196.30
17.51
20.78
389.00
53.00
127.53
414.48
3,730.36
0.250 7,670.20
0.48
332.31
0.576
502.05
0.288
627.05
0.096
597.05
1,917.55
159.51
289.18
180.59
57.32
47.76
0.08
0.10
1.63
0.27
194.50
207.80
194.50
196.30
15.56
20.78
317.04
53.00
0.40
190.00
76.00
123.46
401.25
3,611.23
0.250 7,670.20
0.48
332.31
0.576
502.05
0.288
627.05
0.096
597.05
0.09
0.10
2.00
0.27
194.50
207.80
194.50
196.30
1,917.55
159.51
289.18
180.59
57.32
17.51
20.78
389.00
53.00
123.38
400.98
3,608.79
[Chapter -11](Page-207)
Sr.
No.
Ref.
MORD
Specifn
Description
Unit Quantity
4
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class0
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Formwork @ 4% on cost of material,
labour and machinery (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
(ii) Nominal mix 1:2.5:5 (Hand mixing)
Unit = cum
Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Formwork @ 4% on (a+b)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
III. P.C.C. grade M 20
(i) Nominal mix (1:2:4)
Unit = cum
a) Material
Cement
t
Sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Formwork @ 4% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
(ii) Nominal mix 1:2:4 (Hand mixed)
Unit = cum
a) Material
Cement
t
Sand
cum
a)
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
5
6
0.275 7,670.20
0.48
332.31
0.48
502.05
0.24
627.05
0.08
597.05
Amount
(Rs.)
7
2,109.31
159.51
240.98
150.49
47.76
0.08
0.10
1.63
0.27
194.50
207.80
194.50
196.30
15.56
20.78
317.04
53.00
0.40
190.00
76.00
127.62
414.76
3,732.80
0.275 7,670.20
0.48
332.31
0.48
502.05
0.24
627.05
0.08
597.05
0.09
0.10
2.00
0.27
2,109.31
159.51
240.98
150.49
47.76
194.50
207.80
194.50
196.30
17.51
20.78
389.00
53.00
127.53
414.48
3,730.36
0.33 7,670.20
0.45
332.31
0.36
502.05
0.36
627.05
0.18
597.05
2,531.17
149.54
180.74
225.74
107.47
0.08
0.10
1.63
0.27
194.50
207.80
194.50
196.30
15.56
20.78
317.04
53.00
0.40
190.00
76.00
147.08
478.01
4,302.12
0.33 7,670.20
0.45
332.31
2,531.17
149.54
[Chapter -11](Page-208)
Sr.
No.
Ref.
MORD
Specifn
11.5
Description
Unit Quantity
Rate
(Rs.)
3
4
5
6
40 mm aggregate
cum
0.36
502.05
20 mm aggregate
cum
0.36
627.05
10 mm aggregate
cum
0.18
597.05
b) Labour
Mate
day
0.09
194.50
Mason (1st Class)
day
0.10
207.80
Mazdoor (Unskilled)
day
2.00
194.50
Bhisti
day
0.27
196.30
c) Formwork @ 4% out of material and
labour (a+b)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
IV. R.C.C grade M 20
Unit = cum
a) Material
Cement
t
0.35 7,670.20
Coarse sand
cum
0.45
332.31
cum
0.54
627.05
20 mm aggregate
cum
0.36
597.05
10 mm aggregate
b) Labour
Mate
day
0.08
194.50
Mason (1st Class)
day
0.12
207.80
Mazdoor (Unskilled)
day
1.73
194.50
Bhisti
day
0.27
196.30
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
190.00
d) Formwork @ 4% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = (a+b+c+d+e+f)
V.
R.C.C. grade M 25
Unit = cum
a) Material
Cement
t
0.404 7,670.20
Coarse sand
cum
0.45
332.31
20 mm aggregate
cum
0.54
627.05
10 mm aggregate
cum
0.36
597.05
b) Labour
Mate
day
0.08
194.50
Mason (1st Class)
day
0.12
207.80
194.50
Mazdoor (Unskilled)
day
1.73
Bhisti
day
0.27
196.30
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
190.00
d) Formwork @ 3.75% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
600 & Brick masonry work in cement mortar in
1200 foundation complete excluding pointing and
plastering as per drawing and technical
specifications Clauses 600, 1202 & 1203
Unit = cum
I.
Brick masonry in 1:3 cement mortar
a) Material
Brick
Nos.
500.00
4.69
Cement mortar 1:3
cum
0.24 4,459.26
(Rate as per Sub-analysis)
PanchayatR B Circle-2,Rajkot
Amount
(Rs.)
7
180.74
225.74
107.47
17.51
20.78
389.00
53.00
147.00
477.74
4,299.68
2,684.57
149.54
338.61
214.94
15.56
24.94
336.49
53.00
76.00
155.75
506.17
4,555.55
3,098.76
149.54
338.61
214.94
15.56
24.94
336.49
53.00
76.00
161.54
558.67
5,028.04
2,345.00
1,070.22
[Chapter -11](Page-209)
Sr.
No.
Ref.
MORD
Specifn
Description
b)
Unit Quantity
4
Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Sub-analysis
Cement mortar 1:3 (1 cement : 3 sand)
Unit = cum
a) Material
Cement
t
Sand
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
Total material and labour = (a+b)
II. Brick masonry in 1:4 cement mortar
Unit = cum
a) Material
Brick
Nos.
Cement mortar 1:4
cum
Rates as per sub-analysis
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b
Sub-analysis
Cement mortar 1:4 (1 cement : 4 sand)
Unit = cum
a) Material
Cement
t
Sand
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
Total material and labour = (a+b)
III. Brick masonry in cement-lime-mortar (1:0.5:4.5)
Unit = cum
a) Material
Brick
Nos.
Cement lime mortar rates as per sub-analysis cum
b)
Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Sub-analysis
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
5
0.09
0.80
1.60
0.20
Rate
(Rs.)
Amount
(Rs.)
194.50
207.80
194.50
196.30
17.51
166.24
311.20
39.26
493.68
4,443.11
0.51 7,670.20
1.05
332.31
3,911.80
348.93
0.04
0.90
0.08
194.50
194.50
196.30
7.78
175.05
15.70
4,459.26
500.00
4.69
0.24 3,462.14
2,345.00
830.91
0.09
0.80
1.60
0.20
194.50
207.80
194.50
196.30
17.51
166.24
311.20
39.26
463.76
4,173.88
0.38 7,670.20
1.05
332.31
2,914.68
348.93
0.04
0.90
0.08
194.50
194.50
196.30
7.78
175.05
15.70
3,462.14
500.00
4.69
0.24 4,207.64
2,345.00
1,009.83
0.09
0.80
1.60
0.20
194.50
207.80
194.50
196.30
17.51
166.24
311.20
39.26
486.13
4,375.17
[Chapter -11](Page-210)
Sr.
No.
Ref.
MORD
Specifn
11.6
Description
3
Cement-lime-mortar 1:0.5:4.5 (1 cement: 0.5 lime
putty : 4.5 sand)
Unit = cum
a) Material
Cement
Lime putty
Sand
b) Labour
Mate
Mazdoor (Unskilled)
Bhisti
Total material and labour = (a+b)
700 & Stone masonry work in cement mortar in
1200 foundation complete as per drawing and technical
specifications Clauses 702, 704, 1202 & 1203.
Unit Quantity
4
t
t
cum
day
day
day
Unit = cum
Coursed rubble masonry (1st sort)
I.
(i) In 1:3 cement mortar
Unit = cum
a) Material
Stone for C.R. masonry 1st sort
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement mortar (1:3) (Rate as in item 11.5 I) cum
b)
Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for C.R. masonry 1st sort
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement mortar 1:4 (Rate as in item 11.5 II)
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = (a+b+c+d)
(iii) In cement-lime-sand mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for C.R. masonry 1st sort
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement lime mortar (Rate as in item 11.5 III) cum
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
0.38 7,670.20
0.175 2,000.00
1.05
332.31
2,914.68
350.00
348.93
0.10
2.50
0.45
194.50
194.50
196.30
19.45
486.25
88.34
4,207.64
1.10
7.00
339.73
34.90
373.70
244.30
0.30 4,459.26
1,337.78
0.14
1.50
2.10
0.08
194.50
207.80
194.50
196.30
27.23
311.70
408.45
15.70
339.86
3,058.72
1.10
7.00
339.73
34.90
373.70
244.30
0.30 3,462.14
1,038.64
0.14
1.50
2.10
0.08
194.50
207.80
194.50
196.30
27.23
311.70
408.45
15.70
302.47
2,722.19
1.10
7.00
339.73
34.90
373.70
244.30
0.30 4,207.64
1,262.29
[Chapter -11](Page-211)
Sr.
No.
Ref.
MORD
Specifn
Description
b)
Unit Quantity
4
Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Note: Quantity of required chips has not been provided for
separately as it is assumed that the same will be availble
from dressing of stones
II.
Rate
(Rs.)
Amount
(Rs.)
0.14
1.50
2.10
0.08
194.50
207.80
194.50
196.30
27.23
311.70
408.45
15.70
330.42
2,973.80
0.60
7.00
185.00
34.90
111.00
244.30
0.50
185.00
0.33 4,459.26
92.50
1,471.56
0.14
1.30
2.00
0.08
194.50
207.80
194.50
196.30
27.23
270.14
389.00
15.70
327.68
2,949.11
0.60
7.00
339.73
34.90
203.84
244.30
0.50
185.00
0.33 3,462.14
92.50
1,142.50
0.14
1.30
2.00
0.08
194.50
207.80
194.50
196.30
27.23
270.14
389.00
15.70
272.67
2,454.05
0.60
7.00
339.73
34.90
203.84
244.30
0.50
185.00
0.33 4,207.64
92.50
1,388.52
0.14
1.30
2.00
0.08
194.50
207.80
194.50
196.30
27.23
270.14
389.00
15.70
303.42
2,730.82
[Chapter -11](Page-212)
Sr.
No.
Ref.
MORD
Specifn
11.7
Description
Unit Quantity
3
4
III. Random Rubble Masonry
(i) In 1:3 cement mortar
Unit = cum
a) Material
Stone for R.R. masonry
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement mortar (1:3) (Rate as in item 11.5 I) cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
(ii) In cement mortar 1:4
a) Material
cum
Stone for R.R. masonry
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement mortar (1:4) (Rate as in item 11.5 II) cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
(iii) In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for R.R. masonry
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement lime mortar (Rate as in item 11.5 III) cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Note: Quantity of required chips has not been provided for
separately as it is assumed that the same will be availble
from dressing of stones
1000 Supplying, fitting and placing HYSD bar
&
reinforcement in foundation complete as per
1200 drawings and technical specifications Clauses
1000 and 1202
Unit = t
a) Material
HYSD bars including 5 per cent for overlaps
t
and wastage
Binding wire
kg
PanchayatR B Circle-2,Rajkot
1.00
7.00
Rate
(Rs.)
Amount
(Rs.)
195.00
34.90
195.00
244.30
0.33 4,459.26
1,471.56
0.12
1.20
1.80
0.08
194.50
207.80
194.50
196.30
23.34
249.36
350.10
15.70
318.67
2,868.03
1.00
7.00
339.73
34.90
339.73
244.30
0.33 3,462.14
1,142.50
0.12
1.20
1.80
0.08
194.50
207.80
194.50
196.30
23.34
249.36
350.10
15.70
295.63
2,660.67
1.00
7.00
339.73
34.90
339.73
244.30
0.33 4,207.64
1,388.52
0.12
1.20
1.80
0.08
194.50
207.80
194.50
196.30
23.34
249.36
350.10
15.70
326.38
2,937.44
1.05 44,200.60
46,410.63
6.00
58.00
348.00
[Chapter -11](Page-213)
Sr.
No.
Ref.
MORD
Specifn
11.8
11.9
1000
&
1200
1000
&
1200
Description
b)
3
Labour for cutting, bending, shifting to
site, tying and placing in position
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c
Supplying,
fitting
and
placingTMT
bar
reinforcement in foundation complete as per
drawings and technical specifications Clauses
1000 and 1202
Unit = t
a) Material
TMT bars including 5 per cent for overlaps and t
wastage
Binding wire
kg
b) Labour for cutting, bending, shifting to
site, tying and placing in position
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c
Supplying,
fitting
and
placing
MS
bar
reinforcement in foundation complete as per
drawings and technical specifications Clauses
1000 and 1202
Unit = t
a) Material
MS bars including 5 per cent for overlaps and t
wastage
Binding wire
kg
b) Labour for cutting, bending, shifting to
site, tying and placing in position
0.40
2.00
6.00
6.00
58.00
348.00
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c
0.40
2.00
6.00
194.50
207.80
194.50
77.80
415.60
1,167.00
5,789.88
52,108.91
PanchayatR B Circle-2,Rajkot
194.50
207.80
194.50
77.80
415.60
1,167.00
6,052.38
54,471.41
1.05 48,200.60
50,610.63
6.00
58.00
348.00
0.40
2.00
6.00
194.50
207.80
194.50
77.80
415.60
1,167.00
6,577.38
59,196.41
1.05 42,200.60
44,310.63
[Chapter -11](Page-214)
Chapter 12
SUBSTRUCTURE
Sr.
No.
1
12.1
Ref.
Description
Unit Quantity
MORD
n
Specif
2
3
4
5
600 Brick masonry work in cement mortar in
substructure complete excepting pointing and
plastering, as per drawing and technical
specification Clauses 602, 603, 604, 1202 & 1204
I.
II.
Nos.
cum
day
day
day
day
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
500.00
0.24
4.69
4,459.26
2,345.00
1,070.22
0.09
0.80
1.60
0.20
194.50
207.80
194.50
196.30
17.51
166.24
311.20
39.26
170.76
515.02
4,635.21
500.00
4.69
2,345.00
0.24
3,462.14
830.91
0.09
0.80
1.60
0.20
194.50
207.80
194.50
196.30
17.51
166.24
311.20
39.26
185.51
486.95
4,382.58
500.00
0.24
4.69
2,925.22
2,345.00
702.05
0.09
0.80
1.60
0.20
194.50
207.80
194.50
196.30
17.51
166.24
311.20
39.26
179.06
470.04
4,230.36
[Chapter -12](Page-215)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
Cement
Sand
b) Labour
Mate
Mazdoor (Unskilled)
Bhisti
Total material and labour = (a+b)
IV. In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Brick first class
Cement lime mortar (Rate as in item 11.5 III)
b)
12.2
600
Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
Bhisti
Add for scaffolding @ 5 per cent of cost of
materials and labour (a+b)
Unit Quantity
Rate
(Rs.)
4
t
cum
5
0.31
1.05
6
7,670.20
332.31
7
2,377.76
348.93
day
day
day
0.04
0.90
0.08
194.50
194.50
196.30
7.78
175.05
15.70
2,925.22
500.00
0.24
4.69
4,207.64
2,345.00
1,009.83
0.09
0.80
1.60
0.20
194.50
207.80
194.50
196.30
17.51
166.24
311.20
39.26
194.45
Nos.
cum
day
day
day
day
510.44
4,593.93
0.03
4,459.26
133.78
0.04
0.50
0.50
0.20
194.50
207.80
194.50
196.30
7.78
103.90
97.25
39.26
47.75
429.71
0.24
3,462.14
830.91
0.06
0.60
0.60
0.30
194.50
207.80
194.50
196.30
11.67
124.68
116.70
58.89
142.86
1,285.71
Amount
(Rs.)
PanchayatR B Circle-2,Rajkot
[Chapter -12](Page-216)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
12.4
700
Rate
(Rs.)
Amount
(Rs.)
3
Though cement mortar of leaner mix has been
included in item 12.1, for cement plaster mix of 1:4
has been proposed for better finishing
Unit Quantity
1.10
7.00
339.73
34.90
373.70
244.30
0.30
4,459.26
1,337.78
0.14
1.50
2.10
0.08
194.50
207.80
194.50
196.30
27.23
311.70
408.45
15.70
135.94
356.85
3,211.66
1.10
7.00
339.73
34.90
373.70
244.30
0.30
3,462.14
1,038.64
0.14
1.50
2.10
0.08
194.50
207.80
194.50
196.30
27.23
311.70
408.45
15.70
120.99
317.59
2,858.30
0.60
7.00
339.73
34.90
203.84
244.30
0.50
0.33
185.00
2,925.22
92.50
965.32
[Chapter -12](Page-217)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
As for scaffolding @ 5% on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iv) In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for CR masonry 1st sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement lime mortar (Rate as in item 11.5. III) cum
b)
II.
Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5% of (a) and (b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
Coursed Rubble masonry (2nd sort)
(i) In cement mortar (1:3)
Unit = cum
a) Material
Stone for CR masonry 2nd sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Spalls/blasted rubbles
cum
Cement mortar (Rate as in item 11.5 I)
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for CR masonry 2nd sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Spall/blasted rubble
cum
Cement mortar (Rate same as in item 11.5 II) cum
b)
Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
Bhisti
PanchayatR B Circle-2,Rajkot
day
day
day
day
Rate
(Rs.)
Amount
(Rs.)
5
0.14
1.30
2.00
0.08
6
194.50
207.80
194.50
196.30
1.10
7.00
339.73
34.90
373.70
244.30
0.30
4,207.64
1,262.29
0.14
1.50
2.10
0.08
194.50
207.80
194.50
196.30
27.23
311.70
408.45
15.70
132.17
346.94
3,122.49
0.60
7.00
339.73
34.90
203.84
244.30
0.50
0.33
185.00
4,459.26
92.50
1,471.56
0.14
1.30
2.00
0.08
194.50
207.80
194.50
196.30
27.23
270.14
389.00
15.70
135.71
27.23
270.14
389.00
15.70
110.40
289.80
2,608.24
356.25
3,206.23
0.60
7.00
339.73
34.90
203.84
244.30
0.50
0.33
185.00
3,462.14
92.50
1,142.50
0.14
1.30
2.00
0.08
194.50
207.80
194.50
196.30
27.23
270.14
389.00
15.70
[Chapter -12](Page-218)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iii) In cement mortar (1:5)
Unit = cum
a) Material
Stone for CR masonry 2nd sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Spall/blasted rubble
cum
Cement mortar (Rate same as in item 12.1 cum
III)
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iv) In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for CR masonry 2nd sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Spalls/blasted rubbles
cum
Cement lime mortar (Rate as in item 11.5 III) cum
b)
Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
III. Random rubble masonry
(i) In cement mortar (1:3)
Unit = cum
a) Material
Stone for RR masonry
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement mortar (Rate as in item 11.5 I)
cum
b)
Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
Bhisti
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b)
c)
day
day
day
day
Rate
(Rs.)
6
Amount
(Rs.)
7
119.26
313.06
2,817.54
0.60
7.00
339.73
34.90
203.84
244.30
0.50
0.33
185.00
2,925.22
92.50
965.32
0.14
1.30
2.00
0.08
194.50
207.80
194.50
196.30
27.23
270.14
389.00
15.70
110.40
289.80
2,608.24
0.60
7.00
339.73
34.90
203.84
244.30
0.50
0.33
185.00
4,207.64
92.50
1,388.52
0.14
1.30
2.00
0.08
194.50
207.80
194.50
196.30
27.23
270.14
389.00
15.70
131.56
345.35
3,108.14
1.00
7.00
339.73
34.90
339.73
244.30
0.33
4,459.26
1,471.56
0.12
1.20
1.80
0.08
194.50
207.80
194.50
196.30
23.34
249.36
350.10
15.70
134.70
353.60
3,182.39
[Chapter -12](Page-219)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for RR masonry
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement mortar (Rate same as in item 11.5 II) cum
b)
Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b) 5% on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iii) In cement mortar (1:5)
Unit = cum
a) Material
Stone for RR masonry
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement mortar (Rate same as in item 12.1 cum
III)
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iv) In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for RR masonry
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement lime mortar (Rate as in item 11.5 III) cum
b)
12.5
800
Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
Plain/reinforced cement concrete in substructure
complete as per drawings and technical
specification Clauses 802, 804, 805, 806, 807,
1202 ans 1204
Rate
(Rs.)
Amount
(Rs.)
1.00
7.00
339.73
34.90
339.73
244.30
0.33
3,462.14
1,142.50
0.12
1.20
1.80
0.08
194.50
207.80
194.50
196.30
23.34
249.36
350.10
15.70
118.25
310.41
2,793.70
1.00
7.00
339.73
34.90
339.73
244.30
0.33
2,925.22
965.32
0.12
1.20
1.80
0.08
194.50
207.80
194.50
196.30
23.34
249.36
350.10
15.70
109.39
287.16
2,584.41
1.00
7.00
339.73
34.90
339.73
244.30
0.33
4,207.64
1,388.52
0.12
1.20
1.80
0.08
194.50
207.80
194.50
196.30
23.34
249.36
350.10
15.70
130.55
342.70
3,084.31
PanchayatR B Circle-2,Rajkot
[Chapter -12](Page-220)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
I.
3
P.C.C grade M 15
(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason (1st Class0
Mazdoor (Unskilled)
Bhisti
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
t
cum
cum
cum
cum
0.275
0.48
0.48
0.24
0.08
7,670.20
332.31
502.05
627.05
597.05
2,109.31
159.51
240.98
150.49
47.76
day
day
day
day
0.08
0.10
1.63
0.27
194.50
207.80
194.50
196.30
15.56
20.78
317.04
53.00
hour
0.40
190.00
76.00
d)
II.
319.04
438.68
3,948.16
0.275
0.48
0.48
0.24
0.08
7,670.20
332.31
502.05
627.05
597.05
2,109.31
159.51
240.98
150.49
47.76
0.09
0.10
2.00
0.27
194.50
207.80
194.50
196.30
17.51
20.78
389.00
53.00
318.83
438.40
3,945.57
0.33
0.45
0.36
0.36
0.18
7,670.20
332.31
502.05
627.05
597.05
2,531.17
149.54
180.74
225.74
107.47
0.08
0.10
1.63
0.27
194.50
207.80
194.50
196.30
15.56
20.78
317.04
53.00
0.40
190.00
76.00
367.70
505.59
4,550.32
[Chapter -12](Page-221)
Sr.
No.
1
Ref.
MORD
Specifn
2
Note:
Description
3
4
(ii) Nominal mix 1:2:4 (Hand mixed)
Unit = cum
a) Material
Cement
t
Sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Formwork @ 10% on (a+b+c)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d+e
III. R.C.C grade M 20
Unit = cum
a) Material
Cement
t
Coarse sand
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Formwork @ 10% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = (a+b+c+d+e+f)
IV. R.C.C. grade M 25
Unit = cum
a) Material
Cement
t
Coarse sand
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Formwork @ 10% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e+f
1 For height above 5 m upto 10 m same as above
with following changes:
a.
Unit Quantity
5
Rate
(Rs.)
Amount
(Rs.)
0.33
0.45
0.36
0.36
0.18
7,670.20
332.31
502.05
627.05
597.05
2,531.17
149.54
180.74
225.74
107.47
0.09
0.10
2.00
0.27
194.50
207.80
194.50
196.30
17.51
20.78
389.00
53.00
367.49
505.30
4,547.73
0.35
0.45
0.54
0.36
7,670.20
332.31
627.05
597.05
2,684.57
149.54
338.61
214.94
0.08
0.12
1.73
0.27
194.50
207.80
194.50
196.30
15.56
24.94
336.49
53.00
0.40
190.00
76.00
389.36
535.38
4,818.38
0.404
0.45
0.54
0.36
7,670.20
332.31
627.05
597.05
3,098.76
149.54
338.61
214.94
0.08
0.12
1.73
0.27
194.50
207.80
194.50
196.30
15.56
24.94
336.49
53.00
0.40
190.00
76.00
430.78
592.33
5,330.94
[Chapter -12](Page-222)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
b.
2
3
12.6
1000
Unit Quantity
3
The provision of formwork shall be 12 per
cent instead of 10 per cent of cost of material,
labour and machinery
1000
1000
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c+d
Supplying,
fitting
and
placing
TMT
bar
reinforcement (Fe 415) in substructrue complete
as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c+d
Supplying, fitting and placing with MS bar
reinforcement (Fe 415) in substructrue complete
as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202
Unit = t
a) Material
MS bars including 5 per cent overlaps and t
wastage
Binding wire
kg
Unit = t
a) Material
TMT bars including 5 per cent overlaps and t
wastage
Binding wire
kg
b) Labour for cutting, bending, shifting to
site, tying, and placing in position
12.8
Amount
(Rs.)
Unit = t
a) Material
HYSD bars including 5 per cent overlaps and t
wastage
Binding wire
kg
b) Labour for cutting, bending, shifting to
site, tying, and placing in position
12.7
Rate
(Rs.)
PanchayatR B Circle-2,Rajkot
1.05 44,200.60
46,410.63
6.00
58.00
348.00
0.34
2.00
6.50
194.50
207.80
194.50
66.13
415.60
1,264.25
6,063.08
54,567.69
1.05 48,200.60
50,610.63
6.00
58.00
348.00
0.34
2.00
6.50
194.50
207.80
194.50
66.13
415.60
1,264.25
6,588.08
59,292.69
1.05 42,200.60
44,310.63
6.00
58.00
348.00
[Chapter -12](Page-223)
Sr.
No.
1
12.9
12.10
Ref.
MORD
Specifn
2
600
1200
Description
b)
3
Labour for cutting, bending, shifting to
site, tying, and placing in position
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c+d
Providing weepholes in brick masonry/stone
masonry, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC pipe
extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7
Unit = Nos
Taking output = 30 Nos
a) Material
AC pipe 100 mm dia including wastage @ 5 m
per cent. Average length of weep hole is
taken as one metre for the purpose of
estimating
MS clamps
Nos.
Cement mortar 1:3 (For rate refer to item cum
11.5 I)
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 30 Nos = (a+b+c+d)
Rate per No = (a+b+c+d)/30
Backfilling behind abutment, wing wall and return
wall complete as per drawings & technical
specification Clause 1204.3.8
I)
Unit = cum
Taking output = 10 cum
Granular material
a) Material
Granular material
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 10 cum of granular backfill =
a+b+c+d
Unit Quantity
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
0.34
2.00
6.50
194.50
207.80
194.50
66.13
415.60
1,264.25
5,800.58
52,205.19
31.50
42.70
1,345.05
30.00
0.05
45.00
4,459.26
1,350.00
222.96
0.03
0.50
0.25
194.50
207.80
194.50
5.84
103.90
48.63
384.55
3,460.92
115.36
12.00
201.89
2,422.68
0.28
10.00
0.40
194.50
194.50
196.30
54.46
1,945.00
78.52
562.58
5,063.24
506.32
cum
12.00
332.31
3,987.72
[Chapter -12](Page-224)
Sr.
No.
1
12.11
12.12
Ref.
MORD
Specifn
2
1200
1200
Description
Unit Quantity
3
4
Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 10 cum of sand backfill = a+b+c+d
Rate per cum = (a+b+c+d)/10
Providing and laying filter media with granular
crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
wall and providing over the entire surface behind
abutment, wing wall, return wall to the full
height, compacted to firm condition complete as
per drawing and technical specification Clause
1204.3.8
b)
Rate
(Rs.)
Amount
(Rs.)
0.40
10.00
0.40
194.50
194.50
196.30
77.80
1,945.00
78.52
761.13
6,850.17
685.02
12.00
948.89
11,386.68
0.40
9.00
1.00
0.50
194.50
194.50
199.90
196.30
77.80
1,750.50
199.90
98.15
1,689.13
15,202.16
1,520.22
day
day
day
0.06
1.00
0.50
194.50
194.50
199.90
11.67
194.50
99.95
Nos.
1.00 38,500.00
38,500.00
Unit = cum
Taking output = 10 cum
a) Material
Filter media as per specification
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 10 cum of filter media = a+b+c+d
Rate per cum = (a+b+c+d)/10
Supplying, fitting and fixing in position true to line
and level elastomeric bearing conforming to
IRC:83 (Part-II) Section IX complete, including all
accessories as per drawings and technical
specification Clause 1207.1
Unit = cubic centimetre
Considering an elastomeric bearing of size 500 x
400 x 96 mm for this analysis,
Overall volume = 19200 cu.cm
Volume of 6 Nos 488x388x4 mm size reinforcing
steel plates = 4545 cu.cm.
Hence volume of elastomer = 14655 cu. cm.
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor Skilled
b) Material
Elastomeric bearing assembly consisting of 7
internal layers of elastomer bonded to 6 nos.
internal reinforcing steel laminates by the
process of vulcanisation, complete with all
components as per drawing and technical
specification
PanchayatR B Circle-2,Rajkot
[Chapter -12](Page-225)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
Add for anchorage bolts if required and
consumables @ 1 per cent on (a+b)
Rate
(Rs.)
6
Amount
(Rs.)
7
388.06
4,899.27
44,093.45
2.30
600
12.14
1200
4,550.32
Cost of 1 m = a
Rate per m = a
Providing pressure relief pipes 100 mm dia in
bottom slab of box cell on a filter media base of
500 mm x 500 mm as per drawing and technical
specification Clause 1205.5.7
Unit = Nos
a) Material
AC pipe 100 mm dia i/c wastage of 5 per cent m
600 mm long upto the bottom of levelling
course
Filter media base with stone aggregate 0.5 m cum
x 0.5 m area 1 m deep
b)
Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per No = (a+b+c+d)
0.059
PanchayatR B Circle-2,Rajkot
268.47
26.85
268.47
268.47
0.63
42.70
26.90
0.25
948.89
237.22
0.031
0.016
0.80
194.50
207.80
194.50
6.03
3.32
155.60
53.63
482.71
[Chapter -12](Page-226)
Chapter 13
SUPERSTRUCTURE
Sr.
No.
Ref.
MORD
Specifn
1
13.1
2
800
Description
3
Providing and laying reinforced cement concrete
in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5
Unit Quantity
4
I. R.C.C grade M 20
(i) For nominal mix 1:2:4
Unit = cum
a) Material
Cement
t
0.35
Coarse sand
cum
0.45
20 mm aggregate
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.08
Mason (1st Class)
day
0.12
Mazdoor (Unskilled)
day
1.73
Bhisti
day
0.27
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
d) Add for formwork and staging
Height upto 5 m @ 20% of (a+b+c)
e) Overhead & contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
(ii) For nominal mix 1:2:4 (Hand mixed)
Unit = cum
a) Material
Cement
t
0.35
Coarse aggregate
cum
0.45
20 cum aggregates
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.09
Mason (1st Class)
day
0.10
Mazdoor (Unskilled)
day
2.00
Bhisti
day
0.27
c) For formwork and staging add the
following percentage of (a+b)
Height upto 5 m @ 20 per cent of (a+b)
Height from 5 m to 10 m @ 25 per cent of (a+b)
Height above 10 m @ 30 per cent of (a+b)
d) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
(iii) For design mix RCC M 20
a) Material
Cement
t
0.33
Coarse sand
cum
0.45
20 mm aggregate
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.08
Mason (1st Class)
day
0.12
Mazdoor (Unskilled)
day
1.73
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
7,670.20
332.31
627.05
597.05
2,684.57
149.54
338.61
214.94
194.50
207.80
194.50
196.30
15.56
24.94
336.49
53.00
190.00
40.00
771.53
578.65
5,207.81
7,670.20
332.31
627.05
597.05
2,684.57
149.54
338.61
214.94
194.50
207.80
194.50
196.30
17.51
20.78
389.00
53.00
773.59
580.19
5,221.72
7,670.20
332.31
627.05
597.05
2,531.17
149.54
338.61
214.94
194.50
207.80
194.50
15.56
24.94
336.49
[Chapter -13](Page-227)
Sr.
No.
Ref.
MORD
Specifn
Description
Unit Quantity
3
4
5
Bhisti
day
0.27
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
d) For formwork and staging add the
following percentage of (a+b+c):
Height upto 5 m @ 20 per cent
e) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d+e
Note:
Height from 5 m to 10 m @ 25 per cent
Height above 10 m @ 30 per cent
II. R.C.C M 25
Unit =cum
a) Material
Cement
t
0.40
Coarse sand
cum
0.45
20 mm aggregate
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.08
Mason (1st Class)
day
0.12
Mazdoor (Unskilled)
day
1.73
Bhisti
day
0.27
e) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
d) For formwork and staging refer to subitem (c) of I (ii) above
e) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d+e+f
Rate
(Rs.)
6
196.30
190.00
PanchayatR B Circle-2,Rajkot
53.00
76.00
7,670.20
332.31
627.05
597.05
3,068.08
149.54
338.61
214.94
194.50
207.80
194.50
196.30
15.56
24.94
336.49
53.00
190.00
76.00
773.59
631.34
5,682.08
t
cum
cum
cum
0.43
0.45
0.54
0.36
7,670.20
332.31
627.05
597.05
3,298.19
149.54
338.61
214.94
day
day
day
day
0.08
0.12
1.73
0.27
194.50
207.80
194.50
196.30
15.56
24.94
336.49
53.00
hour
0.40
190.00
76.00
1,480.93
748.05
561.03
5,049.31
935.06
Note: This analysis will hold good for concrete of nominal mix
1:1:3 also
Amount
(Rs.)
748.52
6,736.71
[Chapter -13](Page-228)
Sr.
No.
1
13.2
13.3
13.4
Ref.
MORD
Specifn
2
Note:
Description
Unit Quantity
3
of cement provided for various
components of the superstructure is for estimating
purpose only. Actual quantity of cement will be as
per approved mix design. Similarly quantity for
corase and fine aggregates is for estimating
purpose and the exact quantity shall be as per the
mix design use of design mix in place of nominal
mix of concrete of M 20 and higher grader shall be
prepared. Nominal mix of grades M 20 and M 25 is
to be used with adequate supervision and quality
control requirements Clause 803 technical
specificatiosn
2 For higher grades like M 25 and M 30, if adopted,
design mix is recommended.
1 Quantity
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
Amount
(Rs.)
1.05 44,200.60
8.00
58.00
0.44
3.00
8.00
46,410.63
464.00
194.50
207.80
194.50
85.58
623.40
1,556.00
6,142.45
55,282.06
1.05 48,200.60
8.00
58.00
50,610.63
464.00
0.44
3.00
8.00
194.50
207.80
194.50
85.58
623.40
1,556.00
6,667.45
60,007.06
1.05 42,200.60
8.00
58.00
44,310.63
464.00
[Chapter -13](Page-229)
Sr.
No.
Ref.
MORD
Specifn
13.5
13.6
800
800
Description
b)
3
Labour for cutting, bending, tying and
placing in position
Unit Quantity
4
Amount
(Rs.)
Mate
day
0.44
194.50
Blacksmith
day
3.00
207.80
Mazdoor (Unskilled)
day
8.00
194.50
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c
Providing and laying cement concrete wearing
course M 30 grade including reinforcement
complete as per drawing and technical
specifications Clauses 800 and 1206.3
Unit = cum
a) Material
Cement
t
0.43
7,670.20
Sand
cum
0.45
332.31
20 mm aggregate
cum
0.54
627.05
10 mm aggregate
cum
0.36
597.05
0.075 46,410.63
HYSD bar reinforcement (Rate as per item 13.2 t
Binding Wire
kg
0.01
58.00
b) Labour
Mate
day
0.10
194.50
Mason (1st Class)
day
0.12
207.80
Mazdoor (Unskilled)
day
3.00
194.50
Bhisti
day
0.27
196.30
Blacksmith
day
0.30
207.80
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
190.00
d) Formwork @ 3% of cost of concrete
e) Overheads & contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
Construction of R.C.C. railing of M 25 grade in
cast-in-situ with 20 mm nominal size aggregate,
true to line and grade, tolerance of vertical
railing post not to exceed 1 in 500, centre-tocentre spacing between vertical posts not to
exceed 2000 mm as per drawing and technical
specifications Clauses 800, 900 and 1208.3
Unit = Runing m
Taking output = 4x12 m
Span = 48 m
a) M 25 grade R.C.C.
No. of vertical posts = (6+1) 4 = 28 nos
Cross-sectional area of vertical post =
Concrete in vertical posts = 0.069 x28x1.00 =
Hand rail in 3 tiers = 3x48 = 144 m
Cross-sectional area = 0.17x0.175 = 0.03 sqm
Concrete in hand rails = 0.03 x 144 = 4.32 cum
Total concrete = 1.932+4.32 = 6.252 cum
cum
b) HYSD bar reinforcement (Rate as per t
item 13.2)
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 48 m = (a+b+c)
Rate per m = (a+b+c)/48
Rate
(Rs.)
PanchayatR B Circle-2,Rajkot
6.25
4,729.69
1.36 46,410.63
85.58
623.40
1,556.00
5,879.95
52,919.56
3,298.19
149.54
338.61
214.94
3,480.80
0.58
19.45
24.94
583.50
53.00
62.34
76.00
224.48
1,065.79
9,592.15
29,570.00
63,118.46
11,586.06
104,274.51
2,172.39
[Chapter -13](Page-230)
Sr.
No.
Ref.
MORD
Specifn
Description
3
Sub Analysis for Rate of Concrete
a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
Bhisti
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
d) Formwork @ 12%
Total (a+b+c+d)
Note: 1 48 m length is the total linear length adding both
sides of 2x12 m span
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
t
cum
cum
cum
0.40
0.45
0.54
0.36
7,670.20
332.31
627.05
597.05
3,068.08
149.54
338.61
214.94
day
day
day
day
0.08
0.12
1.73
0.27
194.50
207.80
194.50
196.30
15.56
24.94
336.49
53.00
hour
0.40
190.00
76.00
452.54
4,729.69
t
t
t
t
2.946
1.012
0.18
0.15
50,600.60
50,600.60
42,200.60
71,500.00
149,069.37
51,207.81
7,596.11
10,725.00
day
day
day
2.80
30.00
40.00
194.50
207.80
194.50
544.60
6,234.00
7,780.00
10,929.91
PanchayatR B Circle-2,Rajkot
2,185.98
2,185.98
31,057.35
2,795.16
[Chapter -13](Page-231)
Sr.
No.
1
13.8
13.9
13.10
Ref.
MORD
Specifn
Description
Unit Quantity
2
3
1200 Providing and fixing in position pipe railing
consisting of IS Rolled steel joist posts
designation IS MB 100 (100x75) at 2.5 m interval
and three rows of 50 mm dia steel pipes (light)
including fixing in position on bridge deck
complete as per drawing and technical
specifications Clause 1208.2
600
Amount
(Rs.)
Unit = Running m
Taking output = 2 x 10 m = 20 m
a) Material
i)
Steel posts IS MB 100 (100 x 75)
t
0.13 50,600.60
5 x 2 x 11.5 x 1.1 x 1.05 = 130 kg
ii) 50 mm dia steel pipes
m
60.00
360.00
20 x 3 = 60 m
iii) M.S Bolts, nuts and washers
t
0.05 71,500.00
Add @ 5 per cent of (a) for painting one shop
Add for electricity charges, welding and drilling
b) Labour
Mate
day
0.56
194.50
Blacksmith
day
6.00
207.80
Mazdoor (Unskilled)
day
8.00
194.50
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 20 m steel railing = a+b+c
Rate per metre = (a+b+c+d)/20
Brick masonry work in cement mortar 1:3 in
parapet excluding pointing and plastering as per
drawing and technical specifications Clauses 600,
900 and 1208.4
Unit = cum
a) Material
Bricks
Nos.
500.00
Cement mortar (Rate as in item 11.5 I)
cum
0.24
b) Labour
Mate
day
0.09
Mason 1st Class
day
0.80
Mazdoor (Unskilled)
day
1.60
Bhisti
day
0.20
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
1200 Drainage spouts complete as per drawing and
technical specifications Clause 1209
Unit = 1 No
a) Material
i)
Corrosion resistant structural steel grating
including 5 per cent wastage
ii)
b)
Rate
(Rs.)
6,578.08
21,600.00
3,575.00
1,587.65
317.53
108.92
1,246.80
1,556.00
4,571.25
41,141.23
2,057.06
4.69
4,459.26
2,345.00
1,070.22
194.50
207.80
194.50
196.30
17.51
166.24
311.20
39.26
493.68
4,443.11
kg
4.00
60.00
240.00
1.00
794.00
794.00
day
day
day
0.02
0.02
0.20
194.50
207.80
194.50
3.89
4.16
38.90
[Chapter -13](Page-232)
Sr.
No.
Ref.
MORD
Specifn
13.11
800
13.12
800
Description
Unit Quantity
3
4
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Add @ 5 per cent of cost of material and labour (a+b) for
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per m = a+b+c
P.C.C. M 15 ordinary grade (1:2.5:5) levelling
course below approach slab complete as per
drawing and technical specifications Clauses 800
and 1211
(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class0
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(ii) Nominal mix 1:2.5:5 (Hand mixing)
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Reinforced Cement Concrete M 25 grade
approach slab including reinforcement and
formwork complete as per drawing and technical
specifications Clauses 800 and 1211
Unit = cum
a) Material
Reinforced cement concrete M 25 grade
Rate as per Item 13.1 II
cum
HYSD reinforcement
Rate per item 13.2
t
Rate per cum = (a)
PanchayatR B Circle-2,Rajkot
Rate
(Rs.)
5
0.01
0.01
0.20
electrodes,
6
194.50
207.80
194.50
gas cutt
Amount
(Rs.)
7
1.95
2.08
38.90
4.49
141.05
1,269.41
0.275
0.48
0.48
0.24
0.08
7,670.20
332.31
502.05
627.05
597.05
2,109.31
159.51
240.98
150.49
47.76
0.08
0.10
1.63
0.27
194.50
207.80
194.50
196.30
15.56
20.78
317.04
53.00
0.40
190.00
76.00
398.80
3,589.23
0.275
0.48
0.48
0.24
0.08
7,670.20
332.31
502.05
627.05
597.05
2,109.31
159.51
240.98
150.49
47.76
0.09
0.10
2.00
0.27
194.50
207.80
194.50
196.30
17.51
20.78
389.00
53.00
398.54
3,586.88
1.00
5,682.08
5,682.08
0.05 55,282.06
2,764.10
8,446.18
[Chapter -13](Page-233)
Sr.
No.
1
13.13
Ref.
MORD
Specifn
Description
Unit Quantity
Rate
(Rs.)
2
3
4
5
6
1200 Providing and laying of an elastomeric slab seal
expansion joint complete as per approved
drawing and approved specifications to be
installed by manufacturer/supplier or their
authorised representative ensuring compliance
to
the
manufacturers
instructions
for
installlation and as per technical specifications
Clause 1207.2.5
Unit = Running m
Taking output = 7.5 m
a) Material
Supply of elastomeric slab seal expansion joint m
7.50 38,500.00
b) Labour
Mate
day
0.04
194.50
Mazdoor (Unskilled)
day
0.70
194.50
Mazdoor (skilled)
day
0.40
199.90
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
13.14
Amount
(Rs.)
7
288,750.00
7.78
136.15
79.96
36,121.74
325,095.63
43,346.08
293.00
94.00
1,377.10
7.50
35.00
Labour
Mate
day
0.024
Mazdoor (Skilled)
day
0.20
Mazdoor (Unskilled)
day
0.40
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
262.50
2.63
27,542.00
194.50
199.90
194.50
4.67
39.98
77.80
3,663.33
32,970.01
[Chapter -13](Page-234)
Sr.
No.
Ref.
MORD
Specifn
Note:
Description
Unit Quantity
3
Rate per m = (a+b+c)/7.5
1 The installation shall be done by the manufacturer
or his authorised representative to the satisfaction
of the Engineer.
Rate
(Rs.)
Amount
(Rs.)
7
4,396.00
94.00
14,100.00
150.00
141.00
b)
13.16
Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
1200 Filler Joint
I) Providing and fixing 2 mm thick corrugated
copper plate in expansion joint as per
drawing and technical specifications Clause
1207.2.2
Unit = Running m
Taking output = 7.5 m
a) Material
Copper plate - 7.5 m long x 250 mm wide
Area = 7.5 x 0.25 = 1.875 sqm
Weight = 1.875 x 0.002 x 8900 = 33.4 kg.
Wastage @ 2.5% = 0.83 kg.
Total weight = 34 kg
b) Labour
PanchayatR B Circle-2,Rajkot
kg
0.01
0.25
0.15
194.50
199.90
194.50
1.95
49.98
29.18
1,790.26
16,112.36
2,148.31
34.00
390.00
13,260.00
[Chapter -13](Page-235)
Sr.
No.
Ref.
MORD
Specifn
Description
Unit Quantity
3
4
5
For cutting, bending, carrying and fixing
etc.
Mate
day
0.02
Mazdoor (Unskilled)
day
0.35
Mazdoor (Skilled)
day
0.35
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = (a+b+c)
Rate per m = (a+b+c)/7.5
and
fixing
20
mm
thick
II) Providing
compressible fibre board in expansion joint
complete as per drawing and technical
specifications
Unit = Running m
Taking output = 7.5 m
a) Material
20 mm thick compressible fibre board sqm
7.5 m long and 250 mm deep
Area = 7.5 x 0.25 = 1.875 sqm
Labour
For carrying, placing and fixing
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c+d)/7.5
III) Providing and fixing in position 20 mm thick
premoulded joint filler in expansion joint for
fixed ends of simply supported spans,
covered with sealant complete as per
drawing and technical specifications
Unit = Running m
Taking output = 7.5 m
a) Material
Premoulded joint filler 7.5 m long, 20 mm
sqm
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = (a+b+c+d)
Rate per m = (a+b+c)/7.5
IV) Providing and fillling joint sealing compound
as per drawings and technical specifications
with coarse sand and 6 per cent bitumen by
weight.
Unit = Running m
Taking output = 7.5 m
7.5 m long x 100 mm wide x 10 mm deep recess
Rate
(Rs.)
Amount
(Rs.)
194.50
194.50
199.90
3.89
68.08
69.97
1,675.24
15,077.17
2,010.29
1.875
358.00
671.25
0.01
0.10
0.10
194.50
194.50
199.90
1.95
19.45
19.99
89.08
801.71
106.90
2.25
363.00
816.75
0.01
0.13
0.07
194.50
194.50
199.90
1.95
25.29
13.99
107.25
965.22
128.70
0.008
312.31
2.50
b)
a)
Material
Sand
Volume = 7.5 x 0.1 x 0.01 = 0.008 cum
PanchayatR B Circle-2,Rajkot
cum
[Chapter -13](Page-236)
Sr.
No.
Ref.
MORD
Specifn
Description
Unit Quantity
Rate
(Rs.)
3
4
5
6
Weight = 0.008 x 1400 = 11.2 kg
Bitumen-11.2 x 0.06 = 0.672 kg
t
0.0007 44,966.00
b) Labour
Mate
day
0.02
194.50
Mazdoor (Skilled)
day
0.50
199.90
Mazdoor (Unskilled)
day
0.10
194.50
c) Overheads & contractor's profit @ 12.5% on (a+b+c)
Cost for 7.5 m with 10 mm depth =a+b+c+d
Rate per m with 1 cm depth = (a+b+c+d)/7.5
Note: For arriving at the final rate for filler joints per m length
and per cm depth of joint filling compound, the rates of
Sr. Nos (i), (ii), (iii) and (iv) shall be added.
13.17
700
600
13.19
600
13.20
800
31.48
3.89
99.95
19.45
19.66
176.92
23.59
3,182.39
3,211.66
429.71
128.57
I.
13.21
13.18
Amount
(Rs.)
3,945.57
3,948.16
i.
108.78
ii.
Rate for seal coat Type B as per item No. 5.12 of sqm
Chapter 5
43.34
PanchayatR B Circle-2,Rajkot
[Chapter -13](Page-237)
Sr.
No.
Ref.
MORD
Specifn
Description
i.
Unit Quantity
3
4
Rate for BM layer may be analysed as per item No cum
5.3 of Chapter 5
ii.
13.23
Rate
(Rs.)
6
5,285.64
Amount
(Rs.)
7
108.78
43.34
4.69
3,462.14
2,462.25
830.91
194.50
194.50
207.80
196.30
38.90
311.20
415.60
15.70
4,482.02
1,069.57
9,626.16
700
PanchayatR B Circle-2,Rajkot
1.10
7.00
0.30
339.73
34.90
3,462.14
373.70
244.30
1,038.64
0.25
3.00
2.10
0.08
194.50
207.80
194.50
196.30
48.63
623.40
408.45
15.70
[Chapter -13](Page-238)
Sr.
No.
Ref.
MORD
Specifn
Note:
Description
Unit Quantity
3
4
5
Add for centering and shuttering @ 100
% of (a+b)
d) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
1 In case cement mortar 1:3 is used, rate for the
same shall be as per item 11.5 I.
c)
Rate
(Rs.)
6
Amount
(Rs.)
7
2,752.82
688.21
6,193.85
800
PanchayatR B Circle-2,Rajkot
7,670.20
332.31
627.05
597.05
2,684.57
149.54
338.61
214.94
194.50
207.80
194.50
196.30
15.56
41.56
350.10
53.00
190.00
76.00
1,961.94
735.73
6,621.54
7,670.20
332.31
627.05
597.05
3,098.76
149.54
338.61
214.94
194.50
207.80
194.50
196.30
15.56
41.56
350.10
53.00
190.00
76.00
2,169.03
813.39
7,320.49
[Chapter -13](Page-239)
Sr.
No.
1
13.26
Ref.
MORD
Specifn
2
Note:
Description
Unit Quantity
3
The additional cost of centering and shuttering @
50 per cent of cost of material and labour shall hold
good for arch spans of 6 m and above. For lesser
length of spans, the corresponding additional cost
can be taken as 40 per cent for spans above 4 m
length and 30 per cent for spans less than 4m.
Rate
(Rs.)
Amount
(Rs.)
Material
R.S.Js 350 m x 200 mm @ 56.9 kg/m
6.0 m x 56.9 kg = 341.4 kg
Add 5 per cent for wastage = 17.87 kg
Total = 358.47 kg
25 cm wide x 12 mm thick plate
4x6x8.25 = 565.25 kg
Wastage 5 per cent = 28.3 kg
Total = 593.54 kg
Add shear connectors @ 10% = 59 kg
Total = 358.47 +593.5+59 =
1011 kg
Steel fabricated section
q
Rivets 22 mm dia = 240 Nos
Wastage @ 5 per cent = 12 Nos
Total = 252 Nos
Quantity of rivetting @ 1.8 kg per 10 rivets = q
45.35 kg
10.11
5,060.06
51,157.21
0.454
7,150.00
3,246.10
2,720.17
Note:
Labour
Fitter
day
6.00
Blacksmith
day
6.00
Mazdoor (Unskilled)
day
12.00
c) Overheads & contractor's profit @ 12.5% on (a+b+c)
Cost for 10.11 q = a+b+c
Rate per quintal = (a+b+c+d)/10.11
i) In case of welded section, welding charges per cm
length of welding shall substitute cost of rivetting
PanchayatR B Circle-2,Rajkot
196.30
207.80
194.50
1,177.80
1,246.80
2,334.00
7,735.26
69,617.33
6,885.99
[Chapter -13](Page-240)
Sr.
No.
Ref.
MORD
Specifn
Description
3
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
top flange
0.01
0.06
0.24
194.50
199.90
194.50
1.95
11.99
46.68
PanchayatR B Circle-2,Rajkot
[Chapter -13](Page-241)
Chapter 14
PROTECTION WORKS
Sr.
No.
1
14.1
Ref.
Description
MORD
n
Specif
2
3
1300 Providing and laying boulder apron for bed
protection with stone boulders of minimum size
and weight as per Table 1300.1, no fragment
weighing less than 25 kg laid dry complete as per
drawing and technical specifications Clause 1301
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Unit = cum
a) Material
Stone boulder (25 kg minimum)
cum
Stone spalls
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
1.00
0.20
185.00
274.73
185.00
54.95
0.04
0.35
0.75
194.50
207.80
194.50
7.78
72.73
145.88
58.29
524.62
cum
cum
kg
5.63
1.13
64.00
185.00
274.73
92.00
1,041.55
310.44
5,888.00
day
day
day
0.18
1.50
3.00
194.50
199.90
194.50
35.01
299.85
583.50
18.37
b)
Note:
Material
Stone boulder (25 kg minimum)
Stone spalls
GI wires 4 mm dia @ 32 kg/10 sqm
Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Add for labour for weaving the wire crates @ 2
per cent of cost of GI wire
c)
OH & Contractor's profit @ 12.5% on (a+b)
Cost for 5.63 cum = a+b+c+d
Rate per cum = (a+b+c)/5.63
1 Nominal cost of trimming for preparation of bed has
been included in the cost of labour
1,022.09
9,198.81
1,633.89
PanchayatR B Circle-2,Rajkot
[Chapter -14](Page-242)
Sr.
No.
1
14.3
Ref.
Description
MORD
n
Specif
2
3
1300 Providing and laying of apron with cement concrete
blocks of size as per Table 1300.1 cast-in-situ and
made with nominal mix of M-15 grade cement
concrete
as
per
drawing
and
technical
specifications Clause 1301
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Unit = cum
a) Concrete grade M 15
(Rate as per item No 11.4 II (i)
cum
Add 2 per cent of cost to account for excavation for
preparation of bed, nominal surface reinforcement
and filling of granular material in recesses between
blocks.
14.4
1.00
3,732.80
B)
Binding Wire
kg
Brush Wood (LS Rs.10.00)
LS
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries (LS Rs.5.00)
LS
d) OH & Contractor's profit @ 12.5% on(a+b+c)
Cost for 3 metre = a+b+c+d+e
Rate per metre = (a+b+c+d) / 3.00
Driven at least 900 mm below ground and 900 mm
above ground on average
a)
Materials
2nd Class Bamboo 65 mm to 75 mm dia, (1.8 m-nos.
2.5 m) long
Binding Wire
kg
Brush Wood (LS Rs.10.00)
LS
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3 m = a+b+c+d
Rate per m = (a+b+c+d) / 3.00
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
3,732.80
74.66
3,807.46
15.00
45.00
225.00
0.15
58.00
0.02
10.00
0.04
1.00
194.50
194.50
0.00
1.00
5.00
30.13
271.15
90.38
14.00
25.00
196.00
0.15
58.00
0.02
10.00
0.04
1.00
194.50
194.50
0.00
1.00
5.00
26.50
238.53
79.51
[Chapter -14](Page-243)
Sr.
No.
1
14.5
Ref.
Description
MORD
n
Specif
2
3
1300 Providing and laying pitching on slopes laid over
prepared filter media as per drawing and technical
specifications Clause 1302
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
I.
Stone/Boulder
Unit = cum
a) Material
Stone boulder (25 kg minimum)
cum
Stone spalls of minimum 25 mm size
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
c)
OH & Contractor's profit @ 12.5% 15% on (a+b)
Rate per cum = (a+b+c)
II. Cement concrete blocks of size as per Table
1300.2 cast in cement concrete of grade M 15
a)
14.6
Concrete grade M 15
(Rate as per item No. 11.4 II (i)except that the cum
size of aggregate shall be 20 mm & down
1.00
0.20
185.00
274.73
185.00
54.95
0.04
0.35
0.75
194.50
207.80
194.50
7.78
72.73
145.88
58.29
524.62
1.00
3,732.80
3,732.80
74.66
3,807.46
500.00
0.24
4.69
4,173.88
2,345.00
1,001.73
0.10
0.80
1.60
0.20
194.50
207.80
194.50
196.30
19.45
166.24
311.20
39.26
485.36
4,368.24
1.20
446.81
536.17
0.05
0.25
1.02
194.50
199.90
194.50
9.73
49.98
198.39
99.28
893.54
PanchayatR B Circle-2,Rajkot
[Chapter -14](Page-244)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
3
4
Unit = cum
a) Material
i.
Cement mortar (1:3) (For rate refer to item cum
11.5 (I)
Add for cement concrete bedding (M 10) cum
ii.
nominal mix) (For rate refer to item 11.4 I (i)
*
Quantity shall be adopted as per design.
Add 1 per cent of cost to account for excavation
for preparation of bed
iii.
iv.
b)
0.33
4,443.11
1,466.23
3,611.23
0.00
14.66
1.00
0.20
185.00
274.73
185.00
54.95
0.08
0.50
1.50
194.50
207.80
194.50
15.56
103.90
291.75
266.51
2,398.55
1.00
3,732.80
3,732.80
3,732.80
0.00
cum
cum
37.33
3,770.13
Unit=cum
a) Material
Bricks
Nos
Cement mortar (1:3) [(Rate as in item 11.5 (i)] cum
14.8
500.00
0.15
4.69
4,459.26
2,345.00
668.89
0.25
2,925.22
731.31
0.10
0.80
1.60
0.20
194.50
207.80
194.50
196.30
19.45
166.24
311.20
39.26
535.17
4,816.51
cum
cum
1.00
0.20
185.00
274.73
185.00
54.95
day
0.10
194.50
19.45
PanchayatR B Circle-2,Rajkot
[Chapter -14](Page-245)
Sr.
No.
1
14.9
Ref.
MORD
Specifn
2
Description
Unit
3
4
Mason 1st Class
day
Mazdoor (Unskilled)
day
Add 1 per cent of (b) for trimming and
preparation of base
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
1300 Providing and laying curtain walls complete as per
drawing and technical specification Clause 1304
Unit = cum
I. Brick masonry in cement mortar (1:4)
(Rate same as per item 11.5 (II)
cum
II. Coursed rubble masonary (2nd sort) in cement
mortar (1:4)
Quantity
5
0.50
1.50
Rate
(Rs.)
6
207.80
194.50
Amount
(Rs.)
7
103.90
291.75
4.15
82.40
741.60
1.00
4,173.88
4,173.88
1.00
2,817.54
2,817.54
1.00
3,611.23
3,611.23
cum
cum
1.00
0.20
185.00
274.73
185.00
54.95
day
day
day
0.05
0.25
1.00
194.50
207.80
194.50
9.73
51.95
194.50
4.96
14.11
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
1300 Construction of toe walls for protection of slopes as
per drawing and technical specifications Clause
1302.5
I.
62.64
563.72
1.00
7.00
195.00
34.90
195.00
244.30
0.33
2,925.22
965.32
Labour
PanchayatR B Circle-2,Rajkot
[Chapter -14](Page-246)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
c)
Unit
3
4
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Quantity
Rate
(Rs.)
Amount
(Rs.)
5
0.12
1.20
1.80
0.08
6
194.50
207.80
194.50
196.30
7
23.34
249.36
350.10
15.70
102.16
429.06
2,574.34
500.00
0.24
4.69
3,441.14
2,345.00
825.87
0.09
0.80
1.60
0.20
194.50
207.80
194.50
196.30
17.51
166.24
311.20
39.26
741.02
4,446.09
0.38
1.05
7,670.20
312.31
2,914.68
327.93
0.04
0.90
0.08
194.50
194.50
196.30
7.78
175.05
15.70
3,441.14
0.250
0.48
0.576
0.288
0.096
7,670.20
332.31
502.05
627.05
597.05
1,917.55
159.51
289.18
180.59
57.32
0.08
0.10
1.63
0.27
194.50
207.80
194.50
196.30
15.56
20.78
317.04
53.00
Note: For height less than 3 m, dry rubble masonry can also be
used. In that case, the sub-item of cement mortar may
be omitted in the analysis.
II. Brick masonry in cement mortar 1:4 in case of
brick pitching
Unit = cum
a) Material
Brick
Nos.
Cement mortar 1:4
cum
Rates as per sub-analysis
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Sub-analysis
Cement mortar 1:4 (1 cement : 4 sand)
Unit = cum
a) Material
Cement
t
Sand
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
Total material and labour = (a+b)
III. Cement concrete grade M 10 in case of
concrete block pitching
Unit = cum
I. P.C.C grade M 20
(i) Nominal mix 1:3:6
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c)
Machinery
PMGSY SOR 13-14
PanchayatR B Circle-2,Rajkot
[Chapter -14](Page-247)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit
3
4
Mechnical concrete mixer 0.4/0.28 cum capacity hour
fitted with water measuring device and
preferably also with load cell.
Quantity
5
0.40
Rate
(Rs.)
6
190.00
B)
642.00
3,851.98
Nos
18.00
45.00
810.00
Kg.
LS
0.15
58.00
8.70
10.00
day
day
LS
0.04
1.00
194.50
194.50
7.78
194.50
5.00
129.50
1,165.48
388.49
14.00
25.00
350.00
0.15
58.00
8.70
10.00
0.04
1.00
194.50
194.50
7.78
194.50
5.00
72.00
647.98
215.99
7
76.00
123.46
d)
14.12
Amount
(Rs.)
PanchayatR B Circle-2,Rajkot
[Chapter -14](Page-248)
Ref.
Description
MORD
n
Specif
1
2
3
14.13 uggestiv Single bamboo spur and palisading of whole 1st
class bamboo (Bholuka or Barua) 85 mm to 100
mm dia. Closely packed & driven including fitting,
fixing with half 2nd class bamboo (jati or Bethua)
horizontally in three rows with cane or tying wire
complete and struts 1500 mm apart longitudinally
and providing brush wood in the spur as per
drawings and technical specifications
Sr.
No.
A)
B)
C)
Quantity
Rate
(Rs.)
Amount
(Rs.)
15.00
50.00
750.00
2.00
0.15
45.00
58.00
90.00
8.70
10.00
0.05
1.20
194.50
194.50
9.73
233.40
5.00
138.35
1,245.18
415.06
10.00
1.50
37.00
25.00
370.00
37.50
0.15
58.00
8.70
10.00
0.04
1.00
194.50
194.50
7.78
194.50
5.00
79.19
712.67
237.56
Nos
Nos
9.00
1.50
37.00
25.00
333.00
37.50
Kg.
LS
0.15
58.00
8.70
10.00
b)
PMGSY SOR 13-14
Unit
Binding wire
Brush Wood (LS Rs.10.00)
Labour
PanchayatR B Circle-2,Rajkot
[Chapter -14](Page-249)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit
3
4
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d)
OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3 m = a+b+c+d
Rate per m = (a+b+c+d)/3
14.14 uggestiv Bamboo spur 'A' type with whole bamboo 85mm100mm dia, placed 230 mm centre to centre driven
900 mm below ground and 1200 mm to 1500 mm
above ground tied with 2nd class bamboo (jati or
Bethua) on either side at 450 mm apart
horizontally with galvanised wire etc. complete as
per drawings and technical specifications
A)
Amount
(Rs.)
6
194.50
194.50
14.00
25.00
350.00
4.00
0.75
25.00
58.00
100.00
43.50
0.04
1.00
194.50
194.50
7.78
194.50
5.00
87.60
788.38
525.59
7.00
42.00
294.00
4.00
1.00
25.00
58.00
100.00
58.00
10.00
0.06
1.40
194.50
194.50
11.67
272.30
5.00
93.87
844.84
563.23
7.78
194.50
5.00
74.56
671.04
223.68
b)
c)
d)
Rate
(Rs.)
5
0.04
1.00
B)
Quantity
PanchayatR B Circle-2,Rajkot
[Chapter -14](Page-250)
Ref.
Description
MORD
n
Specif
1
2
3
14.15 uggestiv Providing 'A' type single spur with 1st class
bamboo (Bholuka or Barua) 85 mm to 100 mm dia.
Driven closely placed 3m to 4m above ground and
1200 mm to 1500 mm below ground tied with
cane or coir string, half 2nd class bamboo (jati or
Bethua) horizontally on both face placed not more
than one metre apart including whole bamboo
struts inside one metre apart and 2 nos. of purlin at
top and bottom fitted with vertical struts at 1500
mm apart and filling with brushwood or jungle
wood inside the spur complete as per drawing and
technical specifications
Sr.
No.
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
14.16
Binding wire
Kg.
Brush wood (LS Rs.10.00)
LS
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3 metre = a+b+c+d
Rate per metre = (a+b+c+d)/3
1300 Providing close bamboo toe walling consisting of
65mm to 75mm dia bamboos of length ranging
from 1.2 m to 3m driven at 150 mm centre to
centre and provided with three horizontal split
bamboo runner fixed with nails. All bamboos to be
duly protected by coal tar painting.
Unit = Running Metre
Taking output = 10.00 running metre
a) Materials
2nd class bamboo (65mm-75mm dia and Nos
average 2.1 m length)
2nd class bamboo (65mm-75mm dia and 3 m Nos
length)
Coal tar
kg
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% 15% on (a+b+c)
Cost for 10 Running Metre = a+b+c+d
Rate per Sqm = (a+b+c+d)/10
PanchayatR B Circle-2,Rajkot
15.00
100.00
1,500.00
6.00
45.00
270.00
2.00
58.00
116.00
10.00
0.06
1.50
194.50
194.50
11.67
291.75
5.00
275.55
2,479.97
1,653.32
67.00
45.00
3,015.00
6.00
45.00
270.00
10.00
44.97
449.66
0.06
1.50
194.50
194.50
11.67
291.75
5.00
505.39
4,548.47
454.85
[Chapter -14](Page-251)
Ref.
Description
MORD
n
Specif
1
2
3
14.17 uggestiv Double timber spur with two rows at 800 mm c/c
apart of 1st class local wood piles with timber of
Azar/Nahar/Nageswar / Zarul wood 150 mm to
200 mm dia driven 2000 mm minimum below
ground and 3600 mm above ground average placed
at 800 mm belts, bracings etc. of 100 mm x 75 mm
size 1st class local wood longitudinally &
crosswiswe at ends fitted with 10 mm dia bolts and
nuts etc. including coaltarring of timber members
and cost of necessary bamboo stagings etc. as
directed by the Engineer as per drawing and
technical specifications
Sr.
No.
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Unit =RM
Taking output = 4.00 RM
a) Material
1st class local wood piles 150-200 mm dia, 6m nos
long
1st class local wood (100 mm x 75 mm) for cum
collar, bracing and belt
Nuts and Bolts
Kg
1st Class Bamboo
Nos
2nd class bamboo
Nos
Coir rope
LS
Coal tar
LS
b) Labour
Carpenter 1st Class
Nos
Mate
Nos
Mazdoor (Unskilled)
Nos
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 4 RM = (a+b+c+d)
Rate per metre = (a+b+c+d)/4
14.18 uggestiv Supplying and filling up hollows of the timber spur
to an average height of 3600 mm above ground
with jungle wood branches as per drawing and
technical specifications as directed by the
Engineer.
Unit = RM
Taking output = 20.00 RM
a) Labour
Mazdoor (Unskilled)
day
b) Sundries
LS
c)
OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 20 RM = (a+b+c)
Rate per metre = (a+b+c)/20
PanchayatR B Circle-2,Rajkot
68.00
6,545.00 445,060.00
0.404 25,000.00
10,100.00
10.00
5.00
5.00
71.50
50.00
45.00
715.00
250.00
225.00
100.00
100.00
1.20
1.20
30.00
207.80
194.50
194.50
249.36
233.40
5,835.00
50.00
57,864.72
520,782.48
######
5.00
194.50
972.50
5.00
122.19
1,099.69
54.98
[Chapter -14](Page-252)
Chapter 15
MAINTENANCE OF ROADS
Sr.
No.
1
15.1
Ref.
Description
MORD
n
Specif
2
3
1900 Restoration of Rain Cuts
i) Restoration of rain cuts with soil, moorum gravel or a
mixture of these, clearing the loose soil, benching for
300mm width laying fresh material in layers not
exceeding 250 mm and compaction with plate
compactor or power rammer to restore the original
alignment, level and slopes as per drawings and
technical specifications Clause 1902
A. Manual Means
Unit = cum
Taking output = 10 cum
a) Labour
Mate
Mazdoor (Unskilled)
b)
Machinery
Plate compactor
c) Materials
Compensation for earth Taken from private land
d)
B.
a)
b.
c.
Unit Quantity
4
1900
1.
0.24
6.00
194.50
194.50
46.68
1,167.00
hour
3.00
310.00
930.00
cum
7.50
17.50
131.25
Amount
(Rs.)
day
day
d.
Rate
(Rs.)
284.37
2,559.30
255.93
0.40
10.00
194.50
194.50
77.80
1,945.00
0.83
1,400.00
1,162.00
2.27
250.00
567.50
56.75
15.00
310.00
4,650.00
37.50
17.50
656.25
1,139.41
10,254.71
205.09
PanchayatR B Circle-2,Rajkot
[Chapter -15](Page-253)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
Unit = sqm
Taking output = 100 sqm
Assuming average thickness of filling to be 150 mm
Quality of fresh material = 15 cum
a.
Labour
Mate
day
Mazdoor (Unskilled)
day
b.
Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ hour
60 cum per hour
2.
Rate
(Rs.)
Amount
(Rs.)
0.20
5.00
194.50
194.50
38.90
972.50
0.25
1,400.00
350.00
0.68
250.00
170.00
17.00
4.00
310.00
1,240.00
15.00
17.50
262.50
381.36
3,432.26
34.32
0.10
2.50
194.50
194.50
19.45
486.25
4.00
310.00
1,240.00
218.21
1,963.91
19.64
1900
[Chapter -15](Page-254)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
a)
b)
c)
3
Labour
Mate
Mazdoor (Unskilled)
Machinery
Jack hammer 25 kg with tractor
Compressor 210 cfm with tractor
Emulsion pressure distributor
Mixall 6/10 t capacity
Three wheeled 80-100 kN Static Roller
Material
Primer with bitumen emulsion @ 9 kg/10 sqm
187.5x9 = 168.75 kg.
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
0.80
20.00
194.50
194.50
155.60
3,890.00
hour
hour
hour
hour
hour
4.00
2.00
4.00
4.00
4.00
325.00
300.00
840.00
1,036.20
400.00
1,300.00
600.00
3,360.00
4,144.80
1,600.00
Tonne
0.168 34,096.81
5,728.26
0.064 34,096.81
2,182.20
1.082 44,543.81
48,196.40
ii.
PanchayatR B Circle-2,Rajkot
2.985
8.96
4.975
2.99
793.28
745.28
365.00
365.00
2,367.94
6,673.98
1,815.88
1,089.53
######
93,492.66
6,649.55
0.64
16.00
194.50
194.50
663.17
3,112.00
2.00
2.00
4.00
1,036.20
840.00
400.00
2,072.40
1,680.00
1,600.00
0.292 44,543.81
13,006.79
0.04 34,096.81
1,363.87
[Chapter -15](Page-255)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
Bitumen for seal coat @ 6.8 kg per 10 sqm
200 x 6.8 / 10 = 136 kg
iii.
5
6
0.136 44,543.81
Amount
(Rs.)
7
6,057.96
5.40
457.50
2,470.50
1.20
376.81
452.17
4,059.86
36,538.72
182.69
day
day
0.80
20.00
194.50
194.50
155.60
3,890.00
hour
hour
hour
hour
2.00
2.00
2.00
4.00
300.00
840.00
1,036.20
400.00
600.00
1,680.00
2,072.40
1,600.00
tonne
0.064 34,096.81
2,182.20
0.29 44,543.81
13,006.79
0.14 44,543.81
6,057.96
5.40
457.50
2,470.50
1.20
376.81
452.17
Unit = sqm
Taking output = 200 sqm
a)
Labour
Mate
Mazdoor (Unskilled)
PMGSY SOR 13-14
4
tonne
Rate
(Rs.)
Unit = sqm
Taking output = 200 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Air compressor 210 cfm with tractor
Bitumen pressure distributor
Mixall 6/10t capacity
Three wheeled 80-100 kN Static Roller
c) Material
Bitumen for tack coat @ 3kg per 10 sqm 200 x
3 / 10 = 60 kg
iv.
Unit Quantity
PanchayatR B Circle-2,Rajkot
tonne
day
day
4,270.95
38,438.57
192.19
0.64
16.00
194.50
194.50
124.48
3,112.00
[Chapter -15](Page-256)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
b)
c)
15.4
1900
Unit Quantity
3
Machinery
Concrete mixer 0.4 / 0.28 cum capacity
Air compressor 210 CFM with tractor
Emulsion pressur distributor
Three wheeled 80-100 kN Static Roller
Materials
Emulsion for tack coat @ 3 kg per 10 sqm
200 x 3 / 10 = 60 kg
Rate
(Rs.)
Amount
(Rs.)
hour
hour
hour
hour
2.50
2.00
2.00
4.00
190.00
300.00
840.00
400.00
475.00
600.00
1,680.00
1,600.00
tonne
0.06 34,096.81
2,045.81
0.43 34,096.81
14,661.63
0.20 34,096.81
6,819.36
5.40
457.50
2,470.50
1.20
376.81
452.17
tonn
4,255.12
38,296.07
191.48
Unit = sqm
Taking out put @ 5% of the area in one km. as
affected:
= 1000 x 3.75x0.05 / 100 = 187.5 Sqm
Quantity = 187.5 x 0.15 = 28.12 cum
a)
Rate as per item 4.1 of Chapter 4
Add 50% for extra efforts involved
b)
maintenance is to be done in small reaches
as
1900
cum
28.12
564.20
15,865.29
7,932.64
23,797.93
126.92
PanchayatR B Circle-2,Rajkot
[Chapter -15](Page-257)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
Output - Taking affected area @ 5% in 1 km
= 1000 x 3.75 x 0.05 = 187.5 sqm
Quantity 187.5 x 0.075 = 14.06 cum
a)
Rate as per item No. 4.7 of Chapter 4
Add 50% for Extra Efforts involved
b)
maintenance to be done in Small reachs
on
cum
14.06
Rate
(Rs.)
Amount
(Rs.)
995.91
15.7
1900
1900
21,003.82
112.02
Maintenance of Drains
The maintenance of drains include erosion, repair,
clearing, cleaning, reshaping, regrading, deepening of side
drains as well as catch water drains as per technical
specification Clause 1907.
Unit - Per Metre
Taking output one km = 1000 metre
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on a
Cost for 1000 metre = a+b
Rate per Metre = a+b/1000
(I) Maintenance of Culverts
Maintenance of Hume pipe Culvert by way of
Clearing, Cleaning, Erosion repair, repairs to cracks,
parapet wall and protection work as per drawing and
technical specification Clause 1908
Unit = One No. Hume pipe (1000 mm dia)
Taking output = One No.H.P. Culvert
a) Labour
Mate
Mazdoor (Unskilled)
Mason 2nd Class
b) Material
Cement, Sand, Brick, Boulder etc.
c) OH & Contractor's profit @ 12.5% on a+b
Cost for one No. Hume pipe culvert = a+b+c
Rate per hume pipe Culvert = a+b+c
(II) Maintenance of Culverts Slab type
Maintenance of Slab type Culverts by way of clearing,
Cleaning, Erosion repair, repairs to cracks, parapet
walls and Protection works as per drawing and
technical specification Clasue 1908
Unit = One No. Culvert (2 m span)
Taking output = one No. Slab Culvert
a) Labour
Mate
Mazdoor (Unskilled)
Mason 2nd Class
b) Material
Cement, Sand, Bricks, Stone Boulder etc.
14,002.54
7,001.27
PanchayatR B Circle-2,Rajkot
day
day
day
0.32
8.00
194.50
194.50
62.24
1,556.00
202.28
1,820.52
1.82
0.10
1.00
1.40
194.50
194.50
199.90
19.45
194.50
279.86
L.S
day
day
day
L.S
200.00
86.73
780.54
780.54
0.20
4.00
1.00
194.50
194.50
199.90
38.90
778.00
199.90
500.00
[Chapter -15](Page-258)
Ref.
MORD
Specifn
2
15.8
1900
Sr.
No.
15.9
1900
Description
3
c)
OH & Contractor's profit @ 12.5% on a+b
Cost for One Slab Culverts =a+b+c
Rate per Culvert = a+b+c
Maintenance of Causeway
Maintenance of Causeway by way of minor Surface
repairs, replacing Guide Posts, repair of flood gauges,
removal of debris, providing boulders and protection work
and painting as per technical specification Clause 1909
Unit = One metre
Taking output = 50 metre causeway
a) Labour
Mate
Mazdoor (Unskilled)
Mason 1st Class/Painter 1st Class
b) Material
Supply of cement, paint, sand, aggregate,
boulder etc.
(LS Rs.350.00)
c) OH & Contractor's profit @ 12.5% on a+b
Cost for 50 metre = a+b+c
Rate per metre = a+b+c/50
Maintenance of Road Signs
Maintenance of road signs by way of cleaning and
repainting of mandatory / requlatory / cautionary /
informatory and place identifications sign board as
perdrawings and technical specification Clause 1910
Unit = 1 km
Taking output = one km
All types of signs in one Km
a) Labour
Mate
Mazdoor (Unskilled)
Painter 1st Class
b) Material
Synthetic Enamel Paint, Engineering grade tape,
welding machine etc. (LS Rs.300)
15.10
1900
day
day
day
0.80
1.60
4.00
Rate
(Rs.)
Amount
(Rs.)
7
189.60
1,706.40
1,706.40
194.50
194.50
207.80
LS
155.60
311.20
831.20
350.00
206.00
1,854.00
37.08
day
day
day
0.09
2.00
0.125
194.50
194.50
199.90
LS
17.51
389.00
24.99
300.00
91.44
822.93
822.93
Unit Quantity
PanchayatR B Circle-2,Rajkot
day
day
day
day
0.024
0.30
0.10
0.20
194.50
194.50
199.90
207.80
4.67
58.35
19.99
41.56
[Chapter -15](Page-259)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
Unit Quantity
3
4
Materials
Mild steel (structural steel)
t
ISMC = 0.029T
MS plate = 0.01
Nuts and bolts
t
c) Machinery
Welding set (LS Rs.100.00)
LS
d) OH & Contractor's profit @ 12.5% on a+b+c
Cost for 10 metre = a+b+c+d
Rate per metre = a+b+c+d/10
(ii) Repair of RCC railing to bring it to the original shape,
cleaning and repainting as per drawings and technical
specification Clause 1911
b)
Rate
(Rs.)
Amount
(Rs.)
0.039 50,600.60
1,973.42
0.001 71,500.00
71.50
100.00
283.69
2,553.18
255.32
RCC Railing
Unit = running metre
Taking output = 1 metre
It is assumed that damage is to the extent of 10%
a)
15.11
1900
Labour
Mate
Mazdoor (Unskilled)
Mason 1st Class
b) Materials
M 30 grade cement concrete
Rate as per item no. 13.1 (III) of Chapter 13
Steel bars reinforcement
Rate as per item no.13.2 of Chapter 13
c) OH & Contractor's profit @ 12.5% on (a)
Rate per metre = a+b+c
Maintenance of 200 metre and km stones
day
day
day
0.012
0.20
0.10
194.50
194.50
207.80
2.33
38.90
20.78
cum
0.10
6,736.71
673.67
0.013 60,007.06
780.09
7.75
1,523.53
1.895
73.91
140.06
PanchayatR B Circle-2,Rajkot
[Chapter -15](Page-260)
Sr.
No.
1
Ref.
MORD
Specifn
2
Description
3
Rate as per item no 10.1 of chapter 10
Unit Quantity
4
per cm
height
per
letter
a)
15.12
1900
Labour
Mate
day
Mazdoor
day
Mason 1st Class
day
b) Materials
Cement, sand, aggregates etc.
LS
(LS = Rs.100.00)
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for one km = (i+ii+a+b+c)
Rate per/km = (i+ii+a+b+c)
Cutting of branches of trees shrubs and trimming
of grass and weeds
(i)
0.024
0.50
0.10
Amount
(Rs.)
0.54
7
118.28
194.50
194.50
207.80
4.67
97.25
20.78
100.00
27.84
508.87
508.87
5
220.00
Rate
(Rs.)
PanchayatR B Circle-2,Rajkot
0.12
1.00
2.00
194.50
199.90
194.50
23.34
199.90
389.00
76.53
688.77
68.88
day
day
0.08
2.00
194.50
194.50
15.56
389.00
50.57
455.13
4.55
day
day
0.40
10.00
194.50
194.50
77.80
1,945.00
252.85
2,275.65
1.52
[Chapter -15](Page-261)
Sr.
No.
1
15.13
Ref.
Description
MORD
n
Specif
2
3
1900 White washing of parapet walls of CD work and
tree truncks
White washing two coats on parapet walls and tree trunks
including preparation of surface by cleaning scraping etc.
as per technical specifications Clause 1915
Unit = sqm
Taking output = 9 sqm
a) Labour
Mate
Mazdoor (Unskilled)
White washer
b) Materials
Lime
Fevicol adhesive
Indigo
c) OH & Contractor's profit @ 12.5% on a+b
Cost for 9 sqm = a+b+c
Rate per sqm = a+b+c/9
Note: For analysis of rates for maintenance works bitumen
grade S-90 has been taken. User may modify as per site
requirement
15.14
1900
Unit Quantity
4
Rate
(Rs.)
Amount
(Rs.)
day
day
day
0.01
0.143
0.143
194.50
194.50
196.30
1.95
27.79
28.04
quintel
kg
kg
0.045
0.10
0.013
200.00
165.00
190.00
9.00
16.50
2.47
10.72
96.46
10.72
sqm
PanchayatR B Circle-2,Rajkot
sqm
[Chapter -15](Page-262)
Name of Work :-
Sr.
No.
Name of Material
1
1
2
Const. of Rural Road Under P.M.G.S.Y. General Rate Analysis for Year 2013-14
MATERIAL
NO.
Name of
Quarry
2
M.C.(25 - 10 mm)
M-009
3
Quarry
4
50.00
5
668.23
6
51.37
7
25.68
49.00
8
0.00
0.00
M.C.(37.5 - 25 mm )
M-010
Quarry
50.00
716.23
51.37
25.68
49.00
0.00
M.C.(10 - 5 mm )
M-012
Quarry
50.00
365.00
51.37
25.68
49.00
M-014
Quarry
50.00
365.00
51.37
25.68
M-015
Quarry
50.00
520.00
51.37
M-016
Quarry
50.00
550.00
M-017
Quarry
50.00
M-021
Quarry
5
6
7
M.C.Metal (40mm
nomial)
M.C.Metal (40-63)
Total to site of
works
1.00
10
0.00
0.00
11
745.28
0.00
1.00
0.00
0.00
793.28
0.00
0.00
1.00
0.00
0.00
442.05
49.00
0.00
0.00
1.00
0.00
0.00
442.05
25.68
49.00
0.00
0.00
1.00
0.00
0.00
597.05
51.37
25.68
49.00
0.00
0.00
1.00
0.00
0.00
627.05
425.00
51.37
25.68
49.00
0.00
0.00
1.00
0.00
0.00
502.05
50.00
390.00
51.37
25.68
49.00
0.00
0.00
1.00
0.00
0.00
467.05
Bitumen VG-10
M-037
Koyali
200.00
44005.00
78.51
69.54
199
1.94
386.06
4.70
4.7
44543.81
M-038
Panipat
900.00
34800.00
78.51
69.54
899
1.94 1744.06
4.70
4.7
36696.81
10
M-039
Panipat
900.00
32200.00
78.51
69.54
899
1.94 1744.06
4.70
4.7
34096.81
11
M-043
Quarry
25.00
33.00
0.75
0.37
24.00
0.03
0.72
1.00
0.06
0.06
34.90
12
M-044
Market
20.00
4400.00
84.13
84.13
19.00
5.88
111.72
1.00
14.24
14.24
4694.22
13
Cement
M-045
Market
25.00
580.00
67.88
67.88
24.00
1.94
46.56
1.00
4.70
4.70
767.02
14
M-055
Quarry
50.00
200.00
51.37
25.68
49.00
1.94
95.06
1.00
4.70
4.70
376.81
15
M-073
As available
20.00
868.00
25.68
13.65
19.00
1.94
36.86
1.00
4.70
4.70
948.89
16
Graded Stone
M-081
Quarry
50.00
270.00
51.37
25.68
49.00
1.94
95.06
1.00
4.70
4.70
446.81
17
Granular Material
M-082
Local Kotar
20.00
121.00
25.68
13.65
19.00
1.94
36.86
1.00
4.70
4.70
201.89
18
M-097
Market
25.00
50400.00
74.67
74.67
24.00
1.94
46.56
1.00
4.70
4.70
50600.60
M-098
Market
25.00
75000.00
74.67
74.67
24.00
1.94
46.56
1.00
4.70
4.70
75200.60
19
Sr.
No.
Name of Material
MATERIAL
NO.
Name of
Quarry
1
20
2
Rubble (M-106)
21
M-106
3
Quarry
4
25.00
5
185.00
6
51.37
7
25.68
M-108
Dhasa
Variable
3630.00
69.58
223.71
M-109
Dhasa
Variable
1898.00
41.75
186.43
23
M-119
Local Kotar
20.00
230.00
25.68
13.65
19.00
2.94
55.86
1.00
24
Sand (Fine)
M-120
Local Kotar
20.00
210.00
25.68
13.65
19.00
2.94
55.86
25
HYSD Bar
M-123
Market
25.00
44000.00
74.67
74.67
24.00
1.94
26
Mild Steel
M-124
Market
25.00
42000.00
74.67
74.67
24.00
27
TMT BARS
M-125
Market
25.00
48000.00
74.67
74.67
28
M-130
Quarry
25.00
185.00
51.37
M-138
Quarry
25.00
120.00
51.37
22
29
10
7.12
Total to site of
works
7.12
11
339.73
0.00
3923.29
0.00
2126.18
7.12
7.12
332.31
1.00
7.12
7.12
312.31
46.56
1.00
4.70
4.70
44200.60
1.94
46.56
1.00
4.70
4.70
42200.60
24.00
1.94
46.56
1.00
4.70
4.70
48200.60
25.68
24.00
2.94
70.56
1.00
7.12
7.12
339.73
25.68
24.00
2.94
70.56
1.00
7.12
7.12
274.73
24.00
70.56
1.00
0.00