Sei sulla pagina 1di 7

Accenture Delivery Suite

1. Accenture Delivery suite has which of the following


advantages, (Multiple Options)
ADS provides a base for application development in
SAP, Oracle and SIEBEL technologies too,
ADS enables Multi-site delivery challenges
achievable,
ADS gives support for Management only,
Cost is reduced since it encourages Component
reusability,
ADS is a primary channel to achieve CMMI.
2. Which of the following portal is accessed by Accenture
people across all Delivery centers?
a) Global Web portal,
b) WIREFRAME,
c) Engagement Dashboard,
d) Global Delivery Dashboard,
e) Defects tracking sheet.
3. Which one of the following is used to execute the
methodology from both the process and documentation
standpoint?
a) ADM,
b) ADT,
c) ADMetrics,

d) ADA,
e) SIR.
4. Rational Purity Plus is used in following phase of SDLC,
a) Analysis,
b) System concept development,
c) Build/Development phase,
d) Testing phase to purify errors and defects,
e) Just before deployment to enhance the quality by
removing defects.
5. Identify the processes that involves Project Manager,
a) Prepare for Testing,
b) Prepare a design,
c) Project Initiation,
d) Planning Workforce,
e) All the above,
f) None of the above.
6. ADM contains which of the following methods
a) Management methods,
b) Strategy and planning methods,
c) Development methods,
d) Operations Methods,
e) Testing & Deployment Methods

1. Only a,b and c


2. b and c,
3. a, b, c and d,
4. Only e,
5. None of the above.
7. Which one of the following process is specific for
Accenture IDC?
a) V- Model,
b) Accenture Delivery Suite,
c)

Quality Management System & Supplier


management,

d) Quality Management System,


e) Internal Audit control.

8. A common web portal for all Delivery central across the


Globe has which of the following reports?
a. Requirement Traceability Matrix,
b. Defects tracking sheet,
c. Metrics Reports,
d. Operational reports,
e. Project- specific reports,
f. All the above excluding a and b.
9. Select the correct option from the following. (Phase Key
Role)
a) Plan Business Architect, Analyze Business Analyst,
Design- Project Manager, Build Developer, Test Tester,
Deploy Client and PM,
b) Plan Project Manager, Analyze- Project Lead, Design
Designer, Build Developer, Test Tester, Deploy Client.
c) Plan Business Architect, Analyze Business Analyst,
Design Application Designer, Build- Development
lead, Test Test Lead, Deploy- Project Manager.
d) The roles for Plan, Analyze, Design, Build, Test, and Deploy
phases are Pre-defined whereas the responsibilities are
assigned by corresponding supervisors.

10.

Predict the Correct definition for

Deliverables.
a. Deliverables are the outcome of each and every phases in
Application Development,
b. Deliverables are as likes as Proof of concepts as we use in
Prototype models,
c. Deliverables are the Proof of Work what an individual or
a team has performed in a particular stage of
Application development.
d. Deliverables are the Final Product that is to be delivered to the
client.
11. The following Diagram represents,

a. Build Application Architecture,


b. Build Development Environment,
c. Build Technical Architecture,
d. Build Application transition,
e. None of the above.

12. The Following Figure represents,

a. Test Application,
b. Build technical architecture,
c. Test Training and performance support,
d. Test Service Support,
e. None of the above.
13. Identify correct set of Test Deliverables.
a. Develop test approach, Create test plan, Prepare the Test
Cycle Schedule, Execute Test, sign off,
b. Develop test approach, Create work plan, Prepare Test Cases,
Execute Test, sign off,
c. Develop test approach, Create test plan, prepare work plan,
create test data, Execute test scripts, Sign-off,
d. Develop Test scripts, Create Work plan, Prepare Test cases,
Execute test scripts, Document the Test results, Sign off.

14. State True or False for the following scenario.


You are assigned to a project. The duration of the project is 3
weeks and its rated quantitatively as small Project. For a small project
do you think the TechSupport Team will be accessible to you? F
15. State True or False.
Causal Analysis Resolution technique identifies the problem
and fixes it, but it is not preventing from the error. F

Answers Key:
1. (b) and (d)
2. (d)
3. (b)
4. (c)
5. (e)
6. (3)
7. (c)
8. (f)
9. (c)
10. (c)
11. (c)
12. (e)
13. (a)
14. False.