GENERAL STATISTICS
%
Change
7.0%
9.7%
14.3%
12.3%
15.7%
88.0%
-10.7%
0.0%
-10.7%
-11.2%
5.2%
5.7%
5.1%
6.2%
-8.5%
8.5%
8.1%
2010
2011
404,495 412,858
2,287
2,325
64,514 67,634
63,686 66,750
826
881
2
3
45
42
1
1
42
40
2
1
3,402
3,356
2,897
2,841
498
507
7
8
742
614
2,930
3,188
478,415 490,017
%
Change
2.1%
1.7%
4.8%
4.8%
6.7%
50.0%
-6.7%
0.0%
-4.8%
-50.0%
-1.4%
-1.9%
1.8 %
14.3%
-17.3%
8.8%
2.4%
Note - Three part tariff was introduced for bulk customers as tariff change w.e. from 01/01/2011.
2010
2011
BULK +S.L.
14.1%
BULK +S.L.
13.7%
DOM+RP
34.4%
INDUSTRIAL
31.0%
DOM+RP
34.2%
GENERAL
18.9%
GENERAL
19.2%
INDUSTRIAL
1.0%
GENERAL
10.1%
BULK +S.L.
0.0%
INDUSTRIAL
1.0%
BULK +S.L.
0.0%
Hotel
0.0%
Hotel
0.0%
DOM+RP
88.9%
DOM+RP
89.0%
BULK +S.L.
INDUSTRIAL
Hotel
GENERAL
DOM+RP
%
Change
1.0 %
16.9 %
8.4 %
16.7 %
8.3 %
15.5 %
18.1 %
6.8 %
0.5 %
-2.2 %
2010
2011
%
Change
483
1,724
50
25,257
35
1,544
754
108,886
33,859
3,697
71,330
0.0 %
0.6 %
21.0 %
3.6 %
0.0 %
1.4 %
2.7 %
4.5 %
-0.4 %
1.3 %
7.3 %
First 30 units
31 - 60 units
61 - 90 units
91 - 120 units
121 - 180 units
Above 180 units
Unit Rate
(for each 30 days billing period)
@ Rs 3.00 per unit
@ Rs 4.70 per unit
@ Rs 7.50 per unit
@ Rs 21.00 per unit
@ Rs 24.00 per unit
@ Rs 36.00 per unit
Fixed Charge
+
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 90.00
Rs. 315.00
Rs. 315.00
Rs. 315.00
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 180.00
Rs. 180.00
Rs. 240.00
Chunnakam
Transmission
Network 2011
Kilinochchi
Vavuniya
Note:- 1. Excludes 141 route km of 132 kV transmission lines which is being re-constructed in the North.
2. Includes only distribution lines & substations rehabilitated and used from 1998 in Northern Province.
K.P.S.(smallGT - L.A.D)
K.P.S.(new GT - L.A.D)
SP.P.S. - A ( L.A.D.)
SP.P.S. - A (L.H.F.)
SP.P.S.- B (L.A.D.)
SP.P.S.- B (L.H.F.)
K.P.S. - C.Cy. (L.A.D.)
K.P.S. - C.Cy. (Naptha)
Puttlam - Coal
Puttlam - LAD
Hotel
1.6%
2010
2011*
20,869
6,470,617
2,832,318
6,542,663
2,863,854
313,511
2,836
151.5
7.8
65,610
110.57
INDUSTRIAL
31.2%
Hotel
1.6%
GENERAL
10.0%
2010
20,653
5,534,327
2,612,603
5,604,104
2,645,542
271,346
2,400
141.9
%
7.3
sq.km.
65,610
Rs/US $
113.06
* - Provisional
Units
Thous.
Rs.m.
Rs.m.
Rs.m.
Rs.m.
Rs.
U.S.$
Province
Colombo City
North Western
North central
Northern
Region - 1
Western - North
Central
Eastern
Region - 2
Western - South 2
Uva
Sabaragamuwa
Region - 3
Western - South 1
Southern
Region - 4
TOTAL
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Units
2010
2011
%
Change
44
2,874
5
2100/500
2
405
4
306
121
1,084
21,930
4,838
22,106
46
3,043
5
2100/500
2
405
5
369
124
1,090
22,839
5,627
23,021
4.5 %
5.9 %
0.0 %
0.0 %
0.0 %
0.0 %
25.0 %
20.6 %
2.5 %
0.6 %
4.1 %
16.3 %
4.1 %
12,107
13,134
8.5 %
Total capacity
2011
CSC
8
19
9
11
47
18
23
18
59
13
16
20
49
10
26
36
191
CSC
8
21
10
11
50
18
23
18
59
13
16
20
49
10
26
36
194
MVA
YEAR
2006
2007
2008
2009
2010
2011
Total at End
of the year
17,297
17,757
18,103
18,590
19,116
19,643
OTHER CONSUMER
CATEGORIES
Rate - 1
Supply at 400/230V
Contract demand < or = 42 kVA
Unit Charge (Rs/unit)
Fixed Charge(Rs./Month)
Region 4
18.2%
Region 3
23.6%
2011
Region 1
26.5%
Region 2
31.7%
Region 4
18.0%
Region 3
23.7%
Hotel
19.50 +
240.00
19.40
+
850.00
Day - 10.45
(5.30 am to
6.30 pm) +
Peak- 13.60
(6.30 pm to
10.30 pm) +
Off-Peak - 7.35
(10.30 pm to
5.30 am)
+
850.00
Day - 13.00
(5.30 am to
6.30 pm) +
Peak- 16.90
(6.30 pm to
10.30 pm) +
Off-Peak - 9.10
(10.30 pm to
5.30 am)
+
850.00
+
3000.00
+
3000.00
+
3000.00
+
750.00
Day - 10.25
(5.30 am to
6.30 pm) +
Peak- 13.40
(6.30 pm to
10.30 pm) +
Off-Peak - 7.15
(10.30 pm to
5.30 am)
+
750.00
Day - 12.60
(5.30 am to
6.30 pm) +
Peak- 16.40
(6.30 pm to
10.30 pm) +
Off-Peak - 8.85
(10.30 pm to
5.30 am)
+
750.00
Fixed Charge(Rs./Month)
+
3000.00
+
3000.00
+
3000.00
Rate - 2
Supply at 400/230V
Contract demand
above 42 kVA
Unit Charge
(Rs/unit)
Demand Charge
(Rs/kVA)
Fixed Charge (Rs./Month)
Puttalam
Coal
Puttalam
Heladhanavi
Habarana
Valachchenai
Pannala
Madampe
Bowatenna
Bolawatte
Kurunegala
Ukuwela
Veyangoda
Kiribathkumbura
Kotugoda
Kegalle
Thulhiriya
Victoria
Ampara
Randenigala
Inginiyagala
Rantembe
Kotmale
Polpitiya Laxapana
Sitawaka
Wimalasurendra
Kosgama New Lax
Nuwara Eliya
Badulla
Canyon
Rate - 3
Supply at 11 kV & above
Unit Charge
(Rs/unit)
Trincomalee
Anuradhapura
10.50 +
240.00
Region 1
26.8%
Region 2
31.6%
Industrial
19.50 +
240.00
General
Purpose
19.10
Note - 1. Eligible Government Instititions shall be entitled to a 25% discount on energy charges.
2. No Fuel Adjustment Charge effective from 01/01/2011 to 31/12/2011.
ACE
Horana
Ratnapura
Veyangoda
Matugama
Kotugoda
Kerawalapitiya
AES
Kelanitissa
CPPL
Kolonnawa
Maradana
Havelock Town
Sri Jayewardenepura
Dehiwela
Aniyakanda
Ambalangoda
Biyagama
Embilipitiya
ACE
Hambantota
Galle
APPL
Sapugaskanda
Aturugiriya
Oruwala
Pannipitiya
Ratmalana
Panadura
Kukule
Deniyaya
Kelaniya
Balangoda
Samanala Wewa
ACE
Horana
Matara
220 kV
132 kV
STATISTICAL DIGEST
2011
Enrich
life
through
g
Power
Matugama
C E Y L O N E L E C T R I C I T Y
C o l o m b o 0 0 2 0 0 S r i
w w w. c e b . l k
B O A R D
L a n k a
449
No./ km.
KTOE
34.3
1.2
480
34.6
1.0
7.0%
0.9%
8,892(b)
kg OE/Person
431(b)
9.0(b)
7159 859.7%
10
84 758.7%
3136 -31.6%
59
33 -44.4%
Naphtha 4231
4154
-1.8%
78
63 -19.1%
SP.P.S.(Diesel) - A
L.H.F.
2485
3804
53.1%
83
95
L.A.D.
169
132 -21.9%
L.H.F.
2959
4246
43.5%
102
L.A.D.
94
93
-0.8%
Chunnakam - Diesel
L.A.D.
167
187
12.1%
Puttamm - Coal
L.A.D.
331
Coal
6410
SP.P.S.(Diesel) - B
31.587.6%
TOTAL
1383
1390
45
2818
1401
1690
50
3141
10
1.3%
21.6%
10.7%
11.5%
(2) Revenue includes FAC (30% of unit charge for GP, Hotel-GP, St. Lighting
& consumers who consumed over 90 units per month in Domestic sector)
in 2010 & no FAC in 2011.
2010
2011
40%
2011
1%
9%
43%
60%
57%
47%
PPP
CEB
395 (M.kg)
349
430
23.3%
1%
53%
40%
50%
Hydro
Thermal
Coal
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North*
Central
Eastern
Region - 2 Total
Western-South II*
Uva
Sabaragamuwa
Region - 3 Total
Western-South I*
Southern*
Region - 4 Total
TOTAL
C.E.B. Percentage
Change
2010
1170
919
320
164
2573
1904
688
418
3010
1252
347
420
2019
869
797
1666
9268
2010/11
6.0 %
9.1 %
11.6 %
21.0 %
8.7 %
-12.9 %
7.3 %
6.7 %
-5.5 %
-18.6 %
6.8 %
8.6 %
-8.6 %
-41.2 %
-4.8 %
-23.8 %
8.1 %
C.E.B.
2011
1239
1003
356
199
2797
1659
739
446
2844
1019
370
457
1846
511
759
1269
10023
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
12.4 %
10.0 %
3.6 %
2.0 %
27.9 %
16.5 %
7.4 %
4.5 %
28.4 %
10.2 %
3.7 %
4.6 %
18.4 %
5.1 %
7.6 %
12.7 %
100.0 %
2011
655
133
94
100
184
263
98
110
159
251
82
94
138
184
103
125
177
300
200
100
Tariff
0
Naphtha
LAD
2010
NCRE
LHF
2011
Coal
LAD
2010
Naphtha
LHF
2011
Coal
Fuel Cost per Unit for Thermal Generation by Power Station in CEB
2010
2011
%
Rs/kWh Rs/kWh Change
11.72
13.07
11.5%
K.P.S.(small GT)
34.62
44.86
29.6%
K.P.S.(new GT)
27.53
29.37
6.7%
KPS-C Cy
K.P.S.(C.Cy.)
17.87
28.51
59.6%
SPPS-A
SP.P.S.(Diesel) - A
7.37
9.56
29.8%
SPPS-B
SP.P.S.(Diesel) - B
6.36
8.69
36.8%
Coal
Puttalam - Coal
500
400
1259
(3) Local standard time was adjusted to +5 1/2 GMT in April, 2006.
(4) Victoria, Randenigala & Rantembe were spilled in December, 2010.
-2.3%
3.8%
1 -12.2%
15
Power Station
CSC - Consumer Service Centres
106
Province
6.49
2010
10
2011
20
30
40
Rs./ kWh.
50
C.E.B. Percentage
Change
2010
2010/11
Domestic
3138
Religious
48
General Total
1754
Small
898
Medium
654
Large
202
Hotel Total
149
Small
12
Small T.D.
Medium
68
Medium T.D.
6
Large
63
Large T.D.
Industrial Total
2870
Small
232
Small T.D.
0.09
Medium
1330
Medium T.D.
143
Large
974
Large T.D.
191
Bulk Supply to LECO
L2 -11kV & above 1201
Street Lighting
108
TOTAL
9268
7.7%
8.3%
9.8%
11.6%
7.6%
9.5%
7.1%
-87.7%
34.5%
3.0%
9.1%
8.6%
17.0%
30.9%
5.5%
0.3%
8.1%
C.E.B.
2011
3379
51
1927
1002
704
221
159
1
92
2*
65
3131
252
0.05*
1556
18*
1275
31*
1267
109
10023
33.7%
0.5%
19.2%
10.0%
7.0%
2.2%
1.6%
0.0%
0.9%
0.0%
0.6%
31.2%
2.5%
0.0%
15.5%
0.2%
12.7%
0.3%
68
151
338
177
17,733
227,802
27,748
399
46,632
-*
768,286
-*
5,490
483
-*
32,595
-*
614,269
-*
12.6%
1.1%
100.0%
177
Increase
%
in Accounts Change
2010
2011 2010/11
154,268
594,899
295,924
143,611
1,188,702
510,016
598,187
312,727
1,420,930
327,342
353,632
374,729
1,055,703
223,200
591,887
815,087
4,480,423
3,332
32,390
18,599
22,440
76,761
14,982
28,273
24,560
67,815
11,519
20,187
28,630
60,336
7,517
24,595
32,112
237,025
2.2%
5.4%
6.3%
15.6%
6.5%
2.9%
4.7%
7.9%
4.8%
3.5%
5.7%
7.6%
5.7%
3.4%
4.2%
3.9%
5.3%
C.E.B. Percentage
of Total
2011
2011
157,600
627,289
314,523
166,051
1,265,463
524,998
626,460
337,287
1,488,745
338,861
373,819
403,359
1,116,039
230,717
616,482
847,199
4,717,448
3.3%
13.3%
6.7%
3.5%
26.8%
11.1%
13.3%
7.1%
31.6%
7.2%
7.9%
8.6%
23.7%
4.9%
13.1%
18.0%
100.0%
C.E.B.
Increase
in Accounts
2010
2011
Domestic
3,958,829
Religious
26,763
General Total 449,270
Small
446,121
Medium
3,077
Large
72
Hotel Total
463
Small
298
Small T.D.
Medium
146
Medium T.D.
12
Large
7
Large T.D.
Industrial Total 45,059
Small
41,031
Small T.D.
6
Medium
3,482
Medium T.D.
379
Large
141
Large T.D.
20
Bulk Supply to LECO
L2 - 11kV & above 38
Street Lighting
1
TOTAL
4,480,423
%
Change
2010/11
C.E.B. Percentage
of Total
2011
2011
206,909
1,557
26,110
25,870
231
9
16
8
18
0
2,470
2,336
495
32
-
5.2%
5.8%
5.8%
5.8%
7.5%
12.5%
3.5%
2.7%
12.3%
0.0 %
5.5%
5.7%
14.2 %
22.7 %
-
4,165,738
28,320
475,380
471,991
3,308
81
479
306
164
2*
7
47,529
43,367
2*
3,977
10*
173
-*
88.3%
0.6%
10.1%
10.0%
0.1%
negli. %
0.01%
0.01 %
negli.%
negli.%
negli.%
1.0%
0.9 %
negli. %
0.1 %
negli. %
negli. %
-
0
237,025
0.0%
5.3 %
1*
1
4,717,448
negli. %
negli. %
100 %
Note - Trans. Bulk Supply to LECO Accounts are accounted as one for 2011.negli. - negligible.
* - Due to 3 part tariff introduced effective from 01/01/2011.
Province
C.E.B. Percentage
Change
2010
2010/11
Colombo City
21,719
North Western
10,886
North Central
3,758
Northern
2,180
Region - 1 Total 38,542
Western-North*
23,481
Central
8,213
Eastern
4,974
Region - 2 Total 36,669
Western-South II* 15,776
Uva
4,008
Sabaragamuwa
4,779
Region - 3 Total 24,563
Western-South I* 11,647
Southern*
9,359
Region - 4 Total 21,006
TOTAL
120,780
11.5%
7.3%
12.8%
21.2%
11.0%
-9.1%
8.8%
7.3%
-2.9%
-15.3%
7.1%
8.7%
-7.0%
-35.6%
-6.3%
-22.6%
9.6%
C.E.B.
2011
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
24,206
11,684
4,239
2,642
42,771
21,352
8,933
5,337
35,622
13,367
4,294
5,194
22,854
7,500
8,767
16,267
132,373
18.3%
8.8%
3.2%
2.0%
32.3%
16.1%
6.7%
4.0%
26.9%
10.1%
3.2%
3.9%
17.3%
5.7%
6.6%
12.3%
100.0%
19.53
11.65
11.89
13.28
15.29
12.87
12.09
11.96
12.53
13.11
11.60
11.38
12.38
14.69
11.55
12.81
13.21
* - Revenue from Transmission Bulk Supply (14859 m.Rs) to LECO was added to the Total for 2011.
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
2011
C.E.B.
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern
Region - 2 Total
Western-South II
Uva
Sabaragamuwa
Region - 3 Total
Western-South I
Southern
Region - 4 Total
TOTAL
* - Transmission Bulk Supply (1267 GWh) to LECO was added to the Total for 2011.
Installed Capacity
by Source in MW.
-18.0%
35.9%
41.1%
7.6%
14.9%
1 -35.3%
395
-0.1%
746
4583
201
291
L.A.D.
185
292
2011
57%
35%
13%
9%
0%
43%
5%
37%
1.0%
100%
40 240.6%
L.A.D.
166
11.5%
2010
60%
47%
13%
0%
40%
6%
34%
0.8%
100%
12
86
421,855
-2.49*
Percentage of Total
2011 % increase
6552
2.6%
4018
-19.5%
1494
7.1%
1038
3
-11.1%
4976
14.9%
604
-6.5%
4254
18.1%
118
43.0%
11528
7.6%
K.P.S.(C.Cy.)
78
378,207
0.05*
2010
6386
4988
1394
3
4329
646
3600
83
10714
3436 279.1%
K.P.S.(new GT)
907
63
m.Rs.
%
L.A.D.
Million Litres
5.4%
10.0%
K.P.S.(small GT)
2010
%
2011 Change
6410
16,192
63,817
%
2011 Change
2058 17.1%
1207
0.0%
548
0.0%
300
3
0.0%
1082
2.2%
194 10.4%
842
0.0%
47 11.4%
3141 11.5%
2010
1758
1207
548
3
1059
175
842
42
2818
Fuel Cost in m. Rs
Type of
Fuel
5445
3.0%
-1.8%
15,366
58,002
kWh/Person
%
Change
4.3%
0.0%
0.0%
0.0%
9.5%
5.9%
0.0%
55.6%
8.6%
No.
m.Rs.
No./Employee
C.E.B. - Total
- Hydro
- Thermal-Oil
- Thermal-Coal
- Wind
P.P.P. - Total
- Hydro-Small
- Thermal-Oil
- NCRE
Total
2011
24
16
6
1
1
115
90
11
14
139
C. E. B.
Name of
Power Station
14474
8.6%
11.5%
10.7%
7.6%
-1.3%
8.1%
1.3%
9.6%
5.3%
2010
23
16
6
1
105
85
11
9
128
6665
128
139
2818
3141
1955
2163
10714
11528
3
12.97
11.72
9,268
10,023
13.03
13.21
120,780
132,373
15,822
4,480,423 4,717,448
55
55
191
194
88.0 (a)
91.0 (a)
62.6
60.8
4154
No.
MW.
MW.
GWh.
GWh.
%
GWh.
Rs/kWh
m.Rs.
m.Rs.
No.
No.
No.
%
%
4231
2010
Annual
Percentage
2011
Change
Million Rs.
Thousands
Units
GENERATION STATISTICS
8050
C.E.B. Percentage
Change
2010
2010/11
Domestic
30,937
Religious
428
General Total
36,616
Small
18,766
Medium
13,881
Large
3,969
Hotel Total
1,953
Small
153
Small T.D.
Medium
942
Medium T.D.
92
Large
765
Large T.D.
Industrial Total 33,104
Small
2,543
Small T.D.
1
Medium
15,927
Medium T.D.
1,959
Large
10,597
Large T.D.
2,078
Bulk Supply to LECO
L2 -11kV & above 15,070
Street Lighting
2,673
TOTAL
120,780
7.1%
-16.2%
13.8%
11.1%
16.2%
18.4%
21.0%
-80.5%
49.5%
17.2%
20.8%
8.1%
33.2%
44.7%
-1.4%
9.6%
C.E.B.
2011
33,138
358
41,682
20,852
16,132
4,698
2,362
30
1,408
27*
897
39,974
2,750
0.5*
21,220
283*
15,336
385*
14,859
-*
132,373
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
25.0%
0.3%
31.5%
15.8%
12.2%
3.5%
1.8%
0.0%
1.1%
0.0%
0.7%
30.2%
2.1%
0%
16.0%
0.2%
11.6%
0.3%
9.81
6.97
21.63
20.82
22.92
21.22
14.81
20.35
15.39
13.90
12.77
10.93
13.64
12.03
-
11.2%
100.0%
11.73
13.21
449
No./ km.
KTOE
34.3
1.2
480
34.6
1.0
7.0%
0.9%
8,892(b)
kg OE/Person
431(b)
9.0(b)
7159 859.7%
10
84 758.7%
3136 -31.6%
59
33 -44.4%
Naphtha 4231
4154
-1.8%
78
63 -19.1%
SP.P.S.(Diesel) - A
L.H.F.
2485
3804
53.1%
83
95
L.A.D.
169
132 -21.9%
L.H.F.
2959
4246
43.5%
102
L.A.D.
94
93
-0.8%
Chunnakam - Diesel
L.A.D.
167
187
12.1%
Puttamm - Coal
L.A.D.
331
Coal
6410
SP.P.S.(Diesel) - B
31.587.6%
TOTAL
1383
1390
45
2818
1401
1690
50
3141
10
1.3%
21.6%
10.7%
11.5%
(2) Revenue includes FAC (30% of unit charge for GP, Hotel-GP, St. Lighting
& consumers who consumed over 90 units per month in Domestic sector)
in 2010 & no FAC in 2011.
2010
2011
40%
2011
1%
9%
43%
60%
57%
47%
PPP
CEB
395 (M.kg)
349
430
23.3%
1%
53%
40%
50%
Hydro
Thermal
Coal
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North*
Central
Eastern
Region - 2 Total
Western-South II*
Uva
Sabaragamuwa
Region - 3 Total
Western-South I*
Southern*
Region - 4 Total
TOTAL
C.E.B. Percentage
Change
2010
1170
919
320
164
2573
1904
688
418
3010
1252
347
420
2019
869
797
1666
9268
2010/11
6.0 %
9.1 %
11.6 %
21.0 %
8.7 %
-12.9 %
7.3 %
6.7 %
-5.5 %
-18.6 %
6.8 %
8.6 %
-8.6 %
-41.2 %
-4.8 %
-23.8 %
8.1 %
C.E.B.
2011
1239
1003
356
199
2797
1659
739
446
2844
1019
370
457
1846
511
759
1269
10023
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
12.4 %
10.0 %
3.6 %
2.0 %
27.9 %
16.5 %
7.4 %
4.5 %
28.4 %
10.2 %
3.7 %
4.6 %
18.4 %
5.1 %
7.6 %
12.7 %
100.0 %
2011
655
133
94
100
184
263
98
110
159
251
82
94
138
184
103
125
177
300
200
100
Tariff
0
Naphtha
LAD
2010
NCRE
LHF
2011
Coal
LAD
2010
Naphtha
LHF
2011
Coal
Fuel Cost per Unit for Thermal Generation by Power Station in CEB
2010
2011
%
Rs/kWh Rs/kWh Change
11.72
13.07
11.5%
K.P.S.(small GT)
34.62
44.86
29.6%
K.P.S.(new GT)
27.53
29.37
6.7%
KPS-C Cy
K.P.S.(C.Cy.)
17.87
28.51
59.6%
SPPS-A
SP.P.S.(Diesel) - A
7.37
9.56
29.8%
SPPS-B
SP.P.S.(Diesel) - B
6.36
8.69
36.8%
Coal
Puttalam - Coal
500
400
1259
(3) Local standard time was adjusted to +5 1/2 GMT in April, 2006.
(4) Victoria, Randenigala & Rantembe were spilled in December, 2010.
-2.3%
3.8%
1 -12.2%
15
Power Station
CSC - Consumer Service Centres
106
Province
6.49
2010
10
2011
20
30
40
Rs./ kWh.
50
C.E.B. Percentage
Change
2010
2010/11
Domestic
3138
Religious
48
General Total
1754
Small
898
Medium
654
Large
202
Hotel Total
149
Small
12
Small T.D.
Medium
68
Medium T.D.
6
Large
63
Large T.D.
Industrial Total
2870
Small
232
Small T.D.
0.09
Medium
1330
Medium T.D.
143
Large
974
Large T.D.
191
Bulk Supply to LECO
L2 -11kV & above 1201
Street Lighting
108
TOTAL
9268
7.7%
8.3%
9.8%
11.6%
7.6%
9.5%
7.1%
-87.7%
34.5%
3.0%
9.1%
8.6%
17.0%
30.9%
5.5%
0.3%
8.1%
C.E.B.
2011
3379
51
1927
1002
704
221
159
1
92
2*
65
3131
252
0.05*
1556
18*
1275
31*
1267
109
10023
33.7%
0.5%
19.2%
10.0%
7.0%
2.2%
1.6%
0.0%
0.9%
0.0%
0.6%
31.2%
2.5%
0.0%
15.5%
0.2%
12.7%
0.3%
68
151
338
177
17,733
227,802
27,748
399
46,632
-*
768,286
-*
5,490
483
-*
32,595
-*
614,269
-*
12.6%
1.1%
100.0%
177
Increase
%
in Accounts Change
2010
2011 2010/11
154,268
594,899
295,924
143,611
1,188,702
510,016
598,187
312,727
1,420,930
327,342
353,632
374,729
1,055,703
223,200
591,887
815,087
4,480,423
3,332
32,390
18,599
22,440
76,761
14,982
28,273
24,560
67,815
11,519
20,187
28,630
60,336
7,517
24,595
32,112
237,025
2.2%
5.4%
6.3%
15.6%
6.5%
2.9%
4.7%
7.9%
4.8%
3.5%
5.7%
7.6%
5.7%
3.4%
4.2%
3.9%
5.3%
C.E.B. Percentage
of Total
2011
2011
157,600
627,289
314,523
166,051
1,265,463
524,998
626,460
337,287
1,488,745
338,861
373,819
403,359
1,116,039
230,717
616,482
847,199
4,717,448
3.3%
13.3%
6.7%
3.5%
26.8%
11.1%
13.3%
7.1%
31.6%
7.2%
7.9%
8.6%
23.7%
4.9%
13.1%
18.0%
100.0%
C.E.B.
Increase
in Accounts
2010
2011
Domestic
3,958,829
Religious
26,763
General Total 449,270
Small
446,121
Medium
3,077
Large
72
Hotel Total
463
Small
298
Small T.D.
Medium
146
Medium T.D.
12
Large
7
Large T.D.
Industrial Total 45,059
Small
41,031
Small T.D.
6
Medium
3,482
Medium T.D.
379
Large
141
Large T.D.
20
Bulk Supply to LECO
L2 - 11kV & above 38
Street Lighting
1
TOTAL
4,480,423
%
Change
2010/11
C.E.B. Percentage
of Total
2011
2011
206,909
1,557
26,110
25,870
231
9
16
8
18
0
2,470
2,336
495
32
-
5.2%
5.8%
5.8%
5.8%
7.5%
12.5%
3.5%
2.7%
12.3%
0.0 %
5.5%
5.7%
14.2 %
22.7 %
-
4,165,738
28,320
475,380
471,991
3,308
81
479
306
164
2*
7
47,529
43,367
2*
3,977
10*
173
-*
88.3%
0.6%
10.1%
10.0%
0.1%
negli. %
0.01%
0.01 %
negli.%
negli.%
negli.%
1.0%
0.9 %
negli. %
0.1 %
negli. %
negli. %
-
0
237,025
0.0%
5.3 %
1*
1
4,717,448
negli. %
negli. %
100 %
Note - Trans. Bulk Supply to LECO Accounts are accounted as one for 2011.negli. - negligible.
* - Due to 3 part tariff introduced effective from 01/01/2011.
Province
C.E.B. Percentage
Change
2010
2010/11
Colombo City
21,719
North Western
10,886
North Central
3,758
Northern
2,180
Region - 1 Total 38,542
Western-North*
23,481
Central
8,213
Eastern
4,974
Region - 2 Total 36,669
Western-South II* 15,776
Uva
4,008
Sabaragamuwa
4,779
Region - 3 Total 24,563
Western-South I* 11,647
Southern*
9,359
Region - 4 Total 21,006
TOTAL
120,780
11.5%
7.3%
12.8%
21.2%
11.0%
-9.1%
8.8%
7.3%
-2.9%
-15.3%
7.1%
8.7%
-7.0%
-35.6%
-6.3%
-22.6%
9.6%
C.E.B.
2011
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
24,206
11,684
4,239
2,642
42,771
21,352
8,933
5,337
35,622
13,367
4,294
5,194
22,854
7,500
8,767
16,267
132,373
18.3%
8.8%
3.2%
2.0%
32.3%
16.1%
6.7%
4.0%
26.9%
10.1%
3.2%
3.9%
17.3%
5.7%
6.6%
12.3%
100.0%
19.53
11.65
11.89
13.28
15.29
12.87
12.09
11.96
12.53
13.11
11.60
11.38
12.38
14.69
11.55
12.81
13.21
* - Revenue from Transmission Bulk Supply (14859 m.Rs) to LECO was added to the Total for 2011.
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
2011
C.E.B.
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern
Region - 2 Total
Western-South II
Uva
Sabaragamuwa
Region - 3 Total
Western-South I
Southern
Region - 4 Total
TOTAL
* - Transmission Bulk Supply (1267 GWh) to LECO was added to the Total for 2011.
Installed Capacity
by Source in MW.
-18.0%
35.9%
41.1%
7.6%
14.9%
1 -35.3%
395
-0.1%
746
4583
201
291
L.A.D.
185
292
2011
57%
35%
13%
9%
0%
43%
5%
37%
1.0%
100%
40 240.6%
L.A.D.
166
11.5%
2010
60%
47%
13%
0%
40%
6%
34%
0.8%
100%
12
86
421,855
-2.49*
Percentage of Total
2011 % increase
6552
2.6%
4018
-19.5%
1494
7.1%
1038
3
-11.1%
4976
14.9%
604
-6.5%
4254
18.1%
118
43.0%
11528
7.6%
K.P.S.(C.Cy.)
78
378,207
0.05*
2010
6386
4988
1394
3
4329
646
3600
83
10714
3436 279.1%
K.P.S.(new GT)
907
63
m.Rs.
%
L.A.D.
Million Litres
5.4%
10.0%
K.P.S.(small GT)
2010
%
2011 Change
6410
16,192
63,817
%
2011 Change
2058 17.1%
1207
0.0%
548
0.0%
300
3
0.0%
1082
2.2%
194 10.4%
842
0.0%
47 11.4%
3141 11.5%
2010
1758
1207
548
3
1059
175
842
42
2818
Fuel Cost in m. Rs
Type of
Fuel
5445
3.0%
-1.8%
15,366
58,002
kWh/Person
%
Change
4.3%
0.0%
0.0%
0.0%
9.5%
5.9%
0.0%
55.6%
8.6%
No.
m.Rs.
No./Employee
C.E.B. - Total
- Hydro
- Thermal-Oil
- Thermal-Coal
- Wind
P.P.P. - Total
- Hydro-Small
- Thermal-Oil
- NCRE
Total
2011
24
16
6
1
1
115
90
11
14
139
C. E. B.
Name of
Power Station
14474
8.6%
11.5%
10.7%
7.6%
-1.3%
8.1%
1.3%
9.6%
5.3%
2010
23
16
6
1
105
85
11
9
128
6665
128
139
2818
3141
1955
2163
10714
11528
3
12.97
11.72
9,268
10,023
13.03
13.21
120,780
132,373
15,822
4,480,423 4,717,448
55
55
191
194
88.0 (a)
91.0 (a)
62.6
60.8
4154
No.
MW.
MW.
GWh.
GWh.
%
GWh.
Rs/kWh
m.Rs.
m.Rs.
No.
No.
No.
%
%
4231
2010
Annual
Percentage
2011
Change
Million Rs.
Thousands
Units
GENERATION STATISTICS
8050
C.E.B. Percentage
Change
2010
2010/11
Domestic
30,937
Religious
428
General Total
36,616
Small
18,766
Medium
13,881
Large
3,969
Hotel Total
1,953
Small
153
Small T.D.
Medium
942
Medium T.D.
92
Large
765
Large T.D.
Industrial Total 33,104
Small
2,543
Small T.D.
1
Medium
15,927
Medium T.D.
1,959
Large
10,597
Large T.D.
2,078
Bulk Supply to LECO
L2 -11kV & above 15,070
Street Lighting
2,673
TOTAL
120,780
7.1%
-16.2%
13.8%
11.1%
16.2%
18.4%
21.0%
-80.5%
49.5%
17.2%
20.8%
8.1%
33.2%
44.7%
-1.4%
9.6%
C.E.B.
2011
33,138
358
41,682
20,852
16,132
4,698
2,362
30
1,408
27*
897
39,974
2,750
0.5*
21,220
283*
15,336
385*
14,859
-*
132,373
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
25.0%
0.3%
31.5%
15.8%
12.2%
3.5%
1.8%
0.0%
1.1%
0.0%
0.7%
30.2%
2.1%
0%
16.0%
0.2%
11.6%
0.3%
9.81
6.97
21.63
20.82
22.92
21.22
14.81
20.35
15.39
13.90
12.77
10.93
13.64
12.03
-
11.2%
100.0%
11.73
13.21
449
No./ km.
KTOE
34.3
1.2
480
34.6
1.0
7.0%
0.9%
8,892(b)
kg OE/Person
431(b)
9.0(b)
7159 859.7%
10
84 758.7%
3136 -31.6%
59
33 -44.4%
Naphtha 4231
4154
-1.8%
78
63 -19.1%
SP.P.S.(Diesel) - A
L.H.F.
2485
3804
53.1%
83
95
L.A.D.
169
132 -21.9%
L.H.F.
2959
4246
43.5%
102
L.A.D.
94
93
-0.8%
Chunnakam - Diesel
L.A.D.
167
187
12.1%
Puttamm - Coal
L.A.D.
331
Coal
6410
SP.P.S.(Diesel) - B
31.587.6%
TOTAL
1383
1390
45
2818
1401
1690
50
3141
10
1.3%
21.6%
10.7%
11.5%
(2) Revenue includes FAC (30% of unit charge for GP, Hotel-GP, St. Lighting
& consumers who consumed over 90 units per month in Domestic sector)
in 2010 & no FAC in 2011.
2010
2011
40%
2011
1%
9%
43%
60%
57%
47%
PPP
CEB
395 (M.kg)
349
430
23.3%
1%
53%
40%
50%
Hydro
Thermal
Coal
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North*
Central
Eastern
Region - 2 Total
Western-South II*
Uva
Sabaragamuwa
Region - 3 Total
Western-South I*
Southern*
Region - 4 Total
TOTAL
C.E.B. Percentage
Change
2010
1170
919
320
164
2573
1904
688
418
3010
1252
347
420
2019
869
797
1666
9268
2010/11
6.0 %
9.1 %
11.6 %
21.0 %
8.7 %
-12.9 %
7.3 %
6.7 %
-5.5 %
-18.6 %
6.8 %
8.6 %
-8.6 %
-41.2 %
-4.8 %
-23.8 %
8.1 %
C.E.B.
2011
1239
1003
356
199
2797
1659
739
446
2844
1019
370
457
1846
511
759
1269
10023
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
12.4 %
10.0 %
3.6 %
2.0 %
27.9 %
16.5 %
7.4 %
4.5 %
28.4 %
10.2 %
3.7 %
4.6 %
18.4 %
5.1 %
7.6 %
12.7 %
100.0 %
2011
655
133
94
100
184
263
98
110
159
251
82
94
138
184
103
125
177
300
200
100
Tariff
0
Naphtha
LAD
2010
NCRE
LHF
2011
Coal
LAD
2010
Naphtha
LHF
2011
Coal
Fuel Cost per Unit for Thermal Generation by Power Station in CEB
2010
2011
%
Rs/kWh Rs/kWh Change
11.72
13.07
11.5%
K.P.S.(small GT)
34.62
44.86
29.6%
K.P.S.(new GT)
27.53
29.37
6.7%
KPS-C Cy
K.P.S.(C.Cy.)
17.87
28.51
59.6%
SPPS-A
SP.P.S.(Diesel) - A
7.37
9.56
29.8%
SPPS-B
SP.P.S.(Diesel) - B
6.36
8.69
36.8%
Coal
Puttalam - Coal
500
400
1259
(3) Local standard time was adjusted to +5 1/2 GMT in April, 2006.
(4) Victoria, Randenigala & Rantembe were spilled in December, 2010.
-2.3%
3.8%
1 -12.2%
15
Power Station
CSC - Consumer Service Centres
106
Province
6.49
2010
10
2011
20
30
40
Rs./ kWh.
50
C.E.B. Percentage
Change
2010
2010/11
Domestic
3138
Religious
48
General Total
1754
Small
898
Medium
654
Large
202
Hotel Total
149
Small
12
Small T.D.
Medium
68
Medium T.D.
6
Large
63
Large T.D.
Industrial Total
2870
Small
232
Small T.D.
0.09
Medium
1330
Medium T.D.
143
Large
974
Large T.D.
191
Bulk Supply to LECO
L2 -11kV & above 1201
Street Lighting
108
TOTAL
9268
7.7%
8.3%
9.8%
11.6%
7.6%
9.5%
7.1%
-87.7%
34.5%
3.0%
9.1%
8.6%
17.0%
30.9%
5.5%
0.3%
8.1%
C.E.B.
2011
3379
51
1927
1002
704
221
159
1
92
2*
65
3131
252
0.05*
1556
18*
1275
31*
1267
109
10023
33.7%
0.5%
19.2%
10.0%
7.0%
2.2%
1.6%
0.0%
0.9%
0.0%
0.6%
31.2%
2.5%
0.0%
15.5%
0.2%
12.7%
0.3%
68
151
338
177
17,733
227,802
27,748
399
46,632
-*
768,286
-*
5,490
483
-*
32,595
-*
614,269
-*
12.6%
1.1%
100.0%
177
Increase
%
in Accounts Change
2010
2011 2010/11
154,268
594,899
295,924
143,611
1,188,702
510,016
598,187
312,727
1,420,930
327,342
353,632
374,729
1,055,703
223,200
591,887
815,087
4,480,423
3,332
32,390
18,599
22,440
76,761
14,982
28,273
24,560
67,815
11,519
20,187
28,630
60,336
7,517
24,595
32,112
237,025
2.2%
5.4%
6.3%
15.6%
6.5%
2.9%
4.7%
7.9%
4.8%
3.5%
5.7%
7.6%
5.7%
3.4%
4.2%
3.9%
5.3%
C.E.B. Percentage
of Total
2011
2011
157,600
627,289
314,523
166,051
1,265,463
524,998
626,460
337,287
1,488,745
338,861
373,819
403,359
1,116,039
230,717
616,482
847,199
4,717,448
3.3%
13.3%
6.7%
3.5%
26.8%
11.1%
13.3%
7.1%
31.6%
7.2%
7.9%
8.6%
23.7%
4.9%
13.1%
18.0%
100.0%
C.E.B.
Increase
in Accounts
2010
2011
Domestic
3,958,829
Religious
26,763
General Total 449,270
Small
446,121
Medium
3,077
Large
72
Hotel Total
463
Small
298
Small T.D.
Medium
146
Medium T.D.
12
Large
7
Large T.D.
Industrial Total 45,059
Small
41,031
Small T.D.
6
Medium
3,482
Medium T.D.
379
Large
141
Large T.D.
20
Bulk Supply to LECO
L2 - 11kV & above 38
Street Lighting
1
TOTAL
4,480,423
%
Change
2010/11
C.E.B. Percentage
of Total
2011
2011
206,909
1,557
26,110
25,870
231
9
16
8
18
0
2,470
2,336
495
32
-
5.2%
5.8%
5.8%
5.8%
7.5%
12.5%
3.5%
2.7%
12.3%
0.0 %
5.5%
5.7%
14.2 %
22.7 %
-
4,165,738
28,320
475,380
471,991
3,308
81
479
306
164
2*
7
47,529
43,367
2*
3,977
10*
173
-*
88.3%
0.6%
10.1%
10.0%
0.1%
negli. %
0.01%
0.01 %
negli.%
negli.%
negli.%
1.0%
0.9 %
negli. %
0.1 %
negli. %
negli. %
-
0
237,025
0.0%
5.3 %
1*
1
4,717,448
negli. %
negli. %
100 %
Note - Trans. Bulk Supply to LECO Accounts are accounted as one for 2011.negli. - negligible.
* - Due to 3 part tariff introduced effective from 01/01/2011.
Province
C.E.B. Percentage
Change
2010
2010/11
Colombo City
21,719
North Western
10,886
North Central
3,758
Northern
2,180
Region - 1 Total 38,542
Western-North*
23,481
Central
8,213
Eastern
4,974
Region - 2 Total 36,669
Western-South II* 15,776
Uva
4,008
Sabaragamuwa
4,779
Region - 3 Total 24,563
Western-South I* 11,647
Southern*
9,359
Region - 4 Total 21,006
TOTAL
120,780
11.5%
7.3%
12.8%
21.2%
11.0%
-9.1%
8.8%
7.3%
-2.9%
-15.3%
7.1%
8.7%
-7.0%
-35.6%
-6.3%
-22.6%
9.6%
C.E.B.
2011
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
24,206
11,684
4,239
2,642
42,771
21,352
8,933
5,337
35,622
13,367
4,294
5,194
22,854
7,500
8,767
16,267
132,373
18.3%
8.8%
3.2%
2.0%
32.3%
16.1%
6.7%
4.0%
26.9%
10.1%
3.2%
3.9%
17.3%
5.7%
6.6%
12.3%
100.0%
19.53
11.65
11.89
13.28
15.29
12.87
12.09
11.96
12.53
13.11
11.60
11.38
12.38
14.69
11.55
12.81
13.21
* - Revenue from Transmission Bulk Supply (14859 m.Rs) to LECO was added to the Total for 2011.
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
2011
C.E.B.
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern
Region - 2 Total
Western-South II
Uva
Sabaragamuwa
Region - 3 Total
Western-South I
Southern
Region - 4 Total
TOTAL
* - Transmission Bulk Supply (1267 GWh) to LECO was added to the Total for 2011.
Installed Capacity
by Source in MW.
-18.0%
35.9%
41.1%
7.6%
14.9%
1 -35.3%
395
-0.1%
746
4583
201
291
L.A.D.
185
292
2011
57%
35%
13%
9%
0%
43%
5%
37%
1.0%
100%
40 240.6%
L.A.D.
166
11.5%
2010
60%
47%
13%
0%
40%
6%
34%
0.8%
100%
12
86
421,855
-2.49*
Percentage of Total
2011 % increase
6552
2.6%
4018
-19.5%
1494
7.1%
1038
3
-11.1%
4976
14.9%
604
-6.5%
4254
18.1%
118
43.0%
11528
7.6%
K.P.S.(C.Cy.)
78
378,207
0.05*
2010
6386
4988
1394
3
4329
646
3600
83
10714
3436 279.1%
K.P.S.(new GT)
907
63
m.Rs.
%
L.A.D.
Million Litres
5.4%
10.0%
K.P.S.(small GT)
2010
%
2011 Change
6410
16,192
63,817
%
2011 Change
2058 17.1%
1207
0.0%
548
0.0%
300
3
0.0%
1082
2.2%
194 10.4%
842
0.0%
47 11.4%
3141 11.5%
2010
1758
1207
548
3
1059
175
842
42
2818
Fuel Cost in m. Rs
Type of
Fuel
5445
3.0%
-1.8%
15,366
58,002
kWh/Person
%
Change
4.3%
0.0%
0.0%
0.0%
9.5%
5.9%
0.0%
55.6%
8.6%
No.
m.Rs.
No./Employee
C.E.B. - Total
- Hydro
- Thermal-Oil
- Thermal-Coal
- Wind
P.P.P. - Total
- Hydro-Small
- Thermal-Oil
- NCRE
Total
2011
24
16
6
1
1
115
90
11
14
139
C. E. B.
Name of
Power Station
14474
8.6%
11.5%
10.7%
7.6%
-1.3%
8.1%
1.3%
9.6%
5.3%
2010
23
16
6
1
105
85
11
9
128
6665
128
139
2818
3141
1955
2163
10714
11528
3
12.97
11.72
9,268
10,023
13.03
13.21
120,780
132,373
15,822
4,480,423 4,717,448
55
55
191
194
88.0 (a)
91.0 (a)
62.6
60.8
4154
No.
MW.
MW.
GWh.
GWh.
%
GWh.
Rs/kWh
m.Rs.
m.Rs.
No.
No.
No.
%
%
4231
2010
Annual
Percentage
2011
Change
Million Rs.
Thousands
Units
GENERATION STATISTICS
8050
C.E.B. Percentage
Change
2010
2010/11
Domestic
30,937
Religious
428
General Total
36,616
Small
18,766
Medium
13,881
Large
3,969
Hotel Total
1,953
Small
153
Small T.D.
Medium
942
Medium T.D.
92
Large
765
Large T.D.
Industrial Total 33,104
Small
2,543
Small T.D.
1
Medium
15,927
Medium T.D.
1,959
Large
10,597
Large T.D.
2,078
Bulk Supply to LECO
L2 -11kV & above 15,070
Street Lighting
2,673
TOTAL
120,780
7.1%
-16.2%
13.8%
11.1%
16.2%
18.4%
21.0%
-80.5%
49.5%
17.2%
20.8%
8.1%
33.2%
44.7%
-1.4%
9.6%
C.E.B.
2011
33,138
358
41,682
20,852
16,132
4,698
2,362
30
1,408
27*
897
39,974
2,750
0.5*
21,220
283*
15,336
385*
14,859
-*
132,373
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
25.0%
0.3%
31.5%
15.8%
12.2%
3.5%
1.8%
0.0%
1.1%
0.0%
0.7%
30.2%
2.1%
0%
16.0%
0.2%
11.6%
0.3%
9.81
6.97
21.63
20.82
22.92
21.22
14.81
20.35
15.39
13.90
12.77
10.93
13.64
12.03
-
11.2%
100.0%
11.73
13.21
449
No./ km.
KTOE
34.3
1.2
480
34.6
1.0
7.0%
0.9%
8,892(b)
kg OE/Person
431(b)
9.0(b)
7159 859.7%
10
84 758.7%
3136 -31.6%
59
33 -44.4%
Naphtha 4231
4154
-1.8%
78
63 -19.1%
SP.P.S.(Diesel) - A
L.H.F.
2485
3804
53.1%
83
95
L.A.D.
169
132 -21.9%
L.H.F.
2959
4246
43.5%
102
L.A.D.
94
93
-0.8%
Chunnakam - Diesel
L.A.D.
167
187
12.1%
Puttamm - Coal
L.A.D.
331
Coal
6410
SP.P.S.(Diesel) - B
31.587.6%
TOTAL
1383
1390
45
2818
1401
1690
50
3141
10
1.3%
21.6%
10.7%
11.5%
(2) Revenue includes FAC (30% of unit charge for GP, Hotel-GP, St. Lighting
& consumers who consumed over 90 units per month in Domestic sector)
in 2010 & no FAC in 2011.
2010
2011
40%
2011
1%
9%
43%
60%
57%
47%
PPP
CEB
395 (M.kg)
349
430
23.3%
1%
53%
40%
50%
Hydro
Thermal
Coal
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North*
Central
Eastern
Region - 2 Total
Western-South II*
Uva
Sabaragamuwa
Region - 3 Total
Western-South I*
Southern*
Region - 4 Total
TOTAL
C.E.B. Percentage
Change
2010
1170
919
320
164
2573
1904
688
418
3010
1252
347
420
2019
869
797
1666
9268
2010/11
6.0 %
9.1 %
11.6 %
21.0 %
8.7 %
-12.9 %
7.3 %
6.7 %
-5.5 %
-18.6 %
6.8 %
8.6 %
-8.6 %
-41.2 %
-4.8 %
-23.8 %
8.1 %
C.E.B.
2011
1239
1003
356
199
2797
1659
739
446
2844
1019
370
457
1846
511
759
1269
10023
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
12.4 %
10.0 %
3.6 %
2.0 %
27.9 %
16.5 %
7.4 %
4.5 %
28.4 %
10.2 %
3.7 %
4.6 %
18.4 %
5.1 %
7.6 %
12.7 %
100.0 %
2011
655
133
94
100
184
263
98
110
159
251
82
94
138
184
103
125
177
300
200
100
Tariff
0
Naphtha
LAD
2010
NCRE
LHF
2011
Coal
LAD
2010
Naphtha
LHF
2011
Coal
Fuel Cost per Unit for Thermal Generation by Power Station in CEB
2010
2011
%
Rs/kWh Rs/kWh Change
11.72
13.07
11.5%
K.P.S.(small GT)
34.62
44.86
29.6%
K.P.S.(new GT)
27.53
29.37
6.7%
KPS-C Cy
K.P.S.(C.Cy.)
17.87
28.51
59.6%
SPPS-A
SP.P.S.(Diesel) - A
7.37
9.56
29.8%
SPPS-B
SP.P.S.(Diesel) - B
6.36
8.69
36.8%
Coal
Puttalam - Coal
500
400
1259
(3) Local standard time was adjusted to +5 1/2 GMT in April, 2006.
(4) Victoria, Randenigala & Rantembe were spilled in December, 2010.
-2.3%
3.8%
1 -12.2%
15
Power Station
CSC - Consumer Service Centres
106
Province
6.49
2010
10
2011
20
30
40
Rs./ kWh.
50
C.E.B. Percentage
Change
2010
2010/11
Domestic
3138
Religious
48
General Total
1754
Small
898
Medium
654
Large
202
Hotel Total
149
Small
12
Small T.D.
Medium
68
Medium T.D.
6
Large
63
Large T.D.
Industrial Total
2870
Small
232
Small T.D.
0.09
Medium
1330
Medium T.D.
143
Large
974
Large T.D.
191
Bulk Supply to LECO
L2 -11kV & above 1201
Street Lighting
108
TOTAL
9268
7.7%
8.3%
9.8%
11.6%
7.6%
9.5%
7.1%
-87.7%
34.5%
3.0%
9.1%
8.6%
17.0%
30.9%
5.5%
0.3%
8.1%
C.E.B.
2011
3379
51
1927
1002
704
221
159
1
92
2*
65
3131
252
0.05*
1556
18*
1275
31*
1267
109
10023
33.7%
0.5%
19.2%
10.0%
7.0%
2.2%
1.6%
0.0%
0.9%
0.0%
0.6%
31.2%
2.5%
0.0%
15.5%
0.2%
12.7%
0.3%
68
151
338
177
17,733
227,802
27,748
399
46,632
-*
768,286
-*
5,490
483
-*
32,595
-*
614,269
-*
12.6%
1.1%
100.0%
177
Increase
%
in Accounts Change
2010
2011 2010/11
154,268
594,899
295,924
143,611
1,188,702
510,016
598,187
312,727
1,420,930
327,342
353,632
374,729
1,055,703
223,200
591,887
815,087
4,480,423
3,332
32,390
18,599
22,440
76,761
14,982
28,273
24,560
67,815
11,519
20,187
28,630
60,336
7,517
24,595
32,112
237,025
2.2%
5.4%
6.3%
15.6%
6.5%
2.9%
4.7%
7.9%
4.8%
3.5%
5.7%
7.6%
5.7%
3.4%
4.2%
3.9%
5.3%
C.E.B. Percentage
of Total
2011
2011
157,600
627,289
314,523
166,051
1,265,463
524,998
626,460
337,287
1,488,745
338,861
373,819
403,359
1,116,039
230,717
616,482
847,199
4,717,448
3.3%
13.3%
6.7%
3.5%
26.8%
11.1%
13.3%
7.1%
31.6%
7.2%
7.9%
8.6%
23.7%
4.9%
13.1%
18.0%
100.0%
C.E.B.
Increase
in Accounts
2010
2011
Domestic
3,958,829
Religious
26,763
General Total 449,270
Small
446,121
Medium
3,077
Large
72
Hotel Total
463
Small
298
Small T.D.
Medium
146
Medium T.D.
12
Large
7
Large T.D.
Industrial Total 45,059
Small
41,031
Small T.D.
6
Medium
3,482
Medium T.D.
379
Large
141
Large T.D.
20
Bulk Supply to LECO
L2 - 11kV & above 38
Street Lighting
1
TOTAL
4,480,423
%
Change
2010/11
C.E.B. Percentage
of Total
2011
2011
206,909
1,557
26,110
25,870
231
9
16
8
18
0
2,470
2,336
495
32
-
5.2%
5.8%
5.8%
5.8%
7.5%
12.5%
3.5%
2.7%
12.3%
0.0 %
5.5%
5.7%
14.2 %
22.7 %
-
4,165,738
28,320
475,380
471,991
3,308
81
479
306
164
2*
7
47,529
43,367
2*
3,977
10*
173
-*
88.3%
0.6%
10.1%
10.0%
0.1%
negli. %
0.01%
0.01 %
negli.%
negli.%
negli.%
1.0%
0.9 %
negli. %
0.1 %
negli. %
negli. %
-
0
237,025
0.0%
5.3 %
1*
1
4,717,448
negli. %
negli. %
100 %
Note - Trans. Bulk Supply to LECO Accounts are accounted as one for 2011.negli. - negligible.
* - Due to 3 part tariff introduced effective from 01/01/2011.
Province
C.E.B. Percentage
Change
2010
2010/11
Colombo City
21,719
North Western
10,886
North Central
3,758
Northern
2,180
Region - 1 Total 38,542
Western-North*
23,481
Central
8,213
Eastern
4,974
Region - 2 Total 36,669
Western-South II* 15,776
Uva
4,008
Sabaragamuwa
4,779
Region - 3 Total 24,563
Western-South I* 11,647
Southern*
9,359
Region - 4 Total 21,006
TOTAL
120,780
11.5%
7.3%
12.8%
21.2%
11.0%
-9.1%
8.8%
7.3%
-2.9%
-15.3%
7.1%
8.7%
-7.0%
-35.6%
-6.3%
-22.6%
9.6%
C.E.B.
2011
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
24,206
11,684
4,239
2,642
42,771
21,352
8,933
5,337
35,622
13,367
4,294
5,194
22,854
7,500
8,767
16,267
132,373
18.3%
8.8%
3.2%
2.0%
32.3%
16.1%
6.7%
4.0%
26.9%
10.1%
3.2%
3.9%
17.3%
5.7%
6.6%
12.3%
100.0%
19.53
11.65
11.89
13.28
15.29
12.87
12.09
11.96
12.53
13.11
11.60
11.38
12.38
14.69
11.55
12.81
13.21
* - Revenue from Transmission Bulk Supply (14859 m.Rs) to LECO was added to the Total for 2011.
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
2011
C.E.B.
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern
Region - 2 Total
Western-South II
Uva
Sabaragamuwa
Region - 3 Total
Western-South I
Southern
Region - 4 Total
TOTAL
* - Transmission Bulk Supply (1267 GWh) to LECO was added to the Total for 2011.
Installed Capacity
by Source in MW.
-18.0%
35.9%
41.1%
7.6%
14.9%
1 -35.3%
395
-0.1%
746
4583
201
291
L.A.D.
185
292
2011
57%
35%
13%
9%
0%
43%
5%
37%
1.0%
100%
40 240.6%
L.A.D.
166
11.5%
2010
60%
47%
13%
0%
40%
6%
34%
0.8%
100%
12
86
421,855
-2.49*
Percentage of Total
2011 % increase
6552
2.6%
4018
-19.5%
1494
7.1%
1038
3
-11.1%
4976
14.9%
604
-6.5%
4254
18.1%
118
43.0%
11528
7.6%
K.P.S.(C.Cy.)
78
378,207
0.05*
2010
6386
4988
1394
3
4329
646
3600
83
10714
3436 279.1%
K.P.S.(new GT)
907
63
m.Rs.
%
L.A.D.
Million Litres
5.4%
10.0%
K.P.S.(small GT)
2010
%
2011 Change
6410
16,192
63,817
%
2011 Change
2058 17.1%
1207
0.0%
548
0.0%
300
3
0.0%
1082
2.2%
194 10.4%
842
0.0%
47 11.4%
3141 11.5%
2010
1758
1207
548
3
1059
175
842
42
2818
Fuel Cost in m. Rs
Type of
Fuel
5445
3.0%
-1.8%
15,366
58,002
kWh/Person
%
Change
4.3%
0.0%
0.0%
0.0%
9.5%
5.9%
0.0%
55.6%
8.6%
No.
m.Rs.
No./Employee
C.E.B. - Total
- Hydro
- Thermal-Oil
- Thermal-Coal
- Wind
P.P.P. - Total
- Hydro-Small
- Thermal-Oil
- NCRE
Total
2011
24
16
6
1
1
115
90
11
14
139
C. E. B.
Name of
Power Station
14474
8.6%
11.5%
10.7%
7.6%
-1.3%
8.1%
1.3%
9.6%
5.3%
2010
23
16
6
1
105
85
11
9
128
6665
128
139
2818
3141
1955
2163
10714
11528
3
12.97
11.72
9,268
10,023
13.03
13.21
120,780
132,373
15,822
4,480,423 4,717,448
55
55
191
194
88.0 (a)
91.0 (a)
62.6
60.8
4154
No.
MW.
MW.
GWh.
GWh.
%
GWh.
Rs/kWh
m.Rs.
m.Rs.
No.
No.
No.
%
%
4231
2010
Annual
Percentage
2011
Change
Million Rs.
Thousands
Units
GENERATION STATISTICS
8050
C.E.B. Percentage
Change
2010
2010/11
Domestic
30,937
Religious
428
General Total
36,616
Small
18,766
Medium
13,881
Large
3,969
Hotel Total
1,953
Small
153
Small T.D.
Medium
942
Medium T.D.
92
Large
765
Large T.D.
Industrial Total 33,104
Small
2,543
Small T.D.
1
Medium
15,927
Medium T.D.
1,959
Large
10,597
Large T.D.
2,078
Bulk Supply to LECO
L2 -11kV & above 15,070
Street Lighting
2,673
TOTAL
120,780
7.1%
-16.2%
13.8%
11.1%
16.2%
18.4%
21.0%
-80.5%
49.5%
17.2%
20.8%
8.1%
33.2%
44.7%
-1.4%
9.6%
C.E.B.
2011
33,138
358
41,682
20,852
16,132
4,698
2,362
30
1,408
27*
897
39,974
2,750
0.5*
21,220
283*
15,336
385*
14,859
-*
132,373
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
25.0%
0.3%
31.5%
15.8%
12.2%
3.5%
1.8%
0.0%
1.1%
0.0%
0.7%
30.2%
2.1%
0%
16.0%
0.2%
11.6%
0.3%
9.81
6.97
21.63
20.82
22.92
21.22
14.81
20.35
15.39
13.90
12.77
10.93
13.64
12.03
-
11.2%
100.0%
11.73
13.21
449
No./ km.
KTOE
34.3
1.2
480
34.6
1.0
7.0%
0.9%
8,892(b)
kg OE/Person
431(b)
9.0(b)
7159 859.7%
10
84 758.7%
3136 -31.6%
59
33 -44.4%
Naphtha 4231
4154
-1.8%
78
63 -19.1%
SP.P.S.(Diesel) - A
L.H.F.
2485
3804
53.1%
83
95
L.A.D.
169
132 -21.9%
L.H.F.
2959
4246
43.5%
102
L.A.D.
94
93
-0.8%
Chunnakam - Diesel
L.A.D.
167
187
12.1%
Puttamm - Coal
L.A.D.
331
Coal
6410
SP.P.S.(Diesel) - B
31.587.6%
TOTAL
1383
1390
45
2818
1401
1690
50
3141
10
1.3%
21.6%
10.7%
11.5%
(2) Revenue includes FAC (30% of unit charge for GP, Hotel-GP, St. Lighting
& consumers who consumed over 90 units per month in Domestic sector)
in 2010 & no FAC in 2011.
2010
2011
40%
2011
1%
9%
43%
60%
57%
47%
PPP
CEB
395 (M.kg)
349
430
23.3%
1%
53%
40%
50%
Hydro
Thermal
Coal
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North*
Central
Eastern
Region - 2 Total
Western-South II*
Uva
Sabaragamuwa
Region - 3 Total
Western-South I*
Southern*
Region - 4 Total
TOTAL
C.E.B. Percentage
Change
2010
1170
919
320
164
2573
1904
688
418
3010
1252
347
420
2019
869
797
1666
9268
2010/11
6.0 %
9.1 %
11.6 %
21.0 %
8.7 %
-12.9 %
7.3 %
6.7 %
-5.5 %
-18.6 %
6.8 %
8.6 %
-8.6 %
-41.2 %
-4.8 %
-23.8 %
8.1 %
C.E.B.
2011
1239
1003
356
199
2797
1659
739
446
2844
1019
370
457
1846
511
759
1269
10023
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
12.4 %
10.0 %
3.6 %
2.0 %
27.9 %
16.5 %
7.4 %
4.5 %
28.4 %
10.2 %
3.7 %
4.6 %
18.4 %
5.1 %
7.6 %
12.7 %
100.0 %
2011
655
133
94
100
184
263
98
110
159
251
82
94
138
184
103
125
177
300
200
100
Tariff
0
Naphtha
LAD
2010
NCRE
LHF
2011
Coal
LAD
2010
Naphtha
LHF
2011
Coal
Fuel Cost per Unit for Thermal Generation by Power Station in CEB
2010
2011
%
Rs/kWh Rs/kWh Change
11.72
13.07
11.5%
K.P.S.(small GT)
34.62
44.86
29.6%
K.P.S.(new GT)
27.53
29.37
6.7%
KPS-C Cy
K.P.S.(C.Cy.)
17.87
28.51
59.6%
SPPS-A
SP.P.S.(Diesel) - A
7.37
9.56
29.8%
SPPS-B
SP.P.S.(Diesel) - B
6.36
8.69
36.8%
Coal
Puttalam - Coal
500
400
1259
(3) Local standard time was adjusted to +5 1/2 GMT in April, 2006.
(4) Victoria, Randenigala & Rantembe were spilled in December, 2010.
-2.3%
3.8%
1 -12.2%
15
Power Station
CSC - Consumer Service Centres
106
Province
6.49
2010
10
2011
20
30
40
Rs./ kWh.
50
C.E.B. Percentage
Change
2010
2010/11
Domestic
3138
Religious
48
General Total
1754
Small
898
Medium
654
Large
202
Hotel Total
149
Small
12
Small T.D.
Medium
68
Medium T.D.
6
Large
63
Large T.D.
Industrial Total
2870
Small
232
Small T.D.
0.09
Medium
1330
Medium T.D.
143
Large
974
Large T.D.
191
Bulk Supply to LECO
L2 -11kV & above 1201
Street Lighting
108
TOTAL
9268
7.7%
8.3%
9.8%
11.6%
7.6%
9.5%
7.1%
-87.7%
34.5%
3.0%
9.1%
8.6%
17.0%
30.9%
5.5%
0.3%
8.1%
C.E.B.
2011
3379
51
1927
1002
704
221
159
1
92
2*
65
3131
252
0.05*
1556
18*
1275
31*
1267
109
10023
33.7%
0.5%
19.2%
10.0%
7.0%
2.2%
1.6%
0.0%
0.9%
0.0%
0.6%
31.2%
2.5%
0.0%
15.5%
0.2%
12.7%
0.3%
68
151
338
177
17,733
227,802
27,748
399
46,632
-*
768,286
-*
5,490
483
-*
32,595
-*
614,269
-*
12.6%
1.1%
100.0%
177
Increase
%
in Accounts Change
2010
2011 2010/11
154,268
594,899
295,924
143,611
1,188,702
510,016
598,187
312,727
1,420,930
327,342
353,632
374,729
1,055,703
223,200
591,887
815,087
4,480,423
3,332
32,390
18,599
22,440
76,761
14,982
28,273
24,560
67,815
11,519
20,187
28,630
60,336
7,517
24,595
32,112
237,025
2.2%
5.4%
6.3%
15.6%
6.5%
2.9%
4.7%
7.9%
4.8%
3.5%
5.7%
7.6%
5.7%
3.4%
4.2%
3.9%
5.3%
C.E.B. Percentage
of Total
2011
2011
157,600
627,289
314,523
166,051
1,265,463
524,998
626,460
337,287
1,488,745
338,861
373,819
403,359
1,116,039
230,717
616,482
847,199
4,717,448
3.3%
13.3%
6.7%
3.5%
26.8%
11.1%
13.3%
7.1%
31.6%
7.2%
7.9%
8.6%
23.7%
4.9%
13.1%
18.0%
100.0%
C.E.B.
Increase
in Accounts
2010
2011
Domestic
3,958,829
Religious
26,763
General Total 449,270
Small
446,121
Medium
3,077
Large
72
Hotel Total
463
Small
298
Small T.D.
Medium
146
Medium T.D.
12
Large
7
Large T.D.
Industrial Total 45,059
Small
41,031
Small T.D.
6
Medium
3,482
Medium T.D.
379
Large
141
Large T.D.
20
Bulk Supply to LECO
L2 - 11kV & above 38
Street Lighting
1
TOTAL
4,480,423
%
Change
2010/11
C.E.B. Percentage
of Total
2011
2011
206,909
1,557
26,110
25,870
231
9
16
8
18
0
2,470
2,336
495
32
-
5.2%
5.8%
5.8%
5.8%
7.5%
12.5%
3.5%
2.7%
12.3%
0.0 %
5.5%
5.7%
14.2 %
22.7 %
-
4,165,738
28,320
475,380
471,991
3,308
81
479
306
164
2*
7
47,529
43,367
2*
3,977
10*
173
-*
88.3%
0.6%
10.1%
10.0%
0.1%
negli. %
0.01%
0.01 %
negli.%
negli.%
negli.%
1.0%
0.9 %
negli. %
0.1 %
negli. %
negli. %
-
0
237,025
0.0%
5.3 %
1*
1
4,717,448
negli. %
negli. %
100 %
Note - Trans. Bulk Supply to LECO Accounts are accounted as one for 2011.negli. - negligible.
* - Due to 3 part tariff introduced effective from 01/01/2011.
Province
C.E.B. Percentage
Change
2010
2010/11
Colombo City
21,719
North Western
10,886
North Central
3,758
Northern
2,180
Region - 1 Total 38,542
Western-North*
23,481
Central
8,213
Eastern
4,974
Region - 2 Total 36,669
Western-South II* 15,776
Uva
4,008
Sabaragamuwa
4,779
Region - 3 Total 24,563
Western-South I* 11,647
Southern*
9,359
Region - 4 Total 21,006
TOTAL
120,780
11.5%
7.3%
12.8%
21.2%
11.0%
-9.1%
8.8%
7.3%
-2.9%
-15.3%
7.1%
8.7%
-7.0%
-35.6%
-6.3%
-22.6%
9.6%
C.E.B.
2011
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
24,206
11,684
4,239
2,642
42,771
21,352
8,933
5,337
35,622
13,367
4,294
5,194
22,854
7,500
8,767
16,267
132,373
18.3%
8.8%
3.2%
2.0%
32.3%
16.1%
6.7%
4.0%
26.9%
10.1%
3.2%
3.9%
17.3%
5.7%
6.6%
12.3%
100.0%
19.53
11.65
11.89
13.28
15.29
12.87
12.09
11.96
12.53
13.11
11.60
11.38
12.38
14.69
11.55
12.81
13.21
* - Revenue from Transmission Bulk Supply (14859 m.Rs) to LECO was added to the Total for 2011.
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
2011
C.E.B.
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern
Region - 2 Total
Western-South II
Uva
Sabaragamuwa
Region - 3 Total
Western-South I
Southern
Region - 4 Total
TOTAL
* - Transmission Bulk Supply (1267 GWh) to LECO was added to the Total for 2011.
Installed Capacity
by Source in MW.
-18.0%
35.9%
41.1%
7.6%
14.9%
1 -35.3%
395
-0.1%
746
4583
201
291
L.A.D.
185
292
2011
57%
35%
13%
9%
0%
43%
5%
37%
1.0%
100%
40 240.6%
L.A.D.
166
11.5%
2010
60%
47%
13%
0%
40%
6%
34%
0.8%
100%
12
86
421,855
-2.49*
Percentage of Total
2011 % increase
6552
2.6%
4018
-19.5%
1494
7.1%
1038
3
-11.1%
4976
14.9%
604
-6.5%
4254
18.1%
118
43.0%
11528
7.6%
K.P.S.(C.Cy.)
78
378,207
0.05*
2010
6386
4988
1394
3
4329
646
3600
83
10714
3436 279.1%
K.P.S.(new GT)
907
63
m.Rs.
%
L.A.D.
Million Litres
5.4%
10.0%
K.P.S.(small GT)
2010
%
2011 Change
6410
16,192
63,817
%
2011 Change
2058 17.1%
1207
0.0%
548
0.0%
300
3
0.0%
1082
2.2%
194 10.4%
842
0.0%
47 11.4%
3141 11.5%
2010
1758
1207
548
3
1059
175
842
42
2818
Fuel Cost in m. Rs
Type of
Fuel
5445
3.0%
-1.8%
15,366
58,002
kWh/Person
%
Change
4.3%
0.0%
0.0%
0.0%
9.5%
5.9%
0.0%
55.6%
8.6%
No.
m.Rs.
No./Employee
C.E.B. - Total
- Hydro
- Thermal-Oil
- Thermal-Coal
- Wind
P.P.P. - Total
- Hydro-Small
- Thermal-Oil
- NCRE
Total
2011
24
16
6
1
1
115
90
11
14
139
C. E. B.
Name of
Power Station
14474
8.6%
11.5%
10.7%
7.6%
-1.3%
8.1%
1.3%
9.6%
5.3%
2010
23
16
6
1
105
85
11
9
128
6665
128
139
2818
3141
1955
2163
10714
11528
3
12.97
11.72
9,268
10,023
13.03
13.21
120,780
132,373
15,822
4,480,423 4,717,448
55
55
191
194
88.0 (a)
91.0 (a)
62.6
60.8
4154
No.
MW.
MW.
GWh.
GWh.
%
GWh.
Rs/kWh
m.Rs.
m.Rs.
No.
No.
No.
%
%
4231
2010
Annual
Percentage
2011
Change
Million Rs.
Thousands
Units
GENERATION STATISTICS
8050
C.E.B. Percentage
Change
2010
2010/11
Domestic
30,937
Religious
428
General Total
36,616
Small
18,766
Medium
13,881
Large
3,969
Hotel Total
1,953
Small
153
Small T.D.
Medium
942
Medium T.D.
92
Large
765
Large T.D.
Industrial Total 33,104
Small
2,543
Small T.D.
1
Medium
15,927
Medium T.D.
1,959
Large
10,597
Large T.D.
2,078
Bulk Supply to LECO
L2 -11kV & above 15,070
Street Lighting
2,673
TOTAL
120,780
7.1%
-16.2%
13.8%
11.1%
16.2%
18.4%
21.0%
-80.5%
49.5%
17.2%
20.8%
8.1%
33.2%
44.7%
-1.4%
9.6%
C.E.B.
2011
33,138
358
41,682
20,852
16,132
4,698
2,362
30
1,408
27*
897
39,974
2,750
0.5*
21,220
283*
15,336
385*
14,859
-*
132,373
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
25.0%
0.3%
31.5%
15.8%
12.2%
3.5%
1.8%
0.0%
1.1%
0.0%
0.7%
30.2%
2.1%
0%
16.0%
0.2%
11.6%
0.3%
9.81
6.97
21.63
20.82
22.92
21.22
14.81
20.35
15.39
13.90
12.77
10.93
13.64
12.03
-
11.2%
100.0%
11.73
13.21
449
No./ km.
KTOE
34.3
1.2
480
34.6
1.0
7.0%
0.9%
8,892(b)
kg OE/Person
431(b)
9.0(b)
7159 859.7%
10
84 758.7%
3136 -31.6%
59
33 -44.4%
Naphtha 4231
4154
-1.8%
78
63 -19.1%
SP.P.S.(Diesel) - A
L.H.F.
2485
3804
53.1%
83
95
L.A.D.
169
132 -21.9%
L.H.F.
2959
4246
43.5%
102
L.A.D.
94
93
-0.8%
Chunnakam - Diesel
L.A.D.
167
187
12.1%
Puttamm - Coal
L.A.D.
331
Coal
6410
SP.P.S.(Diesel) - B
31.587.6%
TOTAL
1383
1390
45
2818
1401
1690
50
3141
10
1.3%
21.6%
10.7%
11.5%
(2) Revenue includes FAC (30% of unit charge for GP, Hotel-GP, St. Lighting
& consumers who consumed over 90 units per month in Domestic sector)
in 2010 & no FAC in 2011.
2010
2011
40%
2011
1%
9%
43%
60%
57%
47%
PPP
CEB
395 (M.kg)
349
430
23.3%
1%
53%
40%
50%
Hydro
Thermal
Coal
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North*
Central
Eastern
Region - 2 Total
Western-South II*
Uva
Sabaragamuwa
Region - 3 Total
Western-South I*
Southern*
Region - 4 Total
TOTAL
C.E.B. Percentage
Change
2010
1170
919
320
164
2573
1904
688
418
3010
1252
347
420
2019
869
797
1666
9268
2010/11
6.0 %
9.1 %
11.6 %
21.0 %
8.7 %
-12.9 %
7.3 %
6.7 %
-5.5 %
-18.6 %
6.8 %
8.6 %
-8.6 %
-41.2 %
-4.8 %
-23.8 %
8.1 %
C.E.B.
2011
1239
1003
356
199
2797
1659
739
446
2844
1019
370
457
1846
511
759
1269
10023
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
12.4 %
10.0 %
3.6 %
2.0 %
27.9 %
16.5 %
7.4 %
4.5 %
28.4 %
10.2 %
3.7 %
4.6 %
18.4 %
5.1 %
7.6 %
12.7 %
100.0 %
2011
655
133
94
100
184
263
98
110
159
251
82
94
138
184
103
125
177
300
200
100
Tariff
0
Naphtha
LAD
2010
NCRE
LHF
2011
Coal
LAD
2010
Naphtha
LHF
2011
Coal
Fuel Cost per Unit for Thermal Generation by Power Station in CEB
2010
2011
%
Rs/kWh Rs/kWh Change
11.72
13.07
11.5%
K.P.S.(small GT)
34.62
44.86
29.6%
K.P.S.(new GT)
27.53
29.37
6.7%
KPS-C Cy
K.P.S.(C.Cy.)
17.87
28.51
59.6%
SPPS-A
SP.P.S.(Diesel) - A
7.37
9.56
29.8%
SPPS-B
SP.P.S.(Diesel) - B
6.36
8.69
36.8%
Coal
Puttalam - Coal
500
400
1259
(3) Local standard time was adjusted to +5 1/2 GMT in April, 2006.
(4) Victoria, Randenigala & Rantembe were spilled in December, 2010.
-2.3%
3.8%
1 -12.2%
15
Power Station
CSC - Consumer Service Centres
106
Province
6.49
2010
10
2011
20
30
40
Rs./ kWh.
50
C.E.B. Percentage
Change
2010
2010/11
Domestic
3138
Religious
48
General Total
1754
Small
898
Medium
654
Large
202
Hotel Total
149
Small
12
Small T.D.
Medium
68
Medium T.D.
6
Large
63
Large T.D.
Industrial Total
2870
Small
232
Small T.D.
0.09
Medium
1330
Medium T.D.
143
Large
974
Large T.D.
191
Bulk Supply to LECO
L2 -11kV & above 1201
Street Lighting
108
TOTAL
9268
7.7%
8.3%
9.8%
11.6%
7.6%
9.5%
7.1%
-87.7%
34.5%
3.0%
9.1%
8.6%
17.0%
30.9%
5.5%
0.3%
8.1%
C.E.B.
2011
3379
51
1927
1002
704
221
159
1
92
2*
65
3131
252
0.05*
1556
18*
1275
31*
1267
109
10023
33.7%
0.5%
19.2%
10.0%
7.0%
2.2%
1.6%
0.0%
0.9%
0.0%
0.6%
31.2%
2.5%
0.0%
15.5%
0.2%
12.7%
0.3%
68
151
338
177
17,733
227,802
27,748
399
46,632
-*
768,286
-*
5,490
483
-*
32,595
-*
614,269
-*
12.6%
1.1%
100.0%
177
Increase
%
in Accounts Change
2010
2011 2010/11
154,268
594,899
295,924
143,611
1,188,702
510,016
598,187
312,727
1,420,930
327,342
353,632
374,729
1,055,703
223,200
591,887
815,087
4,480,423
3,332
32,390
18,599
22,440
76,761
14,982
28,273
24,560
67,815
11,519
20,187
28,630
60,336
7,517
24,595
32,112
237,025
2.2%
5.4%
6.3%
15.6%
6.5%
2.9%
4.7%
7.9%
4.8%
3.5%
5.7%
7.6%
5.7%
3.4%
4.2%
3.9%
5.3%
C.E.B. Percentage
of Total
2011
2011
157,600
627,289
314,523
166,051
1,265,463
524,998
626,460
337,287
1,488,745
338,861
373,819
403,359
1,116,039
230,717
616,482
847,199
4,717,448
3.3%
13.3%
6.7%
3.5%
26.8%
11.1%
13.3%
7.1%
31.6%
7.2%
7.9%
8.6%
23.7%
4.9%
13.1%
18.0%
100.0%
C.E.B.
Increase
in Accounts
2010
2011
Domestic
3,958,829
Religious
26,763
General Total 449,270
Small
446,121
Medium
3,077
Large
72
Hotel Total
463
Small
298
Small T.D.
Medium
146
Medium T.D.
12
Large
7
Large T.D.
Industrial Total 45,059
Small
41,031
Small T.D.
6
Medium
3,482
Medium T.D.
379
Large
141
Large T.D.
20
Bulk Supply to LECO
L2 - 11kV & above 38
Street Lighting
1
TOTAL
4,480,423
%
Change
2010/11
C.E.B. Percentage
of Total
2011
2011
206,909
1,557
26,110
25,870
231
9
16
8
18
0
2,470
2,336
495
32
-
5.2%
5.8%
5.8%
5.8%
7.5%
12.5%
3.5%
2.7%
12.3%
0.0 %
5.5%
5.7%
14.2 %
22.7 %
-
4,165,738
28,320
475,380
471,991
3,308
81
479
306
164
2*
7
47,529
43,367
2*
3,977
10*
173
-*
88.3%
0.6%
10.1%
10.0%
0.1%
negli. %
0.01%
0.01 %
negli.%
negli.%
negli.%
1.0%
0.9 %
negli. %
0.1 %
negli. %
negli. %
-
0
237,025
0.0%
5.3 %
1*
1
4,717,448
negli. %
negli. %
100 %
Note - Trans. Bulk Supply to LECO Accounts are accounted as one for 2011.negli. - negligible.
* - Due to 3 part tariff introduced effective from 01/01/2011.
Province
C.E.B. Percentage
Change
2010
2010/11
Colombo City
21,719
North Western
10,886
North Central
3,758
Northern
2,180
Region - 1 Total 38,542
Western-North*
23,481
Central
8,213
Eastern
4,974
Region - 2 Total 36,669
Western-South II* 15,776
Uva
4,008
Sabaragamuwa
4,779
Region - 3 Total 24,563
Western-South I* 11,647
Southern*
9,359
Region - 4 Total 21,006
TOTAL
120,780
11.5%
7.3%
12.8%
21.2%
11.0%
-9.1%
8.8%
7.3%
-2.9%
-15.3%
7.1%
8.7%
-7.0%
-35.6%
-6.3%
-22.6%
9.6%
C.E.B.
2011
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
24,206
11,684
4,239
2,642
42,771
21,352
8,933
5,337
35,622
13,367
4,294
5,194
22,854
7,500
8,767
16,267
132,373
18.3%
8.8%
3.2%
2.0%
32.3%
16.1%
6.7%
4.0%
26.9%
10.1%
3.2%
3.9%
17.3%
5.7%
6.6%
12.3%
100.0%
19.53
11.65
11.89
13.28
15.29
12.87
12.09
11.96
12.53
13.11
11.60
11.38
12.38
14.69
11.55
12.81
13.21
* - Revenue from Transmission Bulk Supply (14859 m.Rs) to LECO was added to the Total for 2011.
Monthly
Percentage
Av.Sales
of Total kWh/Cons.
2011
2011
C.E.B.
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern
Region - 2 Total
Western-South II
Uva
Sabaragamuwa
Region - 3 Total
Western-South I
Southern
Region - 4 Total
TOTAL
* - Transmission Bulk Supply (1267 GWh) to LECO was added to the Total for 2011.
Installed Capacity
by Source in MW.
-18.0%
35.9%
41.1%
7.6%
14.9%
1 -35.3%
395
-0.1%
746
4583
201
291
L.A.D.
185
292
2011
57%
35%
13%
9%
0%
43%
5%
37%
1.0%
100%
40 240.6%
L.A.D.
166
11.5%
2010
60%
47%
13%
0%
40%
6%
34%
0.8%
100%
12
86
421,855
-2.49*
Percentage of Total
2011 % increase
6552
2.6%
4018
-19.5%
1494
7.1%
1038
3
-11.1%
4976
14.9%
604
-6.5%
4254
18.1%
118
43.0%
11528
7.6%
K.P.S.(C.Cy.)
78
378,207
0.05*
2010
6386
4988
1394
3
4329
646
3600
83
10714
3436 279.1%
K.P.S.(new GT)
907
63
m.Rs.
%
L.A.D.
Million Litres
5.4%
10.0%
K.P.S.(small GT)
2010
%
2011 Change
6410
16,192
63,817
%
2011 Change
2058 17.1%
1207
0.0%
548
0.0%
300
3
0.0%
1082
2.2%
194 10.4%
842
0.0%
47 11.4%
3141 11.5%
2010
1758
1207
548
3
1059
175
842
42
2818
Fuel Cost in m. Rs
Type of
Fuel
5445
3.0%
-1.8%
15,366
58,002
kWh/Person
%
Change
4.3%
0.0%
0.0%
0.0%
9.5%
5.9%
0.0%
55.6%
8.6%
No.
m.Rs.
No./Employee
C.E.B. - Total
- Hydro
- Thermal-Oil
- Thermal-Coal
- Wind
P.P.P. - Total
- Hydro-Small
- Thermal-Oil
- NCRE
Total
2011
24
16
6
1
1
115
90
11
14
139
C. E. B.
Name of
Power Station
14474
8.6%
11.5%
10.7%
7.6%
-1.3%
8.1%
1.3%
9.6%
5.3%
2010
23
16
6
1
105
85
11
9
128
6665
128
139
2818
3141
1955
2163
10714
11528
3
12.97
11.72
9,268
10,023
13.03
13.21
120,780
132,373
15,822
4,480,423 4,717,448
55
55
191
194
88.0 (a)
91.0 (a)
62.6
60.8
4154
No.
MW.
MW.
GWh.
GWh.
%
GWh.
Rs/kWh
m.Rs.
m.Rs.
No.
No.
No.
%
%
4231
2010
Annual
Percentage
2011
Change
Million Rs.
Thousands
Units
GENERATION STATISTICS
8050
C.E.B. Percentage
Change
2010
2010/11
Domestic
30,937
Religious
428
General Total
36,616
Small
18,766
Medium
13,881
Large
3,969
Hotel Total
1,953
Small
153
Small T.D.
Medium
942
Medium T.D.
92
Large
765
Large T.D.
Industrial Total 33,104
Small
2,543
Small T.D.
1
Medium
15,927
Medium T.D.
1,959
Large
10,597
Large T.D.
2,078
Bulk Supply to LECO
L2 -11kV & above 15,070
Street Lighting
2,673
TOTAL
120,780
7.1%
-16.2%
13.8%
11.1%
16.2%
18.4%
21.0%
-80.5%
49.5%
17.2%
20.8%
8.1%
33.2%
44.7%
-1.4%
9.6%
C.E.B.
2011
33,138
358
41,682
20,852
16,132
4,698
2,362
30
1,408
27*
897
39,974
2,750
0.5*
21,220
283*
15,336
385*
14,859
-*
132,373
Percentage
of Total
2011
Ave.Price
Rs./kWh
2011
25.0%
0.3%
31.5%
15.8%
12.2%
3.5%
1.8%
0.0%
1.1%
0.0%
0.7%
30.2%
2.1%
0%
16.0%
0.2%
11.6%
0.3%
9.81
6.97
21.63
20.82
22.92
21.22
14.81
20.35
15.39
13.90
12.77
10.93
13.64
12.03
-
11.2%
100.0%
11.73
13.21
2011
538
8
367
214
148
5
37
0
35
2
241
25
192
24
1
23
1216
GENERAL STATISTICS
%
Change
7.0%
9.7%
14.3%
12.3%
15.7%
88.0%
-10.7%
0.0%
-10.7%
-11.2%
5.2%
5.7%
5.1%
6.2%
-8.5%
8.5%
8.1%
2010
2011
404,495 412,858
2,287
2,325
64,514 67,634
63,686 66,750
826
881
2
3
45
42
1
1
42
40
2
1
3,402
3,356
2,897
2,841
498
507
7
8
742
614
2,930
3,188
478,415 490,017
%
Change
2.1%
1.7%
4.8%
4.8%
6.7%
50.0%
-6.7%
0.0%
-4.8%
-50.0%
-1.4%
-1.9%
1.8 %
14.3%
-17.3%
8.8%
2.4%
Note - Three part tariff was introduced for bulk customers as tariff change w.e. from 01/01/2011.
2010
2011
BULK +S.L.
14.1%
BULK +S.L.
13.7%
DOM+RP
34.4%
INDUSTRIAL
31.0%
DOM+RP
34.2%
GENERAL
18.9%
GENERAL
19.2%
INDUSTRIAL
1.0%
GENERAL
10.1%
BULK +S.L.
0.0%
INDUSTRIAL
1.0%
BULK +S.L.
0.0%
Hotel
0.0%
Hotel
0.0%
DOM+RP
88.9%
DOM+RP
89.0%
BULK +S.L.
INDUSTRIAL
Hotel
GENERAL
DOM+RP
%
Change
1.0 %
16.9 %
8.4 %
16.7 %
8.3 %
15.5 %
18.1 %
6.8 %
0.5 %
-2.2 %
2010
2011
%
Change
483
1,724
50
25,257
35
1,544
754
108,886
33,859
3,697
71,330
0.0 %
0.6 %
21.0 %
3.6 %
0.0 %
1.4 %
2.7 %
4.5 %
-0.4 %
1.3 %
7.3 %
First 30 units
31 - 60 units
61 - 90 units
91 - 120 units
121 - 180 units
Above 180 units
Unit Rate
(for each 30 days billing period)
@ Rs 3.00 per unit
@ Rs 4.70 per unit
@ Rs 7.50 per unit
@ Rs 21.00 per unit
@ Rs 24.00 per unit
@ Rs 36.00 per unit
Fixed Charge
+
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 90.00
Rs. 315.00
Rs. 315.00
Rs. 315.00
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 180.00
Rs. 180.00
Rs. 240.00
Chunnakam
Transmission
Network 2011
Kilinochchi
Vavuniya
Note:- 1. Excludes 141 route km of 132 kV transmission lines which is being re-constructed in the North.
2. Includes only distribution lines & substations rehabilitated and used from 1998 in Northern Province.
K.P.S.(smallGT - L.A.D)
K.P.S.(new GT - L.A.D)
SP.P.S. - A ( L.A.D.)
SP.P.S. - A (L.H.F.)
SP.P.S.- B (L.A.D.)
SP.P.S.- B (L.H.F.)
K.P.S. - C.Cy. (L.A.D.)
K.P.S. - C.Cy. (Naptha)
Puttlam - Coal
Puttlam - LAD
Hotel
1.6%
2010
2011*
20,869
6,470,617
2,832,318
6,542,663
2,863,854
313,511
2,836
151.5
7.8
65,610
110.57
INDUSTRIAL
31.2%
Hotel
1.6%
GENERAL
10.0%
2010
20,653
5,534,327
2,612,603
5,604,104
2,645,542
271,346
2,400
141.9
%
7.3
sq.km.
65,610
Rs/US $
113.06
* - Provisional
Units
Thous.
Rs.m.
Rs.m.
Rs.m.
Rs.m.
Rs.
U.S.$
Province
Colombo City
North Western
North central
Northern
Region - 1
Western - North
Central
Eastern
Region - 2
Western - South 2
Uva
Sabaragamuwa
Region - 3
Western - South 1
Southern
Region - 4
TOTAL
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Units
2010
2011
%
Change
44
2,874
5
2100/500
2
405
4
306
121
1,084
21,930
4,838
22,106
46
3,043
5
2100/500
2
405
5
369
124
1,090
22,839
5,627
23,021
4.5 %
5.9 %
0.0 %
0.0 %
0.0 %
0.0 %
25.0 %
20.6 %
2.5 %
0.6 %
4.1 %
16.3 %
4.1 %
12,107
13,134
8.5 %
Total capacity
2011
CSC
8
19
9
11
47
18
23
18
59
13
16
20
49
10
26
36
191
CSC
8
21
10
11
50
18
23
18
59
13
16
20
49
10
26
36
194
MVA
YEAR
2006
2007
2008
2009
2010
2011
Total at End
of the year
17,297
17,757
18,103
18,590
19,116
19,643
OTHER CONSUMER
CATEGORIES
Rate - 1
Supply at 400/230V
Contract demand < or = 42 kVA
Unit Charge (Rs/unit)
Fixed Charge(Rs./Month)
Region 4
18.2%
Region 3
23.6%
2011
Region 1
26.5%
Region 2
31.7%
Region 4
18.0%
Region 3
23.7%
Hotel
19.50 +
240.00
19.40
+
850.00
Day - 10.45
(5.30 am to
6.30 pm) +
Peak- 13.60
(6.30 pm to
10.30 pm) +
Off-Peak - 7.35
(10.30 pm to
5.30 am)
+
850.00
Day - 13.00
(5.30 am to
6.30 pm) +
Peak- 16.90
(6.30 pm to
10.30 pm) +
Off-Peak - 9.10
(10.30 pm to
5.30 am)
+
850.00
+
3000.00
+
3000.00
+
3000.00
+
750.00
Day - 10.25
(5.30 am to
6.30 pm) +
Peak- 13.40
(6.30 pm to
10.30 pm) +
Off-Peak - 7.15
(10.30 pm to
5.30 am)
+
750.00
Day - 12.60
(5.30 am to
6.30 pm) +
Peak- 16.40
(6.30 pm to
10.30 pm) +
Off-Peak - 8.85
(10.30 pm to
5.30 am)
+
750.00
Fixed Charge(Rs./Month)
+
3000.00
+
3000.00
+
3000.00
Rate - 2
Supply at 400/230V
Contract demand
above 42 kVA
Unit Charge
(Rs/unit)
Demand Charge
(Rs/kVA)
Fixed Charge (Rs./Month)
Puttalam
Coal
Puttalam
Heladhanavi
Habarana
Valachchenai
Pannala
Madampe
Bowatenna
Bolawatte
Kurunegala
Ukuwela
Veyangoda
Kiribathkumbura
Kotugoda
Kegalle
Thulhiriya
Victoria
Ampara
Randenigala
Inginiyagala
Rantembe
Kotmale
Polpitiya Laxapana
Sitawaka
Wimalasurendra
Kosgama New Lax
Nuwara Eliya
Badulla
Canyon
Rate - 3
Supply at 11 kV & above
Unit Charge
(Rs/unit)
Trincomalee
Anuradhapura
10.50 +
240.00
Region 1
26.8%
Region 2
31.6%
Industrial
19.50 +
240.00
General
Purpose
19.10
Note - 1. Eligible Government Instititions shall be entitled to a 25% discount on energy charges.
2. No Fuel Adjustment Charge effective from 01/01/2011 to 31/12/2011.
ACE
Horana
Ratnapura
Veyangoda
Matugama
Kotugoda
Kerawalapitiya
AES
Kelanitissa
CPPL
Kolonnawa
Maradana
Havelock Town
Sri Jayewardenepura
Dehiwela
Aniyakanda
Ambalangoda
Biyagama
Embilipitiya
ACE
Hambantota
Galle
APPL
Sapugaskanda
Aturugiriya
Oruwala
Pannipitiya
Ratmalana
Panadura
Kukule
Deniyaya
Kelaniya
Balangoda
Samanala Wewa
ACE
Horana
Matara
220 kV
132 kV
STATISTICAL DIGEST
2011
Enrich
life
through
g
Power
Matugama
C E Y L O N E L E C T R I C I T Y
C o l o m b o 0 0 2 0 0 S r i
w w w. c e b . l k
B O A R D
L a n k a
2011
538
8
367
214
148
5
37
0
35
2
241
25
192
24
1
23
1216
GENERAL STATISTICS
%
Change
7.0%
9.7%
14.3%
12.3%
15.7%
88.0%
-10.7%
0.0%
-10.7%
-11.2%
5.2%
5.7%
5.1%
6.2%
-8.5%
8.5%
8.1%
2010
2011
404,495 412,858
2,287
2,325
64,514 67,634
63,686 66,750
826
881
2
3
45
42
1
1
42
40
2
1
3,402
3,356
2,897
2,841
498
507
7
8
742
614
2,930
3,188
478,415 490,017
%
Change
2.1%
1.7%
4.8%
4.8%
6.7%
50.0%
-6.7%
0.0%
-4.8%
-50.0%
-1.4%
-1.9%
1.8 %
14.3%
-17.3%
8.8%
2.4%
Note - Three part tariff was introduced for bulk customers as tariff change w.e. from 01/01/2011.
2010
2011
BULK +S.L.
14.1%
BULK +S.L.
13.7%
DOM+RP
34.4%
INDUSTRIAL
31.0%
DOM+RP
34.2%
GENERAL
18.9%
GENERAL
19.2%
INDUSTRIAL
1.0%
GENERAL
10.1%
BULK +S.L.
0.0%
INDUSTRIAL
1.0%
BULK +S.L.
0.0%
Hotel
0.0%
Hotel
0.0%
DOM+RP
88.9%
DOM+RP
89.0%
BULK +S.L.
INDUSTRIAL
Hotel
GENERAL
DOM+RP
%
Change
1.0 %
16.9 %
8.4 %
16.7 %
8.3 %
15.5 %
18.1 %
6.8 %
0.5 %
-2.2 %
2010
2011
%
Change
483
1,724
50
25,257
35
1,544
754
108,886
33,859
3,697
71,330
0.0 %
0.6 %
21.0 %
3.6 %
0.0 %
1.4 %
2.7 %
4.5 %
-0.4 %
1.3 %
7.3 %
First 30 units
31 - 60 units
61 - 90 units
91 - 120 units
121 - 180 units
Above 180 units
Unit Rate
(for each 30 days billing period)
@ Rs 3.00 per unit
@ Rs 4.70 per unit
@ Rs 7.50 per unit
@ Rs 21.00 per unit
@ Rs 24.00 per unit
@ Rs 36.00 per unit
Fixed Charge
+
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 90.00
Rs. 315.00
Rs. 315.00
Rs. 315.00
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 180.00
Rs. 180.00
Rs. 240.00
Chunnakam
Transmission
Network 2011
Kilinochchi
Vavuniya
Note:- 1. Excludes 141 route km of 132 kV transmission lines which is being re-constructed in the North.
2. Includes only distribution lines & substations rehabilitated and used from 1998 in Northern Province.
K.P.S.(smallGT - L.A.D)
K.P.S.(new GT - L.A.D)
SP.P.S. - A ( L.A.D.)
SP.P.S. - A (L.H.F.)
SP.P.S.- B (L.A.D.)
SP.P.S.- B (L.H.F.)
K.P.S. - C.Cy. (L.A.D.)
K.P.S. - C.Cy. (Naptha)
Puttlam - Coal
Puttlam - LAD
Hotel
1.6%
2010
2011*
20,869
6,470,617
2,832,318
6,542,663
2,863,854
313,511
2,836
151.5
7.8
65,610
110.57
INDUSTRIAL
31.2%
Hotel
1.6%
GENERAL
10.0%
2010
20,653
5,534,327
2,612,603
5,604,104
2,645,542
271,346
2,400
141.9
%
7.3
sq.km.
65,610
Rs/US $
113.06
* - Provisional
Units
Thous.
Rs.m.
Rs.m.
Rs.m.
Rs.m.
Rs.
U.S.$
Province
Colombo City
North Western
North central
Northern
Region - 1
Western - North
Central
Eastern
Region - 2
Western - South 2
Uva
Sabaragamuwa
Region - 3
Western - South 1
Southern
Region - 4
TOTAL
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Units
2010
2011
%
Change
44
2,874
5
2100/500
2
405
4
306
121
1,084
21,930
4,838
22,106
46
3,043
5
2100/500
2
405
5
369
124
1,090
22,839
5,627
23,021
4.5 %
5.9 %
0.0 %
0.0 %
0.0 %
0.0 %
25.0 %
20.6 %
2.5 %
0.6 %
4.1 %
16.3 %
4.1 %
12,107
13,134
8.5 %
Total capacity
2011
CSC
8
19
9
11
47
18
23
18
59
13
16
20
49
10
26
36
191
CSC
8
21
10
11
50
18
23
18
59
13
16
20
49
10
26
36
194
MVA
YEAR
2006
2007
2008
2009
2010
2011
Total at End
of the year
17,297
17,757
18,103
18,590
19,116
19,643
OTHER CONSUMER
CATEGORIES
Rate - 1
Supply at 400/230V
Contract demand < or = 42 kVA
Unit Charge (Rs/unit)
Fixed Charge(Rs./Month)
Region 4
18.2%
Region 3
23.6%
2011
Region 1
26.5%
Region 2
31.7%
Region 4
18.0%
Region 3
23.7%
Hotel
19.50 +
240.00
19.40
+
850.00
Day - 10.45
(5.30 am to
6.30 pm) +
Peak- 13.60
(6.30 pm to
10.30 pm) +
Off-Peak - 7.35
(10.30 pm to
5.30 am)
+
850.00
Day - 13.00
(5.30 am to
6.30 pm) +
Peak- 16.90
(6.30 pm to
10.30 pm) +
Off-Peak - 9.10
(10.30 pm to
5.30 am)
+
850.00
+
3000.00
+
3000.00
+
3000.00
+
750.00
Day - 10.25
(5.30 am to
6.30 pm) +
Peak- 13.40
(6.30 pm to
10.30 pm) +
Off-Peak - 7.15
(10.30 pm to
5.30 am)
+
750.00
Day - 12.60
(5.30 am to
6.30 pm) +
Peak- 16.40
(6.30 pm to
10.30 pm) +
Off-Peak - 8.85
(10.30 pm to
5.30 am)
+
750.00
Fixed Charge(Rs./Month)
+
3000.00
+
3000.00
+
3000.00
Rate - 2
Supply at 400/230V
Contract demand
above 42 kVA
Unit Charge
(Rs/unit)
Demand Charge
(Rs/kVA)
Fixed Charge (Rs./Month)
Puttalam
Coal
Puttalam
Heladhanavi
Habarana
Valachchenai
Pannala
Madampe
Bowatenna
Bolawatte
Kurunegala
Ukuwela
Veyangoda
Kiribathkumbura
Kotugoda
Kegalle
Thulhiriya
Victoria
Ampara
Randenigala
Inginiyagala
Rantembe
Kotmale
Polpitiya Laxapana
Sitawaka
Wimalasurendra
Kosgama New Lax
Nuwara Eliya
Badulla
Canyon
Rate - 3
Supply at 11 kV & above
Unit Charge
(Rs/unit)
Trincomalee
Anuradhapura
10.50 +
240.00
Region 1
26.8%
Region 2
31.6%
Industrial
19.50 +
240.00
General
Purpose
19.10
Note - 1. Eligible Government Instititions shall be entitled to a 25% discount on energy charges.
2. No Fuel Adjustment Charge effective from 01/01/2011 to 31/12/2011.
ACE
Horana
Ratnapura
Veyangoda
Matugama
Kotugoda
Kerawalapitiya
AES
Kelanitissa
CPPL
Kolonnawa
Maradana
Havelock Town
Sri Jayewardenepura
Dehiwela
Aniyakanda
Ambalangoda
Biyagama
Embilipitiya
ACE
Hambantota
Galle
APPL
Sapugaskanda
Aturugiriya
Oruwala
Pannipitiya
Ratmalana
Panadura
Kukule
Deniyaya
Kelaniya
Balangoda
Samanala Wewa
ACE
Horana
Matara
220 kV
132 kV
STATISTICAL DIGEST
2011
Enrich
life
through
g
Power
Matugama
C E Y L O N E L E C T R I C I T Y
C o l o m b o 0 0 2 0 0 S r i
w w w. c e b . l k
B O A R D
L a n k a
2011
538
8
367
214
148
5
37
0
35
2
241
25
192
24
1
23
1216
GENERAL STATISTICS
%
Change
7.0%
9.7%
14.3%
12.3%
15.7%
88.0%
-10.7%
0.0%
-10.7%
-11.2%
5.2%
5.7%
5.1%
6.2%
-8.5%
8.5%
8.1%
2010
2011
404,495 412,858
2,287
2,325
64,514 67,634
63,686 66,750
826
881
2
3
45
42
1
1
42
40
2
1
3,402
3,356
2,897
2,841
498
507
7
8
742
614
2,930
3,188
478,415 490,017
%
Change
2.1%
1.7%
4.8%
4.8%
6.7%
50.0%
-6.7%
0.0%
-4.8%
-50.0%
-1.4%
-1.9%
1.8 %
14.3%
-17.3%
8.8%
2.4%
Note - Three part tariff was introduced for bulk customers as tariff change w.e. from 01/01/2011.
2010
2011
BULK +S.L.
14.1%
BULK +S.L.
13.7%
DOM+RP
34.4%
INDUSTRIAL
31.0%
DOM+RP
34.2%
GENERAL
18.9%
GENERAL
19.2%
INDUSTRIAL
1.0%
GENERAL
10.1%
BULK +S.L.
0.0%
INDUSTRIAL
1.0%
BULK +S.L.
0.0%
Hotel
0.0%
Hotel
0.0%
DOM+RP
88.9%
DOM+RP
89.0%
BULK +S.L.
INDUSTRIAL
Hotel
GENERAL
DOM+RP
%
Change
1.0 %
16.9 %
8.4 %
16.7 %
8.3 %
15.5 %
18.1 %
6.8 %
0.5 %
-2.2 %
2010
2011
%
Change
483
1,724
50
25,257
35
1,544
754
108,886
33,859
3,697
71,330
0.0 %
0.6 %
21.0 %
3.6 %
0.0 %
1.4 %
2.7 %
4.5 %
-0.4 %
1.3 %
7.3 %
First 30 units
31 - 60 units
61 - 90 units
91 - 120 units
121 - 180 units
Above 180 units
Unit Rate
(for each 30 days billing period)
@ Rs 3.00 per unit
@ Rs 4.70 per unit
@ Rs 7.50 per unit
@ Rs 21.00 per unit
@ Rs 24.00 per unit
@ Rs 36.00 per unit
Fixed Charge
+
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 90.00
Rs. 315.00
Rs. 315.00
Rs. 315.00
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 180.00
Rs. 180.00
Rs. 240.00
Chunnakam
Transmission
Network 2011
Kilinochchi
Vavuniya
Note:- 1. Excludes 141 route km of 132 kV transmission lines which is being re-constructed in the North.
2. Includes only distribution lines & substations rehabilitated and used from 1998 in Northern Province.
K.P.S.(smallGT - L.A.D)
K.P.S.(new GT - L.A.D)
SP.P.S. - A ( L.A.D.)
SP.P.S. - A (L.H.F.)
SP.P.S.- B (L.A.D.)
SP.P.S.- B (L.H.F.)
K.P.S. - C.Cy. (L.A.D.)
K.P.S. - C.Cy. (Naptha)
Puttlam - Coal
Puttlam - LAD
Hotel
1.6%
2010
2011*
20,869
6,470,617
2,832,318
6,542,663
2,863,854
313,511
2,836
151.5
7.8
65,610
110.57
INDUSTRIAL
31.2%
Hotel
1.6%
GENERAL
10.0%
2010
20,653
5,534,327
2,612,603
5,604,104
2,645,542
271,346
2,400
141.9
%
7.3
sq.km.
65,610
Rs/US $
113.06
* - Provisional
Units
Thous.
Rs.m.
Rs.m.
Rs.m.
Rs.m.
Rs.
U.S.$
Province
Colombo City
North Western
North central
Northern
Region - 1
Western - North
Central
Eastern
Region - 2
Western - South 2
Uva
Sabaragamuwa
Region - 3
Western - South 1
Southern
Region - 4
TOTAL
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Units
2010
2011
%
Change
44
2,874
5
2100/500
2
405
4
306
121
1,084
21,930
4,838
22,106
46
3,043
5
2100/500
2
405
5
369
124
1,090
22,839
5,627
23,021
4.5 %
5.9 %
0.0 %
0.0 %
0.0 %
0.0 %
25.0 %
20.6 %
2.5 %
0.6 %
4.1 %
16.3 %
4.1 %
12,107
13,134
8.5 %
Total capacity
2011
CSC
8
19
9
11
47
18
23
18
59
13
16
20
49
10
26
36
191
CSC
8
21
10
11
50
18
23
18
59
13
16
20
49
10
26
36
194
MVA
YEAR
2006
2007
2008
2009
2010
2011
Total at End
of the year
17,297
17,757
18,103
18,590
19,116
19,643
OTHER CONSUMER
CATEGORIES
Rate - 1
Supply at 400/230V
Contract demand < or = 42 kVA
Unit Charge (Rs/unit)
Fixed Charge(Rs./Month)
Region 4
18.2%
Region 3
23.6%
2011
Region 1
26.5%
Region 2
31.7%
Region 4
18.0%
Region 3
23.7%
Hotel
19.50 +
240.00
19.40
+
850.00
Day - 10.45
(5.30 am to
6.30 pm) +
Peak- 13.60
(6.30 pm to
10.30 pm) +
Off-Peak - 7.35
(10.30 pm to
5.30 am)
+
850.00
Day - 13.00
(5.30 am to
6.30 pm) +
Peak- 16.90
(6.30 pm to
10.30 pm) +
Off-Peak - 9.10
(10.30 pm to
5.30 am)
+
850.00
+
3000.00
+
3000.00
+
3000.00
+
750.00
Day - 10.25
(5.30 am to
6.30 pm) +
Peak- 13.40
(6.30 pm to
10.30 pm) +
Off-Peak - 7.15
(10.30 pm to
5.30 am)
+
750.00
Day - 12.60
(5.30 am to
6.30 pm) +
Peak- 16.40
(6.30 pm to
10.30 pm) +
Off-Peak - 8.85
(10.30 pm to
5.30 am)
+
750.00
Fixed Charge(Rs./Month)
+
3000.00
+
3000.00
+
3000.00
Rate - 2
Supply at 400/230V
Contract demand
above 42 kVA
Unit Charge
(Rs/unit)
Demand Charge
(Rs/kVA)
Fixed Charge (Rs./Month)
Puttalam
Coal
Puttalam
Heladhanavi
Habarana
Valachchenai
Pannala
Madampe
Bowatenna
Bolawatte
Kurunegala
Ukuwela
Veyangoda
Kiribathkumbura
Kotugoda
Kegalle
Thulhiriya
Victoria
Ampara
Randenigala
Inginiyagala
Rantembe
Kotmale
Polpitiya Laxapana
Sitawaka
Wimalasurendra
Kosgama New Lax
Nuwara Eliya
Badulla
Canyon
Rate - 3
Supply at 11 kV & above
Unit Charge
(Rs/unit)
Trincomalee
Anuradhapura
10.50 +
240.00
Region 1
26.8%
Region 2
31.6%
Industrial
19.50 +
240.00
General
Purpose
19.10
Note - 1. Eligible Government Instititions shall be entitled to a 25% discount on energy charges.
2. No Fuel Adjustment Charge effective from 01/01/2011 to 31/12/2011.
ACE
Horana
Ratnapura
Veyangoda
Matugama
Kotugoda
Kerawalapitiya
AES
Kelanitissa
CPPL
Kolonnawa
Maradana
Havelock Town
Sri Jayewardenepura
Dehiwela
Aniyakanda
Ambalangoda
Biyagama
Embilipitiya
ACE
Hambantota
Galle
APPL
Sapugaskanda
Aturugiriya
Oruwala
Pannipitiya
Ratmalana
Panadura
Kukule
Deniyaya
Kelaniya
Balangoda
Samanala Wewa
ACE
Horana
Matara
220 kV
132 kV
STATISTICAL DIGEST
2011
Enrich
life
through
g
Power
Matugama
C E Y L O N E L E C T R I C I T Y
C o l o m b o 0 0 2 0 0 S r i
w w w. c e b . l k
B O A R D
L a n k a
2011
538
8
367
214
148
5
37
0
35
2
241
25
192
24
1
23
1216
GENERAL STATISTICS
%
Change
7.0%
9.7%
14.3%
12.3%
15.7%
88.0%
-10.7%
0.0%
-10.7%
-11.2%
5.2%
5.7%
5.1%
6.2%
-8.5%
8.5%
8.1%
2010
2011
404,495 412,858
2,287
2,325
64,514 67,634
63,686 66,750
826
881
2
3
45
42
1
1
42
40
2
1
3,402
3,356
2,897
2,841
498
507
7
8
742
614
2,930
3,188
478,415 490,017
%
Change
2.1%
1.7%
4.8%
4.8%
6.7%
50.0%
-6.7%
0.0%
-4.8%
-50.0%
-1.4%
-1.9%
1.8 %
14.3%
-17.3%
8.8%
2.4%
Note - Three part tariff was introduced for bulk customers as tariff change w.e. from 01/01/2011.
2010
2011
BULK +S.L.
14.1%
BULK +S.L.
13.7%
DOM+RP
34.4%
INDUSTRIAL
31.0%
DOM+RP
34.2%
GENERAL
18.9%
GENERAL
19.2%
INDUSTRIAL
1.0%
GENERAL
10.1%
BULK +S.L.
0.0%
INDUSTRIAL
1.0%
BULK +S.L.
0.0%
Hotel
0.0%
Hotel
0.0%
DOM+RP
88.9%
DOM+RP
89.0%
BULK +S.L.
INDUSTRIAL
Hotel
GENERAL
DOM+RP
%
Change
1.0 %
16.9 %
8.4 %
16.7 %
8.3 %
15.5 %
18.1 %
6.8 %
0.5 %
-2.2 %
2010
2011
%
Change
483
1,724
50
25,257
35
1,544
754
108,886
33,859
3,697
71,330
0.0 %
0.6 %
21.0 %
3.6 %
0.0 %
1.4 %
2.7 %
4.5 %
-0.4 %
1.3 %
7.3 %
First 30 units
31 - 60 units
61 - 90 units
91 - 120 units
121 - 180 units
Above 180 units
Unit Rate
(for each 30 days billing period)
@ Rs 3.00 per unit
@ Rs 4.70 per unit
@ Rs 7.50 per unit
@ Rs 21.00 per unit
@ Rs 24.00 per unit
@ Rs 36.00 per unit
Fixed Charge
+
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 90.00
Rs. 315.00
Rs. 315.00
Rs. 315.00
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 180.00
Rs. 180.00
Rs. 240.00
Chunnakam
Transmission
Network 2011
Kilinochchi
Vavuniya
Note:- 1. Excludes 141 route km of 132 kV transmission lines which is being re-constructed in the North.
2. Includes only distribution lines & substations rehabilitated and used from 1998 in Northern Province.
K.P.S.(smallGT - L.A.D)
K.P.S.(new GT - L.A.D)
SP.P.S. - A ( L.A.D.)
SP.P.S. - A (L.H.F.)
SP.P.S.- B (L.A.D.)
SP.P.S.- B (L.H.F.)
K.P.S. - C.Cy. (L.A.D.)
K.P.S. - C.Cy. (Naptha)
Puttlam - Coal
Puttlam - LAD
Hotel
1.6%
2010
2011*
20,869
6,470,617
2,832,318
6,542,663
2,863,854
313,511
2,836
151.5
7.8
65,610
110.57
INDUSTRIAL
31.2%
Hotel
1.6%
GENERAL
10.0%
2010
20,653
5,534,327
2,612,603
5,604,104
2,645,542
271,346
2,400
141.9
%
7.3
sq.km.
65,610
Rs/US $
113.06
* - Provisional
Units
Thous.
Rs.m.
Rs.m.
Rs.m.
Rs.m.
Rs.
U.S.$
Province
Colombo City
North Western
North central
Northern
Region - 1
Western - North
Central
Eastern
Region - 2
Western - South 2
Uva
Sabaragamuwa
Region - 3
Western - South 1
Southern
Region - 4
TOTAL
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Units
2010
2011
%
Change
44
2,874
5
2100/500
2
405
4
306
121
1,084
21,930
4,838
22,106
46
3,043
5
2100/500
2
405
5
369
124
1,090
22,839
5,627
23,021
4.5 %
5.9 %
0.0 %
0.0 %
0.0 %
0.0 %
25.0 %
20.6 %
2.5 %
0.6 %
4.1 %
16.3 %
4.1 %
12,107
13,134
8.5 %
Total capacity
2011
CSC
8
19
9
11
47
18
23
18
59
13
16
20
49
10
26
36
191
CSC
8
21
10
11
50
18
23
18
59
13
16
20
49
10
26
36
194
MVA
YEAR
2006
2007
2008
2009
2010
2011
Total at End
of the year
17,297
17,757
18,103
18,590
19,116
19,643
OTHER CONSUMER
CATEGORIES
Rate - 1
Supply at 400/230V
Contract demand < or = 42 kVA
Unit Charge (Rs/unit)
Fixed Charge(Rs./Month)
Region 4
18.2%
Region 3
23.6%
2011
Region 1
26.5%
Region 2
31.7%
Region 4
18.0%
Region 3
23.7%
Hotel
19.50 +
240.00
19.40
+
850.00
Day - 10.45
(5.30 am to
6.30 pm) +
Peak- 13.60
(6.30 pm to
10.30 pm) +
Off-Peak - 7.35
(10.30 pm to
5.30 am)
+
850.00
Day - 13.00
(5.30 am to
6.30 pm) +
Peak- 16.90
(6.30 pm to
10.30 pm) +
Off-Peak - 9.10
(10.30 pm to
5.30 am)
+
850.00
+
3000.00
+
3000.00
+
3000.00
+
750.00
Day - 10.25
(5.30 am to
6.30 pm) +
Peak- 13.40
(6.30 pm to
10.30 pm) +
Off-Peak - 7.15
(10.30 pm to
5.30 am)
+
750.00
Day - 12.60
(5.30 am to
6.30 pm) +
Peak- 16.40
(6.30 pm to
10.30 pm) +
Off-Peak - 8.85
(10.30 pm to
5.30 am)
+
750.00
Fixed Charge(Rs./Month)
+
3000.00
+
3000.00
+
3000.00
Rate - 2
Supply at 400/230V
Contract demand
above 42 kVA
Unit Charge
(Rs/unit)
Demand Charge
(Rs/kVA)
Fixed Charge (Rs./Month)
Puttalam
Coal
Puttalam
Heladhanavi
Habarana
Valachchenai
Pannala
Madampe
Bowatenna
Bolawatte
Kurunegala
Ukuwela
Veyangoda
Kiribathkumbura
Kotugoda
Kegalle
Thulhiriya
Victoria
Ampara
Randenigala
Inginiyagala
Rantembe
Kotmale
Polpitiya Laxapana
Sitawaka
Wimalasurendra
Kosgama New Lax
Nuwara Eliya
Badulla
Canyon
Rate - 3
Supply at 11 kV & above
Unit Charge
(Rs/unit)
Trincomalee
Anuradhapura
10.50 +
240.00
Region 1
26.8%
Region 2
31.6%
Industrial
19.50 +
240.00
General
Purpose
19.10
Note - 1. Eligible Government Instititions shall be entitled to a 25% discount on energy charges.
2. No Fuel Adjustment Charge effective from 01/01/2011 to 31/12/2011.
ACE
Horana
Ratnapura
Veyangoda
Matugama
Kotugoda
Kerawalapitiya
AES
Kelanitissa
CPPL
Kolonnawa
Maradana
Havelock Town
Sri Jayewardenepura
Dehiwela
Aniyakanda
Ambalangoda
Biyagama
Embilipitiya
ACE
Hambantota
Galle
APPL
Sapugaskanda
Aturugiriya
Oruwala
Pannipitiya
Ratmalana
Panadura
Kukule
Deniyaya
Kelaniya
Balangoda
Samanala Wewa
ACE
Horana
Matara
220 kV
132 kV
STATISTICAL DIGEST
2011
Enrich
life
through
g
Power
Matugama
C E Y L O N E L E C T R I C I T Y
C o l o m b o 0 0 2 0 0 S r i
w w w. c e b . l k
B O A R D
L a n k a
2011
538
8
367
214
148
5
37
0
35
2
241
25
192
24
1
23
1216
GENERAL STATISTICS
%
Change
7.0%
9.7%
14.3%
12.3%
15.7%
88.0%
-10.7%
0.0%
-10.7%
-11.2%
5.2%
5.7%
5.1%
6.2%
-8.5%
8.5%
8.1%
2010
2011
404,495 412,858
2,287
2,325
64,514 67,634
63,686 66,750
826
881
2
3
45
42
1
1
42
40
2
1
3,402
3,356
2,897
2,841
498
507
7
8
742
614
2,930
3,188
478,415 490,017
%
Change
2.1%
1.7%
4.8%
4.8%
6.7%
50.0%
-6.7%
0.0%
-4.8%
-50.0%
-1.4%
-1.9%
1.8 %
14.3%
-17.3%
8.8%
2.4%
Note - Three part tariff was introduced for bulk customers as tariff change w.e. from 01/01/2011.
2010
2011
BULK +S.L.
14.1%
BULK +S.L.
13.7%
DOM+RP
34.4%
INDUSTRIAL
31.0%
DOM+RP
34.2%
GENERAL
18.9%
GENERAL
19.2%
INDUSTRIAL
1.0%
GENERAL
10.1%
BULK +S.L.
0.0%
INDUSTRIAL
1.0%
BULK +S.L.
0.0%
Hotel
0.0%
Hotel
0.0%
DOM+RP
88.9%
DOM+RP
89.0%
BULK +S.L.
INDUSTRIAL
Hotel
GENERAL
DOM+RP
%
Change
1.0 %
16.9 %
8.4 %
16.7 %
8.3 %
15.5 %
18.1 %
6.8 %
0.5 %
-2.2 %
2010
2011
%
Change
483
1,724
50
25,257
35
1,544
754
108,886
33,859
3,697
71,330
0.0 %
0.6 %
21.0 %
3.6 %
0.0 %
1.4 %
2.7 %
4.5 %
-0.4 %
1.3 %
7.3 %
First 30 units
31 - 60 units
61 - 90 units
91 - 120 units
121 - 180 units
Above 180 units
Unit Rate
(for each 30 days billing period)
@ Rs 3.00 per unit
@ Rs 4.70 per unit
@ Rs 7.50 per unit
@ Rs 21.00 per unit
@ Rs 24.00 per unit
@ Rs 36.00 per unit
Fixed Charge
+
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 90.00
Rs. 315.00
Rs. 315.00
Rs. 315.00
+
+
+
+
+
Rs. 30.00
Rs. 60.00
Rs. 180.00
Rs. 180.00
Rs. 240.00
Chunnakam
Transmission
Network 2011
Kilinochchi
Vavuniya
Note:- 1. Excludes 141 route km of 132 kV transmission lines which is being re-constructed in the North.
2. Includes only distribution lines & substations rehabilitated and used from 1998 in Northern Province.
K.P.S.(smallGT - L.A.D)
K.P.S.(new GT - L.A.D)
SP.P.S. - A ( L.A.D.)
SP.P.S. - A (L.H.F.)
SP.P.S.- B (L.A.D.)
SP.P.S.- B (L.H.F.)
K.P.S. - C.Cy. (L.A.D.)
K.P.S. - C.Cy. (Naptha)
Puttlam - Coal
Puttlam - LAD
Hotel
1.6%
2010
2011*
20,869
6,470,617
2,832,318
6,542,663
2,863,854
313,511
2,836
151.5
7.8
65,610
110.57
INDUSTRIAL
31.2%
Hotel
1.6%
GENERAL
10.0%
2010
20,653
5,534,327
2,612,603
5,604,104
2,645,542
271,346
2,400
141.9
%
7.3
sq.km.
65,610
Rs/US $
113.06
* - Provisional
Units
Thous.
Rs.m.
Rs.m.
Rs.m.
Rs.m.
Rs.
U.S.$
Province
Colombo City
North Western
North central
Northern
Region - 1
Western - North
Central
Eastern
Region - 2
Western - South 2
Uva
Sabaragamuwa
Region - 3
Western - South 1
Southern
Region - 4
TOTAL
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Area
4
5
3
2
14
6
7
4
17
5
4
6
15
3
6
9
55
Units
2010
2011
%
Change
44
2,874
5
2100/500
2
405
4
306
121
1,084
21,930
4,838
22,106
46
3,043
5
2100/500
2
405
5
369
124
1,090
22,839
5,627
23,021
4.5 %
5.9 %
0.0 %
0.0 %
0.0 %
0.0 %
25.0 %
20.6 %
2.5 %
0.6 %
4.1 %
16.3 %
4.1 %
12,107
13,134
8.5 %
Total capacity
2011
CSC
8
19
9
11
47
18
23
18
59
13
16
20
49
10
26
36
191
CSC
8
21
10
11
50
18
23
18
59
13
16
20
49
10
26
36
194
MVA
YEAR
2006
2007
2008
2009
2010
2011
Total at End
of the year
17,297
17,757
18,103
18,590
19,116
19,643
OTHER CONSUMER
CATEGORIES
Rate - 1
Supply at 400/230V
Contract demand < or = 42 kVA
Unit Charge (Rs/unit)
Fixed Charge(Rs./Month)
Region 4
18.2%
Region 3
23.6%
2011
Region 1
26.5%
Region 2
31.7%
Region 4
18.0%
Region 3
23.7%
Hotel
19.50 +
240.00
19.40
+
850.00
Day - 10.45
(5.30 am to
6.30 pm) +
Peak- 13.60
(6.30 pm to
10.30 pm) +
Off-Peak - 7.35
(10.30 pm to
5.30 am)
+
850.00
Day - 13.00
(5.30 am to
6.30 pm) +
Peak- 16.90
(6.30 pm to
10.30 pm) +
Off-Peak - 9.10
(10.30 pm to
5.30 am)
+
850.00
+
3000.00
+
3000.00
+
3000.00
+
750.00
Day - 10.25
(5.30 am to
6.30 pm) +
Peak- 13.40
(6.30 pm to
10.30 pm) +
Off-Peak - 7.15
(10.30 pm to
5.30 am)
+
750.00
Day - 12.60
(5.30 am to
6.30 pm) +
Peak- 16.40
(6.30 pm to
10.30 pm) +
Off-Peak - 8.85
(10.30 pm to
5.30 am)
+
750.00
Fixed Charge(Rs./Month)
+
3000.00
+
3000.00
+
3000.00
Rate - 2
Supply at 400/230V
Contract demand
above 42 kVA
Unit Charge
(Rs/unit)
Demand Charge
(Rs/kVA)
Fixed Charge (Rs./Month)
Puttalam
Coal
Puttalam
Heladhanavi
Habarana
Valachchenai
Pannala
Madampe
Bowatenna
Bolawatte
Kurunegala
Ukuwela
Veyangoda
Kiribathkumbura
Kotugoda
Kegalle
Thulhiriya
Victoria
Ampara
Randenigala
Inginiyagala
Rantembe
Kotmale
Polpitiya Laxapana
Sitawaka
Wimalasurendra
Kosgama New Lax
Nuwara Eliya
Badulla
Canyon
Rate - 3
Supply at 11 kV & above
Unit Charge
(Rs/unit)
Trincomalee
Anuradhapura
10.50 +
240.00
Region 1
26.8%
Region 2
31.6%
Industrial
19.50 +
240.00
General
Purpose
19.10
Note - 1. Eligible Government Instititions shall be entitled to a 25% discount on energy charges.
2. No Fuel Adjustment Charge effective from 01/01/2011 to 31/12/2011.
ACE
Horana
Ratnapura
Veyangoda
Matugama
Kotugoda
Kerawalapitiya
AES
Kelanitissa
CPPL
Kolonnawa
Maradana
Havelock Town
Sri Jayewardenepura
Dehiwela
Aniyakanda
Ambalangoda
Biyagama
Embilipitiya
ACE
Hambantota
Galle
APPL
Sapugaskanda
Aturugiriya
Oruwala
Pannipitiya
Ratmalana
Panadura
Kukule
Deniyaya
Kelaniya
Balangoda
Samanala Wewa
ACE
Horana
Matara
220 kV
132 kV
STATISTICAL DIGEST