BASIC CONCEPT
OF
QUANTITY SURVEYING
(Q.S.)
-PREPARED BY MANIRUL ISLAM
Quantity Surveyor (Civil), Teejan, Oman
1. UNITS OF MEASUREMENTS
SL.N
O
ITEMS
UNIT
UNIT
FOR
FOR COMPLETED ITEM
LABOUR (MATERIAL+LABOUR)
WORK
01
Excavation
cum / cft
cum / cft
02
Back filling
soling
/cum / cft
cum / cft
03
Footing
(Concreting)
No.
cum / cft
04
P.C.C
sqm / sft
cum / cft
05
Column
/rm / rft
Beam / Lintel
Concreting
cum / cft
06
cum / cft
07
cum / cft
08
Staircase
Concreting
cum / cft
09
sqm / sft
10
cum / cft
11
cum / cft
12
cum / cft
13
Plastering
sqm / sft
/sqm / sft
Pointing
14
sqm / sft
15
rm / rft
16
Sill Patti
rm / rft
rm / rft
17
Kitchen otta
No. or rm / rft
rm / rft
18
Painting
sqm / sft
sqm / sft
19
Doors
Windows
20
rm / rft
21
Plumbing fittingNo.
/ sanitary ware
No.
22
Water tanks
ltr.
ltr.
23
Septic tanks
ltr.
No. of users
24
Road
worksqm / sft
(asphalting)
sqm / sft
25
Electrical
rm / rft
cabling / Wiring
rm / rft
26
Electrical
points
No.
27
sqm / sft
28
Water-proofing No.
of W.C
sqm / sft
29
Gardening
(lawn)
sqm / sft
30
Gardening
No.
(trees / bushes)
No.
sqm / sft
No.
2. CONVERSION TABLE
SR.NO
UNIT
EQUIVALENT UNITS
01
1 meter
100 centimeter
02
1 meter
3.28 feet
04
1 centimeter
0.393 inch
05
1 foot
0.305 meter
07
1 inch
08
1 tone
1000 kg
09
1 kg
1000 grams
10
1 kg
0.001 tone
11
1 gram
0.001 kg
13
1 sq meter
10.76 sq feet
14
1 brass
100 sq feet
15
1 brass
9.29 sq meter
16
1 cu meter
35.28 cu feet
17
1 cu meter
1000 liters
18
1 cu feet
28.315 liters
19
1 brass
100 cu feet
20
1 cu feet
0.0283 cu meter
21
1 liter
0.001 cu meter
22
1 liter
0.0353 cu feet
23
1 cu feet
0.01 brass
24
1 cu meter
0.35 brass
MATERIAL
THEORETICAL WEIGHT IN
Kg/cum
01
Cement
1440
02
Steel
7850
03
Dry sand
1600
04
River sand
1840
05
Stone
2850 to 2960
06
Water
1000
07
P.C.C
2240
08
2420
09
Bricks
1600 to 1920
10
Brick masonry
1920
11
Soil
1760
12
1800
13
Cement mortar
2080
14
Lime mortar
1760
15
Lime
640
16
Glass
2530
17
Teak wood
670 to 830
18
Sal wood
990
19
Marble stone
2620
20
Granite stone
2460 to2800
21
Cuddappa
2720
22
Bitumen
1040
RATE
ANALYSIS
1. P.C.C. FOOTING (1:3:6)
Consider 10 cum volume.
Volume of dry concrete = 15.2 cum. (Adding 50 to 52% for compaction, wastages etc)
Proportion (1:3:6) = 1+3+6 = 10
Volume of cement = 15.2/10 = 1.52 cum.
= 1.52/0.035 = 43.4 bags ~ 44 bags.
Volume of sand = 1.52 X 3 = 4.56 cum.
Volume of metal = 1.52 X 6 = 9.12 cum.
MATERIAL
QTY
CEMENT
44
SAND
METAL
RATE
PER
AMOUNT
265 Rs.
Bag
11660.00
4.56
1270 Rs.
Cum
5791.20
9.12
900 Rs.
Cum
8208.00
LABOURS
NO.
RATE
PER
AMOUNT
HEAD MASON
02
400 Rs.
Day
800.00
MASON
04
250 Rs.
Day
1000.00
MALE COOLIE
16
200 Rs.
Day
3200.00
FEMALE COOLIE
07
150Rs.
Day
1050.00
TOTAL
TOTAL=31709.2+317.092
31709.2
317.092
32026.292
640.52
TOTAL=32026.292+640.52
32666.818
8166 .705
40833.505
2. BRICK WORK
Considering 1:4 ratios for cement mortar in 150mm thick brickwork.
Calculation of quantity for 5 cu.m volume in brickwork as follows:
Size of brick = 19 cm x9 cm x9 cm.
Vol. of brick = (0.19 x 0.09 x 0.09) cu.m
= 0.00154cu.m.
Vol. of brick with cement mortar
= (0.2 x 0.1 x 0.1) cu.m
= 0.002 cu.m.
No. of bricks in 5 cu.m
= 5 (vol. of one brick with mortar).
= 5 0.002
= 2500
Vol. of 2500 bricks = 2500 x vol. of one brick without mortar.
=2500 x 0.00154
= 3.85cu.m.
Vol. of mortar = 5 3.85 = 1.15 cu.m.
Add 15% (Bulkage + wastage)
Vol. of wet mortar = 1.15 + {1.15 x (15 100)}
= 1.323cu.m
Vol. of dry mortar = 1.323 + 33% in wet mortars for interlocking =1.759cu.m
Vol. of cement = 1.759 (1+4) =0.352cu.m
No. of cement bags = 0.352 0.035
=10.057bags.
10.00bags
Vol. of sand = 0.352 x 4
= 1.408cu.m.
ITEM DESCRIPTION
QUANTITY
RATE RS.
AMOUNT RS.
Cement
10 bags
250/bag
2500.00
Sand
1.408 cu.m
1270/cu.m
1788.16
Bricks
2500 Nos.
4/no.
10000.00
Mason
250/day
1000.00
Head Mason
400/day
400.00
Male coolie
10
200/day
2000.00
a. Material
Total
c. Tools & Plants
1%
0f total
Total
d. Water charges
2%
25%
Of total
17688.16
176.88
17865.04
357.30
Total
18222.34
Of the total
4555.58
Total
22777.92
Profit
= 22777.92 Rs.
3. R.C.C. COLUMN
Consider 10 cum volume.
Grade of concrete M 40
Proportion (1: 1.808: 1.616) 1+1.808+1.616= 4.424 {as per mix design}
Volume of dry concrete = 15.2 cum. (52% for compaction & wastages)
QTY
RATE
PER
AMOUNT
CEMENT
99
265 Rs.
Bag
26235.00
SAND
6.21
1270 Rs.
Cum
7886.70
METAL
5.55
900 Rs.
Cum
4995.00
LABOURS
NO.
RATE
PER
AMOUNT
HEAD MASON
400 Rs.
Day
400.00
MASON
250 Rs.
Day
750.00
MALE COOLIE
16
200 Rs.
Day
3200.00
BHISTI
150 Rs.
Day
1050.00
CARPENTER
200 Rs.
Day
800.00
HELPER
125 Rs.
Day
1000.00
TOTAL
46316.7
TOTAL=46316.7+463.167
= 46779.86
Water charges 2%
463.167
= 935.59
TOTAL=46779.86+935.59
= 47715.45
= 11928.8
TOTAL = 47715.45+11928.8
= 59644.31
RATE FOR 10 CUM = RS. 59644.31/RATE FOR PER CU.M = RS. 5964.43/-
4. INTERNAL PLASTER
12mm thick internal plaster
Considering 100sqm area
Proportion of C:M = 1:4
Summation of proportion =5
Quantity of one cement bag = 0.035cum
Quantity of wet mortar = 0.012 x 100 = 1.2cum
Adding 15% wastage = 1.2 + (1.2 x 0.15) =1.38cum
Volume of dry mix = 1.38 + (1.38 x 1/3) =1.84cum
Volume of cement = (dry volume / 5) x 1
= (1.84 /5) x 1
= 0.368cum
= 0.368 / 0.035
=10.5 bags
Volume of sand = (dry volume / 5) x 4
= (1.84 /5) x 4
= 1.472 cum
MATERIALS
QUANTITY
RATE (RS)
AMOUNT (RS)
Sand
1.472cum
1300 /cum
1913
Cement
10.5bags
250 / bag
2625
Scaffolding
L.S
550
550
LABOURS
QUANTITY
RATE (RS)
AMOUNT (RS)
Mason
8nos
200
1600
Helper
12nos
90
1080
Total
7768
1%
0f total
Total
Water charges
2%
25%
Of total
77.68
7845.68
156.91
Total
8002.59
Of the total
2000.65
Total
10003.23
Profit
= 100.03Rs.
5. EXTERNAL PLASTER
20mm thick external plaster
PARTICULAR
QUANTITY
RATE(RS)
AMOUNT(RS)
Sand
2.56cum
1300
3328
Cement
19bags
250
4750
Scaffolding
L.S.
550
550
Mason
8nos
200
1600
Helper
12nos
90
1080
Total
11708.5
Materials
Labors
1%
0f total
Total
117.08
11825.60
Water charges
Supervisor, Overhead
2%
25%
Of total
236.512
Total
12062.112
Of the total
3015.53
Grand Total
15077.64
& Profit
=150.77Rs.
6' / '4'
0.170
0.113
2.266
1.000
7' / '5'
0.198
0.142
2.832
1.400
10' / '7'
0.283
0.198
3.965
1.700
Cement in Kg
Cement in
bag
Sand in
'cum'.
Remarks
1 : 1'
1054
21.08
0.73
1 : 2'
686
13.72
0.96
1 : 3'
491
9.82
1.02
1 : 4'
380
7.60
1.05
1 : 6'
253
5.06
1.05
1 : 8'
192
3.84
1.06
Cement in Kg
Cement in
bag
Sand in
'cum'.
161
3.22
0.45
0.89
212
4.24
0.44
0.88
317
6.34
0.44
0.88
403
8.06
0.42
0.84
555
11.10
0.385
0.77
Cement Mortar:
Cement Concrete:
Sr. No: Ratio
1
2
3
4
5
1 : 4 : 8'
Nominal
Mix
1 : 3 : 6'
Nominal
Mix
1 : 2 : 4'
M15
1 : 1.5 : 3'
M20
1 : 1 : 2'
M25
Remarks
Considering dry density of concrete is 1.54
'cum'.
Aggregate may be used 60% : 40% ratio of 20mm and 10mm down respectively.
Water required for concrete varies from 28 to 35 litres per bag of (50kg) cement depending on the mix and
proportion.
DESCRIPTION
OF
WORK
Unit
Rate
Cft
5.00
Cft
70.00
Cft
90.00
Cft
150.00
hard soil.
concrete ( 1 : 4 : 8 ).
plinth beam.
charges).
Cft
150.00
Cft
150.00
charges).
Cft
150.00
Cft
100.00
charges).
wall).
wall).
Sft
70.00
150.00
Sft
120.00
Cft
200.00
Cft
150.00
11
Providing and laying cement concrete (1:2:4)
for R.C.C. Stair case using 20 mm and down
size granite jelly including vibrating curing and
with necessary centering and form work ,
including smooth finish in cement mortar (1:3)
etc, complete (Exclusive of cost of steel and
fabrication charges).
12
Providing and laying cement concrete (1:2:4)
for R.C.C. Roof slab using 20mm and down
size granite jelly with necessary centering and
shuttering including machine mixing lifting
laying tamping finishing exposed faces in
cement mortar (1:3) curing etc , complete
(Exclusive of cost of steel and fabrication
charges).
13
specification .
Tons
45000.00
Sft
30.00
Sft
30.00
Sft
35.00
Sft
40.00
400.00
shutters including
800.00
Sft
1500.00
Sft
130.00
Skirting(Vetrified tiles):
Rft
70.00
Sft
80.00
Sft
120.00
Sft
14.00
10.00
23
24
Sft
12.00
Sft
30.00
Rft
300.00
Sft
120.00
Sft
12.00
complete.
sump cover.
Rft
750.00
Sft
200.00
Sft
150.00
Note: