Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Ltd
Plot No 22-A, Sector 19-C
Palm Beach Marg, Vashi, Navi Mumbai 400 705
Tel. : 7896241/42/43/44/45 Fax : (91-22) 7896240
Email: navimumbai@stupmail.com
OFFICE OF ORIGIN
OWNER
CLIENT
Date
Rev
No
Prepared
Name
04.03.15
For Approval
Date
04.03.2015
K.B
Sign
Checked
Name
AA
Sign
Approved
Name
Sign
ASG
Pages
Note No
01 + 05 = 06
1 / CE / DN 20001(A)
Rev
No
A
Date :
04.03.15
By:
K.B
Sheet No: 1
CONTENTS
OUTFALL OF DRAIN
Date :
04.03.15
By:
K.B
Sheet No: 2
(CWC)Proposed project area falls under Upper Indo-Ganga Plains Subzone 1(e)
and Middle Ganga Plains Subzone 1(f) but major portion of DFCC track falls
under CWC report Subzone 1(e) so 50 year 24 hour point rainfall (mm) value
is taken from 1(e). Catchment area for track drainage is less than 25 sq. km,
the method given in the report No. RBF-16 published by RDSO is used, and
critical intensity of rainfall is derived following the method described in RBF16.
Improved Rational Formula for Runoff Calculation for Storm drainage design
Q50 = 0.278 C I50 A
Where,
Q50 - 50-year return peak flood (m3/sec)
A - Catchment area of drainage channel in sq.km.
C - Coeficient of run off for the type of catchment.
I50 - Intensity of rainfall in mm/hour for tc duration, where, tc = time of
concentration.
Time of concentration, tc = [L3/H] 0.345 hour; where
L = Length of longest stream here drainage channel (kM)
H = Level diff between the starting point of drain and outfall location (M)
Coefficient of runoff, C = 0.332 (R. F)0.2 for alluvium / silty loam; where
R = 50 year 24 hour point rainfall isopluvial map of relevant CWC report.
F = Areal reduction factor, as per table 6.2 of RDSO Monograph No. 50,
Date :
04.03.15
By:
K.B
Sheet No: 3
For design of the drain section, velocity is calculated from Mannings formula
which is expressed as:
V =
I
x R 2 / 3 xS 1 / 2
n
A
in meter
P
Half channel type drain is designed based Mannings formula for circular
conduit, here liquid depth is considered less than radious of circular pipe.
Date :
04.03.15
By:
K.B
Sheet No: 4
Date :
04.03.15
By:
K.B
Sheet No: 5