500kV Muzaffargarh-Gatti Transmission Line

Contract # MG-1 (Package-II)


ID

Task Name

2005

Revision-1

PROJECT TIME SCHEDULE


Start

2006
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B
11/28
Nov 28 '05
Nov

Contract Sign

Over All Project Completion Time


Mobilization

Nov 28 '05
Nov 28 '05

Project Office

Nov 28 '05

Construction Office

Dec 16 '05

Material Store

Jan 15 '06

Site Camps

Dec 16 '05

Mobilization Complete

Apr 28 '06

9
10

Design & Engineering


Survey

Nov 28 '05
Nov 28 '05

11

Route Alignment

Nov 28 '05

12

Route Alignment Approval

Dec 30 '05

13

Detail Survey (2-Crews)

Jan 12 '06

14

Detail Survey Approval

Feb 24 '06

15

Tower Spotting

16

Tower Spotting Approval

Mar 31 '06

17

Construction List

Mar 31 '06

18

Construction List Approval

Apr 28 '06

19

Survey Complete

Jun 21 '06

20
21
22
23
24

Transposition Towers
Transposition Scheme Submission
Transposition Scheme Approval
Transposition Complete
Geotechnical Investigation

4/28

Mar 3 '06

6/21

Apr 10 '06
Apr 10 '06
Apr 17 '06
Apr 23 '06

4/23

Jan 27 '06

25

Field Drilling

Jan 27 '06

26

Field Drilling for River Xing

Feb 26 '06

27

Laboratory Testing

Feb 11 '06

28

Geotechnical Report

Jun 29 '06

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 1

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID

Task Name

Revision-1

PROJECT TIME SCHEDULE

2005

Start

2006
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B
7/5
Jul 5 '06
Nov

29
30

Geotech Investigation Complete


Foundation Design

Feb 26 '06

31

Selection of Foundation Types

32

Approval of Foundation Drawings

33

Selection of Pile Foundations

May 15 '06

34

Approval of Pile Foundation Drawings

May 22 '06

35

Foundation Design Complete

36
37

Steel Lattice Tower


Procure Tower Fab. Dwgs

Feb 26 '06
Mar 5 '06

Nov 28 '05
Nov 28 '05

38

Reproduction of Tower Fab. Dwgs

Dec 13 '05

39

Approval of Tower Fab. Dwgs

Jan 25 '06

40
41
42

ACD & Tower Signs Drawing Submission


ACD, Tower Signs Drawing Approval
Tower Design Complete

Mar 12 '06
Mar 19 '06
Mar 25 '06

43
44

Overhead Line Material


Manufacturers Approval

Dec 16 '05

Earthing Material

Dec 16 '05

46

Tower Stubs

Dec 16 '05

47

Lattice Steel Tower

Dec 16 '05

48

Conductor

Dec 16 '05

49

Shield Wire (OGW)

Dec 16 '05

50

Shield Wire (OPGW)

Dec 16 '05

51

Hardware

Dec 16 '05

52

Spacer Dampers

Dec 16 '05

53

Telecommunication Equipt

54

Manufacturer Approval Complete


Specific Goods Data (Schedule-D) Submission

3/25

Dec 16 '05

45

55

7/18

Jul 18 '06

Feb 4 '06
3/19

Mar 19 '06
Jan 15 '06

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 2

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID

Task Name

2005

Start
Nov

56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77

Earthing Material
Tower Stubs
Lattice Steel Tower
Conductor
Shield Wire (OGW)
Shield Wire (OPGW)
Hardware
Spacer Dampers
Telecommunication Equipt
Specific Goods Data Submission Complete
Specific Goods Data (Schedule-D) Approval

Earthing Material
Tower Stubs
Lattice Steel Tower
Conductor
Shield Wire (OGW)
Shield Wire (OPGW)
Hardware
Spacer Dampers
Telecommunication Equipt
Specific Goods Data Approval Complete
Material Orders/Procurement

Revision-1

PROJECT TIME SCHEDULE

2006
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B

Jan 15 '06
Jan 15 '06
Feb 4 '06
Feb 4 '06
Feb 4 '06
Feb 4 '06
Feb 4 '06
Feb 4 '06
Mar 20 '06
Mar 26 '06

3/26

Jan 22 '06
Jan 22 '06
Jan 22 '06
Feb 11 '06
Feb 11 '06
Feb 11 '06
Feb 11 '06
Feb 11 '06
Feb 11 '06
Mar 27 '06
Apr 2 '06

4/2

Jan 29 '06

78

Earthing Material

Jan 29 '06

79

Tower Stubs

Jan 29 '06

80

Lattice Steel Tower

Feb 18 '06

81

Conductor (Local & Off-Shore)

Feb 18 '06

82

Shield Wire (OGW)

Feb 18 '06

83

Shield Wire (OPGW)

Feb 18 '06

84

Insulator

Apr 25 '06

85

Hardware

Feb 18 '06

86

Spacer Dampers

Feb 18 '06

87

Telecommunication Equipment

Apr 3 '06

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 3

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID

Task Name

2005

PROJECT TIME SCHEDULE

Revision-1

Start

2006
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B
5/24
May 24 '06
Nov

88
89

Material Orders Complete


Manufacturing

Feb 28 '06

90

Earthing Material (Lot-1)

Feb 28 '06

91

Earthing Material (Lot-2)

Mar 30 '06

92

Tower Stubs (Lot-1)

Feb 28 '06

93

Tower Stubs (Lot-2)

Mar 30 '06

94

Lattice Steel Tower (Lot-1)

Apr 4 '06

95

Lattice Steel Tower (Lot-2)

Apr 4 '06

96

Lattice Steel Tower (Lot-3)

Apr 4 '06

97

Conductor-Local (Lot-1)

Apr 4 '06

98

Conductor-Local (Lot-2)

Jun 18 '06

99

Conductor (Imported)

Apr 4 '06

100

Shield Wire (OGW)

Apr 4 '06

101

Shield Wire (OPGW)

Jun 3 '06

102

Hardware

Apr 4 '06

103

Spacer Dampers

Apr 4 '06

104

Telecommunication Equipment

May 25 '06

105

Manufacturing Complete

Aug 31 '06

106

Material Inspection/Testing

Mar 30 '06

107

Stubs (Lot-1)

Mar 30 '06

108

Stubs (Lot-2)

Apr 29 '06

109

Lattice Steel Tower (Lot-1)

Jul 3 '06

110

Lattice Steel Tower (Lot-2)

Jul 3 '06

111

Lattice Steel Tower (Lot-3)

Sep 1 '06

112

Conductor-Local (Lot-1)

Jun 18 '06

113

Conductor-Local (Lot-2)

Sep 1 '06

Detail Construction Schedule Shall be given before the commencement of construction activity.

8/31

Page 4

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID

Task Name

2005

PROJECT TIME SCHEDULE


Start
Nov

114

Conductor (Imported)

115

Shield Wire (OGW)

116

Shield Wire (OPGW)

117

Hardware

Jul 3 '06

118

Spacer Dampers

Jul 3 '06

119

Inspection/Testing Complete

Oct 15 '06

120

Material Shipping (Imported)

Mar 30 '06

Jul 3 '06
Sep 1 '06

Earthing Material (Lot-1)

Mar 30 '06

122

Earthing Material (Lot-2)

Apr 29 '06

123

Stubs (Lot-1)

Apr 9 '06

124

Stubs (Lot-2)

May 9 '06

125

Lattice Steel Tower (Lot-1)

Jul 13 '06

126

Lattice Steel Tower (Lot-2)

Jul 13 '06

127

Lattice Steel Tower (Lot-3)

Sep 11 '06

128

Conductor (Imported)

129

Shield Wire (OGW)

Aug 17 '06

130

Shield Wire (OPGW)

Oct 16 '06

131

Hardware

Aug 17 '06

132

Spacer Dampers

Aug 17 '06

133

Telecommunication Equipment

May 25 '06

134

Material Shipping Complete

Nov 14 '06

Custom Clearance/Site Delivery

2006
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B

Jun 3 '06

121

135

Revision-1

Jul 18 '06

Apr 29 '06

136

Earthing Material (Lot-1)

Apr 29 '06

137

Earthing Material (Lot-2)

May 29 '06

138

Stubs (Lot-1)

May 9 '06

139

Stubs (Lot-2)

Jun 8 '06

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 5

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID

Task Name

2005

PROJECT TIME SCHEDULE


Start
Nov

140

Lattice Steel Tower (Lot-1)

Aug 12 '06

141

Lattice Steel Tower (Lot-2)

Aug 12 '06

142

Lattice Steel Tower (Lot-3)

Oct 11 '06

143

Conductor-Local (Lot-1)

Jul 18 '06

144

Conductor-Local (Lot-2)

Oct 1 '06

145

Conductor (Imported)

Aug 17 '06

146

Shield Wire (OGW)

Sep 16 '06

147

Shield Wire (OPGW)

Sep 16 '06

148

Insulator

149

Hardware

Sep 16 '06

150

Spacer Damper

Sep 16 '06

151

Telecommunication Equipment

Jun 24 '06

152

Material Delivery at Site Complete

153

Construction of Overhead Line

Nov 9 '06
Jun 8 '06

Foundations (2-Crews)

Jun 8 '06

155

Foundations (3-Crews)

Jul 8 '06

156

Pile Foundations (2-Crews)

Jul 12 '06

157

River Crossing Pile Foundations (1Crew)

Sep 5 '06

158

Pile Caps and Beams (2-Crews)

Sep 10 '06

159

Tower Erection (3-Crews)

Sep 11 '06

160

Conductor Stringing (2-Crews)

Oct 26 '06

161
162
163

Supply of ACD/Tower Signs


Installation of ACD/Tower Signs
Test & Commission

164

Project Complete

2006
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B

May 1 '06

154

Revision-1

Apr 4 '07
Jul 3 '07
Sep 1 '07
Sep 18 '07

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 6

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID

Task Name

Contract Sign

Over All Project Completion Time


Mobilization

2006

Project Office

Construction Office

Material Store

Site Camps

4/28
Mobilization
Complete

9
10

Survey
Route Alignment

12

Route Alignment Approval

13

Detail Survey (2-Crews)

14

Detail Survey Approval

15

Tower Spotting

16

Tower Spotting Approval

17

Construction List

18

Construction List Approval

19

Survey Complete 6/21

21
22
23
24

Transposition Towers
Transposition Scheme Submission
Transposition Scheme Approval
4/23
Transposition
Complete
Geotechnical Investigation

25

Field Drilling

26

Field Drilling for River Xing

27

Laboratory Testing

28

Geotechnical Report

Revision-1

2007
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M

Design & Engineering

11

20

PROJECT TIME SCHEDULE

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 7

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID

Task Name

2006

30

Foundation Design

31

Selection of Foundation Types

32

Approval of Foundation Drawings

33

Selection of Pile Foundations

34

Approval of Pile Foundation Drawings

35

7/18
Foundation Design Complete

36

Steel Lattice Tower

37

Procure Tower Fab. Dwgs

38

Reproduction of Tower Fab. Dwgs

39

Approval of Tower Fab. Dwgs

40
41
42

ACD & Tower Signs Drawing Submission


ACD, Tower Signs Drawing Approval
Tower Design Complete

3/25

Overhead Line Material

44

Manufacturers Approval

45

Earthing Material

46

Tower Stubs

47

Lattice Steel Tower

48

Conductor

49

Shield Wire (OGW)

50

Shield Wire (OPGW)

51

Hardware

52

Spacer Dampers

53
54
55

Telecommunication Equipt
3/19

Revision-1

2007
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M

7/5
Geotech Investigation Complete

29

43

PROJECT TIME SCHEDULE

Manufacturer Approval Complete


Specific Goods Data (Schedule-D) Submission

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 8

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77

Task Name

PROJECT TIME SCHEDULE

2006

2007
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M

Earthing Material
Tower Stubs
Lattice Steel Tower
Conductor
Shield Wire (OGW)
Shield Wire (OPGW)
Hardware
Spacer Dampers
Telecommunication Equipt
3/26 Specific Goods Data Submission Complete
Specific Goods Data (Schedule-D) Approval

Earthing Material
Tower Stubs
Lattice Steel Tower
Conductor
Shield Wire (OGW)
Shield Wire (OPGW)
Hardware
Spacer Dampers
Telecommunication Equipt
4/2 Specific Goods Data Approval Complete
Material Orders/Procurement

78

Earthing Material

79

Tower Stubs

80

Lattice Steel Tower

81

Conductor (Local & Off-Shore)

82

Shield Wire (OGW)

83

Shield Wire (OPGW)

84

Insulator

85

Hardware

86

Spacer Dampers

87

Telecommunication Equipment

Revision-1

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 9

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID
88
89

Task Name

PROJECT TIME SCHEDULE

2006

2007
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M

5/24 Complete
Material Orders

Manufacturing

90

Earthing Material (Lot-1)

91

Earthing Material (Lot-2)

92

Tower Stubs (Lot-1)

93

Tower Stubs (Lot-2)

94

Lattice Steel Tower (Lot-1)

95

Lattice Steel Tower (Lot-2)

96

Lattice Steel Tower (Lot-3)

97

Conductor-Local (Lot-1)

98

Conductor-Local (Lot-2)

99

Conductor (Imported)

100

Shield Wire (OGW)

101

Shield Wire (OPGW)

102

Hardware

103

Spacer Dampers

104

Telecommunication Equipment

105

Manufacturing Complete

106

Material Inspection/Testing

107

Stubs (Lot-1)

108

Stubs (Lot-2)

109

Lattice Steel Tower (Lot-1)

110

Lattice Steel Tower (Lot-2)

111

Lattice Steel Tower (Lot-3)

112

Conductor-Local (Lot-1)

113

Conductor-Local (Lot-2)

Revision-1

8/31

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 10

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID

Task Name

2006

114

Conductor (Imported)

115

Shield Wire (OGW)

116

Shield Wire (OPGW)

117

Hardware

118

Spacer Dampers

119

Inspection/Testing Complete

120

Material Shipping (Imported)

121

Earthing Material (Lot-1)

122

Earthing Material (Lot-2)

123

Stubs (Lot-1)

124

Stubs (Lot-2)

125

Lattice Steel Tower (Lot-1)

126

Lattice Steel Tower (Lot-2)

127

Lattice Steel Tower (Lot-3)

128

Conductor (Imported)

129

Shield Wire (OGW)

130

Shield Wire (OPGW)

131

Hardware

132

Spacer Dampers

133

Telecommunication Equipment

134

Material Shipping Complete

135

PROJECT TIME SCHEDULE

2007
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M

10/15

11/14

Custom Clearance/Site Delivery

136

Earthing Material (Lot-1)

137

Earthing Material (Lot-2)

138

Stubs (Lot-1)

139

Stubs (Lot-2)

Revision-1

Detail Construction Schedule Shall be given before the commencement of construction activity.

Page 11

500kV Muzaffargarh-Gatti Transmission Line


Contract # MG-1 (Package-II)
ID

Task Name

2006

140

Lattice Steel Tower (Lot-1)

141

Lattice Steel Tower (Lot-2)

142

Lattice Steel Tower (Lot-3)

143

Conductor-Local (Lot-1)

144

Conductor-Local (Lot-2)

145

Conductor (Imported)

146

Shield Wire (OGW)

147

Shield Wire (OPGW)

148

Insulator

149

Hardware

150

Spacer Damper

151

Telecommunication Equipment

152

Material Delivery at Site Complete

153

Revision-1

2007
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M

11/9

Construction of Overhead Line

154

Foundations (2-Crews)

155

Foundations (3-Crews)

156

Pile Foundations (2-Crews)

157

River Crossing Pile Foundations (1Crew)

158

Pile Caps and Beams (2-Crews)

159

Tower Erection (3-Crews)

160

Conductor Stringing (2-Crews)

161
162
163

Supply of ACD/Tower Signs


Installation of ACD/Tower Signs
Test & Commission

164

PROJECT TIME SCHEDULE

9/18

Project Complete

Detail Construction Schedule Shall be given before the commencement of construction activity.