SCAFFOLDING PROCEDURE
5 Oct 13
Oni S
REV.
DATE
DESCRIPTION
BY
CHECK
APPROVED
APPROVED
CONTRACT NO:
C.1036806
CONTRACTOR:
PT. TIMAS SUPLINDO
Page 2 of 16
REVISIONS
B
SHEET
36
37
38
39
40
41
42
43
44
10
45
11
46
12
47
13
48
14
49
15
50
16
51
17
52
18
53
19
54
20
55
21
56
22
57
23
58
24
59
25
60
26
61
27
62
28
63
29
64
30
65
31
66
32
67
33
68
34
69
35
70
REVISIONS
B
TABLE OF CONTENTS
CONTRACT NO:
C.1036806
Page 3 of 16
1.
OBJECTIVES......................................................................................4
2.
SCOPE............................................................................................4
3.
REFERENCE.......................................................................................4
4.
RESPONSIBILITY..................................................................................5
5.
PROCEDURE......................................................................................5
5.1.
SCAFFOLDING MATERIAL....................................................................................... 5
5.2.
TRAINING AND COMPETENCY REQUIREMENT...................................................................6
5.2.1.
Mandatory Scaffolding Training........................................................................6
5.3.
TYPICAL SCAFFOLDING......................................................................................... 6
5.3.1.
Bracket Scaffolding..................................................................................... 7
5.3.2.
Rolling Scaffold....................................................................................... 10
5.3.4
Pipe tube scaffolding. 13
5.3.4
all Prevention / Protection Training..................Error! Bookmark not defined.
5.4.
SCAFFOLDING SAFETY........................................................................................ 14
Appendix 1 Detail Engineering Design & Calculation........Error! Bookmark not defined.
CONTRACT NO:
C.1036806
Page 4 of 16
1. OBJECTIVES
This procedure describes the minimum requirements and guidelines of working at heights and safe
operations of ladders and scaffolding use in all Timas work activities.
These guidelines are to be used to provide minimum access and egress, safe working conditions and also
maximum prevention / protection against falls from elevations. It is also meant to provide a minimum
training standard to ensure that personnel understand and comply with the programme, thereby achieving
100% fall prevention / protection to all Timas Suplindo employees and sub-contractors exposed to a fall
hazard.
2. SCOPE
2.1.
This procedure is applicable for all scaffolding work activities within Timas Suplindo and its
subcontractors during the execution of SLN Tank Repair & Replacement Project.
2.2.
Contractor shall follow the Companys Scaffolding Safety / Working at Height Safety process
whenever working in the Companys facilities.
3. REFERENCE
This procedure makes reference to the following document:
TIMAS Level 1 HSSE Management System (Doc. No: TS-HSSE-MSM-01)
TIMAS Level 2 HSSE Procedure for Scaffolding and Ladder Safety
Indonesian Occupational Safety Act No.1/1970
Indonesian Ministry of Manpower Decree No. PER.05/MEN/1996 Health and Safety Management
System (SMK3)
Internationally recognized standards i.e. ISO14001 and OHSAS18001
COMPANY HSSE Requirements as stipulated in the ITB Document / Contract.
CONTRACT NO:
C.1036806
CONTRACTOR:
PT. TIMAS SUPLINDO
Page 5 of 16
4. RESPONSIBILITY
4.1.
Senior management is responsible for supporting this scaffolding procedure and ensuring
scaffolders are trained and use the procedure as an accident prevention tool.
4.2.
Line supervisors, foremen, and leading hands are responsible for applying the procedure whenever
they are build a scaffolding platform.
4.3.
Employees are responsible for following the scaffolding procedure whenever they are working at
height and comply with the minimum requirement of scaffolding procedure.
5. PROCEDURE
5.1. Scaffolding Material
All cases, access equipment, whether tube and fittings, proprietary systems or special equipment,
shall be suitable in all respects for its intended application. For the majority of applications this will
entail the use of steel tube, fittings and boards in accordance with table below. However, the use of
proprietary systems manufactured from steel or aluminum or the use of special equipment shall be
acceptable when the access is required for a short period only, or is required to be easily moveable
and there is a firm footing.
All scaffolding components, i.e.: tubes, couplers to be used in Timas worksites shall be
manufactured to a standard recognized and accepted in the industry and shall have the appropriate
certification.
Standard
Steel tube BS 1139 Parts 1
Additional Requirement
Only galvanized tube to be used. Tubes to be regularly
inspected and cleaned. All tubes to be checked before use for
corrosion and general condition. Defective tubes to be
discarded. Butt welded tubes may be used on condition that
the welding has been carried out to an approved procedure.
Fittings
BS 1139 Parts 1
Boards
BS 48
CONTRACT NO:
C.1036806
Page 6 of 16
All scaffolding personnel shall complete a Contractor EHS Induction before start work at client
or contractor location.
However the erection of proprietary system scaffold by unqualified personnel shall be an exception
to the above requirement.
All personnel who supervise activities that include the use of scaffolding and access platforms,
including all HSE Supervisors, shall complete the scaffolding training course as regulated in the
Directorate General of Work Monitoring of Manpower Dept No Kep. 0/DJPKK/004 on Competency
Certification in Construction OHS. Approved certifications are required.
CONTRACT NO:
C.1036806
CONTRACTOR:
PT. TIMAS SUPLINDO
Page 7 of 16
Bracket Straps
I.
Bracket straps are normally located 52 down from the top of the sheet. The horizontal
spacing between bracket straps is indicated for various tank diameters and board
lengths. Bracket strap spacing must never exceed 10 6. The number of bracket straps
required for one shell ring with trapdoor is equal to one and half the number of boards
plus 1. Use the arc dimension when laying out and attaching bracket straps on inside of
the shell on the ground or the outside of the shell in the air. Use the chord dimension
when laying out and attaching bracket straps on the inside of the shell in the air.
II.
Make sure that the bracket straps fits tightly against the shell before tacking. Bracket
straps can be adjusted by placing them against a shell plate and tapping them with a 4
lb. hammer.
III.
IV.
Weld across the top of bracket straps as shown in Fig. 7.1.2a. Make all welds in the
order and direction shown. Reverse the direction of welding on the ends of the welds to
fill the crater. Use a 3/16 filled weld of E6010 or E7018 electrode (on material other
than mild steel, use the electrode as specified in the welding procedure to weld the
bracket to the structure.
V.
If, for whatever reason, the welding of a bracket strap cannot be completed, it must be
removed by breaking the attaching welds. Never leave a bracket strap that is partially
welded.
VI.
All welded bracket straps must be inspected by foreman, pusher, weld supervisor, or a
qualified person designated by the foreman. The welder who welds the strap must not
be the person that does the inspection. The slag must be removed from the weld before
inspection. To show that the bracket strap weld has been inspected and correctly
welded, it must be circled and initialed with lumber crayon by the person inspecting the
weld.
VII.
Bracket straps may be used a maximum of 2 times. If a bracket strap is being used a
second time, turn it over and weld on the side which has not been welded on.
CONTRACT NO:
C.1036806
b)
CONTRACTOR:
PT. TIMAS SUPLINDO
Page 8 of 16
Scaffold Bracket
I.
All brackets must be inspected carefully before starting to erect each structure. Items to
look for include cuts, gouges, rusting, bent members, or pitting which weaken the
strength of structural members. Look out for undersized or insufficient welding of the
welded members, cracks in the welds or any field modifications made to standard
brackets. Do Not Use Damaged Or Altered Brackets mark them clearly (Red Tag) and
return them to the warehouse or destroy them in field and report to warehouse.
II.
Brackets are not to be welded on in the field. Do not strike arcs on brackets to light a
torch or to adjust a welding machine. Do not make any alterations to brackets (or any
other erection equipment) in the field without permission and detail drawings from the
construction office.
III.
Brackets must be installed plumb (vertically). Note that if a bracket is installed only 5
out of plumb, it will support only half of its designed load (see Fig. 7.1.2b). The
maximum permissible load on a bracket is 1000 lbs.
CONTRACT NO:
C.1036806
c)
Page 9 of 16
Handrail Posts (see Fig. 7.1.2c) are attached to the brackets to secure wire rope hand
lines.
II.
Hand rail Posts must be inspected before use similar to brackets. Check for corrosion
and defective welding. Defective handrail posts should not be used.
III.
Handrail Posts must be secured to the Bracket Arm Stubs on the bracket (or other
support device) with a bent weld rod or pin.
IV.
Handrail Posts are provided with a hook on the outside which may be used to support
light objects such as key channels, scaffold brackets, etc., so they may be safely stored
off of the scaffold.
II.
Guardrails and mid rails must be supported at intervals not exceeding 1.8 meter, parallel
with the platform and not more than 100mm outside the platform edge. The guardrail
should be approximately one (1) meter above the platform with the mid rail positioned
midway between the guardrail and the toe board.
III.
Toe boards and kick plates should be at least as strong and as rigid as timber scaffold
planks and be securely fixed. They should extend not less than 150mm above the
platform surface. The gap between the platform and the toe board should not exceed
10mm.
CONTRACT NO:
C.1036806
Page 10 of 16
CONTRACT NO:
C.1036806
CONTRACTOR:
PT. TIMAS SUPLINDO
Page 11 of 16
Fig. 5.4.1
Fig. 5.4.3
Fig. 5.4.2
Fig. 5.4.4
CONTRACT NO:
C.1036806
Fig. 5.4.5
Page 12 of 16
Fig. 5.4.6
CONTRACT NO:
C.1036806
CONTRACTOR:
PT. TIMAS SUPLINDO
Page 13 of 16
Approximate Maximum Total Load for Persons and Material Kg per platform per bay:
Light duty
225kg
Medium duty
Heavy duty
-Mobile Scaffolding
450kg
675kg
CONTRACT NO:
C.1036806
Page 14 of 16
JSA must be completed and reviewed with all personnel involved with a work activity in
erection, dismantling or utilising the scaffold.
5.4.2.
Prior to erection, any necessary work permits shall be obtained. The operational and
geographical parameters specified in the permit shall be fully complied with.
5.4.3.
5.4.4.
For scaffolds after erection, and before work commences upon the scaffold, Scaffold
inspector/assessor shall inspect and approve the scaffold and shall record this inspection in
the site scaffold/ staging inspection log book.
5.4.5.
Prior to work each day, a Scaffold Inspector/ Assessor/ Supervisor shall inspect all
scaffolding, staging and peripheral equipment. Where any scaffold of staging is altered or
adjusted in any way, it shall be inspected by the Scaffold Inspector/ Assessor/ Supervisor
prior to work upon it re-commencing
5.4.6.
Prefabricated scaffolding and any associated components shall be constructed and utilized
in strict accordance with manufacturers instructions.
5.4.7.
Scaffolds shall be constructed and dismantled under qualified supervisions. They should
hold appropriate certificates.
5.4.8.
Where any scaffold or staging is altered or adjusted in any way it shall be inspected and
approved by the Scaffold Inspector/ Assessor/ Supervisor prior to work upon it recommencing.
CONTRACT NO:
C.1036806
5.4.9.
Page 15 of 16
If unauthorized modifications are observed, they shall be reported to the supervisor and a
DO NOT USE warning shall be displayed
MEANS:
Ready
Scaffoldin
g
Safe
Scaffoldin
g
MEANS:
Not Safe
Scaffolding
Under
Construction
/Repair
Do Not Use
5.4.10. Preliminary study of erection methods shall be conducted by Scaffolding Supervisor prior
toerection. This is to reduce erection time; subsequent use of maintenance purposes, of the
facilities set up for erection, and reduces hazards to workers
5.4.11. The studies shall cover at least overall erection and assembly design, detail engineering
andworking methods for installation and removal of construction aids and safety features.
(Scaffolding exceeding 40 meters and above in height and overhang etc., must have a
Professional engineers drawing and approval before the commencement of work).
5.4.12. A scaffolding log book shall be completed and maintained by Scaffolding Supervisor.
5.4.13. The Scaffolding Supervisor should conduct routine check of the content and quality of
information in the log book.
5.4.14. The footing or anchorage for scaffold shall be level, rigid, and capable of carrying the
maximum intended load without settling or displacement (includes base plates, support
etc). Unstable objects such as barrel, boxes, loose bricks or concrete blocks, shall not be
used as platforms, or to support scaffolds or planks.
5.4.15. Any scaffold, including accessories such as braces, brackets, trusses, screw legs, ladders,
etc, that are damaged or weakened shall be immediately replaced. Scaffold planks shall be
free of cracks, splits, excessive knots, or notable damage. Damaged plank shall be
destroyed.
CONTRACT NO:
C.1036806
Page 16 of 16
5.4.16. All working platforms ie., scaffolding planks shall be secured to the scaffold frame before
access is granted to the workers. Scaffolding is secured using steel wire of scaffold plank
clips(Tie backs)
5.4.17. Scaffolding activity should be discontinued during adverse weather conditions (i.e. thunder,
lightning heavy rain and strong wind).
5.4.18. Ladder access shall be provided, and made secure at every working platform level.
5.4.19. Scaffold tubes and fittings or the integral parts there of shall not be considered as access.
5.4.20. All access ways and areas to scaffold shall be kept free of all debris and construction
materials in order to provide safe entry/ exit.
5.4.21. Materials, tool, equipment, etc, shall not be thrown up to a higher level nor down to a lower
level and shall not be carried by a person if it affects the safety of his own movement to a
higher or lower level. Fiber rope should be used to raise and lower materials.
5.4.22. Metal ladders or scaffolding shall not be used in the vicinity of any electrified conductor or
equipment where there is a possibility of a person receiving an electric shock unless the
equipment has been adequately isolated or insulated.
5.4.23. Ladders shall be secured.