Sei sulla pagina 1di 15

QUIBORAX S.A.

Proyecto Sistema de Transmisin Planta Solar


El Aguila Subestacin N3

MEMORIA DE CLCULO
TENSIN Y FLECHA
LINEA DE TRANSMISIN
1302851-E-MC-001
Julio 2013
1

24/07/13

REV

FECHA

Ingeniero de
Proyectos
I.C.R.

Gerente
Proyectos
M.S.F

Gerente
General
R.D.C

ELECTRICIDAD Y PROYECTOS S.A.

MEMORIA DE CALCULO
TENSION Y FLECHA

1302851-E-MC-001

INDICE

ITEM

CONTENIDO

PGINA

1.

INTRODUCCION.. 2

2.

ALCANCE.. 3

3.

SISTEMA ELECTRICO.... 3

4.

CONDICIONES AMBIENTALES Y GEOGRAFICAS.. 4

5.

CONDUCTOR DE FASE DE LA LINEA.... 4

6.

HIPOTESIS DE CALCULO DE CONDUCTORES.. 5

7.

TENSIONES PERMISIBLES EN CONDUCTORES .. 5

8.

RESUMEN DE LISTADO DE POSTES.... 6

9.

RESULTADOS DE CONDUCTOR BUTTE..... 7

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 1 de 25

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

1. Introduccin
Un conductor de peso uniforme, sujeto entre dos apoyos por los puntos A y B situados a la
misma altura, forma una curva llamada catenaria. La distancia f entre el punto ms bajo
situado en el centro de la curva y la recta AB que une los apoyos, recibe el nombre de flecha.
Se llama vano a la distancia a entre los dos puntos de amarre A y B (figura N 1 y N2).

Figura N1

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 2 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

Figura N2

2. Alcance
Este documento tiene como objetivo mostrar las caractersticas principales con las cuales se
elaboran y presentan las tablas de tensado asociadas al conductor de fase.
El posicionamiento de las estructuras se realiz utilizando la aplicacin PLS-CADD en su
versin 10.2.

3. Sistema Elctrico
El sistema elctrico en el que operar el proyecto tiene las siguientes caractersticas:
Voltaje nominal
Frecuencia Nominal
Nmero de circuitos
N de fases por circuito
N de conductores por fase

: 13,8 kV
: 50 Hz
:1
:3
:1

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 3 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

4. Condiciones Ambientales y Geogrficas


Los valores de los parmetros ambientales considerados para el diseo de las instalaciones se
indican a continuacin:
TABLA 1. PARMETROS AMBIENTALES GEOGRFICOS

Altitud mxima (sobre nivel del mar)


Nivel Cerunico
Nivel Contaminacin (IEC 60815)
Densidad relativa del aire
Zona NSEG
Mxima
Temperatura
Media
Mnima
Mxima
Presin de viento
Reducida
Precipitaciones (mx. mensual)
Hielo

1.800 m.s.n.m.
2
25 mm/kV
0,823
III
35 C
15 C
-5 C
40 kg/m2
10 kg/m2
Sin informacin
0 mm

5. Conductor de fase de la lnea


TABLA 2. CARACTERSTICAS DEL CABLE DE ALUMINIO

Tipo
Nombre
Calibre
Seccin
Dimetro externo
Peso
Tensin nominal de rotura

AAAC/6201
Butte
321,8 kcmil
2
158,5 mm
16,29 mm
0,4348 kg/m
4.767 kgf

Resistencia elctrica en CC 20C

0,2114 /km

Coef. Dilatacin lineal


Mod. Elasticidad

23x10^-6 1/C
2
6.350 kg/m

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 4 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

6. Hiptesis de clculo de conductores


Las hiptesis principales para el clculo de las cargas ejercidas por los conductores que se
emplearn en la evaluacin de las capacidades elctricas y mecnicas de los diferentes
elementos de la lnea elctrica, se muestran en la Tabla 3.
TABLA 3. HIPOTESIS DE CALCULO DE CONDUCTORES

Hiptesis
1.
2.
3.
4.

Normal
Flecha Mxima
Tensin Mxima
Tensin Reducida

Temp. Cable
(C)
50
75
30
30

Temp. Amb.
(C)
15
35
-5
-5

Presin Viento
(kgf/m2)
0
0
40
10

Hielo (mm)
0
0
0
0

7. Tensiones permisibles en conductores


TABLA 4. TENSIONES DE TRABAJO ADMISIBLES EN LOS CONDUCTORES

P1-P2
P2-P6
P6-P8
P8-P12

Hip. Normal

Hip. Flecha Max.

12%
11%
7%
10%

8%
7%
5%
6%

Hip. Tensin
Max.
20%
18%
13%
17%

Hip. Tensin
Red.
16%
16%
11%
16%

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 5 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

8. Resumen de Listado de Postes


Poste

P1
P2
P3
P5
P6
P7
P8
P9
P10
P11
P12

Desnivel
adelante
(m)
6.49
2.1
4.41
1.92
1.98
3.16
1.33
-0.27
-1.44
-1.36
0.16

Estacin
(m)
0
125.31
216.65
307.76
399.01
489.97
570.34
621.89
666.6
743.76
809.46

Vano
adelante
(m)
125.31
91.34
91.11
91.25
90.96
80.38
51.55
44.71
77.15
65.71
74.13

Coordenada
Este
406,483.51
406,566.92
406,634.69
406,702.29
406,769.99
406,837.47
406,914.44
406,963.80
406,994.03
407,046.18
407,090.60

Coordenada
Norte
7,960,158.09
7,960,064.58
7,960,003.34
7,959,942.25
7,959,881.07
7,959,820.08
7,959,796.92
7,959,782.06
7,959,815.01
7,959,871.86
7,959,920.27

Cota
(msnm)

Tipo
armado

1,657.09
1,663.58
1,665.68
1,670.09
1,672.01
1,673.99
1,677.15
1,678.48
1,678.21
1,676.77
1,675.41

pa11_13
pa11_13
s11_13
s11_13
s11_13
pa11_13
s11_13
pa15_13
s15_13
s15_13
s15_13

Equivalencia de unidades y otros:

9. 1 daN = 10 N = 1.02 kgf


10. Span
11. Mid Span Sag
12. Sag in sheaves
13. Hor.Tension in sheaves
14. Left Struct Number
15. Span Vertical Projection
16. Span Ahead
17. 5 Wave Time

: Vano
: Flecha en la mitad del vano
: Flecha en poleas
: Tensin horizontal en poleas
: Nmero de la estructura lado izquierdo
: Desnivel en los apoyos
: Vano hacia delante
: Tiempo de 5 Percusiones

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 6 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

9. Resultados Conductor Butte


Tramo P1 - P2, Temple Butte
Section #1 from structure #1 to structure #2, start set #1 'Circuito 1', end set #1 'Circuito 1'
Cable 'c:\documentos\planta solar el aguila\cables\butte_aaac.wir', Ruling span (m) 125.137
Sagging data: Catenary (m) 2333.8, Tension (N) 9999.79 Condition I Temperature (deg C) 15
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span
Length

(m)
125.3

Span
Length

(m)
125.3

Mid
Span
Sag
-5 C
(m)
0.64

Mid
Span
Sag
0 C
(m)
0.68

Mid
Span
Sag
5 C
(m)
0.73

Mid
Span
Sag
10 C
(m)
0.78

Mid
Span
Sag
15 C
(m)
0.84

Mid
Span
Sag
20 C
(m)
0.91

Mid
Span
Sag
25 C
(m)
0.98

Mid
Span
Sag
30 C
(m)
1.06

Mid
Span
Sag
35 C
(m)
1.15

Mid
Span
Sag
40 C
(m)
1.25

Mid
Span
Sag
45 C
(m)
1.35

Mid
Left
Span
Span Struct
Vertical
Sag Number Projection
50 C
(m)
(m)
1.46
1
6.49

5
Wave
Time
-5 C
Sec.
7.2

5
Wave
Time
0 C
Sec.
7.5

5
Wave
Time
5 C
Sec.
7.7

5
Wave
Time
10 C
Sec.
8.0

5
Wave
Time
15 C
Sec.
8.3

5
Wave
Time
20 C
Sec.
8.6

5
Wave
Time
25 C
Sec.
8.9

5
Wave
Time
30 C
Sec.
9.3

5
Wave
Time
35 C
Sec.
9.7

5
Wave
Time
40 C
Sec.
10.1

5
Wave
Time
45 C
Sec.
10.5

5
Left
Span
Wave Struct
Vertical
Time Number Projection
50 C
Sec.
(m)
10.9
1
6.49

Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
-5 C
0 C
5 C
10 C
15 C
20 C
25 C
30 C
35 C
40 C
45 C
50 C
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
13158
12339
11545
10755
10004
9269
8574
7920
7305
6742
6229
5766

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 7 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

Tramo P1 - P2, Temple ADSS


Section #2 from structure #1 to structure #2, start set #2 'ADSS', end set #2 'ADSS'
Cable 'f:\planta solar el aguila\cables\adss_36c', Ruling span (m) 125.079
Sagging data: Catenary (m) 1100.51, Horiz. Tension (N) 1500 Condition I Temperature (deg C) 15
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span
Length

(m)
125.2

Span
Length

(m)
125.2

Mid
Span
Sag
-5 C
(m)
1.74

Mid
Span
Sag
0 C
(m)
1.75

Mid
Span
Sag
5 C
(m)
1.76

Mid
Span
Sag
10 C
(m)
1.77

Mid
Span
Sag
15 C
(m)
1.78

Mid
Span
Sag
20 C
(m)
1.80

Mid
Span
Sag
25 C
(m)
1.81

Mid
Span
Sag
30 C
(m)
1.82

Mid
Span
Sag
35 C
(m)
1.83

Mid
Span
Sag
40 C
(m)
1.84

Mid
Span
Sag
45 C
(m)
1.85

Mid
Left
Span
Span Struct
Vertical
Sag Number Projection
50 C
(m)
(m)
1.86
1
6.49

5
Wave
Time
-5 C
Sec.
11.91

5
Wave
Time
0 C
Sec.
11.95

5
Wave
Time
5 C
Sec.
11.98

5
Wave
Time
10 C
Sec.
12.02

5
Wave
Time
15 C
Sec.
12.06

5
Wave
Time
20 C
Sec.
12.10

5
Wave
Time
25 C
Sec.
12.14

5
Wave
Time
30 C
Sec.
12.17

5
Wave
Time
35 C
Sec.
12.21

5
Wave
Time
40 C
Sec.
12.25

5
Wave
Time
45 C
Sec.
12.29

5
Left
Span
Wave Struct
Vertical
Time Number Projection
50 C
Sec.
(m)
12.32
1
6.49

Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
-5 C
0 C
5 C
10 C
15 C
20 C
25 C
30 C
35 C
40 C
45 C
50 C
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
1539
1528
1519
1510
1501
1490
1481
1472
1463
1454
1445
1438

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 8 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

Tramo P2 P6, Temple Butte


Section #2 from structure #2 to structure #6, start set #1 'Circuito 1', end set #1 'Circuito 1'
Cable 'c:\documentos\planta solar el aguila\cables\butte_aaac.wir', Ruling span (m) 91.1225
Sagging data: Catenary (m) 2333.8, Tension (N) 9999.79 Condition I Temperature (deg C) 15
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span
Length

(m)
91.3
91.1
91.2
91.0

Span
Length

(m)
91.3
91.1
91.2
91.0

Mid
Span
Sag
-5 C
(m)
0.34
0.33
0.33
0.33

Mid
Span
Sag
0 C
(m)
0.36
0.36
0.36
0.36

Mid
Span
Sag
5 C
(m)
0.38
0.38
0.38
0.38

Mid
Span
Sag
10 C
(m)
0.41
0.41
0.41
0.41

Mid
Span
Sag
15 C
(m)
0.45
0.44
0.45
0.44

Mid
Span
Sag
20 C
(m)
0.49
0.48
0.48
0.48

Mid
Span
Sag
25 C
(m)
0.53
0.53
0.53
0.52

Mid
Span
Sag
30 C
(m)
0.58
0.58
0.58
0.57

Mid
Span
Sag
35 C
(m)
0.64
0.63
0.64
0.63

Mid
Span
Sag
40 C
(m)
0.70
0.70
0.70
0.70

Mid
Span
Sag
45 C
(m)
0.77
0.77
0.77
0.77

Mid
Left
Span
Span Struct
Vertical
Sag Number Projection
50 C
(m)
(m)
0.85
2
2.20
0.85
3
4.41
0.85
4
1.92
0.85
5
1.88

5
Wave
Time
-5 C
Sec.
5.2
5.2
5.2
5.2

5
Wave
Time
0 C
Sec.
5.4
5.4
5.4
5.4

5
Wave
Time
5 C
Sec.
5.6
5.6
5.6
5.6

5
Wave
Time
10 C
Sec.
5.8
5.8
5.8
5.8

5
Wave
Time
15 C
Sec.
6.0
6.0
6.0
6.0

5
Wave
Time
20 C
Sec.
6.3
6.3
6.3
6.3

5
Wave
Time
25 C
Sec.
6.6
6.6
6.6
6.5

5
Wave
Time
30 C
Sec.
6.9
6.9
6.9
6.8

5
Wave
Time
35 C
Sec.
7.2
7.2
7.2
7.2

5
Wave
Time
40 C
Sec.
7.6
7.5
7.6
7.5

5
Wave
Time
45 C
Sec.
7.9
7.9
7.9
7.9

5
Left
Span
Wave Struct
Vertical
Time Number Projection
50 C
Sec.
(m)
8.3
2
2.20
8.3
3
4.41
8.3
4
1.92
8.3
5
1.88

Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
-5 C
0 C
5 C
10 C
15 C
20 C
25 C
30 C
35 C
40 C
45 C
50 C
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
13340
12485
11643
10816
10005
9210
8445
7709
7015
6374
5773
5241

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 9 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

Tramo P2 P6, Temple ADSS


Section #4 from structure #2 to structure #6, start set #2 'ADSS', end set #2 'ADSS'
Cable 'f:\planta solar el aguila\cables\adss_36c', Ruling span (m) 91.0516
Sagging data: Catenary (m) 1100.51, Horiz. Tension (N) 1500 Condition I Temperature (deg C) 15
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span
Length

(m)
91.3
91.1
91.2
90.7

Span
Length

(m)
91.3
91.1
91.2
90.7

Mid
Span
Sag
-5 C
(m)
0.91
0.91
0.91
0.90

Mid
Span
Sag
0 C
(m)
0.92
0.92
0.92
0.91

Mid
Span
Sag
5 C
(m)
0.93
0.93
0.93
0.92

Mid
Span
Sag
10 C
(m)
0.94
0.94
0.94
0.93

Mid
Span
Sag
15 C
(m)
0.95
0.94
0.95
0.93

Mid
Span
Sag
20 C
(m)
0.95
0.95
0.95
0.94

Mid
Span
Sag
25 C
(m)
0.96
0.96
0.96
0.95

Mid
Span
Sag
30 C
(m)
0.97
0.97
0.97
0.96

Mid
Span
Sag
35 C
(m)
0.98
0.98
0.98
0.97

Mid
Span
Sag
40 C
(m)
0.99
0.99
0.99
0.98

Mid
Span
Sag
45 C
(m)
1.00
0.99
1.00
0.98

Mid
Left
Span
Span Struct
Vertical
Sag Number Projection
50 C
(m)
(m)
1.01
2
2.20
1.00
3
4.41
1.00
4
1.92
0.99
5
1.88

5
Wave
Time
-5 C
Sec.
8.63
8.61
8.62
8.57

5
Wave
Time
0 C
Sec.
8.67
8.65
8.66
8.61

5
Wave
Time
5 C
Sec.
8.70
8.69
8.70
8.65

5
Wave
Time
10 C
Sec.
8.75
8.73
8.74
8.69

5
Wave
Time
15 C
Sec.
8.78
8.77
8.78
8.73

5
Wave
Time
20 C
Sec.
8.82
8.81
8.82
8.77

5
Wave
Time
25 C
Sec.
8.86
8.85
8.86
8.80

5
Wave
Time
30 C
Sec.
8.90
8.88
8.89
8.84

5
Wave
Time
35 C
Sec.
8.93
8.92
8.93
8.88

5
Wave
Time
40 C
Sec.
8.98
8.96
8.97
8.92

5
Wave
Time
45 C
Sec.
9.01
9.00
9.01
8.96

5
Left
Span
Wave Struct
Vertical
Time Number Projection
50 C
Sec.
(m)
9.05
2
2.20
9.04
3
4.41
9.05
4
1.92
8.99
5
1.88

Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
-5 C
0 C
5 C
10 C
15 C
20 C
25 C
30 C
35 C
40 C
45 C
50 C
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
1556
1542
1528
1514
1502
1488
1475
1463
1451
1436
1426
1413

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 10 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

Tramo P6 P8, Temple Butte


Section #3 from structure #6 to structure #8, start set #1 'Circuito 1', end set #1 'Circuito 1'
Cable 'c:\documentos\planta solar el aguila\cables\butte_aaac.wir', Ruling span (m) 70.4229
Sagging data: Catenary (m) 1750.4, Tension (N) 7500.06 Condition I Temperature (deg C) 15
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span
Length

(m)
80.4
51.5

Span
Length

(m)
80.4
51.5

Mid
Span
Sag
-5 C
(m)
0.32
0.13

Mid
Span
Sag
0 C
(m)
0.35
0.14

Mid
Span
Sag
5 C
(m)
0.38
0.16

Mid
Span
Sag
10 C
(m)
0.42
0.17

Mid
Span
Sag
15 C
(m)
0.46
0.19

Mid
Span
Sag
20 C
(m)
0.51
0.21

Mid
Span
Sag
25 C
(m)
0.57
0.24

Mid
Span
Sag
30 C
(m)
0.64
0.26

Mid
Span
Sag
35 C
(m)
0.72
0.30

Mid
Span
Sag
40 C
(m)
0.80
0.33

Mid
Span
Sag
45 C
(m)
0.90
0.37

Mid
Left
Span
Span Struct
Vertical
Sag Number Projection
50 C
(m)
(m)
1.00
6
3.26
0.41
7
4.13

5
Wave
Time
-5 C
Sec.
5.1
3.3

5
Wave
Time
0 C
Sec.
5.3
3.4

5
Wave
Time
5 C
Sec.
5.6
3.6

5
Wave
Time
10 C
Sec.
5.8
3.8

5
Wave
Time
15 C
Sec.
6.1
3.9

5
Wave
Time
20 C
Sec.
6.5
4.2

5
Wave
Time
25 C
Sec.
6.8
4.4

5
Wave
Time
30 C
Sec.
7.2
4.6

5
Wave
Time
35 C
Sec.
7.6
4.9

5
Wave
Time
40 C
Sec.
8.1
5.2

5
Wave
Time
45 C
Sec.
8.6
5.5

5
Left
Span
Wave Struct
Vertical
Time Number Projection
50 C
Sec.
(m)
9.0
6
3.26
5.8
7
4.13

Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
-5 C
0 C
5 C
10 C
15 C
20 C
25 C
30 C
35 C
40 C
45 C
50 C
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
10737
9890
9073
8273
7492
6754
6058
5415
4825
4309
3853
3468

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 11 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

Tramo P6 P8, Temple ADSS


Section #6 from structure #6 to structure #8, start set #2 'ADSS', end set #2 'ADSS'
Cable 'f:\planta solar el aguila\cables\adss_36c', Ruling span (m) 70.1515
Sagging data: Catenary (m) 1100.51, Horiz. Tension (N) 1500 Condition I Temperature (deg C) 15
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span
Length

(m)
80.1
51.0

Span
Length

(m)
80.1
51.0

Mid
Span
Sag
-5 C
(m)
0.70
0.28

Mid
Span
Sag
0 C
(m)
0.71
0.29

Mid
Span
Sag
5 C
(m)
0.72
0.29

Mid
Span
Sag
10 C
(m)
0.72
0.29

Mid
Span
Sag
15 C
(m)
0.73
0.30

Mid
Span
Sag
20 C
(m)
0.74
0.30

Mid
Span
Sag
25 C
(m)
0.75
0.30

Mid
Span
Sag
30 C
(m)
0.75
0.31

Mid
Span
Sag
35 C
(m)
0.76
0.31

Mid
Span
Sag
40 C
(m)
0.77
0.31

Mid
Span
Sag
45 C
(m)
0.78
0.32

Mid
Left
Span
Span Struct
Vertical
Sag Number Projection
50 C
(m)
(m)
0.79
6
3.26
0.32
7
4.12

5
Wave
Time
-5 C
Sec.
7.56
4.81

5
Wave
Time
0 C
Sec.
7.59
4.83

5
Wave
Time
5 C
Sec.
7.64
4.86

5
Wave
Time
10 C
Sec.
7.68
4.89

5
Wave
Time
15 C
Sec.
7.72
4.92

5
Wave
Time
20 C
Sec.
7.76
4.94

5
Wave
Time
25 C
Sec.
7.80
4.97

5
Wave
Time
30 C
Sec.
7.84
4.99

5
Wave
Time
35 C
Sec.
7.89
5.02

5
Wave
Time
40 C
Sec.
7.93
5.05

5
Wave
Time
45 C
Sec.
7.97
5.07

5
Left
Span
Wave Struct
Vertical
Time Number Projection
50 C
Sec.
(m)
8.01
6
3.26
5.10
7
4.12

Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
-5 C
0 C
5 C
10 C
15 C
20 C
25 C
30 C
35 C
40 C
45 C
50 C
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
1563
1549
1532
1514
1499
1483
1467
1451
1436
1420
1406
1390

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 12 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

Tramo P8 P12, Temple Butte


Section #4 from structure #8 to structure #12, start set #1 'Circuito 1', end set #1 'Circuito 1'
Cable 'c:\documentos\planta solar el aguila\cables\butte_aaac.wir', Ruling span (m) 68.8192
Sagging data: Catenary (m) 2333.8, Tension (N) 9999.79 Condition I Temperature (deg C) 15
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span
Length

(m)
44.7
77.2
65.7
74.1

Span
Length

(m)
44.7
77.2
65.7
74.1

Mid
Span
Sag
-5 C
(m)
0.08
0.24
0.17
0.22

Mid
Span
Sag
0 C
(m)
0.09
0.25
0.18
0.23

Mid
Span
Sag
5 C
(m)
0.09
0.27
0.20
0.25

Mid
Span
Sag
10 C
(m)
0.10
0.29
0.21
0.27

Mid
Span
Sag
15 C
(m)
0.11
0.32
0.23
0.29

Mid
Span
Sag
20 C
(m)
0.12
0.35
0.25
0.32

Mid
Span
Sag
25 C
(m)
0.13
0.38
0.28
0.35

Mid
Span
Sag
30 C
(m)
0.14
0.42
0.30
0.39

Mid
Span
Sag
35 C
(m)
0.16
0.47
0.34
0.43

Mid
Span
Sag
40 C
(m)
0.17
0.52
0.38
0.48

Mid
Span
Sag
45 C
(m)
0.20
0.58
0.42
0.54

Mid
Left
Span
Span Struct
Vertical
Sag Number Projection
50 C
(m)
(m)
0.22
8
-0.17
0.65
9
-1.44
0.47
10
-1.35
0.60
11
0.05

5
Wave
Time
-5 C
Sec.
2.5
4.4
3.7
4.2

5
Wave
Time
0 C
Sec.
2.6
4.5
3.9
4.4

5
Wave
Time
5 C
Sec.
2.7
4.7
4.0
4.5

5
Wave
Time
10 C
Sec.
2.8
4.9
4.2
4.7

5
Wave
Time
15 C
Sec.
3.0
5.1
4.3
4.9

5
Wave
Time
20 C
Sec.
3.1
5.3
4.5
5.1

5
Wave
Time
25 C
Sec.
3.2
5.6
4.7
5.4

5
Wave
Time
30 C
Sec.
3.4
5.9
5.0
5.6

5
Wave
Time
35 C
Sec.
3.6
6.2
5.2
5.9

5
Wave
Time
40 C
Sec.
3.8
6.5
5.5
6.3

5
Wave
Time
45 C
Sec.
4.0
6.9
5.9
6.6

5
Left
Span
Wave Struct
Vertical
Time Number Projection
50 C
Sec.
(m)
4.2
8
-0.17
7.3
9
-1.44
6.2
10
-1.35
7.0
11
0.05

Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
-5 C
0 C
5 C
10 C
15 C
20 C
25 C
30 C
35 C
40 C
45 C
50 C
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
13426
12558
11692
10841
10005
9175
8363
7593
6842
6133
5479
4877

Fidel Oteiza 1971 Of. 202 Providencia - Santiago Fono: 02-2343 2506 email: elypsa@elypsa.cl
Pgina 13 de 40

MEMORIA DE CALCULO
ELECTRICA

1302851-E-MC-001

Tramo P8 P12, Temple ADSS


Section #8 from structure #8 to structure #12, start set #2 'ADSS', end set #2 'ADSS'
Cable 'f:\planta solar el aguila\cables\adss_36c', Ruling span (m) 68.8031
Sagging data: Catenary (m) 1100.51, Horiz. Tension (N) 1500 Condition I Temperature (deg C) 15
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span
Length

(m)
44.1
77.2
65.7
74.1

Span
Length

(m)
44.1
77.2
65.7
74.1

Mid
Span
Sag
-5 C
(m)
0.21
0.65
0.47
0.60

Mid
Span
Sag
0 C
(m)
0.21
0.65
0.47
0.60

Mid
Span
Sag
5 C
(m)
0.22
0.66
0.48
0.61

Mid
Span
Sag
10 C
(m)
0.22
0.67
0.49
0.62

Mid
Span
Sag
15 C
(m)
0.22
0.68
0.49
0.62

Mid
Span
Sag
20 C
(m)
0.22
0.68
0.50
0.63

Mid
Span
Sag
25 C
(m)
0.23
0.69
0.50
0.64

Mid
Span
Sag
30 C
(m)
0.23
0.70
0.51
0.65

Mid
Span
Sag
35 C
(m)
0.23
0.71
0.51
0.65

Mid
Span
Sag
40 C
(m)
0.23
0.71
0.52
0.66

Mid
Span
Sag
45 C
(m)
0.24
0.72
0.52
0.67

Mid
Left
Span
Span Struct
Vertical
Sag Number Projection
50 C
(m)
(m)
0.24
8
-0.17
0.73
9
-1.44
0.53
10
-1.35
0.67
11
0.05

5
Wave
Time
-5 C
Sec.
4.16
7.27
6.19
6.98

5
Wave
Time
0 C
Sec.
4.18
7.31
6.22
7.02

5
Wave
Time
5 C
Sec.
4.20
7.35
6.26
7.06

5
Wave
Time
10 C
Sec.
4.23
7.39
6.29
7.10

5
Wave
Time
15 C
Sec.
4.25
7.43
6.33
7.14

5
Wave
Time
20 C
Sec.
4.27
7.47
6.36
7.18

5
Wave
Time
25 C
Sec.
4.30
7.51
6.40
7.22

5
Wave
Time
30 C
Sec.
4.32
7.55
6.43
7.25

5
Wave
Time
35 C
Sec.
4.34
7.59
6.47
7.30

5
Wave
Time
40 C
Sec.
4.37
7.63
6.50
7.33

5
Wave
Time
45 C
Sec.
4.39
7.67
6.54
7.37

5
Left
Span
Wave Struct
Vertical
Time Number Projection
50 C
Sec.
(m)
4.41
8
-0.17
7.72
9
-1.44
6.57
10
-1.35
7.41
11
0.05

Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
-5 C
0 C
5 C
10 C
15 C
20 C
25 C
30 C
35 C
40 C
45 C
50 C
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
1566
1549
1532
1514
1499
1483
1465
1451
1434
1420
1404
1389