INTERCONEXION DE

ENERGA DISTRIBUIDA

CASO MEXICO
rramirez@avantel.net
9/17/02

RRB-IIE

QUE ES GENERACIN
DISTRIBUIDA
GENERADORES EN SITIO, TAMAO
MENOR A CONVENCIONALES
n TECNOLOGAS NUEVAS
n ENERGAS RENOVABLES
n APLICACIONES DE CONSUMIDORES
n POSIBILIDAD DE CONECTARSE A LA
RED DE DISTRIBUCIN
n

9/17/02

RRB-IIE

Center for the Advance of Energy


Market Distributed Energy
n

A System Composed of generation


located near the energy customers
site, possibly incorporating energy
storage, energy management and
combined heat and power,
potentially highly integrated with the
electric grid to provide multiple benefit
of both sides of the utility meter

9/17/02

RRB-IIE

APLICACIONES
ENERGIA DE CALIDAD-PREMIUM
n STANDBY
n PEAK SHAVING
n ENERGIA DE MENOR COSTO
n COGENERACION
n ENERGIA CONTINUA 99.999
n

9/17/02

RRB-IIE

BENEFICIOS
MAYOR CONFIABILIDAD
n SOLUCIONES SEGN CONSUMIDOR
n EN CASOS, MEJOR CALIDAD
n COGENERACIN, < EFICIENCIA
n PEAK SHAVING
n INSTALACIONES REMOTAS
n BENEFICIOS AMBIENTALES
n

9/17/02

RRB-IIE

9/17/02

RRB-IIE

MEXICO: ENERGIAS
RENOVABLES
n Energa

Eolica y Solar
n Hidralicas:
n Volumen autorizado por la CNA o
el almacenamiento, sea MENOR
al volumen para operar en horas
punta de la regin al Q max. de
diseo.
9/17/02

RRB-IIE

Capital Costs
of INVERSIN
Selected DER
MONTOS
DE
Equipment
Capital Cost
($/kW)
700-1100
300-1000

Microturbine
Combustion
Turbine
IC Engine
Stirling Engine
Fuel Cell
Photovoltaic
Wind Turbine
9/17/02

300-800
2,000-50,000
3,500-10,000
4,500-6,000
800-3,500
RRB-IIE

O&M Costs of Selected DER Equipment


Time Until Maintenance Required
(hours of operation)

Average Maintenance
Costs (/kWh)

Microturbine

5,000-8,000

0.5-1.6 (estimated)

Combustion
Turbine

4,000-8,000

0.4-0.5

Internal
Combustion
Engine

750-1,000: change oil and oil filter


8,000: rebuild engine head
16,000: rebuild engine block

0.7-1.5 (natural gas)


0.5-1.0 (diesel)

Yearly: fuel supply system check


Yearly: reformer system check
40,000: replace cell stack

0.5-1.0 (estimated)

Photovoltaic

Biyearly maintenance check

1% of initial investment
per year

Wind Turbine

Biyearly maintenance check

1.5-2% of initial
investment per year

Fuel Cell

9/17/02

RRB-IIE

DRIVERS - IMPULSORES
n
n
n
n
n
n
n

REGULACION
ENERGIAS ALTERNATIVAS
CALIDAD
INSTALACIONES REMOTAS
MENORES EMISIONES
DIVERSIDAD DE FUENTES DE SUMINISTRO
INDEPENDENCIA Y PRECIOS

9/17/02

RRB-IIE

OBSTACULOS TECNICOS
Disruptive Tecnology
n Tecnologas en comercializacion. I&D
n Inversin, O & M, mayores
n Competencia entre tecnologas
n Compite con generacin Convencional
n Normas de Interconexin
n

9/17/02

RRB-IIE

BARRERAS A LA Energa
Distribuida
n

REGULACION
n
n
n

Permisos y ubicacin
Impacto Ambiental
Costos hundidos.

INTERCONEXION
n
n
n

9/17/02

Falta de Normalizacin
Seguridad y confiabilidad
Equipos de Interconexin
RRB-IIE

INTERCONEXION
n

Afectacin a circuitos elctricos


n
n
n
n
n

Capacidad de flujo Activo y Reactivo


Corto Circuito
Frecuencias Armnicas
Variaciones de Voltaje, Flikers, Sag
Seguridad

Medicin de aportacin a la Red


n Supervisin del comportamiento.
n

9/17/02

RRB-IIE

DEMAND RESPONSE
n

LOAD RESPONSE
n
n
n
n

Control Directo de la
Carga
Corte Parcial o
Selectivo
Corte Total de la
Carga
Energa Interruptible

PRICE RESPONSE
n
n
n

n
n
n

9/17/02

RRB-IIE

Tarifa a Precio Real


Precios Dinmicos
Segn Demanda
Coincidente
Tarifa Horaria
Demanda a Subasta
Recompra de
Demanda

CONFIABILIDAD
n

SUMINISTRADOR DESARROLLA
TECNOLOGIAS
n REDUNDANCIA
n GENERACIN DE RESPALDO
n GENERACIN EN SITIO
n SOLUCIN A PARMETROS NOCIVOS

9/17/02

RRB-IIE

RESPUESTA A
INTERCONEXIN
n

TRATO SIMILAR A GENERACIN


CONVENCIONAL
n
n
n
n

9/17/02

ESTUDIOS
CUOTAS
PERMISOS
TRAMITES

RRB-IIE

CONCLUSIONES DE CAEM
n

EL GOBIERNO FEDERAL DEBE TENER


PROGRAMAS DE PROMOCION DE LOS
RECURSOS DE ENERGIA DISTRIBUIDA,
YA QUE LAS POLITICAS ACTUALES, LA
REGULACION Y LAS PRACTICAS DE
NEGOCIO, BLOQUEAN SU DESARROLLO

9/17/02

RRB-IIE

ESTADOS UNIDOS
FERC emite NOPR(Notice of Proposed
Rulemaking) Interconnection of Electric
Generation, en Oct-01
n Fast Track para pequeos generadores
n Oposicin de IOU, DISCO, ESC y grupos
de inters.
n FERC, emite sin cambios NOPR, Abril02

9/17/02

RRB-IIE

PROCESO NORMAL
SOLICITUD EN LISTA DE ESPERA
n ESTUDIOS EXHAUSTIVOS ELECTRICOS
Y ECONOMICOS
n LARGA DURACIN Y COSTOS
n REQUERIMIENTOS TECNICOS:
n

n
n

9/17/02

CARACTERSTICAS DE GENERADOR
INTERRUPTORES, ETC
RRB-IIE

Senate Energy Bill


US CHP ASSOCIATION, LOGRA QUE
SENADO INCLUYA EN NUEVA LEY, QUE
CHP, TENGA EL DERECHO A VENDER
EXCEDENTES Y A CONTRATAR
RESPALDO, 0402
n SIN AFECTACIN POR CAMBIOS
REGULATORIOS.
n

9/17/02

RRB-IIE

NARUC, Junio 02
NARUC, MODELO DE CONTRATO Y
PROCEDIMIENTO INTERCONEXIN DE
G. D. Fast Track
n CADA COMISIN REGULADORA
ESTATAL SERA RESPONSABLE
n

n
n
n

9/17/02

Definir Capacidad y Tipo de G.D.


Tipo de Interconexin
Tramites y Tiempo
RRB-IIE

Institute of Electrical & Electronic


Engineers. IEEE
Grupo de Trabajo en 1999
n Draft en 2000
n Participan:
n

Empresas Elctricas, Fabricantes, DER,


Laboratorios, Universidades, Tcnicos
Fondos de DOE

Norma en Revisin

9/17/02

RRB-IIE

CALIFORNIA
La CPUC, orden para instituir norma de
conexin de DER, Oct. 99
n Energy Commission, FOCUS, Nov. 99
n Reuniones de interesados
n CPUC, emite Rule 21, Dic. 01
n Empresas Elctricas, publican reglas de
interconexin.
n

9/17/02

RRB-IIE

CALIFORNIA
Vigente norma de interconexin G. D.
n Capacidad de 1 MW
n Fast Track en trmite
n Fondo de $125 MUS por ao:
n

n
n
n

9/17/02

Comercio e Industria, menor consumo


EE en problemas de reserva.
Energa Limpia
RRB-IIE

CALIFORNIA & FABRICANTE


Lgr que la CPUC, aumentara a 1.5 MW
el lmite de G. D.
n Herramienta: Modelo GPB15X, 1.4 MW,
con catalizador XONON, 3 ppm NOX !!!
n Tecnologa de Vanguardia rompe las
barreras reguladoras.
n Eficiencia Econmica
n

9/17/02

RRB-IIE

Incentiv
e
category

Incentive
offered

Level
1

$4.50/
W

Level
2

Level
3

9/17/02

Maximum
percentag
e of
project
cost

Minimum
system
size

Maximum
system
size

50%

30 kW

1 MW

$2.50/
W

40%

None

1 MW

$1.00/
W

30%

None

1 MW

RRB-IIE

Eligible Technologies

Photovoltaics

Fuel cells
operating on
renewable fuel

Wind turbines

Fuel cells
operating on
nonrenewable fuel and
utilizing sufficient
waste heat recovery

Microturbines,
internal combustion
engines and small gas
turbines utilizing
sufficient waste heat
recovery and meeting
reliability criteria

9/17/02

RRB-IIE

solicitud
Red Primaria
De Distribucin

Si

No
Estudio de
Factibilidad
E impacto
A la Red

Si
Potencia > KW
No
Excedentes >
15% Max.Dem
No
Se requiere
Construccion

Si

Si

Si

Requiere
Construccion?

No
Contrato de
Interconexion
Simplificado
9/17/02

No
C.I.S. pago
Aportaciones

Contrato
Normal De
Interconexion
RRB-IIE

C.N.I. Por
Definir
Fecha

TRANSFERENCIA, NO SINCRONISMO

9/17/02

RRB-IIE

TRANSFERENCIA PARCIAL

9/17/02

RRB-IIE

SITUACION EN MEXICO
n
n
n
n
n
n
n
n
n

NO EXISTE GENERACION DISTRIBUIDA


Sin norma de interconexin. NOM
CFE, Regiones de Transmisin
No existen incentivos para G. D.
No hay planes o programas de promocin
No hay fabricantes nacionales
Sin normalizacin de Equipos
Incluir a Minihidralicas
Mnimas instalaciones interconectadas

9/17/02

RRB-IIE

CONCLUSIONES
MUCHO TRABAJO POR REALIZAR
n RECONOCIMIENTO JURIDICO
n ESPECIFICACIONES NORMALIZADAS
n NOM DE EQUIPOS Y MECANISMOS
n DIFUSIN, CAPACITACIN
n FABRICACIN
n PLANES GUBERNAMENTALES
n

9/17/02

RRB-IIE

COMPROMISO
GRUPOS DE TRABAJO
n PROPUESTA A LEGISLADORES
n SOLICITUD A ORGANISMO FEDERAL
n CENTROS DE DIFUSION
n FABRICACION DE EQUIPOS
n INSTITUTOS DE INVESTIGACION
TRABAJEMOS
n

rramirez@avantel.net

9/17/02

RRB-IIE