Sei sulla pagina 1di 10

___

OF

___

NO.

REVISION

PAGE
JOB NO.

00-3310

CLIENT

PT.VICO INDONESIA

LOCATION

BADAK FIELD, EAST KALIMANTAN

SUBJECT

RECTANGULAR 2nd PILE ARRANGEMENT

PILE FOUNDATION
c
=
2.400
h
=
0.600
k
=
0.500
n
=
1.800
p
=
1.800
q
=
0.300
c
=
2.400
s
=
1.560

m
m
m
m
m
m
t/m3
t/m3

DATE
BY

AR

REVIEW
CHECK
APPR.

p
n

Pile Arrangement
L
=
12
D
=
300
ID
=
180
p
=
0.109
Ap
=
0.07069
p
=
0.94248
sp
=
1.80
mx
=
2
ny
=
1
n
=
2

m
mm
mm
t/m
m2
m
m
nos
nos
nos

pile length
pile outside diameter
pile inside diameter
pile weight
pile area
pile perimeter
length between pile
number of pile x-dir
number of pile y-dir
total number of pile

Efficiency Group Pile for Axial

arc.tg D/sp
=
Eg1
1 - .[(ny - 1).mx + (mx - 1).ny]/90.mx.ny
=

=
=

9.46
0.95

Efficiency Group Pile for Lateral


Eg2
=
sp/(6.D) >0,5

1.00

Pile Allowable Capacity


PC
=
0.95
PT
=
0.95
PH
=
1.00
PM
=
1.00
LOADING DATA

x
x
x
x
(see page

Vertical Load at each pedestal


Vertical Load
Horizontal Load at each pedestal
Seismic Load

Moment Load at each pedestal


Seismic Moment

22.06
21.74
1.31
2.39

=
=
=
=

degrees

20.96
20.65
1.31
2.39

ton
ton
ton
ton

allowable compression
allowable tension
allowable lateral
allowable moment

V1
V2

=
=

1.230
1.203

ton
ton

at pedestal 1
at pedestal 2

H1x
H1y
H2x
H2y

=
=
=
=

-0.001
0.000
0.001
0.000

ton
ton
ton
ton

at pedestal 1
at pedestal 1
at pedestal 2
at pedestal 2

M1x
M1y
M2x
M2y

=
=
=
=

-0.018
0.000
-0.005
0.000

ton m
ton m
ton m
ton m

at pedestal 1
at pedestal 1
at pedestal 2
at pedestal 2

Combined Vertical Load


E(O)
=

2.433

ton

Combined Horizontal Load


HSx
=
H1x + H2x
HSy
=
H1y + H2y

=
=

0.000
0.000

ton
ton

Combined Moment Load


Excentricity cause by vertical load
ex
=
[V1.(c/2-n/2) + V2.(c/2+n/2)] / E(O) - c/2
MSx
=
M1x + M2x
MSy
=
M1y + M2y + E(O).ex

=
=
=

-0.010
-0.023
-0.024

m
ton m
ton m

Foundation Weight
Wf
Wpi
WF

=
=
=

1.73
2.61
4.33

ton
ton
ton

=
=
=

V1 + V2

(h.c.k).c
(n.L).p
Wf+Wpi

footing weight
pile weight
total weight

PILE CAPACITY
Lateral Load (x - direction)
Total Horizontal Force (Hx)
Hx

HS(O)

0.000

ton

H1

Hx / n

0.000

ton

< 1.31ok

Total Axial Force (Pu)


Qg

WF+E(O)

6.767

ton

My

MS(O)+HS(O).k

0.024

ton.m

wy

xi2 / xi

3.600

Pu+

Qg / n + My / wy

3.390

ton

< 20.96...ok

Pu-

Qg / n - My / wy

3.377

ton

> 0ok

Lateral Load (y - direction)


Total Axial Force
Qg
Q1

WF+E(O)

6.767

ton

Qg/n

3.384

ton

< 20.96...ok

0.000

ton

< 1.31ok

0.024

ton

< 2.39ok

Total Horizontal Force


Hp

HS(O)

Total Moment Force


Mp

MS(O)+HS(O).k

Rebar Calculation for Pilecap of Foundation


L

1.800

1,4.[WF+E(O)]

9.474

ton

1,7.1,1.MSy + 1,7.1,1.HSx.k/2

0.045

ton.m

Maximum Positif Moment


M+

M + 1/4.P.L

P
M

Maximum Negatif Moment

4.30841 ton.m/m'

P
M

M-

30%.M+

1.29252 ton.m/m'

Design of Flexural Reinforcement


Bottom Reinforcement
b

100

cm

50

cm

42.5

cm

fc'

210

kg/cm2

fy

4000

kg/cm2

M+

4.30841 ton.m/m'

Rn

M+ / (0,9.b.d2)

2.65031

0,85 .fc' / fy [1 - (1 - 2.Rn / 0,85 .fc')0.5]

0.00067

min

As

7.65

0.0018
larger bd & min.bd

13

150

As =

8.84

cm2/m'

cm /m'
2

Top Reinforcement
b

100

cm

50

cm

42.5

cm

fc'

210

kg/cm2

fy

4000

kg/cm2

M-

1.29252 ton.m/m'

Rn

M- / (0,9.b.d2)

0.79509

0,85 .fc' / fy [1 - (1 - 2.Rn / 0,85 .fc')0.5]

0.00020

min

As

7.65

0.0018
larger bd & min.bd

13

150

As =

8.84

cm2/m'

cm /m'
2

Check of Punching Shear


two way action shear
fc'

210

kg/cm2

42.5

cm

bo

1/2..(D+d)

113.883

cm

Vn

0,85.1,06(fc')0.5 bo.d

63.19

ton

1,7.1,1.Qp

6.33

ton

Pu+

(pile critical perimeter)

< 63.19...ok

SETTLEMENT CALCULATION
Bg

0.30

pile group width

Lg

2.10

pile group Length

0.3

Ep
cp

200000

6.5

Esp

250.cp

cs

Ess

3.175
250.cs

poisson ratio
kg/cm2 modulus of elasticity of pile
t/m2
=
t/m
=

cohesion of soil below the tip of the pile


1625

t/m2

modulus elasticity of soil below the tip of the pile

cohesion of soil average along the pile shaft


793.75

t/m2

modulus elasticity of soil average along the pile shaft

Immediate Settlement due to Pile deformation


Qp

Qg/n

Qwp

0.049

ton

end bearing contributed by pile load

Qws

3.331

ton

friction contributed by pile load

Si1

=
=

0.67

3.38

ton

triangular friction distribution on pile

[Qwp + .Qws].L /(Ap.Ep)

0.00019

Immediate Settlement due to End Bearing Load


Iwp

0.82

qwp
Si2

Qwp/Ap

0.69363

t/m2

qwp.D/Esp .(1-2).Iwp

1E-004

4.21359

0.00043

0.00072

0.00072

influence factor

Immediate Settlement due to Friction Load


Iws
Si3

2+0,35.(L/D)0.5

[Qws/p.L].D/Ess .(1-2).Iws

influence factor

Immediate Settlement of Pile


Si1 + Si2 + Si3
Si
=
Immediate Settlement of Group Pile
Sg

Si.(Bg/D)0.5

Consolidation Settlement at Center of Group Piles


Pc

preconsolidation pressure

eo

initial void ratio

Cc

compression index

0,75.(eo - 0.8)

2 /3 L
L

Hough approach for highly micaceous soils


Cs

swell index

settlement calculation for 12.5 m below footing

Qg

6.77

1/6.Cc

1
2

ton

Qg / [(Bg+z).(Lg+z)]

If Pc < Po Normally Consolidation (NC) - Eq.1


Sc

Cc.H/(1+eo) .log [(Po+P)/Po]

If Po < Pc < Po+p Over Consolidation (OC) - Eq. 2


Sc

Cs.H/(1+eo) .log [pc/po] + Cc.H/(1+eo) .log [(Po+P)/Pc]

If Pc > Po + p Over Consolidation (OC) - Eq. 3


Cs.H/(1+eo) .log [(Po+P)/Po]

Sc

H (m)

z (m)

s (t/m2)

Pc (t/m2)

eo

Cc

Cs

p (t/m2)

8.5

0.5

1.590

10.5

2.05

0.9375

NC

3.2534 24.0164 0.01696

Eq. 1

9.5

1.5

1.590

21

1.64

0.63

NC

1.0443 25.6064 0.00414

Eq. 1

10.5

2.5

1.590

21

1.64

0.63

NC

0.52539 27.1964 0.00198

Eq. 1

11.5

3.5

1.590

21

1.64

0.63

NC

12.5

4.5

1.660

14

1.16

0.27

NC

Sc

0.0246

0.02532

Total settlement at Center of Group Piles


Scenter
=
Sig + Sc
=
Material Take Off
Foundation

Total

unit

0.72

m3

0.318

Po (t/m2)

Sc (m)

28.7864 0.00114

Eq. 1

0.21361 30.4114 0.00038

Eq. 1

25.32

mm

check

Pile

24.00

Rebar (75 kg/m3)

54.00

kg

Formwork (4.96 m2/m3)

3.57

m2

Leveling concrete (50 mm)

0.07

m3

Excavation

2.24

m3

Backfill

2.24

m3

Soil Disposal

0.00

m3

Bowplank

6.00

m1

f
e

f
a
h2
t

h1

b a c k fi ll