Chapte!3
Easic
St6tem
('t) lntroducdon
This system supply he elecftic po,ver to
tle facililios
of
tle
The po{er is received at 1 50kV in a p. {er rcceiving suMlion (RSS), the voltage is stepped
doan to 20 kV ard Uansmitled to the tradion subclations OSS) and electric rooms (ER) along
side of the truck throuqh 20kV hansmission line.
TSS supply the po/er vh ove*Ead contad s)6tem (OCS) to trle MRT t'ains on
fie buck.
seoJ rdiable and s'table powr supply to fie bad, tlE porcr must be received fiom PLN
PLN Gdd syslem is sbudured as follo,rs, 500kV tunk line, 150kV t'ansmission line connecled
io funk lino, 20kV disbihnion line and
vdbge line.
arnount ol power as a
be frcrn 150kV
of 15020kV
PLN
substalion b dens from MRT Blok M staton to aound Kota tut levi, from Blok M to Lebak
Bulus slalion. To receive rcliable porr bet',reen Blok M and Lebuk Bulus, new PLN
15020kV subshtion is requirBd. lf MRT side requesled to constuct lhis subslalion all the
vd@e equipmeitt.
',iork
witl
rnore
is Equircd
lor
And imeiftace point shq.tld b,e sst io 20kV side of $e main trarisfc rne{ dd mainten c6,{ork
of higher voltage shouH be done by PLN. MRTJ ofierd lo PLN flese items. &n PLN insisls
lhat interface pdrn should be at GSWI of PLN subs-talion. These matb{s ale depended on
negofalion between MRTJand PLN
planned.
bt
chapar3
D$lgn
Iransit Systerr
- lterns
(i)
(ii)
(iii)
(iv)
Cipete RaF
(v)
be independent
Snayan.
fudc
(vi)
(vii)
ln September, it was decided that tfte locatbn cf RSS ,,'rould be in a PKK prk at Jln
Smbas Jaksek.
t5okv/2okv soMva
2 lrantforhar
20lv
to
REBAI( SU.US
ER
CtpETERAyA
rss
tss
The
SISINGAMANGA
RAJA
ISS
be deciled by negdidion
DUI(UII ATAS
tsg
bd$/een MR dd PtN.
1)
Location
ISS planning, the location musl be deciJed flst. Frorn tle viev/ of land acquisilion TSS
is da?nsd li stalion are. TIle dfsbnce bet erl subshliom is mainly dedded torn tle
Voltage drop calculalion of fmltrain @ralion phn. For fte load of MRTJ,4 b skn is usually
ln the
LcbakBulus
Ch.pte.3
Basic Englnaedng De.ign
Clptc Raya
J*
,"'* "*
Sisingamangaraia
lcL
I--:"-
Dukuh Atas
.I
:g.
TSS capa.ity
TSS capacjty is caldiated bsed on finaltrain operalion plan.
.
.
.
.
Hedway
Number of cars
:3 minlies
:8ca6
Train r.right
Consumplion factor
No.
Max. Houriy
lnstantaneous
Reclifer Unit
Capadty
(kw)
{k!v)
(kw)
Lebak Bulus
2ffi
6260
4000
Cipete Raya
3800
9520
4000
Sisingamangaraia
4230
10570
4000
Dukuh Atas
3S50
9880
4000
uAao
36230
16000
Sum Tobl
3)
cirqit
Froin the bcation and capacity cahulalbn and other condilion Volbge drop is caldrhed.