Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
ENGINEERING SOFTWARE
WETSIDE DESIGN
Essential
EssentialDesign
DesignPrograms
Programs
with
withAccurate
AccurateSizing
SizingCalculations
Calculations
help
helpto
toStreamline
StreamlineYour
YourDesign
Design
Copyright 2008 HVAC Design Solutions
Overview
JUMP TO FILE
INDEXP.xls#PROJ.INFO!D2
Bldginfo.xls#'Bldg. Info.'!E11
Bldginfo.xls#'Ceiling Space'!D11
LOADCAL.XLS#'Design Criteria'!C5
INDEX2W.xls#INDEX!C10
Quick Links to
all calculation
programs
INDEX2W.xls#PIPECALC!H10
INDEX2W.xls#PIPESIZE!A13
INDEX2W.xls#'PUMP-HD.-PRELIM.'!C3
INDEX2W.xls#'VAV REHEAT'!C6
INDEX2W.xls#'AHU-COOL. COIL'!H6
INDEX2W.xls#'AHU-HTG.COIL'!H6
INDEX2C.xls#INDEX!C9
INDEX2C.xls#'PUMP-CHW-PRIM.'!F15
INDEX2C.xls#'PUMP-CHW-SEC.'!F15
INDEX2C.xls#'PUMP-DIAG.'!C2
INDEX2C.xls#'PUMP-COOL.TOWER'!F15
INDEX2C.xls#'EXPTANK-CHW'!B9
INDEX2H.xls#INDEX!C9
INDEX2H.xls#'PUMP-HHW-PRIM.'!F15
INDEX2H.xls#'PUMP-HHW-SEC.'!F15
INDEX2H.xls#'PUMP-DIAG.'!B2
INDEX2H.xls#'EXPTANK-HHW'!B9
HELP
PROJECT NAME :
PROJECT NUMBER :
134-08
PROJECT LOCATION :
DATE :
TYPE OF BUILDING :
Information automatically
transfers to all programs
CHICAGO, IL
05/06/08
OFFICE
91.0
-6.0
75.0
70.0
670
PROJECT MANAGER :
BILL REECE
PROJECT ENGINEER :
CLIENT :
CLIENT CONTACT NAME:
JIM EDMOND
ADS ARCHITECTS
JOHN GOREMANN
PIPE SECTION
FLOW RATE
(GPM)
NORMAL
SIZE *
(INCH)
PROJECT NAME:
TEST PROJECT #1
PROJECT NUMBER:
1444-07
DATE:
12/19/07
CAUTION: VELOCITY EXCEEDS 10 FT./SEC. - MAY CAUSE NOISE AND EROS
CAUTION: VELOCITY IS LESS THAN 2 FT./SEC. - MAY CAUSE AIR TRAPPING
CAUTION: EXCESSIVE PRESSURE DROP - MAY INCREASE PUMP HORSEPO
NORMAL
VELOCITY
(FT/SEC)
NORMAL
PRESS.
DROP
(FT/100 FT)
LOW FIRST
COST SIZE
(INCH)
LOW FIRST
COST VEL.
(FT/SEC)
FROM
TO
164.0
4.4
1.8
2 1/2
152.0
4.4
1.8
2 1/2
141.5
7.1
5.5
2 1/2
138.0
7.1
5.5
2 1/2
10.1
136.8
7.1
5.5
2 1/2
10.1
121.0
5.9
4.0
2 1/2
96.0
4.7
2.6
5.2
5.1
1 1/2
4.5
5.7
1 1/4
3.1
3.4
8
9
48.5
Quick
and
Easy
Input
9
10
22.3
10
11
12.8
11
12
6.3
3/4
0
LOW FIRST
COST PD
(FT/100 FT)
11.7
20.0
Alternate
11.7
20.0
Pipe
Sizes
10.1
13.0
LOW
LOW
OPERATING OPERATING
COST SIZE
COST VEL.
(INCH)
(FT/SEC)
4
4.4
4.4
4.0
13.0
4.0
13.0
4.0
8.4
8.5
3.3
10.4
17.0
4.7
5.2
5.1
2.4
1 1/4
6.4
13.0
2.6
4.7
9.0
1 1/2
2.2
10.0
1 1/4
1.5
0.0
0.0
10.0
3/4
Most4.0Economical
Pipe 4.0
0.0
0.0
0
0.0
Sizes to meet Sizing Criteria
(Velocity and Pressure Drop)
164
4.0
PROJECT NAME:
HELP
TEST PROJECT #1
Preliminary Pump
1444-07Head Calcs, for
DATE:preliminary Pump
12/19/2007
HP requirements
PROJECT NUMBER:
APPROX. HP:
5.4
PIPE SIZE
TOTAL PIPE
LENGTH (ft.)
1/2
4.0
0.0
ELL - 90 DEG.
12
18
10.3
3/4
30
4.0
1.2
ELL - 45 DEG.
0.0
4.0
0.0
THRU TEE
3.9
1 1/4
15
4.0
0.6
BRANCH TEE
1.1
1 1/2
25
4.0
1.0
GLOBE VALVE
6.6
25
4.0
1.0
GATE VALVE
0.0
ANGLE VALVE
2 1/2
0
3.0
Quick
and Easy
Input
FITTING OR
VALVE TYPE
0
0
Approximate
Fitting0.2
0
0
0.0
and Valve
counts
130
3.0
3.9
SWING CHECK
VALVE
2.3
62
3.0
1.9
LIFT CHECK
VALVE
0.0
2.5
0.0
CONTROL
VALVE
5.3
PRIMARY PUMPS
Copyright 2008 HVAC Design Solutions
2.5
SIZE
(IN.)
ITEM
LENGTH (FT.)
PUMP ACCESSORIES:
RESET/CLEAR
AVERAGE
NUMBER OF
GPM
FITTINGS (EACH SIZE)
RunningPROJECT
TotalNAME:
of
PROJECT NUMBER:
Approx.DATE:
Pump BHP
9
TEST PROJECT #1
1444-06
2/19/2006
VELOCITY
(FT./SEC.)
EQUIVALENT
LENGTH
(FT.)
PRESS.
DROP -EACH
(FT/100 FT.) *
LOSS FOR
SIZE
(FT. HD.)
22
2.6
1.14
84
2.6
2.18
0.00
N/A
N/A
0.00
HELP
Easy Input of
N/A
N/A
System
Components
and GPM
Quantities
N/A
N/A
0
TOTAL
LOSS
(FT. HD.)
4.00
2.00
0.00
GPM
160
120
120
160
120
160
120
120
120
120
0
0
0
0
0
0
0
0
0
0
VEL.
8
EQ. LEN.
21.39
FT/100 FT.
7
1.50
16.91
0.68
16.91
0.68
16.91
0.68
16.91
0.68
GPM
120
160
120
160
0
0
0
0
0
0
VEL.
6
EQ. LEN.
8.9
FT/100 FT.
4
0.36
8.9
0.36
0.00
0.00
0.00
GPM "IN"
GPM "OUT"
GPM "IN"
GPM "OUT"
GPM "IN"
GPM "OUT"
GPM "IN"
GPM "OUT"
GPM "IN"
GPM "OUT"
Built-in Fitting
Coefficients
0
0.00
0.00
0.00
0.00
0.00
4.20
10
VEL.
EQ. LEN.
FT/100 FT.
N/A
N/A
0.60
0.00
0.00
0.00
0.00
Y-TYPE STRAINER
130.5
2.6
3.39
22
2.6
1.14
N/A
0.80
Allowance
forN/AItems at
Chiller or Boiler
5.94
CHILLER PRESSURE DROP (FROM MANUFACTURER, IF KNOWN) :
GENERIC CHILLER PRESSURE DROP (IF NOT AVAIL. FROM MFG'R.) :
CHILLER TONS :
100
CHILLER GPM :
120
GENERIC AIR SEPARATOR PRESSURE DROP - WITH STRAINER (IF NOT AVAIL. FROM MFG'R.) :
SIZE : 2 0
GPM :
160
4.20
4.20
0
11.05
11
GPM
VELOCITY
(FT./SEC.)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
8.0
0.0
EQ. LEN.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
160
150
0
0
0
STEEL PIPE :
0
1/2
N/A
0
0.0
0
STEEL PIPE :
0
3/4
N/A
0
0.0
0
STEEL PIPE :
0
1
N/A
0
0.0
0
STEEL PIPE :
0
1 1/4
N/A
0
0.0
0
STEEL PIPE :
0
1 1/2
N/A
0
0.0
0
STEEL PIPE :
0
2
N/A
0
0.0
0
STEEL PIPE :
0
2 1/2
N/A
0
0.0
0
STEEL PIPE :
0
3
N/A
0
0.0
0
SUB-TOTAL
PRESSURE
STEEL PIPE :
0
4
N/A
0
0.0 DROP (FT.
0 HEAD) :
STEEL PIPE :
0
5
N/A
0
0.0
0
GLYCOL
PRESSURE
DROP0CORRECTION
ON 50 DEGREE
F WATER
:
STEEL PIPE
:
6 (IF ANY) - BASED
N/A
0
0.0 TEMPERATURE
0
Adjustments for
Glycol (if applicable)
and/or Safety Factor
PRESS.
DROP
(FT/100 FT.) *
0.0
0.0
0.0
0.0
0.0
0.0
0.0
7.0
0.0
Imput Length of
Longest Run Piping
(Measured Out &
0.0
0.00
Back to Pump)
0.0
0.00
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL
LOSS
(FT. HD.)
10.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LOSS FOR
SIZE
(FT. HD.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.50
0.00
1
55.25
1.05
58.01
12
PROJECT NAME:
PROJECT NUMBER:
DATE:
9
TEST PROJECT #1
1444-06
2/19/2006
2.5
(IN.)
EQUIVALENT
(FT.)
PRESS.
(FT/100 FT.)
LOSS FOR
(FT. HD.)
120
120
22
2.6
1.14
84
2.6
2.18
160
N/A
N/A
4.00
160
N/A
N/A
2.00
120
N/A
N/A
1.20
N/A
N/A
0.00
FITTINGS
AVERAGE
(EACH SIZE) (FT./SEC.)
LOSS
TOTAL
10.53
3.26
0.46
4.20
0.71
5.94
4.20
11.05
3.50
0.90
10.50
55.25
55.25
58.01
13
91
74
75
PROJECT ELEVATION =
CHILLED WATER DELTA-T =
670
10
RESET/CLEAR
PROJECT NAME:
TEST PROJECT #1
PROJECT NUMBER:
1456-07
DATE:
06/21/07
AHU
COOLING
SUPPLY
MINIMUM
LEAVING AIR
COOLING
CHILLED
FLOOR
CFM PER
NUMBER
LOAD *
AIR TEMP.
OUTSIDE AIR
QUANTITY
TEMP.
ENTHALPY
ENTHALPY
ENTHALPY
ENTHALPY
COIL LOAD
WATER
AREA
SQ. FT.
(MBH)
(F)
(CFM)
(CFM)
(F)
(BTU/LB.)
(BTU/LB.)
(BTU/LB.)
(BTU/LB.)
(MBH)
(GPM)
(SQ. FT)
12.5
18.2
46.3
244.8
42.0
121.7
24.5
205.9
105.5
33.6
19.5
150.3
54.0
54.0
54.0
54.0
54.0
54.0
54.0
54.0
54.0
54.0
54.0
54.0
150
320
1550
5500
1480
2640
450
5120
2200
1250
250
2850
590
859
2186
11556
1983
5745
1157
9720
4980
1586
921
7095
0
0
0
0
78.0
78.0
78.0
78.0
78.0
78.0
78.0
78.0
78.0
78.0
78.0
78.0
0.0
0.0
0.0
0.0
37.7
37.7
37.7
37.7
37.7
37.7
37.7
37.7
37.7
37.7
37.7
37.7
0.0
0.0
0.0
0.0
30.2
30.2
30.2
30.2
30.2
30.2
30.2
30.2
30.2
30.2
30.2
30.2
0.0
0.0
0.0
0.0
32.1
33.0
35.5
33.8
35.8
33.6
33.1
34.2
33.5
36.1
32.2
33.2
0.0
0.0
0.0
0.0
21.7
21.7
21.7
21.7
21.7
21.7
21.7
21.7
21.7
21.7
21.7
21.7
0.0
0.0
0.0
0.0
26.1
41.1
126.6
586.9
117.2
289.6
55.7
509.2
248.2
95.8
41.2
344.7
0.0
0.0
0.0
0.0
5.2
8.2
25.3
117.4
23.4
57.9
11.1
101.8
49.6
19.2
8.2
68.9
0.0
0.0
0.0
0.0
400
650
2000
12950
1820
4800
820
11200
4280
1500
700
6200
1
2
3
4
5
6
7
8
9
10
11
12
HELP
1.5
1.3
1.1
0.9
1.1
1.2
1.4
0.9
1.2
1.1
1.3
1.1
0.0
0.0
0.0
0.0
14
40
PROJECT NAME:
200
PROJECT NUMBER:
670
TOTAL PIPE
LENGTH (ft.)
GALLONS PER
FOOT
PIPE GALLONS
0.0121
0.0
PIPE SIZE
1/2
DATE:
120
0.0251
3.0
60
0.0429
2.6
BOILER MBH
0.0653
1 1/2
# HEATING COILS
75
0.0924
# HEAT EXCHANGERS
224
0.1610
450
18
1
TEST PROJECT #1
1444-07
3/4
1 1/4
HELP
337.5
0.0
COIL
GALLONS
36.0
6.9
EXCHANGER
GALLONS
15.0
36.1
490.2
10
EXPANSION FACTOR
0.03510
20.8
45
30
ACCEPTANCE FACTOR
0.06
353.8
24.6
(SYSTEM PRESSURE)
30
27
0.94
ACCEPTANCE VOLUME MUST EXCEED EXPANDED WATER VOLUME (gal.)
15
TEST PROJECT #1
PROJECT NUMBER:
1456-07
HELP
DATE:
06/21/07
TEST PROJECT #1
DATE:
HELP
06/21/07
REQUESTED BY:
Please provide the following information, to expedite our design of your project. It is very important that
you respond as soon as possible, with as accurate information as you have available, so we can
calculate the correct air conditioning requirements and make accurate equipment selections.
A. Please provide the number of people, heat output or amperage and voltage of equipment, and any
other element that might effect the HVAC load in the following areas:
REQUESTED BY:
ROOM NAME/NUMBER:
NUMBER OF PEOPLE
PEOPLE ACTIVITY LEVEL: (S) - Seated Office; (M) - Moderate Office; (W) - Walking or
Standing; (B) - Bench Work; (H) Heavy Work
1. All Offices
2. Conference Rooms
3. Photocopy machine rooms
4. Lounge and/or lunch rooms
5. Electrical equipment rooms
6. Computer Rooms
7. Procedure Rooms
Programming
Information Request
Forms for Owner or
Architect Input
Laser Printers
Photocopy Machines
Fax Machines
Microwaves
TV Sets or Monitors
Vending Machines
Coffee Makers
Special Lighting (Total Watts to Room)
The above information should include: PC Stations, Laser Printers, Fax Machines, Photocopy
Machines, Microwaves, Vending Machines, Refrigerators, Coffee Makers, Special Lighting, etc. If
available, this information should contain: quantity, location, BTU/hr, wattage, amperage, voltage,
heat output to the space, operating cycle time, etc.
16
Extensive Quality
Control Mechanical
Checklists are available
in a separate Mechanical
Peer Review Software
Package
Example of Quality
Control Check List
Items
18
Calculation Documents
PUMP HEAD CALCULATION - CHILLED WATER - PRIMARY
2007 hvacdes igns olutions .com
* PRESSURE DROP BASED ON:
VELOCITY NOT EXCEEDING 5 FT/SEC. UP TO 2" PIPE
VELOCITY NOT EXCEEDING 10 FT/SEC. FOR LARGER THAN 2" PIPE
PRESSURE DROP BETWEEN 1 AND 5 FT/100 FT.
PROJECT NAME:
PROJECT NUMBER:
DATE:
9
TEST PROJECT #1
1444-06
2/19/2006
2.5
(IN.)
EQUIVALENT
(FT.)
PRESS.
(FT/100 FT.)
LOSS FOR
(FT. HD.)
120
120
22
2.6
1.14
84
2.6
2.18
160
N/A
N/A
4.00
160
N/A
N/A
2.00
120
N/A
N/A
1.20
N/A
N/A
0.00
FITTINGS
AVERAGE
(EACH SIZE) (FT./SEC.)
LOSS
TOTAL
10.53
3.26
0.46
4.20
0.71
5.94
4.20
11.05
3.50
0.90
10.50
55.25
55.25
58.01
19
Software Contents
PIPECALC
PUMP-CHW-PRIM.
PIPESIZE
PUMP-CHW-SEC.
PUMP-DIAG.
PUMP-COOL.TOWER
PUMP-HD.-PRELIM.
CONDENSER WATER (COOLING TOWER) PUMP
HEAD CALCULATIONS
VAV REHEAT
AHU-COOL. COIL
AHU-HTG.COIL
Bldg. Info.
EXPTANK-CHW
PUMP-HHW-PRIM.
PUMP-HHW-SEC.
Extensive Wetside
Programs to help
PRIMARY HEATING WATER PUMP HEAD
Streamline your
CALCULATIONS
Design Procedures
CHILLED WATER EXPANSION TANK
CALCULATIONS
Bldg. Info. 2
Ceiling Space
PUMP-DIAG.
EXPTANK-HHW
20
21
22
Pricing
23
Availability
24
System Requirements
25
Thanks!
26