RESULT OF INSPECTION
ROTATING EQUIPMENT - PUMP
I.
II.
GENERAL DATA
1.
Tag No.
2.
3.
d
5.
6.
7.
8.
9.
10.
11.
Name of equipment
Service
Type of Equipment
Owner
Manufacturer
Manufacturer Serial No.
Year of Built
Specification
Location
Inspection Date
TECHNICAL DATA
1.
2.
3.
4.
5.
6.
7.
8.
III.
: P-02
: LPG Pump
: Gas
: Centrifugal
: PT SANGKULIRANG ENERGI UTAMA
: Stearling Sihi
: 10-11020-02
: 2010
: API 610
: SPPBE Swarga Bara,Kutai-KalSel
: Oct 29th 2014
Capacity Rating
Discharge Pressure
Differential Head
MAWP
Speed
Direction of Rotation
Size (Suction x Discharge)
Driver / Prime Mover
- Type
- Manufacturer
- Power Capacity
- Speed
:
:
:
:
:
:
:
7,5
10
70
12
1460
CCW
4 x 3
:
:
:
:
Electric Motor
Siemens
45
KW
1465
RPM
m3/h
Kg/cm 2
M
Kg/cm 2
rpm
INSPECTION SUMMARY
Form For Pump Result of Inspection
Page 2 of 3
NO.
1.
DESCRIPTION
LEVEL OF
INSPECTION
ACCEPTANCE
CRITERIA /
REFERENCE
LEVEL OF
ACCEPTANCE
REMARKS
DOCUMENT REVIEW
a. Specification
N/A
b. Drawing (s)
-
Lay out
P & ID
Area Classification
Grounding Lay Out
c. Data Sheet
d. Manufacturer Document :
- Technical Data
- Acceptance Test Report
- Manufacture Certificate
2.
N/A
Reviewed
Reviewed
Reviewed
Reviewed
Reviewed
R
e
v
i
e
w
e
d
R
e
v
i
e
w
e
d
Reviewed
Verified
g. Test procedure
Reviewed
Reviewed
Verified
OK
Photo
Verified
OK
No Damage
c. Foundation
Verified
OK
Tighten
Verified
OK
Isolated
e. Liquid level
Verified
OK
f. Control Panel
Verified
OK
Level
properly
Function
Properly
Verified
OK
Installed
Verified
OK
Function
Properly
Verified
OK
Installed
ACC
ACC
Page 3 of 3
ACCEPTANCE
CRITERIA /
REFERENCE
LEVEL OF
ACCEPTANCE
REMARKS
OK
On Skid
OK
On Skid
Verified
Visual
OK
Verified
Visual
OK
Function
Properly
Verified
Visual
OK
No Leak
OK
OK
OK
d. Pump Temperature ( C)
OK
e. Voltage (V)
OK
f. Current (A)
OK
OK
NO.
3.
DESCRIPTION
b. Bearing Temperature ( C)
c. Engine Temperature ( C)
o
IV.
RESULT
CONCLUSION
Based on the inspection and verification, THIS IS TO REPORT that the pump with Tag No. P-2 / 10-11020-02
has been manufactured, installed and operated satisfactory in compliance with the applicable Code/Standard,
Specification, Drawings, and Government Requirement.
Inspected by,
Ditjen Migas