Sei sulla pagina 1di 3

Proposed Agenda3/9/14 Bishops Committee

Call to Order
Call to Order at 3:05
Opening Devotion
Johnnette read Letters to Mark
Approval or corrections to prior minutes
Approval by Kevin Mich
Seconded by Julie Seidler
Reports:
Vicar
Epiphany completed and now in Lent
No ashes to Go due to weather
Ash Wednesday was well attended, 15+
Friday Stations of the Crosses going well
Adult Formation going well
Bishops Warden
Communication Committee No seasonal
newsletter, the what has eclipsed the need.
Blogging and Social Media
Possible use of Skype or Livemeeting for people
who dot have access to regular services.
Choir Pancake supper was a success.
Approximately $321.00 dollars collected.
Junior Wardens
Tim Baker New Toilet seat in bathroom
Tim Baker Smoke detectors in sancristy and in
hallway replaced.
Tim Baker snow removal done twice
Johnette face plate needs to be repaired in
sacristy, Tim to insert material and reinsert
screws.

Johnette everyone should be alert to water


intrusion due to melting snow / ice.
Old Business:
Leftovers from Planning Meeting
Nothing
Young Adult Ministry
Participation is good and going well
Treasurers Report
Read by Tim Baker for Krista Baker
Building Committee
Tim Baker parish meeting of 3/2/2014 presented
3 plans to get people thinking. Bishops needs to
approval
Brad Selby City will not participate in diagonal
parking. City will install storm drainage if Trinity
does decide to continue this project.
Original Deeds did not define property lines. There
is no alley, all utilities are on private property.
Received cost estimate from PSR. Estimate was
approximately twice what was anticipated.
Estimate was received for $323,000. Kimi
recommended Sparks. Tim Baker will resign if
Sparks is selected. Search will be expanded to
receive other builders. Landscaping, windows
could be changed to save money. Tim to check if
contractor bid labor at Prevailing wage. Building
committee meeting to be held 3/22/2014.
New Business:
Schedule for next meetings
Building Campaign
Change in direction?
Does the project get scaled back.
Grants tough sell
Tim Baker to get additional meeting with PSR

Bishop Committee to setup meeting with


congregation.
Alec and Krista to come up with suggestions
on fund raising.
Glen Moritz has approached Kevin Minch as to
be painting contractor. Decision was made to
have anyone who wants to work on the
project has to go through the Prime
Contractor to be selected.
What next?
Bishop Committee Meeting - Sunday 4/6/2014
6:00 p.m.
Bishop Committee Meeting Sunday
5/4/2014 12:30 p.m.
Prayer
Adjourn

Moved by Kevin Minch


Seconded by Tim Baker

Potrebbero piacerti anche