WELDING PROCEDURE SPECIFICATION

PROCCESS

APPLICABLE

WELDING

CASING PUMP

WPS NO : 011-WP-WE-07-11
APPROVED BY

ISSUED BY : DETH

DATE BY

: 05 JULY 2011

Procedure Qualification No.01-PQR-A436-07-11


Revision new
Welding Process(es) GTAW
1

SCOPE
This Repair Procedure specification is proposed for repair including building up, of
A436 Casing using GTAW Welding process with matching filler material, and postweld heat treatment.

Applicable document
2
2 1 The following standard,

specification,code and related document form part of this welding


procedure to extend specified here in
2 1 1. American society of mechanical engineers
2 1 2. Section IX Welding and Brazing Qualification
Base Material
3
3 1 The Base metal/s

to be repair welded under this welding procedure specification, shall be


that specified below.
Ni- Resist(A-436 )

Prepare before
4
4 1 Cleaning

Welding process

All area to be welded should be cleaning by using chemical and/ or mechanical


Chemical should be use alkaline Solution then Follow by mechanical by using aluminumoxide grit 80-120
2 Removing any stress concentraction
Remove any sharp edges, cracks,dent and heavy scracth on areas to welded by using
Grinding process, under penetrant tested

4.

Welding
All welding peformed under this procedure using GTAW method

Welding Equipment
6
6 1 All Welding power sources

use in the performance of production welding to this specification


shall be of DC constant current type and shall be capable of maintaining a uniform output
throughout their entire operation range

6 2 All
6.

welding power sources used shall be equipped with control capable of infinitely the welding Current
3 Cable, Lug, electrode holder,ground Clamp,power source,controls,and related item shall be
suitable for the work being performed and shall be maintained in good kondition.

WELDING PROCEDURE SPECIFICATION


PROCCESS

APPLICABLE

WELDING TIG

CASING PUMP

WPS NO : 007-WP-WE-08-09
ISSUED BY : DETH

APPROVED BY

DATE BY

: 22 AUGUST 2009

Filler Metal
Welding electrode/filler use in performing production welding specified below:
Ni Cr

Base metal preparation


8 1 Casting shall be prepared for repair welding in general accord the procedure specified
below
8

Thermal method
Where arc-Air gouging is employed the casting shall be uniformly preheat to a minimum
400 deg F. Before applying the arc air process
Where thermal method are used this shall be followed by mechanical removal

8 1 1.

Mecanical method
Discrepant areas shall be prepared for welding using one or more of the mechanical method
as specified belom
Grinding
Chiping
Machining
Preparation of the casting shall be performed carefully to ensure removal of all discrepant
material. Following removal of all discrepant metal the wall of the resltant excavation shall
be tapered as required to minimize the posibility of lack of fusion type weld depect

8 1 2.

8 1 3.

where preheating is required the temperature shall be monitored by use of one or more
method specified bellow
- Temperature indicating crayons
- Contact pyrometer
- Thermocouple
- Laser detector

BACKING MATERIAL
9
9 1 Where depect extend through

the wall, backing materials shall be used to facilitate filling


the excavation. The type of backing material shall be as specified below:
9 1 1. Back up material shall be pabricated for P No 1 steel and shall be formed
and fitted to undeside of the casting the minimum overlap should be 1/4 inch on all side
9 1 1.

Where backing material is to remain in place then the back-up plate should be joined to
undeside of the casting with a contnuous fillet weld.

9 1 1.

Where backing material is to removed after excavation has been filled. Then the backing
need only be tack welded in place on the underside casting

WELDING PROCEDURE SPECIFICATION


PROCCESS

APPLICABLE

WELDING TIG

CASING PUMP

WPS NO : 007-WP-WE-08-09
ISSUED BY : DETH

APPROVED BY
DATE BY

: 22 AUGUST 2009

CLEANING
10
10 1 Prior to Welding
Following verification that all discrepants material has been removed, the repair areas shall
be cleaned as required to remove all oil, grease, paints, water, shop oil, and other foriegn
material detrimental to welding. This should be followed by wipping with clean paper wiper
moistened with isopropyl alcohol. This should be continue with fresh wiper until no more
soil can be removed.
10 2 Interpass

Cleaning
All slags and other foregn material shall be removed from each weld bead prior to desposition of additional weld passes. This shall be accomplished using wire brush with aclean
satain less steel brush. Follow by blowing with clean dry air.
Following this each weld bead shall be inspected visually in adequate light and any
discrepant material removed by grinding

10 3 Post

Weld Cleaning
following completion of the weld of the final weld surface should be cleaned of all slag and
other foreign material as detail in paragraph 10.1 and the surface visually examined for
defects open to the surfaces. Any dicrepant material noted shall be removed and repaired

PREHEATING
11
11 1 Uniformly preheat

the casting to minimum temperature of 200 deg F. Preheating shall be


accomplished using one more of the method specified below
- Furnance
- Induction
- Resistance
- Gas burner
where gas burner are used care shall be taken to avoid direct flame impingement to the
cating

11 2 where

preheating temperature shall be monitored by use of one or more


method specified bellow
- Temperature indicating crayons
- Contact pyrometer
- Thermocouple
- Laser detector

11 3 Where

local surface heating source are employed the heat source should be removed and
a minimum of 60 seconds shall be alapse before temperature leading are taken.

12

INTERPASS TEMPERATURE

The maximum interpass temperature shall be 800 deg F. Interpass temperature shall be

WELDING PROCEDURE SPECIFICATION


PROCCESS

APPLICABLE

WELDING TIG

CASING PUMP

WPS NO : 007-WP-WE-08-09
ISSUED BY : DETH

APPROVED BY

DATE BY

: 22 AUGUST 2009

maintained and shall be monitored continuously throughout the repair welding cycle,
The minimum interpass temperature shall be 700 deg F.
13

POSTWELD HEATREATMENT

13 1 All

welding repaired castings shall be postweld stress relieved as specified below:

13 1 1.

Following completion of the repair allow the casting temperature to fall to 600 deg F
to ensure completion of the transformation to martensite. Cooling must be accomplished
in still air.

13 1 2.

When casting has reached a temperature of 300 deg F the casting should be placed in
furnace.
furnace. Temperature at this time should be 600 deg F
casting temperature should not be permitted to fall below 300 deg F at any time.

3.

Increase furnace temperature at rate not exceeding 1150 deg F.

4.

Hold temperature for a minimum of one hour per inch.

5.

Furnace cool at rate permitted temperature

6.

Remove Casting from furnace when it has cool to 600 deg F and allow it to cool to room
temperature
WELDING TECHNIQUE
14
1 The maximum weld bead thickness shall be 5/32 inch
2 Weld bead shall be limited to four (4) time the wire diameter
3 Welding parameter should be in accordance with welding parameter chart

BASE CASING

WELD PARAMETER CHART


WELD
LAYER/PASS

1-2 / 1-6
3-6 / 1-6

FILLER METAL
TYPE
NiFe-CI
NiFe-CI

SIZE
1/8"
5/32"

ARC VOLTAGE

AMPERAGE

24
25

40
70

26
28

70
110

7-8 / 1-7

NiFe-CI

3/16"

25

28

90

140

ATION

BLE

UMP

ATION

BLE

UMP

UST 2009

ATION

BLE

UMP

UST 2009

ATION

BLE

UMP

Potrebbero piacerti anche