TECHNICAL MEETMEETTAMILNADU

ENGINEERS FORUM,
KUWAIT
Safety Engineering for Oil &
Gas Industry Operational
Plants

J RAMESH BABU

Private and Confidential

AGENDA
About Cholamandalam MS Risk Services Ltd.
Safety Engineering studies for Operational plants
Case studies

Page 1

Private and Confidential

CMSRS SERVICES POTFOLIO

Page 2

Private and Confidential

Services Offered by CMSRS Contd.,

Page 3

Private and Confidential

Our Global Foot Prints

Page 4

Private and Confidential

Global Risk Technology Center [GRTC]

Page 5

Private and Confidential

Accolades

Page 6

Private and Confidential

WINNER OF RISK MANAGER OF THE YEAR AWARD

Page 7

Private and Confidential

NAPESCO our partner in Kuwait

a leading national oil field services provider


Page 8

Private and Confidential

OTHER ACCOLADES
APPROVED HEALTH & SAFETY CONSULTANTS FOR KUWAIT
OIL COMPANY UNDER 31 S CATEGORY ( ONLY ASIAN
COMPANY)
APPROVED FOR CONSULTANCY STUDIES AT KUWAIT
NATIONAL PETROLEUM COMPANY ON PROJECT TO
PROJECT BASIS
APPROVED FOR CONSULTANCY STUDIES AT AL KHAFJI
JOINT OPERATIONS OF SAUDI ARAMCO OIL COMPANY AT
SAUDI ARABIA ON PROJECT TO PROJECT BASIS

Page 9

Private and Confidential

Risk Based Inspection


Identification of risks of each equipment on the risk matrix
Selection of type of maintenance and frequency of
inspection

Page 10

Private and Confidential

Risk & Reliability Management - Concept

Page 11

Private and Confidential

RRM Process

Page 12

Private and Confidential

Standards adopted
API publication 581- Base Resource Document: Risk
Based Inspection
API 580 Recommended Practice for Risk Based
Inspection

Page 13

Private and Confidential

Health Safety Environment Critical


Equipment System (HSECES) for
Refinery and Off shore Facilities

Page 14

Private and Confidential

HSECES
HSE Critical Equipment and Systems
(HSECES)
Parts of an installation and such of its structures, plant
equipment and systems (including computer programmes)
or any part thereof, the failure of which could cause or
contribute substantially to; or a purpose of which is to
prevent or limit the effect of a major accident or any
accident with severe or catastrophic consequences

Page 15

Private and Confidential

CRITICAL EQUIPMENT

Page 16

Private and Confidential

Fire Safety Audit / Fire Risk Assessment

Identification of fire risks and assessment of fire


risks based on Risk Assessment technique
suggested by Fire Precautions at Workplace Act,
UK
Recommendation of fire prevention measures
Fire / smoke spread hazards and suggesting
control measures
Review of Passive Fire Protection System (PFPS)
Identification of heat / smoke detection
requirements
Review of Active Fire Protection System (AFPS) as
per TAC & NFPA standards

Page 17

Private and Confidential

Fire & Explosion Hazard Management system

Page 18

Private and Confidential

Process of FEHM

Page 19

Private and Confidential

CHAZOP STUDY FOR ELECTRICAL/ ELECTRONIC/ PL SYSTEMS


OBJECTIVE
To analyze the types of failure modes of new system (independently and in
conjunction with other new/existing equipment) and to ensure that sufficient
redundancy/fall back arrangement is provided and the introduction of the
new system does not result in unsafe plant operation
SCOPE
Hazards and Operability Study, HAZOPS, is a Systematic Structured
Discovery technique to identify hazardous consequences due to deviations
from designers intentions. The scope of the study covers all the
Instruments and Control systems like DCS, ESD, Field Instruments, Local
Control Panel, UPS, paging system, etc. including new design and
revamping of existing facilities.
The study will also undertake a Safety Integrity Level (SIL) assessment for
all safety related electrical/ electronic/ programmable electronic systems

Page 20

Private and Confidential

PROCESS SAFETY AUDITS/ SAFETY AUDITS


Comprehensive Safety Audit as per IS 14489 /OHSAS 18001
Review of 31 SMS elements
Combination of Engineering and System based solutions
Comprehensive Approach similar to that of a health check up
Should address ground level realities
Should have performance based approach
Can be objective (Adoption of Scoring Pattern)

Page 21

Private and Confidential

Process Safety Management

14 Elements of PSM

Employee Participation
Process Safety Information
Process Hazard Analysis
Operating Procedures
Training
Contractors
Pre-startup Safety Review

Mechanical Integrity
Hot-work Permits
Management of Change
Incident Investigations
Emergency Planning & Response
Compliance Safety Audits
Trade Secrets

Page 22

Private and Confidential

Safety Perception Survey


SPS part of culture change management, a step
further to OHSAS 18001, to understand employees
safety perception better
Specific SPS questionnaire for each employee category
Developed a software to analyze survey data collected
Carried out SPS for a 9 MMTPA refinery
100
93.75
90.62

90

86.59

84.55
80

79.83

83.85

79.21
72.5

70
62.5
60

50

40

30

20

10

EMPLOYEE
EMPOWERMENT

MANAGEMENT CLIMATE

MANAGEMENT
COMMITMENT

QUALITY OF
SUPERVISON

RECOGNITION OF
PERFORMANCE

Category 1

93.75

90.62

72.5

62.5

Category 2

79.83

79.21

84.55

83.85

86.59

Page 23

Private and Confidential

Disaster Management Planning

Disaster Management Plan can be evolved


as per standards US EPA, NFPA 1600,
local statutes and corporate standards
Should be scenario based
Specific and detail procedures should be
developed
Periodically rehearsed
Periodically updated
Page 24

Private and Confidential

ELECTRICAL SAFETY AUDIT


Comprehensive Electrical Safety Reviews
(Earthing, ESD, HAC, Lightning, accidents, protection,WPs, sample tests)
Lightning Protection Reviews

Electrical Hotspot Detection Surveys

Thermographic Surveys

Page 25

Private and Confidential

LIGHTNING PROTECTION REVIEW


Review of LP based on IS 2309 /NFPA 780/API RP 2003/OISD 180

Use of LP Risk Assessment software, based on BS 6651

Risk Based design preferred

Page 26

Private and Confidential

Thermography Surveys

Part of E-RBM Programme


In the De-Tariff scenario, may be offered free by general insurance
companies
Identification of potential survey points / equipment and
interpretation - very crucial
NFPA 70 E recommends Thermographic surveys

Page 27

Private and Confidential

Accident Investigation

Page 28

Private and Confidential

The Aim of the Investigation

THE KEY RESULT SHOULD BE TO PREVENT A RECURRENCE


OF THE SAME ACCIDENT

Page 29

Private and Confidential

INVESTIGATION STRATEGY
GATHER INFORMATION & ESTABLISH FACTS
ISOLATE ESSENTIAL CONTRIBUTORY FACTORS
DETERMINE CORRECTIVE ACTIONS
IMPLEMENT CORRECTIVE ACTIONS

Page 30

Private and Confidential

Accident Investigation Techniques

 Fault Tree Analysis


 Fishbone / Ischikawa Diagram
 Why Why Analysis

Page 31

Private and Confidential

Fault Tree Analysis

Page 32

Fish bone / Ischikawa


Diagram

Private and Confidential

Page 33

Private and Confidential


S tr a in s
B u rn s
C u ts
U

ng

ua

rd

ed

Br
ok
en

ac

rs
H o
hi

to
ol
s
C h e
m ic
al s
p ill
D e
fe c
tiv e
P P
E
U n tra
in e d w
o rk e r

p e c t
F a ils to in s

F a ils to e n fo r c e

L a c k o f tim e
o rk
u c h w
T o m

N o o r ie n ta tio n p r o c e s s
In a d e q u a te tr a in in g p la n
N o a c c o u n ta b ilit y p o lic y

F a ils
to tra
in

Lack of vision No mission statement

N o d is c ip lin e p r o c e d u r e s

la y

a rd
h az
a
a te
C re
z a rd
a h a
e
r
ry
Ig n o
n ju
i
t
or
ep
o r
t
ils
Fa

ne

In a d e q u a te tr a in in g

ep

N o r e c o g n itio n
In a d e q u a te la b e lin g

O u td a te d h a z c o m

p ro g ra m

N o r e c o g n itio n p la n

N o in s p e c tio n p o lic y

Page 34

17

Private and Confidential

Page 35

Private and Confidential

Stage 5
Certainty

Moving towards Excellence


High

Stage 4
Wisdom

Low

TQM Maturity

Stage 3
Enlightenment
Stage 2
Awakening
Stage 1
(Cosmetic)
Crisis
Management

Sustainabilit
y
Behavior based
Interventions

Self Assessments
Improvement program
Measurement Program
Supporting MIS
Satisfaction Surveys,
ISO 9000. ISO 14001, OHSAS 18001

re s
u
at tion
m
Im n i z a
ga
r
O

Business Processes Mapped


SHEQ Strategic Planning
Ad-Hoc Risk Assessments
Ad-hoc Training
Ad-Hoc Management Reviews
Ad-Hoc Annual Audits

Crisis Management
10 12 Years
Time
Page 36