ABSTRACT
Environmental risk assessment is a scientific activity that includes a significant review of the
information or data for quantifying and identifying the risk linked to prospective risk. Risk
management is applied to know the need to compel the measures to control and manage the risk. The
working methodology in this paper is based on various research studies that relates to environmental
risk for soil pollution with hydrocarbons obtained from accidental crude oil spills. Data is required
for the separation of gas oil, which is complex, and its assessment of the environmental risk for
industrial sites for drilling is done by various quantitative and qualitative methods. Environmental
risk calculation methodology for soil is structured and presented in the form of steps and modules
etc. There are five interrelated modules in the assessment of pollution with hydrocarbons from crude
oil in the environment risk that are hazard assessment, hazard identification, environmental risk
management, estimation of risks and assessment of environmental risk with severity of
consequences based on risk criteria These modules required the information and data in the form of
extraction and gas oil separation, technical data for the equipment in the upstream industrial
activities, physic chemical analysis for the soil contaminants, charts, equations on mathematics, soil
properties that influence the severity and consequences of the default risk as well as assessment of
environmental risk intensity in matrix form. The methodology part explains the steps that are
required to calculate the entry and involvement with additional studies such as chemical study,
geotechnical study with pedological study as well.
Keywords: Environmental Risk, Risk Analysis, Soil Pollution, Crude oil.
INTRODUCTION
The main aim of the Sectoral Operational Program for the environment is to reduce the
existing gap to protect the issues of environmental protection. All the constructions and all the
127
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 6308 (Print),
ISSN 0976 6316(Online), Volume 6, Issue 1, January (2015), pp. 127-135 IAEME
installations are done according to the standards set (Agbogidi & Nweke,2005). All best available
tools and techniques with specific values for the production limit established in the reference
document with the best available techniques There is a requirement to introduce the best available
techniques in the environmental management system to avoid and control, manage and organize the
environmental risk. Risk assigns a possible hazard for the near future as per according to the rules
and regulations. The risk depends on the cause or the type of the technological or natural risk further
depends on the type of health risk, ecological and environmental risk which is based on the strength
either on high or accepted risk or on non-acceptable risk. On the quantitative as well as on the
qualitative basis, there is a wide range of methodologies for risk assessment. The assessment of the
environmental risk includes the calculation of the possibility of an unpleasant effect in a particular
period and is repeated as equation (Babu et. al., 2002)
R= probability x severity (1)
The qualitative risk assessment considers few factors such as receptor, path of action, threat
or source. All of these are considered as the tools of the pollutants which are first generated and then
identified or selected to be on the site. Path of action that is one of the factors can be defined as the
manner with the help of which the pollutants migrate to the receptor. The factor can be defined as the
subjects that are affected by some dangerous toxic and harmful substances on site that includes all
the environmental factors along with people and plants as well. The quantitative method of risk
assessment inspects the threat that is based on indicators that are specific, measurable, available,
relevant and timely. The quantitative risk assessment also estimates the size and impact of these
consequences, their possibility and future prospects. For the analysis because of the environmental
pollution produced or created by specific tool for extraction, activity of gas, oil separation of the
proposed methodology is further divided into five major modules which are organized and
interconnected with each other at each level and each stage of the job and the effort done (Ziegler,
2005). All these modules will create main sources which can be generated by putting negative effects
on the environment, how these modules are generated with the negative effects on the environment,
what is the substance which affects the environment in a harmful way, migration trail of pollutants
reaches the goal, environment risk is assigned by the risk which is known as grades for the reasons
that be the cause of possibility and regularity which is indirectly related to the risk criteria and the
procedures to lessen the amount of the environmental risk to an adequate or suitable stage ( Duffus,
2001).
Specific upstream facility shown by the main process flow diagram
It is very to know the specific procedure of the flow of activities of extraction of crude oil and
separation of liquid gas for determining the environmental risk. Here under is the flow diagram of
the field production facility (Osuji, 2001). The upstream process is made of the following important
steps which are: combination of hydrocarbons in the type of gaseous and liquid form which gets
along with the reservoir water and the impurities are taken out from the wells, the fluids which have
been taken out are transported by the means of pipelines to the field production facilities, separating
the oil impurities of the reservoir water which is the liquid part from the gaseous phase in the
separators, after the gas separation obtained from mixing and combining the reservoir water with
crude oil is stored in provisional tanks, rich and wet gases are moved further to the next procedure:
light fuel gas and C3-C5 cut, fuel gas directs to the gas distribution system, crude oil is treated with
thermo-chemical in the special tanks specially designed for this purpose to destroy the crude oil
water and to collect the brine water. Brine water is a part that is inserted or injected again into the
reservoir and its other part is sent to the unit of water treatment (Chukuigwe, 2000).
128
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 6308 (Print),
ISSN 0976 6316(Online), Volume 6, Issue 1, January (2015), pp. 127-135 IAEME
129
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 6308 (Print),
ISSN 0976 6316(Online), Volume 6, Issue 1, January (2015), pp. 127-135 IAEME
130
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 6308 (Print),
ISSN 0976 6316(Online), Volume 6, Issue 1, January (2015), pp. 127-135 IAEME
Step 7- Diagram presentation in the form of source-cause-effect that is found on the basis of
Ishikowa diagram presentation.
Step 8 Establishment of the form of pollution.
More deep explanation of the steps 6 and step 7 has been done. In the sixth step pollutant is
selected as a whole in the module of hazard identification which is to be evaluated depending on the
individual standardized components analyzed in the laboratory (Duffus, 2001) Total petroleum
hydrocarbons are analyzed and checked for the oil pollution of soil, few metals are also present in the
drilling fluids. Ample of research studies have been done in our country for establishing the soil
pollution by heavy metals and for establishing the nature. Whereas on the other hand, in step seven,
the diagrammatic presentation of the cause-effect that is the correlation between the cause and the
effect on the environmental pollution. The Ishikawa diagram generates the consequences in the form
of a horizontal arrow that is tilted at 45 degrees on the main which also shows the main causes which
are responsible (Vega & Jarquin, 2001). The soil pollution can have many various causes as well as
many sources. Overall the stage one completes with the establishment of the accidental or diffused
pollution.
Module 1- Stage 2
In the stage two matrix source oath receptor is determined which contains all the probable
sources of pollution, receptor and migration routes to calculate the environmental risk. The main
hazard sources responsible for this are the amount pollutants present may be in the form of chemical
pollutants or in the form of physical pollutants (Agbogidi et. al.,2005). Matrix vectors are the
dispersion paths and transports of the pollutants, target or receptors as the negative effects of the
pollution. On the basis of the matrix module 2 depends, what is the assessment of hazard. The
presence of the sources of pollution, contaminated areas, and pollutants which affects the ground is
represented in figure no. 3 in this hazard identification module.
131
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 6308 (Print),
ISSN 0976 6316(Online), Volume 6, Issue 1, January (2015), pp. 127-135 IAEME
When the concentrations in the soil are below the alert threshold and need to be monitored
then it is potential soil pollution and when concentration in the soil is above the threshold, soil
pollution is significant only few remedies are required. Module 3 is represented with its stages in
figure number 4.
132
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 6308 (Print),
ISSN 0976 6316(Online), Volume 6, Issue 1, January (2015), pp. 127-135 IAEME
Stage 2- Estimation of the severity of consequences and probability are assigned to grades in
the final report of module 3 stage 1. The causes depend on the pollutant types and the number
of factors. In figure 5 the stages are presented clearly- module 3
133
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 6308 (Print),
ISSN 0976 6316(Online), Volume 6, Issue 1, January (2015), pp. 127-135 IAEME
CONCLUSION
Protection of soil quality is the main priority of this research study. All the five modules
discussed in this research are interrelated with each other, estimation of hazard and identifying of the
sources generates significant pollution of soil. After the implication of the tools and techniques on
different stages lead to the more deep study of other related studies (Anozie & Onwurah, 2001).
ALARP criteria are taken into consideration in the assessment of risk. Few strategical elements have
been established in the environmental management system for the reduction of risk at an acceptable
level. All the remedies mentioned in this research can also be used in monitoring the environmental
risks, but more accuracy is needed for significant accidents at different levels and different stages as
per according to the law and regulations.
REFERENCES
[1]
[2]
Agbogidi, O.M., Nweke, F.U. and Eshegbeyi, O.F. (2005) Effects of soil pollution by crude
oil on seedling growth of Leucaena leucocephala (Lam.De Witt). Global Journal of Pure
Applied Science, 11, 453-456.
Anozie, O., Onwurah, I. N. E., (2001). Toxic effects of Bonny light crude oil in rats after
ingestion of contaminated diet. Nigerian J. Biochemistry and Molecular Biology
(Proceedings Supplement). 16 (3), 1035-1085.
134
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 6308 (Print),
ISSN 0976 6316(Online), Volume 6, Issue 1, January (2015), pp. 127-135 IAEME
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10]
[11]
[12]
[13]
Babu, T. S., Huang, X. D., Greenberg, B. M., (2002). Reactive oxygen species mediated
toxicity of environmental contaminants In: Learned Discourses: Timely Scientific Opinions
SETACGlobe, 3(3), 26-28.
C.A. Chukuigwe, Environmental Risk Management: A Global Consciousness.1st ed. Osia
International Publishers, Port Harcourt, Nigeria, (2000), 15-17.
Duffus, J.H. (2001) Heavy metals a meaningless term. Chemistry International, 23,
793-807.
L. C. Osuji, Journal of Applied Science and Environmental Management, (2001), 5 (2)
35-38.
Oberdorster, E., Cheek, A. O., (2000). Gender benders at the beach, endocrine disruption in
marine and estuarine organisms. Environ. Toxicol. Chem., 20(4), 23-36.
Onwurah, I. N. E., (2002). Anticoagulant potency of water-soluble fractions of Bonny light
oil and enzyme induction in rats. Biomed. Res., 13(1), 33-37
Tiido, T., Rignell-Hydbom, A., Jnsson, B. A. G., Giwercman, Y. L., Pederson, H. S.,
Wojtyniak, B., Ludwicki, J. K., Lesovoy, V., Zvyezday, V., and 10 others., (2006). Impact
of PCB and p,p-DDE contaminants on human sperm Y:X chromosome ratio: studies on
three European populations and the Inuit population in Greenland. Environ. Health
Perspect., 114, 718-724.
Vega-Jarquin, C., (2001). Dengooven l, Magana-Plaza 1, Thalasso F, Ramas-Valdivia A.
Biotransformation of n-hexadecane by cell suspension cultures of Cinchona
robusta and Dioscorea composti. Environ. Toxicol. Chem., 20, 2670-2675.
Ziegler, C. K., (2005). Using mathematical models to assess sediment stability. Integrated
Environmental Assessment and Management, 2(1) 44-50.
Ahmed Neamah Naji, Dr. V. C. Agarwal, Prabhat Kumar Sinha and Mohammed Fadhil
Obaid, Influence of Crude Oil Fouling on Geotechnical Properties of Clayey and Sandy
Soils, International Journal of Civil Engineering & Technology (IJCIET), Volume 5,
Issue 3, 2014, pp. 60 - 70, ISSN Print: 0976 6308, ISSN Online: 0976 6316.
Dr. S. K. Doifode and Dr. A. G. Matani, Advanced Environment Protection Techniques by
Industries: Potential for Corporate Social Responsibility Activities, International Journal of
Civil Engineering & Technology (IJCIET), Volume 4, Issue 1, 2013, pp. 45 - 51,
ISSN Print: 0976 6308, ISSN Online: 0976 6316.
135