STANDARD DESIGN DETAILS

Division 22 - PLUMBING

Release 2.0
April 2012

Released by:
Cleveland Clinic
Facilities and Construction
9500 Euclid Ave.
Cleveland OH 44195

All information within this Document is considered CONFIDENTIAL and PROPRIETARY. By


receipt and use of this Document, the recipient agrees not to divulge any of the information herein
and attached hereto to persons other than those within the recipients organization that have
specific need to know for the purposes of reviewing and referencing this information. Recipient
also agrees not to use this information in any manner detrimental to the interests of Cleveland
Clinic.

Cleveland Clinic
Standard Design Details
Copyright 2012
By the Cleveland Clinic
These Specifications, or parts thereof, may not be reproduced in any form without
the permission of the Cleveland Clinic.

Cleveland Clinic

Cleveland Clinic Standard Design Details: Division 22 - Plumbing

The following pages contain standard details for the design and construction of new and
renovated facilities at all domestic Cleveland Clinic locations. They shall be used by A/E
firms in the preparation of drawings and specifications for construction of facilities.
The general purpose of each Detail is to provide the preferred method for installation of
construction materials and equipment at Cleveland Clinic facilities regarding Codes and
FM Global compliance, execution and uniformity.
These Details are to be used as a part of Plumbing Bid and Construction documents. They
are intended to be used to address system design aspects of equipment and materials that
Cleveland Clinic desires to standardize among facilities, and identify prohibited materials
and construction practices.
The use of these Details is mandatory for all design or maintenance projects. Deviations
are discouraged. If project conditions arise which require a deviation, it shall be
thoroughly documented by the user and submitted to Cleveland Clinic for review and
approval using the Design Standards Revision Request document. Additionally, all
Cleveland Clinic staff, architects, engineers, and contractors are encouraged to participate
in the ongoing development of these guidelines by communicating any suggestions by
use of the Revision Request document.
The Detail Drawings are in AutoCad format and categorized by system.
*****

Cleveland Clinic
STANDARD DESIGN DETAILS: DIVISION 22 - PLUMBING
I. PLUMBING DETAILS
a.
b.
c.
d.
e.

P-001 Wall Cleanout Detail


P-002 Floor Cleanout Detail
P-003 Trap Primer Detail
P-004 Floor Sleeve Detail
P-005 Wall Sleeve Detail

** End of List **