Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
MM-Purchasing
Process flow for Plant Configuration:
1. Creation of the Plant - OX10
2. Assigning the Plant to Company Code - OX18
3. Assigning the Plant to Purchasing Org - OX17
4. Creating the Storage Locations of Plant - OX09
5. Creating MRP Controller for Plant - OMD0
6. Defining the Floats (Scheduling Margin Key) - OMDC
7. Define Quantity and Value updation for Material Types - OMS2
8. Group Together Valuation Areas OMWD
9. Carry out overall maintenance of plant parameters through Transaction code - OMI8.
10. Define Plant Parameters.
11. Configure Split Valuation through Transaction code OMWC
Copy As
Icon
Address
icon
Change the Plant name. (Enter the name which we want to create.)
SAVE.
Click on CREATE REQUEST icon.
Every step should be saved in the same Request number which you have created.
Press ENTER.
Press ENTER.
7. Define Quantity and Value updation for Material Types through Transaction Code OMS2
Select each material code (ROH, RW01, RW02, RW03, RW04, ERSA, FERT, ZOSM) and
Tick Quantity updating and Value updating fields for the required plant.
Select material codes (FHMI and PMAC) and tick the Quantity updating field.
9. Carry out overall maintenance of plant parameters through Transaction code OMI8.
Press ENTER.
11. Configure Split Valuation through Transaction code OMWC (Note: This not a transportable
step- This has to be repeated on all clients and systems.)
Click on Local Definitions
SAVE.