Superintending Engineer

Panchayat R & B Circle-2


Rajkot

A B S T R A C T
SR. No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

PARTICULAR

SOR Front Page


ABSTRACT
Rates of Labour
Rates of Palnt & Machinery
Rates of Material
SOR Summary
CHAPTER-1 LOADING, UNLOADING, CARRIAGE
CRUSHING OF MATERIALS AND SETTING OUT
CHAPTER-2 SITE CLEARANCE
CHAPTER-3 EARTHWORK, EROSION CONTROL AND
DRAINAGE
CHAPTER-4 GRANULAR SUB-BASES, BASES (NONBITUMINOUS) AND SHOULDERS
CHAPTER-5 BASES AND SURFACE COURSES
(BITUMINOUS)
CHAPTER-6 CEMENT CONCRETE PAVEMENT
CHAPTER-7 CAUSEWAY AND SUBMERSIBLE BRIDGES

From
Page

To Page

CHAPTER-8 HILL ROADS


CHAPTER-9 PIPE CULVERTS
CHAPTER-10 TRAFFIC SIGNS, MARKINGS AND OTHER
ROAD APPURTENANCES
CHAPTER-11 FOUNDATION
CHAPTER-12 SUBSTRUCTURE
CHAPTER-13 SUPER STRUCTURE
CHAPTER-14 PROTECTION WORKS
CHAPTER-15 MAINTENANCE OF ROAD
RA of Material Lead Loading Unloading

PMGSY SOR 13-14

[Chapter -Abs](Page-1)

BASIC RATES for Year 2013-14 SOR (PMGSY WORKS), Gujarat State
(Panchayat R&B Circle-2, Rajkot)

(A) Labour
Sl. No.

Description of Labour

Unit

Rate

L-01
L-02
L-03
L-04
L-05
L-06
L-07
L-08
L-09
L-10
L-11
L-12
L-13
L-14
L-15
L-16
L-17
L-18
L-19
L-20
L-21

PMGSY SOR 13-14

Bhisti
Bitumen Sprayer
Blacksmith
Blaster
Carpenter 1st Class
Chips spreader
Chiseller
Dresser (Skilled)
Driller
Electrician
Fitter
Mason (1st class)
Mason (2nd Class)
Mate
Mazdoor (Unskilled)
Mazdoor (Semi skilled)
Mazdoor (Skilled)
Painter (Ist class)
Plumber
Surveyor
White Washer

PanchayatR B Circle-2,Rajkot

day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day

196.30
199.90
207.80
194.50
207.80
194.50
194.50
194.50
194.50
196.30
196.30
207.80
199.90
194.50
194.50
196.30
199.90
199.90
207.80
207.80
196.30

[Chapter -Labour](Page-1)

BASIC RATES for Year 2013-14 SOR (PMGSY WORKS), Gujarat State
(Panchayat R&B Circle-2, Rajkot)
(B) USAGE RATES OF PLANT & MACHINERY
Description of

Sr. No.

Machine

Output of Machine
Activity

Unit

Output

Usage Rates in Rs.


Unit

PM-001

Air Compressor 210 cfm

Supplying compressed
air

cfm

PM-002

Batch mix HMP 40-60 TPH

BM, DBM, SDBC, PM

t/h

50.00 per hour

PM-003

Batch type HMP 30/40 TPH

BM, DBM, SDBC, PM

t/h

35.00 per hour

PM-004

Bitumen boiler oil fired


200 litre
1000 litre
Bitumen emulsion pressure
PM-005
distributor
PM-006 Concrete mixer 0.28/0.4 cum
PM-007 Crane upto 8T
PM-008
Dozer D 50

Applying bitumen tack


coat
Mixing of ingradients
Lifting of materials
Dozing cutting

litre / h
litre / h

400.00 per hour


2000.00 per hour

sqm/h

1750.00 per hour

cum/h
cum/h
cum/h

2.50 per hour


per hour
200.00
per hour
100.00

Electricity generation

KVA

100.00 per hour

PM-010
PM-011

Emulsion Sprayer with Tractor


Front end-loader 1 cum bucket
capacity @ 45 cum/hour
Hydraulic broom with tractor
Hydraulic Excavator 0.9 cum
Hydraulic self propelled chip
spreader

Spraying of Emulsion
Loading Aggregates
Loading Soil
Surface cleaning
Excavation

cum/h
cum/h
sqm/h
cum/h

per hour
45.00
per hour
100.00
1250.00 per hour
100.00 per hour

Surface Dressing

sqm/h

1500.00 per hour

Pavement breaking &


rock drilling

cum/h

PM-015

Jack Hammer with tractor

PM-016

Joint Cutting Machine with 2-3


blades

PM-017

Mixall 6-10 t capacity

PM-018

Motor Grader

PM-019

Needle vibrator

PM-020
PM-021
PM-022
PM-023

Paver finisher
Plate compactor
Plate vibrator
Screed vibrator
Smooth wheeled 80-100 kN
tandem roller
Stone crusher (Integrated) of 200
TPH
Three wheel 80-100 kN Static
Roller

PM-024
PM-025
PM-026

PMGSY SOR 13-14

9,000.00
7,150.00
Input Rate

Heating of bitumen

Electric generator set, 125 KVA

PM-014

300.00

210.00 per hour

PM-009

PM-012
PM-013

Rate

05. to 1

per hour

Cutting of Joints

per hour

Mixing of bituminous
materials

t/h

8.00 per hour

Scarifier & levelling

cum/h

200.00
per hour
50.00

cum/h

3.50 per hour

t/h
cum/h
cum/h
cum/h

75.00 per hour


per hour
per hour
per hour

cum/h

30.00 per hour

t/h

200.00 per hour

Vibrating cement
concrete mix
Laying/spreading
Compaction
Compaction
Compaction
Compaction of Subbase/ Asphalt
Crushing of Spalls
Compaction/ Rolling
Earth:- Embankment
or sub-grade
Sub-base G-I
Sub-base G-II/G-III
WMM
BUSG
BM 50/75 mm
Premix 20 mm
Seal Coat
PanchayatR B Circle-2,Rajkot

per hour
cum/h
cum/h
cum/h
cum/h
cum/h
cum/h
sqm/h
sqm/h

80/70
10.00
8.00
16.00
10.00
12.00
250.00
500.00

128.00
160.00
840.00
190.00
1,080.20
2,100.00
1,814.00
700.00
700.00
764.00
675.00
300.00
1,400.00
2,100.00
325.00
150.00
1,036.20
2,100.00
1,600.00
60.00
1,200.00
310.00
400.00
310.00
400.00
14,200.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00

[Chapter -Plant & Machinery](Page-5)

Description of

Sr. No.

PM-027
PM-028
PM-029

Machine

Tipper 5.5 cum/10 t


Tractor with Disc Harrows
Tractor with ripper @ 60 cum per
hour

PM-030

Tractor with trolley

PM-031
PM-032

Tractor with Rotavator


Truck 10 t capacity

PM-033
PM-034
PM-035

Vibratory roller 80-100 kN


Water tanker 6 kl capacity (Truck
Mounted)
Wet mix plant (Pug Mill)

PMGSY SOR 13-14

Output of Machine
Activity
Surface Dressing 1st
Coat
Surface Dressing
2ndCoat
Carriage
Pulverisation of soil
Ripping Pavements,
uprooting trees
Transportation of
materials
Scarifier
Carriage
Compaction of soil
WMM
Compaction of BM

Unit

Output

sqm/h

400.00

sqm/h

500.00

Usage Rates in Rs.


Unit

400.00
400.00

cum/trip
cum/h

5.50 per hour


80.00 per hour

cum/h

60.00 per hour

t/trip
cum/h
cum/trip

3 to 5

per hour

25.00 per hour


5.50 per hour

cum/h

100.00

cum/h

60.00

per hour

Carriage of water

litre / h

12000.00 per hour

Wet Mix

cum/h

25.00 per hour

PanchayatR B Circle-2,Rajkot

Rate

250.00
300.00
300.00
300.00
300.00
300.00
1,200.00
1,200.00
300.00
1,000.00

[Chapter -Plant & Machinery](Page-6)

BASIC RATES for Year 2013-14 SOR (PMGSY WORKS), Gujarat


State
(C) Material

Sr. No.

M-001
M-002
M-003
M-004
M-005
M-006
M-007
M-008
M-009
M-010
M-011
M-012
M-013
M-014
M-015
M-016
M-017
M-018
M-019
M-020
M-021
M-022
M-023
M-024
M-025
M-025
M-026
M-027
M-028
M-028
M-029
M-028
M-029
M-030
M-031
M-032
M-033
M-034
M-035
M-036
M-037

Description

Unit

AC pipe 100 mm
Aggregate - For 37.5 mm Maximum size - 22.4 mm to 5.6 mm
Aggregate - For 37.5 mm Maximum size - 45 mm to 22.5 mm
Aggregate - For 37.5 mm Maximum size - Below 5.6 mm
Aggregate - For 53 mm Maximum size - 22.5 mm to 5.6 mm
Aggregate - For 53 mm Maximum size - 63 mm to 45 mm
Aggregate - For 53 mm Maximum size - Below 5.6 mm
Aggregate - Grading I (40 mm nominal Size) 10 mm - 5 mm
Aggregate - Grading I (40 mm nominal Size) 25 mm 10 mm
Aggregate - Grading I (40 mm nominal Size) 37.25 mm - 25 mm
Aggregate - Grading I (40 mm nominal Size) 5 mm and below
Aggregate - Grading II (19 mm nominal Size) 10 mm - 5 mm
Aggregate - Grading II (19 mm nominal Size) 25 mm 10 mm
Aggregate - Grading II (19 mm nominal Size) 5 mm and below
Aggregate 10 mm
Aggregate 20 mm
Aggregate 40 mm
Aggregate- Crushable type such as moorum or Gravel for Grading I
Aggregate- Crushable type such as moorum or Gravel for Grading II
Aggregate- Crushable type such as moorum or Gravel for Grading III
Aggregate-Grading I 90 mm to 45 mm
Aggregate-Grading II 63 mm to 45 mm
Aggregate-Grading III 53 mm to 22.4 mm
Aggregates 22.4 mm to 2.36 mm for wet mix macadam
Aggregates 45 mm to 22.4 mm for wet mix macadam
Aluminium sheeting (1.5 mm thick)

Aluminium Studs 100 mm x 100 mm fitted with lense reflectors

*
Bamboo (1st Class) 85 mm - 100 mm dia, 2.5 m long *
Bamboo (1st Class) 85 mm - 100 mm dia, 3.0 m long *
Bamboo (1st Class) 85 mm - 100 mm dia, 2.0 m long

Bamboo (1st Class) 85 mm - 100 mm dia, 4.5 m - 5.5 m long

*
Bamboo (2nd Class) 75mm dia, 2.1 m - 3.0 m long*
Bamboo (2nd Class) 75mm dia, 1.8 m - 2.5 m long
Barbed wire
Binding Material
Binding wire
Bitumen (Crumb Rubber Modified)
Bitumen (Natural Rubber Modified)
Bitumen (Polymer Modified)
Bitumen (S-65)
Bitumen (S-90)

M-038 Bitumen Emulsion (RS-1)


M-039 Bitumen Emulsion (SS-1)
M-040
Bituminous sealant
M-041 Blasted rubble
M-042 Blasting material
M-043 Bond stone (400 mm x 150 mm x 150 mm)
M-044 Brick 1st Class
M-045 Cement
M-046
Cement Primer
M-047
Chlorprene Elastomer or Closed Cell Foam Sealing Element

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

m
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
sqm

Rate as on
23/10/13
42.70
525.00
525.00
365.00
525.00
380.00
365.00
365.00
745.28
793.28
365.00
442.05
440.00
442.05
597.05
627.05
502.05
120.00
120.00
120.00
467.05
390.00
470.00
457.50
470.00
3680.00

Nos.

230.00

No.

37.00

No.

42.00

No.

50.00

No.

100.00

No.

25.00

No.

45.00

kg
cum
kg
tonne
tonne
tonne
t
t

75.00
85.00
58.00
48775.00
49,565.0
48,775.0
44,966.0
44,543.8

t
t
litre

36,696.8

cum
kg
No.
No.
t
litre

185.00

34,096.8
70.00
60.00
34.90
4.69
7,670.20
110.00
35.00
[Chapter -Material](Page-2)

Sr. No.

Description

M-048
M-049
M-050
M-051

Compensation for earth taken from private land


Compressible Fibre Board

Unit

Copper plate

Corbelling Stones (300 mm x 150 mm x 150 mm)

M-052

Corrosion Resistant Structural Steel Grating


M-053 Credit for excavated rock found suitable for use
M-054 Crow bars 40 mm dia (hire charges)
M-055 Crushed Sand or Grit Passing 2.36 mm and retained on 180 micron
M-056
Crushed Slag
M-057 Crushed Stone Aggregate 26.5 mm to 75 micron
M-058 Crushed Stone chipping 13.2 mm nominal size
M-059 Crushed Stone Chipping 6.7 mm size 100% passing 11.2 mm and retained
on 2.36 mm
M-060 Crushed Stone Chipping 6.7 mm size 100% passing 9.5 mm and retained
on 2.36 mm
M-061 Crushed Stone chipping 9.5 mm nominal size
M-062 Crushed Stone Coarse Aggregate Passing 53 mm and retained on 2.8 mm

M-063
M-064
M-065
M-066
M-067
M-068
M-069
M-070
M-071
M-072
M-073
M-074
M-075
M-076
M-077
M-078
M-079
M-080
M-081
M-082
M-083
M-084
M-085
M-086
M-087
M-088
M-089
M-090
M-091
M-092
M-093
M-094
M-095
M-096
M-097
M-098
M-099
PMGSY SOR 13-14

*
Debonding strips *
Curing compound

*
Edge Stone (450 mm x 350 mm x 200 mm) *
Elastomeric bearing assembly *
Edge Stone (450 mm x 350 mm x 100 mm)

Electric Detonator*
Epoxy Paint*
Epoxy Primer*
Farmyard manure*
Fevicol adhesive*
Filter media
Fine aggregate/Crushed sand 2.36 mm to 75 micron
Galvanised angle*

Galvanised angle Section 100 mm x 100 mm of 12 mm thickness*

Gelatine 80 per cent*


GI Pipe 100 mm dia*
GI Pipe 50 mm dia
GI wires*
Graded stone aggregate
Granular material (Natural occuring, soil gravel mixture / quarry waste,
kankar, laterite, dhandla
Hand Broken Metal 40 mm size
Indigo*
Interlocking Blocks with 60 mm thickness*
Interlocking Blocks with 80 mm thickness*
Joint filler board*
Jute netting, open weave 25 mm square opening*
Jute rope 12 mm dia*
Key Aggregates passing 22.4 mm and retained on 2.8 mm
Lime
Lime putty*
Local Wood Piles (1st Class) 150-200 mm dia ,6m long*
Local Wood Piles (1st Class) 100 mm x 75 mm
Loose stone
MS clamps*
MS Flat / Structural Steel*
MS Sheet Tube (47 mm x 47 mm x 12 SWG Sheet)*
MS Sheet 1.5 mm thick*
PanchayatR B Circle-2,Rajkot

Rate as on
23/10/13

cum

17.50

sqm

358.00

kg

390.00

No.

68.00

kg

60.00

cum
hour
cum
cum

185.00
8.00
376.81
330.00

cum
cum
cum

457.50

cum

365.00

cum
cum

440.00

litre

550.00

535.00
365.00

378.00

6.00

No.

66.00

No.

72.00

Nos.

38500.00

each
litre
litre
cum
kg
cum
cum
kg
kg
kg
m
m
kg
cum
cum
cum
kg
sqm
sqm
sqm
sqm
m
cum
t
t
No.
cum
cum
Nos.
t
kg
sqm

35.00
450.00
300.00
295.00
165.00
948.89
230.00
94.00
94.00
144.00
794.00
410.00
92.00
446.81
201.89
270.00
190.00
201.00
297.00
363.00
30.00
50.00
457.50
2000.00
2,750.00
6,545.00
25,000.0
185.00
45.00
50,600.6
75.20
690.00
[Chapter -Material](Page-3)

Sr. No.

M-100
M-101
M-102
M-103
M-104
M-105
M-106
M-107
M-108
M-109
M-110
M-111
M-112
M-113
M-114
M-115
M-116
M-117
M-118
M-119
M-120
M-121
M-122
M-123
M-124
M-125
M-126
M-127
M-128
M-129
M-130
M-131
M-132
M-133
M-134
M-135
M-136
M-137
M-138
M-139
M-140
M-141
M-142
M-143
M-144
M-145
M-146
M-147
M-148
M-149
M-150
M-151
M-152
M-153
M-154
M-155
M-156
M-157

PMGSY SOR 13-14

Description
2

MS Sheet 2 mm thick
Nuts, Bolts and Rivets
Paint (Synthetic Enamel)
Plasticizer*
Polythene sheet (125 micron)*
Polythene Sheething*
Quarried Stone 150-200 mm size
RCC Pipe NP3 (1200 mm dia)*
RCC Pipe NP3 (1000 mm dia)*
RCC Pipe NP3 (750 mm dia)*
RCC Pipe NP3 (600 mm dia)*
RCC Pipe NP3 (500 mm dia)*
RCC Pipe NP4 (1200 mm dia)*
RCC Pipe NP4 (1000 mm dia)*
RCC Pipe NP4 (750 mm dia)*
RCC Pipe NP4 (600 mm dia)*
RCC Pipe NP4 (500 mm dia)*
Red-oxide Primer
Road marking paint*
Sand (Coarse)
Sand (Fine)
Seeds*
Steel Pipe 50 mm dia*
Steel Reinforcement (HYSD Bars)
Steel Reinforcement (MS Round Bars)
Steel Reinforcement (TMT Bars)
Stone Boulder of size 150 mm and below
Stone Chips 12 mm size
Stone Chips 13.2 mm to 5.6 mm*
Stone Crushed Aggregate 11.2 mm to 0.09 mm
Stone for Coarse Rubble Masonry 1st Sort
Stone for Coarse Rubble Masonry 2nd Sort
Stone for Random Rubble Masonry
Stone for Stone Set Pavement (300 mm x 200 mm x 150 mm)
Stone Screening - Type A 13.2 mm for Grading-1
Stone Screening - Type A 13.2 mm for Grading-2
Stone Screening - Type B 11.2 mm for Grading-2
Stone Screening - Type B 11.2 mm for Grading-3
Stone spall
Traffic cones *
Water*

Well graded Granular Base Material - Grading A 2.36 mm below


Well graded Granular Base Material - Grading A 26.5 mm to 4.75 mm
Well graded Granular Base Material - Grading A 53 mm to 26.5 mm
Well graded Granular Base Material - Grading B 2.36 mm below
Well graded Granular Base Material - Grading B 26.5 mm to 4.75 mm
Well graded Granular Base Material - Grading C 2.36 mm below
Well graded Granular Base Material - Grading C 9.5 mm to 4.75 mm
Well Graded Material for Sub-Base - Grading I 2.36 mm below
Well Graded Material for Sub-Base - Grading I 53 mm to 9.5 mm
Well Graded Material for Sub-Base - Grading I 9.5 mm to 2.36 mm
Well Graded Material for Sub-Base - Grading II 2.36 mm below
Well Graded Material for Sub-Base - Grading II 26.5 mm to 9.5 mm
Well Graded Material for Sub-Base - Grading II 9.5 mm to 2.36 mm
Well Graded Material for Sub-Base - Grading III 2.36 mm below
Well Graded Material for Sub-Base - Grading III 4.75 mm to 2.36 mm
Well Graded Material for Sub-Base - Grading III 9.5 mm to 4.75 mm
Wooden sleepers (250 mm x 250 mm x 125 mm) (hire charges)*

PanchayatR B Circle-2,Rajkot

Unit
3

sqm
t
litre
litre
sqm
Nos.
cum
m
m
m
m
m
m
m
m
m
m
litre
litre
cum
cum
kg
m
t
t
t
cum
cum
cum
cum
cum
cum
cum
No.
cum
cum
cum
cum
cum
No.
kl
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
No.

Rate as on
23/10/13
920.00
71,500.0
210.00
81.00
17.00
4.00
339.73
4180.00
3,923.29
2,126.18
1,265.00
990.00
7,590.00
6,235.00
3,970.00
3,770.00
2,720.00
100.00
205.00
332.31
312.31
8.25
360.00
44,200.6
42,200.6
48,200.6
185.00
550.00
402.50
295.00
339.73
185.00
195.00
195.00
390.00
390.00
390.00
470.00
274.73
850.00
16.00
150.00
395.00
407.50
150.00
395.00
150.00
365.00
150.00
377.50
365.00
150.00
395.00
365.00
150.00
150.00
365.00
85.00

[Chapter -Material](Page-4)

Summary of Rate Analysis


Item
No.
1

Chapter-1
1.1

1.4

1.5

1.6

Rate
(Rs.)
4

LOADING, UNLOADING, CARRIAGE CRUSHING OF


MATERIALS AND SETTING OUT

Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar,


Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means
including a lead upto 30 m
Loading of Earth, Sand, Moorum, Manure, Flyash by manual means
including a lead upto 30 m

cum

51.37

cum

25.68

(iii)

Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar,


Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means
including a lead upto 30 m

cum

25.68

(iv)

Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar,


Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means
including a lead upto 30 m

cum

13.65

(ii)

1.3

Unit

Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry
Work by Manual Means
(i)

1.2

Description

Loading and Unloading Lime, Aggregate, Stone Boulder, Brick Aggregate,


Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by
Mechanical Means
(i)

Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar,


Building Rubbish, Crushed Slag, Stone for Masonry Work by mechanical
means including a lead upto 30 m

cum

27.86

(ii)

Loading of Earth, Sand, Moorum, Manure, Flyash by mechanical means


including a lead upto 30 m.

cum

13.96

(iii)

Unloading of Earth, Sand, Lime, Moorum, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Manure, Crushed Slag, Flyash, Stone
for Masonry Work by mechanical means.

cum

4.09

Loading, Unloading and Stacking of Bricks by Manual Means


(i)

Loading of Bricks by manual means including a lead upto 30 m

1000 Nos.

84.13

(ii)

Unloading and Stacking of Bricks by manual means including a lead upto 30 1000 Nos.
m

84.13

Loading and Unloading of Cement by Manual Means


(i)

Loading of Cement by manual means including a lead upto 30 m

67.88

(ii)

Unloading of Cement by manual means including a lead upto 30 m

67.88

Loading and Unloading of Structural Steel and Steel Bars by manual


means
(i)

Loading of Structural Steel, Steel Bars by manual means including a lead


upto 30 m

74.67

(ii)

Unloading of Structural Steel, Steel Bars by manual means including a lead


upto 30 m

74.67

t
t

78.51
69.54

Loading and Unloading of Bitumen Drums by Manual Means


(i)
(ii)

Loading of Bitumen Drums by manual means including a lead upto 30 m


Unloading of Bitumen Drums by Manual Means including a lead upto 30 m

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-7)

Item
No.
1
1.7

1.8

Loading of Timber by manual means including a lead upto 30 m

113.01

(ii)

Unloading of Timber by manual means including a lead upto 30 m

113.01

cum

174.80

cum

174.80

Loading and Unloading of C.C. Blocks, Kerb, etc.


Loading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar,
Kerb, Channel, Bond Stone, etc. by manual means including a lead upto 30
m
Unloading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar,
Kerb, Channel, Bond Stone, etc. by manual means including a lead upto 30
m

Loading and Unloading of Hume Pipes


(i)

(ii)

Loading of RCC Hume pipes by mechanical means including a lead upto 30


m
A.
1000 / 1200 mm dia Hume pipe
B.
750 mm dia Hume pipe
C.
600/450 mm dia Hume pipe
Unloading of RCC Hume pipe by manual means including a lead upto 30 m

A.
1000/1200 mm dia RCC Hume pipes
B.
750 mm dia Hume pipe
C.
600/450 mm dia Hume pipe
Unloading of RCC Hume pipes by mechanical means including a lead upto
(iii)
30 m
A.
1000/1200 mm dia Hume pipe
B.
750 mm dia Hume pipe
C.
600/450 mm dia Hume pipe
Haulage excluding Loading & Unloading
Haulage of materials by tipper excluding cost of loading, unloading and stacking.
Case-I : Surfaced Road
Case-II: Unsurfaced Gravel Road
Case-III: Katcha Track and Track in River Bed/Nallah Bed and Choe Bed

1.11

1.12

Rate
(Rs.)
4

(i)

(ii)

1.10

Unit

Loading and Unloading of Timber by Manual Means

(i)

1.9

Description

Supply of Quarried stone and hand breaking


(i)
Supply of quarried stone and hand breaking into coarse aggregate to
Grading 1 (90 mm to 45 mm) as per Table 400.8 of Technical
Specifications.

per pipe
per pipe
per pipe

69.58
41.75
29.82

per pipe
per pipe
per pipe

222.36
185.30
138.98

per pipe
per pipe
per pipe

47.15
28.29
20.21

t.km
t.km
t.km

1.94
2.33
4.70

cum

693.49

(ii)

Supply of quarried stone and hand breaking into coarse aggregate to


Grading 2 (63 mm to 45 mm) as per Table 400.8 of Technical
Specifications.

cum

761.76

(iii)

Supply of quarried stone and hand breaking into coarse aggregate to


Grading 3 (53 mm to 22.4 mm) as per Table 400.8 of Technical
Specifications.

cum

830.03

Crushing of Stone Aggregates 100 per cent passing through 53 mm sieve


as per Table 500.6 of Technical Specifications.

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-8)

Item
No.
1

1.13

Description

Unit

Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of


200 t/h capacity comprising of primary and secondary crushing units, belt conveyor
and vibrating screens to obtain stone aggregates 100 per cent passing through 53
mm sieve as per Table 500.6 of Technical Specifications including the cost of stone.

cum

328.10

cum

336.20

cum

418.30

cum

440.31

hectare

9,102.60

hectare
hectare

34,472.25
46,188.00

hectare
hectare

24,872.76
30,221.64

Crushing of Stone Aggregates 100 per cent passing through 22.4 mm sieve
as per Table 500.6 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of
200 t/h capacity comprising of primary and secondary crushing units, belt conveyor
and vibrating screens to obtain stone aggregates 100 per cent passing through 22.4
mm sieve as per Table 500.6 of Technical Specifications including the cost of stone.

1.14

Crushing of Stone Aggregates Nominal Size 13.2 mm as per Table 500.9 of


Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of
200 t/h capacity comprising of primary and secondary crushing units, belt conveyor
and vibrating screens to obtain stone aggregates of 13.2 mm nominal size as per
Table 500.9 of Technical Specifications including the cost of stone.

1.15

Crushing of Stone Aggregates 9.5 mm Nominal Size as per Table 500.9 of


Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of
200 t/h capacity comprising of primary and secondary crushing units, belt conveyor
and vibrating screens to obtain stone aggregates of 9.5 mm nominal size as per
Table 500.9 of Technical Specifications including the cost of stone.

1.16

Setting Out

Chapter-2

2.1

2.2

SITE CLEARANCE

Clearing Grass and Removal of Rubbish


Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery
of the area as per Technical Specification Clause 201.

By Manual Means
Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees
cut earlier and disposal of unserviceable materials and stacking of serviceable
material to be used or auctioned, upto a lead of 1000 m including removal and
disposal of top organic soil not exceeding 150 mm in thickness as per Technical
Specification Clause 201.
By Manual Means
(A)
In area of non-thorny jungle
(B)
In area of thorny jungle
By Mechanical Means
(II)
(A)
In area of non-thorny jungle
(B)
In area of thorny jungle
Cutting of Trees including Cutting of Trunks, Branches and Removal of
Stumps
(I)

2.3

Rate
(Rs.)
4

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-9)

Item
No.
1

Description

Unit

Rate
(Rs.)
4

Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots, refilling, compaction of backfilling and stacking of serviceable material by
manual means with all lifts as per Technical Specification Clause 201.
A.

2.4

2.5

Lead upto 100 m


(i)
Girth above 300 mm to 600 mm
(ii)
Girth above 600 mm to 900 mm
(iii)
Girth above 900 mm to 1800 mm
(iv)
Girth above 1800 mm to 2700 mm
(v)
Girth above 2700 mm to 4500 mm
(vi)
Girth above 4500 mm
B.
Lead upto 1000 m
(i)
Girth above 300 mm to 600 mm
(ii)
Girth above 600 mm to 900 mm
(iii)
Girth above 900 mm to 1800 mm
(iv)
Girth above 1800 mm to 2700 mm
(v)
Girth above 2700 mm to 4500 mm
(vi)
Girth above 4500 mm
Uprooting and Removing Stumps & Roots
Uprooting and Removing Stumps & roots, compaction of backfilling and stacking of
servicable material by manual means as per Technical Specification Clause 201.
A.
Lead upto 100 m
(i)
Girth above 300 mm to 600 mm
(ii)
Girth above 600 mm to 900 mm
(iii)
Girth above 900 mm to 1800 mm
(iv)
Girth above 1800 mm to 2700 mm
(v)
Girth above 2700 mm to 4500 mm
(vi)
Girth above 4500 mm
B.
Lead upto 1000 m
(i)
Girth above 300 mm to 600 mm
(ii)
Girth above 600 mm to 900 mm
(iii)
Girth above 900 mm to 1800 mm
(iv)
Girth above 1800 mm to 2700 mm
(v)
Girth above 2700 mm to 4500 mm
(vi)
Girth above 4500 mm
Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other
structure comprising of masonry, cement concrete, wood work, steel work, including
T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with all lifts and lead of
1000 m as per Technical Specification Clause 202.
(I)

2.6

By Manual Means
(A)
Lime Concrete
(B)
Cement Concrete
(C)
Reinforced Cement Concrete
(II)
By Mechanical Means
(A)
Cement Concrete
(B)
Reinforced Cement Concrete
Dismantling Brick/Tile Work
Dismantling of existing structures like culverts, bridges, retaining walls and other
structures comprising of brick masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and lead of 1000 m as per Technical
Specification Clause 202.
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

each
each
each
each
each
each

160.16
275.68
549.63
1,052.01
2,158.02
6,364.13

each
each
each
each
each
each

170.29
306.06
590.13
1,112.76
2,225.52
6,532.88

each
each
each
each
each
each

97.10
153.41
326.24
643.24
1,296.60
3,666.60

each
each
each
each
each
each

99.46
161.85
336.37
656.74
1,313.47
3,750.98

cum
cum
cum

254.95
300.47
732.33

cum
cum

388.03
625.20

[SOR Summary](Page-10)

Item
No.
1

Description

Unit

3
cum
cum
cum
cum

163.93
209.44
145.72
136.62

Rubble Stone Masonry in Lime Mortar


Rubble Stone Masonry in Cement Mortar
Rubble Stone Masonry in Mud Mortar
Dry Rubble Masonry
Dismantling Stone Pitching / Dry Stone Spalls
Dismantling boulders laid in wire crates including opening of
crates and stacking dismantled materials

cum
cum
cum
cum
cum
cum

182.13
209.44
163.93
154.82
145.72
163.93

2.8

Dismantling Wood Work Wrought and Planed Fixed in Frames of Trusses upto a
height of 5 m above Plinth Level as per Technical Specification Clause 202.

cum

341.46

2.9

Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth
Level excluding Cutting of rivet as per Technical Specification Clause 202.

2.7

(A)
Lime mortar
(B)
Cement mortar
(C)
Mud Mortar
(D)
Dry Brick Pitching or Brick Soling
Dismantling Stone Masonry as per Technical Specification Clause 202.

Rate
(Rs.)
4

Dismantling of existing structures like culverts, bridges, retaining walls and other
structure comprising of stone masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and lead of 1000 m as per Technical
Specification Clause 202.
(A)
(B)
(C)
(D)
(E)
(F)

2.10
2.11

2.12
2.13

2.14

Including dismembering
(A)
t
(B)
Excluding dismembering
t
(C)
Extra over Items (A) and (B) for cutting rivets
t
Scraping of bricks dismantled from brick work including stacking as per Technical 1000 Nos.
Specification Clause 202.
Scraping of Stone from Dismantled Stone Masonry as per Technical Specification
Clause 202.
In Cement or Lime Mortar
Scraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as per
Technical Specification Clause 202.

cum
sqm

319.47
10.18

m
m
m

118.16
159.73
273.52

cum
cum

469.60
338.94

cum

199.29

Removing all types of Hume pipes and stacking within a lead of 1000 m including
Earthwork and Dismantling of Masonry Works as per Technical Specification Clause
202.
Upto 600 mm dia Hume pipe
(A)
(B)
Above 600 mm to 900 mm dia Hume pipe
(C)
Above 900 mm dia Hume pipe
Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials upto a lead
of 100 m, stacking serviceable and unserviceable materials separately as per
Technical Specification Clause 202
(I)

2.15

886.85
646.58
6.10
796.48

By Manual Means
(A)
Bituminous Courses
(B)
Granular Courses
(II)
By Mechanical Means
(A)
Bituminous Courses
Dismantling of Cement Concrete Pavements as per Technical Specification
Clause 202.
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-11)

Item
No.
1

Description

Unit

Dismantling of cement concrete pavements by mechanical means using pneumatic


tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at
designated locations and disposal of dismantled materials upto a lead of 1000 m,
stacking serviceable and unserviceable materials separately

cum

2.16

Dismantling Guard Rails


Dismantling guard rails by manual means and disposal of dismantled material with running m
all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable
materials separately as per Technical Specification Clause 202.

2.17

Dismantling Kerb Stones


Dismantling kerb stones by manual means and disposal of dismantled material with running m
all lifts and upto a lead of 1000 m as per Technical Specification Clause 202.

2.18

Dismantling Kerb Stone Channels


Dismantling kerb stone channels by manual means and disposal of dismantled running m
material with all lifts and upto a lead of 1000 m as per Technical Specification Clause
202.

2.19

Dismantling Kilometre Stones


Dismantling of kilometre stones including cutting of earth, foundation and disposal of
dismantled material with all lifts and lead upto 1000 m and backfilling of pit as per
Technical Specification Clause 202.

2.20

2.21

5th km Stone
(A)
m
Ordinary km Stones
(B)
m
200 m Stones
(C)
m
Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing including posts, foundation running m
concrete, backfilling of pit by manual means including disposal of dismantled
material with all lifts and upto a lead of 1000 m, stacking serviceable material and
unserviceable material separately as per Technical Specification Clause 202.
Dismantling of CI Water Pipe Line
Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and lead running m
upto 1000 m and stacking of serviceable material and unserviceable material
separately under supervision of concerned department as per Technical Specification
Clause 202.

2.22

Removal of Cement Concrete Pipe of Sewer Gutter


Removal of cement concrete pipe of sewer gutter 1500 mm dia under the running m
supervision of concerned department including disposal with all lifts and upto a lead
of 1000 m and stacking of serviceable and unserviceable material separately but
excluding earth excavation and dismantling of masonry works as per Technical
Specification Clause 202.

2.23

Removal of Telephone/Electric Poles and Lines


Removal of telephone/electric poles with wires including excavation and dismantling
of foundation concrete and lines under the supervision of concerned department,
disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and
unserviceable material separately as per Technical Specification Clause 202.

Chapter-3
3.1

each

Rate
(Rs.)
4
867.64

51.01

10.16

15.38

221.30
139.10
29.51
30.51

120.77

127.10

108.04

EARTHWORK, EROSION CONTROL AND DRAINAGE

Preparation of Foundation for Embankment


Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-12)

Item
No.
1

3.2

3.3

Description

Unit

Scarifying existing granular surface to a depth of 50 mm and disposal of scarified


material with a lift upto 3 m and leads upto 1000 m as per Technical Specification
Clause 301.4.
Preparation of Foundation for Embankment
Scarifying Existing Bituminous Surface to a Depth of 150 mm by
Mechanical Means
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of
scarified material with a lift upto 3 m and lead upto 1000 m as per Technical
Specification Clause 301.4.

sqm

14.17

sqm

5.71

cum

39.30

cum

142.07

Excavation for roadway in soil using manual means for carrying of cut earth
to embankment site with a lift upto 1.5 m and lead upto 50 m as per
Technical Specification Clause 302.3
Excavation in Soil with Dozer with lead upto 100 m

cum

85.34

Excavation for roadway in soil by mechanical means including cutting and


pushing the earth to site of embankment upto a distance of 100 m,
including trimming bottom and side slopes in accordance with requirements
of lines, grades and cross-sections.
Excavation in Soil using Hydraulic Excavator and Tippers with
disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket
capacity including cutting and loading in tippers, trimming bottom and side
slopes, in accordance with requirements of lines, grades and cross-sections,
and transporting to the embankment location with a lift upto 1.5 m and
lead upto 1000 m as per Technical Specification Clause 302.3

cum

49.78

cum

27.56

cum

36.30

cum

27.56

Construction of Embankment with Material Obtained from Roadway


Cutting
Construction of embankment with approved materials deposited at site from
roadway cutting and excavation from drain and foundation of other structures
graded and compacted to meet requirement of Tables 300.1 and 300.2 as per
Technical Specification Clause 301.5

3.4

Construction of Embankment with Material Obtained from Borrow Pits


Construction of embankment with approved material obtained from borrow pits with
a lift upto 1.5 m, transporting to site, spreading, grading to required slope and
compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m
as per Technical Specification Clause 301.5

3.5

(i)

(ii)

(iii)

3.6

3.7

3.8

Rate
(Rs.)
4

Excavation in Cutting in Soil by manual means with lead upto 50


m

Excavation in Marshy Soil


Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket
capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m
and lead upto 1000 m, trimming of bottom and side slopes in accordance with
requirements of lines, grades and cross- sections as per Technical Specification
Clause 302.3.6.
Removal of Unsuitable Soil with Disposal upto 1000 m
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m
lead but excluding compaction ground supporting embankment subgrade
replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as
per Technical Specification Clause 302.3.11
(i)
Excavation in ordinary Rock by manual means
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-13)

Item
No.
1

Description

Unit

3
cum

132.75

Excavation for roadway in ordinary rock by deploying a dozer D-50


including cutting and pushing the cut earth to site of embankment upto a
distance of 100 m (average lead 50 m), trimming bottom and side slopes in
accordance with the requirements of lines, grades and cross-sections with
lift upto 1.5 m.
Excavation in Ordinary Rock using Hydraulic Excavator and
Tippers with disposal upto 1000 m

cum

53.57

Excavation for roadway in ordinary rock with hydraulic excavator of 0.9


cum bucket capacity including cutting and loading in tippers, transporting
to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming
bottom and side slopes in accordance with requirements of lines, grades
and cross-sections as per Technical Specification Clause 302.3.5

cum

52.87

cum

161.86

cum
cum

525.89
267.35

Excavation for roadway in hard rock with controlled blasting by drilling,


blasting and breaking, trimming of bottom and side slopes in accordance
with requirements of lines, grades and cross-sections, loading and disposal
of cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical
Specification Clause 302.3.5
Stripping, Storing and Relaying Top Soil from Right-of-Way (R.O.W)

cum

316.57

Stripping, storing and preservation of top soil by keeping it damp in stock piles and
keep wet till it is used by road side at 15 m internal and re-application on
embankment slopes, cut slopes and other areas in localities where the available
embankment material is not conducive to plant growth as per Technical
Specification Clause 302.3.2
Stripping, Storing and Relaying Top Soil from Borrow Areas in Agricultural
Fields

cum

244.28

Excavation in ordinary rock using manual means including loading in a truck


and carrying of excavated material to embankment site with a lift upto 1.5
m and lead upto 50 m as per Technical Specification Clause 302.3.5.
(ii)

(iii)

3.9

(i)

(ii)

(iii)

3.10

3.11

Rate
(Rs.)
4

Excavation in Ordinary Rock with Dozer with lead upto 100 m

Excavation in Hard Rock (requiring blasting) with disposal upto


1000 m
Excavation for roadway in hard rock (requiring blasting) by drilling, blasting
and breaking, trimming of bottom and side slopes in accordance with
requirements of lines, grades and cross-sections, loading and disposal of
cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical
Specification Clause 302.3.5
Excavation in Hard Rock (blasting prohibited)
Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with a lift
upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross- sections as per
Technical Specification Clause 302.3.5
(A)
Manual Means
(B)
Mechanical Means
Excavation in Hard Rock (controlled blasting) with disposal upto
1000 m

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-14)

Item
No.
1

Description

Unit

Stripping of top soil from borrow areas located in agriculture fields, storing at a
suitable place, spreading and relaying after taking the borrow earth to maintain
fertility of the agricultural field, finishing it to the required levels to the satisfaction of
the farmer/land owner as per Technical Specification Clause 302.3.2.

cum

123.11

sqm

37.53

sqm

85.01

cum

132.33

cum

12.73

cum

40.95

sqm

1.10

sqm

270.31

cum

125.92

3.12

Turfing with Sods


Furnishing and laying of the live sods of perennial turf forming grass on embankment
slope, verges or other locations shown on the drawing or as directed by the
Engineer including preparation of ground, fetching of sods and watering as per
Technical Specification Clause 309.

3.13

Seeding and Mulching


Preparation of seed bed on previously laid top soil, furnishing and placing of seeds,
fertilizer, mulching material, applying bituminous emulsion @ 0.23 litre per sqm and
laying and fixing jute netting, including watering for 3 months all as per Technical
Specification Clause 310.
Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained
from borrow pits with all lifts and leads, transporting to site, spreading, grading to
required slope and compacted to meet requirement of Table 300.2 with lead upto
1000 m as per Technical Specification Clause 303.1.
Compacting Original Ground
(i)
Compacting original ground supporting embankment
Loosening, Levelling and Compacting original ground supporting
embankment to facilitate placement of first layer of embankment, scarified
to a depth of 150 mm, mixed with water at OMC and then compacted by
rolling so as to achieve minimum dry density as given in Tables 300.1 and
300.2 for embankment construction as per Technical Specification Clause
301.4.1.
(ii)
Compacting original ground supporting subgrade
Loosening of the ground upto a level of 300 mm below the subgrade level,
watered, graded and compacted in layers to meet requirement of Tables
300.1 and 300.2 for subgrade construction as per Technical Specification
Clause 303.5.2.
Repairs of damages caused by rain/spillage of water
Preparation and surface treatment of formation by removing mud and slurry,
watering to the extent needed to maintain the desired moisture content, trimming to
the required line, grade, profile and rolling with three wheel 80-100 kN static roller,
complete as per Technical Specification Clause 301.5.5.1
Presplitting Rock Excavation Slopes
Carrying out excavation in hard rock to achive a specified slope of the rock face by
controlled use of explosives and blasting accessories in properly aligned and spaced
drill holes, collection of the excavated rock by a D-50 dozer, loading in tipper by a
front end loader and disposing of the material with a lift upto 1.5 m and lead upto
1000 m as per Technical Specification Clause 304.3
Construction of Embankment with Flyash/Pond ash available from Coal or
Lignite Burning Thermal Plants as Waste Material

3.14

3.15

3.16

3.17

3.18

Construction of embankment with flyash conforming to Table 1 of IRC:SP:58


obtained from coal or lignite burning thermal power stations as waste material,
spread and compacted in layer of 200 mm thickness each at OMC, all as specified in
IRC:SP:58 and as per approved plans with lead upto 1000 m as per Technical
Specification Clause 306.
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
4

[SOR Summary](Page-15)

Item
No.
1
3.19

3.20

(i)

Rate
(Rs.)
4

Surface Drains in Soil


Construction of unlined surface drains of average cross-sectional area 0.40
sqm in soil to specified lines, grades, levels and dimensions. Excavated
material to be used in embankment with a lift upto 3m and lead of 50 m
(average lead 25 m) as per Technical Specification Clause 307.
m
m

45.51
11.99

m
m

68.27
27.13

(i)
For Grading I Material
(ii)
For Grading II Material
(iii)
For Grading III Material
Plant Mix Method
Construction of granular sub-base by providing well graded material,
mixing in a mechanical mix plant at OMC, carriage of mixed material to
work site upto lead of 1000 m spreading in uniform layers with motor
grader on prepared surface and compacting with smooth wheel roller to
achieve the desired density, complete as per Technical Specification Clause
401
(i)
For Grading I Material
(ii)
For Grading II Material
(iii)
For Grading III Material
Gravel/Soil-Aggregate Base (Table 400.2) Grading A

cum
cum
cum

564.20
538.27
446.13

cum
cum
cum

639.84
616.10
490.90

Construction of gravel/soil-aggregate base by providing well graded


material, spreading in uniform layers with motor grader on prepared
surface, mixing by mix in place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller to achieve the
desired density, complete as per Technical Specifications Clause 402

cum

625.34

Providing chute drains across embankment slopes in approches of bridges


and on horizontal curves as per drawings.

Chapter-4

GRANULAR SUB-BASES, BASES


(NON-BITUMINOUS) AND SHOULDERS

Granular Sub-base with Well Graded Material (Table 400.1)


(A)
By Mix in Place Method
Construction of granular sub-base by providing well graded material,
spreading in uniform layers with motor grader on prepared surface, mixing
by mix in place method with rotavator at OMC, and compacting with
smooth wheel roller to achieve the desired density, complete as per
Technical Specification Clause 401.

(B)

4.2

Unit

(A)
Manual Means
(B)
Mechanical Means
Surface Drains in Ordinary Rock
(ii)
Construction of unlined surface drain of average cross-sectional area 0.4
sqm in ordinary rock to specified lines, grades, levels and dimensions as per
approved design and Technical Specification Clause 307. Excavated
material to be used in embankment at site.
(A)
Manual Means
(B)
Mechanical Means
(iii)
Surface Drains in Hard Rock
Chute Drains
A.
Providing chute drains across embankment slopes in approches of bridges
and on horizontal curves as per drawings.
B.

4.1

Description

i)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-16)

Item
No.
1

Description

Unit

Gravel/Soil-Aggregate Base (Table 400.2) Grading B


Construction of granular sub-base by providing well graded material,
spreading in uniform layers with motor grader on prepared surface, mixing
by mix in place method with rotavator at OMC, and compacting with three
wheel 80-100 kN static roller capacity to achieve the desired density,
complete as per Technical Specification Clause 402
iii)
Gravel/Soil-Aggregate Base (Table 400.2) Grading C
Construction of granular sub-base by providing well graded material,
spreading in uniform layers with motor grader on prepared surface, mixing
by mix in place method with rotavator at OMC, and compacting with three
wheel 80-100 kN static roller capacity to achieve the desired density,
complete as per Technical Specification Clause 402
Gravel/Soil-Aggregate Surface Course (Table 400.3)
Construction of granular surface course by providing well graded material,
spreading in uniform layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting with three wheel 80-100 kN
static roller capacity to achieve the desired density, complete as per Technical
Specification Clause 402
ii)

4.3

4.4

Rate
(Rs.)
4

cum

601.40

cum

542.39

cum

325.29

cum
cum

148.92
160.22

cum

280.64

cum

727.17

cum
cum

995.91
894.61

Lime Stabilisation for Improving Subgrade


Laying and spreading available soil in the subgrade on a prepared surface,
pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime
having minimum 70 per cent of contents of CaO, grading with motor grader and
compacting with the smooth wheel road roller at OMC to the desired density to
form a layer of improved Sub-grade as per Technical Specification Cluase 403.

4.5

4.6

4.7

By Manual Means
(A)
(B)
By Mechanical Means
Lime Treated Soil for Sub-Base
Providing, laying and spreading soil on a prepared sub-grade, pulverising, mixing the
spread soil in place with rotavator with 4 per cent slaked lime with minimum content
of 70 per cent of CaO, grading with motor grader and compacting with the road
roller at OMC to achieve atleast 98 per cent of the max dry density to form a layer
of sub-base as per Technical Specification Clause 403.
Cement Treated Soil Sub-Base/Base
Providing, laying and spreading soil on a prepared sub-grade, pulverising, adding the
designed quantity of cement to the spread soil, mixing in place with rotavator,
grading with the motor grader and compacting with the road roller at OMC to
achieve the desired unconfined compressive strength and to form a layer of subbase/base as per Technical Specification Clause 404.
For 4 per cent quantity of cement by weight of soil
Water Bound Macadam Sub-base/base
1)
WBM Grading 1
Providing, laying, spreading and compacting stone aggregates of specific
sizes to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with three wheel 80-100 kN static roller in
stages to proper grade and camber, applying and brooming, stone
screening/binding materials to fill-up the interstices of coarse aggregate,
watering and compacting to the required density Grading 1 as per
Technical Specification Clause 404.
(A)
By Manual Means
(B)
By Mechanical Means
2)
WBM Grading 2
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-17)

Item
No.
1

4.8

4.9

Description

Unit

Providing, laying, spreading and compacting stone aggregates of specific


sizes to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with smooth wheel roller 80-100 kN in
stages to proper grade and camber, applying and brooming, stone
screening/binding materials to fill-up the interstices of coarse aggregate,
watering and compacting to the required density grading 2 as per Technical
Specification Clause 405.
(A)
By Manual Means
(B)
By Mechanical Means
WBM Grading 3
3)
Providing, laying, spreading and compacting stone aggregates of specific
sizes to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with smooth wheel roller 80-100 kN in
stages to proper grade and camber, applying and brooming, stone
screening to fill-up the interstices of coarse aggregate, watering and
compacting to the required density Grading 3 as per Technical Specification
Clause 405.
(A)
By Manual Means
By Mechanical Means
(B)
Water Bound Macadam with Crushable Screenings
1)
WBM Grading 1
Providing, laying, spreading and compacting stone aggregates of specific
sizes to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with three wheel 80-100 kN static roller in
stages to proper grade and camber, applying and brooming, crushable
screening to fill-up the interstices of coarse aggregate, watering and
compacting to the required density Grading 1 as per Technical Specification
Clause 405.
(A)
By Manual Means
(B)
By Mechanical Means
2)
WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific
sizes to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with three wheel 80-100 kN static roller in
stages to proper grade and camber, applying and brooming, crushable
screening to fill-up the interstices of coarse aggregate, watering and
compacting to the required density Grading 2 as per Technical Specification
Clause 405.
(A)
By Manual Means
(B)
By Mechanical Means
3)
WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific
sizes to water bound macadam specification including spreading in uniform
thickness, hand packing, rolling with three wheel 80-100 kN static roller in
stages to proper grade and camber, applying and brooming, crushable
screening to fill-up the interstices of coarse aggregate, watering and
compacting to the required density Grading 3 as per Technical Specification
Clause 405.
(A)
By Manual Means
(B)
By Mechanical Means
Wet Mix Macadam

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
4

cum
cum

900.83
799.53

cum
cum

1,011.97
910.67

cum
cum

910.30
809.00

cum
cum

815.76
714.46

cum
cum

924.66
823.36

[SOR Summary](Page-18)

Item
No.
1

4.10

4.12

4.13

4.14

4.15

4.16

Unit

Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the material with water at OMC in
mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in
uniform layers in sub-base/base course on a well prepared sub-base and compacting
with smooth wheel roller of 80 to 100kN weight to achieve the desired density
including lighting, barricading and maintenance of diversion, etc as per Tables
400.11 & 400.12 and Technical Specification Clause 406.
By Mechanical Means with 1 km lead
Construction of Shoulders as per Technical Specification Clause 407.
A.

Earthen Shoulders
The rate as applicable for sub-grade construction may be adopted.

B.

Hard Shoulders
Rate as applicable for sub-base and/or base may be adopted as per
approved design.
Paved Shoulders
The rates may be adopted as applicable for different layers of pavement
depending upon approved design of paved shoulders.

C.

4.11

Description

Granular sub-base/base/surface course with local materials (Table


(i)
Using naturally occuring gravel
(ii)
Using Gravel mix soil using
Construction of Water Bound Macadam using locally available material
Providing, laying spreading and compacting local material in block or large discrete
particles, such as kankar, Laterite, Dhandla etc. as per Table 400.13 to water bound
macadam specification including spreading in uniform thickness, hand packing,
rolling with three wheel 80-100 kN static roller in stages to proper grade and
camber, applying and brooming requisite type of screening /binding materials to fillup the interstices of laid material watering and compacting to the required density as
per Clause 405.3 and Technical Specification Cluase 408.
Lime-Flyash Stablised Soil Sub-base
Construction of sub-base using lime-flyash admixture with granular soil, free from
organic matter/deleterious material or clayey silts and low plasticity clays having PI
between 5 and 20 and liquid limit less than 25 and commercial dry lime, slaked at
site or pre-slaked with CaO content not less than 50 per cent, flyash to conform to
gradation as per Clause 4.3 of IRC:SP:20, lime+flyash content ranging between 10
to 30 per cent, the minimum un-confined compressive strength and CBR value after
28-days curing and 4-days soaking to be 0.75 MPa and 25 per cent respectively, all
as specified in IRC:88 including a lead upto 1000 m as per Technical Specification
Cluase 409.
Construction of Sub-base/Course Using Crushed Slag as per Table 400.19
Construction of Sub-base by providing crushed slag spreading in uniform layer with
motor grader on prepared surface mixing by mix-in-place method with Rotavator @
OMC, and compacting with three wheel 80-100 kN static roller to achieve the
desired density complete as per Technical Specifications Cluase 402.4 and 410.3.2
Water Bound Macadam using crushed slag
Providing, laying, spreading and compacting crushed slag to water Bound Macadam
specification including spreading in uniform thickness, hand packing rolling with
smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and
brooming requisite type of screening/binding materials to fill up the interstees of
crushed slag watering and compacting to the required density as per Clause 405.3
and Technical Specification Cluase 410.3.2.
Cement Bound Granular Material sub-base/base
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
4

cum

785.65

cum
cum

413.04
411.52

cum

418.80

cum

275.16

cum

597.52

cum

496.91

[SOR Summary](Page-19)

Item
No.
1

4.17

Description

Unit

Providing laying and spreading granulated blast furnace slag on a prepared subgrade pulverising adding the designed quantitity of cement to the spread granulated
blast furnace slag mixing in place with rotavator grading with the mortar grader and
compacting with smooth wheel roller 80-100 kN at OMC to achieve the desired
unconfined compressive strength and to form a layer of sub-base/base as per
Technical Specification Clauses 404.3 and 410.4.2.
Crusher Run Macadam Base
Providing crushed run stone aggregate greading conforming to table 400.20
depositing on a prepared surface by hauling vehicles, spreading and mixing with a
motor grader, watering and compacting with a three wheel 80-100 kN static roller
as per Technical Specification Clause 411 to form a layer of sub-base/base

cum

704.83

cum
cum

691.70
796.68

cum
cum

843.64
890.80

sqm

364.97

sqm

3,314.02

sqm

33.78

sqm

41.58

sqm

53.33

By mix-in-place method
(i)
With 53 mm maximum size of aggregates
(ii)
With 37.5 mm maximum size of aggregates
B)
By mixing plant method
(i)
With 53 mm maximum size of aggregates
(ii)
With 37.5 mm maximum size of aggregates
Brick Soling
Laying brick soling layer on prepared sub-grade with brick on end edging according
to lines, graded and cross-section shown on the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing
the same with three wheel road roller 80-100 kN as per Technical Specification
Clause 412
A)

4.18

4.19

Stone Set Pavement


Providing and laying stone set pavement on prepared surface with sub-base 100 mm
thick compacted Granular Sub-base as per Clause 401.4 and base 75 mm thick
compacted water bound macadam grading 2 as per Clause 405.3. The 150 mm
thick hammer desired stones are laid in the herring one or stretched bond pattern.
The stones are compacted into the bedding sand of 40 mm over the WBM base
bounded by edge stone using suitable compacting device. The gaps are filled with
fine sand stone dust as per Technical Specification Clause 413.4

Chapter-5
5.1

5.2

Rate
(Rs.)
4

BASES AND SURFACE COURSES (BITUMINOUS)

Prime Coat
(i)
Low porosity
Providing and applying primer coat with bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as
per Technical Specification Clause 502
(ii)

Medium porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as
per Technical Specification Clause 502.

(iii)

High porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as
per Technical Specification Clause 502.

Tack Coat
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-20)

Item
No.
1

Description

Unit

(i)

Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared
bituminous surface cleaned with Hydraulic broom as per Technical
Specification Clause 503.

sqm

10.41

(ii)

Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared
dry and hungry bituminous surface cleaned with Hydraulic broom as per
Technical Specification Clause 503.

sqm

12.53

(iii)

Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared
granular surfaces treated with primer & cleaned with Hydraulic broom as
per Technical Specification Clause 503.

sqm

12.53

Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the
prepared non-bituminous surfaces (cement concrete pavement) cleaned
with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed
aggregates of grading as per Table 500.4 premixed with bituminous binder,
transported to site upto a lead of 1000 m laid over a previously prepared surface
with paver finisher to the required grade, level and alignment and rolled to achieve
the desired compaction as per Technical Specification Clause 504.
Built-Up Spray Grout
Providing, laying and rolling of built-up spray grout layer over prepared base
consisting of a two layer composite construction of crushed coarse aggregates using
motor grader for aggregates. Key stone chips spreader may be used with application
of bituminous binder after each layer, and with key aggregates placed on top of the
second layer to serve as a base, conforming to the line, grades and cross-section
specified, the compacted layer thickness being 75 mm as per Technical Specification
Clause 505.
By Manual Means
(A)
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(B)
By Mechanical Means
Modified Penetration Macadam
Construction of penetration macadam over prepared base by providing a layer of
compacted crushed coarse aggregate using chips spreader with alternate
applications of bituminous binder and key aggregates and rolling with a three wheel
80-100 kN static roller to achieve the desired degree of compaction as per Technical
Specification Clause 506.
(A)
50 mm thick
(I)
Bitumen (S-90)
(B)
75 mm thick
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
Surface Dressing using Bituminous (Penetrations grade / modified
Providing and laying surface dressing as wearing course consisting of a layer of
bituminous binder laid on the prepared surface, followed by a cover of crushed stone
aggregates of specified size and rolling with three wheel 80-100 kN static roller
including cleaning the road surface as per Technical Specification Clause 507.

sqm

14.66

cum

5,285.64

sqm
sqm
sqm

243.75
245.17
211.86

sqm

125.12

sqm
sqm

148.04
148.99

(iv)

5.3

5.4

5.5

5.6

Rate
(Rs.)
4

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-21)

Item
No.
1

Description

Unit

(A)

5.7

By Manual Means
Case I: Nominal chipping size 13.2 mm
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case II: Nominal chipping size 9.5 mm
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
(B)
By Mechanical Means
Case I: Nominal chipping size 13.2 mm
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case II: Nominal chipping size 9.5 mm
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Surface Dressing using Bitumen Emulsion
Providing and laying surface dressing as wearing course consisting of a layer of
bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone
chippings of specified size and rolling with 80-100 kN roller including cleaning the
road surface as per Technical Specification Clause 507.

Rate
(Rs.)
4

(A)

5.8

5.9

By Manual Means
Case I: Nominal aggregate size 13.2 mm
Case II: Nominal chipping size 9.5 mm
(B)
By Mechanical Means
Case I: Nominal chipping size 13.2 mm
Case II: Nominal chipping size 9.5 mm
Pre-coating Chips
Pre-coating of chips with 1 per cent of paving bitumen by weight of chips in a
suitable mixer duly heated to 160 degree C as per Technical Specification Clause
507.2.5
(I)
Bitumen (S-90)
Bitumen (S-65)
(II)
20mm thick Open-Graded Premix Carpet using Bituminous (penetration
grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness
composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen
or emulsion to required line, grade and level to serve as wearing course on a
previously prepared base, including mixing in a suitable plant, laying and rolling with
a three wheel 80-100 kN static roller capacity, finished to required level and grades
to be followed by seal coat of either Type A or Type B or Type C as per Technical
Specification Clause 508.
Case - I By Manual Means
(I)
Bitumen (S-90)
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

sqm
sqm
sqm
sqm
sqm

74.24
74.72
79.00
79.00
79.89

sqm
sqm
sqm
sqm
sqm

65.13
65.56
69.40
69.41
70.21

sqm
sqm
sqm
sqm
sqm

61.69
62.16
66.45
66.45
67.34

sqm
sqm
sqm
sqm
sqm

54.39
54.82
58.68
58.68
59.48

sqm
sqm

86.36
77.98

sqm
sqm

72.43
67.09

cum
cum

1,184.72
1,192.32

sqm

114.29

[SOR Summary](Page-22)

Item
No.
1

5.10
5.11

5.12

Description

Unit

(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case - II By Mechanical Means
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per
Technical Specification Clause 508.2

sqm
sqm
sqm
sqm

114.99
121.24
121.22
122.52

sqm
sqm
sqm
sqm
sqm
sqm

108.78
109.47
115.72
115.72
117.02
113.54

sqm
sqm
sqm
sqm
sqm

153.11
154.15
163.58
163.58
165.53

sqm
sqm
sqm
sqm
sqm

138.07
138.97
147.12
147.12
148.80

sqm
sqm
sqm
sqm
sqm

138.79
139.83
149.26
149.26
151.22

sqm
sqm
sqm
sqm
sqm

123.78
124.66
132.80
132.80
134.49

sqm
sqm
sqm

60.01
60.47
64.67

Mix Seal Surfacing


Providing, laying and rolling of close-graded premix surfacing material of 20 mm
thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (TypeB) aggregates using penetration grade bitumen to required line, grade and level to
serve as wearing course on a previously prepared base, including mixing in a
suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing
to required level and grades as per Technical Specification Clause 509
By Manual Means
Type A
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Type B
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
By Mechanical Means
Type A
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Type B
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type A, Type B and Type C as per
Technical Specification Clause 510
By Manual Means
A.
Case - I : Type A
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
4

[SOR Summary](Page-23)

Item
No.
1

5.13

Description

Unit

(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case - II : Type B
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case - III : Type C
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
B.
By Mechanical Means
Case - I : Type A
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Bitumen pressure distributor
(V)
Natural Rubber Modified Bitumen
Case - II : Type B
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Case - III : Type C
(I)
Bitumen (S-90)
(II)
Bitumen (S-65)
(III)
Polymer Modified Bitumen
(IV)
Crumb Rubber Modified Bitumen
(V)
Natural Rubber Modified Bitumen
Supply of Stone Aggregates for Pavement Courses
Supply of stone aggregates from approved sources conforming to the physical
requirement, specified in the respective clauses, including royalties, fees rents,
collection, transportation, stacking and testing and measured in cum as per Clause
511.5.

sqm
sqm

64.67
65.54

sqm
sqm
sqm
sqm
sqm

43.34
43.66
46.58
46.58
47.18

sqm
sqm
sqm
sqm
sqm

43.34
43.65
46.44
46.44
47.01

sqm
sqm
sqm
sqm
sqm

57.45
57.91
62.11
62.11
62.98

sqm
sqm
sqm
sqm
sqm

42.19
42.52
45.43
45.43
46.04

sqm
sqm
sqm
sqm
sqm

40.91
41.22
44.01
44.01
44.59

Note:

Chapter-6

6.1
6.2
6.3

cum

Competitive market rates to be ascertained. Alternatively, rates


for stone crushing given in Chapter 1 may be adopted, if found
economical. In case for supply of aggregates at site are not
available, nearest crusher site may be ascertained. Loading and
unloading charges and cost of carriage may be added to these
rates to arrive at the cost at site.

CEMENT CONCRETE PAVEMENT

Granual Sub-base
Rate as per item No.4.1 of Chapter 4
Lime Treated Soil
Rate as per item No.4.5 of Chapter 4
Water Bound Macadam (WBM) - Sub-base
(A)
By Manual Means
As per item No.4.7 of Chapter 4
(B)
By Mechnical Means

PMGSY SOR 13-14

Rate
(Rs.)
4

PanchayatR B Circle-2,Rajkot

564.20
280.64
995.91

[SOR Summary](Page-24)

Item
No.
1
6.4

Description

Unit

As per item No.4.7 of Chapter 4


Cement Concrete Pavement
Construction of un-reinforced, dowel jointed at expansion and construction joint
only, plain cement concrete pavement, thickness as per design, over a prepared sub
base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade),
coarse and fine aggregates conforming to IS:383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum
capacity and appropriate weigh batcher using approved mix design, laid in approved
fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene
film, wedges, steel plates including levelling the formwork as per drawing),
spreading the concrete with shovels, rakes, compacted using needle, screed and
plate vibrators and finished in continuous operation including provision of contraction
and expansion, construction joints, applying debonding strips, primer, sealant, dowel
bars, near approaches to bridge/culvert and construction joints, admixtures as
approved, curing of concrete slabs for 14-days,
using curing compound (where specified) and water finishing to lines and grade as
per drawing and Technical Specification Clause 1501

Rate
(Rs.)
4
894.61

cum

6,219.67

cum

5,389.40

sqm

540.06

6.5

Roller Compacted Concrete Pavement


Construction of Roller Compacted Concrete Pavement (RCCP) with coarse and fine
aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25
mm with minimum aggregate cement ratio of 5:1 mm and with minimum cemnt
content of 310 kg per cum, aggregate gradation to be as per Table 602.2 after
blending, mixing in concrete mixer at optimum moisture content, transporting to
site, laying with wheel barrows or steel pans or with mechanical paver, compacting
with 80-100 kN smooth wheel, tandem vibratory roller, to achieve, the designed
flexural strength, finishing and curing as per drawings and Technical Specification
Clause 1502

6.6

Rectangular Concrete Block Pavement


Manufacturing, laying of cement concrete blocks of size 0.450 m x 0.300 m x 0.15 m
of Cement Concrete (C.C.) M30 garde and spreading 25 mm thick sand under neath
and filling joints with sand on existing W.B.M. base as per Technical Specification
Clause 1503.

6.7

Interlocking Concrete Block Pavement


Providing and Laying of Interlocking Concrete Block Pavements having
(1)
thickness 80 mm as per drawings and Technical Specification Clause 1504.

sqm

374.88

(2)

sqm

260.83

cum

182.05

cum

3,732.80

cum

4,173.88

cum

2,722.19

Providing and Laying of Interlocking Concrete Blcok Pavements having


thickness 60 mm as per drawing and Technical Specification Clause 1504

Chapter-7

7.1

CAUSEWAY AND SUBMERSIBLE BRIDGES

Construction of Cut-off Walls/Head Walls


(i)
Earthwork in excavation for structures as per drawing and
technical specification Clause 305.
(ii)
(iii)
(iv)

Rate as per item No.11.1 of Chapter 11


Plain cement concrete M15 grade
Rate as per item No.11.4 (ii) of Chapter 11
Brick masonry in cement mortar 1:4
Rate as per item No.11.5 (ii) of Chapter 11
Stone masonry in cement mortar 1:4
Rate as per item No.11.6 (ii) of Chapter 11

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-25)

Item
No.
1
(v)
7.2
7.3
7.4
7.5
7.6

7.8

7.9

7.10

8.2

8.3

Rate
(Rs.)
4

Providing P.C.C M20 architectural coping on top of wall


m

268.47

cum

12.73

cum

564.20

cum

995.91

cum

6,219.67

cum

524.62

Rate as per item No.14.2 of Chapter 14


Providing and Laying of Apron with Cement Concrete Blocks as per
Drawing and Technical Specification Clause 1301

cum

1,633.89

Rate as per item No.14.3 of Chapter 14


Guide Posts
Construction of R.C.C. guide posts of 250 mm dia, M25 grade as per drawing and
technical specification Clause 1401.6

cum

3,807.46

Rate as per item No.8.8 of Chapter 8


Bedding for Causeway
(i)
Type A (concrete cradle) Bedding Clause 1402.5
As per item No.9.2 of Chapter 9
(ii)
Type B (first class) Bedding Clause 1402.5
As per item No.9.2 of Chapter 9
Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical
specification Clause 1402.6

cum

0.00

cum

3,732.80

cum

516.45

As per item No.9.3 of Chapter 9


Laying Reinforced Cement Concrete Pipe NP4 as per technical specification
Clause 1402.6

4,892.57

As per item No.9.4 of Chapter 9

8,728.82

each

4,199.35

Chapter-8

8.1

Unit

Rate as per item No.12.13 of Chapter 12


Preparation of Subgrade
Rate as per item No.3.15 of Chapter 3
Granular Sub-base
Rate as per item No.4.1 of Chapter 4
W.B.M. Base Course
Rate as per item No.4.7 of Chapter 4
Cement Concrete Slab
Rate as per item No.6.4 of Chapter 6
(i)
Providing and Laying Apron with Stone Boulders as per Drawings
& Technical Specification Clause 1301
Rate as per item No.14.1 of Chapter 14
(ii)
Providing and Laying of Boulder Apron Laid in Wire Crates as per
Drawing and Technnical Specification Clause 1301
(iii)

7.7

Description

HILL ROADS

Site Clearance
As per Chapter-2
Setting Out
(1)
Construction of reference pillars (burjee) @ 20 m on both sides as per Fig.
1600.1 (b) and @ 8.33 m interval on curves
(2)

Construction of back pillars in front of each reference pillar as per Fig.


1600.1 (c )

each

17,053.02

(3)

Construction of job pillars as per Fig. 1600.1 (d)

each

422.35

cum

113.78

Earthwork in Hill Road


(i)
Excavation in Hilly Areas in Soil by manual means.
A)
Excavation in soil in Hilly Area by manual means including cutting
and trimming of side slopes and disposing of excavated earth with
a lift upto 1.5 m and a lead upto 20 m as per drawing and
Technical Specification Clause 1603.1

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-26)

Item
No.
1
B)
(ii)

(iv)

(v)

8.4

Unit

Extra for Every Additional Lift of 1.5 m or Part thereof

Excavation in Hilly Areas in Soil by mechanical means


A)
Excavation in soil in Hilly Area by mechanical means including
cutting and trimming of side slopes and disposing of excavated
earth with a lift upto 1.5 m and a lead upto 20 m as per Technical
Specification Clause 1603.1
B)

(iii)

Description

Extra for Every Additional Lift of 1.5 m or Part thereof

cum

12.03

cum

91.86

cum

12.03

Excavation in Hilly Area in Ordinary Rock by manual means


A)

Excavation in ordinary rock using manual means including loading


in a truck and carrying of excavated material to embankment site
with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.

cum

250.32

B)

Extra for Every Additional Lift of 1.5 m or Part thereof

cum

18.82

cum

157.10

Excavation in Hilly Areas in Ordinary Rock by mechanical means


not requiring blasting
Excavation in hilly area in ordinary rock not requiring blasting by
mechanical means including cutting and trimming of slopes and disposal of
cut material with a lift upto 1.5 m and lead upto 20 m as per Clause
1603.2.
Excavation in Hilly Areas in Hard Rock requiring blasting
A)

Excavation in hilly areas in hard rock requiring blasting, by


mechanical means, lift upto 1.5 m and disposal of excavated rock
upto a lead of 20 m as per Clause 1603.2.

cum

307.39

B)

Extra for Every Additional Lift of 1.5 m or Part thereof

cum

23.63

cum

202.28

cum

3,611.23

cum

2,584.41

sqm

42.97

Retaining Walls / Breast Walls


Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and
technical specifications Clause 1604
(i)
(ii)
(iii)
(iv)
(v)

(vi)

Earthwork in excavation for structures


Rate as per item No.11.1 of Chapter 11
Plain cement concrete M 10 grade
Rate as per item No.11.4 of Chapter 11
Stone masonry in cement mortar 1:5
Rate as per item No. 12.4 (III) (iii) of Chapter 12
Pointing with cement mortar 1:3
Rate as per item No.12.2 of Chapter 12
Providing P.C.C. M 20 architectural coping on top of retaining
wall/breast wall
Rate as per item No.12.13 of Chapter 12
Filter material behind retaining wall / breast wall as per
Specification 1204.3.8 in a width of 600 m

Rate as per item No. 12.11 of Chapter 12


cum
Back filling behind retaining wall/breast wall
Rate as per item No. 12.10 of Chapter 12
cum
Construction of Hill Side Drain
Construction of hill side drain in accordance with the requirement of specifications Running m
true to lines and grades. Dimesions and other particulars as per drawing and
Technical Specification Clause 1606.1
(vii)

8.5

Rate
(Rs.)
4

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

268.47

1,520.22
506.32
0.00

[SOR Summary](Page-27)

Item
No.
1

Note:
8.6

Description

Unit

Please ensure that quantities of various items are entered in the


Rate Analysis

Construction of Catch Water / Intercepting Drain


Construction of catch water/intercepting drain in random rubble masonry in 1:5 Running m
cement mortar true to the specified lines grades levels and dimensions as per the
requirement of the specifications Clause 1606.2

Note:

Construction of Scupper
Construction of scupper with dry stone masonry as per drawing and technical Running m
specifications as per Clause 1606.5.

8.8

Construction of RCC guide posts of 250 mm dia M15 grade cast-in-situ with 20 mm
nominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to
exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2
Earth work in excavation for structures
Rates as per item No. 11.1 of Chapter 11
(ii)
RCC M15 grade
Rate as per item No. 11.4 of Chapter 11
(iii)
HYSD steel bars
Rate as per item No. 12.6 of Chapter 12
Painting two coats including prime coat on new concrete surface
(iv)
Rate as per item No.10.5 of Chapter 10
Providing edge stones on valley side of formation as per drawing and Technical
Specification Clause 1608.2.6
(i)

8.10

Turfing with Sods


Furnishing and laying of the live sods of perennial turf forming grass on embankment
slope, verges or other locations shown on the drawing or as directed by the Engineer
including preparation of ground, stacking the sods and watering as per Clause 309

8.11

Seeding and Mulching


Preparation of seed bed on previously laid top soil, furnishing and placing of seeds,
fertilizer, multching material, applying bituminous emulsion at the rate of 0.23 l per
sqm and laying and fixing jute netting, including watering for 3 months all as per
Clause 310.

Chapter-9

9.1

9.2

Please ensure that quantities of various items are entered in the


Rate Analysis

8.7

8.9

Rate
(Rs.)
4

3,489.33

cum

182.05

cum

3,732.80

54,567.69

sqm
m

73.91
229.53

sqm

30.89

sqm

88.83

cum

182.05

cum

3,732.80

PIPE CULVERTS

Excavation for Structures


Earthwork in excavation for foundation of structures upto 3 m depth as per drawing
and technical specification Clause 1104 includding setting out, construction of
shoring and bracing, removal of stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved material.
Rate as per item No.11.1 of Chapter 11
Bedding for Pipe
(i)
Type A (Concrete Cradle) Bedding
Laying concrete cradle bedding with M15 Grade Cement Concrete as per
Clause 1105 (i)
(ii)

Rate as per Item No.11.4 (II)(i) of Chapter 11


Type B (First Class) Bedding

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-28)

Item
No.
1

Description

Unit

Rate
(Rs.)
4

Laying (First Class) bedding on well compacted sand, moorum or approved


granular material as per Clause 1105 (ii)
9.3

Rate as per Item No.11.2 of Chapter 11


Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design
in Single Row

cum

516.45

Providing and laying reinforced cement concrete pipe NP3 for culverts on first class
bedding of granular material in single row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets Clause 1106.

9.4

9.5

9.6

(A)
1200 mm dia
(B)
1000 mm dia
(C)
750 mm dia
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design
in Single Row

m
m
m

4,892.57
4,518.86
2,454.93

m
m
m

8,728.82
7,119.53
4,529.23

m
m
m

9,828.61
9,065.34
4,909.78

(A)
1200 mm dia
(B)
1000 mm dia
(C)
750 mm dia
Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of
granular material including fixing collar with cement sand mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonary work in head wall
and parapets

m
m
m

17,501.11
14,266.69
9,058.37

500 mm dia
Laying Cement Concrete Pipe NP4 (burried conduits) on first class bedding of
granular material including fixing collar with cement sand mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonary work in head wall
and parapets

1,157.05

500 mm dia

3,103.30

Providing and laying reinforced cement concrete pipe NP4 for culverts on first class
bedding of granular material in single row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets Clause 1106.
(A)
1200 mm dia
(B)
1000 mm dia
(C)
750 mm dia
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design
in Double Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class
bedding of granular material in double row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets as per Clause 1106.
(A)
1200 mm dia
(B)
1000 mm dia
(C)
750 mm dia
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per Design
in Double Row
Providing and laying reinforced cement concrete pipe NP4 for culverts on first class
bedding of granular material in double row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets as per Clause 1106.

9.7

9.8

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-29)

Item
No.
1
9.9

9.10

Description

Unit

Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open
foundation of Head walls as per drawings & Technical Specification Clause 1109
Rate as per item No.11.4 of Chapter 11
Brick Masonry Work in cement mortar in foundation of Head walls complete
exculding pointing and plastering as per drawing and technical specification Clause
1109
(A)

9.11

Brick Masonry in 1:4 cement mortar


Rate as per item No.11.5 (ii) Chapter 11
(B)
Brick Masonry in cement-lime mortar (1:0.5:4.5)
Rate as per item No.11.5 (iii) Chapter 11
Stone Masonry Work in cement mortar in foundation of Head walls complete as per
drawing and technical specification Clasue 1109
In 1:4 cement mortar
Rate as per item No.11.6 (II) (ii) Chapter 11
(B)
In cement-lime mortar (1:0.5:4.5)
Rate as per item No.11.6 (II) (iii) Chapter 11
Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause
613.3
(A)

9.12

Rate
(Rs.)
4

cum

3,608.79

cum

4,173.88

cum

4,375.17

cum

2,454.05

cum

2,730.82

9.13

Rate as per item No.12.2 of Chapter 12


Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as
per technical specification

sqm

429.71

9.14

Rate as per item No.12.3 of Chapter 12


Backfilling in Foundation Trenches as per drawing and technical specification Clause
1108

sqm

128.57

9.15

Rate as per Item No.11.2 of Chapter 11


Providing PCC M20 Architectural Coping on the top of wing wall, return wall etc.
complete as per drawing and technical specification Clause 615

sqm

516.45

268.47

Rate as per Item No.12.13 of Chapter 12

Chapter-10
10.1

TRAFFIC SIGNS, MARKINGS AND OTHER ROAD


APPURTENANCES

Printing New Letters and Figures of any Shade


Printing new letter and figures of any shade with synthetic enamel paint black or any
other approved colour to give an even shade as per drawings and Technical
Specification Clause 1701
Hindi (Matras commas and the like not to be measured and paid
per cm
for. Half letters shall be counted as half only)
height per
letter
English and Roman
ii)
per cm
height per
letter
Traffic Signs
A.
Retro-reflectorised Traffic Signs
i)

10.2

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

0.54
0.33

[SOR Summary](Page-30)

Item
No.
1

B.

Unit

(1)

Providing and fixing of retro-reflectorised cautionary, mandatory


and informatory sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3 fixed over aluminium
sheeting, 1.5 mm thick supported on a mild steel angle iron post
75 mm x 75 mm x 6 mm firmly fixed to the ground by means of
properly designed foundation with M15 grade cement concrete
450 mm x 450 mm x 600 mm, 600 mm below ground level as per
drawings and Technical Specification Clause 801

Note:

Please ensure that area of aluminium plate of required size is


entered in the analysis item

(2)

Providing and fixing of retro-reflectorised cautionary, mandatory


and informatory sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 1.5 mm thick supported on GI pipe 50 mm
dia firmly fixed to the ground by means of properly designed
foundation with M-15 grade cement concrete 450 mm x 450 mm x
600 mm, 600 mm below ground level as per drawings and
Technical Specification Clause 1701

Note:

Please ensure that area of aluminium plate of required size is


entered in the analysis item

(3)

Providing and fixing of retro-reflectorised cautionary, mandatory


and informatory sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 1.5 mm thick supported on RCC Post 100
mm x 100 mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 450 mm x
450 mm x 600 mm, 600 mm below ground level as per approved
drawing Clause 1701

Note:

Please ensure that area of aluminium plate of required size is


entered in the analysis item

Semi Reflective Traffic Signs


Providing and fixing of semi reflective cautionary, mandatory and
informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly
stove white colour in front and gray colour on back with red reflective
border of 65 mm width and required letters and figures with reflective tape
engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of
required shade and colour supported and welded on 47mm x 47 mm x 12
SWG sheet tube firmly fixed to the ground by mean of properly designed
foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm
below ground level as per approved drawing Clause 1701.2.2

Note:
10.3

Description

Rate
(Rs.)
4

each

1,256.56

each

1,960.91

each

1,283.02

each

1,765.11

Please ensure that area of MS Sheet of required size is entered in


the analysis item

Direction and Place Identification signs upto 0.9 sqm size board
A.

Retro-reflectorised Traffic Signs

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-31)

Item
No.
1

Description

Unit

Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on a mild steel single angle iron post 75 x 75 x 6 mm
firmly fixed to the ground by means of properly designed
foundation with M-15 grade cement concrete 450 x 450 x 600
mm, 600 mm below ground level as per approved drawing and
Technical Specification Clause 1701
(ii)
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on 2 inch dia GI Pipe firmly fixed to the ground by
means of properly designed foundation with M-15 grade cement
concrete 450 x 450 x 600 mm, 600 mm below ground level as per
approved drawing and Tehnical Specification Clause 1701.
(iii)
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on RCC Post 100 mm x 100 mm firmly fixed to the
ground by means of properly designed foundation with M-15
grade cement concrete 450 x 450 x 600 mm, 600 mm below
ground level as per approved drawing and Technical Specification
Clause 1701
Semi-Reflective Traffic signs
Direction and place indentification signs up to 0.9 sqm size board

sqm

6,305.48

sqm

5,816.84

sqm

4,944.56

Providing and erecting direction and place identifications of semi reflective


sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove
enameled paint in white colour in front and grey colour on back with red
reflective border of 70 mm width and required message, letters, figures
with reflective engineering grade tape as per MORD specifications of
required shade and colour. Supported and welded on 47 mm x 47mm of
12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5
mm M/s flat iron on edges on back firmly fixed to the ground by means of
properly designed foundations with M-15 grade cement concrete 450 mm x
450 mm x 600 mm, 600 mm below ground level as per approved drawing
and Technical Specification Clause 1701
Direction and Place Identification signs with size more than 0.9 sqm size
board
A.
Retro-reflectorised Traffic Signs
(i)
Providing and erecting direction and place identification retro\reflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9 sqm supported on
mild steel angle iron posts 75 mm x 75 mm x 6 mm, 2 Nos. firmly
fixed to the ground by means of properly designed foundation
with M-15 grade cement concrete 450 mm x 450 mm x 600 mm,
600 mm below ground level as per approved drawing and
Technical Specification Clause 1701

sqm

30,415.05

sqm

6,704.74

(i)

B.

10.4

Rate
(Rs.)
4

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-32)

Item
No.
1
(ii)

(iii)

B.

10.5

Description

Unit

Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9 sqm supported on
dia GI Pipe firmly fixed to the ground by means of properly
designed foundation with M-15 grade cement concrete 450 mm x
450 mm x 600 mm, 600 mm below ground level as per approved
drawing and Technical Specification Clause 1701
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9 sqm supported on
RCC Posts 100 mm x 100 mm firmly fixed to the ground by means
of properly designed foundation with M 15 grade cement concrete
450 mm x 450 mm x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification Clause 1701

sqm

6,925.10

sqm

5,101.53

sqm

3,419.53

sqm

73.91

sqm

64.36

sqm

98.45

sqm

82.39

Semi-Reflective Traffic signs


Direction and place identification signs more than 0.90 sqm sign
board

Providing and erecting direction and place identification of semi reflective


sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove
enameled paint white colour in front and grey colour on back with reflective
border of 70 mm width and required message, letters, figures with
reflective tape of engineering grade as per MORD specifications of required
shade and colour. Supported and welded on two nos. 47 mm x 47 mm of
12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5
mm MS flat iron on edges on back firmly fixed to the ground by means of
properly designed foundations with M-15 grade cement concrete 450 mm x
450 mm x 600 mm, 600 mm below ground level as per approved drawing
and Technical Specification Clause 1701
Painting Two Coats on New Concrete Surfaces
Painting two coats including primer coat after filling the surface with synthetic
enamel paint in all shades on new, plastered / concrete surfaces as per drawing and
Technical Specification Clause 1701

10.6

Painting on Steel Surfaces


Providing and applying two coats of ready mix paint including primer coat of
approved brand on steel surface after through cleaning of surface to give an even
shade as per drawing and Technical Specification Clause 1701

10.7

Painting on Concrete/Steel Surfaces with Epoxy


Painting two coats including prime coat with epoxy paint of approved brand on
concrete/steel surfaces after through cleaning of surface to give an even shade as
per drawing and Technical Specification Clause 1701

10.8

Painting lines, Dashes, Arrows, etc. on Road in Two Coats on New Work
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready
mixed road marking paint conforming to IS:164 on bituminous/concrete surface,
including cleaning the surface of all dirt, dust and other foreign matter, demarcation
at site and traffic control as per drawing and Technical Specification Clause 1702

10.9

Rate
(Rs.)
4

Painting lines, Dashes, Arrows, etc. on Roads in Two Coats on Old Work
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-33)

Item
No.
1

10.10

10.11

10.12

10.13

10.14

10.15

Description

Unit

Painting lines, dashes, arrows, etc. on roads in two coats on old work with ready
mixed road marking paint conforming to IS:164 on bituminous/concrete surface,
including cleaning the surface of all dirt, dust and other foreign matter, demarcation
at site and traffic control as per drawing and technical specification Clause 1702

sqm

56.17

each
each
each

2,669.94
1,602.29
445.91

each

376.04

Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone/local stone of standard
design as per IRC:8 fixing in position including painting and printing, etc as per
drawing and Technical Specification Clause 1703
i)
5th Kilometre Stone (precast)
Ordinary Kilometer Stone (Precast)
ii)
200 m stone (precast)
iii)
Boundary Pillar
Reinforced cement concrete M15 grade boundary pillars/local stone of standard
design as per IRC:25, fixed in position including finishing and lettering but excluding
painting as per drawing and Technical Specification Clause 1704

G.I Barbed Wire Fencing 1.2 m high


Providing and fixing 1.2 m high GI barbed wire fencing with 1.8 m RCC posts 150 Running m
mm x 150 mm placed every 3 m centre-to-centre founded in M15 grade cement
concrete, 0.6 m below ground level, every 15th post, last but one end post and
corner post shall be strutted on both sides and end post on one side only and
provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires,
fixed with GI staples, turn buckles etc. complete as per Clause 1705.
G.I Barbed Wire Fencing 1.8 m high
Providing and fixing 1.8 m high GI barbed wire fencing with 2.4 m RCC M15 grade Running m
150 mm x 150 mm concrete post placed every 3 m centre-to-centre founded in M15
grade cement concrete, 0.6 m below ground level, every 15th post, last but one end
post and corner post shall be strutted on both sides and end post on one side only
and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal
wires, fixed with GI staples, turn buckles etc. complete as per Clause 1705.
Tubular Steel Railing on Medium Weight Steel Channel (ISMC series) 100
mm x 50 mm
Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on Running m
medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 m high above
ground, 2 m centre-to-centre, complete as per approved drawings Clause 1706

361.32

485.20

2,044.93

Tubular Steel Railing on Precast RCC posts, 1.2 m high above Ground Level
Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on Running m
precast M-20 grade RCC vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m
above Gl) with 3 holes 50 mm dia for pipe, fixed 2 m centre-to- centre complete as
per approved drawings Clause 1706

10.16

Rate
(Rs.)
4

1,596.83

Providing and Fixing 'Logo' of PMGSY Project

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-34)

Item
No.
1

10.17

Description

Unit

Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD
specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate
duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate
will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron
frame of the lower most plate and flat iron frame of middle plate will be welded to 2
nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement
concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground
level. The top most diamond plate will be welded to middle plate by 47mm x 47mm
of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering
and printing arrows, border etc. will be painted with ready mixed synthetic enamel
paint of superior quality in required shade and colour. All sections of framed posts
and steel tube will be painted with primer and two coats of epoxy paint as per
drawing Clause 1701 and Annexure 1700 1
Traffic Cone
Provision of red fluorescent with white reflective sleeve traffic cone made of Low
Density Polyethylene (LDPE) material with a square base of 390 x 390 x 35 mm and
a height of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as per BS:873

each

11,403.34

each

958.42

10.18

Rumble Strips
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm
high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to
control speed, marked with white strips of road marking paint.

10.19

Safety Devices and Signs in Construction Zones


Provision and fixing of traffic signs for limited period at suitable locations in
construction zone comprising of warning zone, approach transition zone, working
zone and terminal transition zone with a minimum distance of 2-3 m from the edge
of the carriageway. The bottom edge of the lowest sign plate to be not less than 2 m
above the road level, fixed on 600 mm x 600 mm x 6 mm angle iron post, founded
and installed as per approved design and drawings, removed and disposed of after
completion of construction work, all as per IRC:SP:55-2001.
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)

Note:
10.20

sqm

each

Diversion one km ahead


Traffic sign ahead
Road ahead closed
Men at work
Road narrow
Un-even road
Slippery road
Loose chippings
Diversion
Do not enter
Road closed
Stop
Slow
Speed limit

The rate for traffic signs are already worked out and given
elsewhere in this Chapter. The same may be adopted.

Road Markers/Road Stud with Lens Reflector


Providing and fixing of road stud 100 x 100 mm die cast in aluminium, resistant to
corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or
asphaltic surface by drilling holes 30 mm upto a depth of 600 mm and bedded in a
suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973.

Chapter-11

11.1

Rate
(Rs.)
4

Excavation for Structures

PMGSY SOR 13-14

each

514.09

FOUNDATION
PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-35)

Item
No.
1

Description

Unit

Rate
(Rs.)
4

Earthwork in excavation for structures as per drawing and technical specifications


Clause 305.1 including setting out, construction of shoring and bracing, removal of
stumps and other deleterious material and disposal upto a lead of 50 m, dressing of
sides and bottom and backfilling in trenches with excavated suitable material.
Ordinary soil
(i)
Upto 3 m depth
(ii)
3 m to 6 m depth
Ordinary rock (not requiring blasting)
II.
Upto 3 m depth
III.
Hard rock (requiring blasting)
IV.
Hard rock (blasting prohibited)
V.
Marshy soil
Fillling in foundation trenches as per drawing and technical specification
Clause 305.3.9
I.
Sand filling
II.
Earth filling (For marshy soil)
Filling annular space around footing in rock as per technical specification
Clause 1203.4.3.
P.C.C grade M 15
Nominal mix 1:2.5:5
Providing concrete for plain/reinforced concrete in open foundations
complete as per drawings and technical specifications Clause 802, 803,
1202 & 1203
I.

11.2

11.3

11.4

P.C.C grade M 10
(i)
Nominal mix 1:3:6
(ii)
Nominal mix 1:3.6 (Hand mixing)
II.
P.C.C grade M 15
(i)
Nominal mix (1:2.5:5)
(ii)
Nominal mix 1:2.5:5 (Hand mixing)
III.
P.C.C. grade M 20
(i)
Nominal mix (1:2:4)
(ii)
Nominal mix 1:2:4 (Hand mixed)
IV.
R.C.C grade M 20
V.
R.C.C. grade M 25
Brick masonry work in cement mortar in foundation complete excluding pointing and
plastering as per drawing and technical specifications Clauses 600, 1202 & 1203
I.

11.5

11.6

I.
Brick masonry in 1:3 cement mortar
II.
Brick masonry in 1:4 cement mortar
III.
Brick masonry in cement-lime-mortar (1:0.5:4.5)
Stone masonry work in cement mortar in foundation complete as per drawing and
technical specifications Clauses 702, 704, 1202 & 1203.
I.

II.

III.

Coursed rubble masonry (1st sort)


(i)
In 1:3 cement mortar
(ii)
In 1:4 cement mortar
(iii)
In cement-lime-sand mortar (1:0.5:4.5)
Coursed rubble masonry (2nd sort)
(i)
In 1:3 cement mortar
(ii)
In 1:4 cement mortar
(iii)
In cement-lime-mortar (1:0.5:4.5)
Random Rubble Masonry
(i)
In 1:3 cement mortar

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

cum
cum

182.05
216.19

cum
cum
cum
cum

227.57
413.80
451.28
341.35

cum
cum

516.45
116.70

cum

3,730.36

cum
cum

3,611.23
3,608.79

cum
cum

3,732.80
3,730.36

cum
cum
cum
cum

4,302.12
4,299.68
4,555.55
5,028.04

cum
cum
cum

4,443.11
4,173.88
4,375.17

cum
cum
cum

3,058.72
2,722.19
2,973.80

cum
cum
cum

2,949.11
2,454.05
2,730.82

cum

2,868.03

[SOR Summary](Page-36)

Item
No.
1

Description

Unit

(ii)
In cement mortar 1:4
(iii)
In cement lime mortar (1:0.5:4.5)
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per
drawings and technical specifications Clauses 1000 and 1202

cum
cum
t

2,660.67
2,937.44
54,471.41

11.8

Supplying, fitting and placingTMT bar reinforcement in foundation complete as per


drawings and technical specifications Clauses 1000 and 1202

65,455.00

11.9

Supplying, fitting and placing MS bar reinforcement in foundation complete as per


drawings and technical specifications Clauses 1000 and 1202

59,196.41

11.7

Chapter-12

12.1

Rate
(Rs.)
4

SUBSTRUCTURE

Brick masonry work in cement mortar in substructure complete excepting pointing


and plastering, as per drawing and technical specification Clauses 602, 603, 604,
1202 & 1204

In 1:3 cement mortar


I.
II.
In 1:4 Cement mortar
III.
In 1:5 cement mortar
IV.
In cement lime mortar (1:0.5:4.5)
Pointing with cement mortar (1:3) on brickwork as per drawing and technical
specification Clauses 613.3 and 1204

cum
cum
cum
cum
10 sqm

4,635.21
4,382.58
4,230.36
4,593.93
429.71

12.3

Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as


per technical specification Clauses 613.4 & 1204

10 sqm

1,285.71

12.4

Stone masonry in cement mortar for substructure complete as per drawing &
technical specification Clauses 702, 704, 1202 and 1204
cum
cum
cum
cum

3,211.66
2,858.30
2,608.24
3,122.49

cum
cum
cum
cum

3,206.23
2,817.54
2,608.24
3,108.14

cum
cum
cum
cum

3,182.39
2,793.70
2,584.41
3,084.31

(1:2.5:5)
1:2.5:5 (Hand mixing)

cum
cum

3,948.16
3,945.57

(1:2:4)
1:2:4 (Hand mixed)

cum
cum
cum

4,550.32
4,547.73
4,818.38
5,330.94

12.2

Coursed rubble masonry (1st sort)


(i)
In 1:3 cement mortar
(ii)
In 1:4 cement mortar
(iii)
In cement mortar (1:5)
(iv)
In cement lime mortar (1:0.5:4.5)
II.
Coursed Rubble masonry (2nd sort)
(i)
In cement mortar (1:3)
(ii)
In 1:4 cement mortar
(iii)
In cement mortar (1:5)
(iv)
In cement lime mortar (1:0.5:4.5)
III.
Random rubble masonry
(i)
In cement mortar (1:3)
(ii)
In 1:4 cement mortar
(iii)
In cement mortar (1:5)
(iv)
In cement lime mortar (1:0.5:4.5)
Plain/reinforced cement concrete in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
I.

12.5

For height upto 5 m


I.
P.C.C grade M 15
(i)
Nominal mix
(ii)
Nominal mix
II.
P.C.C. grade M 20
(i)
Nominal mix
(ii)
Nominal mix
III.
R.C.C grade M 20
IV.
R.C.C. grade M 25

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-37)

Item
No.
1

Description

Unit

12.6

Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue
complete as per drawings and technical specification Clauses 1002, 1005, 1010 &
1202

54,567.69

12.7

Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue
complete as per drawings and technical specification Clauses 1002, 1005, 1010 &
1202
Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue
complete as per drawings and technical specification Clauses 1002, 1005, 1010 &
1202

59,292.69

52,205.19

12.9

Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete


abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full
width of the structures with slope of 1(V):20(H) towards drawing face complete as
per drawing and technical specification Clauses 614, 709, 1204.3.7

Nos.

115.36

12.10

Backfilling behind abutment, wing wall and return wall complete as per drawings &
technical specification Clause 1204.3.8
I)
Granular material
II)
Sandy material
Providing and laying filter media with granular crushed aggregates as per
specification to a thickness of not less than 600 mm with smaller size towards the
soil and bigger size towards the wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height, compacted to firm condition
complete as per drawing and technical specification Clause 1204.3.8

cum
cum
cum

506.32
685.02
1,520.22

12.12

Supplying, fitting and fixing in position true to line and level elastomeric bearing
conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per
drawings and technical specification Clause 1207.1

cucm

2.30

12.13

Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. Running m
complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11

268.47

12.14

Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter
media base of 500 mm x 500 mm as per drawing and technical specification Clause
1205.5.7

Nos.

482.71

cum
cum
cum
cum
cum
t

5,207.81
5,221.72
5,049.31
5,682.08
6,736.71
55,282.06

12.8

12.11

Chapter-13

13.1

SUPERSTRUCTURE

Providing and laying reinforced cement concrete in superstructure as per drawing


and technical specifications Clauses 800, 1205.4 and 1205.5
R.C.C grade M 20
(i)
For nominal mix 1:2:4
(ii)
For nominal mix 1:2:4 (Hand mixed)
(iii)
For design mix RCC M 20
R.C.C M 25
II.
R.C.C. Grade M 30
III.
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as
per drawing and technical specifications Clauses 1002, 1010 and 1202
I.

13.2

Rate
(Rs.)
4

13.3

Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as


per drawing and technical specifications Clauses 1002, 1010 and 1202

60,007.06

13.4

Supplying, fitting, and placing MS bar reinforcement in superstructure complete as


per drawing and technical specifications Clauses 1002, 1010 and 1202

52,919.56

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-38)

Item
No.
1
13.5

Description

Unit

Rate
(Rs.)
4

Providing and laying cement concrete wearing course M 30 grade including


cum
reinforcement complete as per drawing and technical specifications Clauses 800 and
1206.3
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size Running m
aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in
500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per
drawing and technical specifications Clauses 800, 900 and 1208.3

9,592.15

13.7

Providing fitting and fixing mild steel railing complete as per drawing and technical Running m
specifications Clause 1208.2

2,795.16

13.8

Providing and fixing in position pipe railing consisting of IS Rolled steel joist posts Running m
designation IS MB 100 (100x75) at 2.5 m interval and three rows of 50 mm dia steel
pipes (light) including fixing in position on bridge deck complete as per drawing and
technical specifications Clause 1208.2
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and
cum
plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

2,057.06

13.6

13.9
13.10

Drainage spouts complete as per drawing and technical specifications Clause 1209

13.11

P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete
as per drawing and technical specifications Clauses 800 and 1211

13.12

13.13

13.14

13.15

13.16

Nos.

(i)
Nominal mix (1:2.5:5)
cum
(ii)
Nominal mix 1:2.5:5 (Hand mixing)
cum
cum
Reinforced Cement Concrete M 25 grade approach slab including reinforcement and
formwork complete as per drawing and technical specifications Clauses 800 and
1211
Providing and laying of an elastomeric slab seal expansion joint complete as per Running m
approved drawing and approved specifications to be installed by
manufacturer/supplier or their authorised representative ensuring compliance to the
manufacturers instructions for installlation and as per technical specifications Clause
1207.2.5
Providing and laying of compression seal joint consisting of steel armoured nosing at Running m
two edges of the joint gap suitably anchored to the deck concrete and a preformed
chloroprene elastomer or closed cell foam joint sealer compressed and formed into
the joint gap with special adhesive binder as per drawing, and technical
specifications Clause 1207.2.4

2,172.39

4,443.11
1,269.41

3,589.23
3,586.88
8,446.18

43,346.08

4,396.00

Providing and laying a buried expansion joint, covered with 12 mm thick, 200 mm Running m
wide galvanised weldable structrual steel plate as per IS:2062, placed symmetrical to
centre line of the joint, resting freely over the top surface of the deck concrete,
welding of 8 mm dia, 100 mm long galvanised nails spaced 300 mm c/c along the
centre line of the plate, as per technical specifications Clauses 1207.2.3
Filler Joint
Providing and fixing 2 mm thick corrugated copper plate in expansion joint Running m
I)
as per drawing and technical specifications Clause 1207.2.2

2,148.31

II)

Providing and fixing 20 mm thick compressible fibre board in expansion Running m


joint complete as per drawing and technical specifications

106.90

III)

Providing and fixing in position 20 mm thick premoulded joint filler in Running m


expansion joint for fixed ends of simply supported spans, covered with
sealant complete as per drawing and technical specifications

128.70

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

2,010.29

[SOR Summary](Page-39)

Item
No.
1
IV)

13.17

Description

Unit

Providing and fillling joint sealing compound as per drawings and technical Running m
specifications with coarse sand and 6 per cent bitumen by weight.

Rate
(Rs.)
4
23.59

Stone masonry in cement mortar 1:3 for parapet complete as per drawing and
technical specifications Clauses 700 and 1208.4
Random rubble masonry
I.
II.
Coursed rubble masonry (1st sort)
Pointing with cement mortar (1:3) on brickwork in parapet as per technical
specifications Clauses 613.3 and 1208.4

cum
cum
10 sqm

3,182.39
3,211.66
429.71

13.19

Plastering with cement mortar (1:3) 15 mm thick on brickwork in parapet as per


technical specifications Clauses 613.4 and 1208.4

10 sqm

128.57

13.20

Providing and laying parapet with PCC M 15 as per drawing & technical specifications
Clauses 800 and 1208.4

13.18

13.21

13.22

Nominal mix 1:2.5:5 (Hand mixing)


I.
II.
Nominal mix (1:2.5:5)
Providing bituminous wearing coat comprising of 20 mm thick premix carpet with 5
mm thick seal coat Type B for culverts as per drawing and technical specifications
Clauses 1206.2 and 500

cum
cum

3,945.57
3,948.16

i.

Rate for wearing coat as per item No. 5.9 of Chapter 5

sqm

0.00

ii.

Rate for seal coat Type B as per item No. 5.12 of Chapter 5

sqm

0.00

Providing bituminous wearing coat comprising of 50 mm thick bituminous macadam


overlaid by 20 mm thick premix carpet with 5 mm thick seal coat Type B
i.

Rate for BM layer may be analysed as per item No 5.3 of Chapter


5

cum

0.00

ii.

Rate of 20 mm premix carpet wearing course as per item No.5.9


of Chapter 5

sqm

0.00

iii.

Rate of seal coat Type B as per item No. 5.12 of Chapter 5

sqm

0.00

13.23

Brickwork in arches in cement mortar 1:4 complete including centering and


shuttering excluding pointing and plastering as per drawing and technical
specifications Clauses 606 and 1205.1

cum

9,626.16

13.24

Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:4) complete
including centering etc. complete as per drawing and technical specifications Clauses
706 and 1205.1

cum

6,193.85

13.25

Providing & Laying reinforced cement concrete arch complete including centering
and shuttering excluding reinforcement as per drawings and technical specifications
Clauses 800, 900 and 1205.1
cum
cum

6,621.54
7,320.49

quintal

6,885.99

13.26

I.
RCC grade M20 (1:2.4) nominal mix
II.
RCC Grade M 25
Providing steel R.S.Js/built-up steel sections including cutting, welding/rivetting,
hoisting, fixing in position for composite girders with shear connectors complete with
painting as per drawing and technical specifications Clause 1205.6
A)
Steel section

Chapter-14

14.1

PROTECTION WORKS

Providing and laying boulder apron for bed protection with stone boulders of
minimum size and weight as per Table 1300.1, no fragment weighing less than 25
kg laid dry complete as per drawing and technical specifications Clause 1301

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

cum

524.62

[SOR Summary](Page-40)

Item
No.
1

Description

Unit

14.2

Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire
conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally)
including 10 per cent extra for laps and joints laid with stone boulders weighing not
less than 25 kg each as per drawing and technical specifications Clause 1301

cum

1,633.89

14.3

Providing and laying of apron with cement concrete blocks of size as per Table
1300.1 cast-in-situ and made with nominal mix of M-15 grade cement concrete as
per drawing and technical specifications Clause 1301

cum

3,807.46

14.4

Single bamboo palasiding / walling of whole 2nd class bamboo (Jati or Bethua)
75mm dia and closely packed & driven including fitting fixing with half bamboo kamis
horizontally in three rows with cane or tying with wire complete and struts 1.5 m
apart longitudinally and providing brush wood as per drawing and technical
specifications Clause 1302.5
A)
B)

14.5

Driven at least 900 mm below ground and 1200 mm above ground Running m
Driven at least 900 mm below ground and 900 mm above ground Running m
on average

Rate
(Rs.)
4

90.38
79.51

Providing and laying pitching on slopes laid over prepared filter media as per
drawing and technical specifications Clause 1302
I.
II.

14.6
14.7

Stone/Boulder
Cement concrete blocks of size as per Table 1300.2 cast in cement
concrete of grade M 15

cum

524.62

a)
Concrete grade M 15
III.
Brick pitchng set in cement mortar 1:4
Providing and laying filter material underneath pitching in slopes complete as per
drawing and technical specifications Clause 1302

cum
cum
cum

3,807.46
4,368.24
893.54

cum

2,398.55

cum
cum
cum

3,770.13
4,816.51
741.60

cum
cum
cum
cum

4,173.88
2,817.54
3,611.23
563.72

Providing and laying flooring laid over cement concrete bedding complete as per
drawing and technical specification Clause 1303
I.

Note:

Rubble stone laid in cement mortar 1:3

Please ensure that quantity of cement concrete bedding is


entered in the Rate of Analysis

II.
Cement conrete blocks grade M 15
Brick on edge laid in cement mortar (1:3)
III.
Providing and laying of dry rubble flooring complete as per drawings and technical
specifications Clause 1303.3

14.8
14.9

Providing and laying curtain walls complete as per drawing and technical
specification Clause 1304

14.10
14.11

Brick masonry in cement mortar (1:4)


I.
II.
Coursed rubble masonary (2nd sort) in cement mortar (1:4)
III.
Cement concrete grade M 10
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing
not less then 25 kg beyond curtain wall
Construction of toe walls for protection of slopes as per drawing and technical
specifications Clause 1302.5
I.

Random rubble masonry in case of stone pitching laid with cement


mortar (1:5)

cum

2,574.34

II.

Brick masonry in cement mortar 1:4 in case of brick pitching

cum

4,446.09

III.

Cement concrete grade M 10 in case of concrete block pitching


P.C.C grade M 20

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-41)

Item
No.
1
14.12

14.13

14.14

Description

Unit

Nominal mix 1:3:6


cum
Single bamboo spur and palisading of whole 2nd class bamboo (jati or Bethua) 65
mm to 75 mm dia and closely packed & driven, including fitting, fixing with half
bamboo kamis horrizontally in three rows with cane or tying wire complete and
struts 1500 mm apart longitudinally and providing brush wood as per drawing and
technical specifications Clause 1302.5
Driven at least 900 mm below ground and 1800 mm above ground Running m
A)
Driven at least 900 mm below ground and 900 mm above ground
B)
Running m
Single bamboo spur and palisading of whole 1st class bamboo (Bholuka or Barua) 85
mm to 100 mm dia. Closely packed & driven including fitting, fixing with half 2nd
class bamboo (jati or Bethua) horizontally in three rows with cane or tying wire
complete and struts 1500 mm apart longitudinally and providing brush wood in the
spur as per drawings and technical specifications

Rate
(Rs.)
4
3,851.98

388.49
215.99

A)

Driven at least 900 mm below ground and 1800 mm above ground

Running m

415.06

B)

Driven at least 900 mm below ground and 900 mm above ground Running m
on average

237.56

C)

Driven at least 600 mm below ground and 1200 mm above ground Running m
on average.

223.68

Bamboo spur 'A' type with whole bamboo 85mm-100mm dia, placed 230 mm centre
to centre driven 900 mm below ground and 1200 mm to 1500 mm above ground
tied with 2nd class bamboo (jati or Bethua) on either side at 450 mm apart
horizontally with galvanised wire etc. complete as per drawings and technical
specifications
A)
B)

Running m
Running m

525.59
563.23

Providing 'A' type single spur with 1st class bamboo (Bholuka or Barua) 85 mm to Running m
100 mm dia. Driven closely placed 3m to 4m above ground and 1200 mm to 1500
mm below ground tied with cane or coir string, half 2nd class bamboo (jati or
Bethua) horizontally on both face placed not more than one metre apart including
whole bamboo struts inside one metre apart and 2 nos. of purlin at top and bottom
fitted with vertical struts at 1500 mm apart and filling with brushwood or jungle
wood inside the spur complete as per drawing and technical specifications
Providing close bamboo toe walling consisting of 65mm to 75mm dia bamboos of Running m
length ranging from 1.2 m to 3m driven at 150 mm centre to centre and provided
with three horizontal split bamboo runner fixed with nails. All bamboos to be duly
protected by coal tar painting.

1,653.32

14.17

Double timber spur with two rows at 800 mm c/c apart of 1st class local wood piles Running m
with timber of Azar/Nahar/Nageswar / Zarul wood 150 mm to 200 mm dia driven
2000 mm minimum below ground and 3600 mm above ground average placed at
800 mm belts, bracings etc. of 100 mm x 75 mm size 1st class local wood
longitudinally & crosswiswe at ends fitted with 10 mm dia bolts and nuts etc.
including coaltarring of timber members and cost of necessary bamboo stagings etc.
as directed by the Engineer as per drawing and technical specifications

130,195.62

14.18

Supplying and filling up hollows of the timber spur to an average height of 3600 mm Running m
above ground with jungle wood branches as per drawing and technical specifications
as directed by the Engineer.

54.98

14.15

14.16

2nd class bamboo (jati or Bethua) 75 mm dia


1st class bamboo (Bholuka or Barua ) 85 mm to 100 mm dia

Chapter-15
PMGSY SOR 13-14

454.85

MAINTENANCE OF ROADS
PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-42)

Item
No.
1
15.1

15.2

15.3

Description

Unit

Rate
(Rs.)
4

Restoration of Rain Cuts


i)
Restoration of rain cuts with soil, moorum gravel or a mixture of these,
clearing the loose soil, benching for 300mm width laying fresh material in
layers not exceeding 250 mm and compaction with plate compactor or
power rammer to restore the original alignment, level and slopes as per
drawings and technical specifications Clause 1902

1.

A.
Manual Means
B.
Mechanical Means
Maintenance of Earthen shoulder (filling with fresh selected soil)

cum
cum

255.93
205.09

sqm

34.32

2.

Making up loss of material/irregularities on shoulders to the design level by


adding fresh approved selected soil and compacting it with appropriate
equipment at OMC upto a lead of 1000 m as per technical specification
Clause 1903
Maintenance of Earhen shoulder (stripping of excess soil)
Stripping excess soil from the shoulder surface to achieve the approved
level and compacting with plate compactor at OMC as per drawings and
Technical Specification Clause 1903

sqm

19.64

cum

6,649.55

sqm

182.69

Maintenace of bituminous surface road


Repair to pot holes by removal of failed material, trimming the sides to
i.
vertical and levelling the bottom, cleaning the same with compressed air or
any appropriate method filled with 75mm B.M, applying bitumen emulsion
prime coat at the bottom and bitumen emulsion tack coat on sides and on
bottom as per technical specifications Clauses 502 and 503.
Patch repair on already filled pot holes with 75 mm BM with 20 mm premix
ii.
carpet and seal coat Type B as per drawings and technical specification
Clause 1904.2
iii.

Repair to pot holes and removal of loose material, trimming of sides,


cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and
seal coat type B specification Clause 1904.2

sqm

192.19

iv.

Repair to pot holes and removal of loose material, trimming of sides,


cleaning of surface by providing tack coat with bitumen emulsion, 20 mm
thick pre-mix carpet using catonic bitumen emulsion and seal coat type B
with bitumen emulsion

sqm

191.48

sqm

126.92

sqm

112.02

15.4

Maintenance of Gravel Road


Maintenance of gravel road including making up the loss of profile, rectifying
corrugated surface, filling up of depressions, pot holes and erosion gullies by adding
fresh material and compacting it with appropriate equipment or to strip excess of
material from the road surface as per drawings and technical specification Clause
1905

15.5

Maintenance of WBM Road


Maintenance of WBM road including filling up of pot holes, ruts and rectifying
corrugated surface, damaged edges and ravelling as per technical specification
Clause 1906.

15.6

Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping,
regrading, deepening of side drains as well as catch water drains as per technical
specification Clause 1907.

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

1.82

[SOR Summary](Page-43)

Item
No.
1
15.7

Description

Unit

(I)

Maintenance of Culverts
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion One No.
repair, repairs to cracks, parapet wall and protection work as per drawing Hume Pipe
and technical specification Clause 1908

(II)

Maintenance of Culverts Slab type


Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion
repair, repairs to cracks, parapet walls and Protection works as per drawing
and technical specification Clasue 1908

15.8

Maintenance of Causeway
Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts,
repair of flood gauges, removal of debris, providing boulders and protection work
and painting as per technical specification Clause 1909

15.9

Maintenance of Road Signs


Maintenance of road signs by way of cleaning and repainting of mandatory /
requlatory / cautionary / informatory and place identifications sign board as
perdrawings and technical specification Clause 1910

15.10

Maintenance of steel and RCC Railing


Repair of steel railing to bring it to original shape cleaning and repainting
(i)
as per drawing and technical specification Clause 1911
Steel Railing
(ii)

15.11

15.12

15.13

15.14

Culvert

Rate
(Rs.)
4
780.54

1,706.40

37.08

km

822.93

Running m

255.32

Repair of RCC railing to bring it to the original shape, cleaning and


repainting as per drawings and technical specification Clause 1911

RCC Railing
Maintenance of 200 metre and km stones
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with
cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km
stone as per drawing and technical specification Clause 1912

1,523.53

(i)

Painting two coats with synthetic enamel paint

km

140.06

(ii)

Printing letters and figures of any shade with synthtic enamel paint of any
approved colour to give an even shade

km

508.87

Cutting of branches of trees shrubs and trimming of grass and weeds


68.88

(i)

Cutting of branches of trees and shrubs from the road way or with in
R.O.W including disposal of wood and leaves to suitable location as per
technical specification Clause 1914

one tree

(ii)

Cutting of shrubs from the road way or with in R.O.W and disposal of
shrubs to suitable locations as per technical specifications Clause 1914

each

4.55

(iii)

Trimming of grass and weeds from the shoulders/berms and disposing off
the same to suitable locations as per technical specifications Clause 1914

sqm

1.52

sqm

10.72

White washing of parapet walls of CD work and tree truncks


White washing two coats on parapet walls and tree trunks including preparation of
surface by cleaning scraping etc. as per technical specifications Clause 1915
Periodical Renewal to existing bituminous surface
1
Open graded Premix carpet 20 mm thick
(i)

PMGSY SOR 13-14

Pre-mix carpet using bituminous (penetration grade


modified bitumen) binder
PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-44)

Item
No.
1

Description

Unit

Rates as per item No. 5.9


(ii)
Pre-mix carpet using bituminous (penetration grade
modified bitumen) binder
Rates as per item No. 5.9
(iii)
Premix carpet using bitumen Emulsion
Rates as per item No. 5.10
(iv)
Seal coat Type A, B or C
Rates as per item No. 5.11
Surface dressing single coat/first coat or 2nd coat
Rates as per item No. 5.6

Rate
(Rs.)
4

sqm

108.78

sqm

115.72

sqm

113.54

sqm

138.79

sqm

61.69

This is to certify that this Schedule Of Rates for the year 2013-2014 for Pradhan Mantri Gram Sadak Yojana of
Panchayat R & B Circle - 2 Rajkot is prepared on the basis of basic rates of labour, Plant & Machinery and material
are finalised by SOR committee of Gujarat State R&B Department and SOR committee of Rural Road Development
Agency Gandhinagar

DPIU & Executive Engineer


Panchayat R & B Division
Bhavnagar

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[SOR Summary](Page-45)

BASIC RATES for Year 2013-14 SOR (PMGSY WORKS), Gujarat State
(Panchayat R&B Circle-2, Rajkot)
(B) USAGE RATES OF PLANT & MACHINERY
Description of

Sr. No.

Machine

Output of Machine
Activity

Unit

Output

Usage Rates in Rs.


Unit

PM-001

Air Compressor 210 cfm

Supplying compressed
air

cfm

PM-002

Batch mix HMP 40-60 TPH

BM, DBM, SDBC, PM

t/h

50.00 per hour

PM-003

Batch type HMP 30/40 TPH

BM, DBM, SDBC, PM

t/h

35.00 per hour

PM-004

Bitumen boiler oil fired


200 litre
1000 litre
Bitumen emulsion pressure
PM-005
distributor
PM-006 Concrete mixer 0.28/0.4 cum
PM-007 Crane upto 8T
PM-008
Dozer D 50

Applying bitumen tack


coat
Mixing of ingradients
Lifting of materials
Dozing cutting

litre / h
litre / h

400.00 per hour


2000.00 per hour

sqm/h

1750.00 per hour

cum/h
cum/h
cum/h

2.50 per hour


per hour
200.00
per hour
100.00

Electricity generation

KVA

100.00 per hour

PM-010
PM-011

Emulsion Sprayer with Tractor


Front end-loader 1 cum bucket
capacity @ 45 cum/hour
Hydraulic broom with tractor
Hydraulic Excavator 0.9 cum
Hydraulic self propelled chip
spreader

Spraying of Emulsion
Loading Aggregates
Loading Soil
Surface cleaning
Excavation

cum/h
cum/h
sqm/h
cum/h

per hour
45.00
per hour
100.00
1250.00 per hour
100.00 per hour

Surface Dressing

sqm/h

1500.00 per hour

Pavement breaking &


rock drilling

cum/h

PM-015

Jack Hammer with tractor

PM-016

Joint Cutting Machine with 2-3


blades

PM-017

Mixall 6-10 t capacity

PM-018

Motor Grader

PM-019

Needle vibrator

PM-020
PM-021
PM-022
PM-023

Paver finisher
Plate compactor
Plate vibrator
Screed vibrator
Smooth wheeled 80-100 kN
tandem roller
Stone crusher (Integrated) of 200
TPH
Three wheel 80-100 kN Static
Roller

PM-024
PM-025
PM-026

PMGSY SOR 13-14

9,000.00
7,150.00
Input Rate

Heating of bitumen

Electric generator set, 125 KVA

PM-014

300.00

210.00 per hour

PM-009

PM-012
PM-013

Rate

05. to 1

per hour

Cutting of Joints

per hour

Mixing of bituminous
materials

t/h

8.00 per hour

Scarifier & levelling

cum/h

200.00
per hour
50.00

cum/h

3.50 per hour

t/h
cum/h
cum/h
cum/h

75.00 per hour


per hour
per hour
per hour

cum/h

30.00 per hour

t/h

200.00 per hour

Vibrating cement
concrete mix
Laying/spreading
Compaction
Compaction
Compaction
Compaction of Subbase/ Asphalt
Crushing of Spalls
Compaction/ Rolling
Earth:- Embankment
or sub-grade
Sub-base G-I
Sub-base G-II/G-III
WMM
BUSG
BM 50/75 mm
Premix 20 mm
Seal Coat
PanchayatR B Circle-2,Rajkot

per hour
cum/h
cum/h
cum/h
cum/h
cum/h
cum/h
sqm/h
sqm/h

80/70
10.00
8.00
16.00
10.00
12.00
250.00
500.00

128.00
160.00
840.00
190.00
1,080.20
2,100.00
1,814.00
700.00
700.00
764.00
675.00
300.00
1,400.00
2,100.00
325.00
150.00
1,036.20
2,100.00
1,600.00
60.00
1,200.00
310.00
400.00
310.00
400.00
14,200.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00
400.00

[Chapter -Plant & Machinery](Page-5)

Description of

Sr. No.

PM-027
PM-028
PM-029

Machine

Tipper 5.5 cum/10 t


Tractor with Disc Harrows
Tractor with ripper @ 60 cum per
hour

PM-030

Tractor with trolley

PM-031
PM-032

Tractor with Rotavator


Truck 10 t capacity

PM-033
PM-034
PM-035

Vibratory roller 80-100 kN


Water tanker 6 kl capacity (Truck
Mounted)
Wet mix plant (Pug Mill)

PMGSY SOR 13-14

Output of Machine
Activity
Surface Dressing 1st
Coat
Surface Dressing
2ndCoat
Carriage
Pulverisation of soil
Ripping Pavements,
uprooting trees
Transportation of
materials
Scarifier
Carriage
Compaction of soil
WMM
Compaction of BM

Unit

Output

sqm/h

400.00

sqm/h

500.00

Usage Rates in Rs.


Unit

400.00
400.00

cum/trip
cum/h

5.50 per hour


80.00 per hour

cum/h

60.00 per hour

t/trip
cum/h
cum/trip

3 to 5

per hour

25.00 per hour


5.50 per hour

cum/h

100.00

cum/h

60.00

per hour

Carriage of water

litre / h

12000.00 per hour

Wet Mix

cum/h

25.00 per hour

PanchayatR B Circle-2,Rajkot

Rate

250.00
300.00
300.00
300.00
300.00
300.00
1,200.00
1,200.00
300.00
1,000.00

[Chapter -Plant & Machinery](Page-6)

Chapter 1
LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND SETTING OUT
Notes:
1 Rates are for net quantities after deduction of voids.
2 Part of km beyond 1 km will be payable for the full km.
Sr.
No.
1
1.1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
Loading and Unloading of Lime, Aggregate,
Stone Boulder, Brick Aggregate, Kankar,
Building Rubbish, Crushed Slag, Stone for
Masonry Work by Manual Means

Rate
(Rs.)

Amount
(Rs.)

(i) Loading of Lime, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Crushed
Slag, Stone for Masonry Work by manual means
including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 5.5 cum = a+b+c
Rate per cum = (a+b+c)/5.5
(ii) Loading of Earth, Sand, Moorum, Manure, Flyash
by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 5.5 cum = a+b+c
Rate per cum = (a+b)/5.5
(iii) Unloading of Lime, Aggregate, Stone Boulder,
Brick Aggregate, Kankar, Building Rubbish,
Crushed Slag, Stone for Masonry Work by
manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 5.5 cum = a+b+c
Rate per cum = (a+b+c+d)/5.5
(iv) Unloading of Earth, Sand, Moorum, Manure,
Flyash by manual means including a lead upto
30 m

0.02
0.50

194.50
194.50

3.89
97.25

0.50

300.00

150.00
31.39
282.53
51.37

0.01
0.25

194.50
194.50

1.95
48.63

0.25

300.00

75.00
15.70
141.27
25.68

0.01
0.25

194.50
194.50

1.95
48.63

0.25

300.00

75.00
15.70
141.27
25.68

Unit = cum
Taking output = 5.5 cum
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -1](Page-49)

Sr.
No.
1

1.2

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 5.5 cum = a+b+c
Rate per cum = (a+b+c)/5.5
Loading and Unloading Lime, Aggregate, Stone
Boulder, Brick Aggregate, Kankar, Building
Rubbish, Crushed Slag, Stone for Masonry
Work by Mechanical Means

Rate
(Rs.)

Amount
(Rs.)

0.005
0.125

194.50
194.50

0.97
24.31

0.166

300.00

49.80
9.39
75.09
13.65

250.00
764.00

43.00
93.21

(i) Loading of Lime, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Crushed
Slag, Stone for Masonry Work by mechanical
means including a lead upto 30 m
Placing tipper at loading point, loading with front
end loader excluding time for haulage and return
trip.
Unit = cum
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading point
ii) Loading by front end loader 1 cum bucket
capacity @ 45 cum per hour

Min
Min

1.00
7.33

Min

2.00

Min
a) Machinery
(i) Tipper 10 t capacity
hour
(ii) Front end-loader 1 cum bucket capacity @
hour
45 cum per hour
b) OH & Contractor's profit @12.5 % on (a)
Cost for 5.5 cum = a+b
Rate per cum = (a+b) /5.5
(ii) Loading of Earth, Sand, Moorum, Manure, Flyash
by mechanical means including a lead upto 30
m.

10.33

iii) Waiting time, unforeseen contingencies, etc.

0.172
0.122

17.03
153.23
27.86

Placing tipper at loading point, loading with front


end loader excluding time for haulage and return
trip.
Unit = cum
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading point
ii) Loading by front end loader 1 cum bucket
iii) Waiting time, unforeseen contingencies, etc.

Min
Min
Min
Min

a) Machinery
(i) Tipper 10 t capacity
hour
(ii) Front end-loader 1 cum bucket capacity @
hour
100 cum per hour
b) OH & Contractor's profit @12.5 % on (a)
Cost for 5.5 cum = a+b
Rate per cum = (a+b)/5.5

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

1.00
3.30
2.00
6.30
0.105
0.055

250.00
764.00

26.25
42.02
8.53
76.80
13.96

[Chapter -1](Page-50)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
(iii) Unloading of Earth, Sand, Lime, Moorum,
Aggregate, Stone Boulder, Brick Aggregate,
Kankar, Building Rubbish, Manure, Crushed Slag,
Flyash, Stone for Masonry Work by mechanical
means.

Rate
(Rs.)

Amount
(Rs.)

Unit = cum
Taking output = 5.5 cum
Placing tipper at unloading point excluding time
for haulage and return trip
Time required for
i) Positioning of tipper at unloading point
ii) Manoeuvering, reversing, dumping and
turning for return
iii) Waiting time, unforeseen contingencies, etc.

1.3

Min
Min

1.00
2.00

Min

2.00

Total
Min
a) Machinery
Tipper 10 t capacity
hour
b) OH & Contractor's profit @12.5 % on (a)
Cost for 5.5 cum = a+b
Rate per cum = (a+b)/5.5
Loading, Unloading and Stacking of Bricks by
Manual Means

5.00
0.08

250.00

20.00
2.50
22.50
4.09

0.01
0.25

194.50
194.50

1.95
48.63

0.33

300.00

99.00
18.70
168.27
84.13

0.01
0.25

194.50
194.50

1.95
48.63

0.33

300.00

99.00
18.70
168.27
84.13

day
day

0.06
1.50

194.50
194.50

11.67
291.75

hour

1.00

300.00

300.00

(i) Loading of Bricks by manual means including a


lead upto 30 m

1.4

Unit = 1000 Nos.


Taking output = 2000 Nos.
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 2000 Nos. = a+b+c
Rate for 1000 bricks = (a+b+c)/2
(ii) Unloading and Stacking of Bricks by manual
means including a lead upto 30 m
Unit = 1000 Nos.
Taking output = 2000 Nos.
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 2000 Nos. = a+b+c
Rate for 1000 bricks = (a+b+c)/2
Loading and Unloading of Cement by Manual
Means
(i) Loading of Cement by manual means including a
lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Truck

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -1](Page-51)

Sr.
No.
1

1.5

1.6

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
c) OH & Contractor's profit @12.5 % on(a+b)
Cost for 10 t = a+b+c
Rate per tonnes = (a+b+c)/10
(ii) Unloading of Cement by manual means including
a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per tonne = (a+b+c)/10
Loading and Unloading of Structural Steel and
Steel Bars by manual means
(i) Loading of Structural Steel, Steel Bars by manual
means including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per tonnes = (a+b+c)/10
(ii) Unloading of Structural Steel, Steel Bars by
manual means including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per t = (a+b+c)/10
Loading and Unloading of Bitumen Drums by
Manual Means
(i) Loading of Bitumen Drums by manual means
including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per tonnes = (a+b+c)/10
(ii) Unloading of Bitumen Drums by Manual Means
including a lead upto 30 m
Unit = t

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
6

Amount
(Rs.)
7
75.43
678.85
67.88

0.06
1.50

194.50
194.50

11.67
291.75

1.00

300.00

300.00
75.43
678.85
67.88

0.07
1.80

194.50
194.50

13.62
350.10

1.00

300.00

300.00
82.96
746.68
74.67

0.07
1.80

194.50
194.50

13.62
350.10

1.00

300.00

300.00
82.96
746.68
74.67

0.06
1.60

194.50
194.50

11.67
311.20

1.25

300.00

375.00
87.23
785.10
78.51

[Chapter -1](Page-52)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

3
4
Taking output = 10 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 10 t = a+b+c
Rate per t = (a+b+c)/10
The rate is inclusive of the self weight of drum

Note:
1.7

100

Unit Quantity
5

Rate
(Rs.)

Amount
(Rs.)

0.05
1.20

194.50
194.50

9.73
233.40

1.25

300.00

375.00
77.27
695.39
69.54

0.04
1.00

194.50
194.50

7.78
194.50

1.00

300.00

300.00
62.79
565.07
113.01

0.04
1.00

194.50
194.50

7.78
194.50

1.00

300.00

300.00
62.79
565.07
113.01

0.08
2.00

194.50
194.50

15.56
389.00

1.50

300.00

450.00
106.82
961.38
174.80

Loading and Unloading of Timber by Manual


Means
(i) Loading of Timber by manual means including a
lead upto 30 m
Unit = t
Taking output = 5 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 5 t = a+b+c
Rate per t = (a+b+c)/5
(ii) Unloading of Timber by manual means including
a lead upto 30 m
Unit = t
Taking output = 5 t
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 5 t = a+b+c
Rate per t = (a+b+c)/5

Note: Density of wood has been assumed as 900 kg per


cum. If the density is less the output may be
reduced proportionately
1.8

Loading and Unloading of C.C. Blocks, Kerb,


(i) Loading with care C.C. Blocks, km Stone, 200 m
Stone, Boundary Pillar, Kerb, Channel, Bond
Stone, etc. by manual means including a lead
upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on(a+b)
Cost for 5.5 cum = a+b+c
Rate per cum = (a+b+c)/5.5
(ii) Unloading with care C.C. Blocks, km Stone, 200
m Stone, Boundary Pillar, Kerb, Channel, Bond
Stone, etc. by manual means including a lead
upto 30 m

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -1](Page-53)

Sr.
No.
1

1.9

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 5.5 cum = a+b+c
Rate per cum = (a+b+c)/5.5
Loading and Unloading of Hume Pipes
(i) Loading of RCC Hume pipes by mechanical
means including a lead upto 30 m

Rate
(Rs.)

Amount
(Rs.)

0.08
2.00

194.50
194.50

15.56
389.00

1.50

300.00

450.00
106.82
961.38
174.80

0.02
0.50

194.50
194.50

3.89
97.25

0.33
0.33

300.00
1,080.20

99.00
356.47
69.58
626.18
69.58

0.02
0.50

194.50
194.50

3.89
97.25

0.33
0.33

300.00
1,080.20

99.00
356.47
69.58
626.18
41.75

0.02
0.50

194.50
194.50

3.89
97.25

0.33
0.33

300.00
1,080.20

99.00
356.47
69.58
626.18
29.82

day
day

0.04
1.00

194.50
194.50

7.78
194.50

hour

2.00

300.00

600.00

A.

1000 / 1200 mm dia Hume pipe


Unit = per pipe
Taking output = 9 pipes
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
Crane
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 9 pipes = a+b+c
Rate per pipe = (a+b+c)/9
B. 750 mm dia Hume pipe
Unit = per pipe
Taking output = 15 pipes
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
Crane
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 15 pipes = a+b+c
Rate per pipe = (a+b+c)/15
C. 600/450 mm dia Hume pipe
Unit = per pipe
Taking output = 21 pipe
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
Crane
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 21 pipes = a+b+c
Rate per pipe = (a+b+c)/21
(ii) Unloading of RCC Hume pipe by manual means
including a lead upto 30 m
A.

1000/1200 mm dia RCC Hume pipes


Unit = per pipe
Taking output = 5 pipes
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Truck
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -1](Page-54)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
Material
Wooden sleepers 250mm x 250mm
x125mm hire charges 3 nos sleeper
Crow bars 2 nos not less than 40 mm dia
(hire-charges)
d) OH & Contractor's profit @12.5 % on
(a+b+c)
Cost for 5 pipes = (a+b+c+d)
Rate per pipe = (a+b+c+d)/5
B. 750 mm dia Hume pipe
Unit = per pipe
Taking output = 6 pipes
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Truck
c) Materials
Wooden sleepers 250mm x250mm x
125mm hire charges 3 nos. sleeper
Crow bars 2 nos not less than 40 mm dia
c)

Amount
(Rs.)

hour

2.00

85.00

170.00

hour

2.00

8.00

16.00
123.54
1,111.82
222.36

day
day

0.04
1.00

194.50
194.50

7.78
194.50

hour

2.00

300.00

600.00

hour

2.00

85.00

170.00

hour

2.00

8.00

16.00

d) OH & Contractor's profit @12.5 % on


(a+b+c)
Cost for 6 pipes = a+b+c+d
Rate per pipe = (a+b+c+d)/6
C. 600/450 mm dia Hume pipe
Unit = per pipe
Taking output = 8 pipes
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
c) Materials
Wooden sleepers 250mm x 250mm x hour
125mm hire charges 3 nos. sleeper
Crow bars 2 nos not less than 40 mm dia
hour
d) OH & Contractor's profit @12.5 % on
(a+b+c)
Cost for 8 pipes = a+b+c+d
Rate per pipe = (a+b+c+d)/8
(iii) Unloading of RCC Hume pipes by mechanical
means including a lead upto 30 m
A. 1000/1200 mm dia Hume pipe
Unit = per pipe
Taking output = 9 pipes
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
Crane
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 9 pipes = a+b+c
Rate per pipe = (a+b+c)/9
B. 750 mm dia Hume pipe
Unit = per pipe
Taking output = 15 pipes
a) Labour
PMGSY SOR 13-14

Rate
(Rs.)

PanchayatR B Circle-2,Rajkot

123.54
1,111.82
185.30

0.04
1.00

194.50
194.50

7.78
194.50

2.00

300.00

600.00

2.00

85.00

170.00

2.00

8.00

16.00
123.54
1,111.82
138.98

0.02
0.50

194.50
194.50

3.89
97.25

0.20
0.20

300.00
1,080.20

60.00
216.04
47.15
424.33
47.15

[Chapter -1](Page-55)

Sr.
No.
1

1.10

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
Crane
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 15 pipes = a+b+c
Rate per pipe = (a+b+c)/15
C. 600/450 mm dia Hume pipe
Unit = per pipe
Taking output = 21 pipes
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Truck
hour
Crane
hour
c) OH & Contractor's profit @12.5 % on (a+b)
Cost for 21 pipes = a+b+c
Rate per pipe = (a+b+c)/21
Haulage excluding Loading & Unloading
Haulage of materials by tipper excluding cost of
loading, unloading and stacking.

Unit = t.km
Taking output 10 t load and lead 10 km = 100 t.km
Case-I : Surfaced Road
Speed with load: 25 km per hour
Speed while returning empty: 35 km per hour
a) Machinery
Tipper 10 t capacity
Haulage with load
Empty return trip
b) OH & Contractor's profit @12.5 % on (a)
Cost for 100 t.km = a+b
Rate per t.km = (a+b)/100

Rate
(Rs.)

5
0.02
0.50

6
194.50
194.50

0.20
0.20

300.00
1,080.20

60.00
216.04
47.15
424.33
28.29

0.02
0.50

194.50
194.50

3.89
97.25

0.20
0.20

300.00
1,080.20

60.00
216.04
47.15
424.33
20.21

hour
hour

0.40
0.29

250.00
250.00

100.00
72.50
21.56
194.06
1.94

hour
hour

0.50
0.33

250.00
250.00

125.00
82.50
25.94
233.44
2.33

Note: In case of carriage of Hume pipes, output of truck be


taken as 8 t and the rate for t is to be divided by
number of pipes of different diameters as indicated in
item 1.9 to get the rate per pipe.

Case-II: Unsurfaced Gravel Road


Speed with load: 20 km/hour
Speed for empty return trip: 30 km/hour
a) Machinery
Tipper 10 t capacity
Haulage with load
Empty return trip
b) OH & Contractor's profit @12.5 % on (a)
Cost for 100 t.km = a+b+c
Rate per t.km = (a+b)/100

Amount
(Rs.)

Note: In case of carriage of Hume pipes, output of truck be


taken as 8 t and the rate per t is to be divided by
number of pipes of different diameters as indicated in
item 1.9 to get the rate per pipe.

3.89
97.25

Case-III: Katcha Track and Track in River Bed/Nallah


Bed and Choe Bed
Speed with load: 10 km per hour
Speed while returning empty: 15 km per hour
a) Machinery
i) Tipper 10 t capacity
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -1](Page-56)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
Haulage with load
Empty return trip
b) OH & Contractor's profit @12.5 % on (a)
Cost for 100 t.km = a+b
Rate per t.km = (a+b)/100

4
hour
hour

Rate
(Rs.)

5
1.00
0.67

6
250.00
250.00

7
250.00
167.50
52.19
469.69
4.70

0.048
1.20

194.50
194.50

9.34
233.40

1.10

339.73

373.70
77.05
693.49

0.06
1.50

194.50
194.50

11.67
291.75

1.10

339.73

373.70
84.64
761.76

0.072
1.80

194.50
194.50

14.00
350.10

1.10

339.73

373.70
92.23
830.03

Note: In case of carriage of Hume pipes, output of truck be


taken as 8 t and the cost for 8 t is to be divided by
number of pipes of different diameters as indicated in
item 1.9 to get the rate per pipe.
1.11

1.12

Amount
(Rs.)

Supply of Quarried stone and hand breaking


(i) Supply of quarried stone and hand breaking into
coarse aggregate to Grading 1 (90 mm to 45
mm) as per Table 400.8 of Technical
Specifications.
Unit = cum
Taking output = 1 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Material
Supply of quarried stone 150-200 mm size
cum
c) OH & Contractor's profit @12.5 % on (a+b)
Rate per cum = a+b+c
(ii) Supply of quarried stone and hand breaking into
coarse aggregate to Grading 2 (63 mm to 45
mm) as per Table 400.8 of Technical
Specifications.
Unit = cum
Taking output = 1 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Material
Supply of quarried stone 150-200 mm size
cum
c) OH & Contractor's profit @12.5 % on (a+b)
Rate per cum = a+b+c
(iii) Supply of quarried stone and hand breaking into
coarse aggregate to Grading 3 (53 mm to 22.4
mm) as per Table 400.8 of Technical
Unit = cum
Taking output = 1 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Material
Supply of quarried stone 150-200 mm size
cum
c) OH & Contractor's profit @12.5 % on (a+b)
Rate per cum = a+b+c
Crushing of Stone Aggregates 100 per cent
passing through 53 mm sieve as per Table
500.6 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an
integrated stone crushing unit of 200 t/h capacity
comprising of primary and secondary crushing units,
belt conveyor and vibrating screens to obtain stone
aggregates 100 per cent passing through 53 mm
sieve as per Table 500.6 of Technical Specifications
including the cost of stone.

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -1](Page-57)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
Unit = cum
Taking output = 750 cum at crusher location
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Material
Stone Boulder of size 150 mm and below
c)

Machinery
Integrated stone crusher of 200 t/h including
belt conveyor and vibrating screens

Rate
(Rs.)

Amount
(Rs.)

day
day
day

0.76
2.00
17.00

194.50
199.90
194.50

147.82
399.80
3,306.50

cum

800.00

185.00

148,000.00

6.00 14,200.00

85,200.00

hour

Front end loader 1 cum bucket capacity


hour
Tipper 5.5 cum capacity
hour
d) OH & Contractor's profit @12.5 % on (a+b+c)
Cost for 750 cum = (a+b+c+d) x 0.85
Rate per cum =[ (a+b+c+d) x 0.85]/ 750
Note: 1 800 cum of stone boulders are needed to get
750 cum of stone aggregates.

20.00
20.00

764.00
250.00

15,280.00
5,000.00
32,166.77
246,075.75
328.10

day
day
day

0.76
2.00
17.00

194.50
199.90
194.50

147.82
399.80
3,306.50

cum

800.00

185.00

148,000.00

6.00 14,200.00

85,200.00

85 per cent of above cost will be attributed to


the production of 750 cum of stone aggregates
of 40 mm size and balance 15 per cent will be
for smaller size aggregates and stone dust which
comes out as a by-product.
3 The integrated stone crusher includes primary
and secondary crushing units.
Crushing of Stone Aggregates 100 per cent
passing through 22.4 mm sieve as per Table
500.6 of Technical Specifications.

1.13

Crushing of stone boulders of 150 mm size in an


integrated stone crushing unit of 200 t/h capacity
comprising of primary and secondary crushing units,
belt conveyor and vibrating screens to obtain stone
aggregates 100 per cent passing through 22.4 mm
sieve as per Table 500.6 of Technical Specifications
including the cost of stone.
Unit = cum
Taking output = 670 cum at crusher location
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Material
Stone boulder of size 150 mm and below
c) Machinery
Integrated stone crusher of 200 t/h including
belt conveyor and vibrating screens

d)

Note:

PMGSY SOR 13-14

hour

Front end loader 1 cum bucket capacity


hour
Tipper 5.5 cum capacity
hour
OH & Contractor's profit @12.5 % on (a+b+c)
Cost for 670 cum = (a+b+c+d) x 0.90
Rate per cum = [(a+b+c+d) x 0.90]/ 670
800 cum of stone boulders are needed to get
670 cum of stone chips of required size.

PanchayatR B Circle-2,Rajkot

10.00
10.00

764.00
250.00

7,640.00
2,500.00
30,899.27
250,284.05
336.20

[Chapter -1](Page-58)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

3
1.14

3
90 per cent of above cost will be attributed to
the production of 670 cum of stone aggregate
and balance 10 per cent will be for smaller size
aggregates and stone dust which comes out as a
by-product.

3
4

Rate
(Rs.)

Amount
(Rs.)

The integrated stone crusher includes primary


and secondary crushing units.

Crushing of Stone Aggregates Nominal Size


13.2 mm as per Table 500.9 of Technical
Specifications.
Crushing of stone boulders of 150 mm size in an
integrated stone crushing unit of 200 t/h capacity
comprising of primary and secondary crushing units,
belt conveyor and vibrating screens to obtain stone
aggregates of 13.2 mm nominal size as per Table
500.9 of Technical Specifications including the cost of
stone.
Unit = cum
Taking output = 600 cum at crusher location
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Material
Stone Boulder of size 150 mm and below
cum
c) Machinery
Integrated stone crusher of 200 t/h including
hour
belt conveyor and vibrating screens
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 cum capacity
hour
d) OH & Contractor's profit @12.5 % on (a+b+c)
Cost for 600 cum = (a+b+c+d) x 0.95
Rate per cum = [(a+b+c+d) x 0.95]/ 600
Note: 1 800 cum of stone boulders are needed to get
600 cum of stone chips of size 13.2 mm and 125
cum stone dust.

1.15

Unit Quantity

0.76
2.00
17.00

194.50
199.90
194.50

147.82
399.80
3,306.50

800.00

185.00

148,000.00

6.00 14,200.00

85,200.00

10.00
10.00

764.00
250.00

7,640.00
2,500.00
30,899.27
264,188.72
418.30

95 per cent of above cost will be attributed to


the production of 600 cum of stone chips of 13.2
mm size and balance 5 per cent to the
production of stone dust which comes out as a
by-product.
The integrated stone crusher includes primary
and secondary crushing units.
The analysis for curshing of stone chips of size
11.2 mm will be same as for 13.2 mm

Crushing of Stone Aggregates 9.5 mm Nominal


Size as per Table 500.9 of Technical
Specifications.
Crushing of stone boulders of 150 mm size in an
integrated stone crushing unit of 200 t/h capacity
comprising of primary and secondary crushing units,
belt conveyor and vibrating screens to obtain stone
aggregates of 9.5 mm nominal size as per Table
500.9 of Technical Specifications including the cost of
stone.
Unit = cum
Taking output = 600 cum at crusher location

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -1](Page-59)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

a)

b)
c)

Unit Quantity

3
Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Material
Stone Boulder of size 150 mm and below
Machinery
Integrated stone crusher of 200 t/h including
belt conveyor and vibrating screens

Amount
(Rs.)

day
day
day

0.76
2.00
17.00

194.50
199.90
194.50

147.82
399.80
3,306.50

cum

800.00

185.00

148,000.00

6.00 14,200.00

85,200.00

hour

Front end loader 1 cum bucket capacity


hour
Tipper 5.5 cum capacity
hour
d) OH & Contractor's profit @12.5 % on (a+b+c)
Cost for 600 cum = (a+b+c+d) x 0.95
Rate per cum = [(a+b+c+d) x 0.95]/ 600
Note: 1 800 cum of stone boulders are needed to get
600 cum of stone chips of size 9.5 mm and 125
cum stone dust.

Rate
(Rs.)

10.00
10.00

764.00
250.00

7,640.00
2,500.00
30,899.27
264,188.72
440.31

95 per cent of above cost will be attributed to


the production of 600 cum of stone chips of 9.5
mm size and balance 5 per cent to the
production of stone dust which comes out as a
by-product.
The integrated stone crusher includes primary
and secondary crushing units.

1.16

100

Cost of crushing of stone chips of size 6.7 mm


will be 10 per cent extra over that of 9.5 mm
size.
Setting Out
Unit = 1 km
The analysis of rate per km shall account for the following:
(i) Reference benchmark one no.
(ii) Working benchmark 4 nos. per km and near all
drainage structure and bridges
(iii) Reference Pillars/Burjees @ 50 m interval on
both sides of the formation width
(iv) The marking of centre line setting out curves and
recording of levels, etc. by the surveyor will be
incidental to the work and no extra payment
shall be made for the same
(v) The rate analysis for a typical benchmark as per
Drawing 200.1
1.

2.

3.

PMGSY SOR 13-14

Excavation for structure earthwork in


excavation for foundations as per drawing
and
technical
specification
including
dressing of sides and bottom and backfilling
in ordinary soil.
As per item No.11.1 of Chapter 11
Plain cement concrete M10 (1:3:6) nominal
mix in levelling course below open
foundation as per drawing and technical
specification.
As per item No.11.4 of Chapter 11
Brick masonry work in cement mortar 1:3 in
foundation complete excluding pointing and
plastering as per drawing and technical
specification.

cum

0.325

182.05

59.17

cum

0.10

3,611.23

361.12

PanchayatR B Circle-2,Rajkot

[Chapter -1](Page-60)

Sr.
No.
1

Ref.
MORD
Specifn
2

Unit Quantity

Rate
(Rs.)

3
As per item No.11.5 of Chapter 11
Plastering with cement mortar 1:4, 15 mm
thick cement plaster on brick work as per
technical specifications.

4
cum

5
0.475

6
4,443.11

7
2,110.48

As per item No.12.3 of Chapter 12

sqm

2.63

1,285.71

3,381.41

0.192

182.05

34.95

As per item No.11.4 of Chapter 11


cum
Brick masonry work in cement mortar 1:3 in
foundation complete excluding pointing and
plastering as per drawing and technical
specification.

0.06

3,611.23

216.67

As per item No.11.5 of Chapter 11


cum
Plastering with cement mortar 1:4, 15 mm
thick cement plaster on brick work as per
technical specifications.
As per item No.12.3 of Chapter 12
sqm

0.193

4,443.11

857.52

1.50

1,285.71

1,928.56

Description

4.

Note: Add 5 per cent cost of items No.1 to 4 for white


washing, lettering and painting, etc.

Amount
(Rs.)

Refer to Figure 200.1. of Standard Data Book


(vi) The rate analysis for a typical reference pillar as
per Drawing 200.2
1.

2.

3.

4.

Excavation for structure earthwork in


excavation for foundations as per drawing
and
technical
specification
including
dressing of sides and bottom and backfilling
in ordinary soil.
As per item No.11.1 of Chapter 11
cum
Plain cement concrete M10 (1:3:6) nominal
mix in levelling course below open
foundation as per drawing and technical
specification.

Add 5 per cent cost of items No.1 to 4 for white


washing, lettering and painting, etc.
Refer to Figure 200.2 of Standard Data Book

Note: The cross-section height and material for the


Reference Benchmark, Working Benchmark and
Reference Pillars shall be decided depending upon
site conditions and availability of construction
material. The cost thereof shall be worked out based
on rates of relevant items of work to be picked up
from relevant chapters of this book

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -1](Page-61)

Chapter 2
SITE CLEARANCE

Sr.
No.
1
2.1

2.2

Ref.
MORD
Description
Unit Quantity
n
Specif
2
3
4
5
201 Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance
of 30 m outside the periphery of the area as per
Technical Specification Clause 201.

201

By Manual Means
Unit = hectare
Taking output = 1 hectare
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5% on (a)
Rate per hectare = a+b
Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of
girth upto 300 mm, removal of stumps of such trees cut
earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned,
upto a lead of 1000 m including removal and disposal of
top organic soil not exceeding 150 mm in thickness as
per Technical Specification Clause 201.

day
day

Unit = hectare
Taking output = 1 hectare
(I) By Manual Means
(A) In area of non-thorny jungle
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate per hectare = a+b+c
(B) In area of thorny jungle
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate per hectare = a+b+c
(II) By Mechanical Means
(A) In area of non-thorny jungle
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Dozer D 50 with attachment or suitable
hour
machinery for removal of trees & stumps
Tractor with Trolley
hour
OH & Contractor's profit @ 12.5% on (a+b)
Rate per hectare = a+b+c
(B) In area of thorny jungle
a) Labour
Mate
day
Mazdoor (Unskilled)
day
c)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

1.60
40.00

194.50
194.50

311.20
7,780.00
1,011.40
9,102.60

6.00
150.00

194.50
194.50

1,167.00
29,175.00

1.00

300.00

300.00
3,830.25
34,472.25

8.00
200.00

194.50
194.50

1,556.00
38,900.00

2.00

300.00

600.00
5,132.00
46,188.00

0.16
4.00

194.50
194.50

31.12
778.00

10.00 2,100.00

21,000.00

1.00

300.00

300.00
2,763.64
24,872.76

0.24
6.00

194.50
194.50

46.68
1,167.00
[Chapter -2](Page-62)

Sr.
No.
1

2.3

Ref.
MORD
n
Specif
2

Description
3

Machinery
Dozer D 50 with attachment for removal of
hour
trees & stumps
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate per hectare = a+b+c
Note: The top soil removed during clearing and grubbing of
site, if suitable for re-use shall be transported,
conserved and stacked as directed by the Engineer and
shall be incidental to the work.
201

b)

Unit Quantity
5

Rate
(Rs.)

Amount
(Rs.)

12.00 2,100.00

25,200.00

1.50

300.00

450.00
3,357.96
30,221.64

0.024
0.60

194.50
194.50

4.67
116.70

0.07

300.00

21.00
17.80
160.16

0.036
0.90

194.50
194.50

7.00
175.05

0.21

300.00

63.00
30.63
275.68

0.08
2.00

194.50
194.50

15.56
389.00

0.28

300.00

84.00
61.07
549.63

0.16
4.00

194.50
194.50

31.12
778.00

0.42

300.00

126.00
116.89
1,052.01

0.32
8.00

194.50
194.50

62.24
1,556.00

1.00

300.00

300.00
239.78

Cutting of Trees including Cutting of Trunks,


Branches and Removal of Stumps
Cutting of trees, including cutting of trunks, branches
and removal of stumps & roots, refilling, compaction of
backfilling and stacking of serviceable material by
manual means with all lifts as per Technical
Specification Clause 201.
A.

PMGSY SOR 13-14

Lead upto 100 m


Unit = each
(i) Girth above 300 mm to 600 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(ii) Girth above 600 mm to 900 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(iii) Girth above 900 mm to 1800 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(iv) Girth above 1800 mm to 2700 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(v) Girth above 2700 mm to 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
PanchayatR B Circle-2,Rajkot

[Chapter -2](Page-63)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

B.

PMGSY SOR 13-14

Unit Quantity

3
4
Rate for each tree = a+b+c
(vi) Girth above 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
Lead upto 1000 m
Unit = each
(i) Girth above 300 mm to 600 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(ii) Girth above 600 mm to 900 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(iii) Girth above 900 mm to 1800 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(iv) Girth above 1800 mm to 2700 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(v) Girth above 2700 mm to 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
(vi) Girth above 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each tree = a+b+c
PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
6

Amount
(Rs.)
7
2,158.02

1.00
25.00

194.50
194.50

194.50
4,862.50

2.00

300.00

600.00
707.13
6,364.13

0.024
0.60

194.50
194.50

4.67
116.70

0.10

300.00

30.00
18.92
170.29

0.036
0.90

194.50
194.50

7.00
175.05

0.30

300.00

90.00
34.01
306.06

0.08
2.00

194.50
194.50

15.56
389.00

0.40

300.00

120.00
65.57
590.13

0.16
4.00

194.50
194.50

31.12
778.00

0.60

300.00

180.00
123.64
1,112.76

0.32
8.00

194.50
194.50

62.24
1,556.00

1.20

300.00

360.00
247.28
2,225.52

1.00
25.00

194.50
194.50

194.50
4,862.50

2.50

300.00

750.00
725.88
6,532.88
[Chapter -2](Page-64)

Sr.
No.
1
2.4

Ref.
MORD
Description
n
Specif
2
3
201 Uprooting and Removing Stumps & Roots

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

Uprooting and Removing Stumps & roots, compaction of


backfilling and stacking of servicable material by manual
means as per Technical Specification Clause 201.
A.

B.

PMGSY SOR 13-14

Lead upto 100 m


Unit = each
(i) Girth above 300 mm to 600 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(ii) Girth above 600 mm to 900 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(iii) Girth above 900 mm to 1800 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate for each stump & root = a+b+c
(iv) Girth above 1800 mm to 2700 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(v) Girth above 2700 mm to 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(vi) Girth above 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
Lead upto 1000 m
Unit = each
(i) Girth above 300 mm to 600 mm
a) Labour
PanchayatR B Circle-2,Rajkot

0.016
0.40

194.50
194.50

3.11
77.80

0.018

300.00

5.40
10.79
97.10

0.024
0.60

194.50
194.50

4.67
116.70

0.05

300.00

15.00
17.05
153.41

0.053
1.33

194.50
194.50

10.31
258.69

0.07

300.00

21.00
36.25
326.24

0.11
2.66

194.50
194.50

21.40
517.37

0.11

300.00

33.00
71.47
643.24

0.21
5.33

194.50
194.50

40.85
1,036.69

0.25

300.00

75.00
144.07
1,296.60

0.60
15.00

194.50
194.50

116.70
2,917.50

0.75

300.00

225.00
407.40
3,666.60

[Chapter -2](Page-65)

Sr.
No.
1

2.5

Ref.
MORD
n
Specif
2

202

Description

Unit Quantity

Rate
(Rs.)

4
day
day

5
0.016
0.40

6
194.50
194.50

0.025

300.00

7.50
11.05
99.46

0.024
0.60

194.50
194.50

4.67
116.70

0.075

300.00

22.50
17.98
161.85

0.053
1.33

194.50
194.50

10.31
258.69

0.10

300.00

30.00
37.37
336.37

0.11
2.66

194.50
194.50

21.40
517.37

0.15

300.00

45.00
72.97
656.74

0.21
5.33

194.50
194.50

40.85
1,036.69

0.30

300.00

90.00
145.94
1,313.47

0.60
15.00

194.50
194.50

116.70
2,917.50

1.00

300.00

300.00
416.78
3,750.98

Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(ii) Girth above 600 mm to 900 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate for each stump & root = a+b+c
(iii) Girth above 900 mm to 1800 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(iv) Girth above 1800 mm to 2700 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(v) Girth above 2700 mm to 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
(vi) Girth above 4500 mm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Rate for each stump & root = a+b+c
Dismantling of Structures
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of
masonry, cement concrete, wood work, steel work,
including T&P and scaffolding wherever necessary,
sorting
the
dismantled material,
disposal
of
unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 m as per
Technical Specification Clause 202.

Amount
(Rs.)
7

3.11
77.80

Unit = cum
Taking output = 1.25 cum
(I) By Manual Means
(A) Lime Concrete
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -2](Page-66)

Sr.
No.
1

2.6

Ref.
MORD
n
Specif
2

202

Description

a)

Unit Quantity

Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(B) Cement Concrete
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(C) Reinforced Cement Concrete
a) Labour
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(II) By Mechanical Means
(A) Cement Concrete
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Air compressor 210 cfm with 2 leads of hour
pneumatic breaker @1.5 cum per hour
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(B) Reinforced Cement Concrete
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Blacksmith
day
b) Machinery
Air compressor 170-210 cfm working with 2
hour
Jack Hammers simultaneously @1.00 cum
per hour
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
Dismantling Brick/Tile Work

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

0.04
1.00

194.50
194.50

7.78
194.50

0.27

300.00

81.00
35.41
318.69
254.95

0.05
1.25

194.50
194.50

9.73
243.13

0.27

300.00

81.00
41.73
375.58
300.47

0.15
0.25
3.50

194.50
207.80
194.50

29.18
51.95
680.75

0.27

300.00

81.00
101.71
915.41
732.33

0.02
0.50

194.50
194.50

3.89
97.25

0.83

300.00

249.00

0.27

300.00

81.00
53.89
485.03
388.03

0.05
0.91
0.25

194.50
194.50
207.80

9.73
177.00
51.95

1.25

300.00

375.00

0.27

300.00

81.00
86.83
781.50
625.20

[Chapter -2](Page-67)

Sr.
No.
1

2.7

Ref.
MORD
n
Specif
2

202

Description

Unit Quantity

3
Dismantling of existing structures like culverts, bridges,
retaining walls and other structures comprising of brick
masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and
lead of 1000 m as per Technical Specification Clause
202.
Unit = cum
Taking output = 1.25
(A) Lime mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c) /1.25
(B) Cement mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(C) Mud Mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(D) Dry Brick Pitching or Brick Soling
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
Dismantling Stone Masonry as per Technical
Specification Clause 202.
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of stone
masonry, including disposal of unserviceable material
and stacking the serviceable material with all lift and
lead of 1000 m as per Technical Specification Clause
202.
Unit = cum
Taking ouput = 1.25 cum
(A) Rubble Stone Masonry in Lime Mortar
a) Labour
Mate
Mazdoor (Unskilled)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

day
day

0.02
0.50

194.50
194.50

3.89
97.25

hour

0.27

300.00

81.00
22.77
204.91
163.93

day
day

0.03
0.75

194.50
194.50

5.84
145.88

hour

0.27

300.00

81.00
29.09
261.80
209.44

day
day

0.016
0.40

194.50
194.50

3.11
77.80

hour

0.27

300.00

81.00
20.24
182.15
145.72

day
day

0.014
0.35

194.50
194.50

2.72
68.08

hour

0.27

300.00

81.00
18.97
170.77
136.62

day
day

0.024
0.60

194.50
194.50

4.67
116.70
[Chapter -2](Page-68)

Sr.
No.
1

2.8

Ref.
MORD
n
Specif
2

202

Description

b)

Unit Quantity

Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(B) Rubble Stone Masonry in Cement Mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(C) Rubble Stone Masonry in Mud Mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(D) Dry Rubble Masonry
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(E) Dismantling Stone Pitching / Dry Stone Spalls
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
(F) Dismantling boulders laid in wire crates
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
Dismantling Wood Work Wrought and Planed
Fixed in Frames of Trusses upto a height of 5 m
above Plinth Level as per Technical Specification
Clause 202.
Unit = cum
Taking output = 1.25 cum
a) Labour
Mate
Carpenter 1st Class

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

hour

0.27

300.00

81.00
25.30
227.66
182.13

day
day

0.03
0.75

194.50
194.50

5.84
145.88

hour

0.27

300.00

81.00
29.09
261.80
209.44

day
day

0.02
0.50

194.50
194.50

3.89
97.25

hour

0.27

300.00

81.00
22.77
204.91
163.93

day
day

0.018
0.45

194.50
194.50

3.50
87.53

hour

0.27

300.00

81.00
21.50
193.53
154.82

day
day

0.016
0.40

194.50
194.50

3.11
77.80

hour

0.27

300.00

81.00
20.24
182.15
145.72

day
day

0.02
0.50

194.50
194.50

3.89
97.25

hour

0.27

300.00

81.00
22.77
204.91
163.93

day
day

0.06
0.50

194.50
207.80

11.67
103.90
[Chapter -2](Page-69)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

Rate
(Rs.)

4
day

5
1.00

6
194.50

7
194.50

0.27

300.00

81.00
47.43
426.83
341.46

day
day
day

0.14
1.00
2.50

194.50
207.80
194.50

27.23
207.80
486.25
18.03

hour

0.17

300.00

51.00
96.54
886.85

day
day
day

0.10
2.00
0.50

194.50
194.50
207.80

19.45
389.00
103.90
12.81

0.17

300.00

51.00
70.42
646.58

day
day
day

0.01
0.13
0.13

194.50
207.80
194.50

1.95
27.01
25.29
6.78
61.02
6.10

day
day

0.14
3.50

194.50
194.50

27.23
680.75
88.50
796.48

Mazdoor (Unskilled)
Machinery
Tractor with trolley
hour
c)
OH & Contractor's profit @ 12.5%(a+b)
Cost for 1.25 cum = a+b+c
Rate per cum = (a+b+c)/1.25
Dismantling Steel Work in all Types of Sections
upto a height of 5 m above Plinth Level excluding
Cutting of rivet as per Technical Specification
Clause 202.
b)

2.9

202

Unit = t
Taking output = 1
(A) Including dismembering
a) Labour
Mate
Blacksmith
Mazdoor (Unskilled)
Add 2.5 per cent of cost of labour for gas
cutting, ropes, pulleys, etc.
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per t = a+b+c
(B) Excluding dismembering
a) Labour
Mate
Mazdoor (Unskilled)
Blacksmith
Add 2.5 per cent of cost of labour for gas
cutting, ropes, pulleys, etc.
b)

Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per t = a+b+c
(C) Extra over Items (A) and (B) for cutting rivets

2.10

202

Unit = each
Taking output = 10 rivets
a) Labour
Mate
Blacksmith
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Cost for 10 rivets = a+b
Rate for each rivet = (a+b) /10
Scraping of bricks dismantled from brick work
including stacking as per Technical Specification
Clause 202.
Unit = Nos.
Taking output = 1000 Nos.
In Lime/ Cement Mortar
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Rate per 1000 Nos. = a+b

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

[Chapter -2](Page-70)

Ref.
MORD
Description
Unit Quantity
n
Specif
1
2
3
4
5
2.11
202 Scraping of Stone from Dismantled Stone
Masonry as per Technical Specification Clause
202.
Unit = cum
Taking output = 1 cum
In Cement or Lime Mortar
a) Labour
Mate
day
0.06
Mazdoor (Unskilled)
day
1.40
b) OH & Contractor's profit @ 12.5%(a)
Rate per cum = a+b
2.12
202 Scraping Plaster in Lime or Cement Mortar from
Brick / Stone Masonry as per Technical
Specification Clause 202.
Unit = sqm
Taking ouput = 100 sqm
a) Labour
Mate
day
0.16
Mazdoor (Unskilled)
day
4.00
b) Machinery
0.32
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 100 sqm = a+b+c
Rate per sqm = (a+b+c)/100
2.13
202 Removing all types of Hume pipes and stacking
within a lead of 1000 m including Earthwork and
Dismantling of Masonry Works as per Technical
Specification Clause 202.
Sr.
No.

Unit = m
Taking output = 1m
(A) Upto 600 mm dia Hume pipe
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Rate per m = a+b
(B) Above 600 mm to 900 mm dia Hume pipe
a)

Note:

2.14

202

Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Rate per m = a+b
(C) Above 900 mm dia Hume pipe
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%(a)
Rate per m = a+b

The excavation of earth, dismantling of stone


masonry work in head walls and protection works
is not included which is to be measured and paid
separately.

Credit for retrieved stone from masonry work may


be taken as per actual availability.

Rate
(Rs.)

Amount
(Rs.)

194.50
194.50

11.67
272.30
35.50
319.47

194.50
194.50

31.12
778.00

300.00

96.00
113.14
1,018.26
10.18

day
day

0.02
0.52

194.50
194.50

3.89
101.14
13.13
118.16

day
day

0.03
0.70

194.50
194.50

5.84
136.15
17.75
159.73

day
day

0.05
1.20

194.50
194.50

9.73
233.40
30.39
273.52

Dismantling of Flexible Pavements

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -2](Page-71)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
Dismantling of flexible pavements and disposal of
dismantled materials upto a lead of 100 m, stacking
serviceable and unserviceable materials separately as
per Technical Specification Clause 202
Unit = cum
Taking output = 1 cum
(I) By Manual Means
(A) Bituminous Courses
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per cum = a+b+c
(B) Granular Courses
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per cum = a+b+c
(II) By Mechanical Means
(A) Bituminous Courses
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
Tractor with ripper @ 60 cum per hour

Rate
(Rs.)

Amount
(Rs.)

day
day

0.06
1.50

194.50
194.50

11.67
291.75

hour

0.38

300.00

114.00
52.18
469.60

day
day

0.04
1.00

194.50
194.50

7.78
194.50

hour

0.33

300.00

99.00
37.66
338.94

day
day

0.01
0.30

194.50
194.50

1.95
58.35

hour
hour

0.38
0.016

300.00
300.00

114.00
4.80

c)

2.15

202

OH & Contractor's profit @ 12.5%(a+b)


Rate per cum = a+b+c
Dismantling of Cement Concrete Pavements as
per Technical Specification Clause 202.

22.14
199.29

Dismantling of cement concrete pavements by


mechanical means using pneumatic tools breaking to
pieces not exceeding 0.02 cum in volume and stock
piling at designated locations and disposal of dismantled
materials upto a lead of 1000 m, stacking serviceable
and unserviceable materials separately
Unit = cum
Taking output = 1 cum
a) Labour
Mate
day
Mazdoor (Semi-skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Air compressor 210 cfm with two leads for hour
pneumatic cutters / hammers @ 1 cum per
hour
Tractor with trolley
hour
Joint Cutting Machine with 2-3 blades
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per cum = a+b+c

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

0.03
0.50
0.50

194.50
196.30
194.50

5.84
98.15
97.25

1.00

300.00

300.00

0.40
1.00

300.00
150.00

120.00
150.00
96.40
867.64

[Chapter -2](Page-72)

Ref.
MORD
n
Specif
2

2.16

202

Sr.
No.

2.17

2.18

2.19

Description

Unit Quantity

Note: The above analysis is for removal of complete


pavement. In case full depth repair work is required to
be done after dismantling, provision of a concrete saw
cutter may be added for 0.25h.

202

202

202

Dismantling Guard Rails


Dismantling guard rails by manual means and disposal
of dismantled material with all lifts and upto a lead of
1000
m,
stacking serviceable
materials
and
unserviceable materials separately as per Technical
Specification Clause 202.
Unit = running m
Taking Output = 1 m
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate per m = a+b+c
Dismantling Kerb Stones
Dismantling kerb stones by manual means and disposal
of dismantled material with all lifts and upto a lead of
1000 m as per Technical Specification Clause 202.
Unit = running m
Taking output = 10 m
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost of 10 m = a+b+c
Rate per m = (a+b+c)/10
Dismantling Kerb Stone Channels
Dismantling kerb stone channels by manual means and
disposal of dismantled material with all lifts and upto a
lead of 1000 m as per Technical Specification Clause
202.
Unit = running m
Taking output = 10 m
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost of 10 m = a+b+c
Rate per m = (a+b+c)/10
Dismantling Kilometre Stones
Dismantling of kilometre stones including cutting of
earth, foundation and disposal of dismantled material
with all lifts and lead upto 1000 m and backfilling of pit
as per Technical Specification Clause 202.

Rate
(Rs.)

Amount
(Rs.)

0.006
0.15

194.50
194.50

1.17
29.18

0.05

300.00

15.00
5.67
51.01

0.006
0.15

194.50
194.50

1.17
29.18

0.20

300.00

60.00
11.29
101.63
10.16

0.015
0.225

194.50
194.50

2.92
43.76

0.30

300.00

90.00
17.09
153.77
15.38

Unit = each
Taking output = 1 km stone
(A) 5th km Stone
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -2](Page-73)

Sr.
No.
1

2.20

2.21

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
4
Quantity of cement concrete = 0.392 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate for one 5th km stone = a+b+c
(B) Ordinary km Stones
Quantity of cement concrete = 0.269 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate for one ordinary km stone = a+b+c
(C) 200 m Stones
Quantity of cement concrete = 0.048 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Rate for one 200 m stone = a+b+c
Note: Rate for boundary pillar will be same as that of 200 m
stone
202

202

Rate
(Rs.)

Amount
(Rs.)

0.03
0.75

194.50
194.50

5.84
145.88

0.15

300.00

45.00
24.59
221.30

0.02
0.50

194.50
194.50

3.89
97.25

0.08

300.00

22.50
15.46
139.10

0.004
0.10

194.50
194.50

0.78
19.45

0.02

300.00

6.00
3.28
29.51

0.15
3.00
0.75

194.50
194.50
207.80

29.18
583.50
155.85

0.15

300.00

45.00
101.69
915.22
30.51

0.09
2.00

194.50
194.50

17.51
389.00

Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing
including posts, foundation concrete, backfilling of pit by
manual means including disposal of dismantled material
with all lifts and upto a lead of 1000 m, stacking
serviceable material and unserviceable material
separately as per Technical Specification Clause 202.
Unit = running m
Taking output = 30 m
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Blacksmith
day
b) Machinery
Tractor with trolley
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost of 30 m = a+b+c
Rate per m = (a+b+c)/30
Dismantling of CI Water Pipe Line
Dismantling of CI water pipe line 600 mm dia including
disposal with all lifts and lead upto 1000 m and stacking
of serviceable material and unserviceable material
separately under supervision of concerned department
as per Technical Specification Clause 202.
Unit = running m
Taking output = 10 m
a) Labour
Mate
Mazdoor (Unskilled)

PMGSY SOR 13-14

day
day
PanchayatR B Circle-2,Rajkot

[Chapter -2](Page-74)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

Rate
(Rs.)

4
day

6
207.80

Plumber
Machinery
Truck 10 t capacity
hour
Crane upto 8 t capacity
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 10 m = a+b+c
Rate per m = (a+b+c)/10
Note: The rate analysis does not include any excavation in
earth or dismantling of masonry works which are to be
measured and paid separately.
b)

2.22

202

5
0.25

0.25 300.00
0.50 1,080.20

Amount
(Rs.)
7

51.95

75.00
540.10
134.19
1,207.75
120.77

Removal of Cement Concrete Pipe of Sewer


Gutter
Removal of cement concrete pipe of sewer gutter 1500
mm dia under the supervision of concerned department
including disposal with all lifts and upto a lead of 1000
m and stacking of serviceable and unserviceable
material separately but excluding earth excavation and
dismantling of masonry works as per Technical
Specification Clause 202.

Unit = running m
Taking output = 10 m
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Crane upto 8 t capacity
hour
Truck flat body 10 t
hour
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 10 m = a+b+c
Rate per m = (a+b+c)/10
Note: The rate analysis does not include any excavation in
earth or dismantling of masonry works which are to be
measured and paid separately.
2.23

202

0.10
2.50

194.50
194.50

19.45
486.25

0.30 1,080.20
1.00 300.00

324.06
300.00
141.22
1,270.98
127.10

Removal of Telephone/Electric Poles and Lines


Removal of telephone/electric poles with wires including
excavation and dismantling of foundation concrete and
lines under the supervision of concerned department,
disposal with all lifts and upto a lead of 1000 m and
stacking the serviceable and unserviceable material
separately as per Technical Specification Clause 202.
Unit = each
Taking output = 30 Nos.
a) Labour
Mate
Mazdoor (Unskilled)
Electrician/Lineman
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%(a+b)
Cost for 30 poles = a+b
Rate per pole = (a+b)/30

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

day
day
day

0.48
10.00
2.00

194.50
194.50
196.30

93.36
1,945.00
392.60

hour

1.50

300.00

450.00
360.12
3,241.08
108.04

[Chapter -2](Page-75)

Chapter 3
EARTHWORK, EROSION CONTROL AND DRAINAGE
Sr.
No.
1
3.1

Ref.
MORD
Specifn

Description

3
Preparation of Foundation for Embankment
301.4 Scarifying Existing Granular Surface to a Depth of 50
mm by Manual Means
Scarifying existing granular surface to a depth of 50 mm and
disposal of scarified material with a lift upto 3 m and leads
upto 1000 m as per Technical Specification Clause 301.4.
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 100 sqm = a+b+c
Rate per sqm = (a+b+c)/100

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day

0.16
4.00

194.50
194.50

31.12
778.00

hour

1.50

300.00

450.00
157.39
1,416.51
14.17

day
day

0.01
0.25

194.50
194.50

1.95
48.63

hour
hour

0.25
0.30

300.00
764.00

75.00
229.20

Tipper 5.5 cum capacity, 4 trips per hour


hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 100 sqm = a+b+c
Rate per sqm = (a+b+c)/100
301.5 Construction of Embankment with Material Obtained
from Roadway Cutting

0.61

250.00

153.00
63.47
571.24
5.71

Note: In case material is to be reused at site, transportation cost


catered above (Sub-item b) for disposal shall be deleted.
3.2

Preparation of Foundation for Embankment


301.4 Scarifying Existing Bituminous Surface to a Depth of
150 mm by Mechanical Means
Scarifying the existing bituminous road surface to a depth of
150 mm and disposal of scarified material with a lift upto 3
m and lead upto 1000 m as per Technical Specification
Clause 301.4.
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with ripper attachment @ 60 cum per hour
Front end loader 1 cum bucket capacity @ 50 cum per
hour

3.3

Construction of embankment with approved materials


deposited at site from roadway cutting and excavation from
drain and foundation of other structures graded and
compacted to meet requirement of Tables 300.1 and 300.2
as per Technical Specification Clause 301.5
Unit = cum
Taking output = 100 cum
a) Labour
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -3](Page-76)

Sr.
No.

Ref.
MORD
Specifn

Description
3
Mate
Mazdoor (Unskilled)
b) Machinery
Dozer D-50 for spreading @ 200 cum per hour
Motor grader for grading @ 200 cum per hour
Water tanker 6 kl capacity
Three wheel 80-100 kN Static Roller
c) Material
Water
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Rate for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d)/100

Unit Quantity

Rate
(Rs.)

4
day
day

5
0.02
0.50

6
194.50
194.50

hour
hour
hour
hour

0.50
0.50
2.00
1.25

2,100.00
2,100.00
300.00
400.00

1,050.00
1,050.00
600.00
500.00

12.00

16.00

192.00
436.64
3,929.78
39.30

0.04
1.00

194.50
194.50

7.78
194.50

1.67

1,400.00

2,338.00

kl

Note: In case the earth cutting is done by dozer and pushed for
filling in the embankment, the input of dozer in the cost of
embankment shall be deleted as the same is already
provided in the cost of excavation. However, if the earth is
dumped by tippers from roadway cutting, the input of dozer
for spreading is required to be provided.
3.4

Amount
(Rs.)
7

3.89
97.25

301.5 Construction of Embankment with Material Obtained


from Borrow Pits
Construction of embankment with approved material
obtained from borrow pits with a lift upto 1.5 m,
transporting to site, spreading, grading to required slope
and compacting to meet requirement of Tables 300.1 and
300.2 with a lead upto 1000 m as per Technical
Specification Clause 301.5
Unit = cum
Taking output = 100 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hour
per hour

c)

Tipper 5.5 cum with 10 t capacity


Loading of earth as per item 1.1 (ii)
Unloading of earth as per item 1.1 (iv)
Dozer D-50 for spreading @ 200 cum per hour
Motor grader for grading @ 200 cum per hour
Water tanker 6 kl capacity
Three wheel 80-100 kN Static Roller @ 80 cum per hour

hour
cum
cum
hour
hour
hour
hour

4.05
100.00
100.00
0.50
0.50
2.00
1.25

250.00
25.68
13.65
2,100.00
2,100.00
300.00
400.00

1,012.50
2,568.48
1,365.18
1,050.00
1,050.00
600.00
500.00

Material
Water
Compensation for earth taken from private land

kl
cum

12.00
100.00

16.00
17.50

192.00
1,750.00

d) OH & Contractor's profit @ 12.5%on (a+b+c)


Cost for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d)/100

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

1,578.55
14,206.99
142.07

[Chapter -3](Page-77)

Sr.
No.
1

Ref.
MORD
Specifn
2

3.5

Description
3

Note:

Compensation for earth will vary from place to place and


will have to be assessed realistically as per particular
ground situation. In case earth is available from Govt. land,
compensation for earth will not be required. The position is
required to be clearly stated in the cost estimate.

302

(i) Excavation in Cutting in Soil by manual means


with lead upto 50 m

Unit Quantity
4

Excavation for roadway in soil using manual means for


carrying of cut earth to embankment site with a lift
upto 1.5 m and lead upto 50 m as per Technical
Specification Clause 302.3
Unit = cum
Taking output = 120 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost of 120 cum = a+b
Rate per cum = (a+b)/120
(ii) Excavation in Soil with Dozer with lead upto
100 m
Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of
embankment upto a distance of 100 m, including
trimming bottom and side slopes in accordance with
requirements of lines, grades and cross-sections.
Unit = cum
Taking output = 180 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Dozer D-50 @ 50 cum per hour (cutting with
hour
pushing)

Rate
(Rs.)

Amount
(Rs.)

1.80
45.00

194.50
194.50

350.10
8,752.50
1,137.83
10,240.43
85.34

0.08
2.00

194.50
194.50

15.56
389.00

3.60

2,100.00

7,560.00

c) OH & Contractor's profit @ 12.5% on (a+b)


Cost for 180 cum = a+b+c
Rate per cum = (a+b+c)/180
(iii) Excavation in Soil using Hydraulic Excavator and
Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator
of 0.9 cum bucket capacity including cutting and
loading in tippers, trimming bottom and side slopes, in
accordance with requirements of lines, grades and
cross-sections, and transporting to the embankment
location with a lift upto 1.5 m and lead upto 1000 m as
per Technical Specification Clause 302.3
Unit = cum
Taking output = 360 cum
a) Labour
Mate
PMGSY SOR 13-14

995.57
8,960.13
49.78

day
PanchayatR B Circle-2,Rajkot

0.08

194.50

15.56

[Chapter -3](Page-78)

Sr.
No.

Ref.
MORD
Specifn

3.6

302.3.6

Description

Unit Quantity

3
4
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @
hour
100 cum per hour
Tipper 5.5 cum capacity, 4 trips per hour
hour
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 360 cum = a+b+c
Rate per cum = (a+b+c)/360
Excavation in Marshy Soil
Excavation for roadway in marshy soil with hydraulic
excavator 0.9 cum bucket capacity including cutting and
loading in tippers and disposal with a lift upto 1.5 m and
lead upto 1000 m, trimming of bottom and side slopes in
accordance with requirements of lines, grades and crosssections as per Technical Specification Clause 302.3.6.

3.7

Tipper 5.5 cum capacity, 4 trips per hour


c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 360 cum = a+b+c
Rate per cum = (a+b+c)/360

Note: This item does not include replacement of unsuitable soil by


suitable soil. Replacement, where required, is to be
provided and paid separately under Clause 303.5.2.
3.8

302.3.5

Amount
(Rs.)

5
2.00

6
194.50

7
389.00

3.60

1,400.00

5,040.00

13.50

250.00

3,375.00
1,102.45
9,922.01
27.56

0.08
2.00

194.50
194.50

15.56
389.00

6.00

1,400.00

8,400.00

hour

11.25

250.00

2,812.50
1,452.13
13,069.19
36.30

day
day

0.08
2.00

194.50
194.50

15.56
389.00

hour

3.60

1,400.00

5,040.00

hour

13.50

250.00

3,375.00
1,102.45
9,922.01
27.56

Unit = cum
Taking output = 300 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic excavator 0.90 cum bucket capacity @ 50 hour
cum per hour
Tipper 5.5 cum capacity, 4 trips per hour.
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 300 cum = a+b+c
Rate per cum = (a+b+c)/300
302.3.11 Removal of Unsuitable Soil with Disposal upto 1000
m
Removal of unsuitable soil including excavation, loading and
disposal upto 1000 m lead but excluding compaction
ground supporting embankment subgrade replacement by
suitable soil, which shall be paid separately as per Clause
303.5.2 as per Technical Specification Clause 302.3.11
Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor
b) Machinery
Excavator 0.90 cum bucket capacity @ 100 cum per
hour

Rate
(Rs.)

(i) Excavation in ordinary Rock by manual means

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -3](Page-79)

Sr.
No.

Ref.
MORD
Specifn

Description
3
Excavation in ordinary rock using manual means
including loading in a truck and carrying of excavated
material to embankment site with a lift upto 1.5 m and
lead upto 50 m as per Technical Specification Clause
302.3.5.
Unit = cum
Taking output = 120 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 120 cum = a+b
Rate per cum = (a+b)/120
(ii) Excavation in Ordinary Rock with Dozer with
lead upto 100 m
Excavation for roadway in ordinary rock by deploying a
dozer D-50 including cutting and pushing the cut earth
to site of embankment upto a distance of 100 m
(average lead 50 m), trimming bottom and side slopes
in accordance with the requirements of lines, grades
and cross-sections with lift upto 1.5 m.
Unit = cum
Taking output = 108 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Dozer D-50 @ 50% of 100 cum per hour
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 108 cum = a+b+c
Rate per cum = (a+b+c)/108
(iii) Excavation in Ordinary Rock using Hydraulic
Excavator and Tippers with disposal upto 1000
m
Excavation for roadway in ordinary rock with hydraulic
excavator of 0.9 cum bucket capacity including cutting
and loading in tippers, transporting to embankment site
with a lift upto 1.5 m and lead upto 1000 m, trimming
bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as per
Technical Specification Clause 302.3.5
Unit = cum
Taking output = 240 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity @
40 cum per hour
Tipper 5.5 cum capacity, 4 trips per hour.
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 240 cum = a+b+c
Rate per cum = (a+b+c)/240

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day

2.80
70.00

194.50
194.50

544.60
13,615.00
1,769.95
15,929.55
132.75

day
day

0.12
3.00

194.50
194.50

23.34
583.50

hour

2.16

2,100.00

4,536.00
642.86
5,785.70
53.57

day
day

0.08
2.00

194.50
194.50

15.56
389.00

hour

6.00

1,400.00

8,400.00

hour

9.90

250.00

2,475.00
1,409.95
12,689.51
52.87

[Chapter -3](Page-80)

Sr.
No.
1
3.9

Ref.
MORD
Specifn
2

302.3.5

Description
3
(i) Excavation in Hard Rock (requiring blasting)
with disposal upto 1000 m

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

Excavation for roadway in hard rock (requiring blasting)


by drilling, blasting and breaking, trimming of bottom
and side slopes in accordance with requirements of
lines, grades and cross-sections, loading and disposal of
cut rock with a lift upto 1.5 m and leads upto 1000 m
as per Technical Specification Clause 302.3.5
Unit = cum
Taking 0utput = 180 cum
a) Labour
Mate
Mazdoor (Unskilled)
Driller
Blaster
b) Machinery
Dozer D-50 @ 30 cum per hour
Air compressor, 210 cfm with 2 jack hammers

day
day
day
day

0.22
3.00
2.00
0.25

194.50
194.50
194.50
194.50

42.79
583.50
389.00
48.63

hour
hour

6.00
6.00

2,100.00
300.00

12,600.00
1,800.00

Front end loader 1 cum bucket capacity @ 30 cum hour


per hour

6.00

764.00

4,584.00

hour

14.40

250.00

3,600.00

kg
each

70.00
252.00

144.00
35.00

10,080.00
8,820.00

cum

90.00

-185.00

-16,650.00

Tipper 5.5 cum capacity, 2 trips per hour


c) Materials
Gelatine 80 per cent
Electric Detonators @ 1 detonator for 2 gelatine
sticks of 285 gm each

Credit for ex cavated rock found suitable for


use @ 50 per cent quantity blasted

Note:

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost for 180 cum = a+b+c+d
Rate per cum = (a+b+c+d)/180

1 The quality and availability of rock shall be checked


before affording credit.
2 In case some rock is issued to the contractor at site,
the item of carriage shall be reduced/restricted to that
extent.
3 Credit for useful material received as per site
conditions shall be taken into account. This has been
assumed to be 50 per cent for the purpose of analysis.

3,237.24
29,135.15
161.86

(ii) Excavation in Hard Rock (blasting prohibited)


Excavation for roadway in hard rock (blasting
prohibited) with rock breakers including breaking rock,
loading in tippers and disposal with a lift upto 1.5 m
and lead upto 1000 metres, trimming bottom and side
slopes in accordance with requirements of lines, grades
and cross- sections as per Technical Specification
Clause 302.3.5
(A) Manual Means
Unit = cum
Taking output = 16 cum
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -3](Page-81)

Sr.
No.

Ref.
MORD
Specifn

Description
3
a) Labour
Mate
Mazdoor (Unskilled)
Chiseller
Blacksmith
b) Machinery
Tipper 5.5 cum capacity, 1 trip per hour

Credit for ex cavated rock found suitable for


use @ 50 per cent of ex cavated quantity

Note:

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day
day
day

1.64
16.00
24.00
1.00

194.50
194.50
194.50
207.80

318.98
3,112.00
4,668.00
207.80

hour

2.61

250.00

652.50

cum

8.00

-185.00

-1,480.00

c) OH & Contractor's profit @ 12.5% on (a+b)


Cost for 16 cum = a+b+c
Rate per cum = (a+b+c)/16
1 Credit is considered for 50 per cent of quantity of work.

934.91
8,414.19
525.89

2 Loading for disposal will be done manually, being small


quantity.

3 In case some rock is issued to contractor at site, the


item of carriage shall be omitted to the extent of
quantity issued to the Contractor.
(B) Mechanical Means
Unit = cum
Taking output = 36 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic excavator 0.9 cum with rock breaker
hour
attachment @ 6 cum per hour
Tipper 5.5 cum capacity tipper, 1 trip per hour
hour
Credit for ex cavated rock found suitable for cum

0.40
10.00

194.50
194.50

77.80
1,945.00

6.00

1,400.00

8,400.00

5.85
18.00

250.00
-185.00

1,462.50
-3,330.00

use @ 50 per cent of ex cavated quantity

Note:

c) OH & Contractor's profit @ 12.5% on (a+b)


Cost for 36 cum = a+b+c
Rate per cum = (a+b+c)/36
1 The quality and availability of rock shall be checked
before affording credit.

1,069.41
9,624.71
267.35

2 In case some rock is issued to the contractor at site,


the item of carriage shall be restricted/reduced to that
extent.
3 Being small quantity, manual loading will be economical
in this case and has been provided accordingly.
(iii) Excavation in Hard Rock (controlled blasting)
with disposal upto 1000 m

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -3](Page-82)

Sr.
No.

Ref.
MORD
Specifn

Description
3
Excavation for roadway in hard rock with controlled
blasting by drilling, blasting and breaking, trimming of
bottom and side slopes in accordance with
requirements of lines, grades and cross-sections,
loading and disposal of cut rock with a lift upto 1.5 m
and leads upto 1000 m as per Technical Specification
Clause 302.3.5
Unit = cum
Taking output = 180 cum
a) Labour
Mate
Mazdoor (Unskilled)
Driller
Blaster
b) Machinery
Dozer D-50 @ 30 cum per hour
Air compressor, 210 cfm with 2 jack hammers

Rate
(Rs.)

Amount
(Rs.)

day
day
day
day

0.22
3.00
2.00
0.50

194.50
194.50
194.50
194.50

42.79
583.50
389.00
97.25

hour
hour

6.00
6.00

2,100.00
300.00

12,600.00
1,800.00

hour
hour

6.00
7.38

764.00
250.00

4,584.00
1,845.00

kg
each

70.00
1,008.00

144.00
35.00

10,080.00
35,280.00

Credit for ex cavated rock found suitable for cum


use @ 50 per cent quantity blasted

90.00

-185.00

-16,650.00

Front end loader 1 cum bucket capacity


Tipper 5.5 cum capacity, 4 trips per hour
c) Materials
Gelatine 80 per cent
Electric detonators @ 1 detonator for 2 gelatine
stick of 285 gm each

Note:

Unit Quantity

d) OH & Contractor's profit @ 12.5% on (a+b)


Cost for 180 cum =a+b+c+d
Rate per cum = (a+b+c+d)/180
1 Credit is considered for 50 per cent of quantity of
blasted rock, if found suitable for construction.

6,331.44
56,982.98
316.57

2 In case some rock is issued to the Contractor at site,


the item of carriage shall be reduced to that extent.
3.10

302.3.2

Stripping, Storing and Relaying Top Soil from Rightof-Way (R.O.W)


Stripping, storing and preservation of top soil by keeping it
damp in stock piles and keep wet till it is used by road side
at 15 m internal and re-application on embankment slopes,
cut slopes and other areas in localities where the available
embankment material is not conducive to plant growth as
per Technical Specification Clause 302.3.2
Unit = cum
Taking output = 10 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Dozer D-50 @ 100 cum per hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 10 cum = (a+b+c)
Rate per cum = (a+b+c)/10

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

day
day

0.20
5.00

194.50
194.50

38.90
972.50

hour

0.10

2,100.00

210.00
1,221.40
2,442.80
244.28

[Chapter -3](Page-83)

Sr.
No.
1
3.11

3.12

Ref.
MORD
Specifn
2

302.3.2

309

Description

Unit Quantity

3
4
Stripping, Storing and Relaying Top Soil from Borrow
Areas in Agricultural Fields
Stripping of top soil from borrow areas located in agriculture
fields, storing at a suitable place, spreading and relaying
after taking the borrow earth to maintain fertility of the
agricultural field, finishing it to the required levels to the
satisfaction of the farmer/land owner as per Technical
Specification Clause 302.3.2.
Unit = cum
Taking output = 300 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Dozer D-50 with 100 cum per hour output (Initially hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 300 cum = a+b+c
Rate per sqm = (a+b+c)/300
Turfing with Sods
Furnishing and laying of the live sods of perennial turf
forming grass on embankment slope, verges or other
locations shown on the drawing or as directed by the
Engineer including preparation of ground, fetching of sods
and watering as per Technical Specification Clause 309.
Unit = sqm
Talking output = 100 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Water tanker including watering for 3 months
hour
Tractor with Trolley
hour
c) Material
Farmyard manure @ 0.18 cum per 100 sqm at site ocum

3.13

310

Water
kl
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
Seeding and Mulching
Preparation of seed bed on previously laid top soil,
furnishing and placing of seeds, fertilizer, mulching material,
applying bituminous emulsion @ 0.23 litre per sqm and
laying and fixing jute netting, including watering for 3
months all as per Technical Specification Clause 310.
Unit = sqm
Taking output = 240 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery

PMGSY SOR 13-14

day
day
PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

4.00
100.00

194.50
194.50

778.00
19,450.00

6.00

2,100.00

12,600.00
4,103.50
36,931.50
123.11

0.12
3.00

194.50
194.50

23.34
583.50

6.00

300.00

1,800.00

1.00

300.00

300.00

0.18

295.00

53.10

36.00

16.00

576.00
416.99
3,752.93
37.53

0.40
10.00

194.50
194.50

77.80
1,945.00

[Chapter -3](Page-84)

Sr.
No.

Ref.
MORD
Specifn

Description

Rate
(Rs.)

Amount
(Rs.)

3
4
Water tanker 6 kl capacity including watering for 3 hour
months

5
14.00

6
300.00

7
4,200.00

Tractor with Trolley


hour
c) Material
Seeds
kg
Sludge/Farmyard manure @ 0.18 cum per 100 sqm cum

2.40

300.00

720.00

3.60
0.43

8.25
295.00

29.70
126.85

0.052 34,096.81
264.00
30.00

1,773.03
7,920.00

Bitumen Emulsion
Jute netting, open weave, 25 mm square opening

3.14

Unit Quantity

t
sqm

Water for 3 months


kl
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 240 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/240
303.1 Construction of Subgrade and Earthen Shoulders

84.00

16.00

1,344.00
2,267.05
20,403.43
85.01

0.04
1.00

194.50
194.50

7.78
194.50

1.00

1,400.00

1,400.00

4.05
100.00
100.00
0.50
0.50
2.00
1.43

250.00
25.68
13.65
2,100.00
2,100.00
300.00
400.00

1,012.50
2,568.48
1,365.18
1,050.00
1,050.00
600.00
572.00

12.00
100.00

16.00
17.50

192.00
1,750.00

Construction of subgrade and earthen shoulders with


approved material obtained from borrow pits with all lifts
and leads, transporting to site, spreading, grading to
required slope and compacted to meet requirement of Table
300.2 with lead upto 1000 m as per Technical Specification
Clause 303.1.
Unit = cum
Taking output = 100 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ hour
100 cum per hour
Tipper 5.5 cum capacity, 4 trips per hour
hour
Add rate for loading as per item 1.1 (ii)
cum
Add rate for unloading as per item 1.1 (iv)
cum
Dozer D-50 for spreading @ 200 cum per hour
hour
Motor grader for grading @ 200 cum per hour
hour
Water tanker with 6 kl capacity
hour
Three wheel 80-100 kN Static Roller @ 70 cum per hour
hour
c) Material
Water
kl
Compensation for earth taken from private land
cum

3.15

d) OH & Contractor's profit @ 12.5%on (a+b+c)


Cost for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d)/100
301.4 Compacting Original Ground
(i) Compacting
original
ground
supporting
embankment

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

1,470.30
13,232.74
132.33

[Chapter -3](Page-85)

Sr.
No.

Ref.
MORD
Specifn

303

Description
3
Loosening, Levelling and Compacting original ground
supporting embankment to facilitate placement of first
layer of embankment, scarified to a depth of 150 mm,
mixed with water at OMC and then compacted by
rolling so as to achieve minimum dry density as given in
Tables 300.1 and 300.2 for embankment construction
as per Technical Specification Clause 301.4.1.

Unit Quantity
4

Unit = cum
Taking output = 600 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with ripper attachment
hour
Three wheel 80-100 kN Static Roller
hour
Water tanker 6 kl capacity
hour
c) Material
Water
kl
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 600 cum = a+b+c+d
Rate per sqm = (a+b+c+d)/600
(ii) Compacting original ground supporting subgrade

Loosening of the ground upto a level of 300 mm below


the subgrade level, watered, graded and compacted in
layers to meet requirement of Tables 300.1 and 300.2
for subgrade construction as per Technical Specification
Clause 303.5.2.
Unit = cum
Taking output = 600 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with ripper attachment
hour
Motor grader for grading
hour
Water tanker 6 kl capacity
hour
Three wheel 80-100 kN Static Roller @ 70 cum per hour
hour
c) Material
Water
kl
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 600 cum = a+b+c+d
Rate per cum = (a+b+c+d)/600
3.16 301.5.5.1 Repairs of damages caused by rain/spillage of water

Rate
(Rs.)

Amount
(Rs.)

0.08
2.00

194.50
194.50

15.56
389.00

6.00
7.50
4.00

300.00
400.00
300.00

1,800.00
3,000.00
1,200.00

24.00

16.00

384.00
848.57
7,637.13
12.73

0.24
6.00

194.50
194.50

46.68
1,167.00

10.00
6.00
4.00
8.60

300.00
2,100.00
300.00
400.00

3,000.00
12,600.00
1,200.00
3,440.00

24.00

16.00

384.00
2,729.71
24,567.39
40.95

Preparation and surface treatment of formation by removing


mud and slurry, watering to the extent needed to maintain
the desired moisture content, trimming to the required line,
grade, profile and rolling with three wheel 80-100 kN static
roller, complete as per Technical Specification Clause
301.5.5.1
Unit = sqm
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -3](Page-86)

Sr.
No.

Ref.
MORD
Specifn

3.17

Description

Unit Quantity

3
4
Taking output = 3500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor skilled
day
b) Machinery
Three wheel static roller 80-100 kN
hour
Water tanker 6 kl, one trip per hour
hour
c) Material
Water
kl
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 3500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/3500
304.3 Presplitting Rock Excavation Slopes
Carrying out excavation in hard rock to achive a specified
slope of the rock face by controlled use of explosives and
blasting accessories in properly aligned and spaced drill
holes, collection of the excavated rock by a D-50 dozer,
loading in tipper by a front end loader and disposing of the
material with a lift upto 1.5 m and lead upto 1000 m as per
Technical Specification Clause 304.3
Unit = sqm
Taking output = 400 sqm (120 cum considering 300
mm average depth of excavation over the existing rock
face)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Air compressor 210 cfm with 2 leads @ 20 cum per hour
hour
Dozer D-50
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 cum capacity 2 trip per hour
hour
c) Material
Gelatine 80 per cent
kg
Electric detonators @ 1 detonator for 2 gelatine each
sticks of 285 gm each
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 400 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/400

Note: In case blasted rock is issued to the Contractor against


payment for construction work, the cost of carriage shall
be reduced to that extent.
3.18

306

Rate
(Rs.)

Amount
(Rs.)

0.28
6.00
1.00

194.50
194.50
199.90

54.46
1,167.00
199.90

3.00
2.00

400.00
300.00

1,200.00
600.00

12.00

16.00

192.00
426.67
3,840.03
1.10

0.60
15.00

194.50
194.50

116.70
2,917.50

6.00

300.00

1,800.00

6.00
6.00
9.90

2,100.00
764.00
250.00

12,600.00
4,584.00
2,475.00

42.00
672.00

144.00
35.00

6,048.00
23,520.00
54,061.20
108,122.40
270.31

Construction of Embankment with Flyash/Pond ash


available from Coal or Lignite Burning Thermal Plants
as Waste Material

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -3](Page-87)

Sr.
No.

Ref.
MORD
Specifn

Description
3
Construction of embankment with flyash conforming to
Table 1 of IRC:SP:58 obtained from coal or lignite burning
thermal power stations as waste material, spread and
compacted in layer of 200 mm thickness each at OMC, all as
specified in IRC:SP:58 and as per approved plans with lead
upto 1000 m as per Technical Specification Clause 306.
Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 60
cum per hour
Tipper 5.5 cum capacity, flyash 360 x 1.2 = 432 t

Note:

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day

0.16
4.00

194.50
194.50

31.12
778.00

hour

6.00

1,400.00

8,400.00

hour

16.00

250.00

4,000.00

Loading as per item 1.1 (ii)


cum
Unloading as per item 1.1 (iv)
cum
Dozer D-50 for spreading @ 200 cum per hour
hour
Motor grader for grading @ 200 cum per hour
hour
Water tanker 6 kl capacity
hour
Three wheel 80-100 kN Static Roller
hour
c) Material
Water
kl
d) OH & Contractor's profit @ 12.5%on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
1 As flyash is available free of cost as waste material
from Thermal Plants, cost of material has not been
added.

360.00
360.00
1.80
1.80
9.00
4.50

25.68
13.65
2,100.00
2,100.00
300.00
400.00

9,246.52
4,914.65
3,780.00
3,780.00
2,700.00
1,800.00

54.00

16.00

864.00
5,036.79
45,331.08
125.92

0.08
2.00

194.50
194.50

15.56
389.00
50.57
455.13
45.51

2 The earthcover on sides and intermediate layers of

3.19

307

earth sandwiching the flyash have not been included in


this analysis. The same are required to be provided as
per approved design and priced seperately as
embankment construction.
(i) Surface Drains in Soil
Construction of unlined surface drains of average crosssectional area 0.40 sqm in soil to specified lines,
grades, levels and dimensions. Excavated material to
be used in embankment with a lift upto 3m and lead of
50 m (average lead 25 m) as per Technical
Specification Clause 307.
Unit = m
Taking output = 10 m
(A) Manual Means
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5%on (a)
Cost for 10 m = a+b
Rate per m = (a+b)/10

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -3](Page-88)

Sr.
No.
1

Ref.
MORD
Specifn

Description

Note: Where lining of drain is provided, quantity shall be worked


out based on approved design and drawing and priced on
rate of cement concrete of approved grade or stone/brick
masonary as the case may be.
(B) Mechanical Means
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @
100 cum per hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 10 m = a+b+c
Rate per m = (a+b+c)/10
(ii) Surface Drains in Ordinary Rock
Construction of unlined surface drain of average crosssectional area 0.4 sqm in ordinary rock to specified
lines, grades, levels and dimensions as per approved
design and Technical Specification Clause 307.
Excavated material to be used in embankment at site.
Unit = m
Taking output = 10 m
(A) Manual Means
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5%on (a)
Cost for 10 m = a+b
Rate per m = (a+b)/10
(B) Mechanical Means
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 40
m per hour
c) OH & Contractor's profit @ 12.5%on (a+b)
Cost for 10 m = a+b
Rate per m = (a+b)/10
(iii) Surface Drains in Hard Rock
Rate per m may be worked out based on quantity of
hard rock as per design.

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day

0.01
0.25

194.50
194.50

1.95
48.63

hour

0.04

1,400.00

56.00
13.32
119.89
11.99

day
day

0.12
3.00

194.50
194.50

23.34
583.50
75.86
682.70
68.27

day
day

0.02
0.50

194.50
194.50

3.89
97.25

hour

0.10

1,400.00

140.00
30.14
271.28
27.13

For rate of hard rock cutting, refer relevant item in this


Chapter
3.20

307

Chute Drains
A. Providing chute drains across embankment
slopes in approches of bridges and on horizontal
curves as per drawings.
Unit = 1 m

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -3](Page-89)

Sr.
No.

Ref.
MORD
Specifn

Description

B.

3
(a) Earthwork in excavation for foundations of
structures as per drawings and technical
specifications Clause 307 including setting out
construction of shoring and bracing deleterious
matter, dressings of sides and bottom and
backfilling with approved material (By manual
means).
Rate as per item No.11.1 of Chapter 11.
(b) Providing and laying plain cement concrete M15
grade.
Rate as per item No.12.5 of Chapter 12.
(c) Brick Masonry in cement mortar 1:5.
Rate as per item No. 12.1(III) of Chapter 12.
(d) Plastering with cement mortar 1:4.
Rate as per item No. 12.3 of Chapter 12.
(e) Providing P.C.C. M.20 coping on the top of chute
walls.
As per item No. 12.13 of Chapter 12.
Rate per m = a+b+c+d+e
Providing chute drains across embankment
slopes in approches of bridges and on horizontal
curves as per drawings.

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

cum

182.05

0.00

cum

3,948.16

0.00

cum

4,230.36

0.00

sqm

128.57

0.00

268.47

0.00
0.00

cum

182.05

0.00

cum

3,948.16

0.00

cum

2,817.54

0.00

sqm

1,285.71

0.00

268.47

0.00
0.00

Unit = 1 m
(a) Earthwork in excavation for foundations of
structures as per drawings and technical
specifications Clause 307 including setting out
construction of shoring and bracing deleterious
matter, dressings of sides and bottom and
backfilling with approved material (By manual
means).
Rate as per item No.11.1 of Chapter 11.
(b) Providing and laying plain cement concrete M15
grade.
Rate as per item No.12.5 of Chapter 12.
(c) Coursed rubble stone masonry (2nd Sort) in
Rate as per item No. 12.4 II (ii) of Chapter 12.
(d) Plastering with cement mortar 1:4.
Rate as per item No. 12.3 of Chapter 12.
(e) Providing P.C.C. M.20 coping on the top of chute
walls.
As per item No. 12.13 of Chapter 12.
Rate per m = a+b+c+d+e

Note: Quantities are to be taken as per the designs and drawings.

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -3](Page-90)

Chapter 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
Sr.
No.
1
4.1

Ref.
MORD
Description
Unit Quantity
n
Specif
2
3
4
5
401 Granular Sub-base with Well Graded Material
(Table 400.1)

Rate
(Rs.)

Amount
(Rs.)

(A) By Mix in Place Method


Construction of granular sub-base by providing well
graded material, spreading in uniform layers with
motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and
compacting with smooth wheel roller to achieve the
desired density, complete as per Technical
Specification Clause 401.
(i)

For Grading I Material


Unit = cum
Taking output = 300 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Motor Grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller @ 10 cum hour
per hour
Tractor with Rotavator 25 cum per hour
hour
Water tanker 6 kl capacity
hour
c) Material
Well graded granular sub-base material as per
Table 400.1
53 mm to 9.5 mm @ 50 per cent
cum
9.5 mm to 2.36 mm @ 20 per cent
cum
2.36 mm below @ 30 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
(ii) For Grading II Material
Unit = cum
Taking output = 300 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Motor Grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller @ 10 cum hour
per hour
Tractor with Rotavator 25 cum per hour
hour
Water tanker 6 kl capacity
hour
c) Material
Well graded granular sub-base material as per
Table 400.1
26.5 mm to 9.5 mm @ 35 per cent
cum
9.5 mm to 2.36 mm @ 25 per cent
cum
2.36 mm below @ 40 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

0.48
2.00
10.00

194.50
199.90
194.50

93.36
399.80
1,945.00

6.00
30.00

2,100.00
400.00

12,600.00
12,000.00

12.00
5.00

300.00
300.00

3,600.00
1,500.00

192.00
77.00
115.00
30.00

377.50
365.00
150.00
16.00

72,480.00
28,105.00
17,250.00
480.00
18,806.65
169,259.81
564.20

0.48
2.00
10.00

194.50
199.90
194.50

93.36
399.80
1,945.00

6.00
30.00

2,100.00
400.00

12,600.00
12,000.00

12.00
5.00

300.00
300.00

3,600.00
1,500.00

134.00
96.00
153.00
30.00

395.00
365.00
150.00
16.00

52,930.00
35,040.00
22,950.00
480.00
17,942.27
161,480.43
[Chapter -4](Page-91)

Sr.
No.
1

Ref.
MORD
n
Specif
2

401

Description

Unit Quantity

3
4
Rate per cum = (a+b+c+d)/300
(iii) For Grading III Material
Unit = cum
Taking output = 300 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Motor Grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller @ 10 cum hour
per hour
Tractor with Rotavator 25 cum per hour
hour
Water tanker 6 kl capacity
hour
c) Material
Well graded granular sub-base material as per
Table 400.1
9.5 mm to 4.75 mm @ 35 per cent
cum
4.75 mm to 2.36 mm @ 12.5 per cent
cum
2.36 mm below @ 52.5 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
(B) Plant Mix Method
Construction of granular sub-base by providing well
graded material, mixing in a mechanical mix plant at
OMC, carriage of mixed material to work site upto
lead of 1000 m spreading in uniform layers with
motor grader on prepared surface and compacting
with smooth wheel roller to achieve the desired
density, complete as per Technical Specification
Clause 401
(i)
a)

b)

c)

d)
PMGSY SOR 13-14

For Grading I Material


Unit = cum
Taking output = 225 cum (450 t)
Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
Machinery
Wet mix plant @ 60 t capacity per hour
hour
Water tanker 6 kl capacity 5 km lead with one hour
trip per hour
Front end loader 0.9 cum bucket capacity 25
hour
cum per hour
Tipper 5.5 cum @ 3 trips per hour
hour
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller 10 cum per hour
hour
Material
Well graded granular sub-base material as per
Table 400.1
53 mm to 9.5 mm @ 50 per cent
cum
9.5 mm to 2.36 mm @ 20 per cent
cum
2.36 mm below @ 30 per cent
cum
Water
kl
OH & Contractor's profit @ 12.5% on (a+b+c)
PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
6

Amount
(Rs.)
7
538.27

0.48
2.00
10.00

194.50
199.90
194.50

93.36
399.80
1,945.00

6.00
30.00

2,100.00
400.00

12,600.00
12,000.00

12.00
5.00

300.00
300.00

3,600.00
1,500.00

134.00
48.00
201.60
30.00

365.00
150.00
150.00
16.00

48,910.00
7,200.00
30,240.00
480.00
14,871.02
133,839.18
446.13

0.40
2.00
8.00

194.50
199.90
194.50

77.80
399.80
1,556.00

7.50
4.00

1,000.00
300.00

7,500.00
1,200.00

9.00

764.00

6,876.00

13.60
4.50
22.50

250.00
2,100.00
400.00

3,400.00
9,450.00
9,000.00

144.00
57.00
86.40
24.00

377.50
365.00
150.00
16.00

54,360.00
20,805.00
12,960.00
384.00
15,996.08
[Chapter -4](Page-92)

Sr.
No.
1

4.2

Ref.
MORD
n
Specif
2

402

Description

i)

PMGSY SOR 13-14

Unit Quantity

3
4
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
(ii) For Grading II Material
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Wet mix plant @ 60 t capacity per hour
hour
Water tanker 6 kl capacity 5 km lead with one hour
trip per hour
Front end loader 0.9 cum bucket capacity 25
hour
cum per hour
Tipper 5.5 cum, 3 trips per hour
hour
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller 10 cum
hour
output
c) Material
Well graded granular sub-base material as per
Table 400.1
26.5 mm to 9.5 mm @ 35 per cent
cum
9.5 mm to 2.36 mm @ 25 per cent
cum
2.36 mm below @ 40 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
(iii) For Grading III Material
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Wet mix plant @ 60 t capacity per hour
hour
Water tanker 6 kl capacity 5 km lead with one hour
trip per hour
Front end loader 0.9 cum bucket capacity 25
hour
cum per hour
Tipper 5.5 cum, 3 trips per hour
hour
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller 10 cum
hour
output
c) Material
Well graded granular sub-base material as per
Table 400.1
9.5 mm to 4.75 mm @ 35 per cent
cum
4.75 mm to 2.36 mm @ 12.5 per cent
cum
2.36 mm below @ 52.5 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
Gravel/Soil-Aggregate Base (Table 400.2)

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
6

Amount
(Rs.)
7
143,964.68
639.84

0.40
2.00
8.00

194.50
199.90
194.50

77.80
399.80
1,556.00

7.50
4.00

1,000.00
300.00

7,500.00
1,200.00

9.00

764.00

6,876.00

13.60
4.50
22.50

250.00
2,100.00
400.00

3,400.00
9,450.00
9,000.00

100.80
72.00
115.20
24.00

395.00
365.00
150.00
16.00

39,816.00
26,280.00
17,280.00
384.00
15,402.45
138,622.05
616.10

0.40
2.00
8.00

194.50
199.90
194.50

77.80
399.80
1,556.00

7.50
4.00

1,000.00
300.00

7,500.00
1,200.00

9.00

764.00

3,400.00

13.60
4.50
22.50

250.00
2,100.00
400.00

340.00
9,450.00
9,000.00

100.80
36.00
151.20
24.00

365.00
150.00
150.00
16.00

36,792.00
5,400.00
22,680.00
384.00
12,272.45
110,452.05
490.90

[Chapter -4](Page-93)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3
Construction of gravel/soil-aggregate base by
providing well graded material, spreading in
uniform layers with motor grader on prepared
surface, mixing by mix in place method with
rotavator at OMC, and compacting with three wheel
80-100 kN static roller to achieve the desired
density, complete as per Technical Specifications
Clause 402
Unit = cum
Taking output = 300 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Motor grader 110 HP @ 50 cum per hour
Three wheel 80-100 kN static roller @ 10 cum
per hour
Water tanker 6 kl capacity
Tractor with Rotavator 25 cum per hour
c) Material
For well graded granular sub-base materials as
per Table 400.2

ii)

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

day
day
day

0.40
2.00
8.00

194.50
199.90
194.50

77.80
399.80
1,556.00

hour
hour

6.00
30.00

2,100.00
400.00

12,600.00
12,000.00

hour
hour

5.00
12.00

300.00
300.00

1,500.00
3,600.00

134.40
172.80
76.80
30.00

407.50
395.00
150.00
16.00

54,768.00
68,256.00
11,520.00
480.00
20,844.70
187,602.30
625.34

day
day
day

0.40
2.00
8.00

194.50
199.90
194.50

77.80
399.80
1,556.00

hour
hour

6.00
30.00

2,100.00
400.00

12,600.00
12,000.00

hour
hour

5.00
12.00

300.00
300.00

1,500.00
3,600.00

cum

288.00

395.00

113,760.00

For Grading A Material


53 mm to 26.5 mm @ 35 per cent
cum
26.5 mm to 4.75 mm @ 45 per cent
cum
2.36 mm below @ 20 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Gravel/Soil-Aggregate Base (Table 400.2)
Construction of granular sub-base by providing well
graded material, spreading in uniform layers with
motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller
capacity to achieve the desired density, complete as
per Technical Specification Clause 402
Unit = cum
Taking output = 300 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Motor grader 110 HP @ 50 cum per hour
Three wheel 80-100 kN static roller @ 10 cum
per hour
Water tanker 6 kl capacity
Tractor with Rotavator 25 cum per hour
c) Material
For well graded granular sub-base materials as
per Table 400.2
For Grading B Material
26.5 mm to 4.75 mm @ 75 per cent

PMGSY SOR 13-14

Unit Quantity

[Chapter -4](Page-94)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

3
4
2.36 mm below @ 25 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
iii) Gravel/Soil-Aggregate Base (Table 400.2)
Construction of granular sub-base by providing well
graded material, spreading in uniform layers with
motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller
capacity to achieve the desired density, complete as
per Technical Specification Clause 402

c)

403

Rate
(Rs.)

Amount
(Rs.)

5
96.00
30.00

6
150.00
16.00

7
14,400.00
480.00
20,046.70
180,420.30
601.40

day
day
day

0.40
2.00
8.00

194.50
199.90
194.50

77.80
399.80
1,556.00

hour
hour

6.00
30.00

2,100.00
400.00

12,600.00
12,000.00

Water tanker 6 kl capacity


hour
Tractor with Rotavator 25 cum per hour
hour
Material
For well graded granular sub-base materials as
per Table 400.2

5.00
12.00

300.00
300.00

1,500.00
3,600.00

255.00
129.00
30.00

365.00
150.00
16.00

93,075.00
19,350.00
480.00
18,079.83
162,718.43
542.39

0.40
2.00
8.00

194.50
199.90
194.50

77.80
399.80
1,556.00

6.00
30.00

2,100.00
400.00

12,600.00
12,000.00

5.00
12.00

300.00
300.00

1,500.00
3,600.00

Unit = cum
Taking output = 300 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Motor grader 110 HP @ 50 cum per hour
Three wheel 80-100 kN static roller @ 10 cum
per hour

4.3

Unit Quantity

For Grading C Material


9.5 mm to 4.75 mm @ 66 per cent
cum
2.36 mm below @ 34 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Gravel/Soil-Aggregate Surface Course (Table
400.3)
Construction of granular surface course by providing well
graded material, spreading in uniform layers with motor
grader on prepared surface, mixing by mix in place
method with rotavator at OMC, and compacting with
three wheel 80-100 kN static roller capacity to achieve
the desired density, complete as per Technical
Specification Clause 402
Unit = cum
Taking output = 300 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller @ 10 cum hour
per hour
Water tanker 6 kl capacity
hour
Tractor with Rotavator 25 cum per hour
hour

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-95)

Sr.
No.
1

4.4

4.5

Ref.
MORD
n
Specif
2

Description

Material
For well graded granular sub-base materials as
per Table 400.3
4.75 to 2.36 mm 40 per cent
cum
2.36 mm below @ 60 per cent
cum
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
402 Lime Stabilisation for Improving Subgrade
Laying and spreading available soil in the subgrade on a
prepared surface, pulverising, mixing the spread soil in
place with rotavator with 2 per cent slaked lime having
minimum 70 per cent of contents of CaO, grading with
motor grader and compacting with the smooth wheel
road roller at OMC to the desired density to form a layer
of improved Sub-grade as per Technical Specification
Cluase 403.
(A) By Manual Means
Unit = cum
Taking output = 150 cum (263 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Three wheel 80-100 kN Static roller @ 70 cum hour
Water tanker 6 kl capacity
hour
c) Material
Lime
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 150 cum = a+b+c+d
Rate per cum = ( a+b+c+d)/150
(B) By Mechanical Means
Unit = cum
Taking output = 300 cum (525 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Tractor with ripper and rotavator attachments hour
@ 60 cum per hour for ripping and 25 cum per
hour for mixing
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller @ 70 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material
Lime
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Note: The exact quantity of lime shall be as per design.
403 Lime Treated Soil for Sub-Base

PMGSY SOR 13-14

c)

Unit Quantity

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

153.60
210.40
30.00

150.00
150.00
16.00

23,040.00
31,560.00
480.00
10,851.70
97,587.50
325.29

1.44
1.00
35.00

194.50
199.90
194.50

280.08
199.90
6,807.50

2.15
3.00

400.00
300.00

860.00
900.00

5.26
18.00

2,000.00
16.00

10,520.00
288.00
2,481.94
22,337.42
148.92

0.36
1.00
8.00

194.50
199.90
194.50

70.02
199.90
1,556.00

12.00

300.00

3,600.00

6.00
4.30

2,100.00
400.00

12,600.00
1,720.00

5.00

300.00

1,500.00

10.50
30.00

2,000.00
16.00

21,000.00
480.00
5,340.74
48,066.66
160.22

[Chapter -4](Page-96)

Sr.
No.
1

4.6

Ref.
MORD
n
Specif
2

Description
3
Providing, laying and spreading soil on a prepared subgrade, pulverising, mixing the spread soil in place with
rotavator with 4 per cent slaked lime with minimum
content of 70 per cent of CaO, grading with motor grader
and compacting with the road roller at OMC to achieve
atleast 98 per cent of the max dry density to form a layer
of sub-base as per Technical Specification Clause 403.

Unit Quantity
4

Unit = cum
Taking output = 300 cum (525 t)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity hour
Tipper 5.5 cum 4 trips per hour
hour
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN Static roller @ 70 cum hour
per hour
Tractor with rotavator and blade @ 25 cum per hour
hour
Water tanker 6 kl capacity
hour
c) Material
Lime
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Note: The exact quantity of lime shall be as per design.
404 Cement Treated Soil Sub-Base/Base
Providing, laying and spreading soil on a prepared subgrade, pulverising, adding the designed quantity of
cement to the spread soil, mixing in place with rotavator,
grading with the motor grader and compacting with the
road roller at OMC to achieve the desired unconfined
compressive strength and to form a layer of subbase/base as per Technical Specification Clause 404.

Rate
(Rs.)

Amount
(Rs.)

0.48
2.00
10.00

194.50
199.90
194.50

93.36
399.80
1,945.00

5.00
14.00
6.00
4.30

1,400.00
250.00
2,100.00
400.00

7,000.00
3,500.00
12,600.00
1,720.00

12.00

300.00

3,600.00

5.00

300.00

1,500.00

21.00
30.00

2,000.00
16.00

42,000.00
480.00
9,354.77
84,192.93
280.64

day
day
day

0.48
2.00
10.00

194.50
199.90
194.50

93.36
399.80
1,945.00

hour
hour
hour
hour

5.00
14.00
6.00
4.30

1,400.00
250.00
2,100.00
400.00

7,000.00
3,500.00
12,600.00
1,720.00

hour

12.00

300.00

3,600.00

hour

5.00

300.00

1,500.00

Unit = cum
Taking output = 300 cum (525 t)
For 4 per cent quantity of cement by weight
of soil
a)

b)

c)
PMGSY SOR 13-14

Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Machinery
Hydraulic Excavator 0.90 cum bucket capacity
Tipper 5.5 cum
Motor grader 110 HP @ 50 cum per hour
Three wheel 80-100 kN static roller @ 70 cum
per hour
Tractor with rotavator and blade @ 25 cum per
hour
Water tanker 6 kl capacity
Material
PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-97)

Sr.
No.
1

4.7

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
4
Cement at site @ 4% (of 525 t)
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum =(a+b+c+d)/300
Note: The exact quantity of cement shall be as per design.
405 Water Bound Macadam Sub-base/base
1) WBM Grading 1
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, stone
screening/binding materials to fill-up the interstices
of coarse aggregate, watering and compacting to the
required density Grading 1 as per Technical
Specification Clause 404.
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum
per hour
Water tanker 6 kl capacity
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per
10 sqm for compacted thickness of 100 mm

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

5
21.00
30.00

6
7,670.20
16.00

7
161,074.20
480.00
24,239.05
218,151.41
727.17

day
day
day

10.08
2.00
250.00

194.50
199.90
194.50

1,960.56
399.80
48,625.00

hour

36.00

400.00

14,400.00

hour

24.00

300.00

7,200.00

cum

435.60

467.05

203,446.98

97.20

390.00

37,908.00

28.80

85.00

2,448.00

144.00

16.00

2,304.00
39,836.54
358,528.88
995.91

0.68
2.00
15.00

194.50
199.90
194.50

132.26
399.80
2,917.50

7.20

2,100.00

15,120.00

36.00

400.00

14,400.00

24.00

300.00

7,200.00

Stone Screenings
Type A 13.2 mm for Grading-1 @ 0.27 cum cum
per 10 sqm
Binding Material
Binding Material @ 0.08 cum per 10 sqm for cum
grading 1 material
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Motor grader 110 HP @ 50 cum per hour for hour
spreading
Three wheel 80-100 kN static roller @ 10 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
PMGSY SOR 13-14

Rate
(Rs.)

[Chapter -4](Page-98)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3

Unit Quantity
4

Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per cum
10 sqm for compacted thickness of 100 mm

2)

Stone Screening
Type A 13.2 mm for Grading-1 @ 0.27 cum cum
per 10 sqm
Binding Material
Binding Material @ 0.08 cum per 10 sqm for cum
Grading 2 material
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
WBM Grading 2
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and
camber,
applying
and
brooming,
stone
screening/binding materials to fill-up the interstices
of coarse aggregate, watering and compacting to the
required density grading 2 as per Technical
Specification Clause 405.
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Three wheel 80-100 kN static roller @ 8 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 cum
sqm for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum cum
per 10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for cum
Grading 2 material
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

435.60

467.05

203,446.98

97.20

390.00

37,908.00

28.80

85.00

2,448.00

144.00

16.00

2,304.00
35,784.57
322,061.11
894.61

10.08
2.00
250.00

194.50
199.90
194.50

1,960.56
399.80
48,625.00

45.00

400.00

18,000.00

24.00

300.00

7,200.00

435.60

390.00

169,884.00

96.01

390.00

37,443.90

28.80

85.00

2,448.00

144.00

16.00

2,304.00
36,033.16
324,298.42
900.83

0.68
2.00
15.00

194.50
199.90
194.50

132.26
399.80
2,917.50
[Chapter -4](Page-99)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
4
Motor grader 110 HP @ 50 cum per hour for hour
spreading
Three wheel 80-100 kN static roller @ 8 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 cum
sqm for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum cum
per 10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for cum
Grading 2 material
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Note: Type A Screening can be used in Grading 2
3) WBM Grading 3
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening to
fill-up the interstices of coarse aggregate, watering
and compacting to the required density Grading 3 as
per Technical Specification Clause 405.
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Three wheel 80-100 kN static roller @ 8 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per cum
10 sqm for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum cum
per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

5
7.20

6
2,100.00

7
15,120.00

45.00

400.00

18,000.00

24.00

300.00

7,200.00

435.60

390.00

169,884.00

96.01

390.00

37,443.90

28.80

85.00

2,448.00

144.00

16.00

2,304.00
31,981.18
287,830.64
799.53

10.08
2.00
250.00

194.50
199.90
194.50

1,960.56
399.80
48,625.00

45.00

400.00

18,000.00

24.00

300.00

7,200.00

435.60

470.00

204,732.00

86.40

470.00

40,608.00

144.00

16.00

2,304.00
40,478.67
364,308.03
1,011.97

0.68

194.50

132.26
[Chapter -4](Page-100)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3

b)

c)

4.8

405

Mazdoor (Skilled)
Mazdoor (Unskilled)
Machinery
Motor grader 110 HP @ 50 cum per hour for
spreading
Three wheel 80-100 kN static roller @ 8 cum
per hour
Water tanker 6 kl capacity
Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per
10 sqm for compacted thickness of 75 mm

Unit Quantity
5
2.00
15.00

6
199.90
194.50

7
399.80
2,917.50

hour

7.20

2,100.00

15,120.00

hour

45.00

400.00

18,000.00

hour

24.00

300.00

7,200.00

cum

435.60

470.00

204,732.00

86.40

470.00

40,608.00

144.00

16.00

2,304.00
36,426.70
327,840.26
910.67

10.08
2.00
250.00

194.50
199.90
194.50

1,960.56
399.80
48,625.00

36.00

400.00

14,400.00

24.00

300.00

7,200.00

435.60

467.05

203,446.98

108.00

120.00

12,960.00

144.00

16.00

2,304.00
36,412.04
327,708.38
910.30

(A) By Manual Means


Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per cum
10 sqm for compacted thickness of 100 mm
Crushable type such as moorum or Gravel for cum
grading 1 @ 0.30 cum per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

4
day
day

Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum cum
per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Water Bound Macadam with Crushable Screenings
1) WBM Grading 1
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, crushable
screening to fill-up the interstices of coarse
aggregate, watering and compacting to the required
density Grading 1 as per Technical Specification
Clause 405.

PMGSY SOR 13-14

Rate
(Rs.)

[Chapter -4](Page-101)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3

Amount
(Rs.)

5
0.68
2.00
15.00

6
194.50
199.90
194.50

7
132.26
399.80
2,917.50

hour

7.20

2,100.00

15,120.00

hour

36.00

400.00

14,400.00

hour

24.00

300.00

7,200.00

cum

435.60

467.05

203,446.98

Crushable type such as Moorum or gravel for cum


Grading 2 @ 0.30 cum per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
WBM Grading 2
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, crushable
screening to fill-up the interstices of coarse
aggregate, watering and compacting to the required
density Grading 2 as per Technical Specification
Clause 405.

108.00

120.00

12,960.00

144.00

16.00

2,304.00
32,360.07
291,240.61
809.00

10.08
2.00
250.00

194.50
199.90
194.50

1,960.56
399.80
48,625.00

45.00

400.00

18,000.00

24.00

300.00

7,200.00

435.60

390.00

169,884.00

105.59

120.00

12,670.80

144.00

16.00

2,304.00
32,630.52
293,674.68
815.76

0.68
2.00

194.50
199.90

132.26
399.80

c)

Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Machinery
Motor grader 110 HP @ 50 cum per hour for
spreading
Three wheel 80-100 kN static roller @ 10 cum
per hour
Water tanker 6 kl capacity
Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per
10 sqm for compacted thickness of 100 mm

(A) By Manual Means


Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery
Three wheel 80-100 kN static roller @ 8 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 cum
sqm for compacted thickness of 75 mm
Crushable type such as Moorum or gravel for cum
Grading 2 @ 0.22 cum per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
PMGSY SOR 13-14

Rate
(Rs.)

4
day
day
day

b)

2)

Unit Quantity

PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-102)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

3)

3
4
Mazdoor (Unskilled)
day
b) Machinery
Motor grader 110 HP @ 50 cum per hour for hour
spreading
Three wheel 80-100 kN @ static roller 8 cum hour
per hour
Water tanker 6 kl capacity
hour
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per cum
10 sqm for compacted thickness of 75 mm
Crushable type such as Moorum or gravel for cum
Grading 2 @ 0.22 cum per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
WBM Grading 3
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper
grade and camber, applying and brooming, crushable
screening to fill-up the interstices of coarse
aggregate, watering and compacting to the required
density Grading 3 as per Technical Specification
Clause 405.

Rate
(Rs.)

Amount
(Rs.)

5
15.00

6
194.50

7
2,917.50

7.20

2,100.00

15,120.00

45.00

400.00

18,000.00

24.00

300.00

7,200.00

435.60

390.00

169,884.00

105.59

120.00

12,670.80

144.00

16.00

2,304.00
28,578.55
257,206.91
714.46

day
day
day

10.08
2.00
250.00

194.50
199.90
194.50

1,960.56
399.80
48,625.00

hour

45.00

400.00

18,000.00

hour

24.00

300.00

7,200.00

cum

435.60

470.00

204,732.00

Crushable type such as Moorum or gravel for cum


Grading 3 @ 0.22 cum per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) Machinery

105.59

120.00

12,670.80

144.00

16.00

2,304.00
36,986.52
332,878.68
924.66

0.68
2.00
15.00

194.50
199.90
194.50

132.26
399.80
2,917.50

(A) By Manual Means


Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Three wheel 80-100 kN static roller @ 8 cum
per hour
Water tanker 6 kl capacity
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per
10 sqm for compacted thickness of 75 mm

PMGSY SOR 13-14

Unit Quantity

PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-103)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

4.9

406

407

Amount
(Rs.)

5
7.20

6
2,100.00

7
15,120.00

hour

45.00

400.00

18,000.00

hour

24.00

300.00

7,200.00

cum

435.60

470.00

204,732.00

Crushable type such as Moorum or gravel for cum


Grading 3 @ 0.22 cum per 10 sqm
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Wet Mix Macadam
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the material with water at OMC in mechanical
mixer (Pug Mill), carriage of mixed material by tipper to
site, laying in uniform layers in sub-base/base course on
a well prepared sub-base and compacting with smooth
wheel roller of 80 to 100kN weight to achieve the desired
density including lighting, barricading and maintenance of
diversion, etc as per Tables 400.11 & 400.12 and
Technical Specification Clause 406.

105.59

120.00

12,670.80

144.00

16.00

2,304.00
32,934.55
296,410.91
823.36

day
day
day

0.40
8.00
2.00

194.50
194.50
199.90

77.80
1,556.00
399.80

hour
hour
hour
hour
hour
hour

4.00
4.00
5.00
2.00
1.33
6.25

764.00
1,000.00
250.00
2,100.00
300.00
400.00

3,056.00
4,000.00
1,250.00
4,200.00
399.00
2,500.00

cum

39.90

470.00

18,753.00

cum

53.20

457.50

24,339.00

Fine aggregate/Crushed sand 2.36 mm to 75 cum


micron @ 30 per cent
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d)/100
Construction of Shoulders as per Technical
Specification Clause 407.

39.90

230.00

9,177.00

8.00

16.00

128.00
8,729.45
78,565.05
785.65

By Mechanical Means with 1 km lead


Unit = cum
Taking output = 100 cum
a) Labour
Mate
Dresser (Skilled) for alignment
Mazdoor (Skilled)
b) Machinery
Front end loader 1 cum capacity
Wet mix plant (Pug Mill)
Tipper/Dumper (10-t) capacity
Motor Grader @ 50 cum per hour
Water tanker 6 kl capacity
Three wheel 80-100 kN static roller @ 16 cum
per hour
c) Material
Coarse aggregate 45 mm to 22.4 mm @ 30 per
cent
Aggregates 22.4 mm to 2.36 mm @ 40 per cent

4.10

Rate
(Rs.)

4
hour

c)

3
Motor grader 110 HP @ 50 cum per hour for
spreading
Three wheel 80-100 kN @ Static roller 8 cum
per hour
Water tanker 6 kl capacity
Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per
10 sqm for compacted thickness of 75 mm

Unit Quantity

A.
PMGSY SOR 13-14

Earthen Shoulders
PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-104)

Sr.
No.
1

4.11

Ref.
MORD
n
Specif
2

408

Description
3
The rate as applicable for sub-grade construction
may be adopted.
B.

Hard Shoulders
Rate as applicable for sub-base and/or base may be
adopted as per approved design.

C.

Paved Shoulders
The rates may be adopted as applicable for different
layers of pavement depending upon approved design
of paved shoulders.

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

Granular sub-base/base/surface course with local


materials (Table 400.13) by mix in place method
normal Construction of granular sub-base by
providing local material spreading in uniform
layers with motor grader on prepared surface,
mixing by mix in place method with rotavator at
once and compacting with smooth wheel roller to
achieve the desired density complete as per Clause
401.4 as per Technical Specification Clause 408.
(i) Using naturally occuring gravel
Unit = cum
Taking output = 300 cum
(a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
(b) Machinery
Motor grader 110 HP 50 cum per hour
Three wheel 80-100 kN static roller @10 cum
per hour
Tractor with rotavator 25 cum per hour
Water tanker 6 kl capacity
(c) Material
Naturally occurring gravel (Local materials as
per Table 400.13)

day
day
day

0.48
2.00
10.00

194.50
199.90
194.50

93.36
399.80
1,945.00

hour
hour

6.00
30.00

2,100.00
400.00

12,600.00
12,000.00

hour
hour

12.00
5.00

300.00
300.00

3,600.00
1,500.00

Quantity as per Item No.4.1 of Chapter 4


cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = a+b+c+d/300
(ii) Using Gravel mix soil using
Unit = cum
Taking output = 300 cum
(a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
(b) Machinery
Motor grader 110 HP 50 cum per hour
hour
Three wheel 80-100 kN static roller @10 cum hour
per hour
Water tanker 6 kl capacity
hour
Tractor with Rotavator 25 cum per hour
hour
(c) Material
Soil gravel mixture/quarry waste (Local material
as per Table 400.13)

384.00
30.00

201.89
16.00

77,525.76
480.00
13,767.99
123,911.91
413.04

0.40
2.00
8.00

194.50
199.90
194.50

77.80
399.80
1,556.00

6.00
30.00

2,100.00
400.00

12,600.00
12,000.00

5.00
12.00

300.00
300.00

1,500.00
3,600.00

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-105)

Ref.
MORD
n
Specif
2

4.12

408

Sr.
No.

Description

Unit Quantity

3
4
As per Item No.4.2 of Chapter 4
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Construction of Water Bound Macadam using
locally available material (Table 400.13)

Rate
(Rs.)

Amount
(Rs.)

5
384.00
30.00

6
201.89
16.00

7
77,525.76
480.00
13,717.42
123,456.78
411.52

day
day
day

0.68
2.00
15.00

194.50
199.90
194.50

132.26
399.80
2,917.50

hour

7.20

2,100.00

15,120.00

hour

45.00

400.00

18,000.00

hour

24.00

300.00

7,200.00

cum

435.60

201.89

87,943.28

144.00

16.00

2,304.00
16,752.11
150,768.95
418.80

Providing, laying spreading and compacting local material


in block or large discrete particles, such as kankar,
Laterite, Dhandla etc. as per Table 400.13 to water bound
macadam specification including spreading in uniform
thickness, hand packing, rolling with three wheel 80-100
kN static roller in stages to proper grade and camber,
applying and brooming requisite type of screening
/binding materials to fill-up the interstices of laid material
watering and compacting to the required density as per
Clause 405.3 and Technical Specification Cluase 408.
Unit = cum
Taking output = 360 cum
(a) Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
(b) Machinery
Motor grader 110 H.P @ 50 cum/hr for
spreading
Three wheel 80-100 kN @ static roller 8 cum
per hour
Water tanker 6 kl capacity
(c) Material
Low Grade Aggregate such as Kankar, Laterite,
Dhandla and naturally occuring gravels, quarry
waste as per Table 400.13 @ 1.21 cum per 10
sqm compacted thickness 100 mm

4.13

409

Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Lime-Flyash Stablised Soil Sub-base
Construction of sub-base using lime-flyash admixture with
granular soil, free from organic matter/deleterious
material or clayey silts and low plasticity clays having PI
between 5 and 20 and liquid limit less than 25 and
commercial dry lime, slaked at site or pre-slaked with CaO
content not less than 50 per cent, flyash to conform to
gradation as per Clause 4.3 of IRC:SP:20, lime+flyash
content ranging between 10 to 30 per cent, the minimum
un-confined compressive strength and CBR value after 28days curing and 4-days soaking to be 0.75 MPa and 25
per cent respectively, all as specified in IRC:88 including a
lead upto 1000 m as per Technical Specification Cluase
409.
Unit = cum
Taking output = 480 cum (720 t, density 1.50 t/cum)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-106)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3

Assumptions made
Total mass taken for analysis = 720 t
Lime+Flyash admixture
@ 20% = 0.2 x 720=144 t
Soil = 720-144 = 578 t
(578/1.6 = 360 cum)
Lime + Flyash = 144 t
Ratio Lime 4 : Flyash 16
Lime = 29 t
Flyash = 115 t
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity
@ 60 cum per hour for 360 cum soil

4.14

410

Rate
(Rs.)

Amount
(Rs.)

day
day
day

0.28
6.00
1.00

194.50
194.50
199.90

54.46
1,167.00
199.90

hour

6.00

1,400.00

8,400.00

hour

16.00

250.00

4,000.00

Tipper 10 t capacity for carriage of 115 t flyash hour

5.50

250.00

1,375.00

Tipper 10 t capacity for carriage of 29 t of lime hour


from store to work site
Loading as per item 1.1 (ii)
cum
Unloading as per item 1.1 (iv)
cum
Tractor with disc harrows for pulverisation
hour
Motor Grader 110 HP @ 75 per cent 200 cum hour
per hour for mixing in-place and grading

3.80

250.00

950.00

480.00
480.00
6.00
3.20

25.68
13.65
300.00
2,100.00

12,328.69
6,552.87
1,800.00
6,720.00

12.00
12.00

400.00
300.00

4,800.00
3,600.00

29.00
360.00

2,000.00
17.50

58,000.00
6,300.00

72.00

16.00

1,152.00
14,674.99
132,074.91
275.16

Tipper 10 t capacity for carriage of soil 578 t

Note:

Unit Quantity

Three wheel 80-100 kN static roller


hour
Water tanker 6 kl capacity
hour
c) Material
Lime (Slaked)
t
Compensation for earth taken from private cum
source
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 480 cum = a+b+c+d
Rate per cum = (a+b+c+d)/480

Compensation for earth will vary from place to place


and will have to be assessed realistically as per
particular ground situation. In case earth is
available from Govt. land, compensation for earth
will not be required. The position is required to be
clearly stated in the cost estimate.

Cost of flyash has not been considered as same will


be available free of cost. Only carriage of flyash has
been provided.

Lime + Flyash has been taken as 20 per cent of total


mass and ratio of lime and flyash as 1:4 for
estimating purposes. Total quantities will be as per
approved design.

Construction of Sub-base/Course Using Crushed


Slag as per Table 400.19

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-107)

Sr.
No.
1

4.15

4.16

Ref.
MORD
n
Specif
2

410

410

Description
3
Construction of Sub-base by providing crushed slag
spreading in uniform layer with motor grader on prepared
surface mixing by mix-in-place method with Rotavator @
OMC, and compacting with three wheel 80-100 kN static
roller to achieve the desired density complete as per
Technical Specifications Cluase 402.4 and 410.3.2

Unit Quantity
4

Unit = cum
Taking output = 300 cum
(a) Labour
As per Item No.4.1 of Chapter 4
(b) Machinery
As per Item No.4.1 of Chapter 4
(c) Material
Crushed slag as per Clause 410.4.2 (i)
As per Item No.4.2 of Chapter 4
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
Water Bound Macadam using crushed slag
Providing, laying, spreading and compacting crushed slag
to water Bound Macadam specification including
spreading in uniform thickness, hand packing rolling with
smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming requisite type of
screening/binding materials to fill up the interstees of
crushed slag watering and compacting to the required
density as per Clause 405.3 and Technical Specification
Cluase 410.3.2.
Unit = cum
Taking output = 360 cum
(a) Labour
As per Item No. 4.7 of Chapter 4
(b) Machinery
As per Item No.4.7 of Chapter 4
(c) Material
As per Item No.4.8 (1)(A) of Chapter 4
Crushed slag as per Clause 410.4.2 (ii)
cum
Crushable screening
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Cement Bound Granular Material sub-base/base

Rate
(Rs.)

Amount
(Rs.)

2,438.16
29,700.00
384.00
30.00

330.00
16.00

126,720.00
480.00
19,917.27
179,255.43
597.52

435.60
108.00
144.00

330.00
120.00
16.00

143,748.00
12,960.00
2,304.00
19,876.50
178,888.50
496.91

Providing laying and spreading granulated blast furnace


slag on a prepared sub-grade pulverising adding the
designed quantitity of cement to the spread granulated
blast furnace slag mixing in place with rotavator grading
with the mortar grader and compacting with smooth
wheel roller 80-100 kN at OMC to achieve the desired
unconfined compressive strength and to form a layer of
sub-base/base as per Technical Specification Clauses
404.3 and 410.4.2.
Unit = cum
Taking output = 300 cum (525 t)
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-108)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Note: (i)

Unit Quantity

3
4
For 4 per cent quantity of cement by wt of
granulated blast furnace slag
(a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
(b) Machinery
5.50 cum Tipper for carriage of GBFS add 10 hour
per cent of cost of carriage of cover cost of
loading and unloading
Motor grader 110 HP @ 50 cum per hour
hour
Three wheel 80-100 kN static roller @ 70 cum hour
per hour
Tractor with rotavator and blade @ 25 cum per hour
hour
Water tanker 6 kl capacity
hour
(c) Material
Cement (4%)
t
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300

Rate
(Rs.)

Amount
(Rs.)

0.48
2.00
10.00

194.50
199.90
194.50

93.36
399.80
1,945.00

15.00

250.00

3,750.00

6.00
4.30

2,100.00
400.00

12,600.00
1,720.00

12.00

300.00

3,600.00

7.00

300.00

2,100.00

21.00
42.00

7,670.20
16.00

161,074.20
672.00
23,494.30
211,448.66
704.83

0.48
2.00
10.00

194.50
199.90
194.50

93.36
399.80
1,945.00

14.00

300.00

4,200.00

6.00
45.00

2,100.00
400.00

12,600.00
18,000.00

6.00

300.00

1,800.00

157.46
151.06
116.68
36.00

380.00
525.00
365.00
16.00

59,834.80
79,306.50
42,588.20
576.00
27,667.96
249,011.62

The exact quantity of cement shall be as per design

(ii) Granulated ballast slag will be available free of cost


4.17

411

Crusher Run Macadam Base


Providing crushed run stone aggregate greading
conforming to table 400.20 depositing on a prepared
surface by hauling vehicles, spreading and mixing with a
motor grader, watering and compacting with a three
wheel 80-100 kN static roller as per Technical
Specification Clause 411 to form a layer of sub-base/base
A)

PMGSY SOR 13-14

By mix-in-place method
(i) With 53 mm maximum size of aggregates
Unit = cum
Taking output = 360 cum
(a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
(b) Machinery
Tractor attached with rotavator @ 25 cum per hour
hour
Motor-Grader 110 H.P
hour
Three wheel 80-100 kN static roller @ 8 cum
hour
per hour
Water tanker 6 kl capacity
hour
(c) Material
Aggregate at site
For 53 mm maximum size
63 mm to 45 mm @ 33 per cent
cum
22.5 mm to 5.6 mm @ 32 per cent
cum
Below 5.6 mm @ 35 per cent
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
PanchayatR B Circle-2,Rajkot

[Chapter -4](Page-109)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3
Rate per cum = (a+b+c+d)/360
(ii) With 37.5 mm maximum size of aggregates

B)

PMGSY SOR 13-14

Unit Quantity
4

Unit = cum
Taking output = 360 cum
(a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
(b) Machinery
Tractor attached with rotavator @ 25 cum per hour
hour
Motor-Grader 110 H.P
hour
Three wheel 80-100 kN static roller @ 8 cum
hour
per hour
Water tanker 6 kl capacity
hour
(c) Material
Aggregate at site
For 37.5 mm maximum size
45 mm to 22.5 mm @ 5 per cent
cum
22.4 mm to 5.6 mm @ 50 per cent
cum
Below 5.6 mm @ 45 per cent
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
By mixing plant method
(i) With 53 mm maximum size of aggregates
Unit = cum
Taking output = 225 cum (450 t)
(a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
(b) Machinery
Wet mix plant @ 75 t per hour
hour
Electric generator set, 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Motor grader 110 HP
hour
Three wheel roller 80-100 kN @ 8 cum per hour
hour
Water tanker
hour
Tipper
hour
(c) Material
Aggreate at site
For 53 mm maximum size
63 mm to 45 mm @ 33 per cent
cum
22.4 mm to 5.6 mm @ 32 per cent
cum
Below 5.6 mm @ 35 per cent
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
(ii) With 37.5 mm maximum size of aggregates
Unit = cum
Taking output = 225 cum (450 t)
(a) Labour
Mate
day
Mazdoor (Skilled)
day
PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
6

Amount
(Rs.)
7
691.70

0.48
2.00
10.00

194.50
199.90
194.50

93.36
399.80
1,945.00

14.00

300.00

4,200.00

6.00
45.00

2,100.00
400.00

12,600.00
18,000.00

6.00

300.00

1,800.00

24.12
237.60
213.48
36.00

525.00
525.00
365.00
16.00

12,663.00
124,740.00
77,920.20
576.00
31,867.17
286,804.53
796.68

0.28
1.00
6.00

194.50
199.90
194.50

54.46
199.90
1,167.00

6.00
6.00
6.00
6.00
28.13

1,000.00
700.00
764.00
2,100.00
400.00

6,000.00
4,200.00
4,584.00
12,600.00
11,252.00

3.00
10.00

300.00
250.00

900.00
2,500.00

98.40
94.41
104.18
18.00

380.00
525.00
365.00
16.00

37,392.00
49,565.25
38,025.70
288.00
21,091.04
189,819.35
843.64

0.28
1.00

194.50
199.90

54.46
199.90
[Chapter -4](Page-110)

Sr.
No.
1

4.18

4.19

Ref.
MORD
n
Specif
2

412

413

Description

Unit Quantity

3
4
Mazdoor (Unskilled)
day
(b) Machinery
Wet mix plant @ 75 t per hour
hour
Electric generator set, 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Mortar grader 110 HP
hour
Three wheel roller 80-100 kN @ 8 cum per hour
hour
Water tanker
hour
Tipper
hour
(c) Material
Aggreate at site
For 37.5 mm maximum size
45 mm to 22.5 mm @ 5 per cent
cum
22.4 mm to 5.6 mm @ 50 per cent
cum
Below 5.6 mm @ 45 per cent
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 cum = a+b+c+d
Rate per cum = (a+b+c+d)/225
Brick Soling
Laying brick soling layer on prepared sub-grade with brick
on end edging according to lines, graded and crosssection shown on the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick
soling, watering and rolliing the same with three wheel
road roller 80-100 kN as per Technical Specification
Clause 412
Unit = sqm
Taking ouput = 150 sqm
(a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mason 1st Class
day
(b) Machinery
Three wheel 80-100 kN static roller
hour
Water tanker
hour
(c) Material
Brick 1st Class
No.
Brick 1st Class on edging
No.
Fine Sand
cum
Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 150 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/150
Stone Set Pavement
Providing and laying stone set pavement on prepared
surface with sub-base 100 mm thick compacted Granular
Sub-base as per Clause 401.4 and base 75 mm thick
compacted water bound macadam grading 2 as per
Clause 405.3. The 150 mm thick hammer desired stones
are laid in the herring one or stretched bond pattern. The
stones are compacted into the bedding sand of 40 mm
over the WBM base bounded by edge stone using suitable
compacting device. The gaps are filled with fine sand
stone dust as per Technical Specification Clause 413.4

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

5
6.00

6
194.50

7
1,167.00

6.00
6.00
6.00
6.00
28.13

1,000.00
700.00
764.00
2,100.00
400.00

6,000.00
4,200.00
4,584.00
12,600.00
11,252.00

3.00
10.00

300.00
250.00

900.00
2,500.00

15.06
148.50
133.00
18.00

525.00
525.00
365.00
16.00

7,906.50
77,962.50
48,545.00
288.00
22,269.92
200,429.28
890.80

0.52
10.00
3.00

194.50
194.50
207.80

101.14
1,945.00
623.40

1.00
1.00

400.00
300.00

400.00
300.00

8,160.00
1,100.00
5.66
6.00

4.69
4.69
312.31
16.00

38,270.40
5,159.00
1,767.67
96.00
6,082.83
54,745.44
364.97

[Chapter -4](Page-111)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3

Unit Quantity
4

Unit = sqm
Taking output = 360 sqm
(a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mason 2nd class for laying sett stone and edge day
stone

(b) Machinery
Three wheel 80-100 kN static roller
hour
Water tanker 6 kl capacity
hour
(c) Material
(1) Collection of fine sand
3.4x0.285x0.150x1.20 = 0.174
cum
(2) Coarse sand
96x3.35x0.04x1.20 = 15.437 cum
cum
(3) Collection of stone sett stone
300 mmx200 mmx150 mm
Nos
(4) Collection of edge stone
450 mmx200 mmx350 mm
Nos
(5) Water
kl
(d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 360 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/360

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

2.16
51.00
13.00

194.50
194.50
199.90

420.12
9,919.50
2,598.70

2.00
1.00

400.00
300.00

800.00
300.00

0.174

312.31

54.34

15.437

332.31

5,129.87

5,168.00

195.00

1,007,760.00

464.00
6.00

72.00
16.00

33,408.00
96.00
132,560.82
1,193,047.35
3,314.02

[Chapter -4](Page-112)

Chapter 5
BASES AND SURFACE COURSES (BITUMINOUS)
Ref.
Sr.
MORD
No.
Specifn
1
5.1

2
502

Description
3
Prime Coat
(i) Low porosity
Providing and applying primer coat with bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 0.70-1.0 kg/sqm using mechanical means
as per Technical Specification Clause 502
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Bitumen emulsion pressure distributor @ 1750 sqm
per hour

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day

0.04
1.00

194.50
194.50

7.78
194.50

hour
hour
hour

1.40
1.40
1.00

300.00
300.00
840.00

420.00
420.00
840.00

Water tanker 6 kl capacity 1 trip per hour


hour
c) Material
Bitumen emulsion (SS-1) @ 0.85 kg per sqm
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1750
(ii) Medium porosity
Providing and applying primer coat with Bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 0.90- 1.2 kg/sqm using mechanical
means as per Technical Specification Clause 502.

0.50

300.00

150.00

1.48 34,096.81
3.00
16.00

50,463.28
48.00
6,567.94
59,111.50
33.78

Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Bitumen emulsion pressure distributor @ 1750 sqm
per hour

day
day

0.10
2.00

194.50
194.50

19.45
389.00

hour
hour
hour

1.40
1.40
1.00

300.00
300.00
840.00

420.00
420.00
840.00

Water tanker 6 kl capacity 1 trip per hour


hour
c) Material
Bitumen emulsion (SS-1) @ 1.05 kg per sqm
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1750
(iii) High porosity

0.50

300.00

150.00

1.83 34,096.81
3.00
16.00

62,397.16
48.00
8,085.45
72,769.06
41.58

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -5](Page-113)

Ref.
Sr.
MORD
No.
Specifn
1

5.2

Description

503

3
Providing and applying primer coat with Bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 1.2-1.5 kg/sqm using mechanical means
as per Technical Specification Clause 502.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Bitumen emulsion pressure distributor @ 1750 sqm
per hour

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day

0.12
3.00

194.50
194.50

23.34
583.50

hour
hour
hour

1.40
1.40
1.00

300.00
300.00
840.00

420.00
420.00
840.00

Water tanker 6 kl capacity 1 trip per hour


hour
c) Material
Bitumen emulsion (SS-1) @ 1.35 kg per sqm
t
Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = (a+b+c+d)
Rate per sqm = a+b+c+d/1750
Tack Coat
(i) Providing and applying tack coat with Bitumen emulsion
(RS-1) using emulsion distributor at the rate of 0.20 to
0.25 kg per sqm on the prepared bituminous surface
cleaned with Hydraulic broom as per Technical
Specification Clause 503.

0.50

300.00

150.00

2.36 34,096.81
3.00
16.00

80,468.47
48.00
10,369.16
93,322.48
53.33

Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Emulsion pressure distributor @1750 sqm per hour

day
day

0.04
1.00

194.50
194.50

7.78
194.50

hour
hour
hour

1.40
1.40
1.00

300.00
300.00
840.00

420.00
420.00
840.00

0.39 36,696.81

14,311.76
2,024.25
18,218.29
10.41

c) Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm
t
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1750
(ii) Providing and applying tack coat with Bitumen emulsion
(RS-1) using emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared dry and hungry
bituminous surface cleaned with Hydraulic broom as
per Technical Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

0.04
1.00

194.50
194.50

7.78
194.50

[Chapter -5](Page-114)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Emulsion pressure distributor @1750 sqm per hour hour
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm
t
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1750
(iii) Providing and applying tack coat with Bitumen emulsion
(RS-1) using emulsion distributor at the rate of 0.25
to 0.30 kg per sqm on the prepared granular surfaces
treated with primer & cleaned with Hydraulic broom as
per Technical Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Emulsion pressure distributor @1750 sqm per hour

300.00
300.00
840.00

420.00
420.00
840.00

0.48 36,696.81

17,614.47
2,437.09
21,933.84
12.53

0.04
1.00

194.50
194.50

7.78
194.50

hour
hour
hour

1.40
1.40
1.00

300.00
300.00
840.00

420.00
420.00
840.00

0.48 36,696.81

17,614.47
2,437.09
21,933.84
12.53

c) Material
Bitumen emulsion (RS-1) @ 0.325 kg per sqm
t
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d) / 1750
PanchayatR B Circle-2,Rajkot

1.40
1.40
1.00

Amount
(Rs.)

day
day

c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm
t
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1750 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1750
(iv) Providing and applying tack coat with Bitumen emulsion
(RS-1) using emulsion pressure distributor at the rate
of 0.30 to 0.35 kg per sqm on the prepared nonbituminous surfaces (cement concrete pavement)
cleaned with Hydraulic broom as per Technical
Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Emulsion pressure distributor @1750 sqm per hour hour

PMGSY SOR 13-14

Rate
(Rs.)

0.04
1.00

194.50
194.50

7.78
194.50

1.40
1.40
1.00

300.00
300.00
840.00

420.00
420.00
840.00

0.57 36,696.81

20,917.18
2,849.93
25,649.39
14.66

[Chapter -5](Page-115)

Ref.
Sr.
MORD
No.
Specifn
1

5.3

Description

Note: (i) An output of 1750 sqm has been considered in case of

504

tack coat which can be covered by bituminous courses


on the same day.
(ii) The use of cutback bitumen (Medium Curing grade) as
per IS:217 shall be restricted only for sites at sub-zero
temperature or for emergency applications as directed
by the Engineer.
Bituminous Macadam
Providing and laying bituminous macadam with hot mix
plant using crushed aggregates of grading as per Table
500.4 premixed with bituminous binder, transported to site
upto a lead of 1000 m laid over a previously prepared
surface with paver finisher to the required grade, level and
alignment and rolled to achieve the desired compaction as
per Technical Specification Clause 504.
Unit = cum
Taking output = 102.5 cum (225 t)
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Batch mix HMP 40-60 THP @ 40 t per hour actual
output
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Paver finisher
Generator 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 cum, 10 t capacity
Three wheel 80-100 kN static roller for intial break
Vibratory roller 80-100 kN for intermediate rolling

Unit Quantity
4

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

day
day
day

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

hour

6.00

9,000.00

54,000.00

hour
hour
hour
hour
hour
hour
hour
hour

1.10
1.10
6.00
6.00
6.00
6.21
12.00
6.00

300.00
300.00
1,200.00
700.00
764.00
250.00
400.00
1,200.00

330.00
330.00
7,200.00
4,200.00
4,584.00
1,552.50
4,800.00
7,200.00

7.425 44,543.81

330,737.79

58.02
58.02
29.01

25,528.80
25,647.74
12,823.87
60,197.57
541,778.11
5,285.64

c) Material
i) Bitumen @ 3.3 per cent of mix
t
ii) Aggregate
Total weight of mix = 225 t
Weight of bitumen = 7.425 t
Weight of aggregate = 225 7.425 = 217.575 t
Taking density of aggregate = 1.5 t/cum
Volume of aggregate = 145.05 cum
(19 mm nominal size)
25 -10 mm - 40 per cent
cum
10 5 mm - 40 per cent
cum
5 mm and below - 20 per cent
cum
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 102.5 cum = a+b+c+d
Rate per cum = a+b+c+d/102.5

PMGSY SOR 13-14

Rate
(Rs.)

440.00
442.05
442.05

[Chapter -5](Page-116)

Ref.
Sr.
MORD
No.
Specifn
1

5.4

Note:

505

Description
3

1 Although the rollers are required only for 3 hours as per

Unit Quantity
4

norms of output, but the same have to be available at


site for six hours as the hot mix plant and paver will
take six hours for mixing and paving the output of 225
t considered in these analysis. To cater for the idle
period of these rollers, their usage rates may be
multiplied by a factor of 0.65.
2 Quantity of bitumen has been taken for analysis
purpose. The actual quantity will depend upon job mix
formula.
3 Labour for traffic control, watch and ward and other
miscellaneous duties at site, including sundries have
been included in administrative overheads of the
contractor.
4 In case BM is laid over freshly laid tack coat, provision
of Hydraulic broom and 2 mazdoor for the same shall
be detected as the same has been included in the cost
of tack coat.
5 Analysis is based on 1000 m lead of mixed material.
Built-Up Spray Grout
Providing, laying and rolling of built-up spray grout layer
over prepared base consisting of a two layer composite
construction of crushed coarse aggregates using motor
grader for aggregates. Key stone chips spreader may be
used with application of bituminous binder after each layer,
and with key aggregates placed on top of the second layer
to serve as a base, conforming to the line, grades and crosssection specified, the compacted layer thickness being 75
mm as per Technical Specification Clause 505.
(A) By Manual Means
Unit = sqm
Taking output = 800 sqm (60 cum)
(I) Bitumen (S-90)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Chips spreader
day
Bitumen Sprayer
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static Roller
hour
c) Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for t
each layer
Crushed stone coarse aggregate passing 53 mm cum
and retained on 2.8 mm sieve @ 0.5 cum per 10
sqm for each layer
Key aggregates passing 22.4 mm and retained on cum
2.8 mm sieve @ 0.13 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

5.50
100.50
10.00
2.50
25.50

194.50
194.50
194.50
199.90
196.30

1,069.75
19,547.25
1,945.00
499.75
5,005.65

6.00

160.00

960.00

6.00

400.00

2,400.00

2.40 44,543.81

106,905.14

80.00

378.00

30,240.00

10.40

457.50

4,758.00
21,666.32

[Chapter -5](Page-117)

Ref.
Sr.
MORD
No.
Specifn
1

Description
3
Cost of 800 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/800
(II) Bitumen (S-65)
a) Labour
Mate
Mazdoor (Unskilled)
Chips spreader
Bitumen Sprayer
Mazdoor (Semi-Skilled)
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted
with spray set

Unit Quantity
4

day
day
day
day
day

Amount
(Rs.)
7
194,996.86
243.75

5.50
100.50
10.00
2.50
25.50

194.50
194.50
194.50
199.90
196.30

1,069.75
19,547.25
1,945.00
499.75
5,005.65

hour

6.00

160.00

960.00

Three wheel 80-100 kN static Roller


hour
c) Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for t
each layer

6.00

400.00

2,400.00

2.40 44,966.00

107,918.40

Crushed stone coarse aggregate passing 53 mm cum


and retained on 2.8 mm sieve @ 0.5 cum per 10
sqm for each layer

80.00

378.00

30,240.00

Key aggregates passing 22.4 mm and retained on cum


2.8 mm sieve @ 0.13 cum per 10 sqm

10.40

457.50

4,758.00

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 800 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/800
(B) By Mechanical Means
Unit = sqm
Taking output = 3000 sqm (225 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic self propelled chip spreader both for hour
aggregates and key aggregates @ 1500 sqm per
hour for 3000 x 3 sqm
Bitumen presssure distributor for 3000x 2 sqm @ hour
1750 sqm per hour
Tipper 5.5 cum capacity
hour
Three wheel 80-100 kN Static Roller @ 10 cum per hour
hour
Front end loader 1 cum bucket capacity
hour
c) Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for t
each layer

21,792.98
196,136.78
245.17

0.40
8.00
2.00

194.50
194.50
199.90

77.80
1,556.00
399.80

6.00

2,100.00

12,600.00

3.43

840.00

2,881.20

10.00
22.50

250.00
400.00

2,500.00
9,000.00

5.00

764.00

3,820.00

9.00 44,543.81

400,894.29

Crushed stone coarse aggregate passing 53 mm cum


and retained on 2.8 mm sieve @ 0.5 cum per 10
sqm for each layer

300.00

378.00

113,400.00

Key aggregates passing 22.4 mm and retained on cum


2.8 mm sieve @ 0.13 cum per 10 sqm

39.00

457.50

17,842.50

d) OH & Contractor's profit @ 12.5% on (a+b+c)


PMGSY SOR 13-14

Rate
(Rs.)

PanchayatR B Circle-2,Rajkot

70,621.45
[Chapter -5](Page-118)

Ref.
Sr.
MORD
No.
Specifn
1

5.5

Description

3
Cost of 3000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/3000
Note: 2 tippers will be needed to match the capacity of hydraulic
chip spreader and front end loader.
506

Modified Penetration Macadam


Construction of penetration macadam over prepared base
by providing a layer of compacted crushed coarse
aggregate using chips spreader with alternate applications
of bituminous binder and key aggregates and rolling with a
three wheel 80-100 kN static roller to achieve the desired
degree of compaction as per Technical Specification Clause
506.
(A) 50 mm thick
Unit = sqm
Taking output = 4500 sqm (225 cum)
(I) Bitumen (S-90)
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic self propelled chip spreader both for
aggregates and key aggregates @ 1500 sqm per
hour for 4500 x 2 sqm = 9000 sqm
Bitumen pressure distributor for @ 1750 sqm per
hour

Unit Quantity
4

Rate
(Rs.)
6

Amount
(Rs.)
7
635,593.04
211.86

day
day
day

0.32
6.00
2.00

194.50
194.50
199.90

62.24
1,167.00
399.80

hour

6.00

2,100.00

12,600.00

hour

2.57

840.00

2,158.80

Tipper 5.5 cum capacity for carriage of aggregates hour


from stockpile to chip spreader
Three wheel 80-100 kN Static Roller
hour
Front end loader 1 cum bucked capacity
hour
c) Material
Bitumen @ 1.75 kg per sqm
t
40 mm size hand broken metal @ 0.06 cum per cum
sqm
12 mm size stone chips @ 0.018 cum per sqm
cum
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4500
(B) 75 mm thick
Unit = sqm
Taking output = 4500 sqm (337.5 cum)
(I) Bitumen (S-90)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic self propelled chips spreader both for hour
aggregates and key aggregates @ 1500 sqm per
hour for 4500 x 2 sqm
Bitumen presssure distributor for @ 1750 sqm per hour
hour

10.00

250.00

2,500.00

22.50
6.00

400.00
764.00

9,000.00
4,584.00

7.87 44,543.81
270.00
270.00

350,559.78
72,900.00

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

81.00

550.00

44,550.00
62,560.20
563,041.83
125.12

0.40
8.00
2.00

194.50
194.50
199.90

77.80
1,556.00
399.80

6.00

2,100.00

12,600.00

2.57

840.00

2,158.80

[Chapter -5](Page-119)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
Tipper 5.5 cum capacity for carriage of aggregates
Three wheel 80-100 kN static roller
Front end loader 1 cum bucket capacity
c) Material
Bitumen @ 2 kg per sqm
40 mm size hand broken metal @ 0.09 cum per
sqm

Unit Quantity
4
hour
hour
hour
t
cum

12 mm size stone chips @ 0.018 cum per sqm


cum
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4500
(II) Bitumen (S-65)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic self propelled chips spreader both for hour
aggregates and key aggregates @ 1500 sqm per
hour for 4500 x 2 sqm
Bitumen presssure distributor for @ 1750 sqm per hour
hour
Tipper 5.5 cum capacity for carriage of aggregates hour
Three wheel 80-100 kN static roller
hour
Front end loader 1 cum bucket capacity
hour
c) Material
Bitumen @ 2 kg per sqm
t
40 mm size hand broken metal @ 0.09 cum per cum
sqm
12 mm size stone chips @ 0.018 cum per sqm
cum

5.6

507

5
10.00
33.75
6.00

Rate
(Rs.)
6
250.00
400.00
764.00

7
2,500.00
13,500.00
4,584.00

9.00 44,543.81
405.00
270.00

400,894.29
109,350.00

81.00

550.00

44,550.00
74,021.34
666,192.03
148.04

0.40
8.00
2.00

194.50
194.50
199.90

77.80
1,556.00
399.80

6.00

2,100.00

12,600.00

2.57

840.00

2,158.80

10.00
33.75
6.00

250.00
400.00
764.00

2,500.00
13,500.00
4,584.00

9.00 44,966.00
405.00
270.00

404,694.00
109,350.00

81.00

550.00

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 4500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4500
Surface Dressing using Bituminous (Penetrations
grade / modified bitumen) Binder
Providing and laying surface dressing as wearing course
consisting of a layer of bituminous binder laid on the
prepared surface, followed by a cover of crushed stone
aggregates of specified size and rolling with three wheel 80100 kN static roller including cleaning the road surface as
per Technical Specification Clause 507.
(A) By Manual Means
Case I: Nominal chipping size 13.2 mm
(I) Bitumen (S-90)
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate
Bitumen Sprayer
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b)Machinery

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

day
day
day
day

Amount
(Rs.)

44,550.00
74,496.30
670,466.70
148.99

2.60
1.00
58.00
6.00

194.50
199.90
194.50
196.30

505.70
199.90
11,281.00
1,177.80

[Chapter -5](Page-120)

Ref.
Sr.
MORD
No.
Specifn
1

Description
3
Bitumen boiler oil fired, capacity 1000 litre fitted
with spray set
Three wheel 80-100 kN static roller
Add: 0.5 per cent of (a) Labour for sundries
c) Material
Bitumen (S-90) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

Unit Quantity
5
2.25

6
160.00

7
360.00

hour
L.S.

2.25

400.00

900.00
65.82

t
cum

0.90 44,543.81
9.00
535.00

40,089.43
4,815.00

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 900 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/900
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b)Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
Add: 0.5 per cent of (a) Labour for sundries
L.S.
c) Material
Polymer Modified Bitumen @ 1.00 kg per sqm
t
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 900 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/900
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

4
hour

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 900 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/900
(II)Bitumen (S-65)
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b)Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
Add: 0.5 per cent of (a) Labour for sundries
L.S.
c) Material
Bitumen (S-65) @ 1.00 kg per sqm
t
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm

PMGSY SOR 13-14

Rate
(Rs.)

7,424.33
66,818.98
74.24

2.60
1.00
58.00
6.00

194.50
199.90
194.50
196.30

505.70
199.90
11,281.00
1,177.80

2.25

160.00

360.00

2.25

400.00

900.00
65.822

0.90 44,966.00
9.00
535.00

40,469.40
4,815.00
7,471.83
67,246.45
74.72

2.60
1.00
58.00
6.00

194.50
199.90
194.50
196.30

505.70
199.90
11,281.00
1,177.80

2.25

160.00

360.00

2.25

400.00

900.00
65.822

0.90 48,775.00
9.00
535.00

43,897.50
4,815.00
7,900.34
71,103.06
79.00

[Chapter -5](Page-121)

Ref.
Sr.
MORD
No.
Specifn
1

Description
3
Taking output = 900 sqm
a) Labour
Mate
Bitumen Sprayer
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b)Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted
with spray set
Three wheel 80-100 kN static roller
Add: 0.5 per cent of (a) Labour for sundries
c) Material
Crumb Rubber Modified Bitumen @ 1.00 kg per
sqm

Unit Quantity
4

2.60
1.00
58.00
6.00

194.50
199.90
194.50
196.30

505.70
199.90
11,281.00
1,177.80

hour

2.25

160.00

360.00

hour
L.S.

2.25

400.00

900.00
65.822

0.90 48,775.00

43,897.50

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 900 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/900
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted
hour
Three wheel 80-100 kN static roller
hour
Add: 0.5 per cent of (a) Labour for sundries
L.S.
c) Material
Natural Rubber Modified Bitumen @ 1.00 kg per t
sqm
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 900 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/900
Case II: Nominal chipping size 9.5 mm
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

day
day
day
day

Crushed stone chipping, 13.2 mm nominal size @ cum


0.010 cum per sqm

PMGSY SOR 13-14

Rate
(Rs.)

9.00

535.00

4,815.00
7,900.34
71,103.06
79.00

2.60
1.00
58.00
6.00

194.50
199.90
194.50
196.30

505.70
199.90
11,281.00
1,177.80

2.25
2.25

160.00
400.00

360.00
900.00
65.82

0.90 49,565.00

44,608.50

9.00

535.00

4,815.00
7,989.22
71,902.94
79.89

2.60
1.00
58.00
6.00

194.50
199.90
194.50
196.30

505.70
199.90
11,281.00
1,177.80

2.00

160.00

320.00

2.00

400.00

800.00

[Chapter -5](Page-122)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
c) Material
Bitumen (S-90) @ 0.90 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(II)Bitumen (S-65)
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 0.90 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 0.90 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

0.90 44,543.81
8.00
440.00

40,089.43
3,520.00
7,236.73
65,130.56
65.13

2.60
1.00
58.00
6.00

194.50
199.90
194.50
196.30

505.70
199.90
11,281.00
1,177.80

2.00

160.00

320.00

2.00

400.00

800.00

0.90 44,966.00
8.00
440.00

40,469.40
3,520.00
7,284.23
65,558.03
65.56

2.60
1.00
58.00
6.00

194.50
199.90
194.50
194.50

505.70
199.90
11,281.00
1,167.00

2.00

160.00

320.00

2.00

400.00

800.00

0.90 48,775.00
8.00
440.00

43,897.50
3,520.00
7,711.39
69,402.49
69.40

2.60
1.00
58.00
6.00

194.50
199.90
194.50
196.30

505.70
199.90
11,281.00
1,177.80

[Chapter -5](Page-123)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 0.90 kg per t
sqm
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 0.90 kg per t
sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(B) By Mechanical Means
Case I: Nominal chipping size 13.2 mm
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Hydraulic self propelled chip spreader @ 1500 sqm
per hour
Tipper 5.5 10 t capacity for carriage of stone chips
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
Bitumen pressure distributor
Three wheel 80-100 kN static roller weight
c) Material

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

cum

Rate
(Rs.)

Amount
(Rs.)

2.00

160.00

320.00

2.00

400.00

800.00

0.90 48,775.00

43,897.50

8.00

440.00

3,520.00
7,712.74
69,414.64
69.41

2.60
1.00
58.00
6.00

194.50
199.90
194.50
196.30

505.70
199.90
11,281.00
1,177.80

2.00

160.00

320.00

2.00

400.00

800.00

0.90 49,565.00

44,608.50

8.00

440.00

3,520.00
7,801.61
70,214.51
70.21

day
day
day

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

hour
hour
hour

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

hour

6.00

250.00

1,500.00

hour
hour
hour

6.00
6.00
18.75

764.00
840.00
400.00

4,584.00
5,040.00
7,500.00

[Chapter -5](Page-124)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
Bitumen (S-90) @ 1.00 kg per sqm
t
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chip spreader @ 1500 sqm hour
per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller weight
hour
c) Material
Bitumen (S-65) @ 1.00 kg per sqm
t
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chip spreader @ 1500 sqm hour
per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller weight
hour
c) Material
Polymer Modified Bitumen @ 1.00 kg per sqm
t
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

5
6
7.50 44,543.81
75.00
535.00

Amount
(Rs.)
7
334,078.58
40,125.00
51,407.93
462,671.39
61.69

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

6.00

250.00

1,500.00

6.00
6.00
18.75

764.00
840.00
400.00

4,584.00
5,040.00
7,500.00

7.50 44,966.00
75.00
535.00

337,245.00
40,125.00
51,803.74
466,233.62
62.16

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

6.00

250.00

1,500.00

6.00
6.00
18.75

764.00
840.00
400.00

4,584.00
5,040.00
7,500.00

7.50 48,775.00

365,812.50

75.00

535.00

40,125.00
55,374.67
498,372.05

[Chapter -5](Page-125)

Ref.
Sr.
MORD
No.
Specifn
1

Description
3
Rate per sqm = (a+b+c+d)/7500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Hydraulic self propelled chip spreader @ 1500 sqm
per hour
Tipper 5.5 10 t capacity for carriage of stone chips
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
Bitumen pressure distributor
Three wheel 80-100 kN static roller weight
c) Material
Crumb Rubber Modified Bitumen @ 1.00 kg per
sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

Unit Quantity
4

194.50
194.50
199.90

85.58
1,750.50
399.80

hour
hour
hour

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

hour

6.00

250.00

1,500.00

hour
hour
hour

6.00
6.00
18.75

764.00
840.00
400.00

4,584.00
5,040.00
7,500.00

7.50 48,775.00

365,812.50

t
cum

hour
hour
hour
t
cum

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
Case II: Nominal chipping size 9.5 mm
PanchayatR B Circle-2,Rajkot

7
66.45

0.44
9.00
2.00

Tipper 5.5 10 t capacity for carriage of stone chips hour


from stockpile on road side to chip spreader

PMGSY SOR 13-14

Amount
(Rs.)

day
day
day

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chip spreader @ 1500 sqm hour
per hour

Front end loader 1 cum bucket capacity


Bitumen pressure distributor
Three wheel 80-100 kN static roller weight
c) Material
Natural Rubber Modified Bitumen @ 1.00 kg per
sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

Rate
(Rs.)

75.00

535.00

40,125.00
55,374.67
498,372.05
66.45

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

6.00

250.00

1,500.00

6.00
6.00
18.75

764.00
840.00
400.00

4,584.00
5,040.00
7,500.00

7.50 49,565.00

371,737.50

75.00

535.00

40,125.00
56,115.30
505,037.68
67.34

[Chapter -5](Page-126)

Ref.
Sr.
MORD
No.
Specifn
1

Description
3
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Hydraulic self propelled chips spreader @ 1500
sqm per hour

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day
day

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

hour
hour
hour

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

Tipper 5.5 10 t capacity for carriage of stone chips hour


from stockpile on road side to chips spreader

6.00

250.00

1,500.00

Front end loader 1 cum bucket capacity

hour

6.00

764.00

4,584.00

Bitumen pressure distributor @ 1750 sqm per hour hour

6.00

840.00

5,040.00

Three wheel 80-100 kN static roller weight


hour
c) Material
Bitumen (S-90) @ 0.90 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm

15.00

400.00

6,000.00

6.75 44,543.81
60.00
440.00

300,670.72
26,400.00

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chips spreader @ 1500 hour
sqm per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chips spreader

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

6.00

250.00

1,500.00

Front end loader 1 cum bucket capacity


hour
Bitumen pressure distributor @ 1750 sqm per hour hour

6.00
6.00

764.00
840.00

4,584.00
5,040.00

Three wheel 80-100 kN static roller weight


hour
c) Material
Bitumen (S-65) @ 0.90 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500

15.00

400.00

6,000.00

6.75 44,966.00
60.00
440.00

303,520.50
26,400.00

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

45,328.82
407,959.42
54.39

45,685.05
411,165.43
54.82
[Chapter -5](Page-127)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chips spreader @ 1500 hour
sqm per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chips spreader

Rate
(Rs.)

Amount
(Rs.)

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

6.00

250.00

1,500.00

Front end loader 1 cum bucket capacity


hour
Bitumen pressure distributor @ 1750 sqm per hour hour

6.00
6.00

764.00
840.00

4,584.00
5,040.00

Three wheel 80-100 kN static roller weight


hour
c) Material
Polymer Modified Bitumen @ 0.90 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chips spreader @ 1500 hour
sqm per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chips spreader

15.00

400.00

6,000.00

6.75 48,775.00
60.00
440.00

329,231.25
26,400.00

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

6.00

250.00

1,500.00

Front end loader 1 cum bucket capacity


hour
Bitumen pressure distributor @ 1750 sqm per hour hour

6.00
6.00

764.00
840.00

4,584.00
5,040.00

Three wheel 80-100 kN static roller weight


hour
c) Material
Crumb Rubber Modified Bitumen @ 0.90 kg per t
sqm
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm

15.00

400.00

6,000.00

6.75 48,775.00

329,231.25

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 7500 sqm = a+b+c+d
PMGSY SOR 13-14

48,898.89
440,090.02
58.68

PanchayatR B Circle-2,Rajkot

60.00

440.00

26,400.00
48,898.89
440,090.02

[Chapter -5](Page-128)

Ref.
Sr.
MORD
No.
Specifn
1

5.7

507

Description

Unit Quantity

3
4
Rate per sqm = (a+b+c+d)/7500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chips spreader @ 1500 hour
sqm per hour
Tipper 5.5 10 t capacity for carriage of stone chips hour
from stockpile on road side to chips spreader

Rate
(Rs.)
6

Amount
(Rs.)
7
58.68

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

6.00

250.00

1,500.00

hour
Front end loader 1 cum bucket capacity
Bitumen pressure distributor @ 1750 sqm per hour hour

6.00
6.00

764.00
840.00

4,584.00
5,040.00

Three wheel 80-100 kN static roller weight


hour
c) Material
Natural Rubber Modified Bitumen @ 0.90 kg per t
sqm
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
Surface Dressing using Bitumen Emulsion
Providing and laying surface dressing as wearing course
consisting of a layer of bitumen emulsion laid on the
prepared surface, followed by a cover of crushed stone
chippings of specified size and rolling with 80-100 kN roller
including cleaning the road surface as per Technical
Specification Clause 507.

15.00

400.00

6,000.00

6.75 49,565.00

334,563.75

(A) By Manual Means


Case I: Nominal aggregate size 13.2 mm
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate
day
Bitumen Emulsion Sprayer
day
Mazdoor (Unskilled)
day
b) Machinery
Emulsion sprayer, capacity 1000 litre fitted with hour
spray set
Three wheel 80-100 kN static roller
hour
Add: 0.5 per cent of (a) Labour for sundries
L.S.
c) Material
Bitumen Emulsion (RS-1) @ 1.50 kg per sqm
t

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

60.00

440.00

26,400.00
49,565.45
446,089.08
59.48

2.36
1.00
58.00

194.50
199.90
194.50

459.02
199.90
11,281.00

2.25

840.00

1,890.00

2.25

400.00

900.00
0.5/100

1.35 36,696.81

49,540.69

[Chapter -5](Page-129)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
Crushed stone chipping, 13.2 mm nominal size @ cum
0.010 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 900 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/900
Case II: Nominal chipping size 9.5 mm
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
b) Machinery
Emulsion sprayer, capacity 1000 litre fitted with hour
spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm
t
Crushed stone chipping, 9.5 mm nominal size @ cum
0.008 cum per sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1000
(B) By Mechanical Means
Case I: Nominal chipping size 13.2 mm
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
Hydraulic broom @ 1250 sqm per hour
hour
Air compressor 210 cfm
hour
Hydraulic self propelled chip spreader @ 1500 sqm hour
per hour

PanchayatR B Circle-2,Rajkot

7
4,815.00
8,635.70
77,721.32
86.36

2.36
1.00
58.00

194.50
199.90
194.50

459.02
199.90
11,281.00

2.00

840.00

1,680.00

2.00

400.00

800.00

1.40 36,696.81
8.00
440.00

51,375.53
3,520.00
8,664.43
77,979.89
77.98

194.50
194.50
199.90

85.58
1,750.50
399.80

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

6.00

250.00

1,500.00

hour
hour
hour

6.00
6.00
18.75

764.00
840.00
400.00

4,584.00
5,040.00
7,500.00

t
cum

11.25 36,696.81
75.00
440.00

412,839.11
33,000.00

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
Case II: Nominal chipping size 9.5 mm
Unit = sqm
Taking output = 7500 sqm
PMGSY SOR 13-14

6
535.00

Amount
(Rs.)

0.44
9.00
2.00

Tipper 5.5 10 t capacity for carriage of stone chips hour


from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
Bitumen Emulsion pressure distributor
Three wheel 80-100 kN static roller
c) Material
Bitumen Emulsion (RS-1) @ 1.50 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

5
9.00

Rate
(Rs.)

60,362.37
543,261.37
72.43

[Chapter -5](Page-130)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Hydraulic self propelled chip spreader @ 1500 sqm
per hour
Tipper 5.5 10 t capacity for carriage of stone chips
from stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity
Bitumen emulsion pressure distributor @ 1750 sqm
per hour
Three wheel 80-100 kN static roller
c) Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm

Rate
(Rs.)

Amount
(Rs.)

day
day
day

0.44
9.00
2.00

194.50
194.50
199.90

85.58
1,750.50
399.80

hour
hour
hour

6.00
6.00
6.00

300.00
300.00
2,100.00

1,800.00
1,800.00
12,600.00

hour

6.00

250.00

1,500.00

hour
hour

6.00
6.00

764.00
840.00

4,584.00
5,040.00

hour

15.00

400.00

6,000.00

t
cum

10.50 36,696.81
60.00
440.00

385,316.51
26,400.00

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500

Note:

55,909.55
503,185.93
67.09

Where the proposed aggregate fails to pass the


stripping value test, an approved adhesion agent may
be added to the binder as per Clause 507.24.
Alternatively, chips may be pre-coated as per Clause
507.25.

5.8 507.2.5 Pre-coating Chips


Pre-coating of chips with 1 per cent of paving bitumen by
weight of chips in a suitable mixer duly heated to 160
degree C as per Technical Specification Clause 507.2.5
Unit = cum
Taking output = 30 cum
(I) Bitumen (S-90)
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre itre
Mixall 6-10 t capacity
c) Material
Bitumen @1 per cent
(30x1.6)/100

by

weight

of

day
day

0.60
15.00

194.50
194.50

116.70
2,917.50

hour

6.00

160.00

960.00

hour

6.00

1,036.20

6,217.20

0.48 44,543.81

21,381.03

chips t

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 30 cum = a+b+c+d
Rate per cum = (a+b+c+d)/30
(II)Bitumen (S-65)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

3,949.05
35,541.48
1,184.72
0.60
15.00

194.50
194.50

116.70
2,917.50

[Chapter -5](Page-131)

Ref.
Sr.
MORD
No.
Specifn
1

5.9

Description

508

Unit Quantity

3
4
Bitumen boiler oil fired, capacity 1000 litre itre
hour
Mixall 6-10 t capacity
hour
c) Material
Bitumen @1 per cent by weight of chips t
(30x1.6)/100
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 30 cum = a+b+c+d
Rate per cum = (a+b+c+d)/30
20mm thick Open-Graded Premix Carpet using
Bituminous (penetration grade/modified bitumen)
Binder
Providing, laying and rolling of open-graded premix carpet
of 20 mm thickness composed of 13.2 mm to 5.6 mm
aggregates either using penetration grade bitumen or
emulsion to required line, grade and level to serve as
wearing course on a previously prepared base, including
mixing in a suitable plant, laying and rolling with a three
wheel 80-100 kN static roller capacity, finished to required
level and grades to be followed by seal coat of either Type
A or Type B or Type C as per Technical Specification Clause
508.
Case - I By Manual Means
(I) Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 14.60 kg per 10 sqm
t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

5
6.00
6.00

Rate
(Rs.)

Amount
(Rs.)

6
160.00
1,036.20

7
960.00
6,217.20

0.48 44,966.00

21,583.68
3,974.39
35,769.47
1,192.32

1.08
21.00
6.00

194.50
194.50
196.30

210.06
4,084.50
1,177.80

4.00
4.00

1,036.20
160.00

4,144.80
640.00

2.00

400.00

800.00

0.73 44,543.81
13.50
535.00

32,516.98
7,222.50
6,349.58
57,146.22
114.29

1.08
21.00
6.00

194.50
194.50
196.30

210.06
4,084.50
1,177.80

4.00
4.00

1,036.20
160.00

4,144.80
640.00

2.00

400.00

800.00

[Chapter -5](Page-132)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm
t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 14.60 kg per 10 sqm t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 14.60 kg per t
10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate
day

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

0.73 44,966.00
13.50
535.00

32,825.18
7,222.50
6,388.11
57,492.95
114.99

1.08
21.00
6.00

194.50
194.50
196.30

210.06
4,084.50
1,177.80

4.00
4.00

1,036.20
160.00

4,144.80
640.00

2.00

400.00

800.00

0.73 48,775.00

35,605.75

13.50

535.00

7,222.50
6,735.68
60,621.09
121.24

1.08
21.00
6.00

194.50
194.50
194.50

210.06
4,084.50
1,167.00

4.00
4.00

1,036.20
160.00

4,144.80
640.00

2.00

400.00

800.00

0.73 48,775.00

35,605.75

13.50

535.00

7,222.50
6,734.33
60,608.94
121.22

1.08

194.50

210.06

[Chapter -5](Page-133)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Bitumen boiler oil fired1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 14.60 kg per t
10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
Case - II By Mechanical Means
(I) Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 14.60 kg per 10 sqm
t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(II)Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm
t

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

5
21.00
6.00

6
194.50
194.50

7
4,084.50
1,167.00

4.00
4.00

1,036.20
160.00

4,144.80
640.00

2.00

400.00

800.00

0.73 49,565.00

36,182.45

13.50

535.00

7,222.50
6,806.41
61,257.72
122.52

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.64
6.00
16.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00

5.84 44,543.81
108.00
535.00

260,135.85
57,780.00
48,344.46
435,100.15
108.78

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.64
6.00
16.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00

5.84 44,966.00

262,601.44

[Chapter -5](Page-134)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor skilled for checking line and levels
day
b) Machinery
HMP 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 14.60 kg per 10 sqm t
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 14.60 kg per t
10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

5
108.00

Rate
(Rs.)
6
535.00

Amount
(Rs.)
7
57,780.00
48,652.66
437,873.94
109.47

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.64
6.00
16.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00

5.84 48,775.00

284,846.00

108.00

535.00

57,780.00
51,433.23
462,899.07
115.72

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.64
6.00
16.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00

5.84 48,775.00

284,846.00

108.00

535.00

57,780.00
51,433.23
462,899.07
115.72

[Chapter -5](Page-135)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
HMP 30/40 t per hour
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Natural Rubber Modified Bitumen @ 14.60 kg per
10 sqm

Unit Quantity

5.11

509

5
0.52
10.00
3.00

6
194.50
194.50
199.90

7
101.14
1,945.00
599.70

hour
hour
hour
hour
hour
hour

6.00
6.00
6.00
3.64
6.00
16.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
910.00
7,200.00
6,400.00

5.84 49,565.00

289,459.60

PanchayatR B Circle-2,Rajkot

108.00

535.00

57,780.00
52,009.93
468,089.37
117.02

day
day
day

0.80
18.00
2.00

194.50
194.50
199.90

155.60
3,501.00
399.80

hour
hour

6.00
3.60

190.00
400.00

1,140.00
1,440.00

1.94 36,696.81

71,191.81

Crushed stone aggregates 13.2 mm to 5.6 mm @ cum


0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 900 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/900
Mix Seal Surfacing
Providing, laying and rolling of close-graded premix
surfacing material of 20 mm thickness composed of 11.2
mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B)
aggregates using penetration grade bitumen to required
line, grade and level to serve as wearing course on a
previously prepared base, including mixing in a suitable
plant, laying and rolling with a three wheel 8-10 kN static
roller and finishing to required level and grades as per
Technical Specification Clause 509
By Manual Means
Type A
(I) Bitumen (S-90)
Unit = sqm

PMGSY SOR 13-14

Amount
(Rs.)

4
day
day
day

Crushed stone chipping, 13.2 mm to 5.6 mm @ cum


0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
5.10 508.2 20 mm thick Open Graded Premix Carpet using
Bitumen Emulsion as per Technical Specification
Clause 508.2
Unit = sqm
Taking output = 900 sqm (24.3 cum)
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
Concrete mixer 0.4/0.28 cum capacity
Three wheel 80-100 kN static roller
c) Material
Bitumen emulsion (RS-1) @ 21.50 kg per 10 sqm

Rate
(Rs.)

24.30

535.00

13,000.50
11,353.59
102,182.30
113.54

[Chapter -5](Page-136)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
Taking output = 500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b) Machinery
Mixall 6-10 t capacity
Oil fired bitumen boiler 1000 litre capacity fitted
with spray set
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-90) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @
0.27 cum per 10 sqm

Unit Quantity
4

1.40
21.00
7.00

194.50
194.50
196.30

272.30
4,084.50
1,374.10

hour
hour

6.00
6.00

1,036.20
160.00

6,217.20
960.00

hour

6.00

400.00

2,400.00

1.10 44,543.81
13.50
295.00

48,998.19
3,982.50

t
cum

Three wheel 80-100 kN static roller


hour
c) Material
Bitumen (S-65) @ 22 kg per 10 sqm
t
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6-10 t capacity
hour
Oil fired bitumen boiler 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 22 kg per 10 sqm
t
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

day
day
day

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6-10 t capacity
hour
Oil fired bitumen boiler 1000 litre capacity fitted hour
with spray set

PMGSY SOR 13-14

Rate
(Rs.)

8,536.10
76,552.59
153.11

1.40
21.00
7.00

194.50
194.50
196.30

272.30
4,084.50
1,374.10

6.00
6.00

1,036.20
160.00

6,217.20
960.00

6.00

400.00

2,400.00

1.10 44,966.00
13.50
295.00

49,462.60
3,982.50
8,594.15
77,075.05
154.15

1.40
21.00
7.00

194.50
194.50
196.30

272.30
4,084.50
1,374.10

6.00
6.00

1,036.20
160.00

6,217.20
960.00

6.00

400.00

2,400.00

1.10 48,775.00
13.50
295.00

53,652.50
3,982.50
9,117.89

[Chapter -5](Page-137)

Ref.
Sr.
MORD
No.
Specifn
1

Description
3
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b) Machinery
Mixall 6-10 t capacity
Oil fired bitumen boiler 1000 litre capacity fitted
with spray set
Three wheel 80-100 kN static roller
c) Material
Crumb Rubber Modified Bitumen @ 22 kg per 10
sqm

Unit Quantity
4

7
81,788.69
163.58

1.40
21.00
7.00

194.50
194.50
196.30

272.30
4,084.50
1,374.10

hour
hour

6.00
6.00

1,036.20
160.00

6,217.20
960.00

hour

6.00

400.00

2,400.00

1.10 48,775.00

53,652.50

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6-10 t capacity
hour
Oil fired bitumen boiler 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 22 kg per 10 t
sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6-10 t capacity
hour
PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

day
day
day

Stone crushed aggregates 11.2 mm to 0.09 mm @ cum


0.27 cum per 10 sqm

PMGSY SOR 13-14

Rate
(Rs.)

13.50

295.00

3,982.50
9,117.89
81,788.69
163.58

1.40
21.00
7.00

194.50
194.50
196.30

272.30
4,084.50
1,374.10

6.00
6.00

1,036.20
160.00

6,217.20
960.00

6.00

400.00

2,400.00

1.10 49,565.00

54,521.50

13.50

295.00

3,982.50
9,226.51
82,766.31
165.53

1.40
21.00
7.00

194.50
194.50
196.30

272.30
4,084.50
1,374.10

6.00

1,036.20

6,217.20

[Chapter -5](Page-138)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

Amount
(Rs.)

3
4
Oil fired bitumen boiler 1000 litre capacity fitted hour
with spray set

5
6.00

6
160.00

7
960.00

Three wheel 80-100 kN static roller


hour
c) Material
Bitumen (S-90) @ 19 kg per 10 sqm
t
Stone crushed aggregates 13.2 mm to 0.09 mm @ cum
0.27cum per 10 sqm

6.00

400.00

2,400.00

0.95 44,543.81
13.50
295.00

42,316.62
3,982.50

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6-10 t capacity
hour
Oil fired bitumen boiler 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 19 kg per 10 sqm
t
Stone crushed aggregates 13.2 mm to 0.09 mm @ cum
0.27cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6-10 t capacity
hour
Oil fired bitumen boiler 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
c) Material
Polymer Modified Bitumen @ 19 kg per 10 sqm

1.40
21.00
7.00

194.50
194.50
196.30

272.30
4,084.50
1,374.10

6.00
6.00

1,036.20
160.00

6,217.20
960.00

6.00

400.00

2,400.00

0.95 44,966.00
13.50
295.00

42,717.70
3,982.50
7,751.04
69,487.04
138.97

194.50
194.50
196.30

272.30
4,084.50
1,374.10

6.00
6.00

1,036.20
160.00

6,217.20
960.00

hour

6.00

400.00

2,400.00

0.95 48,775.00

46,336.25

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm
PanchayatR B Circle-2,Rajkot

7,700.90
69,035.82
138.07

1.40
21.00
7.00

Stone crushed aggregates 13.2 mm to 0.09 mm @ cum


0.27cum per 10 sqm

PMGSY SOR 13-14

Rate
(Rs.)

13.50

295.00

3,982.50
8,203.36
73,557.91
147.12

[Chapter -5](Page-139)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b) Machinery
Mixall 6-10 t capacity
Oil fired bitumen boiler 1000 litre capacity fitted
with spray set
Three wheel 80-100 kN static roller
c) Material
Crumb Rubber Modified Bitumen @ 19 kg per 10
sqm

Unit Quantity
4

1.40
21.00
7.00

194.50
194.50
196.30

272.30
4,084.50
1,374.10

hour
hour

6.00
6.00

1,036.20
160.00

6,217.20
960.00

hour

6.00

400.00

2,400.00

0.95 48,775.00

46,336.25

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6-10 t capacity
hour
Oil fired bitumen boiler 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 19 kg per 10 t
sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ cum
0.27cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/500
By Mechanical Means
Type A
(I) Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

day
day
day

Stone crushed aggregates 13.2 mm to 0.09 mm @ cum


0.27cum per 10 sqm

PMGSY SOR 13-14

Rate
(Rs.)

13.50

295.00

3,982.50
8,203.36
73,557.91
147.12

1.40
21.00
7.00

194.50
194.50
196.30

272.30
4,084.50
1,374.10

6.00
6.00

1,036.20
160.00

6,217.20
960.00

6.00

400.00

2,400.00

0.95 49,565.00

47,086.75

13.50

295.00

3,982.50
8,297.17
74,402.22
148.80

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.60
6.00

7,150.00
700.00
764.00
250.00
1,200.00

42,900.00
4,200.00
4,584.00
900.00
7,200.00

[Chapter -5](Page-140)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 22 kg per 10 sqm
t
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(II)Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 22 kg per 10 sqm
t
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 22 kg per 10 sqm
t
Stone crushed aggregates 11.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

5
18.00

Rate
(Rs.)

Amount
(Rs.)

6
400.00

7
7,200.00

8.80 44,543.81
108.00
295.00

391,985.53
31,860.00
61,684.42
555,159.79
138.79

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.60
6.00
18.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00

8.80 44,966.00
108.00
295.00

395,700.80
31,860.00
62,148.83
559,339.47
139.83

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.60
6.00
18.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00

8.80 48,775.00
108.00
295.00

429,220.00
31,860.00
66,338.73
597,048.57
149.26

[Chapter -5](Page-141)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
HMP of appropriate capacity
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Crumb Rubber Modified Bitumen @ 22 kg per 10
sqm

Unit Quantity
4

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

hour
hour
hour
hour
hour
hour

6.00
6.00
6.00
3.60
6.00
18.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00

8.80 48,775.00

429,220.00

108.00

Stone crushed aggregates 11.2 mm to 0.09 mm @ cum


0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour

108.00

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

day
day
day

Stone crushed aggregates 11.2 mm to 0.09 mm @ cum


0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
* Natural Rubber Modified Bitumen @ 22 kg per 10 t
sqm

PMGSY SOR 13-14

Rate
(Rs.)

295.00

31,860.00
66,338.73
597,048.57
149.26

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.60
6.00
18.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00

8.80 49,565.00

436,172.00

295.00

31,860.00
67,207.73
604,869.57
151.22

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00

7,150.00
700.00
764.00

42,900.00
4,200.00
4,584.00

[Chapter -5](Page-142)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
Tipper 5.5 10 t capacity
hour
Add 10 per cent of cost of carriage to cover cost of
loading and unloading
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-90) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27 cum per 10 sqm

hour
hour
t
cum

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(II)Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
day
Mate
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 19 kg per 10 sqm
t
Stone crushed aggregates 13.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 19 kg per 10 sqm
t
Stone crushed aggregates 13.2 mm to 0.09 mm @ cum
0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

5
3.60

6
250.00

7
900.00
90.00

6.00
18.00

1,200.00
400.00

7,200.00
7,200.00

7.60 44,543.81
108.00
295.00

338,532.96
31,860.00
55,014.10
495,126.90
123.78

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.60
6.00
18.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00

7.60 44,966.00
108.00
295.00

341,741.60
31,860.00
55,403.93
498,635.37
124.66

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.60
6.00
18.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00

7.60 48,775.00

370,690.00

108.00

295.00

31,860.00
59,022.48

[Chapter -5](Page-143)

Ref.
Sr.
MORD
No.
Specifn
1

Description
3
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor (Skilled)
b) Machinery
HMP of appropriate capacity
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Crumb Rubber Modified Bitumen @ 19 kg per 10
sqm

Unit Quantity
4

510

Amount
(Rs.)
7
531,202.32
132.80

day
day
day

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

hour
hour
hour
hour
hour
hour

6.00
6.00
6.00
3.60
6.00
18.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00

7.60 48,775.00

370,690.00

Stone crushed aggregates 13.2 mm to 0.09 mm @ cum


0.27 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
b) Machinery
HMP of appropriate capacity
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 19 kg per 10 t
sqm

108.00

Stone crushed aggregates 13.2 mm to 0.09 mm @ cum


0.27 cum per 10 sqm

108.00

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 4000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/4000
* Any one of the above alternatives may be adopted.
5.12

Rate
(Rs.)

295.00

31,860.00
59,022.48
531,202.32
132.80

0.52
10.00
3.00

194.50
194.50
199.90

101.14
1,945.00
599.70

6.00
6.00
6.00
3.60
6.00
18.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

42,900.00
4,200.00
4,584.00
900.00
7,200.00
7,200.00

7.60 49,565.00

376,694.00

295.00

31,860.00
59,772.98
537,956.82
134.49

Seal Coat
Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall using Type A, Type B and Type C as per Technical
Specification Clause 510

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -5](Page-144)

Ref.
Sr.
MORD
No.
Specifn
1

Description
3
A. By Manual Means
Case - I : Type A
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
Bitumen Sprayer
Mazdoor (Unskilled)
Mazdoor (Semi-Skilled)
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted
with spray set
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-90) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm

Unit Quantity
4

1.15
1.00
22.00
6.00

194.50
199.90
194.50
196.30

223.68
199.90
4,279.00
1,177.80

hour

2.20

128.00

281.60

hour

2.20

400.00

880.00

1.078 44,543.81
9.90
365.00

48,018.23
3,613.50

t
cum

Three wheel 80-100 kN static roller


hour
c) Material
Bitumen (S-65) @ 9.80 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

day
day
day
day

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(II)Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set

PMGSY SOR 13-14

Rate
(Rs.)

7,334.21
66,007.91
60.01

1.15
1.00
22.00
6.00

194.50
199.90
194.50
196.30

223.68
199.90
4,279.00
1,177.80

2.20

128.00

281.60

2.20

400.00

880.00

1.078 44,966.00
9.90
365.00

48,473.35
3,613.50

7,391.10
66,519.93
60.47

1.15
1.00
22.00
6.00

194.50
199.90
194.50
196.30

223.68
199.90
4,279.00
1,177.80

[Chapter -5](Page-145)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
c) Material
Polymer Modified Bitumen @ 9.80 kg per 10 sqm

hour
t

Crushed stone chipping of 6.7 mm size 100 per cum


cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 9.80 kg per 10 t
sqm
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 9.80 kg per 10 t
sqm
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

5
2.20

6
128.00

7
281.60

2.20

400.00

880.00

1.078 48,775.00

52,579.45

9.90

365.00

3,613.50

7,904.37
71,139.29
64.67

1.15
1.00
22.00
6.00

194.50
199.90
194.50
196.30

223.68
199.90
4,279.00
1,177.80

2.20

128.00

281.60

2.20

400.00

880.00

1.078 48,775.00

52,579.45

9.90

365.00

3,613.50

7,904.37
71,139.29
64.67

1.15
1.00
22.00
6.00

194.50
199.90
194.50
196.30

223.68
199.90
4,279.00
1,177.80

2.20

128.00

281.60

2.20

400.00

880.00

1.078 49,565.00

53,431.07

9.90

365.00

3,613.50

[Chapter -5](Page-146)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
Case - II : Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Three wheel 80-100 kN static roller
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
c) Material
Bitumen (S-90) @ 6.80 kg per 10 sqm
t
Crushed sand or grit as passing 2.36 mm sieve and cum
retained on 180 micron sieve applied @ 0.06 cum
per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1250 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1250
(II)Bitumen (S-65)
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Three wheel 80-100 kN static roller
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm
t
Crushed sand or grit as passing 2.36 mm sieve and cum
retained on 180 micron sieve applied @ 0.06 cum
per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1250 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1250
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
6

Amount
(Rs.)
7
8,010.82
72,097.36
65.54

0.85
15.00
2.00

194.50
194.50
196.30

165.33
2,917.50
392.60

2.50
2.50
2.50

1,036.20
400.00
160.00

2,590.50
1,000.00
400.00

0.85 44,543.81
7.50
376.81

37,862.24
2,826.08

6,019.28
54,173.52
43.34

0.85
15.00
2.00

194.50
194.50
196.30

165.33
2,917.50
392.60

2.50
2.50
2.50

1,036.20
400.00
160.00

2,590.50
1,000.00
400.00

0.85 44,966.00
7.50
376.81

38,221.10
2,826.08

6,064.14
54,577.24
43.66

0.85
15.00
2.00

194.50
194.50
196.30

165.33
2,917.50
392.60

2.50

1,036.20

2,590.50

[Chapter -5](Page-147)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
Three wheel 80-100 kN static roller
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
c) Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm t

5
2.50
2.50

Crushed sand or grit as passing 2.36 mm sieve and cum


retained on 180 micron sieve applied @ 0.06 cum
per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1250 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1250
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Three wheel 80-100 kN static roller
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set

7.50

c) Material
Crumb Rubber Modified Bitumen @ 6.80 kg per 10 t
sqm
Crushed sand or grit as passing 2.36 mm sieve and cum
retained on 180 micron sieve applied @ 0.06 cum
per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1250 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1250
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Mixall 6/10 t capacity
hour
Three wheel 80-100 kN static roller
hour
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
c) Material
Natural Rubber Modified Bitumen @ 6.80 kg per 10 t
sqm
Crushed sand or grit as passing 2.36 mm sieve and cum
retained on 180 micron sieve applied @ 0.06 cum
per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

6
400.00
160.00

7
1,000.00
400.00

0.85 48,775.00

41,458.75

376.81

2,826.08

6,468.84
58,219.59
46.58

0.85
15.00
2.00

194.50
194.50
196.30

165.33
2,917.50
392.60

2.50
2.50
2.50

1,036.20
400.00
160.00

2,590.50
1,000.00
400.00

0.85 48,775.00

41,458.75

7.50

376.81

2,826.08

6,468.84
58,219.59
46.58

0.85
15.00
2.00

194.50
194.50
196.30

165.33
2,917.50
392.60

2.50
2.50
2.50

1,036.20
400.00
160.00

2,590.50
1,000.00
400.00

0.85 49,565.00

42,130.25

7.50

376.81

2,826.08

6,552.78
[Chapter -5](Page-148)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
Cost of 1250 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1250
Case - III : Type C
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled) for carrying of chips & day
spraying
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 6.50 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(II)Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 6.50 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
6

Amount
(Rs.)
7
58,975.03
47.18

1.15
1.00
22.00

194.50
199.90
194.50

223.68
199.90
4,279.00

5.00

196.30

981.50

2.20

160.00

352.00

2.20

400.00

880.00

0.715 44,543.81
9.90
365.00

31,848.82
3,613.50

5,297.30
47,675.70
43.34

1.15
1.00
22.00
5.00

194.50
199.90
194.50
196.30

223.68
199.90
4,279.00
981.50

2.20

160.00

352.00

2.20

400.00

880.00

0.715 44,966.00
9.90
365.00

32,150.69
3,613.50

5,335.03
48,015.30
43.65

1.15
1.00
22.00
5.00

194.50
199.90
194.50
196.30

223.68
199.90
4,279.00
981.50

[Chapter -5](Page-149)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Polymer Modified Bitumen @ 6.50 kg per 10 sqm t
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm =(a+b+c+d)/1100
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 6.50 kg per 10 t
sqm
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate
day
Bitumen Sprayer
day
Mazdoor (Unskilled)
day
Mazdoor (Semi-Skilled)
day
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted hour
with spray set
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 6.50 kg per 10 t
sqm
Crushed stone chipping of 6.7 mm size defined as cum
100% passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum.
d) OH & Contractor's profit @ 12.5% on (a+b+c)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

2.20

160.00

352.00

2.20

400.00

880.00

0.715 48,775.00
9.90
365.00

34,874.13
3,613.50

5,675.46
51,079.16
46.44

1.15
1.00
22.00
5.00

194.50
199.90
194.50
196.30

223.68
199.90
4,279.00
981.50

2.20

160.00

352.00

2.20

400.00

880.00

0.715 48,775.00

34,874.13

9.90

365.00

3,613.50

5,675.46
51,079.16
46.44

1.15
1.00
22.00
5.00

194.50
199.90
194.50
196.30

223.68
199.90
4,279.00
981.50

2.20

160.00

352.00

2.20

400.00

880.00

0.715 49,565.00

35,438.98

9.90

365.00

3,613.50

5,746.07
[Chapter -5](Page-150)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
Cost of 1100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/1100
Note: Since seal coat is provided immediately over the bituminous
layers, hydraulic broom for cleaning has not been catered.

Unit Quantity
4

B. By Mechanical Means
Case - I : Type A
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 9.80 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 9.80 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
6

Amount
(Rs.)
7
51,714.62
47.01

0.24
6.00

194.50
194.50

46.68
1,167.00

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

7.35 44,543.81
67.50
365.00

327,397.00
24,637.50

47,871.52
430,843.71
57.45

0.24
6.00

194.50
194.50

46.68
1,167.00

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

7.35 44,966.00
67.50
365.00

330,500.10
24,637.50

48,259.41
434,334.69
57.91

0.24
6.00

194.50
194.50

46.68
1,167.00

[Chapter -5](Page-151)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
b) Machinery
Hydraulic self propelled chips spreader
Tipper 5.5 cum capacity
Front end loader 1 cum bucket capacity
Bitumen pressure distributor
Three wheel 80-100 kN static roller
c) Material
Polymer Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm

Unit Quantity
4

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

t
cum

7.35 48,775.00
67.50
365.00

358,496.25
24,637.50

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 9.80 kg per 10 t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

hour
hour
hour
hour
hour

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 9.80 kg per 10 st
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm

PMGSY SOR 13-14

Rate
(Rs.)

51,758.93
465,830.36
62.11

0.24
6.00

194.50
194.50

46.68
1,167.00

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

7.35 48,775.00
67.50
365.00

358,496.25
24,637.50

51,758.93
465,830.36
62.11

0.24
6.00

194.50
194.50

46.68
1,167.00

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

7.35 49,565.00
67.50
365.00

364,302.75
24,637.50

52,484.74
472,362.67
[Chapter -5](Page-152)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
Rate per sqm = (a+b+c+d)/7500
Note: Since seal coat is provided immediately over the bituminous
layers, Hydraulic broom for cleaning has not been catered.
510

Case - II : Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
HMP of 30/40 t per hour
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-90) @ 6.80 kg per 10 sqm
Crushed sand defined as passing 2.36 mm sieve
and retained on 180 micron sieve applied @ 0.06
cum per 10 sqm

Unit Quantity
4

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)
7
62.98

day
day

0.16
4.00

194.50
194.50

31.12
778.00

hour
hour
hour
hour
hour
hour

2.00
2.00
2.00
1.36
2.00
10.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00

t
cum

3.40 44,543.81
30.00
376.81

151,448.95
11,304.30

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 5000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/5000
(II)Bitumen (S-65)
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
HMP of 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm
t
Crushed sand defined as passing 2.36 mm sieve cum
and retained on 180 micron sieve applied @ 0.06
cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 5000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/5000
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
PMGSY SOR 13-14

Rate
(Rs.)

23,441.30
210,971.67
42.19

0.16
4.00

194.50
194.50

31.12
778.00

2.00
2.00
2.00
1.36
2.00
10.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00

3.40 44,966.00
30.00
376.81

152,884.40
11,304.30

23,620.73
212,586.55
42.52

0.16
4.00

194.50
194.50

31.12
778.00

[Chapter -5](Page-153)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
HMP of 30/40 t per hour
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm
Crushed sand defined as passing 2.36 mm sieve
and retained on 180 micron sieve applied @ 0.06
cum per 10 sqm

Unit Quantity

Rate
(Rs.)

4
hour
hour
hour
hour
hour
hour

5
2.00
2.00
2.00
1.36
2.00
10.00

6
7,150.00
700.00
764.00
250.00
1,200.00
400.00

7
14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00

t
cum

3.40 48,775.00
30.00
376.81

165,835.00
11,304.30

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 5000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/5000
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
HMP of 30 / 40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 6.80 kg per 10 st
Crushed sand defined as passing 2.36 mm sieve cum
and retained on 180 micron sieve applied @ 0.06
cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 5000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/5000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
HMP of 30/40 t per hour
hour
Electric generator set 125 KVA
hour
Front end loader 1 cum bucket capacity
hour
Tipper 5.5 10 t capacity
hour
Paver finisher
hour
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 6.80 kg per 10 t
Crushed sand defined as passing 2.36 mm sieve cum
and retained on 180 micron sieve applied @ 0.06
cum per 10 sqm
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

25,239.55
227,155.97
45.43

0.16
4.00

194.50
194.50

31.12
778.00

2.00
2.00
2.00
1.36
2.00
10.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00

3.40 48,775.00
30.00
376.81

165,835.00
11,304.30

25,239.55
227,155.97
45.43

0.16
4.00

194.50
194.50

31.12
778.00

2.00
2.00
2.00
1.36
2.00
10.00

7,150.00
700.00
764.00
250.00
1,200.00
400.00

14,300.00
1,400.00
1,528.00
340.00
2,400.00
4,000.00

3.40 49,565.00
30.00
376.81

168,521.00
11,304.30

[Chapter -5](Page-154)

Ref.
Sr.
MORD
No.
Specifn
1

Description

Unit Quantity

3
4
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 5000 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/5000
Note: Since seal coat is required to be provided over the premix
carpet on the same day, out of the 6 working hours of the
HMP, 4.00 hours are proposed to be utilised for the premix
carpet and the balance 2.00 hours have been considered for
this case.
Case - III : Type C
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-90) @ 6.50 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(II)Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Bitumen (S-65) @ 6.50 kg per 10 sqm
t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(IIIPolymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)
6

Amount
(Rs.)
7
25,575.30
230,177.72
46.04

0.20
5.00

194.50
194.50

38.90
972.50

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

4.88 44,543.81
67.50
365.00

217,373.79
24,637.50

34,093.34
306,840.03
40.91

0.20
5.00

194.50
194.50

38.90
972.50

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

4.88 44,966.00
67.50
365.00

219,434.08
24,637.50

34,350.87
309,157.85
41.22

[Chapter -5](Page-155)

Ref.
Sr.
MORD
No.
Specifn
1

Description

3
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic self propelled chips spreader
Tipper 5.5 cum capacity
Front end loader 1 cum bucket capacity
Bitumen pressure distributor
Three wheel 80-100 kN static roller
c) Material
Polymer Modified Bitumen @ 6.50 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per
cent passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm

Unit Quantity

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

4
day
day

5
0.20
5.00

6
194.50
194.50

hour
hour
hour
hour
hour

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

t
cum

4.88 48,775.00
67.50
365.00

238,022.00
24,637.50

d) OH & Contractor's profit @ 12.5% on (a+b+c)


Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
(IV)Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Crumb Rubber Modified Bitumen @ 6.50 kg per 10 st
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm =(a+b+c+d)/7500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Hydraulic self propelled chips spreader
hour
Tipper 5.5 cum capacity
hour
Front end loader 1 cum bucket capacity
hour
Bitumen pressure distributor
hour
Three wheel 80-100 kN static roller
hour
c) Material
Natural Rubber Modified Bitumen @ 6.50 kg per 10 t
Crushed stone chipping of 6.7 mm size 100 per cum
cent passing 9.5 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
PMGSY SOR 13-14

Rate
(Rs.)

38.90
972.50

36,674.36
330,069.26
44.01

0.20
5.00

194.50
194.50

38.90
972.50

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

4.88 48,775.00
67.50
365.00

238,022.00
24,637.50

36,674.36
330,069.26
44.01

0.20
5.00

194.50
194.50

38.90
972.50

6.00
6.00
6.00
6.00
15.00

2,100.00
250.00
764.00
840.00
400.00

12,600.00
1,500.00
4,584.00
5,040.00
6,000.00

4.88 49,565.00
67.50
365.00

241,877.20
24,637.50

[Chapter -5](Page-156)

Ref.
Sr.
MORD
No.
Specifn
1

5.13

Description

Unit Quantity

3
4
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost of 7500 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/7500
Note: Since seal coat is provided immediately over the bituminous
layers, Hydraulic broom for cleaning has not been catered.
511

Rate
(Rs.)
6

Amount
(Rs.)
7
37,156.26
334,406.36
44.59

Supply of Stone Aggregates for Pavement Courses


Supply of stone aggregates from approved sources
conforming to the physical requirement, specified in the
respective clauses, including royalties, fees rents, collection,
transportation, stacking and testing and measured in cum
as per Clause 511.5.

Note: Competitive market rates to be ascertained. Alternatively,


rates for stone crushing given in Chapter 1 may be adopted,
if found economical. In case for supply of aggregates at site
are not available, nearest crusher site may be ascertained.
Loading and unloading charges and cost of carriage may be
added to these rates to arrive at the cost at site.

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -5](Page-157)

Chapter 6
CEMENT CONCRETE PAVEMENT
Ref.
MORD
Description
n
Specif
1
2
3
6.1
400 Granual Sub-base
Rate as per item No.4.1 of Chapter 4
6.2
400 Lime Treated Soil
Rate as per item No.4.5 of Chapter 4
6.3 500 & 40Water Bound Macadam (WBM) - Sub-base
(A) By Manual Means

Sr.
No.

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

7
564.20
280.64

995.91

As per item No.4.7 of Chapter 4


(B) By Mechnical Means
6.4

894.61

As per item No.4.7 of Chapter 4


1500 Cement Concrete Pavement
Construction of
un-reinforced, dowel jointed at
expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other
type as per Clause 1501.2.2 M30 (Grade), coarse and
fine aggregates conforming to IS:383, maximum size of
coarse aggregate not exceeding 25 mm, mixed in a
concrete mixer of not less than 0.2 cum capacity and
appropriate weigh batcher using approved mix design,
laid in approved fixed side formwork (steel channel,
laying and fixing of 125 micron thick polythene film,
wedges, steel plates including levelling the formwork as
per drawing), spreading the concrete with shovels, rakes,
compacted using needle, screed and plate vibrators and
finished in continuous operation including provision of
contraction and expansion, construction joints, applying
debonding strips, primer, sealant, dowel bars, near
approaches to bridge/culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14d
using curing compound (where specified) and water
finishing to lines and grade as per drawing
Technical Specification Clause 1501

and

Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mate
Mason (1st class)
Mason (2nd class)
Mazdoor (Unskilled)
Mazdoor (Skilled)
Surveyor
Mazdoor (Semi-Skilled)
Bhisti
Blacksmith for cutting of dowel bars including
removal of burrs, fabrications & fixing of dowel
bars.
b) Machinery

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

day
day
day
day
day
day
day
day
day

7.00
5.00
5.00
129.00
6.00
2.00
6.00
14.00
1.00

194.50
207.80
199.90
194.50
199.90
207.80
196.30
196.30
207.80

1,361.50
1,039.00
999.50
25,090.50
1,199.40
415.60
1,177.80
2,748.20
207.80

[Chapter -6](Page-158)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

3
4
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) hour
with weigh batcher and suitable capacity calibrated
water tank

c)

Rate
(Rs.)

Amount
(Rs.)

5
36.00

6
190.00

7
6,840.00

Needle vibrator
Screed vibrator
Plate vibrator
Concrete joint cutting machine for initial & final cuts

hour
hour
hour
hour

9.00
9.00
9.00
4.00

60.00
310.00
400.00
150.00

540.00
2,790.00
3,600.00
600.00

Water tanker 6 kl capacity


Air Compressor (1 hour initial + 1 hour final)
Material
(i) Crushed stone coarse aggregates, grading will
(ii) Sand as per IS:383 and conforming to Clause
1500.2.4.2 @ 0.45 cum/cum of concrete
(iii) Cement @ 310 kg/cum of concrete
(iv) Polythene sheet 125 micron
(v) Mild steel dowel bar 25 mm dia of grade S 240.
(4 x 20 x 0.500) + 5 per cent wastage = 42 m
Bitumen primer @ 200 ml per joint for 23 joints

hour
hour

5.00
2.00

300.00
300.00

1,500.00
600.00

cum
cum

67.50
33.75

525.00
332.31

35,437.50
11,215.46

t
sqm

26.25
412.50

7,670.20
17.00

201,342.75
7,012.50

kg
t

117.60
42.20
0.005 34,096.81

4,962.79
170.48

Bituminous sealant 800 ml per joint for 23


joints
Jute rope 12 mm dia including 5 per cent
wastage
Debonding strips 3.75 m (length) x 10 mm
Polythene sheathing, covering 2/3rd dowel bars
Plasticizer 0.5 per cent by weight of cement
Curing compound (if used) @ 0.33 litre per
sqm
Water for curing
Joint filler board 20 mm thick as per IS:1838
(4 x 3.75 x 0.200 = 3 sqm)

6.5

Unit Quantity

litre

19.00

70.00

1,330.00

90.00

50.00

4,500.00

m
No.
litre
litre

90.00
483.00
122.00
131.25

6.00
4.00
81.00
550.00

540.00
1,932.00
9,882.00
72,187.50

kl
sqm

18.00
3.00

16.00
363.00

288.00
1,089.00

d) Formwork @ 3% of (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Cost for 75 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/75
1500 Roller Compacted Concrete Pavement
Construction of Roller Compacted Concrete Pavement
(RCCP) with coarse and fine aggregates conforming to
IS:383, the size of coarse aggregate not exceeding 25
mm with minimum aggregate cement ratio of 5:1 mm
and with minimum cemnt content of 310 kg per cum,
aggregate gradation to be as per Table 602.2 after
blending, mixing in concrete mixer at optimum moisture
content, transporting to site, laying with wheel barrows
or steel pans or with mechanical paver, compacting with
80-100 kN smooth wheel, tandem vibratory roller, to
achieve, the designed flexural strength, finishing and
curing as per drawings and Technical Specification Clause
1502

12,045.31
51,830.57
466,475.17
6,219.67

Unit = cum
Taking output = 75 cum
a) Labour
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -6](Page-159)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description
3

b)

Unit Quantity
5

6.00
132.00
4.00
4.00
2.00
14.00

6
194.50
194.50
207.80
199.90
207.80
196.30

7
1,167.00
25,674.00
831.20
799.60
415.60
2,748.20

hour

36.00

190.00

6,840.00

(ii) Vibratory/80-100 kN Static Roller

hour

6.00

1,200.00

7,200.00

(iii) Concrete joint cutting machine for days end


work and regular joint cutting.

hour

6.00

150.00

900.00

(iv) Water tanker 6 kl capacity


(v) Air compressor (1 hour initial + 1 hour final)

hour
hour

6.00
2.00

300.00
300.00

1,800.00
600.00

67.50

525.00

35,437.50

33.75
332.31
23.25 7,670.20
0.004 34,096.81

11,215.46
178,332.15
136.39

(i) Mate
(ii) Mazdoor (Unskilled)
(iii) Mason (1st class)
(iv) Mason (2nd class)
(v) Surveyor
(vi) Bhisti
Machinery
(i) Concrete mixer 0.28 / 0.04 cum capacity (6
mixers) with weigh batcher and suitable
capacity calibrated water tank

Material
(i) Crushed stone coarse aggregates grading as cum
per Clause 1501.2.4.1 (Table 1500.3) @ 0.90
cum/cum of concrete conforming to Clause
600.4.4
(ii) Sand as per IS:383 and conforming to Clause cum
(iii) Cement @ 310 kg/cum of concrete
t
(iv) Bitminous primer @ 200 ml per joint for 21
t
joints
m
(v) Jute rope 10 mm dia including 5 per cent
wastage
kg
(vi) Bituminous sealant @ 800 ml per joint for 21
joints
(vii) Curing compound @ 0.33 litre per sqm
l
(viii) Water for mixing and curing for 14-days
day
d) Formwork @ 2% of (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Cost for 75 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/75
Note: When curing compound is used 4-days water curing will
be done
1500 Rectangular Concrete Block Pavement
Manufacturing, laying of cement concrete blocks of size
0.450 m x 0.300 m x 0.15 m of Cement Concrete (C.C.)
M30 garde and spreading 25 mm thick sand under neath
and filling joints with sand on existing W.B.M. base as
per Technical Specification Clause 1503.
Unit = sqm
Taking output = 112.5 sqm
Concrete M30 grade for block, 700 x (0.450 x 0.300 x cum
0.150)
Concrete M30 for edge block, 2 x 100 x (0.300 x 0.300 x cum
0.150)
TOTAL
cum
a) Labour

PMGSY SOR 13-14

Amount
(Rs.)

4
day
day
day
day
day
day

c)

6.6

Rate
(Rs.)

PanchayatR B Circle-2,Rajkot

90.00

50.00

4,500.00

16.80

70.00

1,176.00

131.25
18.00

550.00
16.00

72,187.50
288.00
7,044.97
44,911.70
404,205.27
5,389.40

14.18

1,836.24

26,028.70

2.70

1,836.24

4,957.85

16.88

[Chapter -6](Page-160)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description
3
Labour for Manufacturing the Cement
Concrete Block :

Unit Quantity
4

(i) Mate
day
(ii) Mazdoor (Unskilled)
day
(iii) Mason (2nd class)
day
(iv) Bhisti
day
b) Machinery
Concrete mixer 0.28 / 0.4 cum
hour
Plate vibrator
hour
Water tanker 6 kl capacity
hour
c) Material
(i) Coarse aggregates (9.450 x 0.84)
cum
(ii) Sand (9.450 x 0.42)
cum
(iii) Cement
t
(iv) Sand as per Table 1500.5
cum
Bed = 60*0.025 = 1.5 cum
Joints = 1.5*0.15 = 0.225 cum
kl
(v) Cost of water
d) Formwork @ 3% of (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Cost for 112.5 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/112.5
Note: i. In case curing compound is used in places where
there is scarcity of water, the water curing will be
used for 4-days and rate analysis will be amended
accordingly

Rate
(Rs.)

Amount
(Rs.)

1.70
41.00
6.00
1.40

194.50
194.50
199.90
196.30

330.65
7,974.50
1,199.40
274.82

6.00
12.00
2.00

190.00
400.00
300.00

1,140.00
4,800.00
600.00

7.94
3.97
3.80
1.725

627.05
332.31
7,670.20
332.31

4,978.78
1,319.27
29,146.76
573.23

6.00

16.00

96.00
1,573.00
6,750.80
60,757.22
540.06

1.00
17.00
8.00

194.50
194.50
199.90

194.50
3,306.50
1,599.20

2.00

300.00

600.00

225.00

297.00

66,825.00

120.00
7.23

0.00
332.31

0.00
2,402.60

3.00

16.00

48.00
9,371.98
84,347.78
374.88

ii. Carriage of C.C. block to site of is payable


seperately as per Chapter of carriage of material
from manufacturing site to the site of work.
6.7

1500 Interlocking Concrete Block Pavement


(1) Providing and Laying of Interlocking Concrete
Block Pavements having thickness 80 mm as
per drawings and Technical Specification
Clause 1504.
Unit = sqm
Taking output = 225 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mason (2nd class)
day
b) Machinery
Water tanker 6 kl capacity
hour
c) Material
(i) Providing inter-locking blocks of approved
sqm
shape, thickness and size.
(ii) Edge blocks 60 mx2
m
(iii) Sand as per Table 1500.5
cum
Bed = 603x75x 0.03 = 6.75 cum
Joints = 60x0.08
= 0.48 cum
(iv) Water for wetting of bedding sand
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/225

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -6](Page-161)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
(2) Providing and Laying of Interlocking Concrete
Blcok Pavements having thickness 60 mm as
per drawing and Technical Specification
Clause 1504
Unit = sqm
Taking output = 225 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mason (2nd class)
day
b) Machinery
Water tanker 6 kl capacity
hour
c) Material
(i) Providing inter-locking blocks
sqm
(ii) Edge blocks
m
(iii) Sand as per Table 1500.5
cum
(iv) Water
kl
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 225 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/225
Note: i. Carriage of interlocking blocks is payable seperately
as per Chapter of carriage of material from
manufacturing site to the site of work.

Rate
(Rs.)

Amount
(Rs.)

0.90
15.00
7.00

194.50
194.50
199.90

175.05
2,917.50
1,399.30

2.00

300.00

600.00

225.00
120.00
5.42
3.00

201.00
0.00
332.31
16.00

45,225.00
0.00
1,801.12
48.00
6,520.75
58,686.72
260.83

ii. Edge blocks may be cast-in-situ. Brick masonry toe


wall or CC block 300 mm x 300 mm x 150 mm or
any other shape can also be used and their cost
shall be analysed/included accordingly
iii.

PMGSY SOR 13-14

The rates for sub-grade, sub-base and base course


can be taken from Chapters 3 and 4

PanchayatR B Circle-2,Rajkot

[Chapter -6](Page-162)

Chapter 7
CAUSEWAY AND SUBMERSIBLE BRIDGES
Ref.
Description
MORD
n
Specif
1
2
3
7.1 1400, Construction of Cut-off Walls/Head Walls
300,
600
700 &
800
(i) Earthwork in excavation for structures as per drawing
and technical specification Clause 305.
Rate as per item No.11.1 of Chapter 11
(ii) Plain cement concrete M15 grade
Rate as per item No.11.4 (ii) of Chapter 11
(iii) Brick masonry in cement mortar 1:4
Rate as per item No.11.5 (ii) of Chapter 11
(iv) Stone masonry in cement mortar 1:4
Rate as per item No.11.6 (ii) of Chapter 11
(v) Providing P.C.C M20 architectural coping on top of
wall

Sr.
No.

Rate as per item No.12.13 of Chapter 12

Note: Rate as appropriate for the type of soil/rock are to be

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

cum

182.05

cum

3,732.80

cum

4,173.88

cum

2,722.19

268.47

taken in (i)
7.2

Preparation of Subgrade
Rate as per item No.3.15 of Chapter 3
400 Granular Sub-base
Rate as per item No.4.1 of Chapter 4
400 W.B.M. Base Course
Rate as per item No.4.7 of Chapter 4
1500 Cement Concrete Slab
Rate as per item No.6.4 of Chapter 6
1400 & (i) Providing and Laying Apron with Stone
Boulders as per Drawings & Technical
1300
Specification Clause 1301
Rate as per item No.14.1 of Chapter 14
(ii) Providing and Laying of Boulder Apron Laid in
Wire Crates as per Drawing and Technnical
Specification Clause 1301
300

cum

12.73

cum

564.20

cum

995.91

cum

6,219.67

cum

524.62

cum
Rate as per item No.14.2 of Chapter 14
(iii) Providing and Laying of Apron with Cement
Concrete Blocks as per Drawing and Technical
Specification Clause 1301

1,633.89

Rate as per item No.14.3 of Chapter 14


cum
Any one of the items appropriate may be taken
7.7 1400 & Guide Posts
1600
Construction of R.C.C. guide posts of 250 mm dia, M25
grade as per drawing and technical specification Clause
1401.6

3,807.46

7.3
7.4
7.5
7.6

Note

Rate as per item No.8.8 of Chapter 8


7.8 1400, Bedding for Causeway
1100 &
800
(i) Type A (concrete cradle) Bedding Clause 1402.5
As per item No.9.2 of Chapter 9
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

cum

cum

3,732.80
[Chapter -7](Page-163)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit

3
4
Type B (first class) Bedding Clause 1402.5
As per item No.9.2 of Chapter 9
cum
7.9 1400 & Laying Reinforced Cement Concrete Pipe NP3 as per
1100 drawing and technical specification Clause 1402.6
As per item No.9.3 of Chapter 9
m
7.10 1400 & Laying Reinforced Cement Concrete Pipe NP4 as per
1100 technical specification Clause 1402.6
As per item No.9.4 of Chapter 9
m
(ii)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Quantity

Rate
(Rs.)

Amount
(Rs.)

7
516.45
4,892.57
8,728.82

[Chapter -7](Page-164)

Chapter 8
HILL ROADS

Ref.
Description
Unit
MORD
n
Specif
1
2
3
4
8.1 200
Site Clearance
As per Chapter 2
8.2 1600
Setting Out
Unit = 1km
The analysis of rate per km shall account for the
following:

Sr.
No.

Quantity

Rate
(Rs.)

Amount
(Rs.)

(1) Construction of reference pillars (burjee) @ 20 m


on both sides as per Fig. 1600.1 (b) and @ 8.33 m
interval on curves
(2) Construction of back pillars in front of each
reference pillar as per Fig. 1600.1 (c )
(3) Construction of job pillars as per Fig. 1600.1 (d)
(1)

Construction of reference pillars as per Fig.


1600.1 (b) as per drawing and Technical
Specification Clause 1602.1

(a)

Earthwork in excavation for foundation as per


drawing and technical specifications.
Rate as per item No.11.1 of Chapter 11
Stone masonry work in cement mortar 1:4 in
foundation complete as per drawing and
technical specifications
Rate as per item No.11.6 of Chapter 11
Plaster with cement mortar 1:4 as per
technical specifications
Rate as per item No.12.3 of Chapter 12
Add 5% of (a+b+c) for white washing,
Total Cost for each Reference Pillar
Construction of back piller as per Fig. 1600.1(
c) as per drawing and Technical Specification
Clause 1602.3
Earthwork in excavation for foundation as per
drawing and technical specifications
Rate as per item No. 11.1 of Chapter 11
Stone masonary work in cement mortar 1:4 in
foundation complete as per drawing and
technical specifications
Rate as per itme No. 11.6 Chapter 11
Plaster with cement mortar 1:4 as per
technical specifications
Rate as per item No. 12.3 of Chapter 12
Add 5% of (a+b+c) for white washing,
Total Cost for each back Pillar
Construction of Job pillers as per Fig. 1600.1
(d) and Technical Specification Clause 1602.4

(b)

(c)

(2)

(a)
(b)

(c)

(3)

(a)

1.2

182.05

218.46

cum

1.2

2,722.19

3,266.63

sqm

4.00

128.57

514.28
199.97
4,199.35

cum

3.6

182.05

655.39

cum

3.6

2,722.19

9,799.90

sqm

45.00

128.57

5,785.69
812.05
17,053.02

cum

0.096

182.05

17.48

Earthwork in excavation for foundation as per


drawing and technical specification
Rate as per item No.11.1 of Chapter

PMGSY SOR 13-14

cum

PanchayatR B Circle-2,Rajkot

[Chapter -8](Page-165)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

3
4
Stone masonary work in cement mortar1:4 in
foundation complete as per drawing and
technical specification
Rate as per item No. 11.6 of Chapter 11
cum
(c) Plaster with cement mortar 1:4 as per
drawing and technical specification
Rate as per Item No.12.3 of Chapter 12
sqm
Add 5% of (a+b+c) for white washing,
Total Cost for each Job Pillar
The dimensions of reference pillars, back pillars
and job pillars are as per figure/site conditions.
The above items are covered under different
Chapters of MORD Specifications for payment.
(b)

Note: (i)

(ii)

8.3 1600
300

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

0.096

2,722.19

261.33

0.96

128.57

123.43
20.11
422.35

2.40
60.00

194.50
194.50

466.80
11,670.00
1,517.10
13,653.90
113.78

0.55

194.50

106.98
13.37
120.35
12.03

0.80
20.00

194.50
194.50

155.60
3,890.00

6.00
6.00

2,100.00
764.00

12,600.00
4,584.00
2,653.70
23,883.30

The marking of centre line, setting out, curves,


recording of levels, etc. by the surveyor will be
incidental to work and no extra payment shall be
made for the same.

& Earthwork in Hill Road


(i)

Excavation in Hilly Areas in Soil by manual


means.
A)

Excavation in soil in Hilly Area by


Unit = cum
Taking output = 120 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & contractor's profit @ 12.5% on (a)
Cost for 120 cum = (a+b)
Rate per cum = (a+b)/120
B) Extra for Every Additional Lift of 1.5 m
Excavation in Soil
Unit = cum
Taking output = 10 cum
a) Labour
Mazdoor (Unskilled)
day
b) OH & contractor's profit @ 12.5% on (a)
Cost for 10 cum = (a+b)
Rate per cum = (a+b)/10
(ii) Excavation in Hilly Areas in Soil by
mechanical means
A) Excavation in soil in Hilly Area by
Unit = cum
Taking output = 260 cum
a) Labour
Mate
day
Mazdoor (Unskilled) for trimming slopes and day
helping in excavation, etc.
b) Machinery
Dozer D-50 @ 43.28 cum per hour
hour
Front end loader
hour
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 260 cum = a+b+c
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -8](Page-166)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Note: (i)

(ii)

Unit

3
4
Rate per cum = (a+b+c)/260
B) Extra for Every Additional Lift of 1.5 m
Excavation in Soil
Unit = cum
Taking output = 10 cum
a) Labour
Mazdoor (Unskilled)
day
b) OH & contractor's profit @ 12.5% on (a)
Cost for 10 cum = (a+b)
Rate per cum = (a+b)/10
In case the land on the valley side is barren and
there is no objection for disposing of excavated
earth on the valley side, the provision of front end
loader and tipper shall be deleted as excavated
earth shall be disposed off on the valley side.
For disposal of excavated surplus earth beyond 20
m, the relevant items of carriage be followed

Quantity

Rate
(Rs.)

Amount
(Rs.)

7
91.86

0.55

194.50

106.98
13.37
120.35
12.03

5.28
132.00

194.50
194.50

1,026.96
25,674.00
3,337.62
30,038.58
250.32

0.86

194.50

167.27
20.91
188.18
18.82

0.68
17.00
9.00

194.50
194.50
194.50

132.26
3,306.50
1,750.50

(iii) In

case, alternative machine like hydraulic


excavator 0.9 cum bucket capacity is necessited
because of site conditions, the same can be used.
(iii) Excavation in Hilly Area in Ordinary Rock by
manual means
A)

Excavation in ordinary rock using


Unit = cum
Taking output = 120 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & contractor's profit @ 12.5% on (a)
Cost for 120 cum = a+b
Rate per cum = (a+b)/120
B) Extra for Every Additional Lift of 1.5 m
For Ordinary Rock
Unit = cum
Taking output = 10 cum
a) Labour
Mazdoor (Unskilled)
day
b) OH & contractor's profit @ 12.5% on (a)
Cost for 10 cum = a+b
Rate per cum = (a+b)/10
(iv) Excavation in Hilly Areas in Ordinary Rock by
mechanical means not requiring blasting
Excavation in hilly area in ordinary rock not
requiring blasting by mechanical means including
cutting and trimming of slopes and disposal of cut
material with a lift upto 1.5 m and lead upto 20 m
as per Clause 1603.2.
Unit = cum
Taking output = 170 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor for disposing of earth upto 20 m
day
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -8](Page-167)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit

3
4
Machinery
Dozer D-50 @ 28.32 cum per hour
hour
Hydraulic Excavator 0.9 cum bucket capacity hour
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 170 cum = a+b+c
Rate per cum = (a+b+c)/170
Note: (i) In case the land on the valley side is barren and
there is no objection for disposing of excavated
earth on the valley side, the provision of front end
loader and tipper shall be deleted as excavated
earth shall be disposed off on the valley side.
(ii) In case, alternative machine like hydraulic
excavator 0.9 cum bucket capacity is necessited
because of site conditions, the same can be used.
(v) Excavation in Hilly Areas in Hard Rock
requiring blasting
b)

A)

a)

b)

c)

d)
B)

a)
b)

PMGSY SOR 13-14

Excavation in hilly areas in hard rock


requiring blasting, by mechanical
means, lift upto 1.5 m and disposal of
excavated rock upto a lead of 20 m as
per Clause 1603.2.
Unit = cum
Taking output = 170 cum
Labour
Mate
day
Mazdoor (Unskilled)
day
Driller
day
Blaster
day
Machinery
Dozer D-50 @ 56.67 cum per hour (blasted
hour
rock)
Hydraulic Excavator 0.9 cum bucket capacity hour
@ 34 cum per hour
Air compressor 210 cfm with two jack
hour
hammer @ 6 cum per hour
Materials
Gelatine 80 per cent
kg
Electric detonators @ 1 detonator for 1
nos
Gelatine stick of 285 gm each
OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 170 cum = a+b+c+d
Rate per cum = (a+b+c+d)/170
Extra for Every Additional Lift of 1.5 m
or Part thereof
For Hard Rock
Unit = cum
Taking output = 10 cum
Labour
Mazdoor (Unskilled)
day
OH & contractor's profit @ 12.5% on (a)
Cost for 10 cum = a+b
Rate per cum = (a+b)/10

PanchayatR B Circle-2,Rajkot

Quantity

Rate
(Rs.)

Amount
(Rs.)

6.00
4.25

2,100.00
1,400.00

12,600.00
5,950.00
2,967.41
26,706.67
157.10

1.36
22.00
2.00
10.00

194.50
194.50
194.50
194.50

264.52
4,279.00
389.00
1,945.00

3.00

2,100.00

6,300.00

5.00

1,400.00

7,000.00

28.00

300.00

8,400.00

67.00
235.00

144.00
35.00

9,648.00
8,225.00
5,806.32
52,256.84
307.39

1.08

194.50

210.06
26.26
236.32
23.63

[Chapter -8](Page-168)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Note: (1) In case the land on the valley side is barren and
there is no objection for disposing of excavated
earth on the valley side, the provision of front end
loader and tipper shall be deleted as excavated
earth shall be disposed off on the valley side.
(2) In case of hill roads, the altitude effect comes into
play. The output of men and machines decreases
progressively after 2100 m elevation leading to
increase in cost. High altitude effect has been
explained in the basic approach.

(3) The arrangement for igniting the detonator is


covered under overheads
8.4 1600,
Retaining Walls / Breast Walls
600
&
700
Construction of retaining walls/breast walls in cement
mortar 1:5 as per drawing and technical specifications
Clause 1604
(i) Earthwork in excavation for structures
Rate as per item No.11.1 of Chapter 11
(ii) Plain cement concrete M 10 grade
Rate as per item No.11.4 of Chapter 11
(iii) Stone masonry in cement mortar 1:5
Rate as per item No. 12.4 (III) (iii) of Chapter 12
(iv) Pointing with cement mortar 1:3
Rate as per item No.12.2 of Chapter 12
(v) Providing P.C.C. M 20 architectural coping on
top of retaining wall/breast wall

Note:

cum

182.05

cum

3,611.23

cum

2,584.41

sqm

429.71

Rate as per item No.12.13 of Chapter 12


m
(vi) Filter material behind retaining wall / breast
wall as per Specification 1204.3.8 in a width
of 600 m
Rate as per item No. 12.11 of Chapter 12
cum
(vii) Back filling behind retaining wall/breast wall

268.47

Rate as per item No. 12.10 of Chapter 12


cum
Quantities of material/work shall be as per design
and drawings

1,520.22
506.32

Earth work in excavation may be taken as per site


conditions. It may comprise of a number of subitems depending upon the type of soil/rock
encountered.
Construction of Hill Side Drain
2

8.5 1600,
700, 300
& 800

PMGSY SOR 13-14

Construction of hill side drain in accordance with the


requirement of specifications true to lines and grades.
Dimesions and other particulars as per drawing and
Technical Specification Clause 1606.1
Unit = 1 m
(i) Earthwork in excavation for structures as per
drawing and technical specification
PanchayatR B Circle-2,Rajkot

[Chapter -8](Page-169)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

(ii)

3
Rate as per item No.11.1 of Chapter 11
Plain cement concrete M10 grade
Rate as per item No.11.4 of Chapter 11
Stone masonry in cement mortar 1:5
Rate as per item No.12.4 (III) (iii) of Chapter 12
Plain cement concrete M15 grade
Rate as per item No.11.4 of Chapter 11
Cement plaster 15 mm thick 1:4 on stone
masonry

Unit
4
cum

Quantity
5

Rate
(Rs.)
6
182.05

Amount
(Rs.)
7

0.00

cum

3,611.23

0.00

cum

2,584.41

0.00

cum

3,732.80

0.00

Rate as per item No.12.3 of Chapter 12


cum
(vi) Providing P.C.C. M20 architectural coping on
top of wall

128.57

0.00

268.47

0.00
0.00

cum

182.05

0.00

cum

3,611.23

0.00

cum

2,584.41

0.00

cum

3,732.80

0.00

sqm

128.57

0.00

m
m

268.47

0.00
0.00

(iii)
(iv)
(v)

Rate as per item No.12.13 of Chapter 12


m
Rate per m length (i+ii+iii+iv+v+vi)
Note: 1 Quantities of material/work shall be as per design
and drawings
Earth work in excavation may be taken as per site
conditions. It may comprise of a number of subitems depending upon the type of soil/rock
encountered.
Construction of Catch Water / Intercepting Drain
2

8.6 1600,
300,
700
&
800

Construction of catch water/intercepting drain in


random rubble masonry in 1:5 cement mortar true to
the specified lines grades levels and dimensions as per
the requirement of the specifications Clause 1606.2
Unit = 1 m
(i) Earthwork in excavation for structures as per
drawing and technical specification

Rate as per item No.11.1 of Chapter 11


(ii) Plain cement concrete M10 grade
Rate as per item No.11.4 of Chapter 11
(iii) Stone masonry in cement mortor 1:5
Rate as per item No.12.4 (III) (iii) of Chapter 12
(iv) Plain cement concrete M15 grade
Rate as per item No.11.4 of Chapter 11
(v) Cement plaster 15 mm thick 1:4 on stone
masonry
Rate as per item No. 12.3 of Chapter 12
(vi) Providing P.C.C. M 20 architectural coping on
top of wall
Rate as per item No.12.13 of Chapter 12
Rate per m length (i+ii+iii+iv+v+vi)
Note: 1 Quantities of material/work shall be as per design
and drawings
2

PMGSY SOR 13-14

Earth work in excavation may be taken as per site


conditions. It may comprise of a number of subitems depending upon the type of soil/rock
encountered.
PanchayatR B Circle-2,Rajkot

[Chapter -8](Page-170)

Ref.
Description
Unit
MORD
n
Specif
1
2
3
4
8.7 1600,
Construction of Scupper
300
&
700
Construction of scupper with dry stone masonry as per
drawing and technical specifications as per Clause
1606.5.
Unit = 1 m
Taking output = 6 m
(i) Earthwork in excavation for structures as per
drawing and technical specifications

Sr.
No.

Quantity for 6 m formation width of hill side rock


cutting and foundation as per plate No. 7.27 of
Rural Road Manual
Rate as per item No.11.1 of Chapter 11
cum
Rate per m = a/6
(ii) Random rubble dry stone masonry
Quantity for 6 m formation width = 38 cum
a) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
b) Materials
Stone for RR masonary
cum
Bond stone
nos
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 6 m = a+b+c
Rate per m = (a+b+c)/6
(iii) Random course rubble dry stone masonry in
corbelling
Quantity for 6 m formation width = 9 cum
a) Labour
Mate
Mason (2nd class)
Mazdoor (Unskilled)
b) Materials
Corbelling Stones size 300 mm x 150 mm x
150 mm including wastage

Quantity

Rate
(Rs.)

Amount
(Rs.)

115.00

182.05

20,935.98
3,489.33

3.80
38.00
57.00

194.50
207.80
194.50

739.10
7,896.40
11,086.50

38.00
266.00

195.00
34.90

7,410.00
9,283.40
4,551.93
40,967.33
6,827.89

day
day
day

0.72
6.00
12.00

194.50
199.90
194.50

140.04
1,199.40
2,334.00

nos

1,335.00

68.00

90,780.00

c) OH & contractor's profit @ 12.5% on (a+b)


Cost for 6 m = a+b+c
Rate per m = (a+b+c)/6
(iv) Stone filling in foundation trenches as per
drawing and technical specification
Quantity for 6 m formation width = 10 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Materials
Loose stone
cum
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 6 m = a+b+c
Rate per m = (a+b+c)/6
Rate per m length= (i + ii + iii + iv)
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

11,806.68
106,260.12
17,710.02

0.12
3.00

194.50
194.50

23.34
583.50

12.00

185.00

2,220.00
353.36
3,180.20
530.03
28,557.27

[Chapter -8](Page-171)

Sr.
No.
1

Ref.
MORD
Specifn
2

Note:

Description

3
Quantities of parapet are not included in the
quantities of scupper.

The above analysis is based on plate No.7.27 of


Rural Roads Manual.

Rates for earth work are to be taken appropriate to


the type of soil/rock

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Construction of RCC guide posts of 250 mm dia


8.8 1400,
1700 & M15 grade cast-in-situ with 20 mm nominal size
aggregate, true to line and grade, tolerance of
800
vertical RCC posts not to exceed 1 in 500 as per
drawing and Technical Specification Clause
1608.2
(i)

Earth work in excavation for structures


Unit = cum
Rates as per item No. 11.1 of Chapter 11
(ii) RCC M15 grade
Unit = cum
Rate as per item No. 11.4 of Chapter 11
(iii) HYSD steel bars
Unit = t
Rate as per item No. 12.6 of Chapter 12
(iv) Painting two coats including prime coat on
new concrete surface

182.05

cum

3,732.80

54,567.69

Unit = sqm
Rate as per item No.10.5 of Chapter 10
sqm
Quantities are to be taken as per drawing
Providing edge stones on valley side of formation
Unit = 1 m
Taking Output = 45 m (100 no of edge stones of size
450 mm x 300 mm x 100 mm)

Note:

8.9 1600

a)

b)
c)

8.10 1600
309

cum

Labour
Mate
Mazdoor (Unskilled)
Mason (2nd class)
Materials
Stones of size 450 mmx300 mmx100 mm
Painting two coats including priming coat on
new concrete/stone surfaces

73.91

day
day
day

0.18
3.00
1.50

194.50
194.50
199.90

35.01
583.50
299.85

nos

100.00

66.00

6,600.00

22.50

73.91

1,662.95
1,147.66
10,328.98
229.53

45 x 0.500 = 22.50
Rate as per item No.10.5 of Chapter 10
sqm
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 45 m = a+b+c+d
Rate per m = (a+b+c+d)/45
& Turfing with Sods
Furnishing and laying of the live sods of perennial turf
forming grass on embankment slope, verges or other
locations shown on the drawing or as directed by the
Engineer including preparation of ground, stacking the
sods and watering as per Clause 309
Unit = sqm

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -8](Page-172)

Sr.
No.
1

Ref.
MORD
Specifn
2

8.11 1600
300

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

3
Taking output = 100 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Water tanker including watering for 3 months
Tractor with Trolley
c) Materials
Farmyard manure @ 0.18 cum per 100 sqm at site
of work

day
day

0.16
4.00

194.50
194.50

31.12
778.00

hour
hour

4.00
1.00

300.00
300.00

1,200.00
300.00

cum

0.18

295.00

53.10

24.00

16.00

384.00
343.28
3,089.50
30.89

0.60
15.00

194.50
194.50

116.70
2,917.50

13.00

300.00

3,900.00

2.40

300.00

720.00

3.60
0.43

8.25
295.00

29.70
126.85

0.055
264.00
84.00

34,096.81
30.00
16.00

1,875.32
7,920.00
1,344.00
2,368.76
21,318.83
88.83

Water
kl
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
& Seeding and Mulching
Preparation of seed bed on previously laid top soil,
furnishing and placing of seeds, fertilizer, multching
material, applying bituminous emulsion at the rate of
0.23 l per sqm and laying and fixing jute netting,
including watering for 3 months all as per Clause 310.
Unit = sqm
Taking output = 240 sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Water tanker 6 kl capacity including watering for 3 hour
months (for one hour per week)
Tractor with Trolley
hour
Materials
Seeds
kg
Sludge/Farm yard manure @ 0.18 cum per 100 cum
sqm
Bitumen Emulsion
t
Jute netting, open weave, 25 mm square opening sqm
Water for 3 months
kl
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 240 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/240
c)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -8](Page-173)

Chapter 9
PIPE CULVERTS

Sr.
No.
1
9.1

9.2

9.3

Ref.
MORD
Description
n
Specif
2
3
1100 & Excavation for Structures
300
Earthwork in excavation for foundation of structures
upto 3 m depth as per drawing and technical
specification Clause 1104 includding setting out,
construction of shoring and bracing, removal of stumps
and other deleterious matter, dressing of sides and
bottom and backfilling with approved material.
Unit = cum
Rate as per item No.11.1 of Chapter 11
Rate as applicable for the type of soil/rock are to be
taken
1100 & Bedding for Pipe
800
(i) Type A (Concrete Cradle) Bedding
Laying concrete cradle bedding with M15 Grade
Cement Concrete as per Clause 1105 (i)
Unit = cum
Rate as per Item No.11.4 (II)(i) of Chapter 11

Unit Quantity
4

cum

Providing and laying reinforced cement concrete pipe


NP3 for culverts on first class bedding of granular
material in single row including fixing collar with
cement mortar 1:2 but excluding excavation, protection
works, backfilling, concrete and masonry works in head
walls and parapets Clause 1106.
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
(A) 1200 mm dia
a) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
b) Material
Sand at site
cum
Cement at site
t
RCC pipe NP3 pipe including collar at site
m
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(B) 1000 mm dia
a) Labour
Mate
day
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

182.05

(ii) Type B (First Class) Bedding


Laying (First Class) bedding on well compacted
sand, moorum or approved granular material as
per Clause 1105 (ii)
Unit = cum
Rate as per Item No.11.2 of Chapter 11
cum
Providing and Laying Reinforced Cement
Concrete Pipe NP3 as per design in Single Row

1100

Rate
(Rs.)

1.00 3,732.80

3,732.80

1.00

516.45

516.45

0.14
0.50
3.00

194.50
207.80
194.50

27.23
103.90
583.50

0.05
312.31
0.07 7,670.20
7.50 4,180.00

15.62
536.91
31,350.00
4,077.14
36,694.30
4,892.57

0.09

194.50

17.51

[Chapter -9](Page-174)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description
3

b)

Unit Quantity
4
day
day

Mason (1st Class)


Mazdoor (Unskilled)
Material
Sand at site
cum
Cement at site
t
RCC pipe NP3 concrete pipe including collar at m
site

c) OH & contractor's profit @ 12.5% (a+b)


Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(C) 750 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP3 concrete pipe including collar at
site

5
0.25
2.00

Rate
(Rs.)
6
207.80
194.50

0.04
312.31
0.03 7,670.20
7.50 3,923.29

51.95
389.00

12.49
230.11
29,424.68
3,765.72
33,891.44
4,518.86

day
day
day
cum
t
m

0.05
0.15
1.20

194.50
207.80
194.50

9.73
31.17
233.40

0.024
312.31
0.018 7,670.20
7.50 2,126.18

7.50
138.06
15,946.35

c) OH & contractor's profit @ 12.5% (a+b)


Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
Note: The labour rate for 600 mm dia Hume pipe may be
derived from the rates for 750 dia by decreasing 20 per
cent
9.4

Amount
(Rs.)

2,045.78
18,411.98
2,454.93

Providing and Laying Reinforced Cement


Concrete Pipe NP4 as per design in Single Row

1100

Providing and laying reinforced cement concrete pipe


NP4 for culverts on first class bedding of granular
material in single row including fixing collar with
cement mortar 1:2 but excluding excavation, protection
works, backfilling, concrete and masonry works in head
walls and parapets Clause 1106.
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
(A) 1200 mm dia
a) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
b) Material
Sand at site
cum
Cement at site
t
RCC pipe NP4 pipe including collar at site
m
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(B) 1000 mm dia
a) Labour
Mate
day
Mason (1st Class)
day
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

0.14
0.50
3.00

194.50
207.80
194.50

27.23
103.90
583.50

0.05
312.31
0.07 7,670.20
7.50 7,590.00

15.62
536.91
56,925.00
7,274.02
65,466.18
8,728.82

0.09
0.25

194.50
207.80

17.51
51.95

[Chapter -9](Page-175)

Sr.
No.
1

Ref.
MORD
Specifn
2

Note:

9.5

Description
3
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP4 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(C) 750 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP4 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
The labour rate for 600 mm dia Hume pipe may be
derived from the rates for 750 dia by decreasing 20 per
cent

Unit Quantity
4
day
cum
t
m

5
2.00

Rate
(Rs.)
6
194.50

0.04
312.31
0.03 7,670.20
7.50 6,235.00

Amount
(Rs.)
7

389.00

12.49
230.11
46,762.50
5,932.94
53,396.50
7,119.53

day
day
day
cum
t
m

0.05
0.15
1.20

194.50
207.80
194.50

9.73
31.17
233.40

0.024
312.31
0.018 7,670.20
7.50 3,970.00

7.50
138.06
29,775.00
3,774.36
33,969.21
4,529.23

Providing and Laying Reinforced Cement


Concrete Pipe NP3 as per Design in Double Row

1100

Providing and laying reinforced cement concrete pipe


NP3 for culverts on first class bedding of granular
material in double row including fixing collar with
cement mortar 1:2 but excluding excavation, protection
works, backfilling, concrete and masonry works in head
walls and parapets as per Clause 1106.
Unit = m
Taking output = 7.5 m
(6 pipes of 2.5 m length each in two rows)
(A) 1200 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP3 concrete pipe including collar at
site

day
day
day
cum
t
m

c) OH & contractor's profit @ 12.5% (a+b)


Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(B) 1000 mm dia
a) Labour
Mate
day
Mason 1st Class
day
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

0.34
1.20
7.20

194.50
207.80
194.50

66.13
249.36
1,400.40

0.11
312.31
0.14 7,670.20
15.00 4,180.00

34.35
1,073.83
62,700.00
8,190.51
73,714.58
9,828.61

0.22
0.60

194.50
207.80

42.79
124.68

[Chapter -9](Page-176)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description
3
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP3 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(C) 750 mm dia
a) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP3 pipe including collar at site

Unit Quantity

Rate
(Rs.)

4
day

5
4.80

6
194.50

cum
t
m

0.08
312.31
0.06 7,670.20
15.00 3,923.29

933.60

24.98
460.21
58,849.35
7,554.45
67,990.07
9,065.34

day
day
day
cum
t
m

0.11
0.30
2.40

194.50
207.80
194.50

21.40
62.34
466.80

0.04
312.31
0.036 7,670.20
15.00 2,126.18

12.49
276.13
31,892.70

c) OH & contractor's profit @ 12.5% on (a+b)


Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
Note: The labour rate for 600 mm dia Hume pipe should be
decreased by 20 per cent
9.6

Amount
(Rs.)

4,091.48
36,823.34
4,909.78

Providing and Laying Reinforced Cement


Concrete Pipe NP4 as per Design in Double Row

1100

Providing and laying reinforced cement concrete pipe


NP4 for culverts on first class bedding of granular
material in double row including fixing collar with
cement mortar 1:2 but excluding excavation, protection
works, backfilling, concrete and masonry works in head
walls and parapets as per Clause 1106.
Unit = m
Taking output = 7.5 m
(6 pipes of 2.5 m length each in two rows)
(A) 1200 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP4 concrete pipe including collar at
site

day
day
day
cum
t
m

c) OH & contractor's profit @ 12.5% (a+b)


Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(B) 1000 mm dia
a) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

0.34
1.20
7.20

194.50
207.80
194.50

66.13
249.36
1,400.40

0.11
312.31
0.14 7,670.20
15.00 7,590.00

34.35
1,073.83
113,850.00
14,584.26
131,258.33
17,501.11

0.22
0.60
4.80

194.50
207.80
194.50

42.79
124.68
933.60

[Chapter -9](Page-177)

Sr.
No.
1

9.7

Ref.
MORD
Specifn
2

Description

b)

Material
Sand at site
Cement at site
RCC pipe NP4 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
(C) 750 mm dia
a) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP4 pipe including collar at site

4
cum
t
m

Rate
(Rs.)

Amount
(Rs.)

0.08
312.31
0.06 7,670.20
15.00 6,235.00

c) OH & contractor's profit @ 12.5% (a+b)


Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
Note: The labour rate for 300 mm dia shall be decreased by
20 per cent
1100

24.98
460.21
93,525.00
11,888.91
107,000.18
14,266.69

day
day
day
cum
t
m

0.11
0.30
2.40

194.50
207.80
194.50

21.40
62.34
466.80

0.04
312.31
0.036 7,670.20
15.00 3,970.00

12.49
276.13
59,550.00

c) OH & contractor's profit @ 12.5% on (a+b)


Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
Note: The labour rate for 600 mm dia Hume pipe should be
decreased by 20 per cent
1100 Laying Cement Concrete Pipe NP3 (burried conduits) on
first class bedding of granular material including fixing
collar with cement sand mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and
masonary work in head wall and parapets
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
500 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP3 concrete pipe including collar at
site

9.8

Unit Quantity

7,548.64
67,937.80
9,058.37

day
day
day

0.04
0.11
0.90

194.50
207.80
194.50

7.78
22.86
175.05

cum
t
m

0.02
312.31
0.01 7,670.20
7.50
990.00

6.25
76.70
7,425.00
964.20
8,677.84
1,157.05

Laying Cement Concrete Pipe NP4 (burried conduits) on


first class bedding of granular material including fixing
collar with cement sand mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and
masonary work in head wall and parapets

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -9](Page-178)

Sr.
No.
1

9.9

Ref.
MORD
Specifn
2

Description

Unit Quantity

Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
500 mm dia
a) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
b) Material
Sand at site
Cement at site
RCC pipe NP4 concrete pipe including collar at
site
c) OH & contractor's profit @ 12.5% (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
Note: The labour rate for 300 mm dia shall be decreased by
20 per cent

Rate
(Rs.)

Amount
(Rs.)

day
day
day

0.04
0.11
0.90

194.50
207.80
194.50

7.78
22.86
175.05

cum
t
m

0.02
312.31
0.01 7,670.20
7.50 2,720.00

6.25
76.70
20,400.00
2,586.08
23,274.72
3,103.30

1100 & Plain Cement Concrete M10 (1:3:6 nominal mix) in


levelling course below open foundation of Head walls as
800
per drawings & Technical Specification Clause 1109

Rate as per item No.11.4 of Chapter 11


cum
9.10 1100 & Brick Masonry Work in cement mortar in foundation of
Head walls complete exculding pointing and plastering
600
as per drawing and technical specification Clause 1109
(A) Brick Masonry in 1:4 cement mortar
Rate as per item No.11.5 (ii) Chapter 11
(B) Brick Masonry in cement-lime
(1:0.5:4.5)

3,611.23

cum

4,173.88

Rate as per item No.11.5 (iii) Chapter 11


cum
9.11 1100 & Stone Masonry Work in cement mortar in foundation of
Head walls complete as per drawing and technical
700
specification Clasue 1109

4,375.17

mortar

(A) In 1:4 cement mortar


Rate as per item No.11.6 (II) (ii) Chapter 11
cum
(B) In cement-lime mortar (1:0.5:4.5)
Rate as per item No.11.6 (II) (iii) Chapter 11
cum
9.12 1100 & Pointing with Cement Mortar (1:3) on brickwork as per
technical specification Clause 613.3
600
Rate as per item No.12.2 of Chapter 12

2,454.05
2,730.82

10 sqm

429.71

9.13 1100 & Plastering with Cement Mortar (1:4), 15 mm thick on


600
brickwork in substructure as per technical specification
Rate as per item No.12.3 of Chapter 12
10 sqm

1,285.71

9.14 1100 & Backfilling in Foundation Trenches as per drawing and


technical specification Clause 1108
300
Rate as per Item No.11.2 of Chapter 11
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

cum

516.45
[Chapter -9](Page-179)

Ref.
MORD
Description
Unit Quantity
Specifn
1
2
3
4
5
9.15 1100, Providing PCC M20 Architectural Coping on the top of
600, wing wall, return wall etc. complete as per drawing and
700 & technical specification Clause 615
1200
Rate as per Item No.12.13 of Chapter 12
m
Sr.
No.

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

268.47

[Chapter -9](Page-180)

Chapter 10
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES

Sr.
No.
1
10.1

Ref.
Description
MORD
n
Specif
2
3
1700 Printing New Letters and Figures of any Shade

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

Printing new letter and figures of any shade with


synthetic enamel paint black or any other approved
colour to give an even shade as per drawings and
Technical Specification Clause 1701
i) Hindi (Matras commas and the like not to be
measured and paid for. Half letters shall be
counted as half only)
Details for 100 letters of 160 mm height, i.e., 1600
Unit = per cm height per letter
a) Labour
Mate
day
Painter 1st Class
day
Mazdoor (Unskilled)
day
b) Material
Paint
litre
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 1600 cm = a+b+c
Rate per cm height per letter =
(a+b+c)/1600
ii)

1700,
300,
800

PMGSY SOR 13-14

194.50
199.90
194.50

23.34
399.80
194.50

0.70

210.00

147.00
95.58
860.22
0.54

0.07
1.25
0.50

194.50
199.90
194.50

13.62
249.88
97.25

0.50

210.00

105.00
58.22
523.96
0.33

English and Roman


Hyphens, commas and the like not to be measured
and paid for. Detail for 100 letters of 160 mm
height, i.e., 1600 cm
Unit = per cm height per letter
a) Labour
Mate
day
Painter Ist class
day
Mazdoor
day
b) Material
Paint
litre
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 1600 cm = a+b+c
Rate per cm height per letter = (a+b+c
+d)/1600

10.2

0.12
2.00
1.00

Traffic Signs
A. Retro-reflectorised Traffic Signs
(1) Providing and fixing of retro-reflectorised
cautionary, mandatory and informatory sign as per
IRC:67 made of encapsulated lens type reflective
sheeting vide Clause 1701.2.3 fixed over aluminium
sheeting, 1.5 mm thick supported on a mild steel
angle iron post 75 mm x 75 mm x 6 mm firmly
fixed to the ground by means of properly designed
foundation with M15 grade cement concrete 450
mm x 450 mm x 600 mm, 600 mm below ground
level as per drawings and Technical Specification
Unit = each
Taking output = one traffic sign
PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-181)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3
Excavation for foundation
As per item No.11.1 of Chapter 11
ii) Cement concrete M15 grade
As per item No.11.4 of Chapter 11
iii) Painting Angle Iron Post with Primer
and two coats of Epoxy Paint as per
specifications
i)

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

cum

0.126

182.05

22.94

cum

0.126 3,732.80

470.33

As per item No.10.7 of this Chapter


sqm
labour (For fixing at site)
Mate
day
Mazdoor (Unskilled)
day
b) Material
Mild steel angle iron 75 x 75 x 6 mm
kg
Aluminium sheeting fixed with encapsulated sqm
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Add 3 per cent of cost of angle iron towards
cost of fabrication, drilling holes, nuts, bolts,
etc.
i) 900 mm equilateral triangle
sqm
OR
ii) 600 mm equilateral triangle
sqm
OR
iii) 600 mm circular
sqm
OR
iv) 800 mm x 600 mm rectangular
sqm
OR
v) 600 mm x 450 mm rectangular
sqm
OR
vi) 600 mm x 600 mm square
sqm
OR
vii) 900 mm side octagon
sqm
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Rate per traffic sign = (i+ii+iii+a+b+c+e)
a)

0.887

98.45

87.32

0.01
0.25

194.50
194.50

1.95
48.63

20.00

50.60
3,680.00

1,012.01
0.00

30.36
0.35
0.156
0.283
0.48
0.27
0.36
0.672
0.08

300.00

24.00
139.62
1,256.56

cum

0.126

182.05

22.94

cum

0.126 3,732.80

470.33

(2) Providing and fixing of retro-reflectorised


cautionary, mandatory and informatory sign as per
IRC:67 made of encapsulated lens type reflective
sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 1.5 mm thick supported on GI
pipe 50 mm dia firmly fixed to the ground by
means of properly designed foundation with M-15
grade cement concrete 450 mm x 450 mm x 600
mm, 600 mm below ground level as per drawings
and Technical Specification Clause 1701
Unit = each
Taking output = one traffic sign
i) Excavation for foundation
As per item No.11.1 of Chapter 11
ii) Cement concrete M15 grade
As per item No.11.4 of Chapter 11
a) Labour (For fixing at site)
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-182)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

b)

3
Mate
Mazdoor (Unskilled)
Material
50 mm dia GI Pipe 2.85 m long including 5
per cent wastage
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Add 3 per cent of cost of GI Pipe towards cost
of fabrication, drilling holes, nuts, bolts etc.

Unit Quantity
4
day
day
m

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

0.01
0.25

6
194.50
194.50

3.00

410.00

1,230.00

3,680.00

0.00

0.08

300.00

24.00
163.07
1,960.91

0.126

182.05

22.94

0.126 3,732.80

470.33

sqm

i) 900 mm equilateral triangle


sqm
OR
ii) 600 mm equilateral triangle
sqm
OR
iii) 600 mm circular
sqm
OR
sqm
iv) 800 mm x 600 mm rectangular
OR
v) 600 mm x 450 mm rectangular
sqm
OR
vi) 600 mm x 600 mm square
sqm
OR
vii) 900 mm sides octagon
sqm
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Rate per traffic sign = (i+ii+a+b+c+e)
(3) Providing and fixing of retro-reflectorised
cautionary, mandatory and informatory sign as per
IRC:67 made of encapsulated lens type reflective
sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 1.5 mm thick supported on
RCC Post 100 mm x 100 mm firmly fixed to the
ground by means of properly designed foundation
with M15 grade cement concrete 450 mm x 450
mm x 600 mm, 600 mm below ground level as per
approved drawing Clause 1701
Unit = each
Taking output = one traffic sign
i) Excavation for foundation
As per item No.11.1 of Chapter 11
cum
ii) Cement concrete M15 grade
As per item No.11.4 of Chapter 11
cum
iii) Painting two coats including prime coat
on concrete surface with Epoxy Paint as
per specifications
As per item No.10.7 of this Chapter
sqm
a) labour (For fixing at site)
Mate
day
Mazdoor
day
b) Material
RCC M15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
cum
Steel reinforcement HYSD bars
PMGSY SOR 13-14

Rate
(Rs.)

1.95
48.63

0.35
0.156
0.283
0.48
0.27
0.36
0.672

0.90

98.45

88.60

0.01
0.25

194.50
194.50

1.95
48.63

0.0285 3,948.16

112.52

[Chapter -10](Page-183)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
4
As per item No.12.6 of Chapter 12
t
Aluminium sheeting fixed with encapsulated sqm
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Add 3 per cent of cost of RCC Post towards
cost of drilling holes, nuts, bolts, etc.
i) 900 mm equilateral triangle
sqm
OR
ii) 600 mm equilateral triangle
sqm
OR
iii) 600 mm circular
sqm
OR
iv) 800 mm x 600 mm rectangular
sqm
OR
v) 600 mm x 450 mm rectangular
sqm
OR
vi) 600 mm x 600 mm square
sqm
OR
vii) 900 mm sides octagon
sqm
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Rate per traffic sign = (i+ii+iii+a+b+c+e)

Note:

Any one area of aluminium sheeting given at (i) to


(vii) may be adopted as per site requirement and in
accordance with IRC:67.

The rate for excavation, cement concrete M-15,


RCC M-15 in Sub-structure, steel re-inforcement
and painting may be taken from respective
Chapters.
The depth of foundation and quantity of cement
concrete in the foundation are indicative. These
may be increased for areas having higher wind
velocities like in coastal areas. This is applicable to
all road signs and directions boards.
Semi Reflective Traffic Signs
Providing and fixing of semi reflective cautionary,
mandatory and informatory sign board as per
IRC:67 made of 1.5 mm thick MS Sheet duly stove
white colour in front and gray colour on back with
red reflective border of 65 mm width and required
letters and figures with reflective tape engineering
grade as per Clause 1701.3.9 of MORD for Rural
Roads of required shade and colour supported and
welded on 47mm x 47 mm x 12 SWG sheet tube
firmly fixed to the ground by mean of properly
designed foundations with M-15 grade cement
concrete 450x450x600 mm, 600 mm below ground
level as per approved drawing Clause 1701.2.2

B.

Rate
(Rs.)

5
6
0.0077 54,567.69
3,680.00

Amount
(Rs.)
7
420.17
0.00

15.98
0.35
0.156
0.283
0.48
0.27
0.36
0.672
0.08

300.00

24.00
77.91
1,283.02

Unit = Each
Taking output = one traffic sign
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-184)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Note:

Description

3
4
(i) Excavation foundations
As per Item No. 1 to 11.1 of Chapter 11
cum
(ii) Cement concrete M-15 Grade
As per item no. 11.4 of Chapter 11
cum
(iii) Painting steel tube posts with primer and
two coats of epoxy paint as per
specifications
As per item no 10.7 of Chapter 11
sqm
a) Labour (For fixing at site)
Mate
day
Mazdoor (Unskilled)
day
b) Material
Support of M.S. Sheet tube
(I) 47 mm x 47 mm x 12 SWG Sheet
kg
3050 mm long
(II) Angle iron 50 x 50 x 6 mm for hold fast kg
including 5% wastage
(III 1.5 mm thick M.S. Sheet duly painted with sqm
) stove enamelled paint including lettering,
signs, border, message with reflective tape of
engineering grade required size, shade and
colour as per Technical Specifications
Add 3% cost of MS Sheet tube 12 SWG and
angle irons towards the cost of fabrication,
drilling holes, nuts and bolts etc.
i) 900 mm equilateral & triangle
sqm
OR
ii) 600 mm equilateral & triangle
sqm
OR
iii) 600 mm circular
sqm
OR
iv) 800 mm x 600 mm rectangular
sqm
OR
v) 600 mm x 450 mm rectangular
sqm
OR
vi) 600 mm x 600 mm
sqm
OR
vii) 900 mm side octagon
sqm
c) Machinery
Tractor with Trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Rate per traffic sign = (i+ii+iii+a+b+c+e)

Any one area of M.S. Sheet given at (i) to (viii)


may be adopted as per site requirement and in
accordance with IRC-67.

The rate for excavation, cement concrete M-15,


and painting may be taken from respective
Chapters.
The depth of foundation and quantity of cement in
the foundation are indicative. These may be
increased for areas having higher wind velocities
like in coastal area. This is applicable to all road
signs and direction boards.

PMGSY SOR 13-14

Unit Quantity

PanchayatR B Circle-2,Rajkot

5
0.126

Rate
(Rs.)

Amount
(Rs.)

182.05

22.94

0.126 3,732.80

470.33

0.46

98.45

45.29

0.01
0.25

194.50
194.50

1.95
48.63

12.40

75.20

932.48

1.06

50.60

53.64

690.00

0.00

29.58
0.35
0.156
0.283
0.48
0.27
0.36
0.672
0.08

300.00

24.00
136.28
1,765.11

[Chapter -10](Page-185)

Sr.
No.
1
10.3

Ref.
Description
Unit Quantity
MORD
n
Specif
2
3
4
5
1700, Direction and Place Identification signs upto 0.9
800 & sqm size board
300

Rate
(Rs.)

Amount
(Rs.)

A. Retro-reflectorised Traffic Signs


(i) Providing and erecting direction and place
identification retro-reflectorised sign as per IRC:67
made of encapsulated lens type reflective sheeting
vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9
sqm supported on a mild steel single angle iron
post 75 x 75 x 6 mm firmly fixed to the ground by
means of properly designed foundation with M-15
grade cement concrete 450 x 450 x 600 mm, 600
mm below ground level as per approved drawing
and Technical Specification Clause 1701
Unit = sqm
Taking output = 0.9 sqm
i) Excavation for foundation
As per item No.11.1 of Chapter 11
ii) Cement concrete M-15 grade
As per item No.11.4 of Chapter 11
iii) Painting Angle Iron Post with Primer
and two coats of Epoxy Paint as per
specifications
Rate as per item No.10.7 of this Chapter
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size 0.90 sqm
including lettering and signs as applicable
background with epoxy paint
Add 3 per cent of cost of angle iron towards
cost of fabrication, drilling holes, nuts, bolts,
etc.

cum

0.126

182.05

22.94

cum

0.126 3,732.80

470.33

sqm

0.887

98.45

87.32

day
day

0.01
0.25

194.50
194.50

1.95
48.63

20.00
50.60
0.90 3,680.00

1,012.01
3,312.00

kg
sqm

c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 0.9 sqm = (i+ii+iii+a+b+c+e)
Rate per sqm (for sign having area upto 0.9
sqm) = (i+ii+iii+a+b+c+e)/0.90

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

129.72

0.08

300.00

24.00
566.04
5,674.93
6,305.48

[Chapter -10](Page-186)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3
(ii) Providing and erecting direction and place
identification retro-reflectorised sign as per IRC:67
made of encapsulated lens type reflective sheeting
vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9
sqm supported on 2 inch dia GI Pipe firmly fixed to
the ground by means of properly designed
foundation with M-15 grade cement concrete 450 x
450 x 600 mm, 600 mm below ground level as per
approved drawing and Tehnical Specification
Clause 1701.
Unit = sqm
Taking output = 0.9 sqm
i) Excavation for foundation
As per item No.11.1 of Chapter 11
ii) Cement concrete M-15 grade
As per item No.11.4 of Chapter 11
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
50mm dia GI Pipe 2.85 m long including 5 per
cent wastage
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

cum

0.126

182.05

22.94

cum

0.126 3,732.80

470.33

day
day

0.01
0.25

194.50
194.50

1.95
48.63

3.00

410.00

1,230.00

sqm

0.90 3,680.00

3,312.00

Add 3 per cent of cost of GI Pipe towards cost


of fabrication, drilling holes, nuts, bolts etc.
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 0.9 sqm = a+b+c+e
Rate per sqm (for sign having area upto 0.9
sqm) = (a+b+c+e)/0.90
(iii) Providing and erecting direction and place
identification retro-reflectorised sign as per IRC:67
made of encapsulated lens type reflective sheeting
vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9
sqm supported on RCC Post 100 mm x 100 mm
firmly fixed to the ground by means of properly
designed foundation with M-15 grade cement
concrete 450 x 450 x 600 mm, 600 mm below
ground level as per approved drawing and
Technical Specification Clause 1701
Unit = sqm
Taking output = 0.9 sqm
i) Excavation for foundation
As per item No.11.1 of Chapter 11
cum
ii) Cement concrete M-15 grade
As per item No.11.4 of Chapter 11
cum

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

36.90

0.08

300.00

24.00
581.68
5,235.15
5,816.84

0.126

182.05

22.94

0.126 3,730.36

470.03

[Chapter -10](Page-187)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

Note:

Amount
(Rs.)

3
iii) Painting two coats including prime coat
on concrete surface with Epoxy Paint as
per specifications

As per item No.10.7 of Chapter 10


a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
RCC M-15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
Steel re-inforcement HYSD bars
As per item No.12.6 of Chapter 12
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint

sqm

0.90

98.45

88.60

day
day

0.01
0.25

194.50
194.50

1.95
48.63

cum

0.0285 3,948.16

112.52

t
sqm

0.0077 59,292.69
0.90 3,680.00

456.55
3,312.00

Add 3 per cent of cost of RCC Post towards


cost of drilling holes, nuts, bolts etc.
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 0.9 sqm = a+b+c+e
Rate per sqm (for sign having area upto 0.9
sqm) = (a+b+c+e)/0.90

Rate
(Rs.)

0.08

300.00

24.00
494.46
4,450.10
4,944.56

Lettering and arrow markings on sign board to be


provided separately as per actual requirement.
Rates for these items have been analysed
separately.
The rate for excavation, cement concret M15, RCC
M15 in Sub-structure, steel re-inforcement and
painting may be taken from respective Chapters.
The depth of foundation and quantity of cement
concrete in the foundation are indicative. These
may be increased for areas having higher wind
velocities like in coastal areas. This is applicable to
all road signs and directions boards.

B. Semi-Reflective Traffic signs


Direction and place indentification signs up
to 0.9 sqm size board

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-188)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
4
Providing and erecting direction and place
identifications of semi reflective sign boards as per
IRC:67 made of 2 mm thick M.S. Sheet duly stove
enameled paint in white colour in front and grey
colour on back with red reflective border of 70 mm
width and required message, letters, figures with
reflective engineering grade tape as per MORD
specifications of required shade and colour.
Supported and welded on 47 mm x 47mm of 12
SWG Square tube of 3050 mm height duly
strengthened by 25 mm x 5 mm M/s flat iron on
edges on back firmly fixed to the ground by means
of properly designed foundations with M-15 grade
cement concrete 450 mm x 450 mm x 600 mm,
600 mm below ground level as per approved
drawing and Technical Specification Clause 1701
Unit = each
Take Output = 0.9 sqm
(i) Excavation for foundations
As per Item No. 11.1 of Chapter 11
cum
(ii) Cement Concrete M-15 grade
As per Item No. 11.4 of Chapter 11
cum
(iii) Painting on M.S. tube post with primer
and two coat of epoxy paint as per
specifications
As per item No.10.7 of Chapter 10
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Materials
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm
long
ii) Angle iron 50 x 50 x 6 mm for lugs including
5% wastage

PanchayatR B Circle-2,Rajkot

0.126

Amount
(Rs.)

182.05

22.94

0.126 3,732.80

470.33

sqm

0.59

98.45

58.08

day
day

0.01
0.25

194.50
194.50

1.95
48.63

kg

12.40

75.20

932.48

kg

1.06

50.60

53.64

0.90

920.00

828.00

iii) 2 mm thick MS sheet strengthened by 25 mm sqm


x 5 mm MS flat iron & painted with stove
enameled paint including lettering, signs,
message, border with reflective tape of
engineering grade of required shade and
colour as per Technical Specifications.
Add 3% cost of MS sheet angle iron towards
the cost of fabrications, drilling, holes, nuts,
bolts, etc.
c) Machinery
Tractor with Trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 0.9 sqm = (i+ii+iii+a+b+c+e)
Rate per sqm = (i+ii+iii+a+b+c+e) / 0.9
Note: Rate for excavation, cement concrete M15 and painting
may be taken from respective Chapters.

PMGSY SOR 13-14

Rate
(Rs.)

54.42

0.08

300.00

24.00
242.89
2,737.35
30,415.05

[Chapter -10](Page-189)

Sr.
No.
1
10.4

Ref.
Description
MORD
n
Specif
2
3
1700, Direction and Place Identification signs with size
800 & more than 0.9 sqm size board
300

Unit Quantity
4

A. Retro-reflectorised Traffic Signs


(i) Providing and erecting direction and place
identification retro-\reflectorised sign as per
IRC:67 made of encapsulated lens type reflective
sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area
exceeding 0.9 sqm supported on mild steel angle
iron posts 75 mm x 75 mm x 6 mm, 2 Nos. firmly
fixed to the ground by means of properly designed
foundation with M-15 grade cement concrete 450
mm x 450 mm x 600 mm, 600 mm below ground
level as per approved drawing and Technical
Specification Clause 1701
Unit = sqm
Taking output = 1.50 sqm
i) Excavation for foundation
As per item No.11.1 of Chapter 11
cum
ii) Cement concrete M-15 grade
As per item No.11.4 of Chapter 11
cum
iii) Painting Angle Iron Post with Primer
and two coats of Epoxy Paint
As per item No.10.7 of Chapter 10
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
Mild steel angle iron 75 mm x 75 mm x 6 mm,
2.85 m long, 2 nos. with 5 per cent wastage

PanchayatR B Circle-2,Rajkot

0.252

Amount
(Rs.)

182.05

45.88

0.252 3,732.80

940.67

sqm

1.774

98.45

174.65

day
day

0.02
0.50

194.50
194.50

3.89
97.25

kg

40.00

50.60

2,024.02

1.50 3,680.00

5,520.00

Aluminium sheeting fixed with encapsulated sqm


lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Add 3 per cent of cost of angle iron towards
cost of fabrication, drilling holes, nuts, bolts,
etc.
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 1.5 sqm = i+ii+iii+a+b+c+e
Rate per sqm (for sign having area more
than 0.9 sqm) = (i+ii+iii+a+b+c+e)/1.50

PMGSY SOR 13-14

Rate
(Rs.)

226.32

0.12

300.00

36.00
988.44
10,057.11
6,704.74

[Chapter -10](Page-190)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3
(ii) Providing and erecting direction and place
identification retro-reflectorised sign as per IRC:67
made of encapsulated lens type reflective sheeting
vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9
sqm supported on dia GI Pipe firmly fixed to the
ground by means of properly designed foundation
with M-15 grade cement concrete 450 mm x 450
mm x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification
Clause 1701
Unit = sqm
Taking output = 1.50 sqm
i) Excavation for foundation
As per item No.11.1 of Chapter 11
ii) Cement concrete M15 grade
As per item No.11.4 of Chapter 11
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
50 mm dia GI Pipe 2.85 m long including 5
per cent wastage
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint
Add 3 per cent of cost of GI Pipe towards cost
of fabrication, drilling holes, nuts, bolts, etc.
c)
d)

Unit Quantity
4

0.252

182.05

45.88

cum

0.252 3,732.80

940.67

day
day

0.02
0.50

194.50
194.50

3.89
97.25

6.00

410.00

2,460.00

sqm

1.50 3,680.00

5,520.00

Machinery
Tractor with trolley
hour
OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 1.50 sqm = i+ii+a+b+c+e
Rate per sqm ( for sign having area more
than 0.9 sqm) = (i+ii+a+b+c+e)/1.50

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

cum

(iii) Providing and erecting direction and place


identification retro- reflectorised sign as per
IRC:67 made of encapsulated lens type reflective
sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area
exceeding 0.9 sqm supported on RCC Posts 100
mm x 100 mm firmly fixed to the ground by means
of properly designed foundation with M 15 grade
cement concrete 450 mm x 450 mm x 600 mm,
600 mm below ground level as per approved
drawing and Technical Specification Clause 1701
Unit = sqm
Taking output = 1.50 sqm
i) Excavation for foundation
As per item No.11.1 of Chapter 11
cum
ii) Cement concrete M15 grade
As per item No.11.4 of Chapter 11
cum

PMGSY SOR 13-14

Rate
(Rs.)

239.40

0.12

300.00

36.00
1,044.57
10,387.65
6,925.10

0.252

182.05

45.88

0.252 3,732.80

940.67

[Chapter -10](Page-191)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description
3
iii) Painting two coats including prime coat
on concrete surface with Epoxy Paint as
per specifications
As per item No.10.7 of Chapter 10
a) Labour (For fixing at site)
Mate
Mazdoor (Unskilled)
b) Material
RCC M-15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
Steel re-inforcement HYSD bars
As per item No.12.6 of Chapter 12
Aluminium sheeting fixed with encapsulated
lens type reflective sheeting of size including
lettering and signs as applicable background
with epoxy paint

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

sqm

1.84

98.45

181.14

day
day

0.02
0.50

194.50
194.50

3.89
97.25

cum

0.057 3,948.16

225.04

t
sqm

0.0154 59,292.69
1.50 3,680.00

913.11
5,520.00

Add 3 per cent of cost of RCC Post towards


cost of drilling holes, nuts, bolts, etc.
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 1.5 sqm = a+b+c+e
Rate per sqm (for sign having area more
than 0.9 sqm) = (a+b+c+e)/1.50

Note:

PMGSY SOR 13-14

6.75

0.12

300.00

36.00
850.26
7,652.30
5,101.53

Lettering and arrow markings on sign boards to be


provided separately as per actual requirement.
Rates for these items have been analysed
separately.
2 The rate for excavation, cement concrete M15,
RCC M15 in Sub-structure, steel re-inforcement
and painting may be taken from respective
Chapters.
3 The depth of foundation and quantity of cement
concrete in the foundation are indicative. These
may be increased for areas having higher wind
velocities like in coastal areas. This is applicable to
all road signs and directions boards.
B. Semi-Reflective Traffic signs
Direction and place identification signs more
than 0.90 sqm sign board

PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-192)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
4
Providing and erecting direction and place
identification of semi reflective sign boards as per
IRC-67 made of 2 mm thick M.S. Sheet duly stove
enameled paint white colour in front and grey
colour on back with reflective border of 70 mm
width and required message, letters, figures with
reflective tape of engineering grade as per MORD
specifications of required shade and colour.
Supported and welded on two nos. 47 mm x 47
mm of 12 SWG square tube of 3050 mm height
duly strengthened by 25 mm x 5 mm MS flat iron
on edges on back firmly fixed to the ground by
means of properly designed foundations with M-15
grade cement concrete 450 mm x 450 mm x 600
mm, 600 mm below ground level as per approved
Unit = each
Taking output = 1.5 sqm
(i) Excavation for foundations as
As per item no. 11.1 Chapter 11
cum
(ii) Cement Concrete M15 grade
As per item No.11.4 of Chapter 11
cum
(iii) Painting M.S. tube posts with primer and
As per item No. 10.7 of chapter 10
sqm
a) Labour (fox fixing at site)
Mate
day
Mazdoor (Unskilled)
day
b) Material
Support of MS Sheet tubes 47 mm x 47 mm x kg
i)
12 SWG sheet 3050 mm long
ii) Angle iron 50 mm x 50 mm x 6 mm for lugs
kg
iii) 2 mm thick MS Sheet strengthened by 25 mm sqm
x 5 mm M.S. flat iron and painted with stove
enameled paint including lettering, signs,
messages, border with reflective tape of
engineering grade of required size, shade and
colour as per MORD specifications
Add 3% cost of MS sheet and angle iron
towards the cost of fabrications, drilling,
holes, nuts, bolts etc.
c) Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 1.5 sqm board = (i+ii+iii+a+b+c)
Rate per sqm = (i+ii+iii+a+b+c) / 1.5

Rate
(Rs.)

Amount
(Rs.)

182.05

45.88

0.252 3,732.80

940.67

0.252

0.92

98.45

90.57

0.02
0.50

194.50
194.50

3.89
97.25

24.80

75.20

1,864.96

2.12
1.50

50.60
920.00

107.27
1,380.00

100.57

0.16

300.00

48.00
450.24
5,129.30
3,419.53

Note: Rate for excavation cement concrete M15 and painting


may be taken from respective chapter
10.5

1700

Painting Two Coats on New Concrete Surfaces


Painting two coats including primer coat after filling the
surface with synthetic enamel paint in all shades on
new, plastered / concrete surfaces as per drawing and
Technical Specification Clause 1701
Unit = sqm
Taking output = 40 sqm
a) Labour

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-193)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

b)

10.6

1700

3
Mate
Painter (1st Class)
Mazdoor (Unskilled)
Material
Cement Primer as per specifications
Paint conforming to requirement of Clause
1701.3.8
Add for scaffolding @ 1 per cent of labour
cost where required

1700

4
day
day
day
litre
litre

Rate
(Rs.)

Amount
(Rs.)

0.20
3.00
2.00

6
194.50
199.90
194.50

7
38.90
599.70
389.00

3.00
6.00

110.00
210.00

330.00
1,260.00
10.28

c) OH & contractor's profit @ 12.5% on (a+b)


Cost for 40 sqm = a+b+c
Rate per sqm = (a+b+c)/40
Painting on Steel Surfaces
Providing and applying two coats of ready mix paint
including primer coat of approved brand on steel
surface after through cleaning of surface to give an
even shade as per drawing and Technical Specification
Clause 1701
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate
Painter (1st Class)
Mazdoor (Unskilled)
b) Material
Red-oxide Primer as per specifications
Paint ready mixed approved brand
Add @ 1 per cent on cost of material for
scaffolding wherever required

10.7

Unit Quantity

328.48
2,956.36
73.91

day
day
day

0.25
0.60
0.40

194.50
199.90
194.50

48.63
119.94
77.80

litre
litre

0.60
1.25

100.00
210.00

60.00
262.50
3.23

c) OH & contractor's profit @ 12.5% on (a+b)


Cost for 10 sqm = a+b+c
Rate per sqm = (a+b+c)/10
Painting on Concrete/Steel Surfaces with Epoxy

71.51
643.60
64.36

Painting two coats including prime coat with epoxy paint


of approved brand on concrete/steel surfaces after
through cleaning of surface to give an even shade as
per drawing and Technical Specification Clause 1701
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate
Painter (1st Class)
Mazdoor (Unskilled)
b) Material
Epoxy primer/Red-oxide
Epoxy paint
Add @ 1 per cent on cost of material for
scaffolding wherever required

10.8

1700

PMGSY SOR 13-14

day
day
day

0.25
0.60
0.40

194.50
199.90
194.50

48.63
119.94
77.80

litre
litre

0.60
1.25

100.00
450.00

60.00
562.50
6.23

c) OH & contractor's profit @ 12.5% on (a+b)


Cost for 10 sqm = (a+b+c)
Rate per sqm = (a+b+c)/10
Painting lines, Dashes, Arrows, etc. on Road in
Two Coats on New Work
PanchayatR B Circle-2,Rajkot

109.39
984.48
98.45

[Chapter -10](Page-194)

Sr.
No.
1

10.9

10.10

Ref.
MORD
n
Specif
2

1700

1700

Description
3
Painting lines, dashes, arrows, etc. on roads in two
coats on new work with ready mixed road marking
paint conforming to IS:164 on bituminous/concrete
surface, including cleaning the surface of all dirt, dust
and other foreign matter, demarcation at site and traffic
control as per drawing and Technical Specification
Clause 1702

Assuming 100 mm width


Unit = sqm
Taking output = 10 sqm
a) Labour
Mate
day
Painter 1st Class
day
Mazdoor (Unskilled)
day
b) Material
Road marking paint as per IS:164
litre
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 10 sqm = a+b+c
Rate per sqm = (a+b+c)/10
Painting lines, Dashes, Arrows, etc. on Roads in
Two Coats on Old Work
Painting lines, dashes, arrows, etc. on roads in two
coats on old work with ready mixed road marking paint
conforming to IS:164 on bituminous/concrete surface,
including cleaning the surface of all dirt, dust and other
foreign matter, demarcation at site and traffic control as
per drawing and technical specification Clause 1702
Assuming 100 cm width
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate
day
Painter (Ist class)
day
Mazdoor (Unskilled)
day
b) Material
Road marking paint
litre
c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 10 sqm = a+b+c
Rate per sqm = (a+b+c)/10
Kilometre Stone
Reinforced cement concrete M15 grade kilometre
stone/local stone of standard design as per IRC:8 fixing
in position including painting and printing, etc as per
drawing and Technical Specification Clause 1703
i)

PMGSY SOR 13-14

Unit Quantity

5th Kilometre Stone (precast)


Unit = each
Taking output = 6 Nos.
a) M-15 grade of concrete
As per item No.12.5 of Chapter 12
b) Steel reinforcement @ 5 kg per sqm
As per item No.12.6 of Chapter 12
c) Excavation in soil for foundation
As per item No.11.1 of Chapter 11
d) Painting two coats on concrete surface
PanchayatR B Circle-2,Rajkot

cum
kg
cum

Rate
(Rs.)

Amount
(Rs.)

0.09
0.55
1.55

194.50
199.90
194.50

17.51
109.95
301.48

1.48

205.00

303.40
91.54
823.87
82.39

0.06
0.30
1.25

194.50
199.90
194.50

11.67
59.97
243.13

0.90

205.00

184.50
62.41
561.67
56.17

2.35 3,948.16

9,278.17

22.08

54.57

1,204.85

1.68

182.05

305.85

[Chapter -10](Page-195)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
4
As per item No.10.5 of Chapter 10
sqm
e) lettering on km post (average 30 letters of 10
cm height each)
per
As per item No.10.1 of Chapter 10
cm
high
per
litre
Transportation and fixing
f) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
g) Machinery
50 HP Tractor with trolley
hour
h) OH & contractor's profit @ 12.5% on (f+g)
Cost for 6 Nos. 5th km stone = a+b+c+e+f+g+h
Rate for each 5th km stone =
(a+b+c+e+f+g+h)/6
ii)

Ordinary Kilometer Stone (Precast)


Unit = each
Taking output = 14 Nos.
a) M15 grade of concrete
As per item No.12.5 of Chapter 12
b) Steel reinforcement @ 5 kg per sqm
As per item No.12.6 of Chapter 12
c) Excavation in soil for foundation
As per item No.11.1 of Chapter 11
d) Painting two coats on concrete surface
As per item No.10.5 of Chapter 10
e) lettering on km post (average 12 letters of 10
cm height each)
As per item No.10.1 of Chapter 10

cum
kg

Rate
(Rs.)

9.85

6
73.91

7
728.00

1,800.00

0.54

967.75

0.26
0.60
6.00

194.50
207.80
194.50

50.57
124.68
1,167.00

6.00

300.00

1,800.00
392.78
16,019.65
2,669.94

3.77 3,948.16

14,884.55

26.32

54.57

1,436.22

cum

2.77

182.05

504.28

sqm

11.41

73.91

843.30

1,680.00

0.54

903.23

0.32
1.00
7.00

194.50
207.80
194.50

62.24
207.80
1,361.50

6.00

300.00

1,800.00
428.94
22,432.07

per
cm
high
per
letter

Transportation and fixing


f) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
g) Machinery
50 HP Tractor with trolley
hour
h) OH & contractor's profit @ 12.5% on (f+g)
Cost for 14 Nos. ordinary km stone =
(a+b+c+d+e+f+g+h)
Rate for each ordinary km stone =
(a+b+c+d+e+f+g+h)/14
iii) 200 m stone (precast)
Unit = each
Taking output = 33 Nos.
a) M15 grade of concrete
As per item No.12.5 of Chapter 12
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)

1,602.29

cum

1.58 3,948.16

6,238.09

[Chapter -10](Page-196)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

b)
c)
d)
e)

Rate
(Rs.)

Amount
(Rs.)

66.00

54.57

3,601.47

cum

1.39

182.05

253.05

sqm

6.27

73.91

463.41

330.00

0.54

177.42

0.34
1.50
7.00

194.50
207.80
194.50

66.13
311.70
1,361.50

6.00

300.00

1,800.00
442.42
14,715.18
445.91

1.25 3,948.16

4,935.20

Unit Quantity

3
Steel reinforcement @ 5 kg per sqm
As per item No.12.6 of Chapter 12
Excavation in soil for foundation
As per item No.11.1 of Chapter 11
Painting two coats on concrete surface
As per item No.10.5 of Chapter 10
lettering on km post (average 1 letter of 10
As per item No. 10.1 of Chapter 10

4
kg

per
cm
per
litreet
ter

Transportation and fixing


f) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
g) Machinery
50 HP Tractor with trolley
hour
h) OH & contractor's profit @ 12.5% on (f+g)
Cost for 33 Nos. 200 m stone = (a+b+c+e+f+g+h)
Rate for each 200 m stone =
(a+b+c+e+f+g+h)/33

Note:

10.11

1700

The rate for excavation, cement concrete, steel


reinforcement, painting and lettering may be taken
from respective Chapters.

In case local stone is to be used in place of precast


RCC stones, then rate of cement concrete and steel
reinforcement may be deleted.

Boundary Pillar
Reinforced cement concrete M15 grade boundary
pillars/local stone of standard design as per IRC:25,
fixed in position including finishing and lettering but
excluding painting as per drawing and Technical
Specification Clause 1704
Unit = each
Taking output = 57 Nos.
a) M-15 grade of Concrete
As per Item No. 12.5 of Chapter
b) Steel reinforcement
As per Item No. 12.6 of Chapter
c) Excavation in soil
As per Item No. 11.1 of Chapter
d) lettering, each 10 cm high
As per Item No. 10.1 of Chapter

12

cum

12

kg

79.80

54.57

4,354.50

11

cum

10.72

182.05

1,951.60

10

per
litre
per
cm
high

2,280.00

0.54

1,225.81

0.57
14.25

194.50
194.50

110.87
2,771.63

Transportation and fixing


e) Labour
Mate
Mazdoor (Unskilled)
f) Machinery
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

day
day

[Chapter -10](Page-197)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Note:

Description

3
4
Tractor with trolley
hour
g) Material
Stone spall
cum
h) OH & contractor's profit @ 12.5% on (e+f+g)
Cost for 57 Nos. boundary pillar = a+b+c+e+f+g+h
Rate for each boundary pillar =
(a+b+c+e+f+g+h)/57

10.12

1700,
800 &
300

Unit Quantity

Amount
(Rs.)

6.00

6
300.00

7
1,800.00

11.97

274.73

3,288.52
996.38
21,434.49
376.04

day
day
day

0.09
0.25
2.00

194.50
207.80
194.50

17.51
51.95
389.00

kg

31.42

75.00

2,356.50

cum

0.526 3,948.16

2,076.73
103.84

0.074 54,567.69

4,038.01

In case of soft ground, a proper foundation may be


provided as per approved design. In case
foundation is required to be provided, the items of
excavation and foundation concrete are required to
be measured and paid separately.
In case local stone is to be used in place of precast
RCC stones, then rate of cement concrete and steel
reinforcement may be deleted.

G.I Barbed Wire Fencing 1.2 m high


Providing and fixing 1.2 m high GI barbed wire fencing
with 1.8 m RCC posts 150 mm x 150 mm placed every 3
m centre-to-centre founded in M15 grade cement
concrete, 0.6 m below ground level, every 15th post,
last but one end post and corner post shall be strutted
on both sides and end post on one side only and
provided with 9 horizontal lines and 2 diagonals
interwoven with horizontal wires, fixed with GI staples,
turn buckles etc. complete as per Clause 1705.
Unit = per running m
Taking output = 30 m
a) Labour
Mate
Blacksmith
Mazdoor (Unskilled)
b) Material
Barbed wire 335 m length @ 9.38 kg per 100
m
R.C.C. Post 150 mm x 150 mm x 1.80 m
M15 Grade concrete
13 x 150 mm x 150 mm x 1.8 m
Rate as per item No.12.5 of Chapter 12
Add 5 per cent extra cost for formwork of M15
Supply of HYSD Bars including cutting,
bending, tying & placing in position.

10 mm dia HYSD bars for posts


13 x 4 x 1.8 = 93.6 m @ 0.62 kg/mt =
43.60 kg
8 mm dia HYSD bars for rings
13 x 10 x 0.6 = 78 m @ 0.39 kg/mt =
30.42 kg
Total
As per item No.12.6 of Chapter 12
t
Add for GI staple binding wire, drilling holes,
etc. @ 2 per cent of the cost of material
PMGSY SOR 13-14

Rate
(Rs.)

PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-198)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

c)

Unit Quantity

3
Painting
Applying two coats of painting including
primer coat on exposed surface of RCC posts

As per item No.10.5 of this Chapter


sqm
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 30 m fencing = a+b+c+d
Rate per m = (a+b+c+d)/30
Note: Cost of excavation for foundation and foundation
concrete to be added separately in the cost estimate as
per approved design. The rate for these items may be
taken from respective Chapters.
10.13

1700,
800 &
300

Amount
(Rs.)

8.14

73.91

601.62
1,204.39
10,839.54
361.32

day
day
day

0.12
0.40
2.50

194.50
207.80
194.50

23.34
83.12
486.25

kg

40.15

75.00

3,011.25

cum

0.702 3,948.16

2,771.61
138.58

0.111 54,567.69

6,057.01

G.I Barbed Wire Fencing 1.8 m high

Providing and fixing 1.8 m high GI barbed wire fencing


with 2.4 m RCC M15 grade 150 mm x 150 mm concrete
post placed every 3 m centre-to-centre founded in M15
grade cement concrete, 0.6 m below ground level,
every 15th post, last but one end post and corner post
shall be strutted on both sides and end post on one side
only and provided with 12 horizontal lines and 2
diagonals interwoven with horizontal wires, fixed with
GI staples, turn buckles etc. complete as per Clause
1705.
Unit = per running m
Taking output = 30 m
a) Labour
Mate
Blacksmith
Mazdoor (Unskilled)
b) Material
Barbed wire 428 m length @ 9.38 kg per 100
m
R.C.C. Post 150 mm x 150 mm x 2.4 m
High M-15 Grade
13 x 150 mm x 150 mm x 2.4 m
As per item No.12.5 of Chapter 12
Add 5 per cent extra cost of C.C. for formwork
of M-15
Supply of HYSD Bars including cutting,
bending, tying & placing in position.
10 mm dia HYSD bars for posts
13 x 4 x 2.4 =
124.80 m
@ 0.62 kg/mt =
77.38 kg
8 mm dia HYSD bars for rings
13 x 11 x 0.6 =
85.80 m
@ 0.39 kg/m =
33.46 kg
Total
110.84 kg
As per item No.12.6 of Chapter 12
Add for GI staple, binding wire, drilling holes
etc. @ 2 per cent of the cost of material
c)

PMGSY SOR 13-14

Rate
(Rs.)

Painting

PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-199)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Rate
(Rs.)

Amount
(Rs.)

12.10

73.91

894.30
1,683.18
14,555.93
485.20

cum

1.296

182.052

235.94

cum

0.648 3,730.358

2,417.27

Unit Quantity

3
Applying two coats of painting including prime
coat on exposed surface of RCC posts

As per item No.10.5 of this Chapter


sqm
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 30 m fencing = a+b+c+d
Rate per m fencing = (a+b+c+d)/30
Note: Cost of excavation for foundation and foundation
concrete to be added separately in the cost estimate as
per approved design. The rate for these items may be
taken from respective Chapters.
10.14

10.15

1700,
800
&300

1700,
800 &
300

PMGSY SOR 13-14

Tubular Steel Railing on Medium Weight Steel


Channel (ISMC series) 100 mm x 50 mm
Providing, fixing and erecting 50 mm dia steel pipe
railing in 3 rows duly painted on medium weight steel
channels (ISMC series) 100 mm x 50 mm, 1.2 m high
above ground, 2 m centre-to-centre, complete as per
approved drawings Clause 1706
Unit = Running m
Taking output = 10 m
i) Excavation for foundation (6 Nos.) 6 x 0.6 x
As per item No.11.1 of Chapter 11
ii) Foundation concrete M-15 grade PCC 6 x 0.6
As per item No. 11.4 of Chapter 11
iii) Painting of pipe
As per item No.10.6 of this Chapter
iv) Painting of channel section (6 nos.)
As per item No.10.6 of this Chapter
a) labour (For fixing at site)
Mate
Mazdoor (Unskilled)
Plumber
b) Material
Steel pipe 50 mm external dia as per IS:1239

sqm

4.71

64.360

303.14

sqm

2.16

64.360

139.02

day
day
day

0.01
0.25
0.01

194.50
194.50
207.80

1.95
48.63
2.08

30.00

410.00

12,300.00

Medium weight steel channel (ISMC series) kg


100 mm x 50 mm, 10.8 m length @ 9.2 kg
per m including 5 per cent wastage

104.33

50.60

5,279.16

Add for drilling holes @ 3 per cent of cost of


channels
c) Machinery
50 HP Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 10 m = a+b+c+d
Rate per m = (a+b+c+d)/10
Tubular Steel Railing on Precast RCC posts, 1.2 m
high above Ground Level

PanchayatR B Circle-2,Rajkot

527.37
0.06

300.00

18.00
2,272.15
20,449.33
2,044.93

[Chapter -10](Page-200)

Sr.
No.
1

10.16

Ref.
MORD
n
Specif
2

1700

Description
3
Providing, fencing and erecting 50 mm dia painted steel
pipe railing in 3 rows on precast M-20 grade RCC
vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m
above Gl) with 3 holes 50 mm dia for pipe, fixed 2 m
centre-to- centre complete as per approved drawings
Clause 1706

Unit Quantity
4

Unit = Running m
Taking output = 10 m
i) Excavation for foundation (6 Nos.) 6 x 0.6 x
As per item No.11.1 of Chapter 11
cum
ii) Foundation concrete M15 grade PCC 6 x 0.6
As per item No. 11.4 of Chapter 11
cum
iii) RCC M20 for precast posts (6 nos.) of 1.8 m
As per item No.12.5 of Chapter 12
sqm
iv) Painting of pipe
As per item No.10.6 of this Chapter
sqm
a) Labour
Mate
day
Mazdoor (Unskilled)
day
Plumber
day
b) Material
Steel pipe 50 mm dia as per IS:1239
m
HYSD steel bars as per item No.12.6 of t
Chapter 12
c) Machinery
50 HP Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 10 m = a+b+c+d
Rate per m = (a+b+c+d)/10
Providing and Fixing 'Logo' of PMGSY Project
Providing and fixing of typical PMGSY informatory sign
board with Logo as per MORD specifications and
drawing. Three MS Plates of 1.6 mm thick, top and
middle plate duly welded with MS flat iron 25mm x 5m
size on back on edges. The lower plate will be welded
with MS angle iron frame of 25mm x 25mm x 5mm. The
angle iron frame of the lower most plate and flat iron
frame of middle plate will be welded to 2 nos. 75mm x
75 mm of 12 SWG sheet tubes posts duly embedded in
cement concrete M-15 grade blocks of 450mm x 450mm
x 600mm, 600mm below ground level. The top most
diamond plate will be welded to middle plate by 47mm x
47mm of 12 SWG steel plate tube. All M.S. will be stove
enameled on both sides. Lettering and printing arrows,
border etc. will be painted with ready mixed synthetic
enamel paint of superior quality in required shade and
colour. All sections of framed posts and steel tube will
be painted with primer and two coats of epoxy paint as
Unit = Each
Taking out put = one typical board
(i) Excavation for foundations
As per item No. 11.1 of Chapter 11
cum
(ii) Cement Concrete M15 grade
As per item No. 11.4 of Chapter 11
cum

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

1.296

Rate
(Rs.)

Amount
(Rs.)

182.052

235.94

0.648 3,730.358

2,417.27

0.33 4,818.375

1,590.06

4.71

64.360

303.14

0.014
0.35
0.01

194.50
194.50
207.80

2.72
68.08
2.08

30.00
410.00
0.032 54,567.69

12,300.00
1,746.17

0.25

300.00

75.00
1,774.26
15,968.30
1,596.83

0.252

182.052

45.88

0.252 3,730.358

940.05

[Chapter -10](Page-201)

Sr.
No.
1

Ref.
MORD
n
Specif
2

Description

Unit Quantity

3
(iii) Painting on MS Steel tubes with primer and
two coats of epoxy paint

2x2.05x.30 = 1.23
1x1.10x188 = 0.21
As per item no. 10.7 of Chapter 10
sqm
1.80
iv) Printing new letters and figures of any shade
Logo Border 60x4x5 = 1200 per cm height per letter
Figure 60x10 = 600 per cm height per letter
Middle plate words 28x5 = 140 per cm height per letter
Bottom plate border 150x2x5 = 1500 per cm height per letter
Bottom plate border 60x2x5 = 600 per cm height per letter
Words 101x2.5 = 252.5
Words 80x3 = 240.00
Tota 4532.5 per cm height per letter
per
As per item No.10.1 of Chapter 10
4,532.50
cm
heigh
t per
litre
a) Labour (for fixing at site)
Mate
day
0.03
Mazdoor (Unskilled)
day
0.75
b) Material
2 nos. MS tubes 75mx75mm of 12 SWG sheet kg
63.15
2650 mm long

Rate
(Rs.)

Amount
(Rs.)

98.45

177.21

0.54

2,436.84

194.50
194.50

5.84
145.88

75.20

4,748.88

1 No. MS tube 47mm x 47mm of 12 SWG kg


1100 mm long

4.47

75.20

336.14

Angle iron 50mm x 50mm x 5 mm for lugs


kg
1.6 mm thick MS sheet strengthened by sqm
25mm x 5 MS flat iron on logo and middle
plate angle iron 25mm x 25mm x 5mm on
bottom plate painting with stove enameled
paint on both sides as per MORD
specifications
Add 3% cost of MS tube and angle iron
towards the cost of fabrications, drilling holes,
nuts, bolts, etc.

2.12
1.44

50.60
920.00

107.27
1,324.80

c)

Machinery
Tractor with trolley
hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for one Board= (i+ii+iii+iv+a+b+c+d)

195.51

0.24

300.00

72.00
867.04
11,403.34

Note: Printing and lettering for blank spaces on the lower


plate will be written as required and paid seperately.
10.17

Suggestive

PMGSY SOR 13-14

Traffic Cone
Provision of red fluorescent with white reflective sleeve
traffic cone made of Low Density Polyethylene (LDPE)
material with a square base of 390 x 390 x 35 mm and
a height of 770 mm, 4 kg in weight, placed at 1.5 m
interval, all as per BS:873
Unit = Each
Taking output = 68 Nos.
a) Labour
PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-202)

Sr.
No.
1

10.18

Ref.
MORD
n
Specif
2

Suggestive

Description

Unit Quantity

3
4
Mate
day
Mazdoor (Unskilled)
day
b) Material
Traffic cones with 150 mm reflective sleeve
Nos.
c) Machinery
50 HP Tractor with trolley
Hour
d) OH & contractor's profit @ 12.5% on (a+b+c)
Cost for 68 Nos. = a+b+c+d
Rate for each cone = (a+b+c+d)/68
Rumble Strips
Provision of 15 nos. rumble strips covered with premix
bituminous carpet, 15-20 mm high at centre, 250 mm
wide placed at 1 m centre-to-centre at approved
locations to control speed, marked with white strips of
road marking paint.

Rate
(Rs.)

Amount
(Rs.)

0.02
0.50

6
194.50
194.50

68.00

850.00

57,800.00

0.10

300.00

30.00
7,241.39
65,172.53
958.42

3.89
97.25

Unit = sqm
Taking output = 100 sqm (including gaps)
The rate per sqm of premix carpet and road marking
may be adopted from Chapters 5 & 10 respectively for
the quantities calculated from approved drawings.
10.19

Suggestive

Safety Devices and Signs in Construction Zones


Provision and fixing of traffic signs for limited period at
suitable locations in construction zone comprising of
warning zone, approach transition zone, working zone
and terminal transition zone with a minimum distance of
2-3 m from the edge of the carriageway. The bottom
edge of the lowest sign plate to be not less than 2 m
above the road level, fixed on 600 mm x 600 mm x 6
mm angle iron post, founded and installed as per
approved design and drawings, removed and disposed
of after completion of construction work, all as per
IRC:SP:55-2001.
Unit = each
Taking output = one sign post
Following types of signs are required to be fixed in
construction zones for safety of traffic:

Note:

PMGSY SOR 13-14

a) Diversion one km ahead


b) Traffic sign ahead
c) Road ahead closed
d) Men at work
e) Road narrow
f) Un-even road
g) Slippery road
h) Loose chippings
i)
Diversion
j)
Do not enter
k) Road closed
l)
Stop
m) Slow
n) Speed limit
The rate for traffic signs are already worked out and
given elsewhere in this Chapter. The same may be
adopted.
PanchayatR B Circle-2,Rajkot

[Chapter -10](Page-203)

Sr.
No.
1
10.20

Ref.
MORD
n
Specif
2

Suggestive

Description
3
Road Markers/Road Stud with Lens Reflector

Unit Quantity
4

Providing and fixing of road stud 100 x 100 mm die cast


in aluminium, resistant to corrosive effect of salt and
grit, fitted with lense reflectors, installed in concrete or
asphaltic surface by drilling holes 30 mm upto a depth
of 600 mm and bedded in a suitable bituminous grout
or epoxy mortar, all as per BS:873 (Part 4) 1973.
Unit = each
Taking output = 50 Nos.
(a) Labour
Mate
day
Mazdoor (Unskilled)
day
(b) Material
Aluminium studs 100x100 mm fitted with Nos.
lense reflectors
Add 10 per cent of cost of material for fixing
and installation.
(c) OH & contractor's profit @ 12.5% on (a+b)
Cost for 50 studs = a+b+c
Rate per stud = (a+b+c)/50

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

0.04
1.00

194.50
194.50

7.78
194.50

50.00

230.00

11,500.00
1,150.00
12,852.28
25,704.56
514.09

[Chapter -10](Page-204)

Chapter 11
FOUNDATION
Sr.
No.
1
11.1

Ref.
MORD
Specifn
2
300

Description
3
Excavation for Structures
Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps
and other deleterious material and disposal upto a lead of
50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material.
I.

Note:

Note:

Cost of dewatering may be added, where required,


up to 10 per cent of labour cost. Assessment for
dewatering shall be made as per site conditions.

The cost of shoring and shuttering, where needed,


may be added @ 3 per cent on cost of excavation
for open foundation.
The excavated earth if found suitable, can be used
partly for backfilling in trenches & partly for road
work. Hence cost of disposal has not been added
except for marshy soil. This note is common to all
cases of item 11.1 excluding 11.1 V

1
2

II.

Ordinary soil
(i) Upto 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 10 cum = a+b
Rate per cum = (a+b+c)/10

Unit Quantity

(ii) 3 m to 6 m depth
Unit = cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 10 cum = a+b
Rate per cum = (a+b+c)/10
Cost of dewatering may be added, when needed,
up to 15 per cent of labour cost.

Amount
(Rs.)

0.32
8.00

194.50
194.50

62.24
1,556.00
202.28
1,820.52
182.05

0.38
9.50

194.50
194.50

73.91
1,847.75
240.21
2,161.87
216.19

0.40
10.00

194.50
194.50

77.80
1,945.00
252.85

Cost of shoring and shuttering, where needed, may


be taken @ 10 per cent on cost of excavation for
open foundation.
Ordinary rock (not requiring blasting)
Upto 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)

PMGSY SOR 13-14

Rate
(Rs.)

PanchayatR B Circle-2,Rajkot

[Chapter -11](Page-204)

Sr.
No.

Ref.
MORD
Specifn

Description

Unit Quantity

3
Cost for 10 cum = a+b
Rate per cum = (a+b+c)/10
Note: Cost of dewatering upto 10 per cent of labour cost may
be added, where required as per site condition.

Rate
(Rs.)
6

Amount
(Rs.)
7
2,275.65
227.57

III. Hard rock (requiring blasting)


Upto 3 m depth including 1.5 m depth in hard rock
Unit = cum
Taking output = 10 cum
a) Labour
Mate
day
Driller
day
Blaster
day
Mazdoor (Unskilled)
day
b) Machinery
Air compressor 210 cfm with 2 jack hammers hour
for drilling
c) Material
Gelatin 80%
kg
Detonator electric
Nos.
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 10 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Note: Cost of dewatering @ 10 per cent of (a+b) may be
added, where required as per site condition.
IV. Hard rock (blasting prohibited)
Upto 3 m depth including 1.5 m depth in hard rock
Unit = cum
Taking output = 10 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Air compressor 210 cfm with 2 jack hammers hour
of pneumatic breaker

0.53
0.84
0.40
12.00

194.50
194.50
194.50
194.50

103.09
163.38
77.80
2,334.00

1.00

300.00

300.00

3.50
14.00

60.00
35.00

210.00
490.00
459.78
4,138.05
413.80

0.20
5.00

194.50
194.50

38.90
972.50

10.00

300.00

3,000.00

c) OH & Contractor's profit @ 12.5% on (a+b)


Cost for 10 cum = a+b+c
Rate per cum = a+b+c/10
Note: Cost of dewatering up to 10 per cent of (a+b) may be
added, where required as per site conditions.
V.

Note:

1
2

PMGSY SOR 13-14

Marshy soil
Unit = cum
Taking output = 10 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 10 cum = a+b
Rate per cum = (a+b+c)/10
Cost of dewatering @ 30 per cent of (a) may be
added.

501.43
4,512.83
451.28

0.60
15.00

194.50
194.50

116.70
2,917.50
379.28
3,413.48
341.35

Shoring and shuttering @ 15 per cent of (a) may


be added where required.
PanchayatR B Circle-2,Rajkot

[Chapter -11](Page-205)

Sr.
No.

Ref.
MORD
Specifn

Description

11.2

Rate
(Rs.)

Amount
(Rs.)

Marshy soil is generaly available upto 3 m depth.


The rate has, therefore, been done upto 3 m depth
of excavation. For deeper excavation refer analysis
in item 11.1.

300 & Fillling in foundation trenches as per drawing and


1200 technical specification Clause 305.3.9
I.

II.

Note:

11.3

3
Since marshy soil cannot be used in filling in
trenches, it shall be removed and replaced by
approved quality of soil. The labour cost includes
labour input for disposal of marshy soil from
excavated pit with a lead upto 50 m lead.

Unit Quantity

Sand filling
Unit = cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) Material
Sand (assuming 20 per cent voids)
cum
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Earth filling (For marshy soil)
Unit = cum
Taking output = 6 cum
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 6 cum = a+b
Rate per cum = (a+b+c)/6
Cost of transportation of good quality earth has not
been included. Only labour for carrying carted
earth with a lead of 50 m to the foundation pits has
been taken in the rate. The cost of carted earth
may be worked out separately if the same is not
available from the adjoining area.

0.01
0.30

194.50
194.50

1.95
58.35

1.20

332.31

398.77
57.38
516.45

0.20
3.00

194.50
194.50

38.90
583.50
77.80
700.20
116.70

0.275 7,670.20
0.48
332.31
0.48
502.05
0.24
627.05

2,109.31
159.51
240.98
150.49

Backfilling of foundation trenches shall normally be


done with excavated earth. The cost of this
operation is included in item 11.1. Only in case the
excavated earth is not of suitable quality, sand
filling or backfilling with carted earth may be
resorted to

300 & Filling annular space around footing in rock as per


1200 technical specification Clause 1203.4.3.
Unit = cum
P.C.C grade M 15
Nominal mix 1:2.5:5
Unit = cum
a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate

PMGSY SOR 13-14

t
cum
cum
cum
PanchayatR B Circle-2,Rajkot

[Chapter -11](Page-206)

Sr.
No.

Ref.
MORD
Specifn

11.4

Description

Unit Quantity

3
4
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Formwork @ 4% on (a+b)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
800 & Providing concrete for plain/reinforced concrete in
1200 open foundations complete as per drawings and
technical specifications Clause 802, 803, 1202 &
1203
I.
P.C.C grade M 10
(i) Nominal mix 1:3:6
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Mechnical concrete mixer 0.4/0.28 cum hour
capacity fitted with water measuring device
and preferably also with load cell.
d) Formwork @ 4% on cost of material,
labour and machinery (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
(ii) Nominal mix 1:3.6 (Hand mixing)
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Formwork @ 4% on cost of material (a)
and labour (b)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
II. P.C.C grade M 15
(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

5
0.08

6
597.05

0.09
0.10
2.00
0.27

194.50
207.80
194.50
196.30

17.51
20.78
389.00
53.00
127.53
414.48
3,730.36

0.250 7,670.20
0.48
332.31
0.576
502.05
0.288
627.05
0.096
597.05

1,917.55
159.51
289.18
180.59
57.32

47.76

0.08
0.10
1.63
0.27

194.50
207.80
194.50
196.30

15.56
20.78
317.04
53.00

0.40

190.00

76.00
123.46
401.25
3,611.23

0.250 7,670.20
0.48
332.31
0.576
502.05
0.288
627.05
0.096
597.05
0.09
0.10
2.00
0.27

194.50
207.80
194.50
196.30

1,917.55
159.51
289.18
180.59
57.32
17.51
20.78
389.00
53.00
123.38
400.98
3,608.79

[Chapter -11](Page-207)

Sr.
No.

Ref.
MORD
Specifn

Description

Unit Quantity
4

Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class0
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Formwork @ 4% on cost of material,
labour and machinery (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
(ii) Nominal mix 1:2.5:5 (Hand mixing)
Unit = cum
Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Formwork @ 4% on (a+b)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
III. P.C.C. grade M 20
(i) Nominal mix (1:2:4)
Unit = cum
a) Material
Cement
t
Sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Formwork @ 4% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
(ii) Nominal mix 1:2:4 (Hand mixed)
Unit = cum
a) Material
Cement
t
Sand
cum
a)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

5
6
0.275 7,670.20
0.48
332.31
0.48
502.05
0.24
627.05
0.08
597.05

Amount
(Rs.)
7
2,109.31
159.51
240.98
150.49
47.76

0.08
0.10
1.63
0.27

194.50
207.80
194.50
196.30

15.56
20.78
317.04
53.00

0.40

190.00

76.00
127.62
414.76
3,732.80

0.275 7,670.20
0.48
332.31
0.48
502.05
0.24
627.05
0.08
597.05
0.09
0.10
2.00
0.27

2,109.31
159.51
240.98
150.49
47.76

194.50
207.80
194.50
196.30

17.51
20.78
389.00
53.00
127.53
414.48
3,730.36

0.33 7,670.20
0.45
332.31
0.36
502.05
0.36
627.05
0.18
597.05

2,531.17
149.54
180.74
225.74
107.47

0.08
0.10
1.63
0.27

194.50
207.80
194.50
196.30

15.56
20.78
317.04
53.00

0.40

190.00

76.00
147.08
478.01
4,302.12

0.33 7,670.20
0.45
332.31

2,531.17
149.54

[Chapter -11](Page-208)

Sr.
No.

Ref.
MORD
Specifn

11.5

Description

Unit Quantity

Rate
(Rs.)

3
4
5
6
40 mm aggregate
cum
0.36
502.05
20 mm aggregate
cum
0.36
627.05
10 mm aggregate
cum
0.18
597.05
b) Labour
Mate
day
0.09
194.50
Mason (1st Class)
day
0.10
207.80
Mazdoor (Unskilled)
day
2.00
194.50
Bhisti
day
0.27
196.30
c) Formwork @ 4% out of material and
labour (a+b)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
IV. R.C.C grade M 20
Unit = cum
a) Material
Cement
t
0.35 7,670.20
Coarse sand
cum
0.45
332.31
cum
0.54
627.05
20 mm aggregate
cum
0.36
597.05
10 mm aggregate
b) Labour
Mate
day
0.08
194.50
Mason (1st Class)
day
0.12
207.80
Mazdoor (Unskilled)
day
1.73
194.50
Bhisti
day
0.27
196.30
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
190.00
d) Formwork @ 4% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = (a+b+c+d+e+f)
V.
R.C.C. grade M 25
Unit = cum
a) Material
Cement
t
0.404 7,670.20
Coarse sand
cum
0.45
332.31
20 mm aggregate
cum
0.54
627.05
10 mm aggregate
cum
0.36
597.05
b) Labour
Mate
day
0.08
194.50
Mason (1st Class)
day
0.12
207.80
194.50
Mazdoor (Unskilled)
day
1.73
Bhisti
day
0.27
196.30
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
190.00
d) Formwork @ 3.75% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
600 & Brick masonry work in cement mortar in
1200 foundation complete excluding pointing and
plastering as per drawing and technical
specifications Clauses 600, 1202 & 1203
Unit = cum
I.
Brick masonry in 1:3 cement mortar
a) Material
Brick
Nos.
500.00
4.69
Cement mortar 1:3
cum
0.24 4,459.26
(Rate as per Sub-analysis)

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Amount
(Rs.)
7
180.74
225.74
107.47
17.51
20.78
389.00
53.00
147.00
477.74
4,299.68

2,684.57
149.54
338.61
214.94
15.56
24.94
336.49
53.00
76.00
155.75
506.17
4,555.55

3,098.76
149.54
338.61
214.94
15.56
24.94
336.49
53.00
76.00
161.54
558.67
5,028.04

2,345.00
1,070.22

[Chapter -11](Page-209)

Sr.
No.

Ref.
MORD
Specifn

Description

b)

Unit Quantity
4

Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Sub-analysis
Cement mortar 1:3 (1 cement : 3 sand)
Unit = cum
a) Material
Cement
t
Sand
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
Total material and labour = (a+b)
II. Brick masonry in 1:4 cement mortar
Unit = cum
a) Material
Brick
Nos.
Cement mortar 1:4
cum
Rates as per sub-analysis
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b
Sub-analysis
Cement mortar 1:4 (1 cement : 4 sand)
Unit = cum
a) Material
Cement
t
Sand
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
Total material and labour = (a+b)
III. Brick masonry in cement-lime-mortar (1:0.5:4.5)
Unit = cum
a) Material
Brick
Nos.
Cement lime mortar rates as per sub-analysis cum
b)

Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Sub-analysis
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

5
0.09
0.80
1.60
0.20

Rate
(Rs.)

Amount
(Rs.)

194.50
207.80
194.50
196.30

17.51
166.24
311.20
39.26
493.68
4,443.11

0.51 7,670.20
1.05
332.31

3,911.80
348.93

0.04
0.90
0.08

194.50
194.50
196.30

7.78
175.05
15.70
4,459.26

500.00
4.69
0.24 3,462.14

2,345.00
830.91

0.09
0.80
1.60
0.20

194.50
207.80
194.50
196.30

17.51
166.24
311.20
39.26
463.76
4,173.88

0.38 7,670.20
1.05
332.31

2,914.68
348.93

0.04
0.90
0.08

194.50
194.50
196.30

7.78
175.05
15.70
3,462.14

500.00
4.69
0.24 4,207.64

2,345.00
1,009.83

0.09
0.80
1.60
0.20

194.50
207.80
194.50
196.30

17.51
166.24
311.20
39.26
486.13
4,375.17

[Chapter -11](Page-210)

Sr.
No.

Ref.
MORD
Specifn

11.6

Description
3
Cement-lime-mortar 1:0.5:4.5 (1 cement: 0.5 lime
putty : 4.5 sand)

Unit = cum
a) Material
Cement
Lime putty
Sand
b) Labour
Mate
Mazdoor (Unskilled)
Bhisti
Total material and labour = (a+b)
700 & Stone masonry work in cement mortar in
1200 foundation complete as per drawing and technical
specifications Clauses 702, 704, 1202 & 1203.

Unit Quantity
4

t
t
cum
day
day
day

Unit = cum
Coursed rubble masonry (1st sort)
I.
(i) In 1:3 cement mortar
Unit = cum
a) Material
Stone for C.R. masonry 1st sort
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement mortar (1:3) (Rate as in item 11.5 I) cum
b)

Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for C.R. masonry 1st sort
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement mortar 1:4 (Rate as in item 11.5 II)
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = (a+b+c+d)
(iii) In cement-lime-sand mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for C.R. masonry 1st sort
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement lime mortar (Rate as in item 11.5 III) cum
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

0.38 7,670.20
0.175 2,000.00
1.05
332.31

2,914.68
350.00
348.93

0.10
2.50
0.45

194.50
194.50
196.30

19.45
486.25
88.34
4,207.64

1.10
7.00

339.73
34.90

373.70
244.30

0.30 4,459.26

1,337.78

0.14
1.50
2.10
0.08

194.50
207.80
194.50
196.30

27.23
311.70
408.45
15.70
339.86
3,058.72

1.10
7.00

339.73
34.90

373.70
244.30

0.30 3,462.14

1,038.64

0.14
1.50
2.10
0.08

194.50
207.80
194.50
196.30

27.23
311.70
408.45
15.70
302.47
2,722.19

1.10
7.00

339.73
34.90

373.70
244.30

0.30 4,207.64

1,262.29

[Chapter -11](Page-211)

Sr.
No.

Ref.
MORD
Specifn

Description

b)

Unit Quantity
4

Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Note: Quantity of required chips has not been provided for
separately as it is assumed that the same will be availble
from dressing of stones
II.

PMGSY SOR 13-14

Coursed rubble masonry (2nd sort)


(i) In 1:3 cement mortar
Unit = cum
a) Material
Stone for C.R. masonry 2nd sort
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Spalls/blasted rubble
cum
Cement mortar (Rate as in item 11.5 I.)
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for C.R. masonry 2nd sort
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Spalls/Blasted rubble
cum
Cement mortar (Rate as in item 11.5 II)
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
(iii) In cement-lime-mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for C.R. masonry 2nd sort
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Spalls/blasted rubble
cum
Cement-lime-mortar (Rate as in item 11.5 III) cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

0.14
1.50
2.10
0.08

194.50
207.80
194.50
196.30

27.23
311.70
408.45
15.70
330.42
2,973.80

0.60
7.00

185.00
34.90

111.00
244.30

0.50
185.00
0.33 4,459.26

92.50
1,471.56

0.14
1.30
2.00
0.08

194.50
207.80
194.50
196.30

27.23
270.14
389.00
15.70
327.68
2,949.11

0.60
7.00

339.73
34.90

203.84
244.30

0.50
185.00
0.33 3,462.14

92.50
1,142.50

0.14
1.30
2.00
0.08

194.50
207.80
194.50
196.30

27.23
270.14
389.00
15.70
272.67
2,454.05

0.60
7.00

339.73
34.90

203.84
244.30

0.50
185.00
0.33 4,207.64

92.50
1,388.52

0.14
1.30
2.00
0.08

194.50
207.80
194.50
196.30

27.23
270.14
389.00
15.70
303.42
2,730.82

[Chapter -11](Page-212)

Sr.
No.

Ref.
MORD
Specifn

11.7

Description

Unit Quantity

3
4
III. Random Rubble Masonry
(i) In 1:3 cement mortar
Unit = cum
a) Material
Stone for R.R. masonry
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement mortar (1:3) (Rate as in item 11.5 I) cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
(ii) In cement mortar 1:4
a) Material
cum
Stone for R.R. masonry
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement mortar (1:4) (Rate as in item 11.5 II) cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
(iii) In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for R.R. masonry
cum
Through bond stone (7 nos 0.24 x 0.24 x 0.39 Nos.
= 0.16 cum)
Cement lime mortar (Rate as in item 11.5 III) cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Note: Quantity of required chips has not been provided for
separately as it is assumed that the same will be availble
from dressing of stones
1000 Supplying, fitting and placing HYSD bar
&
reinforcement in foundation complete as per
1200 drawings and technical specifications Clauses
1000 and 1202
Unit = t
a) Material
HYSD bars including 5 per cent for overlaps
t
and wastage
Binding wire
kg

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

1.00
7.00

Rate
(Rs.)

Amount
(Rs.)

195.00
34.90

195.00
244.30

0.33 4,459.26

1,471.56

0.12
1.20
1.80
0.08

194.50
207.80
194.50
196.30

23.34
249.36
350.10
15.70
318.67
2,868.03

1.00
7.00

339.73
34.90

339.73
244.30

0.33 3,462.14

1,142.50

0.12
1.20
1.80
0.08

194.50
207.80
194.50
196.30

23.34
249.36
350.10
15.70
295.63
2,660.67

1.00
7.00

339.73
34.90

339.73
244.30

0.33 4,207.64

1,388.52

0.12
1.20
1.80
0.08

194.50
207.80
194.50
196.30

23.34
249.36
350.10
15.70
326.38
2,937.44

1.05 44,200.60

46,410.63

6.00

58.00

348.00

[Chapter -11](Page-213)

Sr.
No.

Ref.
MORD
Specifn

11.8

11.9

1000
&
1200

1000
&
1200

Description

b)

3
Labour for cutting, bending, shifting to
site, tying and placing in position

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c
Supplying,
fitting
and
placingTMT
bar
reinforcement in foundation complete as per
drawings and technical specifications Clauses
1000 and 1202
Unit = t
a) Material
TMT bars including 5 per cent for overlaps and t
wastage
Binding wire
kg
b) Labour for cutting, bending, shifting to
site, tying and placing in position
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c
Supplying,
fitting
and
placing
MS
bar
reinforcement in foundation complete as per
drawings and technical specifications Clauses
1000 and 1202
Unit = t
a) Material
MS bars including 5 per cent for overlaps and t
wastage
Binding wire
kg
b) Labour for cutting, bending, shifting to
site, tying and placing in position

0.40
2.00
6.00

6.00

58.00

348.00

Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c

0.40
2.00
6.00

194.50
207.80
194.50

77.80
415.60
1,167.00
5,789.88
52,108.91

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

194.50
207.80
194.50

77.80
415.60
1,167.00
6,052.38
54,471.41

1.05 48,200.60

50,610.63

6.00

58.00

348.00

0.40
2.00
6.00

194.50
207.80
194.50

77.80
415.60
1,167.00
6,577.38
59,196.41

1.05 42,200.60

44,310.63

[Chapter -11](Page-214)

Chapter 12
SUBSTRUCTURE

Sr.
No.
1
12.1

Ref.
Description
Unit Quantity
MORD
n
Specif
2
3
4
5
600 Brick masonry work in cement mortar in
substructure complete excepting pointing and
plastering, as per drawing and technical
specification Clauses 602, 603, 604, 1202 & 1204
I.

II.

In 1:3 cement mortar


Unit = cum
a) Material
Bricks
Cement mortar (Rate as in item 11.5 I)
b) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
Bhisti
Add for scaffolding @ 5 per cent of cost of
materials and labour (a+b)

Nos.
cum
day
day
day
day

c) OH & Contractor's profit @ 12.5% on (a+b)


Rate per cum = a+b+c+d
In 1:4 Cement mortar
Unit = cum
a) Material
Bricks
Nos.
Cement mortar
(Rate as in item 11.5 II)
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent of cost of
materials and labour (a+b)

c) OH & Contractor's profit @ 12.5% on (a+b)


Rate per cum = a+b+c+d
III. In 1:5 cement mortar
Unit = cum
a) Material
Bricks 1st class
Nos.
Cement mortar
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent of cost of
materials and labour (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
Sub-analysis
Cement mortar 1:5 (1 cement, 5 sand)
a) Material
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

500.00
0.24

4.69
4,459.26

2,345.00
1,070.22

0.09
0.80
1.60
0.20

194.50
207.80
194.50
196.30

17.51
166.24
311.20
39.26
170.76
515.02
4,635.21

500.00

4.69

2,345.00

0.24

3,462.14

830.91

0.09
0.80
1.60
0.20

194.50
207.80
194.50
196.30

17.51
166.24
311.20
39.26
185.51
486.95
4,382.58

500.00
0.24

4.69
2,925.22

2,345.00
702.05

0.09
0.80
1.60
0.20

194.50
207.80
194.50
196.30

17.51
166.24
311.20
39.26
179.06
470.04
4,230.36

[Chapter -12](Page-215)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description
3
Cement
Sand
b) Labour
Mate
Mazdoor (Unskilled)
Bhisti
Total material and labour = (a+b)
IV. In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Brick first class
Cement lime mortar (Rate as in item 11.5 III)
b)

12.2

600

Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
Bhisti
Add for scaffolding @ 5 per cent of cost of
materials and labour (a+b)

Unit Quantity

Rate
(Rs.)

4
t
cum

5
0.31
1.05

6
7,670.20
332.31

7
2,377.76
348.93

day
day
day

0.04
0.90
0.08

194.50
194.50
196.30

7.78
175.05
15.70
2,925.22

500.00
0.24

4.69
4,207.64

2,345.00
1,009.83

0.09
0.80
1.60
0.20

194.50
207.80
194.50
196.30

17.51
166.24
311.20
39.26
194.45

Nos.
cum
day
day
day
day

c) OH & Contractor's profit @ 12.5% on (a+b)


Rate per cum = a+b+c+d
Pointing with cement mortar (1:3) on brickwork
as per drawing and technical specification Clauses
613.3 and 1204
Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement mortar 1.3 (Rate as in item 11.5. I) cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per 10 sqm = (a+b+c+d)

510.44
4,593.93

0.03

4,459.26

133.78

0.04
0.50
0.50
0.20

194.50
207.80
194.50
196.30

7.78
103.90
97.25
39.26
47.75
429.71

0.24

3,462.14

830.91

0.06
0.60
0.60
0.30

194.50
207.80
194.50
196.30

11.67
124.68
116.70
58.89
142.86
1,285.71

Note: Scaffolding is already included in item 12.1


12.3

Amount
(Rs.)

Plastering with cement mortar (1:4), 15 mm thick


on brickwork in substructure as per technical
specification Clauses 613.4 & 1204
Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement mortar 1:4 (Rate as in item 11.5 II ) cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per 10 sqm = a+b+c+d
Note: 1 Scaffolding is already included in item 12.1
600

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -12](Page-216)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

12.4

700

Rate
(Rs.)

Amount
(Rs.)

If cement plaster 12 mm or 18 mm thick is required


elsewhere only the quantity of cement mortar may
be changed on prorata basis without any change in
the labour.

Stone masonry in cement mortar for substructure


complete as per drawing & technical specification
Clauses 702, 704, 1202 and 1204
I.

PMGSY SOR 13-14

3
Though cement mortar of leaner mix has been
included in item 12.1, for cement plaster mix of 1:4
has been proposed for better finishing

Unit Quantity

Coursed rubble masonry (1st sort)


(i) In 1:3 cement mortar
Unit = cum
a) Material
Stone for CR masonry 1st sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement mortar (Rate as in item 11.5. I)
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b) (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for CR masonry 1st sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement mortar (Rate as in item 11.5 II)
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b) 5% on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iii) In cement mortar (1:5)
Unit = cum
a) Material
Stone for CR masonry 1st sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Spalls/blasted rubbles
cum
Cement mortar (Rate same as in item 12.1 cum
III)
b) Labour
PanchayatR B Circle-2,Rajkot

1.10
7.00

339.73
34.90

373.70
244.30

0.30

4,459.26

1,337.78

0.14
1.50
2.10
0.08

194.50
207.80
194.50
196.30

27.23
311.70
408.45
15.70
135.94
356.85
3,211.66

1.10
7.00

339.73
34.90

373.70
244.30

0.30

3,462.14

1,038.64

0.14
1.50
2.10
0.08

194.50
207.80
194.50
196.30

27.23
311.70
408.45
15.70
120.99
317.59
2,858.30

0.60
7.00

339.73
34.90

203.84
244.30

0.50
0.33

185.00
2,925.22

92.50
965.32

[Chapter -12](Page-217)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
As for scaffolding @ 5% on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iv) In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for CR masonry 1st sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement lime mortar (Rate as in item 11.5. III) cum
b)

II.

Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5% of (a) and (b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
Coursed Rubble masonry (2nd sort)
(i) In cement mortar (1:3)
Unit = cum
a) Material
Stone for CR masonry 2nd sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Spalls/blasted rubbles
cum
Cement mortar (Rate as in item 11.5 I)
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for CR masonry 2nd sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Spall/blasted rubble
cum
Cement mortar (Rate same as in item 11.5 II) cum
b)

PMGSY SOR 13-14

Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
Bhisti
PanchayatR B Circle-2,Rajkot

day
day
day
day

Rate
(Rs.)

Amount
(Rs.)

5
0.14
1.30
2.00
0.08

6
194.50
207.80
194.50
196.30

1.10
7.00

339.73
34.90

373.70
244.30

0.30

4,207.64

1,262.29

0.14
1.50
2.10
0.08

194.50
207.80
194.50
196.30

27.23
311.70
408.45
15.70
132.17
346.94
3,122.49

0.60
7.00

339.73
34.90

203.84
244.30

0.50
0.33

185.00
4,459.26

92.50
1,471.56

0.14
1.30
2.00
0.08

194.50
207.80
194.50
196.30

27.23
270.14
389.00
15.70
135.71

27.23
270.14
389.00
15.70
110.40
289.80
2,608.24

356.25
3,206.23

0.60
7.00

339.73
34.90

203.84
244.30

0.50
0.33

185.00
3,462.14

92.50
1,142.50

0.14
1.30
2.00
0.08

194.50
207.80
194.50
196.30

27.23
270.14
389.00
15.70

[Chapter -12](Page-218)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iii) In cement mortar (1:5)
Unit = cum
a) Material
Stone for CR masonry 2nd sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Spall/blasted rubble
cum
Cement mortar (Rate same as in item 12.1 cum
III)
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iv) In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for CR masonry 2nd sort
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Spalls/blasted rubbles
cum
Cement lime mortar (Rate as in item 11.5 III) cum
b)

Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
III. Random rubble masonry
(i) In cement mortar (1:3)
Unit = cum
a) Material
Stone for RR masonry
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement mortar (Rate as in item 11.5 I)
cum

PMGSY SOR 13-14

b)

Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
Bhisti
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b)

c)

OH & Contractor's profit @ 12.5% on (a+b)


Rate per cum = a+b+c+d
PanchayatR B Circle-2,Rajkot

day
day
day
day

Rate
(Rs.)
6

Amount
(Rs.)
7
119.26
313.06
2,817.54

0.60
7.00

339.73
34.90

203.84
244.30

0.50
0.33

185.00
2,925.22

92.50
965.32

0.14
1.30
2.00
0.08

194.50
207.80
194.50
196.30

27.23
270.14
389.00
15.70
110.40
289.80
2,608.24

0.60
7.00

339.73
34.90

203.84
244.30

0.50
0.33

185.00
4,207.64

92.50
1,388.52

0.14
1.30
2.00
0.08

194.50
207.80
194.50
196.30

27.23
270.14
389.00
15.70
131.56
345.35
3,108.14

1.00
7.00

339.73
34.90

339.73
244.30

0.33

4,459.26

1,471.56

0.12
1.20
1.80
0.08

194.50
207.80
194.50
196.30

23.34
249.36
350.10
15.70
134.70
353.60
3,182.39

[Chapter -12](Page-219)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
(ii) In 1:4 cement mortar
Unit = cum
a) Material
Stone for RR masonry
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement mortar (Rate same as in item 11.5 II) cum
b)

Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent of cost of
material (a) and labour (b) 5% on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iii) In cement mortar (1:5)
Unit = cum
a) Material
Stone for RR masonry
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement mortar (Rate same as in item 12.1 cum
III)
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(iv) In cement lime mortar (1:0.5:4.5)
Unit = cum
a) Material
Stone for RR masonry
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement lime mortar (Rate as in item 11.5 III) cum
b)

12.5

800

Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
Plain/reinforced cement concrete in substructure
complete as per drawings and technical
specification Clauses 802, 804, 805, 806, 807,
1202 ans 1204

Rate
(Rs.)

Amount
(Rs.)

1.00
7.00

339.73
34.90

339.73
244.30

0.33

3,462.14

1,142.50

0.12
1.20
1.80
0.08

194.50
207.80
194.50
196.30

23.34
249.36
350.10
15.70
118.25
310.41
2,793.70

1.00
7.00

339.73
34.90

339.73
244.30

0.33

2,925.22

965.32

0.12
1.20
1.80
0.08

194.50
207.80
194.50
196.30

23.34
249.36
350.10
15.70
109.39
287.16
2,584.41

1.00
7.00

339.73
34.90

339.73
244.30

0.33

4,207.64

1,388.52

0.12
1.20
1.80
0.08

194.50
207.80
194.50
196.30

23.34
249.36
350.10
15.70
130.55
342.70
3,084.31

For height upto 5 m


Unit = cum
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -12](Page-220)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

I.

3
P.C.C grade M 15
(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason (1st Class0
Mazdoor (Unskilled)
Bhisti
c) Machinery
Concrete mixer 0.4/0.28 cum capacity

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

t
cum
cum
cum
cum

0.275
0.48
0.48
0.24
0.08

7,670.20
332.31
502.05
627.05
597.05

2,109.31
159.51
240.98
150.49
47.76

day
day
day
day

0.08
0.10
1.63
0.27

194.50
207.80
194.50
196.30

15.56
20.78
317.04
53.00

hour

0.40

190.00

76.00

d)

II.

PMGSY SOR 13-14

Formwork @ 10% on cost of material,


labour and machinery (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e+f
(ii) Nominal mix 1:2.5:5 (Hand mixing)
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Formwork @ 10% on (a+b)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d+e
P.C.C. grade M 20
(i) Nominal mix (1:2:4)
Unit = cum
a) Material
Cement
t
Sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Formwork @ 10% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e+f
PanchayatR B Circle-2,Rajkot

319.04
438.68
3,948.16

0.275
0.48
0.48
0.24
0.08

7,670.20
332.31
502.05
627.05
597.05

2,109.31
159.51
240.98
150.49
47.76

0.09
0.10
2.00
0.27

194.50
207.80
194.50
196.30

17.51
20.78
389.00
53.00
318.83
438.40
3,945.57

0.33
0.45
0.36
0.36
0.18

7,670.20
332.31
502.05
627.05
597.05

2,531.17
149.54
180.74
225.74
107.47

0.08
0.10
1.63
0.27

194.50
207.80
194.50
196.30

15.56
20.78
317.04
53.00

0.40

190.00

76.00
367.70
505.59
4,550.32

[Chapter -12](Page-221)

Sr.
No.
1

Ref.
MORD
Specifn
2

Note:

Description

3
4
(ii) Nominal mix 1:2:4 (Hand mixed)
Unit = cum
a) Material
Cement
t
Sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Formwork @ 10% on (a+b+c)
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d+e
III. R.C.C grade M 20
Unit = cum
a) Material
Cement
t
Coarse sand
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Formwork @ 10% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = (a+b+c+d+e+f)
IV. R.C.C. grade M 25
Unit = cum
a) Material
Cement
t
Coarse sand
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Formwork @ 10% on (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e+f
1 For height above 5 m upto 10 m same as above
with following changes:

a.

PMGSY SOR 13-14

Unit Quantity
5

Rate
(Rs.)

Amount
(Rs.)

0.33
0.45
0.36
0.36
0.18

7,670.20
332.31
502.05
627.05
597.05

2,531.17
149.54
180.74
225.74
107.47

0.09
0.10
2.00
0.27

194.50
207.80
194.50
196.30

17.51
20.78
389.00
53.00
367.49
505.30
4,547.73

0.35
0.45
0.54
0.36

7,670.20
332.31
627.05
597.05

2,684.57
149.54
338.61
214.94

0.08
0.12
1.73
0.27

194.50
207.80
194.50
196.30

15.56
24.94
336.49
53.00

0.40

190.00

76.00
389.36
535.38
4,818.38

0.404
0.45
0.54
0.36

7,670.20
332.31
627.05
597.05

3,098.76
149.54
338.61
214.94

0.08
0.12
1.73
0.27

194.50
207.80
194.50
196.30

15.56
24.94
336.49
53.00

0.40

190.00

76.00
430.78
592.33
5,330.94

Add 2 per cent of cost of material, labour and


machinery to cater for extra lift.
PanchayatR B Circle-2,Rajkot

[Chapter -12](Page-222)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

b.

2
3

12.6

1000

Unit Quantity

3
The provision of formwork shall be 12 per
cent instead of 10 per cent of cost of material,
labour and machinery

1000

1000

Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c+d
Supplying,
fitting
and
placing
TMT
bar
reinforcement (Fe 415) in substructrue complete
as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202

Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c+d
Supplying, fitting and placing with MS bar
reinforcement (Fe 415) in substructrue complete
as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202
Unit = t
a) Material
MS bars including 5 per cent overlaps and t
wastage
Binding wire
kg

PMGSY SOR 13-14

Supplying, fitting and placing HYSD bar


reinforcement (Fe 415) in substructrue complete
as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202

Unit = t
a) Material
TMT bars including 5 per cent overlaps and t
wastage
Binding wire
kg
b) Labour for cutting, bending, shifting to
site, tying, and placing in position

12.8

Amount
(Rs.)

The cost of formwork has been increased for more


height to account for cost of side support to
formwork.
Extra expenditure on structures which are more
than 5 m height is to cater for cost involved for
approaching the work spot by providing ramp for
use by labour.

Unit = t
a) Material
HYSD bars including 5 per cent overlaps and t
wastage
Binding wire
kg
b) Labour for cutting, bending, shifting to
site, tying, and placing in position

12.7

Rate
(Rs.)

PanchayatR B Circle-2,Rajkot

1.05 44,200.60

46,410.63

6.00

58.00

348.00

0.34
2.00
6.50

194.50
207.80
194.50

66.13
415.60
1,264.25
6,063.08
54,567.69

1.05 48,200.60

50,610.63

6.00

58.00

348.00

0.34
2.00
6.50

194.50
207.80
194.50

66.13
415.60
1,264.25
6,588.08
59,292.69

1.05 42,200.60

44,310.63

6.00

58.00

348.00

[Chapter -12](Page-223)

Sr.
No.
1

12.9

12.10

Ref.
MORD
Specifn
2

600

1200

Description

b)

3
Labour for cutting, bending, shifting to
site, tying, and placing in position

Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c+d
Providing weepholes in brick masonry/stone
masonry, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC pipe
extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7
Unit = Nos
Taking output = 30 Nos
a) Material
AC pipe 100 mm dia including wastage @ 5 m
per cent. Average length of weep hole is
taken as one metre for the purpose of
estimating
MS clamps
Nos.
Cement mortar 1:3 (For rate refer to item cum
11.5 I)
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 30 Nos = (a+b+c+d)
Rate per No = (a+b+c+d)/30
Backfilling behind abutment, wing wall and return
wall complete as per drawings & technical
specification Clause 1204.3.8

I)

Unit = cum
Taking output = 10 cum
Granular material
a) Material
Granular material
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 10 cum of granular backfill =
a+b+c+d

Rate per cum = (a+b+c+d)/10


II) Sandy material
Unit = cum
Taking output = 10 cum
a) Material
Sand
PMGSY SOR 13-14

Unit Quantity

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

0.34
2.00
6.50

194.50
207.80
194.50

66.13
415.60
1,264.25
5,800.58
52,205.19

31.50

42.70

1,345.05

30.00
0.05

45.00
4,459.26

1,350.00
222.96

0.03
0.50
0.25

194.50
207.80
194.50

5.84
103.90
48.63
384.55
3,460.92
115.36

12.00

201.89

2,422.68

0.28
10.00
0.40

194.50
194.50
196.30

54.46
1,945.00
78.52
562.58
5,063.24
506.32

cum

12.00

332.31

3,987.72

[Chapter -12](Page-224)

Sr.
No.
1

12.11

12.12

Ref.
MORD
Specifn
2

1200

1200

Description

Unit Quantity

3
4
Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 10 cum of sand backfill = a+b+c+d
Rate per cum = (a+b+c+d)/10
Providing and laying filter media with granular
crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
wall and providing over the entire surface behind
abutment, wing wall, return wall to the full
height, compacted to firm condition complete as
per drawing and technical specification Clause
1204.3.8
b)

Rate
(Rs.)

Amount
(Rs.)

0.40
10.00
0.40

194.50
194.50
196.30

77.80
1,945.00
78.52
761.13
6,850.17
685.02

12.00

948.89

11,386.68

0.40
9.00
1.00
0.50

194.50
194.50
199.90
196.30

77.80
1,750.50
199.90
98.15
1,689.13
15,202.16
1,520.22

day
day
day

0.06
1.00
0.50

194.50
194.50
199.90

11.67
194.50
99.95

Nos.

1.00 38,500.00

38,500.00

Unit = cum
Taking output = 10 cum
a) Material
Filter media as per specification
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
Bhisti
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for 10 cum of filter media = a+b+c+d
Rate per cum = (a+b+c+d)/10
Supplying, fitting and fixing in position true to line
and level elastomeric bearing conforming to
IRC:83 (Part-II) Section IX complete, including all
accessories as per drawings and technical
specification Clause 1207.1
Unit = cubic centimetre
Considering an elastomeric bearing of size 500 x
400 x 96 mm for this analysis,
Overall volume = 19200 cu.cm
Volume of 6 Nos 488x388x4 mm size reinforcing
steel plates = 4545 cu.cm.
Hence volume of elastomer = 14655 cu. cm.
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor Skilled
b) Material
Elastomeric bearing assembly consisting of 7
internal layers of elastomer bonded to 6 nos.
internal reinforcing steel laminates by the
process of vulcanisation, complete with all
components as per drawing and technical
specification

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -12](Page-225)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
Add for anchorage bolts if required and
consumables @ 1 per cent on (a+b)

Rate
(Rs.)
6

c) OH & Contractor's profit @ 12.5% on (a+b)


Cost for 19200 cu.cm. of elastomeric bearing =
a+b+c+d

Amount
(Rs.)
7
388.06
4,899.27
44,093.45

Rate per cu.cm of elastomeric bearing =


(a+b+c+d)/19200

2.30

Note: For such type of manufactured item, the overhead cost


is taken as 30 per cent instead of 20 per cent
12.13

600

Providing PCC M-20 architectural coping on the


top of wing wall, return wall etc. complete as per
drawing and technical specification Clauses 615,
710 and 1204.3.11
Unit = Running m
Taking output = 1 m
Assume wall thickness = 345 mm
Projection of the coping will be 25 mm wide on
both side of the wall = 345 + 50 = 395 mm
Quantity = 1 x 0.395 x 0.150 = 0.059
PCC M-20 Grade (1:2:4) Nominal Mix
As per item No. 12.5 (II)(i)
cum
Add 10 per cent extra of cost of (a) being
architectural coping

12.14

1200

4,550.32

Cost of 1 m = a
Rate per m = a
Providing pressure relief pipes 100 mm dia in
bottom slab of box cell on a filter media base of
500 mm x 500 mm as per drawing and technical
specification Clause 1205.5.7
Unit = Nos
a) Material
AC pipe 100 mm dia i/c wastage of 5 per cent m
600 mm long upto the bottom of levelling
course
Filter media base with stone aggregate 0.5 m cum
x 0.5 m area 1 m deep
b)

Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
c) OH & Contractor's profit @ 12.5% on (a+b)
Rate per No = (a+b+c+d)

PMGSY SOR 13-14

0.059

PanchayatR B Circle-2,Rajkot

268.47
26.85
268.47
268.47

0.63

42.70

26.90

0.25

948.89

237.22

0.031
0.016
0.80

194.50
207.80
194.50

6.03
3.32
155.60
53.63
482.71

[Chapter -12](Page-226)

Chapter 13
SUPERSTRUCTURE
Sr.
No.

Ref.
MORD
Specifn

1
13.1

2
800

Description
3
Providing and laying reinforced cement concrete
in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5

Unit Quantity
4

I. R.C.C grade M 20
(i) For nominal mix 1:2:4
Unit = cum
a) Material
Cement
t
0.35
Coarse sand
cum
0.45
20 mm aggregate
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.08
Mason (1st Class)
day
0.12
Mazdoor (Unskilled)
day
1.73
Bhisti
day
0.27
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
d) Add for formwork and staging
Height upto 5 m @ 20% of (a+b+c)
e) Overhead & contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
(ii) For nominal mix 1:2:4 (Hand mixed)
Unit = cum
a) Material
Cement
t
0.35
Coarse aggregate
cum
0.45
20 cum aggregates
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.09
Mason (1st Class)
day
0.10
Mazdoor (Unskilled)
day
2.00
Bhisti
day
0.27
c) For formwork and staging add the
following percentage of (a+b)
Height upto 5 m @ 20 per cent of (a+b)
Height from 5 m to 10 m @ 25 per cent of (a+b)
Height above 10 m @ 30 per cent of (a+b)
d) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
(iii) For design mix RCC M 20
a) Material
Cement
t
0.33
Coarse sand
cum
0.45
20 mm aggregate
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.08
Mason (1st Class)
day
0.12
Mazdoor (Unskilled)
day
1.73
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

7,670.20
332.31
627.05
597.05

2,684.57
149.54
338.61
214.94

194.50
207.80
194.50
196.30

15.56
24.94
336.49
53.00

190.00

40.00
771.53
578.65
5,207.81

7,670.20
332.31
627.05
597.05

2,684.57
149.54
338.61
214.94

194.50
207.80
194.50
196.30

17.51
20.78
389.00
53.00
773.59
580.19
5,221.72

7,670.20
332.31
627.05
597.05

2,531.17
149.54
338.61
214.94

194.50
207.80
194.50

15.56
24.94
336.49

[Chapter -13](Page-227)

Sr.
No.

Ref.
MORD
Specifn

Description

Unit Quantity

3
4
5
Bhisti
day
0.27
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
d) For formwork and staging add the
following percentage of (a+b+c):
Height upto 5 m @ 20 per cent
e) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d+e
Note:
Height from 5 m to 10 m @ 25 per cent
Height above 10 m @ 30 per cent
II. R.C.C M 25
Unit =cum
a) Material
Cement
t
0.40
Coarse sand
cum
0.45
20 mm aggregate
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.08
Mason (1st Class)
day
0.12
Mazdoor (Unskilled)
day
1.73
Bhisti
day
0.27
e) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
d) For formwork and staging refer to subitem (c) of I (ii) above
e) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d+e+f

Rate
(Rs.)
6
196.30
190.00

PanchayatR B Circle-2,Rajkot

53.00
76.00

7,670.20
332.31
627.05
597.05

3,068.08
149.54
338.61
214.94

194.50
207.80
194.50
196.30

15.56
24.94
336.49
53.00

190.00

76.00
773.59
631.34
5,682.08

t
cum
cum
cum

0.43
0.45
0.54
0.36

7,670.20
332.31
627.05
597.05

3,298.19
149.54
338.61
214.94

day
day
day
day

0.08
0.12
1.73
0.27

194.50
207.80
194.50
196.30

15.56
24.94
336.49
53.00

hour

0.40

190.00

76.00
1,480.93

e) Overheads & contractor's profit @ 12.5% on (a+b+c)


Rate per cum = a+b+c+d+e

PMGSY SOR 13-14

748.05
561.03
5,049.31
935.06

Note: This analysis will hold good for concrete of nominal mix
1:1:3 also

III. R.C.C. Grade M 30


Unit =cum
a) Material
Cement
Sand
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
Bhisti
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
d) For formwork and staging refer to subitem (d) of I (II) above

Amount
(Rs.)

748.52
6,736.71

[Chapter -13](Page-228)

Sr.
No.
1

13.2

13.3

13.4

Ref.
MORD
Specifn
2

Note:

Description

Unit Quantity

3
of cement provided for various
components of the superstructure is for estimating
purpose only. Actual quantity of cement will be as
per approved mix design. Similarly quantity for
corase and fine aggregates is for estimating
purpose and the exact quantity shall be as per the
mix design use of design mix in place of nominal
mix of concrete of M 20 and higher grader shall be
prepared. Nominal mix of grades M 20 and M 25 is
to be used with adequate supervision and quality
control requirements Clause 803 technical
specificatiosn
2 For higher grades like M 25 and M 30, if adopted,
design mix is recommended.

1 Quantity

1000 Supplying, fitting, and placing HYSD bar


reinforcement in superstructure complete as per
drawing and technical specifications Clauses
1002, 1010 and 1202
Unit = t
a) Material
HYSD bars including 5 per cent for laps and wast
Binding wire
kg
b) Labour for cutting, bending, tying and
placing in position
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c
1000 Supplying, fitting, and placing TMT bar
reinforcement in superstructure complete as per
drawing and technical specifications Clauses
1002, 1010 and 1202
Unit = t
a) Material
TMT bars including 5 per cent for laps and wastt
Binding wire
kg
b) Labour for cutting, bending, tying and
placing in position
Mate
day
Blacksmith
day
Mazdoor (Unskilled)
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c
1000 Supplying,
fitting,
and
placing
MS
bar
reinforcement in superstructure complete as per
drawing and technical specifications Clauses
1002, 1010 and 1202
Unit = t
a) Material
MS bars including 5 per cent for laps and wasta t
Binding wire
kg

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

Amount
(Rs.)

1.05 44,200.60
8.00
58.00

0.44
3.00
8.00

46,410.63
464.00

194.50
207.80
194.50

85.58
623.40
1,556.00
6,142.45
55,282.06

1.05 48,200.60
8.00
58.00

50,610.63
464.00

0.44
3.00
8.00

194.50
207.80
194.50

85.58
623.40
1,556.00
6,667.45
60,007.06

1.05 42,200.60
8.00
58.00

44,310.63
464.00

[Chapter -13](Page-229)

Sr.
No.

Ref.
MORD
Specifn

13.5

13.6

800

800

Description

b)

3
Labour for cutting, bending, tying and
placing in position

Unit Quantity
4

Amount
(Rs.)

Mate
day
0.44
194.50
Blacksmith
day
3.00
207.80
Mazdoor (Unskilled)
day
8.00
194.50
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per t = a+b+c
Providing and laying cement concrete wearing
course M 30 grade including reinforcement
complete as per drawing and technical
specifications Clauses 800 and 1206.3
Unit = cum
a) Material
Cement
t
0.43
7,670.20
Sand
cum
0.45
332.31
20 mm aggregate
cum
0.54
627.05
10 mm aggregate
cum
0.36
597.05
0.075 46,410.63
HYSD bar reinforcement (Rate as per item 13.2 t
Binding Wire
kg
0.01
58.00
b) Labour
Mate
day
0.10
194.50
Mason (1st Class)
day
0.12
207.80
Mazdoor (Unskilled)
day
3.00
194.50
Bhisti
day
0.27
196.30
Blacksmith
day
0.30
207.80
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
190.00
d) Formwork @ 3% of cost of concrete
e) Overheads & contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
Construction of R.C.C. railing of M 25 grade in
cast-in-situ with 20 mm nominal size aggregate,
true to line and grade, tolerance of vertical
railing post not to exceed 1 in 500, centre-tocentre spacing between vertical posts not to
exceed 2000 mm as per drawing and technical
specifications Clauses 800, 900 and 1208.3
Unit = Runing m
Taking output = 4x12 m
Span = 48 m
a) M 25 grade R.C.C.
No. of vertical posts = (6+1) 4 = 28 nos
Cross-sectional area of vertical post =
Concrete in vertical posts = 0.069 x28x1.00 =
Hand rail in 3 tiers = 3x48 = 144 m
Cross-sectional area = 0.17x0.175 = 0.03 sqm
Concrete in hand rails = 0.03 x 144 = 4.32 cum
Total concrete = 1.932+4.32 = 6.252 cum
cum
b) HYSD bar reinforcement (Rate as per t
item 13.2)
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 48 m = (a+b+c)
Rate per m = (a+b+c)/48

PMGSY SOR 13-14

Rate
(Rs.)

PanchayatR B Circle-2,Rajkot

6.25
4,729.69
1.36 46,410.63

85.58
623.40
1,556.00
5,879.95
52,919.56

3,298.19
149.54
338.61
214.94
3,480.80
0.58
19.45
24.94
583.50
53.00
62.34
76.00
224.48
1,065.79
9,592.15

29,570.00
63,118.46
11,586.06
104,274.51
2,172.39

[Chapter -13](Page-230)

Sr.
No.

Ref.
MORD
Specifn

Description

3
Sub Analysis for Rate of Concrete
a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
Bhisti
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
d) Formwork @ 12%
Total (a+b+c+d)
Note: 1 48 m length is the total linear length adding both
sides of 2x12 m span

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

t
cum
cum
cum

0.40
0.45
0.54
0.36

7,670.20
332.31
627.05
597.05

3,068.08
149.54
338.61
214.94

day
day
day
day

0.08
0.12
1.73
0.27

194.50
207.80
194.50
196.30

15.56
24.94
336.49
53.00

hour

0.40

190.00

76.00
452.54
4,729.69

t
t
t
t

2.946
1.012
0.18
0.15

50,600.60
50,600.60
42,200.60
71,500.00

149,069.37
51,207.81
7,596.11
10,725.00

day
day
day

2.80
30.00
40.00

194.50
207.80
194.50

544.60
6,234.00
7,780.00
10,929.91

2 Quantities of material have been adopted from


standard plans of MORTH vide drawing No SD/202
13.7

1200 Providing fitting and fixing mild steel railing


complete as per drawing and technical
specifications Clause 1208.2
Unit = Runing m
Taking output = 100 m
a) Material
1) IS MC 100=2.806x1.05=2.946 t
2) MS Flats = 0.964x1.05 =1.012 t
3) MS bars = 0.17x1.05=0.18 t
4) MS bolts, nuts and washers
b) Labour
Mate
Blacksmith
Mazdoor (Unskilled)
c) Add 5 per cent of (a) for painting one
shop coat with red oxide primer and
three coats of synthetic enamel paint
and consumables @ 5% on (a)
d) Add for cost of concrete for fixing
vertical post in the preformed recess @ 1
per cent of (a)
e) Add for electricity charges, welding and
drilling equipment, electrodes and other
consumables @ 1 per cent of (a)

f) Overheads & contractor's profit @ 12.5% on (a+b+c+d+e)


Rate per m = (a+b+c+d+e+f)/100

Note: A typical drawing for MS railing has been followed for


estimate purpose. Rate may be worked out as per
design to be followed

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

2,185.98

2,185.98

31,057.35
2,795.16

[Chapter -13](Page-231)

Sr.
No.
1
13.8

13.9

13.10

Ref.
MORD
Specifn

Description

Unit Quantity

2
3
1200 Providing and fixing in position pipe railing
consisting of IS Rolled steel joist posts
designation IS MB 100 (100x75) at 2.5 m interval
and three rows of 50 mm dia steel pipes (light)
including fixing in position on bridge deck
complete as per drawing and technical
specifications Clause 1208.2

600

Amount
(Rs.)

Unit = Running m
Taking output = 2 x 10 m = 20 m
a) Material
i)
Steel posts IS MB 100 (100 x 75)
t
0.13 50,600.60
5 x 2 x 11.5 x 1.1 x 1.05 = 130 kg
ii) 50 mm dia steel pipes
m
60.00
360.00
20 x 3 = 60 m
iii) M.S Bolts, nuts and washers
t
0.05 71,500.00
Add @ 5 per cent of (a) for painting one shop
Add for electricity charges, welding and drilling
b) Labour
Mate
day
0.56
194.50
Blacksmith
day
6.00
207.80
Mazdoor (Unskilled)
day
8.00
194.50
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 20 m steel railing = a+b+c
Rate per metre = (a+b+c+d)/20
Brick masonry work in cement mortar 1:3 in
parapet excluding pointing and plastering as per
drawing and technical specifications Clauses 600,
900 and 1208.4

Unit = cum
a) Material
Bricks
Nos.
500.00
Cement mortar (Rate as in item 11.5 I)
cum
0.24
b) Labour
Mate
day
0.09
Mason 1st Class
day
0.80
Mazdoor (Unskilled)
day
1.60
Bhisti
day
0.20
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
1200 Drainage spouts complete as per drawing and
technical specifications Clause 1209
Unit = 1 No
a) Material
i)
Corrosion resistant structural steel grating
including 5 per cent wastage
ii)
b)

PMGSY SOR 13-14

Rate
(Rs.)

G I pipe 100 mm dia


Labour
For fabrication
Mate
Blacksmith, Welder etc. (Skilled)
Mazdoor (Unskilled)
For fixing in position
PanchayatR B Circle-2,Rajkot

6,578.08
21,600.00
3,575.00
1,587.65
317.53
108.92
1,246.80
1,556.00
4,571.25
41,141.23
2,057.06

4.69
4,459.26

2,345.00
1,070.22

194.50
207.80
194.50
196.30

17.51
166.24
311.20
39.26
493.68
4,443.11

kg

4.00

60.00

240.00

1.00

794.00

794.00

day
day
day

0.02
0.02
0.20

194.50
207.80
194.50

3.89
4.16
38.90

[Chapter -13](Page-232)

Sr.
No.

Ref.
MORD
Specifn

13.11

800

13.12

800

PMGSY SOR 13-14

Description

Unit Quantity

3
4
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Add @ 5 per cent of cost of material and labour (a+b) for
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per m = a+b+c
P.C.C. M 15 ordinary grade (1:2.5:5) levelling
course below approach slab complete as per
drawing and technical specifications Clauses 800
and 1211
(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class0
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
d) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c+d
(ii) Nominal mix 1:2.5:5 (Hand mixing)
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Reinforced Cement Concrete M 25 grade
approach slab including reinforcement and
formwork complete as per drawing and technical
specifications Clauses 800 and 1211
Unit = cum
a) Material
Reinforced cement concrete M 25 grade
Rate as per Item 13.1 II
cum
HYSD reinforcement
Rate per item 13.2
t
Rate per cum = (a)
PanchayatR B Circle-2,Rajkot

Rate
(Rs.)

5
0.01
0.01
0.20
electrodes,

6
194.50
207.80
194.50
gas cutt

Amount
(Rs.)
7

1.95
2.08
38.90
4.49
141.05
1,269.41

0.275
0.48
0.48
0.24
0.08

7,670.20
332.31
502.05
627.05
597.05

2,109.31
159.51
240.98
150.49
47.76

0.08
0.10
1.63
0.27

194.50
207.80
194.50
196.30

15.56
20.78
317.04
53.00

0.40

190.00

76.00
398.80
3,589.23

0.275
0.48
0.48
0.24
0.08

7,670.20
332.31
502.05
627.05
597.05

2,109.31
159.51
240.98
150.49
47.76

0.09
0.10
2.00
0.27

194.50
207.80
194.50
196.30

17.51
20.78
389.00
53.00
398.54
3,586.88

1.00

5,682.08

5,682.08

0.05 55,282.06

2,764.10
8,446.18

[Chapter -13](Page-233)

Sr.
No.
1
13.13

Ref.
MORD
Specifn

Description

Unit Quantity

Rate
(Rs.)

2
3
4
5
6
1200 Providing and laying of an elastomeric slab seal
expansion joint complete as per approved
drawing and approved specifications to be
installed by manufacturer/supplier or their
authorised representative ensuring compliance
to
the
manufacturers
instructions
for
installlation and as per technical specifications
Clause 1207.2.5
Unit = Running m
Taking output = 7.5 m
a) Material
Supply of elastomeric slab seal expansion joint m
7.50 38,500.00
b) Labour
Mate
day
0.04
194.50
Mazdoor (Unskilled)
day
0.70
194.50
Mazdoor (skilled)
day
0.40
199.90
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5

Note: For this specialised item, overhead cost is assumed as


30 per cent

13.14

Amount
(Rs.)
7

288,750.00
7.78
136.15
79.96
36,121.74
325,095.63
43,346.08

1200 Providing and laying of compression seal joint


consisting of steel armoured nosing at two edges
of the joint gap suitably anchored to the deck
concrete and a preformed chloroprene elastomer
or closed cell foam joint sealer compressed and
formed into the joint gap with special adhesive
binder
as
per
drawing,
and
technical
specifications Clause 1207.2.4
Unit = Running m
Taking ourtput = 7.5 m
a) Material
Galvanised angle section 100 mm x 100 mm of 12 kg
mm thickness weldable structural steel as per
IS:2062, 2 Nos. of 7.5 m length each @ 17.7 kg/m
and 5 per cent wastage.

293.00

94.00

1,377.10

Add 5 per cent of cost of above for structural steel


for welding and other incidentals.
Preformed continuous chlorprene elastomer or m
closed cell foam sealing element with high tear
strength, vulcanised in a single operation for the
full length of a joint to ensure water tightness.

7.50

35.00

Labour
Mate
day
0.024
Mazdoor (Skilled)
day
0.20
Mazdoor (Unskilled)
day
0.40
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

262.50

2.63

Add 1 per cent of cost of sealing element for


lubricant-cum-adhesive and other consumables.
b)

27,542.00

194.50
199.90
194.50

4.67
39.98
77.80
3,663.33
32,970.01

[Chapter -13](Page-234)

Sr.
No.

Ref.
MORD
Specifn

Note:

Description

Unit Quantity

3
Rate per m = (a+b+c)/7.5
1 The installation shall be done by the manufacturer
or his authorised representative to the satisfaction
of the Engineer.

Rate
(Rs.)

Amount
(Rs.)

7
4,396.00

94.00

14,100.00

2 The concreting for joining the expansion joint


assembly with the deck has not been included in
this analysis as the same is catered for in the
quantities of R.C.C deck
3 The anchoring bars of the expansion joint assembly
shall be welded to the main reinforement of the
deck.

4 For this specialised item overheads are assumed @


30 per cent
13.15

1200 Providing and laying a buried expansion joint,


covered with 12 mm thick, 200 mm wide
galvanised weldable structrual steel plate as per
IS:2062, placed symmetrical to centre line of the
joint, resting freely over the top surface of the
deck concrete, welding of 8 mm dia, 100 mm
long galvanised nails spaced 300 mm c/c along
the centre line of the plate, as per technical
specifications Clauses 1207.2.3
Unit = Running m
Taking output = 7.5 m
a) Material
Galvanised M.S. plate 200 mm wide 12 mm thick @ kg
94.20 kg/sqm including 5 per cent wastage.

150.00

Add 1 per cent of cost of steel plate for cutting,


welding, consumables and galvanised nails.

141.00

b)

13.16

Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c)/7.5
1200 Filler Joint
I) Providing and fixing 2 mm thick corrugated
copper plate in expansion joint as per
drawing and technical specifications Clause
1207.2.2
Unit = Running m
Taking output = 7.5 m
a) Material
Copper plate - 7.5 m long x 250 mm wide
Area = 7.5 x 0.25 = 1.875 sqm
Weight = 1.875 x 0.002 x 8900 = 33.4 kg.
Wastage @ 2.5% = 0.83 kg.
Total weight = 34 kg
b) Labour

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

kg

0.01
0.25
0.15

194.50
199.90
194.50

1.95
49.98
29.18
1,790.26
16,112.36
2,148.31

34.00

390.00

13,260.00

[Chapter -13](Page-235)

Sr.
No.

Ref.
MORD
Specifn

Description

Unit Quantity

3
4
5
For cutting, bending, carrying and fixing
etc.
Mate
day
0.02
Mazdoor (Unskilled)
day
0.35
Mazdoor (Skilled)
day
0.35
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = (a+b+c)
Rate per m = (a+b+c)/7.5
and
fixing
20
mm
thick
II) Providing
compressible fibre board in expansion joint
complete as per drawing and technical
specifications
Unit = Running m
Taking output = 7.5 m
a) Material
20 mm thick compressible fibre board sqm
7.5 m long and 250 mm deep
Area = 7.5 x 0.25 = 1.875 sqm
Labour
For carrying, placing and fixing
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = a+b+c
Rate per m = (a+b+c+d)/7.5
III) Providing and fixing in position 20 mm thick
premoulded joint filler in expansion joint for
fixed ends of simply supported spans,
covered with sealant complete as per
drawing and technical specifications
Unit = Running m
Taking output = 7.5 m
a) Material
Premoulded joint filler 7.5 m long, 20 mm
sqm
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day
c) Overheads & contractor's profit @ 12.5% on (a+b)
Cost for 7.5 m = (a+b+c+d)
Rate per m = (a+b+c)/7.5
IV) Providing and fillling joint sealing compound
as per drawings and technical specifications
with coarse sand and 6 per cent bitumen by
weight.
Unit = Running m
Taking output = 7.5 m
7.5 m long x 100 mm wide x 10 mm deep recess

Rate
(Rs.)

Amount
(Rs.)

194.50
194.50
199.90

3.89
68.08
69.97
1,675.24
15,077.17
2,010.29

1.875

358.00

671.25

0.01
0.10
0.10

194.50
194.50
199.90

1.95
19.45
19.99
89.08
801.71
106.90

2.25

363.00

816.75

0.01
0.13
0.07

194.50
194.50
199.90

1.95
25.29
13.99
107.25
965.22
128.70

0.008

312.31

2.50

b)

a)

PMGSY SOR 13-14

Material
Sand
Volume = 7.5 x 0.1 x 0.01 = 0.008 cum
PanchayatR B Circle-2,Rajkot

cum

[Chapter -13](Page-236)

Sr.
No.

Ref.
MORD
Specifn

Description

Unit Quantity

Rate
(Rs.)

3
4
5
6
Weight = 0.008 x 1400 = 11.2 kg
Bitumen-11.2 x 0.06 = 0.672 kg
t
0.0007 44,966.00
b) Labour
Mate
day
0.02
194.50
Mazdoor (Skilled)
day
0.50
199.90
Mazdoor (Unskilled)
day
0.10
194.50
c) Overheads & contractor's profit @ 12.5% on (a+b+c)
Cost for 7.5 m with 10 mm depth =a+b+c+d
Rate per m with 1 cm depth = (a+b+c+d)/7.5

Note: For arriving at the final rate for filler joints per m length
and per cm depth of joint filling compound, the rates of
Sr. Nos (i), (ii), (iii) and (iv) shall be added.
13.17

700

600

13.19

600

13.20

800

Random rubble masonry


Rate same as in item 12.4 III (i)
cum
II. Coursed rubble masonry (1st sort)
Rate same as in item 12.4 I (i)
cum
Pointing with cement mortar (1:3) on brickwork
in parapet as per technical specifications Clauses
613.3 and 1208.4

31.48
3.89
99.95
19.45
19.66
176.92
23.59

3,182.39
3,211.66

Rate same as in item 12.2


sqm
Plastering with cement mortar (1:3) 15 mm thick
on brickwork in parapet as per technical
specifications Clauses 613.4 and 1208.4

429.71

Rate same as in item 12.3


sqm
Providing and laying parapet with PCC M 15 as
per drawing & technical specifications Clauses
800 and 1208.4

128.57

I.

13.21

Stone masonry in cement mortar 1:3 for parapet


complete as per drawing and technical
specifications Clauses 700 and 1208.4
I.

13.18

Amount
(Rs.)

Nominal mix 1:2.5:5 (Hand mixing)


Rate same as in item 12.5 I (ii)
cum
II. Nominal mix (1:2.5:5)
Rate same as in item 12.5 I (i)
cum
1200 Providing bituminous wearing coat comprising of
20 mm thick premix carpet with 5 mm thick seal
coat Type B for culverts as per drawing and
technical specifications Clauses 1206.2 and 500

3,945.57
3,948.16

i.

Rate for wearing coat as per item No. 5.9 of sqm


Chapter 5

108.78

ii.

Rate for seal coat Type B as per item No. 5.12 of sqm
Chapter 5

43.34

Note: This type of wearing coat may be adopted where a


cushion is provided over the culvert and the adjoining
road pavement is continued over it.
13.22

1200 Providing bituminous wearing coat comprising of


50 mm thick bituminous macadam overlaid by 20
mm thick premix carpet with 5 mm thick seal
coat Type B

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -13](Page-237)

Sr.
No.

Ref.
MORD
Specifn

Description

i.

Unit Quantity

3
4
Rate for BM layer may be analysed as per item No cum
5.3 of Chapter 5

ii.

13.23

Rate of 20 mm premix carpet wearing course as sqm


per item No.5.9 of Chapter 5
iii. Rate of seal coat Type B as per item No. 5.12 of sqm
Chapter 5
600 Brickwork in arches in cement mortar 1:4
complete including centering and shuttering
excluding pointing and plastering as per drawing
and technical specifications Clauses 606 and
1205.1
Unit = cum
a) Material
Brick 1st class
Nos.
525.00
Cement mortar (1:4) (Rate same as for item cum
0.24
11.5 II)
b) Labour
Mate
day
0.20
Mazdoor (Unskilled)
day
1.60
Mason (1st Class)
day
2.00
Bhisti
day
0.08
c) Add for centering and shuttering @
110% of (a+b)
d) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
Note: 1 In case cement mortar 1:3 is used, rate as in item
11.5 I. will hold good.

Rate
(Rs.)
6
5,285.64

Amount
(Rs.)
7

108.78
43.34

4.69
3,462.14

2,462.25
830.91

194.50
194.50
207.80
196.30

38.90
311.20
415.60
15.70
4,482.02
1,069.57
9,626.16

2 Quantity of bricks for arches will be about 10 per


cent more than that for ordinary brickwork .

3 In case special arch bricks are used, the quantity of


bricks per cum shall be taken as 580 Nos.

4 Rates for spandrel walls shall be taken same as for


brickwork in substructure.

5 Rate for spandrel filling will depend on the filling


material adopted
13.24

700

Coursed rubble stone masonry arch (Ist sort) in


cement
mortar (1:4)
complete including
centering etc. complete as per drawing and
technical specifications Clauses 706 and 1205.1
Unit = cum
a) Material
Stone for CR masonry 1st sort
cum
Through and bond stone (7 Nos 0.24x0.24x0.39Nos.
Cement mortar (Rate as in item 11.5 II)
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

1.10
7.00
0.30

339.73
34.90
3,462.14

373.70
244.30
1,038.64

0.25
3.00
2.10
0.08

194.50
207.80
194.50
196.30

48.63
623.40
408.45
15.70

[Chapter -13](Page-238)

Sr.
No.

Ref.
MORD
Specifn

Note:

Description

Unit Quantity

3
4
5
Add for centering and shuttering @ 100
% of (a+b)
d) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d
1 In case cement mortar 1:3 is used, rate for the
same shall be as per item 11.5 I.
c)

Rate
(Rs.)
6

Amount
(Rs.)
7
2,752.82
688.21
6,193.85

2 The addition for centering and sluttering at (c)


above is for arch above 6 m span. For lesser span
length the addition shall be 80 per cent for span
above 4 m length and 50 per cent for spans less
than 4 m.
13.25

800

PMGSY SOR 13-14

Providing & Laying reinforced cement concrete


arch complete including centering and shuttering
excluding reinforcement as per drawings and
technical specifications Clauses 800, 900 and
1205.1
Unit = cum
I. RCC grade M20 (1:2.4) nominal mix
a) Material
Cement
t
0.35
Coarse sand
cum
0.45
20 mm aggregate
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.08
Mason (1st Class)
day
0.20
Mazdoor (Unskilled)
day
1.80
Bhisti
day
0.27
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
d) Add for cost of centering and shuttering
e) Overheads & contractor's profit @ 12.5% on (a+b+c=d)
Rate per cum = a+b+c+d+e
II. RCC Grade M 25
a) Material
Cement
t
0.40
Coarse sand
cum
0.45
20 mm aggregate
cum
0.54
10 mm aggregate
cum
0.36
b) Labour
Mate
day
0.08
Mason (1st Class)
day
0.20
Mazdoor (Unskilled)
day
1.80
Bhisti
day
0.27
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
d) Add for cost of centering and shuttering
e) Overheads & contractor's profit @ 12.5% on (a+b+c)
Rate per cum = a+b+c+d+e+f

PanchayatR B Circle-2,Rajkot

7,670.20
332.31
627.05
597.05

2,684.57
149.54
338.61
214.94

194.50
207.80
194.50
196.30

15.56
41.56
350.10
53.00

190.00

76.00
1,961.94
735.73
6,621.54

7,670.20
332.31
627.05
597.05

3,098.76
149.54
338.61
214.94

194.50
207.80
194.50
196.30

15.56
41.56
350.10
53.00

190.00

76.00
2,169.03
813.39
7,320.49

[Chapter -13](Page-239)

Sr.
No.
1

13.26

Ref.
MORD
Specifn
2

Note:

Description

Unit Quantity

3
The additional cost of centering and shuttering @
50 per cent of cost of material and labour shall hold
good for arch spans of 6 m and above. For lesser
length of spans, the corresponding additional cost
can be taken as 40 per cent for spans above 4 m
length and 30 per cent for spans less than 4m.

Rate
(Rs.)

Amount
(Rs.)

1200 Providing steel R.S.Js/built-up steel sections


including cutting, welding/rivetting, hoisting,
fixing in position for composite girders with
shear connectors complete with painting as per
drawing and technical specifications Clause
1205.6
A) Steel section
Unit = quintal
Taking output for a typical 6 m long built up
section comprising of of R.S.Js, with connecting
plates with shear connectors
a)

Material
R.S.Js 350 m x 200 mm @ 56.9 kg/m
6.0 m x 56.9 kg = 341.4 kg
Add 5 per cent for wastage = 17.87 kg
Total = 358.47 kg
25 cm wide x 12 mm thick plate
4x6x8.25 = 565.25 kg
Wastage 5 per cent = 28.3 kg
Total = 593.54 kg
Add shear connectors @ 10% = 59 kg
Total = 358.47 +593.5+59 =
1011 kg
Steel fabricated section
q
Rivets 22 mm dia = 240 Nos
Wastage @ 5 per cent = 12 Nos
Total = 252 Nos
Quantity of rivetting @ 1.8 kg per 10 rivets = q
45.35 kg

10.11

5,060.06

51,157.21

0.454

7,150.00

3,246.10
2,720.17

Add 5 per cent of cost of material for painting


one shop coat with red oxide primer and three
coats of synthetic enamel and consumables
b)

Note:

PMGSY SOR 13-14

Labour
Fitter
day
6.00
Blacksmith
day
6.00
Mazdoor (Unskilled)
day
12.00
c) Overheads & contractor's profit @ 12.5% on (a+b+c)
Cost for 10.11 q = a+b+c
Rate per quintal = (a+b+c+d)/10.11
i) In case of welded section, welding charges per cm
length of welding shall substitute cost of rivetting

PanchayatR B Circle-2,Rajkot

196.30
207.80
194.50

1,177.80
1,246.80
2,334.00
7,735.26
69,617.33
6,885.99

[Chapter -13](Page-240)

Sr.
No.

Ref.
MORD
Specifn

Description
3

ii) Shear connectors should always be welded to the

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

top flange

iii) The analysis of R.C.C. deck slab for the composite


girder to be adopted from the item 13.1 of concrete
superstructure

iv) In the analysis of deck slab for composite girder


superstructure, the component of formwork for the
same shall be 20 per cent of cost of materials,
labour and machinery for deck slab.

v) For spans upto 6 m with height above 5 m extra


labour of mazdoor @ 3.0 days per quintal may be
added
vi) For higher span lengths of different heights
following additional labour for erection of steel
girders on pier/abutment caps may be provided:
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
However, it is preferable to analyse the cost of
erection of composite girder type of superstructure
for required span range and height range with a
project - specific methodology.

0.01
0.06
0.24

194.50
199.90
194.50

1.95
11.99
46.68

vii) The provision of 10 per cent for shear connectors in


the typical case is tentative. The quantity shall be
worked out as per design.

viii) The cost of painting can also be analysed in detail


in accordance with item 10.6 of Chapter 10

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -13](Page-241)

Chapter 14
PROTECTION WORKS
Sr.
No.
1
14.1

Ref.
Description
MORD
n
Specif
2
3
1300 Providing and laying boulder apron for bed
protection with stone boulders of minimum size
and weight as per Table 1300.1, no fragment
weighing less than 25 kg laid dry complete as per
drawing and technical specifications Clause 1301

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Unit = cum
a) Material
Stone boulder (25 kg minimum)
cum
Stone spalls
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c

1.00
0.20

185.00
274.73

185.00
54.95

0.04
0.35
0.75

194.50
207.80
194.50

7.78
72.73
145.88
58.29
524.62

cum
cum
kg

5.63
1.13
64.00

185.00
274.73
92.00

1,041.55
310.44
5,888.00

day
day
day

0.18
1.50
3.00

194.50
199.90
194.50

35.01
299.85
583.50
18.37

Note: Nominal excavation required for preparation of bed has


been taken into account while making provisions for
labour.
14.2

1300 Providing and laying of boulder apron laid in wire


crates with 4 mm dia GI wire conforming to IS:280
and IS:4826 in 100 mm x 100 mm mesh (woven
diagonally) including 10 per cent extra for laps and
joints laid with stone boulders weighing not less
than 25 kg each as per drawing and technical
specifications Clause 1301
Unit = cum
Taking ouput = 3 m x 1.5 m x 1.25 m = 5.63 cum
a)

b)

Note:

Material
Stone boulder (25 kg minimum)
Stone spalls
GI wires 4 mm dia @ 32 kg/10 sqm
Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Add for labour for weaving the wire crates @ 2
per cent of cost of GI wire

c)
OH & Contractor's profit @ 12.5% on (a+b)
Cost for 5.63 cum = a+b+c+d
Rate per cum = (a+b+c)/5.63
1 Nominal cost of trimming for preparation of bed has
been included in the cost of labour

1,022.09
9,198.81
1,633.89

2 The analysis will by & large hold good for gabions

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -14](Page-242)

Sr.
No.
1
14.3

Ref.
Description
MORD
n
Specif
2
3
1300 Providing and laying of apron with cement concrete
blocks of size as per Table 1300.1 cast-in-situ and
made with nominal mix of M-15 grade cement
concrete
as
per
drawing
and
technical
specifications Clause 1301

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Unit = cum
a) Concrete grade M 15
(Rate as per item No 11.4 II (i)
cum
Add 2 per cent of cost to account for excavation for
preparation of bed, nominal surface reinforcement
and filling of granular material in recesses between
blocks.
14.4

1.00

3,732.80

Rate per cum = (a)


1300 Single bamboo palasiding / walling of whole 2nd
class bamboo (Jati or Bethua) 75mm dia and
closely packed & driven including fitting fixing with
half bamboo kamis horizontally in three rows with
cane or tying with wire complete and struts 1.5 m
apart longitudinally and providing brush wood as
per drawing and technical specifications Clause
1302.5
A) Driven at least 900 mm below ground and 1200 mm
above ground
Unit = Running metre
Taking Output = 3.00 metre
a) Materials
2nd Class Bamboo 65 mm to 75 mm dia, (1.2 m nos.
to 3.0 m)

B)

Binding Wire
kg
Brush Wood (LS Rs.10.00)
LS
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries (LS Rs.5.00)
LS
d) OH & Contractor's profit @ 12.5% on(a+b+c)
Cost for 3 metre = a+b+c+d+e
Rate per metre = (a+b+c+d) / 3.00
Driven at least 900 mm below ground and 900 mm
above ground on average
a)

Materials
2nd Class Bamboo 65 mm to 75 mm dia, (1.8 m-nos.
2.5 m) long

Binding Wire
kg
Brush Wood (LS Rs.10.00)
LS
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3 m = a+b+c+d
Rate per m = (a+b+c+d) / 3.00
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

3,732.80
74.66

3,807.46

15.00

45.00

225.00

0.15

58.00

0.02
10.00

0.04
1.00

194.50
194.50

0.00
1.00
5.00
30.13
271.15
90.38

14.00

25.00

196.00

0.15

58.00

0.02
10.00

0.04
1.00

194.50
194.50

0.00
1.00
5.00
26.50
238.53
79.51

[Chapter -14](Page-243)

Sr.
No.
1
14.5

Ref.
Description
MORD
n
Specif
2
3
1300 Providing and laying pitching on slopes laid over
prepared filter media as per drawing and technical
specifications Clause 1302

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

I.

Stone/Boulder
Unit = cum
a) Material
Stone boulder (25 kg minimum)
cum
Stone spalls of minimum 25 mm size
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
c)
OH & Contractor's profit @ 12.5% 15% on (a+b)
Rate per cum = (a+b+c)
II. Cement concrete blocks of size as per Table
1300.2 cast in cement concrete of grade M 15
a)

14.6

Concrete grade M 15
(Rate as per item No. 11.4 II (i)except that the cum
size of aggregate shall be 20 mm & down

Add 2 per cent of cost to account for surface


Rate per cum = (a)
III. Brick pitchng set in cement mortar 1:4
Unit = cum
a) Material
Bricks
Nos.
Cement mortar 1:4 (Rate as in item 11.5 II)
cum
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = (a+b+c)
1300 Providing and laying filter material underneath
pitching in slopes complete as per drawing and
technical specifications Clause 1302
Unit = cum
a) Material
Graded stone aggregate of required size
cum
b) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c

Note: Labour cost includes labour required for trimming of slope


to proper profile and preparation of bed.
14.7

1.00
0.20

185.00
274.73

185.00
54.95

0.04
0.35
0.75

194.50
207.80
194.50

7.78
72.73
145.88
58.29
524.62

1.00

3,732.80

3,732.80

74.66
3,807.46

500.00
0.24

4.69
4,173.88

2,345.00
1,001.73

0.10
0.80
1.60
0.20

194.50
207.80
194.50
196.30

19.45
166.24
311.20
39.26
485.36
4,368.24

1.20

446.81

536.17

0.05
0.25
1.02

194.50
199.90
194.50

9.73
49.98
198.39
99.28
893.54

1300 Providing and laying flooring laid over cement


concrete bedding complete as per drawing and
technical specification Clause 1303
I. Rubble stone laid in cement mortar 1:3

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -14](Page-244)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

3
4
Unit = cum
a) Material
i.
Cement mortar (1:3) (For rate refer to item cum
11.5 (I)
Add for cement concrete bedding (M 10) cum
ii.
nominal mix) (For rate refer to item 11.4 I (i)
*
Quantity shall be adopted as per design.
Add 1 per cent of cost to account for excavation
for preparation of bed
iii.
iv.
b)

Stone for rubble flooring 150 mm thick


cum
Stone spalls
cum
Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
c)
OH & Contractor's profit @ 12.5% on (i+ii+iii+a+b)
Rate per cum = a+b+c

0.33

4,443.11

1,466.23

3,611.23

0.00
14.66

1.00
0.20

185.00
274.73

185.00
54.95

0.08
0.50
1.50

194.50
207.80
194.50

15.56
103.90
291.75
266.51
2,398.55

1.00

3,732.80

3,732.80

3,732.80

0.00

Note: Quantity of cement mortar is inclusive of mortar for laying


and filling of joints.
II. Cement conrete blocks grade M 15
Cement concrete blocks grade M 15
(Rate as per item 11.4 (II) (i)
Add for cement concrete bedding
Rate as per item 11.4 (II) (i)

cum
cum

Quantity shall be adopted as per design.


Add 1 per cent of cost to account for excavation for
preparation of bed.

37.33

Rate per cum


III. Brick on edge laid in cement mortar (1:3)

3,770.13

Unit=cum
a) Material
Bricks
Nos
Cement mortar (1:3) [(Rate as in item 11.5 (i)] cum

14.8

500.00
0.15

4.69
4,459.26

2,345.00
668.89

0.25

2,925.22

731.31

0.10
0.80
1.60
0.20

194.50
207.80
194.50
196.30

19.45
166.24
311.20
39.26
535.17
4,816.51

cum
cum

1.00
0.20

185.00
274.73

185.00
54.95

day

0.10

194.50

19.45

Cement mortar bedding (1:5) [(Rate as in itm cum


12.1 (iii)]
b) Labour
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
1303 Providing and laying of dry rubble flooring
complete
as
per
drawings
and technical
specifications Clause 1303.3
Unit = cum
a) Material
Stone for rubble flooring 150 mm thick
Stone spalls
b) Labour
Mate

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -14](Page-245)

Sr.
No.
1

14.9

Ref.
MORD
Specifn
2

Description

Unit

3
4
Mason 1st Class
day
Mazdoor (Unskilled)
day
Add 1 per cent of (b) for trimming and
preparation of base
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
1300 Providing and laying curtain walls complete as per
drawing and technical specification Clause 1304
Unit = cum
I. Brick masonry in cement mortar (1:4)
(Rate same as per item 11.5 (II)
cum
II. Coursed rubble masonary (2nd sort) in cement
mortar (1:4)

Quantity
5
0.50
1.50

Rate
(Rs.)
6
207.80
194.50

Amount
(Rs.)
7
103.90
291.75
4.15
82.40
741.60

1.00

4,173.88

4,173.88

1.00

2,817.54

2,817.54

1.00

3,611.23

3,611.23

cum
cum

1.00
0.20

185.00
274.73

185.00
54.95

day
day
day

0.05
0.25
1.00

194.50
207.80
194.50

9.73
51.95
194.50
4.96

(Rate same as per item 12.4 II (ii) )


cum
III. Cement concrete grade M 10
(Rate same as per item 11.4 I (i)
cum
Note: 1 Other items like excavation for foundation, filling
behind wall, filter media, weep holes, etc. shall be
added separately as per approved design.

2 For this item, where reference has been made to


items analysed in other Chapters, i.e., 11, 12 & 13,
the overheads shall be taken as 15 per cent instead
of 20 per cent
14.10

14.11

1300 Construction of flexible apron 1 m thick comprising


of loose stone boulders weighing not less then 25
kg beyond curtain wall
Unit = cum
a) Material
Stone boulder
Stone spalls
b) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
Add: 1 per cent of cost of (a+b) for trimming
and preparation of bed

c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
1300 Construction of toe walls for protection of slopes as
per drawing and technical specifications Clause
1302.5
I.

Random rubble masonry in case of stone


pitching laid with cement mortar (1:5)
(iii) In cement mortar (1:5)
Unit = cum
a) Material
Stone for RR masonry
cum
Through and bond stone
Nos.
(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
Cement mortar (Rate same as in item 12.1 III) cum
b)

PMGSY SOR 13-14

62.64
563.72

1.00
7.00

195.00
34.90

195.00
244.30

0.33

2,925.22

965.32

Labour
PanchayatR B Circle-2,Rajkot

[Chapter -14](Page-246)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

c)

Unit

3
4
Mate
day
Mason 1st Class
day
Mazdoor (Unskilled)
day
Bhisti
day
Add for scaffolding @ 5 per cent on (a+b)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c

Quantity

Rate
(Rs.)

Amount
(Rs.)

5
0.12
1.20
1.80
0.08

6
194.50
207.80
194.50
196.30

7
23.34
249.36
350.10
15.70
102.16
429.06
2,574.34

500.00
0.24

4.69
3,441.14

2,345.00
825.87

0.09
0.80
1.60
0.20

194.50
207.80
194.50
196.30

17.51
166.24
311.20
39.26
741.02
4,446.09

0.38
1.05

7,670.20
312.31

2,914.68
327.93

0.04
0.90
0.08

194.50
194.50
196.30

7.78
175.05
15.70
3,441.14

0.250
0.48
0.576
0.288
0.096

7,670.20
332.31
502.05
627.05
597.05

1,917.55
159.51
289.18
180.59
57.32

0.08
0.10
1.63
0.27

194.50
207.80
194.50
196.30

15.56
20.78
317.04
53.00

Note: For height less than 3 m, dry rubble masonry can also be
used. In that case, the sub-item of cement mortar may
be omitted in the analysis.
II. Brick masonry in cement mortar 1:4 in case of
brick pitching

Unit = cum
a) Material
Brick
Nos.
Cement mortar 1:4
cum
Rates as per sub-analysis
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c)
OH & Contractor's profit @ 12.5% on (a+b)
Rate per cum = a+b+c
Sub-analysis
Cement mortar 1:4 (1 cement : 4 sand)
Unit = cum
a) Material
Cement
t
Sand
cum
b) Labour
Mate
day
Mazdoor (Unskilled)
day
Bhisti
day
Total material and labour = (a+b)
III. Cement concrete grade M 10 in case of
concrete block pitching
Unit = cum
I. P.C.C grade M 20
(i) Nominal mix 1:3:6
Unit = cum
a) Material
Cement
t
Coarse sand
cum
40 mm aggregate
cum
20 mm aggregate
cum
10 mm aggregate
cum
b) Labour
Mate
day
Mason (1st Class)
day
Mazdoor (Unskilled)
day
Bhisti
day
c)
Machinery
PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -14](Page-247)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit

3
4
Mechnical concrete mixer 0.4/0.28 cum capacity hour
fitted with water measuring device and
preferably also with load cell.

Quantity
5
0.40

Rate
(Rs.)
6
190.00

Formwork @ 4% on cost of material,


labour and machinery (a+b+c)
e) OH & Contractor's profit @ 12.5% on (a+b+c+d)
Rate per cum = a+b+c+d+e
1300 Single bamboo spur and palisading of whole 2nd
class bamboo (jati or Bethua) 65 mm to 75 mm dia
and closely packed & driven, including fitting,
fixing with half bamboo kamis horrizontally in
three rows with cane or tying wire complete and
struts 1500 mm apart longitudinally and providing
brush wood as per drawing and technical
specifications Clause 1302.5
A)

B)

642.00
3,851.98

Driven at least 900 mm below ground and 1800 mm


above ground on average
Unit = Running metre
Taking output = 3.00 metre
a)
Materials
2nd class bamboo (65 mm to 75 mm dia 3 m
long)
Binding wire
Brush Wood (LS Rs.10.00)
b)
Labour
Mate
Mazdoor (Unskilled)
c)
Sundries
d)
Overheads charges @ 15% on (a+b+c)
Cost for 3 metre = a+b+c+d
Rate per metre = (a+b+c+d+e)/3
Driven at least 900 mm below ground and 900 mm
above ground on average

Nos

18.00

45.00

810.00

Kg.
LS

0.15

58.00

8.70
10.00

day
day
LS

0.04
1.00

194.50
194.50

7.78
194.50
5.00
129.50
1,165.48
388.49

14.00

25.00

350.00

0.15

58.00

8.70
10.00

0.04
1.00

194.50
194.50

7.78
194.50
5.00
72.00
647.98
215.99

Unit = Running metre


Taking output = 3.00 metre
a) Materials
2nd class bamboo (65 mm to 75 mm dia 2 m Nos
long)
Binding wire
Kg.
Brush Wood (LS Rs.10.00)
LS
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3.00 metre = a+b+c+d
Rate per metre = (a+b+c+d)/3

PMGSY SOR 13-14

7
76.00

123.46

d)

14.12

Amount
(Rs.)

PanchayatR B Circle-2,Rajkot

[Chapter -14](Page-248)

Ref.
Description
MORD
n
Specif
1
2
3
14.13 uggestiv Single bamboo spur and palisading of whole 1st
class bamboo (Bholuka or Barua) 85 mm to 100
mm dia. Closely packed & driven including fitting,
fixing with half 2nd class bamboo (jati or Bethua)
horizontally in three rows with cane or tying wire
complete and struts 1500 mm apart longitudinally
and providing brush wood in the spur as per
drawings and technical specifications
Sr.
No.

A)

B)

C)

Quantity

Rate
(Rs.)

Amount
(Rs.)

15.00

50.00

750.00

2.00
0.15

45.00
58.00

90.00
8.70
10.00

0.05
1.20

194.50
194.50

9.73
233.40
5.00
138.35
1,245.18
415.06

10.00
1.50

37.00
25.00

370.00
37.50

0.15

58.00

8.70
10.00

0.04
1.00

194.50
194.50

7.78
194.50
5.00
79.19
712.67
237.56

Nos
Nos

9.00
1.50

37.00
25.00

333.00
37.50

Kg.
LS

0.15

58.00

8.70
10.00

Driven at least 900 mm below ground and 1800 mm


above ground
Unit = Running metre
Taking output = 3.00 metre
a)
Materials
1st class bamboo (85 mm - 100 mm dia) 3.0 Nos
long
2nd class bamboo (85-100 mm dia 3.0 long)
Nos
Binding wire
Kg.
Brush Wood (LS Rs.10.00)
LS
b)
Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3 metre = a+b+c+d
Rate per metre = (a+b+c+d)/3
Driven at least 900 mm below ground and 900 mm
above ground on average
Unit = Running metre
Taking output = 3.00 metre
a) Materials
1st class bamboo (85-100 m dia, 2.0m long)
Nos
2nd class bamboo (85-100 mm dia, 2.0 m long) Nos
Binding wire
Kg.
Brush Wood (LS Rs.10.00)
LS
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3.00 metre = a+b+c+d
Rate per metre = (a+b+c+d)/3.00
Driven at least 600 mm below ground and 1200 mm
above ground on average.
Unit = Running metre
Taking output = 3.00 metre
a) Materials
1st class bamboo (85-100 m dia, 2.0m long)
2nd class bamboo (85-100 mm dia, 2 m long0

b)
PMGSY SOR 13-14

Unit

Binding wire
Brush Wood (LS Rs.10.00)
Labour
PanchayatR B Circle-2,Rajkot

[Chapter -14](Page-249)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit

3
4
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d)
OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3 m = a+b+c+d
Rate per m = (a+b+c+d)/3
14.14 uggestiv Bamboo spur 'A' type with whole bamboo 85mm100mm dia, placed 230 mm centre to centre driven
900 mm below ground and 1200 mm to 1500 mm
above ground tied with 2nd class bamboo (jati or
Bethua) on either side at 450 mm apart
horizontally with galvanised wire etc. complete as
per drawings and technical specifications
A)

Amount
(Rs.)

6
194.50
194.50

14.00

25.00

350.00

2nd class bamboo (85-100 mm dia, 2.5 long)


Nos
Binding wire
Kg.
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3 m = a+b+c+d
Rate per metre = (a+b+c+d)/3
1st class bamboo (Bholuka or Barua ) 85 mm to 100
mm dia
Unit = Running metre
Taking output = 3.00 metre
a)
Materials
1st class bamboo (85-100 mm dia, 2.5 m long) Nos

4.00
0.75

25.00
58.00

100.00
43.50

0.04
1.00

194.50
194.50

7.78
194.50
5.00
87.60
788.38
525.59

7.00

42.00

294.00

2nd class bamboo (85-100 mm dia, 2.5 long)


Nos
Binding wire
Kg.
Brush Wood (LS Rs.10.00)
LS
Labour
Mate
day
Mazdoor (Unskilled)
day
Sundries
LS
OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3 m = a+b+c+d
Rate per metre = (a+b+c+d)/3

4.00
1.00

25.00
58.00

100.00
58.00
10.00

0.06
1.40

194.50
194.50

11.67
272.30
5.00
93.87
844.84
563.23

7.78
194.50
5.00
74.56
671.04
223.68

2nd class bamboo (jati or Bethua) 75 mm dia

b)
c)
d)

PMGSY SOR 13-14

Rate
(Rs.)

5
0.04
1.00

Unit= Running metre


Taking output = 3.00 metre
a) Materials
2nd class bamboo (85-100 mm dia, 2.5 m long) Nos

B)

Quantity

PanchayatR B Circle-2,Rajkot

[Chapter -14](Page-250)

Ref.
Description
MORD
n
Specif
1
2
3
14.15 uggestiv Providing 'A' type single spur with 1st class
bamboo (Bholuka or Barua) 85 mm to 100 mm dia.
Driven closely placed 3m to 4m above ground and
1200 mm to 1500 mm below ground tied with
cane or coir string, half 2nd class bamboo (jati or
Bethua) horizontally on both face placed not more
than one metre apart including whole bamboo
struts inside one metre apart and 2 nos. of purlin at
top and bottom fitted with vertical struts at 1500
mm apart and filling with brushwood or jungle
wood inside the spur complete as per drawing and
technical specifications
Sr.
No.

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Unit= Running metre


Taking output = 3.00 metre
a) Materials
1st class bamboo (85-100 mm dia, 4.5-5.5 m Nos
long)
2nd class bamboo (85-100 mm dia, 3.0 m long) Nos

14.16

Binding wire
Kg.
Brush wood (LS Rs.10.00)
LS
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 3 metre = a+b+c+d
Rate per metre = (a+b+c+d)/3
1300 Providing close bamboo toe walling consisting of
65mm to 75mm dia bamboos of length ranging
from 1.2 m to 3m driven at 150 mm centre to
centre and provided with three horizontal split
bamboo runner fixed with nails. All bamboos to be
duly protected by coal tar painting.
Unit = Running Metre
Taking output = 10.00 running metre
a) Materials
2nd class bamboo (65mm-75mm dia and Nos
average 2.1 m length)
2nd class bamboo (65mm-75mm dia and 3 m Nos
length)
Coal tar
kg
b) Labour
Mate
day
Mazdoor (Unskilled)
day
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% 15% on (a+b+c)
Cost for 10 Running Metre = a+b+c+d
Rate per Sqm = (a+b+c+d)/10

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

15.00

100.00

1,500.00

6.00

45.00

270.00

2.00

58.00

116.00
10.00

0.06
1.50

194.50
194.50

11.67
291.75
5.00
275.55
2,479.97
1,653.32

67.00

45.00

3,015.00

6.00

45.00

270.00

10.00

44.97

449.66

0.06
1.50

194.50
194.50

11.67
291.75
5.00
505.39
4,548.47
454.85

[Chapter -14](Page-251)

Ref.
Description
MORD
n
Specif
1
2
3
14.17 uggestiv Double timber spur with two rows at 800 mm c/c
apart of 1st class local wood piles with timber of
Azar/Nahar/Nageswar / Zarul wood 150 mm to
200 mm dia driven 2000 mm minimum below
ground and 3600 mm above ground average placed
at 800 mm belts, bracings etc. of 100 mm x 75 mm
size 1st class local wood longitudinally &
crosswiswe at ends fitted with 10 mm dia bolts and
nuts etc. including coaltarring of timber members
and cost of necessary bamboo stagings etc. as
directed by the Engineer as per drawing and
technical specifications
Sr.
No.

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Unit =RM
Taking output = 4.00 RM
a) Material
1st class local wood piles 150-200 mm dia, 6m nos
long
1st class local wood (100 mm x 75 mm) for cum
collar, bracing and belt
Nuts and Bolts
Kg
1st Class Bamboo
Nos
2nd class bamboo
Nos
Coir rope
LS
Coal tar
LS
b) Labour
Carpenter 1st Class
Nos
Mate
Nos
Mazdoor (Unskilled)
Nos
c)
Sundries
LS
d) OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 4 RM = (a+b+c+d)
Rate per metre = (a+b+c+d)/4
14.18 uggestiv Supplying and filling up hollows of the timber spur
to an average height of 3600 mm above ground
with jungle wood branches as per drawing and
technical specifications as directed by the
Engineer.
Unit = RM
Taking output = 20.00 RM
a) Labour
Mazdoor (Unskilled)
day
b) Sundries
LS
c)
OH & Contractor's profit @ 12.5% on (a+b+c)
Cost for 20 RM = (a+b+c)
Rate per metre = (a+b+c)/20

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

68.00

6,545.00 445,060.00

0.404 25,000.00

10,100.00

10.00
5.00
5.00

71.50
50.00
45.00

715.00
250.00
225.00
100.00
100.00

1.20
1.20
30.00

207.80
194.50
194.50

249.36
233.40
5,835.00
50.00
57,864.72
520,782.48
######

5.00

194.50

972.50
5.00
122.19
1,099.69
54.98

[Chapter -14](Page-252)

Chapter 15
MAINTENANCE OF ROADS
Sr.
No.
1
15.1

Ref.
Description
MORD
n
Specif
2
3
1900 Restoration of Rain Cuts
i) Restoration of rain cuts with soil, moorum gravel or a
mixture of these, clearing the loose soil, benching for
300mm width laying fresh material in layers not
exceeding 250 mm and compaction with plate
compactor or power rammer to restore the original
alignment, level and slopes as per drawings and
technical specifications Clause 1902
A. Manual Means
Unit = cum
Taking output = 10 cum
a) Labour
Mate
Mazdoor (Unskilled)
b)
Machinery
Plate compactor
c) Materials
Compensation for earth Taken from private land
d)
B.
a)
b.

c.

Unit Quantity
4

1900

1.

0.24
6.00

194.50
194.50

46.68
1,167.00

hour

3.00

310.00

930.00

cum

7.50

17.50

131.25

OH & Contractor's profit @ 12.5% on a+b+c


Cost for 50 cum = a+b+c+d
Rate per cum a+b+c+d/50
Note: Only 75% of fresh material has been provided as 25% can
be retrieved from site from earth i.e. flown down the slop
in the form of slurry and deposited at the foot of rain cuts.
15.2

Amount
(Rs.)

day
day

OH & Contractor's profit @ 12.5% on (a+b)


Cost for 10 cum = a+b+c+d
Rate per cum = a+b+c+d/10
Mechanical Means
Unit = cum
Taking output = 50 cum
Labour
Mate
day
Mazdoor (Unskilled)
day
Machinery
Hydraulic Excavator 0.9 cum bucket capacty @ hour
60 cum/h
Tipper 5.5 cum, 10 t capacity
hour
Add 10% cost of carriage towards loading and
unloading charges
Plate compactor
hour
Materials
Compensation for earth taken from private land cum

d.

Rate
(Rs.)

284.37
2,559.30
255.93

0.40
10.00

194.50
194.50

77.80
1,945.00

0.83

1,400.00

1,162.00

2.27

250.00

567.50
56.75

15.00

310.00

4,650.00

37.50

17.50

656.25
1,139.41
10,254.71
205.09

Maintenance of Earthen shoulder (filling with


fresh selected soil)
Making up loss of material/irregularities on shoulders
to the design level by adding fresh approved selected
soil and compacting it with appropriate equipment at
OMC upto a lead of 1000 m as per technical
specification Clause 1903

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -15](Page-253)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
Unit = sqm
Taking output = 100 sqm
Assuming average thickness of filling to be 150 mm
Quality of fresh material = 15 cum
a.
Labour
Mate
day
Mazdoor (Unskilled)
day
b.
Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ hour
60 cum per hour

2.

Tipper 5.5 cum


hour
Add 10% cost of transportation to cover cost of
loading and unloading
Plate compactor @ 25 sqm per hour
hour
c.
Material
Compensation of earth
cum
d.
OH & Contractor's profit @ 12.5% on a+b+c
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
Maintenance of Earhen shoulder (stripping of
excess soil)

Rate
(Rs.)

Amount
(Rs.)

0.20
5.00

194.50
194.50

38.90
972.50

0.25

1,400.00

350.00

0.68

250.00

170.00
17.00

4.00

310.00

1,240.00

15.00

17.50

262.50
381.36
3,432.26
34.32

0.10
2.50

194.50
194.50

19.45
486.25

4.00

310.00

1,240.00
218.21
1,963.91
19.64

Stripping excess soil from the shoulder surface to


achieve the approved level and compacting with plate
compactor at OMC as per drawings and Technical
Specification Clause 1903
Unit = sqm
Taking output = 100 sqm
Assuming height of stripping as 75 mm
Quantity of earth cutting involved = 7.5 cum
a.
Labour
Mate
day
Mazdoor (Unskilled)
day
b.
Machinery
Plate compactor
hour
c.
OH & Contractor's profit @ 12.5% on a+b
Cost for 100 sqm = a+b+c
Rate per sqm = a+b+c/100
Note: Earth stripped from earthen shoulders to be used as
shoulders or dumped on the side slopes locally for
disposal.
15.3

1900

PMGSY SOR 13-14

Maintenace of bituminous surface road


Repair to pot holes by removal of failed material,
i.
trimming the sides to vertical and levelling the
bottom, cleaning the same with compressed air or
any appropriate method filled with 75mm B.M,
applying bitumen emulsion prime coat at the bottom
and bitumen emulsion tack coat on sides and on
bottom as per technical specifications Clauses 502
and 503
Unit = cum
Taking output = 187.5x0.075 = 14.06 cum = (30.94
Tonne)
(5% area of one km)
PanchayatR B Circle-2,Rajkot

[Chapter -15](Page-254)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

a)
b)

c)

3
Labour
Mate
Mazdoor (Unskilled)
Machinery
Jack hammer 25 kg with tractor
Compressor 210 cfm with tractor
Emulsion pressure distributor
Mixall 6/10 t capacity
Three wheeled 80-100 kN Static Roller
Material
Primer with bitumen emulsion @ 9 kg/10 sqm
187.5x9 = 168.75 kg.

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day

0.80
20.00

194.50
194.50

155.60
3,890.00

hour
hour
hour
hour
hour

4.00
2.00
4.00
4.00
4.00

325.00
300.00
840.00
1,036.20
400.00

1,300.00
600.00
3,360.00
4,144.80
1,600.00

Tonne

0.168 34,096.81

5,728.26

Tack coat with bitumen emulsion @ 3.0 kg/ 10


sqm
Bottom = 187.5
Sides = 28.27
Tonne
Total = 215.77
Bitumen for BM @ 3.5% by weight of mix
Tonne
= 30.94 x 3.5 / 100 = 1.082

0.064 34,096.81

2,182.20

1.082 44,543.81

48,196.40

Weight of mix (BM) 14.06 cum = (30.94 tonne)


Weight of Bitumen = 1.082
Weight of aggregate 30.94 -1.082 = 29.86
Taking density of aggregate 1.5 t per cum
Volume of aggregate 29.86 / 1.5 = 19.90 cum

ii.

Grading (1) (40 mm nominal size)


37.5 - 25 mm 15%
cum
25 - 10 mm 45%
cum
10 - 5 mm 25%
cum
5 mm and below 15%
cum
d)
OH & Contractor's profit @ 12.5% on a+b+c
Cost of 14.06 cum = a+b+c+d
Rate per cum = a+b+c+d/14.06
Patch repair on already filled pot holes with 75 mm
BM with 20 mm premix carpet and seal coat Type B
as per drawings and technical specification Clause
1904.2
Unit = sqm
Takign output = 200 sqm
a)
Labour
Mate
day
Mazdoor (Unskilled)
day
b) Machinery
Mixall 6/10 tonne
hour
Bitumen pressure distributior
hour
Three wheeled 80-100 kN Static Roller
hour
c) Material
Bitumen for pre-mix carpet @ 14.60 kg/10 sqm tonne
200x14.60/10 =292 kg
Bitumen for tack coat @ 2 kg per 10 sqm 200 x tonne
2 / 10 = 40 kg

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

2.985
8.96
4.975
2.99

793.28
745.28
365.00
365.00

2,367.94
6,673.98
1,815.88
1,089.53
######
93,492.66
6,649.55

0.64
16.00

194.50
194.50

663.17
3,112.00

2.00
2.00
4.00

1,036.20
840.00
400.00

2,072.40
1,680.00
1,600.00

0.292 44,543.81

13,006.79

0.04 34,096.81

1,363.87

[Chapter -15](Page-255)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description
3
Bitumen for seal coat @ 6.8 kg per 10 sqm
200 x 6.8 / 10 = 136 kg

iii.

5
6
0.136 44,543.81

Amount
(Rs.)
7
6,057.96

5.40

457.50

2,470.50

Crushed sand passing 2.36 mm sieve and cum


retained on 180 mircon sieve @ 0.06 cum per
10 sqm

1.20

376.81

452.17

200 x 0.06 / 10 = 1.20 cum


d)
OH & Contractor's profit @ 12.5% on a+b+c
Cost of 200 sqm = a+b+c+d
Rate/sqm = a+b+c+d/200
Repair to pot holes and removal of loose material,
trimming of sides, cleaning of surface by providing
tack coat, 20 mm thick pre-mix carpet and seal coat
type B specification Clause 1904.2

4,059.86
36,538.72
182.69

day
day

0.80
20.00

194.50
194.50

155.60
3,890.00

hour
hour
hour
hour

2.00
2.00
2.00
4.00

300.00
840.00
1,036.20
400.00

600.00
1,680.00
2,072.40
1,600.00

tonne

0.064 34,096.81

2,182.20

Bitumen for pre-mix carpet @ 14.60 kg per 10 tonne


sqm = 200 x 14.6 / 10 = 292 kg

0.29 44,543.81

13,006.79

Bitumen for seal coat @ 6.8 kg per 10 sqm


= 200 x 6.8 / 10 = 136 kg

0.14 44,543.81

6,057.96

Crushed stone aggregate @ 0.27 cum per 10 cum


sqm
= 200 x 0.27 / 10 = 5.4 cum

5.40

457.50

2,470.50

Crushed sand passing 2.36 mm sieve and cum


retained on 180 micron sieve @ 0.06 cum per
10 sqm
d) OH & Contractor's profit @ 12.5% on a+b+c
Cost for 200 sqm = a+b+c+d
Rate per sqm = a+b+c+d/200
Repair to pot holes and removal of loose material,
trimming of sides, cleaning of surface by providing
tack coat with bitumen emulsion, 20 mm thick premix carpet using catonic bitumen emulsion and seal
coat type B with bitumen emulsion

1.20

376.81

452.17

Unit = sqm
Taking output = 200 sqm
a)
Labour
Mate
Mazdoor (Unskilled)
PMGSY SOR 13-14

4
tonne

Rate
(Rs.)

Crushed stone aggregate @ 0.27 cum per 10 cum


sqm
= 200 x 0.27 / 10 = 5.4 cum

Unit = sqm
Taking output = 200 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Air compressor 210 cfm with tractor
Bitumen pressure distributor
Mixall 6/10t capacity
Three wheeled 80-100 kN Static Roller
c) Material
Bitumen for tack coat @ 3kg per 10 sqm 200 x
3 / 10 = 60 kg

iv.

Unit Quantity

PanchayatR B Circle-2,Rajkot

tonne

day
day

4,270.95
38,438.57
192.19

0.64
16.00

194.50
194.50

124.48
3,112.00

[Chapter -15](Page-256)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

b)

c)

15.4

1900

Unit Quantity

3
Machinery
Concrete mixer 0.4 / 0.28 cum capacity
Air compressor 210 CFM with tractor
Emulsion pressur distributor
Three wheeled 80-100 kN Static Roller
Materials
Emulsion for tack coat @ 3 kg per 10 sqm
200 x 3 / 10 = 60 kg

Rate
(Rs.)

Amount
(Rs.)

hour
hour
hour
hour

2.50
2.00
2.00
4.00

190.00
300.00
840.00
400.00

475.00
600.00
1,680.00
1,600.00

tonne

0.06 34,096.81

2,045.81

Emulsion for premix carpet @ 21.50 kg per 10 tonn


sqm
200 x 21.50 / 10 = 430 kg

0.43 34,096.81

14,661.63

Emulsion for seal coat @ 10 kg per 10 sqm


= 200 x 10 / 10 = 200 kg

0.20 34,096.81

6,819.36

Crushed stone aggregate @ 0.27 cum per 10 cum


sqm =
200 x 0.27 / 10 = 5.4 cum

5.40

457.50

2,470.50

Crushed sand passing 2.36 mm sieve and cum


retained on 180 micron sieve @ 0.06 cum per
10 sqm =
200 x 0.06 / 10 = 1.20

1.20

376.81

452.17

tonn

d) OH & Contractor's profit @ 12.5% on a+b+c


Cost for 200 sqm = a+b+c+d
Rate per sqm = a+b+c+d/200
Maintenance of Gravel Road
Maintenance of gravel road including making up the loss
of profile, rectifying corrugated surface, filling up of
depressions, pot holes and erosion gullies by adding fresh
material and compacting it with appropriate equipment or
to strip excess of material from the road surface as per
drawings and technical specification Clause 1905

4,255.12
38,296.07
191.48

Unit = sqm
Taking out put @ 5% of the area in one km. as
affected:
= 1000 x 3.75x0.05 / 100 = 187.5 Sqm
Quantity = 187.5 x 0.15 = 28.12 cum
a)
Rate as per item 4.1 of Chapter 4
Add 50% for extra efforts involved
b)
maintenance is to be done in small reaches

as

Cost of 187.5 Sqm = a+b


Rate per sqm = a+b/187.5
Note: The cost of 25% retrived material may be deducted from
rates.
15.5

1900

cum

28.12

564.20

15,865.29
7,932.64
23,797.93
126.92

Maintenance of WBM Road


Maintenance of WBM road including filling up of pot holes,
ruts and rectifying corrugated surface, damaged edges
and ravelling as per technical specification Clause 1906.
Unit = Sqm

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -15](Page-257)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
Output - Taking affected area @ 5% in 1 km
= 1000 x 3.75 x 0.05 = 187.5 sqm
Quantity 187.5 x 0.075 = 14.06 cum
a)
Rate as per item No. 4.7 of Chapter 4
Add 50% for Extra Efforts involved
b)
maintenance to be done in Small reachs

on

cum

14.06

Rate
(Rs.)

Amount
(Rs.)

995.91

Cost of 187.5 Sqm = a+b


Rate of per sqm a+b/187.5
Note: The cost of 25% retrived material may be deducted from
rates.
15.6

15.7

1900

1900

21,003.82
112.02

Maintenance of Drains
The maintenance of drains include erosion, repair,
clearing, cleaning, reshaping, regrading, deepening of side
drains as well as catch water drains as per technical
specification Clause 1907.
Unit - Per Metre
Taking output one km = 1000 metre
a) Labour
Mate
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on a
Cost for 1000 metre = a+b
Rate per Metre = a+b/1000
(I) Maintenance of Culverts
Maintenance of Hume pipe Culvert by way of
Clearing, Cleaning, Erosion repair, repairs to cracks,
parapet wall and protection work as per drawing and
technical specification Clause 1908
Unit = One No. Hume pipe (1000 mm dia)
Taking output = One No.H.P. Culvert
a) Labour
Mate
Mazdoor (Unskilled)
Mason 2nd Class
b) Material
Cement, Sand, Brick, Boulder etc.
c) OH & Contractor's profit @ 12.5% on a+b
Cost for one No. Hume pipe culvert = a+b+c
Rate per hume pipe Culvert = a+b+c
(II) Maintenance of Culverts Slab type
Maintenance of Slab type Culverts by way of clearing,
Cleaning, Erosion repair, repairs to cracks, parapet
walls and Protection works as per drawing and
technical specification Clasue 1908
Unit = One No. Culvert (2 m span)
Taking output = one No. Slab Culvert
a) Labour
Mate
Mazdoor (Unskilled)
Mason 2nd Class
b) Material
Cement, Sand, Bricks, Stone Boulder etc.

PMGSY SOR 13-14

14,002.54
7,001.27

PanchayatR B Circle-2,Rajkot

day
day
day

0.32
8.00

194.50
194.50

62.24
1,556.00
202.28
1,820.52
1.82

0.10
1.00
1.40

194.50
194.50
199.90

19.45
194.50
279.86

L.S

day
day
day
L.S

200.00
86.73
780.54
780.54

0.20
4.00
1.00

194.50
194.50
199.90

38.90
778.00
199.90
500.00

[Chapter -15](Page-258)

Ref.
MORD
Specifn
2

15.8

1900

Sr.
No.

15.9

1900

Description
3
c)
OH & Contractor's profit @ 12.5% on a+b
Cost for One Slab Culverts =a+b+c
Rate per Culvert = a+b+c
Maintenance of Causeway
Maintenance of Causeway by way of minor Surface
repairs, replacing Guide Posts, repair of flood gauges,
removal of debris, providing boulders and protection work
and painting as per technical specification Clause 1909
Unit = One metre
Taking output = 50 metre causeway
a) Labour
Mate
Mazdoor (Unskilled)
Mason 1st Class/Painter 1st Class
b) Material
Supply of cement, paint, sand, aggregate,
boulder etc.
(LS Rs.350.00)
c) OH & Contractor's profit @ 12.5% on a+b
Cost for 50 metre = a+b+c
Rate per metre = a+b+c/50
Maintenance of Road Signs
Maintenance of road signs by way of cleaning and
repainting of mandatory / requlatory / cautionary /
informatory and place identifications sign board as
perdrawings and technical specification Clause 1910
Unit = 1 km
Taking output = one km
All types of signs in one Km
a) Labour
Mate
Mazdoor (Unskilled)
Painter 1st Class
b) Material
Synthetic Enamel Paint, Engineering grade tape,
welding machine etc. (LS Rs.300)

15.10

1900

day
day
day

0.80
1.60
4.00

Rate
(Rs.)

Amount
(Rs.)

7
189.60
1,706.40
1,706.40

194.50
194.50
207.80

LS

155.60
311.20
831.20
350.00
206.00
1,854.00
37.08

day
day
day

0.09
2.00
0.125

194.50
194.50
199.90

LS

17.51
389.00
24.99
300.00

c) OH & Contractor's profit @ 12.5% on a+b


Cost for one Km = a+b+c
Rate per km = a+b+c
Maintenance of steel and RCC Railing
(i)

91.44
822.93
822.93

Repair of steel railing to bring it to original shape


cleaning and repainting as per drawing and technical
specification Clause 1911
Steel Railing
Unit = Running metre
Taking output = 10 metre
It is assumed that damage is to the extent of 10%
a) Labour
Mate
Mazdoor (Unskilled)
Painter 1st Class
Blacksmith

PMGSY SOR 13-14

Unit Quantity

PanchayatR B Circle-2,Rajkot

day
day
day
day

0.024
0.30
0.10
0.20

194.50
194.50
199.90
207.80

4.67
58.35
19.99
41.56

[Chapter -15](Page-259)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description

Unit Quantity

3
4
Materials
Mild steel (structural steel)
t
ISMC = 0.029T
MS plate = 0.01
Nuts and bolts
t
c) Machinery
Welding set (LS Rs.100.00)
LS
d) OH & Contractor's profit @ 12.5% on a+b+c
Cost for 10 metre = a+b+c+d
Rate per metre = a+b+c+d/10
(ii) Repair of RCC railing to bring it to the original shape,
cleaning and repainting as per drawings and technical
specification Clause 1911
b)

Rate
(Rs.)

Amount
(Rs.)

0.039 50,600.60

1,973.42

0.001 71,500.00

71.50
100.00
283.69
2,553.18
255.32

RCC Railing
Unit = running metre
Taking output = 1 metre
It is assumed that damage is to the extent of 10%
a)

15.11

1900

Labour
Mate
Mazdoor (Unskilled)
Mason 1st Class
b) Materials
M 30 grade cement concrete
Rate as per item no. 13.1 (III) of Chapter 13
Steel bars reinforcement
Rate as per item no.13.2 of Chapter 13
c) OH & Contractor's profit @ 12.5% on (a)
Rate per metre = a+b+c
Maintenance of 200 metre and km stones

day
day
day

0.012
0.20
0.10

194.50
194.50
207.80

2.33
38.90
20.78

cum

0.10

6,736.71

673.67

0.013 60,007.06

780.09
7.75
1,523.53

Maintenance of 200 metre km stone by way of refiting of


tilted stones repairing with cement mortar, cleaning,
repairing and lettering on 200 metre km stone and 5th km
stone as per drawing and technical specification Clause
1912
Unit = 1 km
Assuming 1 km stone, 4 nos 200 metre stone and
1/5th 5km stone
Painting two coats with synthetic enamel paint
200 m stone 4 nos = 0.760 sqm.
One km stone = 0.815 sqm.
5th km stone 1x1/5 = 0.320 sqm.
Total = 1.895 sqm.
As per item No. 10.5 of chapter 10
km
(ii) Printing letters and figures of any shade with synthtic
enamel paint of any approved colour to give an even
shade
(i)

1.895

73.91

140.06

200 m stone 4 Nos. = 40 per cm height per letter


One no km stone = 120 per cm height per letter
5th km stones 1/5th = 60 per cm height per letter
Total = 220 per cm height per letter

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

[Chapter -15](Page-260)

Sr.
No.
1

Ref.
MORD
Specifn
2

Description
3
Rate as per item no 10.1 of chapter 10

Unit Quantity
4
per cm
height
per
letter

a)

15.12

1900

Labour
Mate
day
Mazdoor
day
Mason 1st Class
day
b) Materials
Cement, sand, aggregates etc.
LS
(LS = Rs.100.00)
c) OH & Contractor's profit @ 12.5% on (a+b)
Cost for one km = (i+ii+a+b+c)
Rate per/km = (i+ii+a+b+c)
Cutting of branches of trees shrubs and trimming
of grass and weeds
(i)

0.024
0.50
0.10

Amount
(Rs.)

0.54

7
118.28

194.50
194.50
207.80

4.67
97.25
20.78
100.00
27.84
508.87
508.87

Cutting of branches of trees and shrubs from the


road way or with in R.O.W including disposal of
wood and leaves to suitable location as per technical
specification Clause 1914

Unit = one tree


Taking output = 10 trees of 900 mm average girth
a) Labour
Mate
day
Mazdoor (Skilled)
day
Mazdoor (Unskilled)
day
b) OH & Contractor's profit @ 12.5% on (a)
Cost for 10 trees = (a+b)
Rate per tree = (a+b)/10
(ii) Cutting of shrubs from the road way or with in R.O.W
and disposal of shrubs to suitable locations as per
technical specifications Clause 1914
Unit=Each
Taking output = 100 nos shrubs
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5% on a
Cost for 100 shurbs = a+b
Rate per shurb = a+b/100
(iii) Trimming of grass and weeds from the
shoulders/berms and disposing off the same to
suitable locations as per technical specifications
Clause 1914
Unit = sqm
Taking output = 1500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b) OH & Contractor's profit @ 12.5% on a
Cost for 1500 sqm = a+b
Rate per sqm = a+b/1500
PMGSY SOR 13-14

5
220.00

Rate
(Rs.)

PanchayatR B Circle-2,Rajkot

0.12
1.00
2.00

194.50
199.90
194.50

23.34
199.90
389.00
76.53
688.77
68.88

day
day

0.08
2.00

194.50
194.50

15.56
389.00
50.57
455.13
4.55

day
day

0.40
10.00

194.50
194.50

77.80
1,945.00
252.85
2,275.65
1.52

[Chapter -15](Page-261)

Sr.
No.
1
15.13

Ref.
Description
MORD
n
Specif
2
3
1900 White washing of parapet walls of CD work and
tree truncks
White washing two coats on parapet walls and tree trunks
including preparation of surface by cleaning scraping etc.
as per technical specifications Clause 1915
Unit = sqm
Taking output = 9 sqm
a) Labour
Mate
Mazdoor (Unskilled)
White washer
b) Materials
Lime
Fevicol adhesive
Indigo
c) OH & Contractor's profit @ 12.5% on a+b
Cost for 9 sqm = a+b+c
Rate per sqm = a+b+c/9
Note: For analysis of rates for maintenance works bitumen
grade S-90 has been taken. User may modify as per site
requirement

15.14

1900

Unit Quantity
4

Rate
(Rs.)

Amount
(Rs.)

day
day
day

0.01
0.143
0.143

194.50
194.50
196.30

1.95
27.79
28.04

quintel
kg
kg

0.045
0.10
0.013

200.00
165.00
190.00

9.00
16.50
2.47
10.72
96.46
10.72

Periodical Renewal to existing bituminous surface


1 Open graded Premix carpet 20 mm thick
Unit = sqm
(i) Tack coat
With bituminous Emulsion (RS-1)
Rates as per item 5.2 (ii)
(ii) Pre-mix carpet using bituminous (penetration
grade modified bitumen) binder

sqm

Rates as per item No. 5.9


sqm
as relevant
Or
(iii) Premix carpet using bitumen Emulsion
Rates as per item No. 5.10
sqm
(iv) Seal coat Type A, B or C
Rates as per item No. 5.11
2 Surface dressing single coat/first coat or 2nd
coat
Rates as per item No. 5.6

PMGSY SOR 13-14

PanchayatR B Circle-2,Rajkot

sqm

[Chapter -15](Page-262)

Name of Work :-

Sr.
No.

Name of Material

1
1
2

Const. of Rural Road Under P.M.G.S.Y. General Rate Analysis for Year 2013-14

Conveyance of Materials For Roads and CD Works

MATERIAL
NO.

Name of
Quarry

2
M.C.(25 - 10 mm)

M-009

3
Quarry

4
50.00

5
668.23

6
51.37

7
25.68

49.00

8
0.00

0.00

M.C.(37.5 - 25 mm )

M-010

Quarry

50.00

716.23

51.37

25.68

49.00

0.00

M.C.(10 - 5 mm )

M-012

Quarry

50.00

365.00

51.37

25.68

49.00

M.C.(5 mm & below)

M-014

Quarry

50.00

365.00

51.37

25.68

B.T. Kapachi c.c.


road(10MM)
B.T. Kapachi(20MM)

M-015

Quarry

50.00

520.00

51.37

M-016

Quarry

50.00

550.00

M-017

Quarry

50.00

M-021

Quarry

5
6
7

M.C.Metal (40mm
nomial)
M.C.Metal (40-63)

Total Basic Rate at Loading unloading


Lead in @ source as
GSRRDA
Km.

Haulage excluding loading & unloading


Surface road
Un surfaced gravel
kachha road
Lead
Rate
Total
Lead Rate Total Lead
Rate
Total

Total to site of
works

1.00

10
0.00

0.00

11
745.28

0.00

1.00

0.00

0.00

793.28

0.00

0.00

1.00

0.00

0.00

442.05

49.00

0.00

0.00

1.00

0.00

0.00

442.05

25.68

49.00

0.00

0.00

1.00

0.00

0.00

597.05

51.37

25.68

49.00

0.00

0.00

1.00

0.00

0.00

627.05

425.00

51.37

25.68

49.00

0.00

0.00

1.00

0.00

0.00

502.05

50.00

390.00

51.37

25.68

49.00

0.00

0.00

1.00

0.00

0.00

467.05

Bitumen VG-10

M-037

Koyali

200.00

44005.00

78.51

69.54

199

1.94

386.06

4.70

4.7

44543.81

Bitumen emulsion RS-1

M-038

Panipat

900.00

34800.00

78.51

69.54

899

1.94 1744.06

4.70

4.7

36696.81

10

Bitumen emulsion SS-1

M-039

Panipat

900.00

32200.00

78.51

69.54

899

1.94 1744.06

4.70

4.7

34096.81

11

Through Bond Stone

M-043

Quarry

25.00

33.00

0.75

0.37

24.00

0.03

0.72

1.00

0.06

0.06

34.90

12

Bricks (1000 Nos.)

M-044

Market

20.00

4400.00

84.13

84.13

19.00

5.88

111.72

1.00

14.24

14.24

4694.22

13

Cement

M-045

Market

25.00

580.00

67.88

67.88

24.00

1.94

46.56

1.00

4.70

4.70

767.02

14

M-055

Quarry

50.00

200.00

51.37

25.68

49.00

1.94

95.06

1.00

4.70

4.70

376.81

15

B.T. Grit 2.36mm to 180


micron
Filter Media

M-073

As available

20.00

868.00

25.68

13.65

19.00

1.94

36.86

1.00

4.70

4.70

948.89

16

Graded Stone

M-081

Quarry

50.00

270.00

51.37

25.68

49.00

1.94

95.06

1.00

4.70

4.70

446.81

17

Granular Material

M-082

Local Kotar

20.00

121.00

25.68

13.65

19.00

1.94

36.86

1.00

4.70

4.70

201.89

18

Structural steel (angle) /


MS Flate (M-097)
MS Sheet Tube (M-098)

M-097

Market

25.00

50400.00

74.67

74.67

24.00

1.94

46.56

1.00

4.70

4.70

50600.60

M-098

Market

25.00

75000.00

74.67

74.67

24.00

1.94

46.56

1.00

4.70

4.70

75200.60

19

PMGSY SOR 13-14

[Chapter -RA Bhav](Page-263)

Sr.
No.

Name of Material

MATERIAL
NO.

Name of
Quarry

1
20

2
Rubble (M-106)

21

M-106

3
Quarry

4
25.00

5
185.00

6
51.37

7
25.68

M-108

Dhasa

Variable

3630.00

69.58

223.71

M-109

Dhasa

Variable

1898.00

41.75

186.43

23

RCC Hume Pipe


(1000mm)
RCC Hume Pipe
(750mm)
Sand (Coarse)

M-119

Local Kotar

20.00

230.00

25.68

13.65

19.00

2.94

55.86

1.00

24

Sand (Fine)

M-120

Local Kotar

20.00

210.00

25.68

13.65

19.00

2.94

55.86

25

HYSD Bar

M-123

Market

25.00

44000.00

74.67

74.67

24.00

1.94

26

Mild Steel

M-124

Market

25.00

42000.00

74.67

74.67

24.00

27

TMT BARS

M-125

Market

25.00

48000.00

74.67

74.67

28

Stone for CR masonary /


Stone boulder
Stone spalls (M-138)

M-130

Quarry

25.00

185.00

51.37

M-138

Quarry

25.00

120.00

51.37

22

29

Total Basic Rate at Loading unloading


Lead in @ source as
Km.
GSRRDA

Haulage excluding loading & unloading


Surface road
Un surfaced gravel
kachha road
Lead
Rate
Total
Lead Rate Total Lead
Rate
Total
8
2.94

10
7.12

Total to site of
works

7.12

11
339.73

0.00

3923.29

0.00

2126.18

7.12

7.12

332.31

1.00

7.12

7.12

312.31

46.56

1.00

4.70

4.70

44200.60

1.94

46.56

1.00

4.70

4.70

42200.60

24.00

1.94

46.56

1.00

4.70

4.70

48200.60

25.68

24.00

2.94

70.56

1.00

7.12

7.12

339.73

25.68

24.00

2.94

70.56

1.00

7.12

7.12

274.73

24.00

70.56

1.00

0.00

DPIU & Executive Engineer


Panchayat R & B Division
Bhavnagar

PMGSY SOR 13-14

[Chapter -RA Bhav](Page-264)