Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Name/
Line Name
RX-D55AE6-K
Or
de
r
Job Name
Time
Manu
4,36
Press trafo
2,00
Solder trafo
7,95
M/C
3,15
3,93
10,29
8,13
7,35
6,52
1,00
1,85
9,86
3,85
6,51
5,38
12,00
5,00
3,50
4,71
1,00
1,85
5,23
2,00
27 Press
2,00
2,00
4,13
30 Assy CD lid
3,50
3,30
2,99
4,13
4,20
15,07
15,76
1,00
1,85
8,80
18,74
19,60
7,10
43 Paste hymeron
7,90
9,10
1,00
1,85
23,11
3,57
4,33
3,89
Create
date
Standard Operation
Combination Table
Process
4,33
12,50
53 Assy USB
4,68
7,96
1,00
1,85
8,90
7,60
6,30
Move/Walk
25
50
75
Dept.
Operation Time
T.T
T.T
100
125
150
( Unit
175
200
T.T
225
5Sec j
250
QTY
/Shift
380Pc
Tact
Time
74,68Sec
T.T
275
300
Manual Op.
M/C Op.
Walk/Move
T.T
325
350
375
T.T
400
425
450
T.T
475
500
525
T.T
550
575
600
T.T
625
650
675
T.T
700
725
750
T.T
775
800
14,00
8,90
62 Assy CD mecha
4,10
63 Screw 2 pcs
7,60
1,00
65 Take PCB
66 Break PCB
67 Insert PCB to jig
68 Adjust signal FM/AM
1,85
11,00
4,66
15,00
69 Apply wax
5,35
2,00
4,60
5,00
1,00
1,85
75 Paste hymeron
3,31
76 Apply grease
4,42
9,90
8,80
6,17
4,49
4,29
2,00
83 Press
2,00
2,00
4,00
1,00
1,85
6,80
9,40
90 Screw 2 pcs
6,00
5,00
9,60
1,85
4,90
1,00
1,85
6,00
4,80
4,30
3,00
7,39
7,52
6,10
1,00
1,85
7,33
15,24
8,80
1,85
3,64
5,82
26,60
1,00
1,85
6,82
6,11
37,12
1,00
1,85
3,00
3,74
125 Checking
39,91
2,00
5,50
2,98
3,00
1,00
1,85
8,00
4,00
8,00
8,40
1,00
1,85
6,00
5,00
4,50
4,30
10,00
Wait
Total
866,10
T.T
825
C.T
850
875
T.T
900
T.T
925
950
975
T.T
1000
1025
1050
Project
Name
Process
No.
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
Create
date
Process
Name
Update date
Necessary
Process Qty
Necessary
qty
Operation
time
Model
Name/Number
Line name
380
2838000
RX-D55AE6-K
CELL 19
Process
Operating
Time
Process
Setting
Number
Group Type
Operator
Name
Create Table
Process
Sequence
Process
Item
Number
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
1
2
3
4
5
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
1
2
3
4
5
3
3
3
3
3
3
3
3
3
4
4
4
4
4
4
4
4
5
5
5
5
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
7
7
7
7
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
1
2
3
4
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
1
2
3
4
7
7
7
7
7
8
8
8
8
8
8
8
8
8
8
8
8
8
9
9
9
9
9
9
9
9
9
9
10
10
10
10
10
10
10
10
10
10
11
11
5
6
7
8
9
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
1
2
5
6
7
8
9
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
1
2
11
11
11
11
11
11
11
12
12
12
12
12
12
13
13
13
13
13
13
13
13
13
14
14
14
14
14
14
14
14
14
14
14
14
3
4
5
6
7
8
9
1
2
3
4
5
6
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
10
11
12
3
4
5
6
7
8
9
1
2
3
4
5
6
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
10
11
12
Output setting
Scale Setting
ate Table
All Process
Auto
By Process
Job Name
Take braket and insert to jig
Take trafo and insert to jig
Screw bracket 4 pcs
Take trafo assy and insert to jig solder
Take PCB trafo and break
Assy fuse 2 pcs and hymeron 1 pcs to PCB trafo
Insert PCB trafo to jig solder
Press trafo
Solder trafo
Open jig solder, take trafo and brushing
Assy safety cover to trafo
Release to next process
Take a bottom cab and insert to jig
Take trafo and assy to bottom cab
Bundle wire with sponge sheet and dressing
Insert PCB spring batt to rib
Dressing wire power to rib
Take PCB lock assy to jack
Screw trafo 5 pcs
Insert name plate
Open batt cover
Insert spring batt with jig
Release to next process
Take a front cab and insert to jig
Paste display panel
Insert to jig press
Press
Take front cab from jig press
Manual
Separate Sheet
Set (period)
Sec
Same Sheet
Set (MAX)
100
Sec
Processing
3.15
3.93
10.29
4.97
8.13
6.65
4.36
2.00
7.95
7.35
6.52
1.00
1.85
9.86
7.59
3.85
6.51
5.38
12.00
5.00
3.50
4.71
1.00
1.85
5.23
2.00
2.00
2.00
Walking Waiting
Option
Category
Option
Value
Model
Name/Number
Line Name
4.13
3.50
3.30
2.99
4.13
4.20
15.07
15.76
1.00
1.85
8.80
18.74
19.60
7.10
7.90
9.10
1.00
1.85
23.11
3.57
4.33
3.89
4.33
12.50
4.68
7.96
1.00
1.85
8.90
7.60
6.30
14.00
8.90
4.10
7.60
1.00
1.85
11.00
4.66
15.00
Apply wax
Open cover jig
Assy safety cover to bottom
Take PCB and put into bottom
Release to next process
Take a top cab
Paste hymeron
Apply grease
Assy mechanism button
Assy angle bar and screw 2 pcs
Assy ant rod and screw 1 pcs
Assy spring casslid
Assy casslid panel to casslid
Insert to jig press
Press
Open jig press and take casslid
Assy casclid to top cab
Release to next process
Take a tape mecha and insert to jig
Take PCB and assy wire motor
Solder wire motor
Screw 2 pcs
Insert connector head to machanism
Check output and paste red bond
Take top cab
Assy dumper gear and paste hymeron to top cab
Assy tape mecha to top cab
Release to next process
Take a top cab
Take mecha button cover and paste rubber
Assy spring to mecha cover
Assy mecha button cover to top cab
Take coin krukrup
Assy rubber and paste grease to coin krukrup
Assy coin krukup to top cab
Srew mechanism unit and coin krukup 6 pcs
Assy hendle
Release to next process
Take set
Screw PCB main 3 pcs
5.35
2.00
4.60
5.00
1.00
1.85
3.31
4.42
9.90
8.80
6.17
4.49
4.29
2.00
2.00
2.00
4.00
1.00
1.85
6.80
9.40
6.00
5.00
9.60
1.85
7.00
4.90
1.00
1.85
6.00
4.80
4.30
3.00
7.39
7.52
18.00
6.10
1.00
1.85
7.33
Insert connector
Assy rubber
Take top cab
Assy wire connector
Assy top cab to bottom
Screw 14 pcs
Release to next process
Take a set
Paste sticker
Insert AC cord, dummy antena, and jack pot
Checking
Unplug AC cord, dummy antena, and jack pot
Release to next process
Take set
Put off cover
Insert AC cord
Checking
Unplug AC cord
Puncture test
Paste pilament tape to mecha cover
Assy batt cover
Release to next process
Take set
Cleaning & check apearance
Paste no seri
Assy miramat sheet and paste peper tape
Assembly poly foam R & L
Release to next process
Take a box
Paste no seri and EAN label
Construct box
Insert radio
Insert I/O book, AC cord, remote
Take to the pallete
15.24
8.80
1.85
3.64
5.82
26.60
1.00
1.85
6.82
6.11
37.12
4.87
1.00
1.85
3.00
3.74
39.91
2.00
5.50
2.98
3.00
1.00
1.85
8.00
4.00
8.00
8.40
1.00
1.85
6.00
5.00
4.50
4.30
10.00
Clear
Option guidance
Option
K
Activate during walking
D
Activate at the same time
W
Job during walking
S
Spot welding
Process Name