QMG BRANCH
II
KNOW YOUR MES WORKS
CHAPTER - FOUR
SITING BOARD
KLP
Whether the accommodation is for long term (more than 10 years) or for s h o r t
term?
Are all inter services aspects taken care of to avoid duplication of common
items/facilities?
TERMS OF REFERENCE
Is the Board represented by all the concerned parties such as DEO, Land
86
SITING BOARD
Acquisition Officer, State Electricity Board, Water Supply And Sewage Board,
Civil Aviation Authority, Corporation Town Planning Authorities as applicable?
ZONAL PLAN
Does the Zonal Plan cater for any expansion? If so, what?
LAND
SITING BOARD
Has the case for acquisition, hired, leased and private land been floated?
Is there any other factor pertaining to land which may hold up the execution of
the project?
88
SITING BOARD
RAILWAY WORKS
If so, has the matter been properly taken up with railway authorities?
SITE CLEARANCE
Have the details of site clearance including filling, cutting of rocks or demolition
been given?
Whether any telephone lines, water mains and so on, lie in the site?
89
SITING BOARD
If the source of water and power is not MES, has the certificate from the
concerned authorities been obtained?
Whether the cost of connection charges and cost of new works to be executed
by civil organisation been furnished?
SPECIAL ITEMS
Whether statement of case is attached for full justification for all the special
items?
90
SITING BOARD
Have the full requirements of the users been taken into account and is the
project complete in all respects?
Whether the disposal/utility of all the existing assets has been clearly
indicated?
91
SITING BOARD
SITING BOARD
Whether the accommodation required is fully justified with facts and figures
particularly :v
Technical accommodation.
v
Storage accommodation based on size and number of machinery, nature of
material to be stored and so on.
Whether any justification has been given for providing compound wall/
security fencing?
SITING BOARD
SITING BOARD
v
Geyser
v
Stabiliser
v
Standby generator
v
Special items of furniture
Whether the PDC of the project is given? Or is the project a time bound project.
Is there any residual aspect to be followed up at the ministry level in respect of:v
Terms for water
v
Terms for power
v
Terms for land
v
Terms for resumptions
v
Effluent discharge point
v
Water and power for construction
v
Railway works
95
SITING BOARD
If so, whether the short brief on each of the affected items is attached?.
FURNITURE
If partial, to what extent it has not been provided for and why?
CERTIFICATES
Has the non-availability certificate for the surplus furniture, signed by GE and
countersigned by OC of the station, been obtained?
Has the certificate for provision of guard bars/grills for the windows in ground
floor of married accommodation been obtained from Station Commander?
Has the 'No Objection Certificate been obtained from DEO/State/Govt Land
Acquisition Officer?
96
SITING BOARD
Have the certificates from representative of State Electricity Board, Water and
Sewage Board, Corporation for supply of power, electricity and for sewage
connections been obtained?
SITE PLANS
Has the dimensioned site plan showing the following items been prepared:v
Prevailing wind direction in relation to earth point and highest flood level.
v
Spot levels, at 10m grids indicating contour at 1m intervals on flat ground
and 2.5m interval on undulating ground.
v
Roads and path ways.
v
Existing services with sizes of mains such as :
Water supply lines.
SITING BOARD
Telephone line.
Sewage-Sewerage-surface drains.
Fencing obstructions.
v
Bearing capacity of soil-sub strata-sub soil water.
v
Means of access, right of way if any.
Has the tentative layout plan showing all proposed buildings along with
services been prepared?
Has the siting of buildings been verified at site by pegging out on the ground
based on the tentative layout plan?
98
SITING BOARD
Have the users indicated their functional priorities for taking over building when
completed ?
99
SITING BOARD
ADDITIONAL POINTS
FOR CONSIDERATION IN
BOARD PROCEEDINGS
ADM BUILDING
v
Front margin of the building should be kept minimum 50m.
v
Such buildings should be as far as possible on high ground.
v
Approach road should be two way with a median. Avenue plantation must be
made along with approach road.
v
Parking spaces must be provided to the sides or the back.
v
Building should as far as possible follow symmetry within main VIP entrance
at the centre. Additional entrances must be made from the rear and sides for
the different category of pers coming to the building.
v
Whenever three storey bldg is planned, lift may be catered as a special item.
v
The main car porch should be able to hold at least two cars.
v
The entrance lobby should be sufficiently large enough.
v
The entrance door should be between 2 to 2.5m wide.
v
Each entrance must have ramps so that physically handicapped persons can
enter the building without any difficulty.
100
v
The connecting passage should be 1.5m wide in case rooms are on one side of
the passage and minimum 2.0m wide whenever rooms are provided on either
side of the passage.
v
Toilets should be provided as per authorisation. However, it should be located
as per requirment.
v
Provision of officers tea room and cafeteria for other ranks must be catered.
v
Architectural design to cater for future expansion both vertically and
horizontally.
v
Light and ventilation aspects must be given due care.
v
Besides the main approach, the building should have approach road from rear
or the side.
v
Compound wall with decorative grill must be part of the project.
v
Sentry post at all gates must be designed to match the main building.
v
As far as possible, avoid locating any building along either side of the main
approach road.
101
102
SCHOOL BUILDING
v
Irrespective of the size of the school, compound must have main gate, gate for
students coming on school buses, students coming on foot, students coming
on two/four wheelers.
v
Adequate parking spaces must be created on side/rear of the school for
parking/offloading of buses, students and teachers vehicles. Separate parking
for parents and guests.
v
Classrooms must be planned only on one side of the corridor.
v
Classrooms must be so located that students do not get the glare of the Sun.
v
Classroom furniture should be based on different age groups.
v
Adequate No of staircases must be provided. There should be one ramp for
handicapped children.
v
Toilets should be separate for staff and students. The boys and girls toilet must
be at different corners. In the toilet blocks, provision must exist for physically
challenged students too.
v
Adequate number of play fields must be catered for all age groups.
v
Adequate number of drinking water points must be catered.
103
HOSPITALS
v
Entrance to the building must be wide.
v
Location of staircases must be well defined and not tucked into corners.
v
Adequate lawns and gardens should be located within the hospital for patients.
v
Parking spaces for visitors and doctors must be made available for outstation
visitors of patients.
v
Guest room with catering facility must be made available for outstation
visitors of patients.
v
For physically challenged persons, adequate ramps, lifts and toilets should be
provided.
SHOPPING COMPLEXES
v
The location should be central to all the married accommodation of the station.
v
Layout should be open type with scope for expansion.
v
Separate entrance for pedestrian and vehicle traffic.
104
v
Adequate parking for two-wheelers and cars.
v
Separate service lane for heavy vehicle carrying goods.
v
Area around shopping complex should be landscaped similar to a park.
v
Adequate toilets for ladies & gents must be provided.
v
Provisions of ramps and toilets must made for physically challenged persons.
OTM ACCOMMODATION FOR UNITS
v
The entire master plan must be finalized during the Phase-I stage of the board.
v
The entire layout should be based on functional relationship between various
spaces of the unit.
v
The line plans of the each and every building should be finalised during board
stage with active participation of the user.
v
Characteristics of each and every building with a unit must have similarity.
v
The inner space management must be done to optimize the functional
efficiency of the unit.
v
Similarly Kote and facilities for parking of guns & Armoured Vehicles must be
done as per requirements of unit administration.
105
CHAPTER - FIVE
EXHAUSTIVE LIST
OF OBSERVATIONS BY
TECHNICAL EXAMINERS
STORAGE OF MATERIAL
CEMENT
106
SITE DOCUMENTS
SITE DOCUMENTS
Works Diary, Site Order Book, Stage Passing Register, Sample Approval
Register, Material Testing Register, Cement and Steel Acceptance R e g i s t e r ,
DO Register, Cement Consumption Register, Cement Requirement R e g i s t e r,
Steel Reinforcement Register.
Various stages of sample quarter are duly passed by GE and the sample
quarter is complete in all respects within the time fixed for its completion.
107
SITE LABORATAORY
SITE LABORATORY
List of equipment required to be kept in site lab shall form part of contract and
all equipment as per CA shall be available at site.
108
DESIGN MIX
DESIGN MIX
In case of RMC, requirements for visiting the RMC plant complied or not.
Cement content and w/c ratio as per approved design mix to be deliberated
(As per IS 456 : 2000 max cement content is 450kg/m3).
Trial mixes carried out or not and record for the same is maintained.
Test samples of three reserve test cubes should be available, record of test
cubes casted commensurate with the quantum of concrete.
109
RCC CHAJJAS
Throating/drip mould.
Slope at top.
110
STONE MASONARY
STONE MASONARY
Size of stones.
Hollowness of mortar.
Dressing of stones.
111
FOUNDATION
FOUNDATIONS
In case of pile foundations, initial load test report, routine load test report,
depth of pile, mix design for pile to be perused with reference to CA and IS
specification.
If any rock met with during excavation, whether mechanical means adopted
and how the DO paid including credit for rock obtained.
In case water met during excavation whether any DO paid for removal of water
or not.
STEEL REINFORCEMENT
STEEL REINFORCEMENT
BRICK WORK
Curing of brickwork.
Testing of bricks.
FORM WORK
Only steel props for scaffolding are to be provided as per latest instructions.
114
ROOF TREATMENT
Bubble formation.
ROOF TREATMENT
In case of accessible roofs, the quality and thickness of PCC machine pressed
tiles to be seen.
BRICK TILE PROTECTION OVER MEMBRANE
Width of joints.
Thickness of pointing.
116
ROOF TREATMENT
Thickness.
Cracks.
117
WOODEN FRAMES
Type of timber.
Dimensions.
Surface finish.
Preservative treatment.
Chamfering/rounding of edges.
Profile dimensions.
Thickness of sheet.
Make.
Stiffener at bottom.
WOODEN SHUTTERS
Surface finish.
Nos & dimensions of sash bars in mosquito proof doors are mitred.
119
PELMET BOXES
Wooden edging.
CURTAIN ROD
ISI marking and make of tower bolts, sliding, door bolt, handles, door spring etc.
120
BUILDERS HARDWARE
MS BUTT HINGES
Grip length.
Base plate.
121
ALUMINIUM DOORS/WINDOWS
Degree of anodizing.
Floor spring.
Configuration of windows.
v
Glazed and wire gauged shutter on common frame.
v
Glazed and wire gauged shutter on separate frame.
122
v
Glazed bars in wire gauged shutters.
Width and thickness of 'Z' section, glazing bars and sash bars.
Hinges:v
Projecting/friction/box type.
v
Electro galvanizing of hinge pin.
v
Thickness/length of sheet, washer Nos & thickness.
v
Oil paper used for covering during plaster.
Window handles.
123
CEILING
CEILING
Level adjustor.
Holding clips.
Tiles.
v
Perforated particle board.
v
Plain AC board.
v
Other material/type.
FLOORING
PCC FLOORING
Thickness.
Size of panels.
Uniformity of colour.
Width of joints.
FLOORING
Colour.
Width of joint.
Width of joint.
Type of granite.
126
FLOORING
Type of marble.
Colour.
Height of dado.
Width of joint.
127
PLASTERING
Thickness.
Surface finish.
Plaster grooves.
Cracks.
POINTING
Quality of workmanship.
128
PAINTING
PAINTING
Surface preparation.
Primer.
129
Long/short shank.
Weight.
Weight.
PLUMBING
Soil/Waste/Vent pipes.
v
Material and class/grade and conformity to specifications/IS.
v
Make & ISI marking.
v
Type of jointing material.
130
v
Fixing arrangements with walls.
v
Height of vent pipe above roof level.
v
Size of pipes.
Nahani/Floor Traps
v
Material.
v
Long body or short body.
v
Make & ISI marking.
v
Weight & size.
v
Type of grating CI or CP/hinged or non hinged.
SANITARY FITTINGS
WHB/WC/Urinals.
v
Make, ISI marking and quality.
v
Sizes.
v
Fixing arrangement.
131
Flushing cistern.
v
Type and capacity.
v
Make and ISI marking.
v
Fixing arrangement with walls.
v
Waste pipe, its type & specification and fixing to cistern & WC.
v
Overflow pipe.
Towel Rails.
v
Material and type.
v
Length.
v
Outer dia and wall thickness.
SEWAGE DISPOSAL
SGSW PIPES
v
Size, make and ISI marking.
v
Thickness of bedding layer.
v
Returning/fitting of soil in trenches.
v
Haunching / surrounding.
v
Precaution in black cotton soil areas.
v
Depth/precaution in portions under roads.
MANHOLES
v
Type of cover RCC or CI.
v
Size and finish of covers.
v
Smoothness of plaster.
v
PCC coping on top of walls.
v
Handle.
133
SEWAGE DISPOSAL
134
INTERNAL ELECTRIFICATION
BATTEN WIRING
v
Quality of wood in battens, thickness and width, surface finish, varnishing.
v
Fixing arrangement with wall and spacing of gutties.
v
Thickness, size and spacing of aluminium clips.
CONDUIT WIRING
v
Type of conduit PVC or MS.
v
Type of fittings PVC or MS.
v
Make and ISI marking on conduits and fittings.
v
Fixing arrangement with wall/in chases.
v
Grade of conduit, outer dia and wall thickness.
v
Number of cables in one conduit.
135
INTERNAL ELECTRIFICATION
EARTHING
v
Type and dia of wire.
v
Earth dolly connection to sunken boxes.
v
Light fittings connected with earth wire.
v
Earthing wire connected to main earthing.
v
Size and thickness of earth plate.
v
Watering and protection pipe.
v
Earth pit covers.
v
Funnel and wire mesh.
136
INTERNAL ELECTRIFICATION
SUNKEN BOXES
v
Type MS or CI.
v
Size and wall thickness and depth.
v
Bituminous paint on embedded surfaces.
v
Paint on exposed surfaces.
v
Cover sheet bakelite or PVC, thickness, make and ISI marking , screws
GI or brass.
LIGHT FITTINGS
v
Make and ISI marking.
v
Thickness of sheet.
v
Fixed on wooden boards or directly on walls.
v
Purchase vouchers.
137
INTERNAL ELECTRIFICATION
MCBs
v
Make and ISI marking.
v
Rating.
v
Wires connected with thimbles.
v
Purchase vouchers.
DBs
v
Make.
v
Thickness of sheet enclosure.
v
Ways 2,4,6 or 8 ways.
v
Blanking plates.
v
Purchase vouchers.
v
On wooden boards or directly embedded on walls.
138
AGGREGATE
v
Type: Trap/Basalt/Granite.
v
Tests: Sieve analysis, flakiness index, abrasion value, stripping value,
soundness, and water absorption.
Camber.
v
Thickness of carpet.
v
Voids on surface.
v
Seal coat type and its suitability and uniformity.
v
Rolling and compaction.
v
Edges.
v
Camber.
v
Localised depressions.
v
Temperature of mix at laying and rolling.
v
Paver used or not.
v
Hot mix plant or mixed at site.
v
Camber.
v
Localised depressions.
v
Thickness and compaction.
v
Voids and surface finish.
Stack measurements.
141
AREA DRAINAGE
AREA DRAINAGE
Location, grid, direction and slopes of drains with respect to topography and
slope of natural ground.
Weep holes.
142
EXTERNAL ELECTRIFICTION
CABLES
v
Grade HT/LT.
v
Voltage 660/1100 volt or 1100 volt for LT-6.5 KV/11 KV for HT.
v
Specifications, make-drum No and ISI marking.
v
Purchase vouchers and test certificate.
v
Trench width and depth.
v
Sand cushioning.
v
Protection covers (Brick/PCC, size/shape and mix of concrete, their
make and testing).
v
Insulation test at site.
v
UG cable for LT preferred.
TRANSFORMERS
v
Specifications, capacity, make and winding (Aluminium/Copper).
v
Purchase vouchers and test certificate.
v
Oil level.
v
Various accessories.
143
EXTERNAL ELECTRIFICTION
v
Neutral and body separately earthed.
v
Type indoor or outdoor.
v
Insulation test at site.
v
Plinth of transformer.
OCB/ACB/VCB
v
Specifications, make and rating.
v
Configuration and various parameters.
v
Purchase vouchers and test certificate.
MCCB
v
Specifications, make and rating.
v
Configuration and various parameters.
v
Purchase vouchers and test certificate.
DG SETS
v
Specifications, make and rating.
v
Various gauges, dampers in outlet soak pipe.
v
Asbestos rope ,fuel tank.
144
EXTERNAL ELECTRIFICTION
v
Make and rating of engine and alternators.
v
Vibration isolation.
v
Foundation, mounting channel frame.
v
Purchase vouchers and test certificate.
v
Testing.
PANELS
v
Specifications and make.
145
EXTERNAL ELECTRIFICTION
v
Size and thickness of sheet.
v
Voltmeter, ammeter and CTs bus bar aluminum/copper and size.
v
Earthing.
v
Rubber gasket lining and locking arrangement.
v
Purchase vouchers and test certificate.
v
CPRI approval.
LIGHTING ARRESTORS
v
Specifications, make and rating.
v
Type linear resistance type or expulsion type.
v
Purchase vouchers and test certificate.
v
Fixing of strip conductors or porcelain saddles.
v
Testing joints.
146
CI PIPES
v
Specifications, class, make and ISI marking.
v
Size and weight.
v
Pressure rating.
v
Lead/Tyton joints.
v
Width and depth of trench.
v
Laying.
v
Returning/filling of soil in trench.
v
Testing.
GI PIPES
v
Specifications, grade, make and ISI marking.
v
Size, weight and grade.
v
ISI marking of fittings.
v
Width and depth of trench.
v
Anti corrosive paint on exposed threaded positions.
v
Laying.
v
Returning/filling of soil in trench.
v
Testing.
147
SLUICE VALVES
v
Specifications, make and ISI marking.
v
Size and class.
v
Spindle Brass/Steel.
v
Serial No on sluice valve.
v
Purchase vouchers and test certificate.
PUMPS
v
Type submersible/centrifugal.
v
Discharge head and RPM.
v
Make and ISI marking.
v
Purchase vouchers and test certificate.
v
Noise.
v
Earthing.
v
Starter.
v
Testing.
148
CHAPTER - SIX
BRICKS
Sample (Nos)
20
32
50
1
2
3
2001 to 10000
10001 to 35000
35001 to 50000
v
Test to be conducted at Site Laboratory.
COMPRESSIVE STRENGTH
v
Testing as per table 2 of IS 3495.
v
Frequency-as per table 2 of IS 5454 given as under :149
BRICKS
Sample (Nos)
05
10
15
0
0
1
v
Test to be conducted at Site Laboratory.
EFFLORESCENCE
v
Test as per IS 3495 part II.
v
Frequency-as given for compressive strength above.
v
Test to be conducted at Zonal Laboratory.
150
COARSE AGGREGATE
SIEVE ANALYSIS
v
Testing as per IS 2386 part-I.
v
Frequency-as per table 3 of IS 2430 given as under :Lot Size (Nos)
Sample (Nos)
Up to 100
101 to 500
501 to 1500
1501 to 5000
1
3
5
7
v
Test to be conducted at Site Laboratory.
COARSE AGGREGATE
MOISTURE CONTENT
v
Test as per IS 2386 part -I.
v
Frequency-as given for sieve analysis above.
v
Test to be conducted at Site Laboratory.
152
CEMENT
SETTING TIME
v
Test as per IS 4031.
v
Frequency-once for each consignment of 50 MT or part thereof.
v
Test to be conducted at Zonal Laboratory and National Test House/SEMT
Wing/Engg College.
153
STRUCTURAL CONCRETE
COMPRESSIVE STRENGTH
v
Test as per IS 516.
v
Frequency test as under :Quantity Of Concrete ( in m)
No Of Samples
1-5
6-15
16-30
31-50
51 and above
1
2
3
4
4 Plus one addl sample for each
addl 50m or part thereof.
v
Test to be conducted at Zonal Laboratory /National Test House/SEMT Wing/Engg
College.
TENSILE STRENGTH
v
Test as per IS 1608, IS 1663 and IS 1894.
v
Frequency-one test for every 25 tonnes of steel or part thereof.
v
Test to be conducted at Zonal Laboratory /National Test House/SEMT
Wing/Engg College.
BEND TEST
v
Test as per IS 1403, IS 1599 and IS 1500.
v
Frequency-one test for every 10 tonnes of steel or part thereof.
v
Test to be conducted at Zonal Laboratory /National Test House/SEMT
Wing/Engg College.
IMPACT TEST
v
As given for bend test above.
HARDNESS TEST
v
As given for bend test above.
155
COMPRESSIVE STRENGTH
v
Test as per IS 2185.
v
Frequency-8 blocks out of 20 randomly selected blocks.
v
Test to be conducted at Site Laboratory.
DRYING SHRINKAGE
v
Test as per IS 2185.
v
Frequency-3 blocks out of 20 randomly selected blocks.
v
Test to be conducted at Zonal Laboratory.
156
MOISTURE MOVEMENT
v
Test as per IS 2185.
v
Frequency-3 blocks out of 20 blocks.
v
Test to be conducted at Site Laboratory.
DENSITY
v
Test as per IS 2185.
v
Frequency-3 blocks out of 20 blocks.
v
Test to be conducted at Site Laboratory.
157
COMPRESSIVE STRENGTH
v
Test as per IS 2185.
v
Frequency-8 blocks out of 20 randomly selected blocks.
v
Test to be conducted at Site Laboratory.
DRYING SHRINKAGE
v
Test as per IS 2185.
v
Frequency-3 blocks out of 20 randomly selected blocks.
v
Test to be conducted at Zonal Laboratory.
158
MOISTURE MOVEMENT
v
Test as per IS 2185.
v
Frequency-3 blocks out of 20 blocks.
v
Test to be conducted at Site Lab.
DENSITY
v
Test as per IS 2185.
v
Frequency-3 blocks out of 20 blocks.
v
Test to be conducted at Site Lab.
159
FLOORING TILES
WATER ABSORPTION
v
Test as per IS 1237.
v
Frequency-06 tiles out of 18 randomly selected tiles.
v
Test to be conducted at Site Laboratory.
WATER ABSORPTION
v
Test as per IS 3495 part-II.
v
Frequency-as per table 2 of IS 5454 given as under :Lot Size (Nos)
2001 to 10000
10001 to 35000
35001 to 50000
Sample (Nos)
5
10
15
v
Test to be conducted at Site Laboratory.
COMPRESSIVE STRENGTH
v
Test as per IS 3495 part - I.
v
Frequency-as given for water absorption above.
v
Test to be conducted at Site Laboratory.
161
0
0
1
Sample (Nos)
32
50
80
125
3
5
7
10
v
Test to be conducted at Site Laboratory.
162
No Of Scantlings
Up to 150
151-300
301-500
20
32
50
v
Test to be conducted at Zonal Laboratory.
.
163
164
Strength test- all as above but at National Test House/SEMT Wing/Engg College.
PLYWOOD
MOISTURE CONTENT
v
Test as per IS 1734 part-I
v
Frequency-as per table 1 of IS 7638 for value of Acceptance Quality Level
(AQL) given as under :For value of AQL=1.5%
Lot Size (Nos)
Sample (Nos)
Up to 50
51 to 150
151 to 300
301 to 500
501 to 1000
1001 to 3000
5
8
13
20
32
50
166
Permissible No Of Defects
0
0
0
0
1
2
PLYWOOD
Sample (Nos)
Permissible No Of Defects
Up to 50
51 to 150
151 to 300
301 to 500
501 to 1000
1001 to 3000
5
8
13
20
32
50
0
0
0
1
2
3
v
Test to be conducted at Site Laboratory.
167
DENSITY
v
Test as per IS 635 part-III.
v
Frequency-as per table 1 of IS 7638 as given for plywood above.
v
Test to be conducted at National Test House/SEMT Wing/Engg College.
Moisture content all as per particle board given above but at Site Laboratory.
WATER ABSORPTION
v
Test as per IS 635 part XVI.
v
Frequency-as given for plywood above.
v
Test to be conducted at Site Laboratory.
Swelling in water-as given for swelling due to surface absorption test above.
168
MODULUS OF RUPTURE
v
Test as per IS 635 part- IV.
v
Frequency-as given for plywood above.
v
Test to be conducted at Zonal Laboratory.
169
GLAZED TILES
WATER ABSORPTION
v
Testing as per IS 777
v
Frequency as under :Lot Size (Nos)
3000 to 10000
Over 10000
Nos Of Sample
32
50
v
Test to be conducted at Site Laboratory.
CRAZING
v
Test as per IS 777.
v
Frequency-as given for water absorption above.
v
Test to be conducted at National Test House/SEMT Wing/Engg College.
IMPACT
v
Test as per IS 2386 part - IV.
v
Frequency-1 test per 100 m.
v
Test to be conducted at Zonal Lab/National Test House/SEMT Wing/Engg
College.
CRUSHING VALUE
v
Test as per IS 2386 part- IV.
v
Frequency-1 test per source.
v
Test to be conducted at Zonal Lab/National Test House/SEMT Wing/Engg
College.
Loss angles abrasion value all as given for crushing value tests above.
FLAKINESS
v
Test as per IS 2386 part - II.
v
Frequency-1 test per 100 m.
v
Test to be conducted at Site Laboratory.
171
WATER ABSORPTION
v
Test as per IS 2386 part III.
v
Frequency-1 test per 100 m.
v
Test to be conducted at Site Laboratory.
SPECIFIC GRAVITY
v
Test as per IS 2386 part III.
v
Frequency-1 test per source.
v
Test to be conducted at Zonal Lab/National Test House/SEMT Wing/Engg
College.
Stripping value of aggregate for BM/AC - All as given for specific gravity tests
above.
172
PENETRATION VALUE
v
Test as per IS 73
v
Frequency-1 test per batch of bitumen supplied in bulk or drums
v
Test to be conducted at Zonal National Test House/SEMT Wing/Engg
College.
WAX CONTENT
v
Test as per IS 1209
v
Frequency-as given for penetration value above.
v
Test to be conducted as given for penetration value above.
CONCLUSION
CONCLUSION