Sei sulla pagina 1di 18

Joint

Measurement
Type of the work: Inside Plaster
Work
Item No.

Sheet

Particulars

Bill No. 15th R/A


Nos.

Length

all child bed grill + duplex grill+ 6 & 7th floor all grill
(includin SW + Lobby Window )
1
3A and 4A Stair Window and Lobby Window
( With all adjacent Window Bit)
Door Frame
Duoplx Main Door Frame
2

5A and 5B Main Door Frame


6 & 7 Floor All Door Frame also Main Door Frame
With Adding their Groove will be count (Item no 40)
not a Single Cat door Fitting is billed (Each)
Other Work
3" up at Counter top bottom

3
6A Floor up
Counter top bottom Wall All
Bounary wall
Brick work

CC work
GB RCC
Rod
Shutter
Excavtion
GB bottom Soling
Politince CC bottom

Contractor

Project Engineer

Project In-Charge

Joint
Measurement
Type of the work: Inside Plaster
Work
Item No.

Sheet

Particulars

Bill No. 15th R/A


Nos.

Length

Total

Contractor

Project Engineer

Project In-Charge

Joint
Measurement
Type of the work: Inside Plaster
Work
width

Height

Sheet

Bill No. 15th R/A

Unit

Sft
Sft

Sft

Sft
Sft

Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft

Contractor

Project Engineer

Project In-Charge

Joint
Measurement
Type of the work: Inside Plaster
Work
width

Height

Sheet

Bill No. 15th R/A

Unit
Sft
Sft
Sft

Sft

Contractor

Project Engineer

Project In-Charge

Joint
Measurement
Type of the work: Inside Plaster
Work
Item No.

Particulars

Roof Gardening
Back side wall
31 (a)
Front side wall
(i)
Total
Net Cement Finishing
49
Same as Plaster

Contractor

Project Engineer

Sheet

Bill No. 14th R/A

Nos.

Length

2
2

226.98
161.83

width

Height
4.25
2.17

Project In-Charge

Joint
Measurement
Type of the work: Inside Plaster
Work
Quantity

Unit

1929.33
702.34
2631.67

Sft
Sft
Sft

2631.67

Sft

Contractor

Project Engineer

Sheet

Bill No. 14th R/A

Project In-Charge

SUPPLY OF MANPOWER SHEET


Name of the Project: Mayeen Alliance
Name of Contractors: HR Enterprise
Sl No

Date

Mason

Helper

Reason

15-04-2013
to 18/4/13

RCC Removing at 3B kitchen Coutertop


for Burner, Plaster removing From 3B
Family Living Wall and Duplex Stair 1st
Landing top

4/20/2013

Plaster Removing at 3A Kitchen


Varanda Wall

4/22/2013

Plaster Removing at 2A Kitchen


Varanda Wall

16-05-2013
to 20/5/13

Countertop Bottom Brick work 3"up


from 1st floor to 5th Floor

7/3/2013

Temporary Kitchen Removing and


Fitting and Excavation

05-07-2013
and 6/5/13

Old East Bounrary Existing Wall,


Column and Column Footing Removing

East Side Boundary wall bottom


Exacavation for New Boundary GB
Casting

RCC Base of Bill Board Removing for


Bounary wall GB

07-07-2013
to 9/7/13
RCC Base of
Bill Board
Removing for
Bounary wall
GB

Total

Contractor

12

25

Project Engineer

Asst. Manager

EET

Manager

Bill No. 15th R/A


Signature

Manager

Joint
Type of the work: Shutter Work
Item No.

Contractor

Measurement Sheet

Bill No. 15th R/A

Particulars

Nos.

RCC Footing East Bounday


Footing Side

10

Column Side

3.67

Gread Beam Side

88.83

2.83

Coping

86

Project Engineer

Length

width

Height

2.75

Project In-Charge

Joint
Type of the work: Shutter Work
Quantity

Bill No. 15th R/A

Unit

60

Sft

176.16

Sft

251.3889

Sft

236.5

Sft

Contractor

Measurement Sheet

Project Engineer

Project In-Charge

Joint Measurement Sheet

Bill No. 16th R/A

Type of the work: Brick Work


Item No.

Particulars

Nos.

5" Wall
Boundary Wall
1ts wall
Additional
Additional
2nd Wall
Additional
Additional
Deduct Void
3rd Wall
Additional
Additional
1st Planter
2nd Planter
Total (for 1/2 portion)
Middle Portion
2nd simetric 1/2 potion
TOTAL

Length

1.58

2
2
1
2

4.08
0.42
1.83
0.67
0.83
0.42

1.58

2
2

4.08
0.42
9
10

9.17

1
1

9
5.67

1
1

1
1

width

10" Wall
Boundary Wall
North - East Corner portion
North - East Corner portion
TOTAL

Contractor

Project Engineer

0.83
0.83

Project In-Charge

Joint Measurement Sheet

Type of the work: Brick Work


Height

Quantity

6.67
2.67
6.67
6.67

Unit

10.5386 Sft
10.8936 Sft
2.8014 Sft
24.4122 Sft
2.2378 Sft
5.5361 Sft

1.67
6.67
3

-2.52 Sft

6.67
2.67
6.67
2

10.5386 Sft
10.8936 Sft
2.8014 Sft
36 Sft
20 Sft

1
6.67

Bill No. 16th R/A

134.1333 Sft
61.1639 Sft
134.1333 Sft
329.4305 Sft

6.67
49.8249 cft
6.67 31.389687 cft
81.214587 cft

Contractor

Project Engineer

Project In-Charge

Joint
Type of the work: RCC Work
Item No.

Measurement Sheet

Particulars

Nos.

Bill No. 15th R/A


Length

width

RCC Footing East Bounday

Contractor

Footing

Column

0.83

Gread Beam

88.83

0.83

Coping

86

1.92

Project Engineer

Project In-Charge

Joint
Type of the work: RCC Work
Height

Quantity

Bill No. 15th R/A

Unit

36

Cft

39.84

Cft

73.7289

Cft

165.12

Sft

Contractor

Measurement Sheet

Project Engineer

Project In-Charge

JointWork
Measurement
Type of the work: Reinforcement
Item No.

Sheet

Bar Dia
(mm)

Particulars

Bill No. 14 R/A

Nos

Length

Total
Length

RCC Footing East Bounday


Footing Side

Contractor

Footing Main

10

24

144

Column Main

10

32

192

Column Binder

10

50.67

304.02

Gread Beam Main

12

1 355.33

355.33

Gread Beam Bainder

10

170

510

Coping main

10

172

1.92

Coping Binder

10

86

330.24
344

Project Engineer

Project In-Charge

JointWork
Measurement
Type of the work: Reinforcement

Sheet

Bill No. 14 R/A

Weight
(Kg)

27.07
36.09
57.15
96.18
95.86
62.08
64.66

Contractor

Project Engineer

Project In-Charge

Joint
Measurement
Type of the work: Patent Stone
work
Item No.

Particulars
Boundary Wall East
Bottom CC

Contractor

Project Engineer

Sheet
Nos.
1

Bill No. 14th R/A


Length
74.17

width

Height

3.08

Project In-Charge

Joint
Measurement
Type of the work: Patent Stone
work
Quantity
228.44

Contractor

Sheet

Bill No. 14th R/A

Unit
Sft

Project Engineer

Project In-Charge

Potrebbero piacerti anche