STATE OF KUWAIT
AMIRI DIWAN
08
OF
THE NEW JAHRA HOSPITAL
MUMARASAH DOCUMENTS
SOIL INVESTIGATION REPORT
APRIL 2014
1024
-i-
REPORT ON
R
O
GEO
OTECHNIICAL INV
VESTIGA
ATION WORKS
W
FOR
F
PRO
OPOSED
D NEW
JAH
HRA HOSPITAL FOR 100
00 BEDS
S CAPAC
CITY.
GIIICO REPO
ORT REF : 2012 02
2 104
SU
UBMITTED
D TO
Rev-A
3
2 Feb 2013
P
PREPARED
BY
- ii -
TABLE OF CONTENTS
TERMINOLOGY ....................................................................................................................................................... V
REFERENCE CODES AND STANDARDS ..................................................................................................... VIII
REFERENCE LITERATURES & TEXT BOOKS ............................................................................................ VIII
1.0 INTRODUCTION .............................................................................................................................................. 9
1.1 PURPOSE AND SCOPE OF STUDY ........................................................................................................................... 9
1.2 PROJECT CHARACTERISTICS ................................................................................................................................. 9
1.3 REPORT FORMAT.................................................................................................................................................. 9
2.0 LOCAL CONDITIONS AND GEOLOGY..................................................................................................... 10
2.1 LOCATION .......................................................................................................................................................... 10
2.2 REGIONAL GEOLOGY .......................................................................................................................................... 10
2.3 CLIMATE ............................................................................................................................................................ 11
2.4 HYDROLOGY & HYDROGEOLOGY ........................................................................................................................ 12
2.5 SOIL NATURE ..................................................................................................................................................... 14
3.0 FIELD INVESTIGATION .............................................................................................................................. 14
3.1 BOREHOLES ....................................................................................................................................................... 14
3.2 DRILLING, SAMPLING AND IN-SITU TESTING ...................................................................................................... 17
3.2.1 Drilling..................................................................................................................................................... 17
3.2.2 Standard Penetration Tests and Sampling ....................................................................................... 17
4.0 LABORATORY INVESTIGATION .............................................................................................................. 18
4.1 GENERAL............................................................................................................................................................ 18
4.2 IDENTIFICATION TESTS ...................................................................................................................................... 18
4.3 CHEMICAL TESTS (BS-1377 PART 3) ................................................................................................................ 18
4.4 DIRECT SHEAR TESTS ........................................................................................................................................ 18
4.5 MODIFIED PROCTOR TESTS ............................................................................................................................... 18
4.6 TYPES AND NUMBER OF FIELD AND LABORATORY TESTS .................................................................................... 19
5.0 SUBSURFACE CONDITIONS ...................................................................................................................... 19
5.1 SITE SURFACE DESCRIPTION .............................................................................................................................. 19
5.2 SUBSURFACE SOIL DESCRIPTION........................................................................................................................ 19
5.3 GROUNDWATER CONDITIONS ............................................................................................................................. 20
5.4 SEISMICITY ........................................................................................................................................................ 21
5.5 CORRELATION OF SUBSURFACE CONDITION WITH REGIONAL GEOLOGY ............................................................... 21
5.6 ENGINEERING SOIL DESIGN PARAMETERS .......................................................................................................... 22
5.7 LIQUEFACTION POTENTIAL ................................................................................................................................. 23
6.0 FOUNDATION ANALYSIS FOR STATIC LOADING ............................................................................. 24
6.1 FOUNDATION GENERAL FEATURES ..................................................................................................................... 24
6.1.1 General ................................................................................................................................................... 24
6.1.2 Foundation Type and Depth ............................................................................................................... 24
6.2 FOUNDATION STABILITY ANALYSIS .................................................................................................................... 25
6.2.1 General Bearing Capacity .................................................................................................................... 25
6.3 FOUNDATION DESIGN RECOMMENDATIONS ........................................................................................................ 28
6.3.1 General ................................................................................................................................................... 28
6.3.2 Footings .................................................................................................................................................. 28
6.3.3 Mat Foundations ................................................................................................................................... 30
6.4 LATERAL SEPARATION OF ADJACENT FOOTINGS................................................................................................... 32
6.5 RETAINING STRUCTURES.................................................................................................................................... 32
6.6 COEFFICIENT OF SUBGRADE REACTION.............................................................................................................. 33
- iv List of Figures
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
1.
2.
3.
4.
5.
6.
7.
8.
9.
Vicinity Map
Test Locations sketch
Subsurface cross-section
Profile of Extrapolated SPT-N value
Profile of Corrected SPT-N value (N160 vs Depth)
E Elastic Modulus of soil from SPT-N values
G Shear Modulus of Soil from SPT-N values
Percent fines (passing 75mic sieve) profile
Seismic Hazard Map of Kuwait
Appendices
I. Field Test Reports
a) Legend & Symbols
b) Borehole Logs
c) Standpipe Readings
II. Laboratory Test Results
a. Laboratory tests data summary soil
b. Grain size distribution curves
c. Direct Shear Test Results
d. Chemical analysis of water samples
e. Modified Proctor Tests
III. Bearing capacity tables
V. Settlement Calculations
VI. Preliminary Pile Capacity Estimates
-vTERMINOLOGY
Definitions
Soil
Any natural or artificial material not classified herein as topsoil or hard stratum.
Cohesive soil
The type of soil which because of its fine-grained content will form a coherent mass at
suitable moisture content e.g. silt, clay.
Cohesion less soil
The type of granular soil consisting of particles which can be identified individually by the
naked eye or with the aid of hand lens e.g. gavel, sand.
Fill
Any deposits or construction which have been manmade as distinct from geological agencies.
Sabkha
Usually brown and light grey, loose or slightly consolidated surface soil often encrusted by
salts. They occupy widespread, low lying and extremely flat areas separated from open sea
by coastal ridges of oolitic deposits in Kuwait.
Boring
Shall mean wash boring, percussion boring and auger boring
Drilling
Shall mean rotary drilling techniques.
Borehole
An exploratory hole put down by boring or drilling techniques.
Standard Penetration Test (SPT)
The in-situ test by a split barrel sampler (50 mm OD, 35 mm ID) which is driven into the base
of borehole to a total depth of 450 mm by 63.5 kg weight falling through 760mm height.
Standard penetration test gives the N-values which signifies the natural compactness of the
soil.
N-Value
At a particular depth of soil, N is the number of blows for the last 300 mm penetration of a
split barrel sampler in the Standard Penetration Test (SPT).
- vi Abbreviations
OD
Outside Diameter
ID
Inside Diameter
UDS
Undisturbed Samples
DS
Disturbed Samples
SPT
TP
Test pit
U/G
Under ground
bgl
LL
Liquid Limit
PL
Plastic Limit
PI
Plasticity Index
Cl
Chloride Content as cl
WC
Water Content
So4
MDD
CBR
Ec
Electrical Conductivity
TDS
ppm
kPa
Kilo Pascal
MPa
Mega Pascal
- vii Symbols
c
Cohesion
cu
Undrained cohesion
Cu
Uniformity Coefficient
Cc
Coefficient of curvature
Microseimens
Void Ratio
Gs
Specific Gravity
Qc or qc Cone resistance
Fs
Friction resistance
Rf
1.0 INTRODUCTION
This report has been prepared in compliance with the scope of works agreed between
M/s Gulf Inspection Intl Company and M/s PACE , Kuwait for the proposed project
titled New Jahra Hospital for 1000 Beds Capacity.
1.1 Purpose and Scope of Study
The purpose of this geotechnical investigation was to explore the subsurface
conditions at the proposed site by a total of eighty (80) boreholes. Sixty four (64)
boreholes were drilled to a depth of twenty (20)m, eight (8) to 30m, three (3) to
40.0m and five (5) to 50.0m as requested by the Client. Further, the scope included
performing laboratory tests on selected samples and evaluating field and laboratory
tests data to develop soil parameters necessary for the design of foundations for the
proposed structure.
1.2 Project Characteristics
Based on the information provided, we understand that the proposed development
includes following major facilities:
Further development includes service tunnels, above ground access bridges, below
ground substations, underground utilties and extensive service roads around the
facility. No information regarding the structural loading conditions and/or settlement
restrictions was available at the time of writing this report.
1.3 Report Format
This report includes information about geology, hydrology, climate, and local
conditions etc. After the completion of field and laboratory investigation, test results
were analyzed and thoroughly studied based on the latest development in the science
and the requirements by regulations and specifications. Results are tabulated and/or
graphically presented in appendices.
Conclusions of the study are presented in tables and graphics leading to our
recommendations for the geotechnical aspects of the construction of the new
facilities.
2.0 LOCAL CONDITIONS AND GEOLOGY
2.1 Location
The state of Kuwait is situated at the North Western corner of the Gulf between
lattitudes 28o and 30o North and longitudes 46o and 48o East. It covers an area of
approximately 17820km2. It is bordered by Iraq to the North and West, Iran to the
Northeast, Saudi Arabia to the South and the Arabian Gulf to the East.
The investigation site is located in Jahra area to the north of existing Jahra Hospital as
shown in Fig 1 & 2.
2.2 Regional Geology
Kuwait lies on the eastern edge of the deep sedimentary basin that forms the majority
of the Arabian Peninsula and is underlain by a considerable thickness of sedimentary
rocks. The land was formed in recent geological times as part of a mass sediment
deposit by a great wadi whose most recent channel, the Wadi al Batin, forms the
western boundary of the country. Layers of sand, gravel and silt lie over limestone to
a depth of more than 200meters.
The mainland of Kuwait comprising a generally, flat, desert landscape, tilting generally
toward North East from 270m above sea level in Salmi to a few meters at Bubiyan
Island. A few oasis, undulating sand hill and occasional escarpment or depressions
break the uniformity of the interior plateau. The Jal Az Zor escarpment north of
Kuwait Bay, stretching approximately 60km towards Northeast forms together with
the Kuwait Bay another of Kuwaits physical features. The Bay is upto 15~20meters
deep.
The near surface geology of Kuwait, which is generally of engineering interest, can be
classified as follows :
The Lower Miocene to Pleistocene deposits are commonly called the Kuwait Group. In
the south of Kuwait relatively young deposits of the Dibdibba formation outcrop at the
surface. These deposits are underlain by the Dammam formation the normally
intervening deposits of the Fars formation are absent except in northern Kuwait.
The Dibdibba formation typically consists of siliceous sands and gravels, with varying
amounts of silt and some thin clay and gypsum bands. Cementation is only partial and
relatively poor consisting of calcium carbonate and gypsum. The Dibdibba deposits
are locally called gatch and their origin is uncertain. The term gatch is generally
defined as a granular soil with fines content ranging from as low as 5 percent to in
excess of 35 percent. Gatch is generally uncemented, however discontinuous
cemented bands are frequently found near the surface and this is locally called hard
gatch.
In south Kuwait the recent deposits overlying the Dibdibba formation consists chiefly
of windblown sands forming sheets and low dune structures. Adjacent to the
shoreline calcareous deposits are locally present, generally consisting of oolitic and
bioclastic sands. Saline marsh coastal deposits, known in the Arabian Peninsula as
sabkhas are often encountered on the landward side of the shoreline in south Kuwait,
with inland drainage basins called playas with similar recent deposits encountered
inland.
2.3 Climate
The climate in Kuwait is characterized by extremely hot and dry summers, with an
average daily temperature of about 45-degree centigrade, and mild to cold winters.
1. Outdoors ambient conditions:
a. Temperature:
Design ambient:
Max. 50C (shade) at 50 % RH
Ave (one day) 45C
Min. 3C at 100% RH
Sun 82C
Maximum radiation:
Black body 85C
White body 63C
There are two major aquifers, the upper being the Kuwait Group of soils and the
lower being the Damman Formation. Groundwater inflow has been estimated at about
20 million cu. m per year through lateral underflow from Saudi Arabia.
19In the inner city in the vicinity of Jahra Gate the Kuwait Group sediments are
approximately 95m thick and uncomformably overlay the carbonate rocks of the
Dammam formation.
The near surface aquifers of Kuwait group in this area can be divided into:-
upper aquifer
Borehole
#
BH01
BH02
BH03
BH04
BH05
BH06
BH07
BH08
BH09
BH10
BH11
BH12
BH13
Coordinates
Northing
Easting
3246707.60
3246734.36
3246761.12
3246787.90
3246814.67
3246868.21
3246895.67
3246921.93
3246948.38
3246669.87
3246696.64
3246750.18
3246776.95
469052.03
469081.76
469111.47
469141.22
469170.95
469230.41
469259.27
469289.41
469319.46
469084.86
469114.59
469174.05
469203.78
Borehole
Depth,m
20
20
20
20
20
20
20
20
20
20
20
20
20
Borehole
Elevation
18.87
18.78
18.05
17.58
16.78
15.67
15.54
14.81
13.94
19.04
18.78
17.92
17.56
Depthto
Groundwater
Groundwater
Elevation,KLD
Level(Initial)
1.60
1.50
1.40
1.55
0.70
1.70
1.00
1.80
1.60
2.00
1.80
2.00
1.60
17.27
17.28
16.65
16.03
16.08
13.97
14.54
13.01
12.34
17.04
16.98
15.92
15.96
Table # 1 (Contd.)
Co-ordinates & Elevations of Boreholes, Depth to Groundwater Level &
Groundwater Elevations
Borehole
#
BH14
BH15
BH16
BH17
BH18
BH19
BH20
BH21
BH22
BH23
BH24
BH25
BH26
BH27
BH28
BH29
BH30
BH31
BH32
BH33
BH34
BH35
BH36
BH37
BH38
BH39
BH40
BH41
BH42
BH43
BH44
BH45
BH46
BH47
BH48
BH49
Coordinates
Northing
Easting
3246803.72
3246830.49
3246861.29
3246891.03
3246909.79
3246632.15
3246685.69
3246712.46
3246766.00
3246797.22
3246819.43
3246845.61
3246872.87
3246598.15
3246624.43
3246650.92
3246703.43
3246729.79
3246756.27
3246772.89
3246779.48
3246838.85
3246556.71
3246610.25
3246637.02
3246663.79
3246722.82
3246745.59
3246771.84
3246798.11
3246497.17
3246523.31
3246772.08
3246825.62
3246879.16
3246836.57
469233.51
469263.24
469312.91
469321.31
469355.49
469117.69
469177.15
469206.88
469266.34
469301.01
469325.11
469355.25
469384.82
469147.31
469177.48
469207.53
469267.67
469297.77
469327.87
469345.28
469416.24
469421.72
469183.35
469242.81
469272.54
469302.27
469367.83
469391.20
469421.31
469451.38
469183.78
469213.86
469048.93
469108.39
469167.85
469045.82
Borehole
Depth,m
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
Borehole
Elevation
17.12
16.20
15.91
15.40
14.78
19.14
17.45
17.84
17.22
16.28
16.58
16.63
16.63
19.46
19.04
18.54
17.79
17.43
16.77
16.59
16.47
17.02
19.78
18.97
18.36
18.01
17.13
16.78
16.68
16.29
19.96
19.60
18.60
17.44
16.09
18.09
Depthto
Groundwater
Groundwater
Elevation,KLD
Level(Initial)
1.60
1.10
1.70
0.60
0.60
2.85
2.35
2.30
1.95
1.70
1.60
1.80
2.80
3.00
4.00
3.90
2.70
2.80
5.90
2.50
1.50
3.50
6.00
5.15
5.00
3.60
5.80
2.60
2.80
2.50
9.65
10.00
0.80
0.70
4.50
3.25
15.52
15.10
14.21
14.80
14.18
16.29
15.10
15.54
15.27
14.58
14.98
14.83
13.83
16.46
15.04
14.64
15.09
14.63
10.87
14.09
14.97
13.52
13.78
13.82
13.36
14.41
11.33
14.18
13.88
13.79
10.31
9.60
17.80
16.74
11.59
14.84
Table # 1 (Contd.)
Co-ordinates & Elevations of Boreholes, Depth to Groundwater Level &
Groundwater Elevations
Borehole
#
BH50
BH51
BH52
BH53
BH54
BH55
BH56
BH57
BH58
BH59
BH60
BH61
BH62
BH63
BH64
BH65
BH66
BH67
BH68
BH69
BH70
BH71
BH72
BH73
BH74
BH75
BH76
BH77
BH78
BH79
BH80
Coordinates
Northing
Easting
3246890.11
3246946.26
3246847.53
3246954.60
3246858.48
3246912.02
3247020.73
3246976.51
3247030.04
3246933.92
3247040.99
3247095.21
3246998.41
3247051.95
3247009.36
3247062.90
3247116.44
3247169.69
3246841.44
3246658.92
3246674.74
3246692.56
3246783.04
3246965.55
3246987.46
3246723.41
3246739.23
3246587.05
3246901.06
3246922.97
3247105.48
469105.28
469167.64
468983.26
469102.18
468920.70
468980.16
469100.91
468977.06
469036.52
468855.04
468973.96
469034.18
468851.94
468911.40
468789.38
468848.84
468908.30
468967.45
469200.68
469147.42
469239.71
469330.98
468986.36
469039.62
468914.50
469144.32
469236.61
469210.76
469042.72
468917.60
468970.86
Borehole
Depth,m
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
30
30
30
30
30
30
30
40
40
40
40
40
40
Borehole
Elevation
16.16
15.20
17.66
15.41
17.78
16.70
14.23
15.86
14.70
17.43
15.55
13.95
17.05
16.12
17.57
16.73
15.50
13.90
16.29
17.73
18.21
17.38
18.60
15.52
16.40
18.34
17.00
19.38
16.41
17.13
14.85
Depthto
Groundwater
Level(Initial)
Groundwater
Elevation,KLD
2.20
2.90
1.50
3.10
3.00
3.30
3.50
4.85
3.45
1.50
2.50
1.50
1.80
3.00
3.00
3.60
3.20
5.00
5.50
2.40
5.70
3.60
1.00
1.50
5.40
1.50
1.70
5.10
1.00
1.60
1.20
13.96
12.30
16.16
12.31
14.78
13.40
10.73
11.01
11.25
15.93
13.05
12.45
15.25
13.12
14.57
13.13
12.30
8.90
10.79
15.33
12.51
13.78
17.60
14.02
11.00
16.84
15.30
14.28
15.41
15.53
13.65
: 968 kg-m
Downward thrust
: 9616 kg
Upward pull
: 12825 kg
Feed
Travel
56
97
12
36
32
06
ASTM D1586
ASTM D-422
ASTM D-2216
ASTM D-4318
BS-1377 Part 3
ASTM D-3080
ASTM D1557
BH-78. The clay layer is found to be silty clay and has been classified into CL group as
per ASTM D-2487. For subsoil conditions at individual borehole locations, see borehole
logs attached in Appendix Ib.
5.3 Groundwater Conditions
Groundwater was measured while drilling in progress and at the completion of drilling. In
most of the boreholes the depth to groudwater was found to range from 0.6m to about
3.5m. In some boreholes the depth to groundwater was about 5.0m below ground level
and in borehole # 44 and 45 the depth to groundwater was 9.6m and 10.0m below
ground level respectively. A complete list of grondweater depths and elevations are
givenin Table # 1.
Standpipe @ BH No
GWL(m)
GW ELE(m)
17
2.20
13.77
68
1.15
15.79
69
2.46
15.91
71
3.27
14.08
79
1.20
16.51
80
0.86
14.56
It should be noted that groundwater levels are not stationary but fluctuate due to rainfall,
tides, nearby irrigation and for other reasons not evident at the time of drilling. And may
rise following heavy or prolonged rain.
Standpipes have been installed in six locations espcially one at each of proposed major
structures. The ground water levels are being monitored and the same would be updated
in the final report to be submitted soon.
5.4 Seismicity
The state of Kuwait is located in the northeastern part of the Arabian Peninsula at the
north western end of the Arabian gulf. It is a common belief in the engineering
community in Kuwait that Kuwait lies in a stable zone that is not affected by the
regional seismicity (earthquakes). However, according to Sadek [ref-11] Kuwait is
located to the southwest of the Zagros belt, which is capable of producing strong
earthquakes of magnitude 7.5. Local seismicity in Kuwait is characterized by several
local earthquakes of magnitude upto 5 mainly in the southern part of the Minagish
oilfields.
Understandably, the seismic monitoring in the State of Kuwait began in 1997,
therefore only very limited information is available for the local seismicity of the State
of Kuwait. The largest recorded event in Kuwait State up to the recent time is of
magnitude 4.3.
Sadek [ref-11] defined the seismic hazard of the State of Kuwait in terms of Peak
Ground Acceleration (PGA) as a percentage of the gravity acceleration, g with 90%
probability of not being exceeded in 100 years. The resulting distribution of (PGA) is
shown on Figure-7. Based on the results of Sadek [ref-11] the (PGA) at the location of
the concerned sites is 0.075g.
The above results suggest that the proposed site lie within the Seismic probability of
Zone 1 according to the classification of Uniform building code (UBC) Table 16-I with
(PGA) of 0.075g.
As per IBC Table 1613.5.2 & UBC1997 Table 16-J and based on the site soil profle,
this site is classified as Site Class-C since the average corrected SPT-N is more than
50 for 30m depth.
Based on field and laboratory works carried out, the recommended soil design
parameters are given in Table # 2 for the three major area of development.
Table # 2a : Central Plant & Staff Car Park
Recommended Soil Design Parameters
S.No.
1
2
3
4 - 30
30 - 50
>50
Bulk
Density
(kN/m3)
18
20
21
Angle
of
Internal
friction (deg)
30
34
40
Modulus
Elasticity
(kN/m2)
20,000
45,000
80,000
of
Modulus
Elasticity
(kN/m2)
15,000
50,000
80,000
of
8 - 20
30 - 50
>50
Bulk
Density
(kN/m3)
18
20
21
Angle
of
Internal
friction (deg)
30
35
40
1
<3.0
6 - 20
2
3.0 10.0
30 - 50
3
10.0 40.0 >50
*For CL hard silty clay soils
Bulk
Density
(kN/m3)
18
20
21
Cohesion, Angle
Cu - kPa
Internal
friction
(deg)
30
250*
35
40
of Modulus
of
Elasticity
(kN/m2)
15,000
50,000
80,000
B + 0 .3
q a = 0.08
Kd
B
For B>1.2m
:
:
:
:
Strain influence factor for square and circular footing is given by:
For zf = 0 to B/2
I = 0.1+(zf/B)(2Ip-0.2)
For zf = B/2 to 2B
I = 0.667Ip (2 - zf/B)
Foundation
Depth(m)
NetallowableBearingPressure
(kN/m2)forwidth(m)
1
75
125
175
1
2
3
2
75
125
175
3
75
100
125
4
60
100
125
Modulusof
Subgrade
Reaction
(kN/m2/m)
7200
12000
15000
Foundation
Depth(m)
NetallowableBearingPressure
(kN/m2)forwidth(m)
1
100
150
200
1
2
3
2
100
150
200
3
100
125
200
4
75
125
175
Modulusof
Subgrade
Reaction
(kN/m2/m)
9000
15000
21000
Table -5 : Allowable Bearing Pressure Values for Footings for Area III
Foundation
Depth(m)
1
2
3
NetallowableBearingPressure
(kN/m2)forwidth(m)
1
200
250
250
2
200
250
250
3
175
225
250
4
150
200
250
Modulusof
Subgrade
Reaction
(kN/m2/m)
18000
24000
30000
Above indicated values are for maximum permissible settlement of 25mm. The
differential settlements between adjacent footings of similar size and foundation
pressure are not expected to exceed fifty to seventy five percent. The above net
allowable bearing capacity values may be increased upto 33percent when considering
load combinations that include wind or seismic components as per any internationally
recognised standards/codes.
Table 6 Allowable Bearing Pressures for Mat Foundation (Central Plant &
Staff Car Park)
Depth
bgl
(m)
~3.0
~5.0
Width (m)
>40m
>40m
Net
Allowable
Pressure, kPa
200
250
12000
15000
(m)
~3.0
~5.0
Width (m)
>40m
>40m
Net
Allowable
Pressure, kPa
200
250
12000
15000
(m)
Width (m)
>40m
>40m
Net
Allowable
Pressure, kPa
200
225
12000
13500
Foundation
Depth(m)
3
5
NetallowableBearingPressure
(kN/m2)forwidth(m)
5
250
300
10
250
300
15
250
300
20
200
250
Modulusof
Subgrade
Reaction
(kN/m2/m)
15000
18000
Large mat foundations tend to settle more at center than at edges. In order to reduce
the differential settlements the mat should be made as rigid as possible.
ACI Committee 336 (1988) suggested a method for calculating differential settlement of
mat foundations. A rigidity factor, Kr, is calculated as:
Kr =
E I b
E sB 3
ah 3
E I b = E I f + I b +
12
EIb : flexural rigidity of the superstructure and foundation per unit length at right angles
to B
EIb : flexural rigidity of the framed members at right angles to B
ah3/12 : flexural rigidity of the shear walls
a : shear wall thickness
h : shear wall height
EIf : flexibility of the foundation
Based on the value of Kr, the ratio () of the differential settlement and the total
settlement can be esitmated as follows:
If Kr > 0.5 then = 0 (considered as rigid)
If Kr = 0.5 then = 0.1
If Kr = 0 then = 0.35 for square mats and = 0.5 for long foundations B/L=0
6.4 Lateral separation of adjacent footings
Net allowable bearing pressures and settlement estimates are based on the
assumption that foundation soils underlying a footing are not significantly affected by
adjacent footings. The stress distribution beneath adjacent footings should be
analyzed so that stress under the footings is less than the bearing capacity of the soil.
6.5 Retaining Structures
The amount of pressure exerted by the backfill on retaining walls depends upon a
number of factors (e.g., the height of the walls, drainage provisions, type of backfill,
method of backfill placement). In the computation of lateral earth pressure for granular
backfill (consisting of well/poorly graded gravel/sand with little silt), a coefficient of
lateral pressure at rest Ko, of 0.5 and a bulk density of 18 kN/m3 can be used. These
values are recommended assuming that walls will be non-yielding and well-graded freedraining granular material will be used as backfill. The above design parameters apply
to a fully drained condition but since a fully drained condition cannot be relied upon,
hydrostatic pressures must also be taken into account. The backfill behind the walls
should be compacted to a density of 90 percent of maximum dry density determined in
accordance with ASTM D-1557. Moisture content should be within the range of
Optimum Moisture Content plus or minus 2 percent (i.e., OMC + 2%).
Lateral earth pressure coefficients of backfill material are calculated as follows:
Earth pressuree at rest ko = 1-sin = 1-sin (30) = 0.5
Active earth pressure ka = 1-sin /1+sin = 0.33
Passive earth pressure kp = 1+sin /1-sin = 3.0
Refer to Section 5.6 for the suggested angle of internal friction values for the native soil.
The modulus of vertical sub grade reaction required for structural design of footings can
be computed using the following equation assuming homogeneous soil stratification:
Ks = 120 qa (Footings subjected to 25 mm of settlement)
Ks = 60 qa (Mat foundations subjected to 50 mm of settlement
where Ks = modulus of vertical subgrade reaction, kN/m3; and
qa = allowable bearing capacity kN/m2 at a settlement of 25 mm for spread footings
and 50 mm for mat foundations (Ref. Foundation Analysis and Design; Bowles, J.E.).
Alternatively, Ks value can also be verified by field plate load tests at the proposed
foundation level and using the expressions as given ACI-336-2R Section 3.3.2.
Parametric studies shall be conducted, as suggested by ACI-336 (1993), by varying
modulus values from one-half the computed values to five or ten times the computed
values, and the structural design should be based on the worst conditions.
Subsurface conditions encountered during construction may vary somewhat from the
conditions disclosed by the borings performed for this study. Foundation design and
construction recommendations presented in this report are based upon material types
and densities encountered in borings drilled for this study. If significant variations should
become evident during construction, we request that we be notified in order that our
engineering staff can appraise the effect of the variations on the foundation analysis and
design criteria presented in the report.
7.3 Potential Construction Difficulties
Following are the potential foundation construction issues have to addressed during
execution of the project:
High ground water and varying levels due to presence of layers of stiff to hard
layers of silty clayey sand in random boreholes
Existing underground utilities & other structures
Dewatering the site which is in close proximity to coast line
Shoring works close to existing services and strucures
sheet-piled coffer dam installed closest to the perimeter of the edges of the foundation
so as to keep a distance as far as possible away from any of the existing structures
nearby the site of proposed tower.
The sheet-piled coffer dam should be strutted from insides to increase its rigidity against
the soil pressure and inward movements of soil from surrounding that may induce
settlement of adjacent structures.
The coffer dam should be duly designed against bearing failure of the excavation as well
as against loss of soil strength of foundation soil due to piping. To this end, penetration
of sheet pile for a depth not less than the excavation depth should be checked and
provided unless a rigorous analysis is carried out to justify a shorter penetration depth.
Drawdown effects to the adjacent facilities and structures should also be checked if
dewatering is found necessary to enable the excavation works within the coffer dam.
Should there be found necessary, a recharging well system may be employed to
maintain the ground water table beneath the adjacent structures (refer to sec 5.2,
ground water table measured is very shallow, and excavation depth is expected about
4~6m bgl, thus extensive dewatering system is anticipated).
To ensure the ground settlement and lowering of ground water that may be induced by
the excavation works even though it is properly shored up, a monitoring plan should be
set out for a regular survey over various monitoring devices including tilting checkpoints, settlement markers on existing structures and on ground, inclinometers behind
the coffer dam, lateral movement survey points at the top of the coffer dam on walings.
In addition to costs of installation, safety and lack of space are critical technical issues
for the choice of type and method of installation of the temporary supporting system.
The design of the shoring system, which is beyond the scope of this study, will depend
on the type of system used, the nature and configuration of the tie-back rods or braces
etc., and should be designed, installed, maintained and warranted by an experienced
speciality contractor.
Soil parameters given in Table-1 can be used in designing a suitable shoring system.
It is recommended that the permanent cut slopes should not be steeper than 2:1
(horizontal:vertical) in the near surface medium dense soils. Where very dense,
cemented soils encountered it may be allowed upto 1.8H:1V. However, slopes of
temporary shallow excavations may be stable with steeper slopes as the sides of
excavated test pits carried out as part of this investigation were remainined mostly near
vertical without collapse.
If excavations of cut slopes expose loose, cohesionless, significantly fractured or
otherwise unsuitable material, overexcavation and replacement of unsuitable materials
with compacted stabilisation fill/structural fill as per Section 7.7 should be accomplished.
7.5.2 Compacted fill slopes
It is recommended that the permanent fill slopes should not be steeper than 1.5:1
(horizontal:vertical) provided back filling operations are carried out as per Section 7.8.
It is recommended that all compacted fill slopes be overbuilt by minimum 0.5m and cut
back to grade, exposing the firm, compacted fill inner core. The actual amount of
overbuilding may vary as field conditions dictate.
7.6 Dewatering
Groundwater was encountered at shallow depth. Excavation extending this depth will
require extensive dewatering for construction to be carried in dry. Considering the
proposed facility, extensive dewatering problem is anticipated for construction of shallow
foundations.
7.7 Recommended Specifications for General and Structural Fill
In general, the site preparation will involve cut and fill operations. The fill operations will
consist of structural filling and non-structural (general fill) filling areas. The structural fill
is defined as fill or backfill placed beneath or immediately surrounding footings, grade
beams, or mat, or beneath slabs, buildings, roads, paved areas, and parking areas.
General fill is fill material other than structural fill.
After stripping of the top surface soil as part of the site preparation, as recommended in
section 6.0 and prior to placement of any fill, scarify the surface soil and bring it near
optimum moisture content (-1 to +3% from OMC) to compact to the specified density or
atleast 90 percent of maximum dry density (Modified Proctor).
7.7.1 General Fill
This material should consist of mixture of gravel, sand and silt. It should not contain any
undesirable materials such as organic matter, trash, chunks of high plasticity clay etc.
The maximum size shall be 75 mm.
7.7.2 Structural Fill
Structural fill shall consist only of inorganic material. With the exception of large
boulders, organic matter and undesirable materials, soils classified as well-graded
sand/gravel with silt, poorly graded sand/gravel with silt can be used as structural fill
(USCS: SW, SW-SM, SP-SM, GP-GM, GW, GW-GM).
However, all structural fill should be tested and evaluated to meet the following
specifications as a minimum or as specified in contract earthwork specifications:
The percentage of fines (passing 75micron/No.200 sieve) shall not exceed 15%,
plasticity index less than 6, liquid limit less than 25, and maximum dry density higher
than 1.95 Mg/m3.
7.7.3 Suitability of On-Site Soils for Earthworks
Based on the laboratory classifcation test results and field inspection of test pits, the
existing soils are generally free of contamination. The soil immediately below superficial
surface soil mainly consists of granular material (SM/SW-SM) with percent fines
generally less than 30%.
The moisture-density relationship was not detemined in this investigation.
Additional testing like sieve analysis and modified Proctor shall be conducted on the
stockpile material regularly to check the suitability as structural and general fill materials
as per client specification or as mentioned in Section 7.7.1 & 7.7.2.
All structural fill beneath tank base, footings, grade beams, mats and buildings should be
compacted to a dry density of at least 95 percent of the modified Proctor maximum dry
density (ASTM D 1557).
Granular (cohesionless) soil used as structural fill that does not exhibit well defined
moisture density relationship shall be compacted to a minimum of 75% relative density
as determined by ASTM D4253 and ASTM D4254.
The compaction should be accomplished by placing the fill in layers and mechanically
compacting each layer to at least the specified dry density. Thickness of each compacted
lift should be not more than 250mm when heavy compaction equipments are used.
If hand-operated compaction equipment is used fill material shall be placed in layers not
exceeding 150 mm in loose depth.
All structural fill material should be compacted at a moisture content of 2 percent of the
optimum as determined by ASTM D 1557.
7.8.2 General fill
All general fill or new fill areas which are located outside of structure, road/pavement
should be compacted to a dry density of at least 90 percent of the modified Proctor
maximum dry density (ASTM D 1557).
The compaction should be accomplished by placing the fill in layers and mechanically
compacting each layer to at least the specified dry density. Thickness of each compacted
lift should be not more than 250mm.
7.8.3 Compaction control
In-place field density tests (such as sand cone test as per ASTM D1556) and sufficient
laboratory moisture-density tests should be carried out to evaluate the compaction. In
general, it is necessary to introduce water to aid compaction efforts. Moisture
conditioning of sand with percent fines greater than 20 (usually the Gatch material)
is to be carefully controlled, as excess water will result in a soft spongy material which
will be difficult to compact.
Chemical tests conducted on the soil samples retrieved from the boreholes have
shown moderate to severe exposure conditions as per ACI-318. Maximum chloride
and sulphate contents in soil samples were found as 3268 ppm and 3160 ppm,
respectively.
Based on the present subsurface conditions, concrete for substructures shall be
designed as per ACI 318/318R (Table 4.2.1. and Table 4.3.1). Additional protective
measures such as bitumen coating of exposed areas of footings and impermeable
membrane below footings could also be considered. Concrete cover over
reinforcement shall be at least 75 mm.
For above ground structure, ordinary portland cement (Type-I) can be used as generally
adopted in Kuwait.
9.0 CONCLUSIONS
Eighty (80) boreholes were drilled to depths raging fromm 20.0m to 50.0m. Based on
the data revealed by the boreholes and the laboratory tests, the subsurface in general
consists of granular soils. A layer of loose to dense sand from ground level to an average
depth of 6.0m overlies a layer of very dense sand which extends down to the maximum
drilled depth of 50.0m below ground level. Based on the results of the laboratory tests
the soils are observed to be well graded and poorly graded and well graded sands with
varying amounts of silt, silty sands silty clayey sands and clayey sands. The soils have
been classified into SW, SP, SP-SM, SM, SC-SM and SC groups as per ASTM D-2487.
Locally very stiff to hard clay layer exits in borehole # 59, BH 64 and BH-78. The clay
layer is found to be silty clay and has been classified into CL group as per ASTM D2487.Based on SPT N-values, A layer of loose to medium dense sand from ground
level down to about 4.5m below ground level overlies a layer of dense to very dense
sand which extends down to the maximum drilled depth of 25m below ground level.
Groundwater was measured while drilling in progress and at the completion of drilling. It
was found at depth ranging from 0.6m and 9.65m bgl during the investigation(TBC).
The proposed building shall either be supported on mat foundations or isolated
footings depending upon load conditions. However, other types such pile assisted mat
foundations may be required to resist uplift loads due to high ground water levels and
loading conditions. Detailed recommendations are given in Section-6 of this report.
The potential for sulfate and chloride attack on concrete is moderate to severe.
Concrete for all substructures shall designed be as per ACI 318/318R (Table 4.2.1 and
4.3.1).
Gulf Inspection Int'l Co.,
Adrian Pinto.,
Geotechnical Engineer
FIGURE # 1
Vicinity Map
FIGURE # 2
Test Locations Sketch
BU
IL
D
IN
G
BU
IL
D
IN
G
BU
IL
D
IN
G
BU
IL
D
IN
G
A
W RE A
IT
H FI L
W LE
IC D
KE
R
BU
IL
D
IN
G
FIGURE # 3
Subsurface Cross - Section
20
BH-07
(EL:15.544)
15
10
Reduced Level
5
0
-5
-10
-15
-20
-25
-30
-35
5
5
10
14
26
29
39
43
47
54
60
71
50
50
50
50
50
50
97
50
50
50
50
(14.54)
SP-SM
SC
SM
SP
BH-08
(EL:14.812)
8
9
11
13
18
21
27
36
87
87
50
50
50
50
50
50
50
74
52
63
65
79
85
SP(13.01)
SP-SM
SP
BH-09
(EL:13.943)
12
16
25
43
39
40
42
45
65
50
50
50
40
46
50
50
84
81
82
91
50
50
50
(12.34)
SP-SM
SM
SP
CL
SP
BH-17
(EL:15.396)
BH-16
(EL:15.912)
6
11
14
23
25
28
41
71
82
90
50
50
50
50
50
64
76
90
93
96
50
50
50
50
87
90
50
50
50
50
50
50
50
50
87
89
96
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
15
13
9
6
9
13
32
65
82
50
50
86
74
67
50
50
50
50
56
41
81
50
86
SP-SM
(14.80)
SP
SP-SM
CL
SP
SP
(14.21)
SC-SM
SP-SM
SP
BH-24
(EL:16.575)
BH-18
(EL:14.778)
SC-SM
(14.18)
SP
6
12
15
24
31
32
55
67
73
90
50
50
50
50
81
70
65
71
79
90
50
50
50
SM
CL
SM
SM
SP-SM
7
8
9
9
7
6
37
48
56
69
75
67
55
55
58
74
67
73
80
87
50
94
97
50
50
89
95
50
50
50
50
50
50
(14.98)
SP-SM
SW
SW
SP
BH-09
BH-08
BH-18
BH-07
BH-17
BH-26
BH-16
BH-25
BH-35
BH-24
BH-33
BH-25
(EL:16.631)
18
31
9
10
9
10
35
59
50
51
41
33
63
50
50
50
50
56
78
81
85
86
76
(14.83)
SP
CL
SP
SM
SP
BH-26
(EL:16.628)
8
8
7
10
11
11
15
37
54
61
46
43
50
50
50
50
50
64
68
64
69
74
84
SP(13.83)
SP-SM
SC-SM
SP
BH-33
(EL:16.59)
6
9
10
11
25
30
37
59
52
61
57
61
68
87
68
61
61
69
84
90
93
50
50
50
50
50
50
50
90
87
90
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
SP
SP-SM
(14.09)
SP
SP-SM
BH-35
(EL:17.015)
7
9
10
13
11
17
34
38
41
51
64
77
50
50
50
50
50
50
50
66
77
50
50
SP(13.52)
SP-SM
SC-SM
SP
BH-34
(EL:16.468)
13
11
8
7
11
10
17
28
44
73
50
50
50
86
85
50
50
50
86
83
87
75
83
SP
BH-34
SUBSURFACE SECTION
Client: Pan Arab Consulting Engineers (PACE)
Project: Geotechnical Investigation Works for Proposed New
Jahra Hospital for 1000 Beds Capacity
Location: Jahra, Kuwait
Number: 2012 02 104
SP
(14.97)
SC-SM
SP
FIGURE # 4
Extrapolated N Values from SPT-N
Values
SPTN1(60)ValuesvsDepthTrend
0.0
20
40
60
80
100
120
140
160
180
1.0
BH-01
2.0
3.0
4.0
BH-02
BH-03
BH-04
BH-05
BH-06
5.0
6.0
7.0
BH-10
BH-11
BH-12
BH-13
BH-14
8.0
9.0
10.0
BH-15
BH-19
BH-20
BH-21
BH-22
11.0
12.0
13.0
BH-23
BH-27
BH-28
BH-29
BH-30
14.0
15.0
BH-31
BH-32
16.0
17.0
18.0
19.0
20.0
21.0
SPTN1(60)ValuesvsDepthTrend
0.0
20
40
60
80
100
120
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
Lowest
Averg
Median
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
SPTN1(60)ValuesvsDepthTrend
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20
40
60
80
100
120
140
160
180
BH-36
BH-37
BH-38
BH-39
BH-40
BH-44
BH-45
BH-69
BH-70
BH-71
BH-75
BH-76
BH-77
SPTN1(60)ValuesvsDepthTrend
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20
40
60
80
100
120
140
160
180
Lowest
Averg
Median
SPTN1(60)ValuesvsDepthTrend
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20
40
60
80
100
120
140
160
180
BH-07
BH-08
BH-09
BH-16
BH-17
BH-18
BH-24
BH-25
BH-26
BH-33
BH-34
BH-35
BH-41
BH-42
BH-43
SPTN1(60)ValuesvsDepthTrend
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20
40
60
80
100
120
Lowest
Averg
Median
SPTN1(60)ValuesvsDepthTrend
0.0
20
40
60
80
100
120
140
160
180
1.0
2.0
3.0
BH-46
4.0
BH-47
5.0
6.0
7.0
BH-49
BH-50
BH-51
8.0
BH-52
9.0
BH-53
10.0
BH-54
11.0
BH-55
12.0
BH-56
13.0
BH-57
14.0
15.0
16.0
BH-48
BH-58
BH-59
BH-60
BH-61
17.0
BH-62
18.0
BH-63
19.0
BH-64
20.0
BH-65
21.0
BH-66
22.0
BH-67
23.0
24.0
25.0
BH-72
BH-73
BH-74
BH-78
26.0
BH-79
27.0
BH-80
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
SPTN1(60)ValuesvsDepthTrend
0.0
20
40
60
80
100
120
140
160
180
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
Lowest
Averg
Median
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
FIGURE # 5
SPT-N1 (60) Values from SPT-N
Values
SPTN1(60)ValuesvsDepthTrend
0.0
20
40
60
80
100
120
140
160
180
1.0
BH-01
2.0
BH-02
BH-03
3.0
4.0
BH-04
BH-05
BH-06
5.0
BH-10
BH-11
6.0
7.0
BH-12
BH-13
BH-14
8.0
BH-15
BH-19
9.0
10.0
BH-20
BH-21
BH-22
11.0
BH-23
BH-27
12.0
13.0
BH-28
BH-29
BH-30
14.0
BH-31
BH-32
15.0
16.0
17.0
18.0
19.0
20.0
21.0
SPTN1(60)ValuesvsDepthTrend
0.0
10
20
30
40
50
60
70
80
90
100
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
Lowest
Averg
Median
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
SPTN1(60)ValuesvsDepthTrend
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20
40
60
80
100
120
140
160
180
BH-36
BH-37
BH-38
BH-39
BH-40
BH-44
BH-45
BH-69
BH-70
BH-71
BH-75
BH-76
BH-77
SPTN1(60)ValuesvsDepthTrend
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
10
20
30
40
50
60
70
80
90
100
Lowest
Averg
Median
SPTN1(60)ValuesvsDepthTrend
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20
40
60
80
100
120
140
160
180
BH-07
BH-08
BH-09
BH-16
BH-17
BH-18
BH-24
BH-25
BH-26
BH-33
BH-34
BH-35
BH-41
BH-42
BH-43
SPTN1(60)ValuesvsDepthTrend
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20
40
60
80
100
120
Lowest
Averg
Median
SPTN1(60)ValuesvsDepthTrend
0.0
50
100
150
200
250
1.0
2.0
3.0
BH-46
4.0
BH-47
5.0
6.0
7.0
BH-48
BH-49
BH-50
BH-51
8.0
BH-52
9.0
BH-53
10.0
BH-54
11.0
BH-55
12.0
BH-56
13.0
BH-57
14.0
15.0
16.0
BH-58
BH-59
BH-60
BH-61
BH-62
18.0
BH-63
19.0
BH-64
20.0
BH-65
21.0
BH-66
22.0
BH-67
17.0
23.0
24.0
25.0
BH-72
BH-73
BH-74
BH-78
26.0
BH-79
27.0
BH-80
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
SPTN1(60)ValuesvsDepthTrend
0.0
10
20
30
40
50
60
70
80
90
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
Lowest
Averg
Median
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
FIGURE # 6
Drained Modulus (E') from SPT-N
Values
Average BH EL +
EL+
17.3
16.0
15.5
15.0
14.5
14.0
13.0
12.0
11.0
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
0.9
-0.1
-1.1
-2.1
-3.1
BH-01
BH-02
BH-03
BH-04
BH-05
BH-06
BH-10
BH-11
BH-12
BH-13
BH-14
BH-15
BH-19
BH-20
BH-21
BH-22
BH-23
BH-27
BH-28
BH-29
BH-30
BH-31
BH-32
6500
5688
5688
5525
6446
12892
17496
22642
38079
56604
100858
110121
110121
139967
154375
139967
104975
110121
118354
154375
137908
110121
117325
5688
4063
5688
4604
6446
11971
12350
14408
15438
18525
29846
36021
62779
71013
110121
118354
139967
154375
137908
115267
91596
99829
110121
5688
6500
7313
10129
8288
11971
14408
18525
41167
44254
98800
154375
154375
139967
110121
116296
74100
107033
110121
117325
89538
76158
91596
4063
5688
8938
11971
14733
25783
27788
48371
86450
92625
90567
71013
86450
118354
110121
110121
118354
139967
154375
118354
92625
95713
104975
3250
4063
4875
9208
16575
27625
39108
44254
52488
54546
53517
53517
61750
68954
110121
128646
118354
110121
82333
85421
110121
118354
128646
3250
4063
7313
11971
18417
19338
24700
27788
25729
36021
36021
33963
45283
54546
84392
104975
138938
118354
154375
100858
84392
67925
64838
5688
6500
7313
9208
11971
18417
34992
38079
39108
45283
51458
77188
69983
139967
128646
110121
86450
115267
128646
110121
118354
107033
116296
4875
5688
5688
7367
8288
9208
11321
19554
28817
38079
42196
49400
45283
50429
53517
64838
87479
118354
139967
114238
91596
92625
91596
5688
5688
5688
9208
10129
11971
27788
38079
40138
37050
51458
52488
53517
46313
56604
57633
65867
110121
139967
118354
154375
106004
77188
9750
12188
13000
13813
9208
4604
15438
31904
42196
47342
54546
62779
59692
61750
58663
71013
110121
110121
110121
98800
110121
110121
110121
4875
4063
4063
9208
13813
17496
30875
36021
42196
60721
55575
57633
57633
57633
60721
63808
71013
110121
110121
36021
86450
100858
110121
8938
12188
18688
25783
27625
29467
37050
39108
44254
47342
51458
87479
146142
65867
58663
62779
69983
154375
154375
154375
154375
154375
154375
5688
6500
7313
8288
11971
13813
23671
33963
38079
48371
55575
60721
68954
52488
56604
64838
59692
63808
58663
74100
49400
54546
46313
4875
4875
7313
11050
13813
14733
34992
42196
48371
59692
58663
54546
54546
51458
67925
127617
118354
110121
139967
128646
110121
139967
139967
4063
4875
7313
11971
12892
13813
39108
40138
44254
64838
69983
54546
55575
55575
68954
118354
139967
139967
118354
118354
139967
128646
118354
5688
6500
8125
9208
11050
9208
31904
66896
110121
110121
48371
33963
46313
65867
73071
72042
86450
94683
99829
98800
107033
128646
118354
3250
4063
5688
9208
9208
14733
33963
40138
44254
48371
68954
110121
118354
128646
154375
154375
154375
154375
154375
139967
154375
154375
118354
7313
11375
17063
17496
15654
16575
19554
23671
31904
36021
39108
27788
37050
48371
79246
50429
63808
76158
67925
53517
54546
47342
53517
4875
6500
7313
10129
11971
12892
15438
22642
38079
45283
53517
82333
72042
56604
48371
37050
37050
38079
43225
50429
61750
71013
76158
10563
12188
12188
11971
12892
20258
14408
22642
39108
47342
56604
61750
71013
67925
55575
38079
42196
52488
47342
54546
61750
68954
82333
4063
6500
8125
11971
11971
8288
27788
30875
43225
45283
57633
94683
128646
128646
107033
110121
81304
73071
78217
75129
80275
99829
110121
13000
11375
12188
10129
11050
12892
28817
37050
45283
57633
61750
64838
66896
77188
94683
109092
154375
128646
110121
98800
102917
118354
128646
6500
6500
8125
11971
12892
24863
57633
56604
54546
61750
66896
154375
154375
59692
68954
74100
89538
90567
97771
98800
107033
139967
118354
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client : Pan Arab Consulting Engineers (PACE)
Lowest
SPT
3250
4063
4063
4604
6446
4604
11321
14408
15438
18525
29846
27788
37050
46313
48371
37050
37050
38079
43225
36021
49400
47342
46313
17.8
Averg
SPT
6005
6853
8478
10930
12491
15774
26982
34589
44925
52309
58841
71549
79425
78575
85689
91506
96205
107839
111150
100635
102201
103946
103812
(Varies)
Median
SPT
5688
6500
7313
10129
11971
13813
27788
36021
42196
47342
55575
61750
66896
65867
73071
104975
87479
110121
110121
100858
102917
106004
110121
20000
40000
60000
80000
100000
120000
140000
160000
180000
0.0
1.0
BH-01
2.0
BH-02
BH-03
3.0
BH-04
4.0
BH-05
BH-06
5.0
BH-10
BH-11
6.0
BH-12
7.0
BH-13
BH-14
8.0
BH-15
BH-19
9.0
DEPTH BGL (m
m)
BH-20
10.0
BH-21
BH-22
11.0
BH-23
BH-27
12.0
BH-28
13.0
BH-29
BH-30
14.0
BH-31
BH-32
15.0
16.0
17.0
18.0
19.0
20.0
21.0
20000
40000
60000
80000
100000
120000
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
Lowest
9.0
Averg
Median
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
Average BH EL +
EL+
18.0
17.5
17.0
16.5
16.0
15.5
14.5
13.5
12.5
11.5
10.5
9.5
8.5
7.5
6.5
5.5
4.5
3.5
2.5
1.5
0.4
-0.6
-1.6
-2.6
-3.6
-4.6
-5.6
-6.6
-7.6
-8.6
-9.6
-10.6
-11.6
-12.6
-13.6
-14.6
-15.6
-16.6
-17.6
-18.6
-19.6
-20.6
-21.6
-22.6
-23.6
-24.6
-25.6
-26.6
-27.6
-28.6
-29.6
-30.6
-31.6
BH-36
BH-37
BH-38
BH-39
BH-40
BH-44
BH-45
BH-69
BH-70
BH-71
BH-75
BH-76
BH-77
8125
11375
13813
13813
11971
11050
16467
17496
14408
58663
57633
55575
41167
49400
74100
53517
66896
81304
75129
55575
57633
53517
59692
7313
11375
13813
13813
17496
19338
15438
29846
52488
59692
63808
59692
71013
58663
98800
118354
73071
104975
85421
128646
110121
154375
128646
14625
18688
19500
15654
16575
20258
16467
25729
31904
40138
50429
58663
56604
66896
88508
118354
128646
139967
59692
73071
82333
102917
117325
12188
13000
13000
14733
13813
9208
29846
29846
29846
106004
84392
69983
72042
109092
128646
139967
54546
61750
66896
72042
78217
73071
83363
4875
5688
6500
11050
11050
11050
28817
29846
33963
38079
51458
107033
119383
110121
93654
113208
97771
75129
72042
78217
95713
107033
116296
10563
17063
20313
13813
10129
11050
20583
29846
59692
61750
67925
118354
62779
48371
73071
59692
65867
81304
73071
104975
110121
139967
154375
15438
21125
21125
14733
11050
11050
18525
26758
36021
41167
54546
116296
57633
51458
49400
56604
63808
82333
72042
59692
63808
54546
66896
6500
8125
11375
10129
14733
19338
36021
42196
48371
61750
67925
69983
60721
57633
57633
59692
62779
66896
74100
121442
118354
139967
118354
110121
128646
108063
127617
128646
139967
110121
118354
139967
128646
7313
8938
8938
7367
6446
6446
12350
13379
34992
62779
118354
154375
59692
36021
40138
59692
55575
61750
42196
37050
31904
49400
57633
74100
67925
67925
71013
118354
154375
154375
118354
139967
128646
10563
12188
12188
15654
16575
16575
37050
47342
58663
61750
66896
75129
86450
102917
121442
110121
101888
102917
154375
92625
111150
129675
110121
142025
132763
118354
110121
128646
154375
156433
118354
139967
154375
5688
6500
10563
13813
17496
22100
36021
40138
46313
50429
50429
50429
45283
54546
55575
63808
76158
110121
154375
128646
91596
77188
136879
128646
110121
110121
139967
154375
128646
154375
128646
154375
110121
118354
139967
139967
108063
110121
110121
139967
118354
110121
128646
154375
118354
110121
154375
154375
154375
110121
128646
118354
139967
4875
7313
8938
11971
11971
10129
10292
16467
34992
45283
61750
71013
110121
154375
154375
154375
154375
154375
110121
118354
139967
154375
139967
128646
110121
118354
154375
139967
110121
128646
110121
118354
110121
139967
154375
110121
118354
154375
154375
110121
118354
139967
110121
128646
139967
118354
110121
128646
139967
154375
154375
154375
110121
8938
13000
17875
12892
12892
11050
14408
15438
26758
31904
39108
39108
60721
67925
77188
76158
80275
100858
94683
118354
110121
118354
139967
118354
110121
128646
154375
128646
154375
154375
110121
118354
139967
154375
118354
106004
117325
155404
110121
128646
110121
118354
139967
110121
128646
110121
154375
154375
154375
128646
110121
110121
128646
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client : Pan Arab Consulting Engineers (PACE)
Lowest
SPT
4875
5688
6500
7367
6446
6446
10292
13379
14408
31904
39108
39108
41167
36021
40138
53517
54546
61750
42196
37050
31904
49400
57633
74100
67925
67925
71013
118354
110121
110121
110121
118354
110121
118354
118354
106004
108063
110121
110121
110121
110121
110121
110121
110121
118354
110121
110121
128646
139967
110121
110121
110121
110121
18.5
Averg
SPT
9000
11875
13688
13033
13246
13742
22483
28025
39108
55338
64204
80433
69508
74417
85579
91042
83204
94129
87242
91438
92388
104183
109963
116982
109949
108577
126244
133106
140310
143054
117325
135164
128646
137565
137565
118697
114581
139967
124872
126244
115610
122814
126244
131047
128989
112865
139624
145799
149572
131047
131047
127617
126244
(Varies)
Median
SPT
8125
11375
13000
13813
12892
11050
18525
29846
34992
58663
61750
69983
60721
58663
77188
76158
73071
82333
74100
92625
95713
107033
117325
123500
110121
114238
133792
128646
147171
154375
118354
139967
128646
139967
139967
110121
117325
154375
110121
128646
118354
118354
128646
128646
128646
110121
154375
154375
154375
128646
128646
118354
128646
DEPTH BGL (m
m)
0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25 0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20000
40000
60000
80000
100000
120000
140000
160000
180000
BH-36
BH-37
BH-38
BH-39
BH-40
BH-44
BH-45
BH-69
BH-70
BH-71
BH-75
BH-76
BH-77
0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20000
40000
60000
80000
100000
120000
140000
160000
180000
Lowest
Averg
Median
Average BH EL +
EL+
15.5
15.0
14.5
14.0
13.5
13.0
12.0
11.0
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0
-1.0
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
-11.0
-12.0
-13.0
-14.0
-15.0
-16.0
-17.0
-18.0
-19.0
-20.0
-21.0
-22.0
-23.0
-24.0
-25.0
-26.0
-27.0
-28.0
-29.0
-30.0
-31.0
-32.0
-33.0
-34.0
BH-07
BH-08
BH-09
BH-16
BH-17
BH-18
BH-24
BH-25
BH-26
BH-33
BH-34
BH-35
BH-41
BH-42
BH-43
4063
4063
8125
12892
23942
26704
40138
44254
48371
55575
61750
73071
154375
154375
139967
128646
128646
154375
103946
118354
128646
118354
128646
6500
7313
8938
11971
16575
19338
27788
37050
97771
97771
110121
154375
154375
110121
154375
154375
110121
76158
53517
64838
66896
81304
91596
9750
13000
20313
39596
35913
36833
43225
46313
66896
110121
128646
154375
41167
47342
128646
110121
104975
91596
102917
127617
110121
139967
118354
12188
10563
7313
5525
8288
11971
32933
66896
102917
110121
118354
107033
76158
68954
154375
154375
154375
118354
57633
44254
83363
118354
107033
4875
8938
11375
21179
23021
25783
42196
73071
84392
96742
110121
139967
154375
110121
118354
65867
78217
111150
129675
154375
110121
128646
154375
110121
108063
126588
110121
128646
110121
128646
110121
110121
118354
110121
102917
104975
144083
118354
154375
154375
118354
110121
154375
128646
110121
139967
139967
118354
154375
118354
110121
128646
118354
4875
9750
12188
22100
28546
29467
56604
68954
75129
111150
110121
110121
154375
128646
83363
72042
66896
73071
81304
111150
110121
118354
154375
5688
6500
7313
8288
6446
5525
38079
49400
57633
71013
77188
68954
56604
56604
59692
76158
68954
75129
82333
89538
110121
100858
108063
118354
128646
104975
123500
128646
139967
118354
110121
118354
128646
14625
25188
7313
9208
8288
9208
36021
60721
51458
52488
42196
33963
64838
154375
154375
110121
118354
57633
88508
83363
106004
107033
78217
6500
6500
5688
9208
10129
10129
15438
38079
55575
62779
47342
44254
139967
154375
154375
110121
128646
65867
69983
65867
71013
76158
94683
4875
7313
8125
10129
23021
27625
38079
60721
53517
62779
58663
62779
69983
102917
69983
62779
62779
71013
86450
104975
129675
110121
118354
128646
139967
118354
154375
110121
111150
102917
126588
110121
128646
110121
118354
128646
154375
110121
118354
110121
118354
139967
154375
110121
128646
139967
118354
110121
139967
154375
110121
128646
118354
10563
8938
6500
6446
10129
9208
17496
28817
45283
75129
118354
139967
154375
133792
106004
118354
154375
154375
133792
111150
148200
77188
111150
5688
7313
8125
11971
10129
15654
34992
39108
42196
52488
65867
79246
118354
154375
139967
110121
154375
128646
110121
67925
79246
118354
139967
5688
8125
11375
11050
11971
11050
34992
39108
43225
48371
53517
57633
68954
139967
128646
118354
118354
110121
104975
107033
113208
118354
118354
8938
12188
11375
8288
9208
17496
26758
30875
32933
36021
36021
39108
108063
116296
154375
110121
45283
34992
33963
42196
55575
66896
85421
8938
4875
6500
4604
6446
5525
9263
46313
48371
53517
62779
122471
139967
110121
128646
154375
139967
118354
128646
110121
139967
154375
154375
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client : Pan Arab Consulting Engineers (PACE)
Lowest
SPT
4063
4063
5688
4604
6446
5525
9263
28817
32933
36021
36021
33963
41167
47342
59692
62779
45283
34992
33963
42196
55575
66896
78217
110121
108063
104975
110121
110121
110121
102917
110121
110121
118354
110121
102917
104975
144083
110121
118354
110121
118354
110121
154375
110121
110121
139967
118354
110121
139967
118354
110121
128646
118354
Location :
16.0 (Varies)
Averg
SPT
7583
9371
9371
12830
15470
17434
32933
48645
60378
73071
80069
92488
110395
116159
125009
110395
108954
96056
91184
93517
104152
108954
117531
119040
125558
116639
129332
122471
120413
116639
115610
112865
125215
110121
110635
116810
149229
114238
136365
132248
118354
125044
154375
119383
119383
139967
129160
114238
147171
136365
110121
128646
118354
Jahra, Kuwait
Median
SPT
6500
8125
8125
10129
10129
15654
34992
46313
53517
62779
65867
79246
118354
116296
128646
110121
118354
91596
88508
104975
110121
118354
118354
118354
128646
118354
123500
128646
111150
118354
110121
110121
128646
110121
110635
116810
149229
114238
136365
132248
118354
125044
154375
119383
119383
139967
129160
114238
147171
136365
110121
128646
118354
DEPTH BGL (m
m)
0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25 0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20000
40000
60000
80000
100000
120000
140000
160000
180000
BH-07
BH-08
BH-09
BH-16
BH-17
BH-18
BH-24
BH-25
BH-26
BH-33
BH-34
BH-35
BH-41
BH-42
BH-43
0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
20000
40000
60000
80000
100000
120000
140000
160000
180000
Lowest
Averg
Median
Average BH EL +
EL+
15.8
15.3
14.8
14.3
13.8
13.3
12.3
11.3
10.3
9.3
8.3
7.3
6.3
5.3
4.3
3.3
2.3
1.3
0.3
-0.7
-1.7
-2.7
-3.7
-4.7
-5.7
-6.7
-7.7
-8.7
-9.7
-10.7
-11.7
-12.7
-13.7
-14.7
-15.7
-16.7
-17.7
-18.7
-19.7
-20.7
-21.7
-22.7
-23.7
BH-46
BH-47
BH-48
BH-49
BH-50
BH-51
BH-52
BH-53
BH-54
BH-55
BH-56
4875
8125
10563
14733
17496
20258
33963
51458
55575
46313
55575
59692
64838
71013
107033
92625
129675
128646
110121
139967
96742
110121
118354
4875
5688
8125
11050
13813
19338
28817
34992
56604
64838
86450
92625
74100
83363
80275
86450
89538
91596
139967
118354
93654
99829
107033
4875
8125
12188
19338
21179
23942
27788
27788
41167
49400
55575
74100
90567
45283
64838
110121
118354
62779
107033
116296
101888
80275
86450
10563
18688
22750
24863
24863
23021
65867
45283
34992
33963
102917
135850
115267
108063
109092
77188
102917
78217
87479
92625
110121
99829
107033
4875
7313
8938
20258
25783
29467
37050
61750
56604
61750
89538
63808
59692
64838
135850
104975
110121
118354
110121
128646
108063
95713
84392
6500
8125
9750
20258
27625
40517
43225
58663
50429
67925
87479
57633
61750
68954
88508
95713
104975
110121
139967
118354
78217
127617
139967
17063
22750
26000
34071
58013
105896
96742
87479
92625
88508
64838
79246
102917
104975
152317
114238
100858
98800
80275
84392
100858
110121
108063
8938
11375
21938
98529
63538
49725
47342
48371
54546
61750
60721
54546
61750
59692
61750
76158
84392
111150
118354
139967
102917
110121
118354
9750
13813
17875
32229
35913
40517
68954
154375
51458
38079
37050
57633
53517
85421
119383
68954
110121
118354
110121
92625
131733
110121
128646
8125
9750
21125
25783
25783
23942
36021
41167
44254
40138
47342
48371
54546
55575
85421
84392
76158
118354
139967
61750
67925
56604
55575
6500
8125
9750
20258
27625
40517
43225
58663
50429
57633
74100
57633
61750
68954
65867
104975
122471
151288
118354
139967
154375
118354
110121
BH-57
BH-58
BH-59
BH-60
8938
5688
5688
9750
13000 6500 12188 17875
15438 10563 15438 23563
20258 14733 25783 29467
29467 20258 29467 25783
38675 21179 36833 9208
31904 27788 47342 47342
29846 30875 84392 69983
38079 40138 45283 82333
41167 47342 66896 88508
47342 52488 110121 96742
58663 57633 118354 103946
65867 66896 128646 102917
57633 68954 154375 66896
48371 77188 110121 63808
45283 76158 112179 67925
51458 76158 117325 107033
58663 82333 89538 120413
71013 83363 116296 128646
84392 89538 91596 110121
86450 110121 104975 118354
57633 99829 110121 110121
49400 107033 139967 107033
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client : Pan Arab Consulting Engineers (PACE)
BH-61
BH-62
BH-63
BH-64
BH-65
BH-66
BH-67
BH-72
BH-73
BH-74
BH-78
BH-79
BH-80
4875
7313
8125
20258
27625
37754
47342
58663
76158
103946
154375
67925
118354
118354
82333
61750
63808
80275
116296
154375
154375
118354
154375
3250
3250
3250
6446
7367
13813
22642
47342
85421
92625
78217
84392
73071
83363
118354
111150
118354
110121
139967
110121
154375
118354
139967
9750
8938
13813
23021
20258
23942
31904
36021
37050
45283
47342
56604
69983
66896
62779
72042
116296
103946
118354
89538
53517
63808
64838
4875
8125
10563
12892
12892
18417
22642
34992
110121
67925
90567
61750
103946
68954
67925
115267
92625
118354
111150
92625
115267
118354
122471
6500
7313
8938
14733
17496
21179
34992
45283
51458
49400
54546
58663
65867
68954
90567
83363
76158
154375
118354
61750
69983
56604
51458
5688
7313
4875
8288
14733
14733
99829
92625
94683
88508
85421
88508
80275
90567
92625
91596
79246
99829
102917
83363
75129
60721
52488
5688
6500
21938
27625
37754
44200
51458
63808
154375
130704
65867
54546
49400
154375
103946
83363
65867
100858
120413
111150
118354
110121
154375
4063
7313
9750
20258
19338
17496
22642
38079
41167
45283
63808
71013
62779
68954
110121
76158
63808
85421
90567
154375
110121
139967
110121
139967
154375
110121
111150
110121
154375
139967
154375
100858
110121
7313
8125
12188
16575
18417
20258
20583
29846
25729
28817
44254
73071
80275
86450
110121
62779
73071
81304
88508
90567
110121
128646
139967
110121
154375
89538
102917
110121
128646
118354
139967
118354
110121
11375
17875
30875
45121
51567
58013
88508
51458
40138
42196
45283
49400
48371
44254
47342
49400
72042
102917
115267
77188
72042
69983
55575
53517
48371
43225
43225
46313
49400
52488
55575
56604
61750
7313
31688
5688
11971
11050
12892
17496
21613
29846
40138
55575
80275
108063
86450
60721
69983
74100
81304
67925
101888
132763
104975
110121
126588
116296
83363
111150
117325
110121
128646
154375
91596
154375
139967
154375
110121
128646
110121
154375
110121
128646
154375
118354
7313
11375
15438
14733
22100
16575
22642
25729
29846
26758
36021
69983
79246
73071
79246
65867
58663
72042
72042
72042
81304
95713
113208
89538
69983
112179
124529
139967
154375
128646
110121
154375
118354
104975
139967
110121
154375
128646
118354
73071
117325
78217
79246
6500
8938
13000
16575
15654
16575
25729
31904
37050
42196
36021
44254
47342
57633
64838
65867
78217
84392
97771
90567
110121
118354
110121
128646
110121
78217
85421
110121
128646
154375
139967
110121
110121
128646
118354
110121
154375
110121
154375
139967
110121
128646
110121
Location :
Lowest
SPT
3250
3250
3250
6446
7367
9208
17496
21613
25729
26758
36021
44254
47342
44254
47342
45283
51458
58663
67925
61750
53517
56604
49400
53517
48371
43225
43225
46313
49400
52488
55575
56604
61750
104975
118354
110121
128646
110121
118354
73071
110121
78217
79246
16.3 (Varies)
Averg
SPT
7196
10911
14016
23218
25816
29960
42563
52230
57413
59214
68770
70718
76857
79724
87883
83068
90493
100491
107879
103505
104424
100013
105232
108063
108920
86107
96399
105661
120927
120413
125730
105318
110807
124529
137565
110121
145799
116296
142368
107719
118697
120413
102574
Jahra, Kuwait
Median
SPT
6500
8125
12188
20258
23481
23481
35506
46313
50429
49400
62265
62779
68440
68954
83877
80275
86965
100344
110635
92625
106519
110121
110121
118354
113208
86450
107033
110121
128646
128646
139967
105490
110121
128646
139967
110121
154375
110121
154375
110121
117325
128646
110121
20000
40000
60000
80000
100000
120000
140000
160000
180000
0.0
1.0
2.0
3.0
4.0
BH-46
BH-47
BH-48
5.0
BH-49
6.0
BH-50
7.0
BH-51
8.0
BH-52
9.0
BH-53
10.0
BH-54
11.0
BH-55
12.0
BH-56
13.0
BH-57
BH-58
14.0
BH-59
15.0
DEPTH BGL (m
m)
16.0
BH-60
BH-61
17.0
BH-62
18.0
BH-63
19.0
BH-64
20.0
BH-65
21.0
BH-66
22.0
23.0
BH-67
BH-72
BH-73
24.0
25.0
BH-74
BH-78
26.0
BH-79
27.0
BH-80
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
20000
40000
60000
80000
100000
120000
140000
160000
180000
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
DEPTH BGL (m
m)
18.0
Lowest
Averg
19.0
M di
Median
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
FIGURE # 7
Shear Modulus (Gmax) from SPT-N
Values
Summary of Estimated (G) Shear Modulus in MPa from SPT-N (N1-60) Values
Dep,m
0.5
1.0
1.5
2.0
2.5
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
EL+
16.5
16.0
15.5
15.0
14.5
14.0
13.0
12.0
11.0
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
0.9
-0.1
-1.1
-2.1
-3.1
-4.1
-5.1
-6.1
-7.1
-8.1
-9.1
-10.1
-11.1
-12.1
-13.1
-14.1
-15.1
-16.1
-17.1
-18.1
-19.1
-20.1
-21.1
-22.1
-23.1
-24.1
-25.1
-26.1
-27.1
-28.1
-29.1
-30.1
-31.1
-32.1
-33.1
BH-01
21
27
22
25
28
40
49
61
80
99
126
136
142
160
171
171
160
167
176
197
194
184
191
BH-02 BH-03
20
24
22
23
28
39
44
51
56
63
81
94
119
128
153
162
176
187
185
178
169
178
187
20
28
24
31
31
39
46
55
81
89
125
153
153
160
153
161
144
165
171
179
168
166
178
BH-04
18
27
27
33
38
51
59
78
107
116
121
117
131
151
153
158
166
181
192
180
170
175
184
BH-05
12
17
21
29
40
52
67
77
90
98
103
109
118
127
153
166
166
167
157
162
180
188
197
BH-06
17
24
24
33
41
47
57
65
69
84
89
92
104
119
139
155
176
171
192
170
166
161
162
BH-07
18
17
25
34
46
51
68
77
85
98
107
118
159
165
166
166
171
187
168
180
189
188
197
BH-08
21
29
27
33
40
47
59
73
111
118
130
153
159
147
171
177
162
149
140
151
156
168
178
BH-09
25
36
36
51
54
58
69
77
98
123
137
153
102
110
161
158
160
157
167
185
180
199
192
BH-10
20
28
34
29
36
44
65
74
80
89
98
121
122
160
161
158
150
170
181
176
184
182
191
BH-11
19
27
22
27
31
34
43
56
71
85
93
102
104
112
123
134
150
171
186
178
169
174
178
BH-12
20
27
32
29
34
39
59
74
81
85
98
108
114
110
125
130
139
167
186
180
201
181
170
BH-13
25
35
30
35
32
27
47
70
82
90
104
113
117
123
126
138
162
167
171
169
180
184
187
BH-14 BH-15 BH-16 BH-17 BH-18 BH-19 BH-20 BH-21 BH-22 BH-23 BH-24 BH-25
19
24
20
29
38
43
60
73
82
101
104
111
116
121
128
134
142
167
171
123
167
178
187
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client : Pan Arab Consulting Engineers (PACE)
24
25
35
43
48
55
66
74
83
90
102
126
156
125
126
133
142
187
192
197
201
206
210
26
33
24
25
31
39
64
91
113
123
133
135
125
127
171
177
182
171
143
131
165
188
186
14
23
29
41
46
51
68
94
106
118
130
148
159
147
156
135
146
167
181
197
180
193
210
191
193
208
202
216
209
223
216
219
227
226
225
229
254
243
266
269
252
250
277
266
258
277
280
271
293
277
274
288
284
14
24
30
41
50
55
78
92
102
123
130
136
159
155
139
138
140
148
156
176
180
188
210
20
28
34
40
36
41
56
72
80
91
104
112
121
118
125
134
136
142
143
157
138
151
142
19
26
34
32
38
41
65
76
85
100
106
109
114
118
131
166
166
167
186
185
180
199
203
18
26
34
33
37
41
67
75
83
103
111
109
115
120
132
162
176
181
176
180
195
193
192
20
28
35
29
35
34
64
91
116
123
96
92
105
125
134
138
150
159
166
169
178
193
192
17
24
22
29
32
41
65
75
83
91
111
136
145
155
171
177
182
187
192
190
201
206
192
20
28
24
28
28
29
67
79
93
106
115
116
116
121
127
140
141
149
157
164
180
178
186
196
205
195
210
216
226
216
216
223
232
28
45
24
29
31
34
66
88
86
97
93
92
120
165
171
158
166
139
159
161
177
182
171
DEPTH BGL (m
m)
50
100
150
200
250
300
350
BH-01
BH-02
BH-03
BH-04
BH-05
BH-06
BH-07
BH-08
BH-09
BH-10
BH-11
BH-12
BH-13
BH-14
BH-15
BH-16
BH-17
BH-18
BH-19
BH-20
BH-21
BH-22
BH-23
BH-24
BH-25
DEPTH BGL (m
m)
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
50
100
150
200
250
300
350
Averg
Median
Lowest
Summary of Estimated (G) Shear Modulus in MPa from SPT-N (N1-60) Values
Dep,m
0.5
1.0
1.5
2.0
2.5
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
EL+
17.2
16.7
16.2
15.7
15.2
14.7
13.7
12.7
11.7
10.7
9.7
8.7
7.7
6.7
5.7
4.7
3.7
2.7
1.7
0.7
-0.3
-1.3
-2.3
-3.3
-4.3
-5.3
-6.3
-7.3
-8.3
-9.3
-10.3
-11.3
-12.3
-13.3
-14.3
-15.3
-16.3
-17.3
-18.3
-19.3
-20.3
-21.3
-22.3
-23.3
-24.3
-25.3
-26.3
-27.3
-28.3
-29.3
-30.3
-31.3
-32.3
BH-26
21
28
32
41
34
37
47
74
92
102
96
99
154
165
171
158
171
144
150
152
159
166
179
BH-27
22
34
46
52
55
43
51
62
76
84
91
83
99
111
137
121
138
149
149
143
148
140
154
BH-28
19
28
34
44
51
56
47
61
80
89
103
123
123
121
115
111
114
119
126
135
153
163
169
BH-29
25
35
41
46
52
65
46
61
80
90
105
113
122
126
125
112
119
135
130
144
153
161
173
BH-30
18
28
35
46
36
33
59
67
83
89
105
129
150
155
151
158
147
148
155
157
164
178
187
BH-31
27
34
41
44
35
40
59
73
83
99
107
114
121
131
145
157
182
176
171
169
176
188
197
BH-32
21
28
35
46
52
69
101
111
91
101
110
153
159
122
132
139
151
156
165
169
178
199
192
BH-33
19
29
35
44
46
52
67
88
91
102
106
113
122
144
132
133
138
147
158
173
190
184
192
201
211
203
226
205
209
209
225
219
232
226
233
241
260
238
246
244
252
266
277
256
269
277
269
266
286
296
274
288
284
BH-34
25
32
23
26
34
34
49
65
83
108
133
148
159
158
151
162
182
187
183
176
199
166
188
BH-35
20
29
35
46
48
59
65
74
82
97
109
122
145
165
166
158
182
176
171
153
163
188
203
BH-36
23
34
43
48
51
53
68
76
55
100
105
110
102
112
134
128
140
152
153
145
150
151
159
BH-37
22
34
43
48
57
65
66
66
90
100
108
112
122
122
147
162
143
164
158
185
180
206
197
BH-38
28
40
48
50
56
65
68
63
76
87
97
111
116
126
142
162
171
181
144
156
165
179
191
BH-39
26
36
42
49
53
49
60
66
71
122
119
117
123
147
161
171
133
141
148
155
163
164
173
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client : Pan Arab Consulting Engineers (PACE)
BH-40 BH-41 BH-42 BH-43 BH-44 BH-45 BH-46 BH-47 BH-48 BH-49 BH-50
19
27
33
45
49
53
82
91
77
85
98
135
146
147
145
159
156
149
151
159
171
182
191
20
30
40
45
36
38
65
74
83
91
103
111
121
160
161
162
166
167
169
174
181
188
192
24
35
40
40
32
43
58
67
77
84
89
96
141
150
171
158
121
116
118
129
149
160
174
24
26
33
33
28
29
38
77
85
97
107
141
154
147
161
177
176
171
181
176
195
206
210
25
39
49
48
48
53
73
91
122
131
143
177
119
111
134
131
139
152
152
173
180
199
210
28
42
49
49
49
139
70
88
106
118
135
176
116
118
116
130
138
152
151
148
154
151
164
14
21
28
35
40
48
65
80
92
90
104
112
120
128
151
149
172
176
171
190
172
184
192
14
19
25
32
38
47
59
72
92
103
120
128
124
134
137
145
151
157
186
180
170
178
186
19
30
41
54
61
69
81
65
81
91
104
119
133
109
130
158
166
142
170
179
175
168
175
25
39
50
58
64
49
83
77
78
83
127
146
144
147
152
140
159
150
159
166
180
178
186
19
29
37
40
47
55
66
88
92
101
121
114
117
125
164
155
162
171
171
185
178
175
174
DEPTH BGL (m
m)
50
100
150
200
250
300
350
BH-26
BH-27
BH-28
BH-29
BH-30
BH-31
BH-32
BH-33
BH-34
BH-35
BH-36
BH-37
BH-38
BH-39
BH-40
BH-41
BH-42
BH-43
BH-44
BH-45
BH-46
BH-47
BH-48
BH-49
BH-50
DEPTH BGL (m
m)
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
50
100
150
200
250
300
350
Averg
Median
Lowest
Summary of Estimated (G) Shear Modulus in MPa from SPT-N (N1-60) Values
Dep,m
0.5
1.0
1.5
2.0
2.5
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
EL+
16.0
15.5
15.0
14.5
14.0
13.5
12.5
11.5
10.5
9.5
8.5
7.5
6.5
5.5
4.5
3.5
2.5
1.5
0.5
-0.5
-1.5
-2.5
-3.5
-4.5
-5.5
-6.5
-7.5
-8.5
-9.5
-10.5
-11.5
-12.5
-13.5
-14.5
-15.5
-16.5
-17.5
-18.5
-19.5
-20.5
-21.5
-22.5
-23.5
-24.5
-25.5
-26.5
-27.5
-28.5
-29.5
-30.5
-31.5
-32.5
-33.5
BH-51
BH-52
BH-53
BH-54
BH-55
21
30
38
55
66
60
69
87
86
104
120
111
118
127
142
150
160
167
186
180
163
193
203
30
43
40
48
66
87
94
99
109
114
108
122
139
145
171
160
158
161
156
162
174
184
186
24
34
50
91
86
67
71
78
91
101
107
109
118
122
128
140
148
167
176
190
176
184
192
25
36
47
64
73
60
84
121
90
85
90
111
114
135
157
137
162
171
171
166
191
184
197
23
33
49
59
65
50
66
75
83
87
96
102
114
120
140
144
145
171
186
149
157
153
155
BH-56
21
30
38
55
66
81
69
87
86
99
113
111
118
127
130
155
168
186
176
190
209
188
187
BH-57
BH-58
BH-59
BH-60
BH-61
BH-62
BH-63
BH-54
BH-65
BH-66
BH-67
BH-68
BH-69
BH-70
BH-71
BH-72
BH-73
BH-74
BH-75
BH-76
BH-77
BH-78
BH-79
BH-80
24
36
44
55
69
80
86
66
80
87
96
111
120
121
115
117
131
139
151
162
167
154
144
20
28
39
49
61
66
59
67
81
90
103
111
121
127
135
140
145
152
157
164
180
178
186
20
35
32
43
51
58
71
98
83
104
130
139
150
165
153
159
166
156
175
165
177
184
203
25
40
51
62
47
34
71
92
105
114
124
133
139
126
129
131
156
167
176
171
180
180
182
19
29
25
40
48
59
71
87
102
121
146
115
145
151
138
133
138
151
175
197
201
188
210
17
22
18
26
30
41
56
78
106
116
116
124
123
134
156
158
166
167
186
176
201
188
203
25
32
43
57
61
50
64
73
79
89
96
110
122
126
129
138
165
164
176
164
147
158
162
19
30
39
47
52
44
56
72
116
104
121
113
139
127
131
160
153
171
172
166
182
188
194
21
29
37
49
57
66
65
77
86
91
104
111
120
127
143
143
145
187
176
149
158
153
152
20
29
30
40
54
41
95
101
110
114
119
126
128
138
144
148
146
161
167
161
161
156
153
20
28
49
59
72
81
96
89
130
130
109
109
107
165
150
143
139
162
177
176
184
184
218
18
34
47
54
61
66
84
101
92
114
121
122
130
133
136
140
171
187
192
197
178
183
192
201
199
209
207
222
209
216
226
244
247
21
30
40
31
38
47
66
76
85
101
110
117
118
121
126
131
138
144
152
181
184
199
192
191
205
197
212
216
226
212
220
236
232
22
32
37
39
41
44
62
70
78
102
133
153
117
102
109
131
133
141
125
124
122
141
157
172
171
175
180
210
233
237
220
236
232
25
35
41
50
56
60
66
78
93
101
110
120
131
144
158
158
158
163
192
166
180
194
187
208
207
203
202
216
233
238
220
236
247
18
20
28
40
44
43
56
74
81
89
108
117
119
127
153
140
138
153
160
197
180
199
187
207
218
198
202
205
233
229
240
215
223
22
30
30
36
41
48
51
66
69
76
94
118
128
136
153
133
143
152
159
165
180
193
203
191
218
188
198
205
219
216
233
223
223
26
40
56
70
80
90
116
80
81
88
95
102
106
108
114
120
143
163
174
158
159
162
155
157
150
147
150
156
162
174
180
183
191
20
28
28
35
40
49
66
75
84
92
97
103
104
119
125
134
145
167
192
185
169
166
202
201
195
198
219
230
219
237
226
244
223
230
245
248
234
238
241
260
252
250
263
280
263
261
288
291
293
271
285
282
297
19
29
27
33
36
37
40
53
78
89
107
117
142
165
171
177
182
187
171
180
195
206
203
201
195
203
226
222
209
223
216
223
223
242
254
232
240
263
266
244
252
266
253
266
275
266
264
277
286
296
299
301
279
24
36
47
47
52
53
65
52
69
81
91
96
118
126
135
140
147
162
163
180
180
188
203
196
195
209
226
216
233
237
216
223
239
250
233
230
239
263
241
254
247
255
269
256
269
261
288
291
293
283
274
276
290
22
36
22
33
35
40
49
60
71
87
104
122
141
136
128
137
144
152
149
171
191
181
187
200
198
184
202
209
209
223
240
209
247
242
254
232
245
238
266
244
257
274
258
22
34
32
35
45
43
56
63
71
74
89
117
127
129
137
135
135
147
151
155
164
175
189
180
173
199
210
222
233
223
216
244
227
223
245
232
260
248
246
219
251
228
231
21
23
30
36
39
43
58
70
79
88
89
99
106
121
130
135
146
153
165
165
180
188
187
201
195
181
189
205
219
237
233
219
223
235
233
232
260
238
266
260
247
260
253
Project : SGeotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client : Pan Arab Consulting Engineers (PACE)
50
100
150
200
250
300
350
BH-51
BH-52
BH-53
BH-54
BH-55
BH-56
BH-57
BH-58
BH-59
BH-60
BH-61
BH-62
BH-63
BH-54
BH-65
BH-66
BH-67
BH-68
BH-69
BH-70
BH
70
BH-71
BH-72
BH-73
BH-74
BH-75
BH-76
BH-77
BH-78
BH-79
BH-80
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25 0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
50
100
150
200
250
300
350
Averg
Median
Lowest
FIGURE # 8
Fines Content (silt+clay) Profile
(passing 75mic sieve)
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-01
BH-02
BH-03
BH-04
BH-05
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-06
BH-07
BH-08
BH-09
BH-10
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-11
BH-12
BH-13
BH-14
BH-15
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-16
BH-17
BH-18
BH-19
BH-20
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-21
BH-22
BH-23
BH-24
BH-25
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-26
BH-27
BH-28
BH-29
BH-30
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-31
BH-32
BH-33
BH-34
BH-35
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-36
BH-37
BH-38
BH-39
BH-40
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-41
BH-42
BH-43
BH-44
BH-45
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-46
BH-47
BH-48
BH-49
BH-50
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-51
BH-52
BH-53
BH-54
BH-56
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-57
BH-58
BH-59
BH-60
BH-61
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-62
BH-63
BH-64
BH-65
BH-66
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-67
BH-68
BH-69
BH-70
BH-71
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-72
BH-73
BH-74
BH-75
BH-76
Gulf Inspection International Co
Area 6, Plot 57, Street 61, Sabhan
P.O. Box 24993
Telephone: 965-24733048-24748859
Fax: 965-24733045
18
16
14
12
10
8
6
4
2
0
Elevation (m)
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
0
10
20
30
40
Percent Fines passing #200
50
60
BOREHOLE IDENTIFICATION
BH-77
BH-78
BH-79
BH-80
FIGURE # 9
Seismic Hazard Map of Kuwait
APPENDIX # I
Field Work Reports
APPENDIX # I
Field Test Reports
CH:
CL:
GC:
GC-GM:
GP:
GP-GM:
GW-GM:
SYMBOLS
High Plasticity Clay
Low Plasticity Clay
Clayey Gravel
Silty, Clayey Gravel
Poorly graded Gravel
Poorly graded Gravel with silt
Well-graded gravel with silt
SC:
SC-SM:
SM:
SP:
SP-SM;
SW:
SW-SM:
Clayey Sand
Silty, Clayey Sand
Silty Sand
Poorly graded sand
Poorly graded sand with silt
Well graded sand
Well-graded sand with silt
(ASTM D 2488)
qu, kPa
<25
25 - 50
50 -100
100 - 200
200 - 400
>400
fine
SILT
5
SIEVE DESIGNATION
60mm
0.06
medium
SAND
coarse
GRAVEL
COBBLES
75
425 m
2.00
4.75
76.2mm
NO. 200
NO. 40
NO. 10
NO. 4
3 inch
U.S.A. ASTM D422
APPENDIX # I
Field Test Reports
b) Borehole Logs
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-01
Completed
11/11/2012
East
469052.026
Depth
20.4 m
Page No.
1 of 2
Date
Started
11/11/2012
Coord North
inates 3246707.595
Elevation
18.865 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/4
1.0
1.00-1.45
SPT-2
2/3/4
1.5
1.50-1.95
SPT-3
3/3/4
2.00-2.45
SPT-4
2/2/4
2.50-2.95
SPT-5
2/3/4
3.00-3.45
SPT-6
4/6/8
2.0
2.5
3.0
4.0
14
14.87
4.00-4.45
SPT-7
4/7/10
5.00-5.45
SPT-8
5/8/14
6.00-6.45
SPT-9
7/10/27
7.00-7.45
SPT-10
11/17/38
8.00-8.43
SPT-11
17/40/50
>>
9.00-9.41
SPT-12
18/39/50
>>
10.00-10.29
SPT-13
20/50
50
11.00-11.26
SPT-14
22/50
50
4.5
5.0
7
7
15.87
3.5
17
22
5.5
6.0
12.87
14.8
6.5
7.0
37
>>
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
12.00-12.25 27/50
SPT-15
BOREHOLE LOG
Borehole No
BH-01
Date
Started
11/11/2012
Coord North
inates 3246707.595
Elevation
18.865 m
Logged By
Nithin
Completed
11/11/2012
East
469052.026
Depth
20.4 m
Page No.
2 of 2
STRATA
SPT N Value
Description
10 20 30 40
50
12.5
[Contd.....]
13.0
13.00-13.26
SPT-16
[Contd.....]
26/50
50
13.5
14.0
14.00-14.42
20/39/50
SPT-17
>>
15.00-15.29
SPT-18
26/50
50
16.00-16.28
SPT-19
27/50
50
17.00-17.25
SPT-20
28/50
14.5
15.0
15.5
16.0
16.5
17.0
Becomes uncemented
50
17.5
18.0
18.00-18.38
26/40/50
SPT-21
>>
19.00-19.29
SPT-22
50
18.5
19.0
27/50
19.5
20.0
20.00-20.40
27/39/50
SPT-23
20.5
21.0
-1.14
-1.54
>>
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-02
Date
Started
12/11/2012
Coord North
inates 3246734.364
Elevation
18.784 m
Logged By
Nithin
Completed
12/11/2012
East
469081.756
Depth
20.41 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/4
1.0
1.00-1.45
SPT-2
2/2/3
1.5
1.50-1.95
SPT-3
2/3/4
2.00-2.45
SPT-4
2/2/3
2.50-2.95
SPT-5
3/3/4
3.00-3.45
SPT-6
5/6/7
4.00-4.45
SPT-7
4/5/7
5.00-5.45
SPT-8
4/7/7
14
6.00-6.45
SPT-9
5/7/8
15
7.00-7.45
SPT-10
6/8/10
2.0
2.5
3.0
7
5
7
16.78
5
7
13
3.5
4.0
17.3
12
4.5
5.0
5.5
6.0
6.5
7.0
18
7.5
8.0
10.78
8.00-8.45
SPT-11
9/12/17
9.00-9.45
SPT-12
11/15/20 16.3
8.5
9.0
29
Becomes dense.
35
9.5
10.0
10.00-10.45
17/24/37
SPT-13
>>
10.5
11.0
11.00-11.45
18/26/43
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-02
Date
Started
12/11/2012
Coord North
inates 3246734.364
Elevation
18.784 m
Logged By
Nithin
Completed
12/11/2012
East
469081.756
Depth
20.41 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.29 20/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
[Contd.....]
13.0
13.00-13.28
SPT-16
24/50
14.00-14.26
SPT-17
27/50
50
15.00-15.25
SPT-18
26/50
50
[Contd.....]
50
13.5
14.0
14.5
15.0
15.5
16.0
16.00-16.38
24/40/50
SPT-19
>>
16.5
17.0
17.00-17.40
20/37/50
SPT-20
1.78
17.5
18.0
>>
18.00-18.44
17/35/50
SPT-21
>>
19.00-19.43
18/39/50
SPT-22
>>
18.5
19.0
19.5
20.0
20.00-20.41
20/39/50
SPT-23
20.5
>>
-1.63
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.40 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
3/3/4
1.0
1.00-1.45
SPT-2
3/4/4
1.5
1.50-1.95
SPT-3
4/4/5
2.00-2.45
SPT-4
3/5/6
2.50-2.95
SPT-5
3/4/5
3.00-3.45
SPT-6
4/6/7
4.00-4.45
SPT-7
5/7/7
5.00-5.45
SPT-8
7/8/10
6.00-6.45
SPT-9
9/16/24
7.00-7.45
SPT-10
11/17/26
2.0
2.5
3.0
Completed
13/11/2012
East
469111.471
Depth
20.43 m
Page No.
1 of 2
Started
13/11/2012
Coord North
inates 3246761.119
Elevation
18.046 m
Logged By
Nithin
SPT N Value
Description
10 20 30 40
7
8
9
11
15.55
12.2
3.5
4.0
BH-03
Date
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
9
13
14
4.5
5.0
18
5.5
6.0
Becomes dense.
40
6.5
7.0
43
7.5
8.0
10.05
8.00-8.41
SPT-11
17/28/50
9.00-9.25
SPT-12
20/50
10.00-10.24
SPT-13
24/50
11.00-11.26
SPT-14
27/50
8.5
9.0
14.6
>>
50
9.5
10.0
50
10.5
11.0
50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.40 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-03
Date
Started
13/11/2012
Coord North
inates 3246761.119
Elevation
18.046 m
Logged By
Nithin
Completed
13/11/2012
East
469111.471
Depth
20.43 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.29 26/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
[Contd.....]
13.0
13.00-13.39
19/30/50
SPT-16
[Contd.....]
>>
13.5
14.0
14.00-14.45
17/28/44
SPT-17
>>
14.5
15.0
15.00-15.41
20/36/50
SPT-18
3.05
15.5
16.0
16.00-16.29
SPT-19
>>
26/50
50
16.5
17.0
17.00-17.40
22/39/50 15.2
SPT-20
>>
17.5
18.0
18.00-18.44
24/33/50
SPT-21
0.05
18.5
19.0
>>
19.00-19.45
20/29/45
SPT-22
>>
19.5
20.0
20.00-20.43
17/31/50
SPT-23
20.5
>>
-2.38
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.55 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
2/2/3
1.0
1.00-1.45
SPT-2
3/3/4
1.5
1.50-1.95
SPT-3
4/5/6
2.00-2.45
SPT-4
4/6/7
2.50-2.95
SPT-5
6/7/9
3.00-3.45
SPT-6
6/13/15
2.0
2.5
3.0
BH-04
Date
Started
14/11/2012
Coord North
inates 3246787.901
Elevation
17.583 m
Logged By
Nithin
Completed
14/11/2012
East
469141.216
Depth
20.43 m
Page No.
1 of 2
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
5
7
12.2
11
13
Becomes wet.
16
13.7
28
3.5
4.0
13.58
4.00-4.45
SPT-7
8/12/15
5.00-5.45
SPT-8
12/18/29
Becomes dense.
6.00-6.42
SPT-9
16/22/50
>>
7.00-7.42
SPT-10
23/28/50
>>
8.00-8.43
SPT-11
29/30/50
>>
9.00-9.45
SPT-12
31/34/35 13.7
>>
4.5
5.0
27
47
5.5
6.0
6.5
7.0
10.58
7.5
8.0
8.5
9.0
9.5
10.0
10.00-10.45
28/38/46
SPT-13
>>
11.00-11.28
SPT-14
50
10.5
11.0
27/50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.55 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-04
Date
Started
14/11/2012
Coord North
inates 3246787.901
Elevation
17.583 m
Logged By
Nithin
Completed
14/11/2012
East
469141.216
Depth
20.43 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.29 31/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
[Contd.....]
13.0
13.00-13.29
SPT-16
30/50
[Contd.....]
50
14.00-14.28
SPT-17
29/50
50
15.00-15.11
SPT-18
50
16.00-16.08
SPT-19
50
50
17.00-17.28
SPT-20
29/50
50
13.5
14.0
14.5
15.0
2.58
15.5
16.0
50
16.5
17.0
17.5
18.0
18.00-18.44
25/36/50
SPT-21
>>
19.00-19.44
27/39/50
SPT-22
>>
18.5
19.0
19.5
20.0
20.00-20.43
28/44/50
SPT-23
20.5
>>
-2.85
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.70 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-05
Date
Started
18/11/2012
Coord North
inates 3246814.670
Elevation
16.783 m
Logged By
Nithin
Completed
18/11/2012
East
469170.946
Depth
20.27 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
2/2/2
1.0
1.00-1.45
SPT-2
2/2/3
1.5
1.50-1.95
SPT-3
2/3/3
2.00-2.45
SPT-4
3/4/6
2.50-2.95
SPT-5
4/8/10
Becomes dense.
3.00-3.45
SPT-6
10/14/16
4.00-4.45
SPT-7
10/15/23 12.7
5.00-5.45
SPT-8
11/17/26
6.00-6.45
SPT-9
13/20/31
7.00-7.45
SPT-10
14/21/32
>>
8.00-8.45
SPT-11
16/22/30
>>
9.00-9.45
SPT-12
18/23/29
>>
10.00-10.45
17/27/33
SPT-13
>>
11.00-11.45
19/28/39
SPT-14
>>
2.0
2.5
3.0
15.28
13.9
4
5
6
10
18
30
3.5
4.0
38
4.5
5.0
43
5.5
6.0
>>
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.70 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-05
Date
Started
18/11/2012
Coord North
inates 3246814.670
Elevation
16.783 m
Logged By
Nithin
Completed
18/11/2012
East
469170.946
Depth
20.27 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.14
50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
13.00-13.27
SPT-16
26/50
50
14.00-14.13
SPT-17
50
50
13.5
14.0
14.5
15.0
15.00-15.29
SPT-18
31/50
14.3
50
15.5
16.0
16.00-16.45
27/36/44
SPT-19
>>
16.5
17.0
17.00-17.45
25/38/45
SPT-20
-0.22
17.5
18.0
>>
18.00-18.29
SPT-21
31/50
50
19.00-19.28
SPT-22
37/50
50
20.00-20.27
SPT-23
48/50
18.5
19.0
19.5
20.0
-3.49
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
1.70 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
2/2/2
1.0
1.00-1.45
SPT-2
2/2/3
1.5
1.50-1.95
SPT-3
3/4/5
2.00-2.45
SPT-4
6/7/6
2.50-2.95
SPT-5
7/10/10
3.00-3.45
SPT-6
8/9/12
2.0
2.5
3.0
BH-06
Date
Started
18/11/2012
Coord North
inates 3246868.208
Elevation
15.667 m
Logged By
Nithin
Completed
18/11/2012
East
469230.407
Depth
20.45 m
Page No.
1 of 2
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
4
5
9
13
13.17
11.3
20
21
3.5
4.0
11.67
4.00-4.45
SPT-7
9/10/14
5.00-5.45
SPT-8
10/12/15
6.00-6.45
SPT-9
10/11/14
7.00-7.45
SPT-10
13/17/18
Becomes dense.
8.00-8.45
SPT-11
12/15/20
9.00-9.45
SPT-12
14/16/17
11.7
4.5
5.0
24
27
5.5
6.0
25
6.5
7.0
35
7.5
8.0
35
8.5
9.0
33
9.5
10.0
10.00-10.45
13/20/24
SPT-13
11.00-11.45
15/23/30
SPT-14
44
10.5
11.0
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
1.70 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-06
Date
Started
18/11/2012
Coord North
inates 3246868.208
Elevation
15.667 m
Logged By
Nithin
Completed
18/11/2012
East
469230.407
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.44
13/28/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.41
20/34/50
SPT-16
2.67
13.5
14.0
>>
14.00-14.38
28/41/50 14.3
SPT-17
>>
14.5
15.0
0.67
15.00-15.28
SPT-18
31/50
16.00-16.25
SPT-19
33/50
15.5
16.0
50
50
16.5
17.0
17.00-17.41
24/30/50
SPT-20
>>
18.00-18.43
20/24/50
SPT-21
>>
19.00-19.45
19/22/44
SPT-22
>>
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.45
20/24/39
SPT-23
20.5
>>
-4.78
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
2/2/3
1.0
1.00-1.45
SPT-2
3/2/3
1.5
1.50-1.95
SPT-3
4/4/6
2.00-2.45
SPT-4
4/4/10
2.50-2.95
SPT-5
10/10/16
3.00-3.45
SPT-6
10/11/18
2.0
2.5
3.0
BH-07
Completed
19/11/2012
East
469259.273
Depth
20.27 m
Page No.
1 of 2
Date
Started
19/11/2012
Coord North
inates 3246895.672
Elevation
15.544 m
Logged By
Nithin
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
13.4
5
5
10
14
26
29
3.5
4.0
11.54
4.00-4.45
SPT-7
13/16/23 13.7
5.00-5.45
SPT-8
14/18/25
6.00-6.45
SPT-9
17/20/27
7.00-7.45
SPT-10
18/24/30
4.5
5.0
39
43
5.5
6.0
47
6.5
7.0
>>
7.5
8.0
7.54
8.00-8.45
SPT-11
25/28/32
9.00-9.45
SPT-12
27/29/42 14.7
8.5
9.0
>>
>>
9.5
10.0
10.00-10.22
SPT-13
47/50
50
11.00-11.09
SPT-14
50
50
10.5
11.0
11.5
3.54
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.00 m
63.5 kg/760 mm (Auto)
BH-07
Date
Started
19/11/2012
Coord North
inates 3246895.672
Elevation
15.544 m
Logged By
Nithin
Completed
19/11/2012
East
469259.273
Depth
20.27 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.26 33/50
SPT-15
12.5
13.0
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
50
13.00-13.27
SPT-16
39/50
14.00-14.12
SPT-17
50
50
15.00-15.10
SPT-18
50
50
50
13.5
14.0
14.5
15.0
15.5
16.0
16.00-16.44
26/47/50
SPT-19
>>
17.00-17.28
SPT-20
36/50
50
18.00-18.27
SPT-21
39/50
50
19.00-19.28
SPT-22
22/50
50
20.00-20.27
SPT-23
46/50
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-4.73
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-08
Completed
19/11/2012
East
469289.410
Depth
20.44 m
Page No.
1 of 2
Date
Started
19/11/2012
Coord North
inates 3246921.932
Elevation
14.812 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/4
1.0
1.00-1.45
SPT-2
3/4/5
1.5
1.50-1.95
SPT-3
4/5/6
2.00-2.45
SPT-4
5/6/7
2.50-2.95
SPT-5
6/8/10
Becomes wet.
3.00-3.45
SPT-6
7/10/11
4.00-4.45
SPT-7
8/12/15
5.00-5.45
SPT-8
15/16/20
Becomes dense.
6.00-6.43
SPT-9
21/37/50
7.00-7.43
SPT-10
21/37/50
8.00-8.29
SPT-11
30/50
9.00-9.25
SPT-12
39/50
50
10.00-10.22
SPT-13
43/50
50
11.00-11.14
SPT-14
50
50
2.0
2.5
3.0
14.7
13.31
8
9
11
13
18
13.4
21
3.5
4.0
27
4.5
5.0
36
5.5
6.0
>>
6.5
7.0
>>
7.5
8.0
50
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-08
Date
Started
19/11/2012
Coord North
inates 3246921.932
Elevation
14.812 m
Logged By
Nithin
Completed
19/11/2012
East
469289.410
Depth
20.44 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
12.00-12.10
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
[Contind....]
13.0
13.00-13.25
SPT-16
40/50
14.00-14.29
SPT-17
33/50
50
13.5
14.0
50
14.5
15.0
15.00-15.45
24/30/44 17.9
SPT-18
-0.19
15.5
16.0
>>
16.00-16.45
20/22/30
SPT-19
>>
17.00-17.45
22/26/37
SPT-20
>>
18.00-18.45
25/27/38
SPT-21
>>
19.00-19.45
28/39/40
SPT-22
>>
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.44
30/35/50
SPT-23
20.5
>>
-5.63
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-09
Completed
19/11/2012
East
469319.457
Depth
20.28 m
Page No.
1 of 2
Date
Started
19/11/2012
Coord North
inates 3246948.377
Elevation
13.943 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
4/5/7
1.0
1.00-1.45
SPT-2
5/7/9
1.5
1.50-1.95
SPT-3
8/11/14
2.00-2.45
SPT-4
9/20/23
2.50-2.95
SPT-5
10/18/21 13.5
3.00-3.45
SPT-6
12/16/24
4.00-4.45
SPT-7
12/17/25
5.00-5.45
SPT-8
10/18/27
6.00-6.45
SPT-9
23/29/36
7.00-7.29
SPT-10
35/50
50
8.00-8.12
SPT-11
50
50
9.00-9.10
SPT-12
50
2.0
2.5
3.0
25
Becomes dense.
43
11.44
39
40
4.5
5.0
16
Becomes wet.
3.5
4.0
12
42
45
5.5
6.0
>>
6.5
7.0
7.5
8.0
8.5
9.0
14.1
9.5
10.0
10.00-10.45
20/16/24
SPT-13
4.94
50
40
10.5
11.0
11.00-11.45
17/21/25
SPT-14
46
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-09
Date
Started
19/11/2012
Coord North
inates 3246948.377
Elevation
13.943 m
Logged By
Nithin
Completed
19/11/2012
East
469319.457
Depth
20.28 m
Page No.
2 of 2
STRATA
SPT N Value
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
12.00-12.12
SPT-15
50
13.00-13.29
SPT-16
50
>>
15.00-15.43
22/31/50 12.6
SPT-18
>>
16.00-16.41
26/32/50
SPT-19
>>
Description
10 20 30 40
12.5
13.0
37/50
13.5
14.0
14.00-14.41
19/34/50
SPT-17
-0.06
14.5
15.0
15.5
16.0
16.5
17.0
17.00-17.39
31/41/50
SPT-20
>>
18.00-18.29
SPT-21
33/50
50
19.00-19.26
SPT-22
37/50
20.00-20.28
SPT-23
34/50
17.5
18.0
18.5
19.0
-5.06
19.5
20.0
50
-6.34
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
1.0
1.00-1.45
SPT-2
3/4/4
1.5
1.50-1.95
SPT-3
4/5/4
2.00-2.45
SPT-4
4/5/5
Becomes brown.
2.50-2.95
SPT-5
5/6/7
3.00-3.45
SPT-6
9/10/10
4.00-4.45
SPT-7
10/16/18
5.00-5.45
SPT-8
13/17/20
6.00-6.45
SPT-9
14/18/20
7.00-7.45
SPT-10
13/20/24 16.4
8.00-8.45
SPT-11
15/22/28
9.00-9.45
SPT-12
16/30/45
3.0
Started
10/11/2012
Coord North
inates 3246669.874
Elevation
19.035 m
Logged By
Nithin
Completed
10/11/2012
East
469084.856
Depth
20.4 m
Page No.
1 of 2
SPT N Value
Description
3/3/4
2.5
BH-10
Date
STRATA
0.50-0.95
SPT-1
2.0
BOREHOLE LOG
Borehole No
10 20 30 40
2.0
7
8
9
10
13
Becomes wet.
20
3.5
4.0
4.5
5.0
34
37
5.5
6.0
38
6.5
7.0
12.04
7.5
8.0
44
50
8.5
9.0
>>
9.5
10.0
10.00-10.45
18/29/39
SPT-13
>>
10.5
11.0
11.00-11.26
SPT-14
27/50
50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-10
Completed
10/11/2012
East
469084.856
Depth
20.4 m
Page No.
2 of 2
Date
Started
10/11/2012
Coord North
inates 3246669.874
Elevation
19.035 m
Logged By
Nithin
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.27 28/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
[Contind....]
13.0
13.00-13.29
SPT-16
[Contind....]
26/50
50
13.5
14.0
14.00-14.44
24/30/50
SPT-17
>>
15.00-15.40
26/37/50
SPT-18
>>
14.5
15.0
15.5
16.0
16.00-16.27
SPT-19
28/50
17.00-17.29
SPT-20
27/50
50
18.00-18.28
SPT-21
28/50
50
50
16.5
17.0
17.5
18.0
18.5
19.0
19.00-19.41
22/36/50
SPT-22
>>
19.5
20.0
20.00-20.40
24/38/50
SPT-23
20.5
>>
-1.37
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
3/3/3
1.0
1.00-1.45
SPT-2
3/3/4
1.5
1.50-1.95
SPT-3
4/3/4
2.00-2.45
SPT-4
3/4/4
2.50-2.95
SPT-5
4/4/5
3.00-3.45
SPT-6
4/5/5
2.0
2.5
3.0
Completed
08/11/2012
East
469114.587
Depth
20.43 m
Page No.
1 of 2
SPT N Value
Description
10 20 30 40
6
7
7
16.28
15.9
9
10
14.78
4.00-4.45
SPT-7
5/5/6
5.00-5.45
SPT-8
7/9/10
6.00-6.45
SPT-9
10/11/17
7.00-7.45
SPT-10
13/17/20 15.7
8.00-8.45
SPT-11
14/17/24
9.00-9.45
SPT-12
17/22/26
4.5
5.0
Started
08/11/2012
Coord North
inates 3246696.643
Elevation
18.775 m
Logged By
Nithin
3.5
4.0
BH-11
Date
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
11
19
5.5
6.0
12.78
6.5
7.0
28
Becomes dense.
37
7.5
8.0
41
8.5
9.0
48
9.5
10.0
10.00-10.45
14/20/24
SPT-13
8.78
10.5
11.0
44
11.00-11.45
15/23/26
SPT-14
49
11.5
6.78
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
12.00-12.45
16/24/28
SPT-15
BH-11
Completed
08/11/2012
East
469114.587
Depth
20.43 m
Page No.
2 of 2
Date
Started
08/11/2012
Coord North
inates 3246696.643
Elevation
18.775 m
Logged By
Nithin
STRATA
12.5
13.0
BOREHOLE LOG
Borehole No
13.00-13.45
18/28/35
SPT-16
SPT N Value
Description
10 20 30 40
>>
>>
13.5
14.0
14.00-14.44
20/31/50
SPT-17
4.78
14.5
15.0
>>
15.00-15.28
SPT-18
26/50
50
16.00-16.26
SPT-19
27/50
50
15.5
16.0
16.5
17.0
17.00-17.40
24/36/50
SPT-20
>>
18.00-18.43
25/31/50
SPT-21
>>
19.00-19.42
20/28/50
SPT-22
>>
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.43
22/31/50
SPT-23
20.5
>>
-1.66
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-12
Date
Started
07/11/2012
Coord North
inates 3246750.181
Elevation
17.915 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/4
1.0
1.00-1.45
SPT-2
3/4/3
1.5
1.50-1.95
SPT-3
4/4/3
2.00-2.45
SPT-4
4/5/5
2.50-2.95
SPT-5
5/5/6
3.00-3.45
SPT-6
5/6/7
4.00-4.45
SPT-7
6/10/17
5.00-5.45
SPT-8
17/18/19
6.00-6.45
SPT-9
17/19/20
7.00-7.45
SPT-10
10/14/22
8.00-8.45
SPT-11
20/23/27
9.00-9.45
SPT-12
17/24/27
2.0
2.5
3.0
Completed
07/11/2012
East
469174.047
Depth
20.45 m
Page No.
1 of 2
7
7
7
10
11
13
3.5
4.0
15.2
27
4.5
5.0
Becomes dense.
37
5.5
6.0
6.5
7.0
39
36
7.5
8.0
50
8.5
9.0
>>
9.5
10.0
10.00-10.45
20/23/29 16.1
SPT-13
10.5
11.0
11.00-11.45
16/20/25
SPT-14
7.92
>>
Becomes dense.
45
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-12
Date
Started
07/11/2012
Coord North
inates 3246750.181
Elevation
17.915 m
Logged By
Nithin
Completed
07/11/2012
East
469174.047
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
18/24/31
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Contd.....]
13.0
13.00-13.45
20/26/30
SPT-16
[Contd.....]
>>
13.5
14.0
14.00-14.45
21/28/36
SPT-17
>>
15.00-15.29
SPT-18
24/50
50
16.00-16.26
SPT-19
25/50
50
17.00-17.28
SPT-20
27/50
18.00-18.25
SPT-21
39/50
14.5
15.0
15.5
16.0
16.5
17.0
50
17.5
18.0
50
18.5
19.0
19.00-19.41
30/35/50
SPT-22
>>
19.5
20.0
20.00-20.45
21/30/45
SPT-23
20.5
>>
-2.54
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
5/6/6
1.0
1.00-1.45
SPT-2
6/7/8
1.5
1.50-1.95
SPT-3
9/7/9
2.00-2.45
SPT-4
6/7/8
2.50-2.95
SPT-5
4/4/6
3.00-3.45
SPT-6
2/2/3
2.0
2.5
3.0
BH-13
Completed
06/11/2012
East
469203.777
Depth
20.29 m
Page No.
1 of 2
Date
Started
06/11/2012
Coord North
inates 3246776.949
Elevation
17.556 m
Logged By
Nithin
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
5.4
12
15
16
15
15.06
10
5
3.5
4.0
13.56
4.00-4.45
SPT-7
4/6/9
5.00-5.45
SPT-8
9/11/20
6.00-6.45
SPT-9
11/16/25 13.1
7.00-7.45
SPT-10
13/19/27
8.00-8.45
SPT-11
15/24/29
9.00-9.45
SPT-12
16/27/34
>>
10.00-10.45
17/25/33
SPT-13
>>
11.00-11.45
19/28/32
SPT-14
>>
4.5
5.0
15
Becomes dense.
31
5.5
6.0
11.56
6.5
7.0
41
46
7.5
8.0
>>
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-13
Completed
06/11/2012
East
469203.777
Depth
20.29 m
Page No.
2 of 2
Date
Started
06/11/2012
Coord North
inates 3246776.949
Elevation
17.556 m
Logged By
Nithin
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
22/26/31
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Contind]
13.0
13.00-13.45
26/30/39
SPT-16
[Contind]
>>
13.5
14.0
3.56
14.00-14.29
SPT-17
39/50
15.00-15.14
SPT-18
50
50
16.00-16.29
SPT-19
36/50
50
15.0
14.5
15.0
50
15.5
16.0
16.5
17.0
17.00-17.43
30/38/50
SPT-20
>>
18.00-18.29
SPT-21
31/50
50
19.00-19.29
SPT-22
30/50
50
20.00-20.29
SPT-23
32/50
17.5
18.0
18.5
19.0
19.5
20.0
-2.73
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
2/3/3
1.0
1.00-1.45
SPT-2
2/2/3
1.5
1.50-1.95
SPT-3
3/2/3
2.00-2.45
SPT-4
3/4/6
2.50-2.95
SPT-5
4/6/9
3.00-3.45
SPT-6
4/9/10
2.0
2.5
3.0
BH-14
Completed
08/11/2012
East
469233.507
Depth
20.29 m
Page No.
1 of 2
Date
Started
08/11/2012
Coord North
inates 3246803.718
Elevation
17.12 m
Logged By
Nithin
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
6
5
5
Becomes gray,wet.
10
14.62
15
19
3.5
4.0
13.12
4.00-4.45
SPT-7
8/11/19
5.00-5.45
SPT-8
10/13/22
6.00-6.45
SPT-9
11/17/24
7.00-7.45
SPT-10
15/23/36
13.2
4.5
5.0
30
Becomes dense.
35
5.5
6.0
41
6.5
7.0
10.12
7.5
8.0
9.12
8.00-8.45
SPT-11
16/22/32 11.1
9.00-9.45
SPT-12
18/24/32
>>
10.00-10.45
16/25/31
SPT-13
>>
11.00-11.45
17/26/30
SPT-14
>>
8.5
9.0
>>
>>
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-14
Completed
08/11/2012
East
469233.507
Depth
20.29 m
Page No.
2 of 2
Date
Started
08/11/2012
Coord North
inates 3246803.718
Elevation
17.12 m
Logged By
Nithin
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
20/28/31
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Contd.....]
13.0
13.00-13.45
23/29/33
SPT-16
[Contd.....]
>>
13.5
14.0
3.12
14.00-14.45
25/31/38
SPT-17
14.5
15.0
15.00-15.29
SPT-18
34/50
16.00-16.14
SPT-19
50
17.00-17.28
SPT-20
30/15
>>
50
15.5
16.0
13.1
50
16.5
17.0
15
17.5
18.0
18.00-18.45
27/39/45
SPT-21
>>
19.00-19.44
29/44/50
SPT-22
>>
18.5
19.0
19.5
20.0
20.00-20.29
SPT-23
31/50
-3.17
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.10 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
6/5/6
1.0
1.00-1.45
SPT-2
7/8/7
1.5
1.50-1.95
SPT-3
9/11/12
2.00-2.45
SPT-4
20/16/12
2.50-2.95
SPT-5
8/14/16
3.00-3.45
SPT-6
9/15/17
2.0
2.5
3.0
BH-15
Date
Started
10/11/2012
Coord North
inates 3246830.487
Elevation
16.201 m
Logged By
Nithin
Completed
11/11/2012
East
469263.237
Depth
20.25 m
Page No.
1 of 2
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
7.5
15.20
SPT N Value
Description
10 20 30 40
11
15
23
28
30
Becomes dense.
32
3.5
4.0
12.20
4.00-4.45
SPT-7
11/17/19
5.00-5.45
SPT-8
12/18/20 12.7
6.00-6.45
SPT-9
13/20/23
7.00-7.45
SPT-10
13/25/21
8.00-8.45
SPT-11
16/23/27
9.00-9.44
SPT-12
18/31/50
4.5
5.0
36
38
5.5
6.0
43
6.5
7.0
46
7.5
8.0
50
8.5
9.0
9.5
10.0
10.00-10.37
22/35/50
SPT-13
>>
Becomes ncemented.
>>
10.5
11.0
11.00-11.45
15/30/34
SPT-14
11.5
5.20
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
>>
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.10 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-15
Date
Started
10/11/2012
Coord North
inates 3246830.487
Elevation
16.201 m
Logged By
Nithin
Completed
11/11/2012
East
469263.237
Depth
20.25 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
12/21/36
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Contind]
13.0
13.00-13.45
13/23/38 20.0
SPT-16
[Contind]
>>
13.5
14.0
14.00-14.45
17/27/41
SPT-17
>>
14.5
15.0
15.00-15.07
SPT-18
50
16.00-16.04
SPT-19
50
17.00-17.23
SPT-20
38/50
18.00-18.25
SPT-21
40/50
50
19.00-19.23
SPT-22
48/50
50
20.00-20.25
SPT-23
46/50
50
15.5
16.0
50
16.5
17.0
-0.80
17.5
18.0
50
18.5
19.0
19.5
20.0
-4.05
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.70 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
BH-16
Started
22/11/2012
Coord North
inates 3246861.294
Elevation
15.912 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
6/7/8
1.0
1.00-1.45
SPT-2
5/6/7
1.5
1.50-1.95
SPT-3
3/4/5
2.00-2.45
SPT-4
2/2/4
2.50-2.95
SPT-5
3/3/6
3.00-3.45
SPT-6
4/6/7
2.0
2.5
3.0
Completed
22/11/2012
East
469312.907
Depth
20.41 m
Page No.
1 of 2
Date
11.1
15
13
9
6
9
13
3.5
4.0
11.91
4.00-4.45
SPT-7
8/15/17
5.00-5.45
SPT-8
15/28/37
>>
6.00-6.41
SPT-9
21/32/50
>>
7.00-7.29
SPT-10
30/50
50
8.00-8.28
SPT-11
31/50
9.00-9.41
SPT-12
25/36/50
16.9
4.5
5.0
32
5.5
6.0
6.5
7.0
7.5
8.0
7.91
8.5
9.0
50
>>
9.5
10.0
10.00-10.45
23/34/40 13.0
SPT-13
>>
11.00-11.45
20/23/44
SPT-14
>>
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.70 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-16
Date
Started
22/11/2012
Coord North
inates 3246861.294
Elevation
15.912 m
Logged By
Nithin
Completed
22/11/2012
East
469312.907
Depth
20.41 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.25 27/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
2.91
13.00-13.23
SPT-16
28/50
14.00-14.08
SPT-17
50
15.00-15.28
SPT-18
28/50
13.5
14.0
[Contind....]
50
14.3
50
14.5
15.0
50
15.5
16.0
16.00-16.45
22/25/31
SPT-19
>>
16.5
17.0
17.00-17.43
24/28/13
SPT-20
41
17.5
18.0
18.00-18.45
26/37/44
SPT-21
>>
19.00-19.28
SPT-22
50
18.5
19.0
30/50
19.5
20.0
20.00-20.41
25/36/50
SPT-23
20.5
>>
-4.50
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-17
Completed
21/11/2012
East
469321.314
Depth
50.13 m
Page No.
1 of 5
Date
Started
19/11/2012
Coord North
inates 3246891.029
Elevation
15.396 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/3
1.0
1.00-1.45
SPT-2
4/5/6
1.5
1.50-1.95
SPT-3
6/7/7
2.00-2.45
SPT-4
8/11/12
2.50-2.95
SPT-5
10/12/13
3.00-3.45
SPT-6
13/13/15
4.00-4.45
SPT-7
15/18/23
5.00-5.45
SPT-8
18/33/38 11.7
6.00-6.45
SPT-9
25/37/45
>>
7.00-7.44
SPT-10
30/40/50
>>
8.00-8.29
SPT-11
35/50
9.00-9.26
SPT-12
43/50
10.00-10.23
SPT-13
40/50
11.00-11.14
SPT-14
50
2.0
2.5
3.0
13.40
6
11
14
14.5
23
25
28
3.5
4.0
Becomes dense.
41
4.5
5.0
10.40
5.5
6.0
>>
6.5
7.0
7.5
8.0
7.40
8.5
9.0
50
50
9.5
10.0
13.0
50
10.5
11.0
50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-17
Date
Started
19/11/2012
Coord North
inates 3246891.029
Elevation
15.396 m
Logged By
Nithin
Completed
21/11/2012
East
469321.314
Depth
50.13 m
Page No.
2 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.13
50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
13.00-13.45
25/30/34
SPT-16
>>
14.00-14.45
28/35/41
SPT-17
>>
15.00-15.41
30/40/50
SPT-18
>>
16.00-16.39
33/43/50
SPT-19
>>
17.00-17.37
35/46/50
SPT-20
>>
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
-2.60
18.00-18.29
SPT-21
29/50
19.00-19.27
SPT-22
31/50
50
20.00-20.25
SPT-23
34/50
50
21.00-21.29
SPT-24
31/50
50
11.8
18.5
19.0
50
19.5
20.0
20.5
21.0
21.5
22.0
22.00-22.41
27/37/50
SPT-25
>>
23.00-23.39
29/40/50
SPT-26
>>
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-17
Date
Started
19/11/2012
Coord North
inates 3246891.029
Elevation
15.396 m
Logged By
Nithin
Completed
21/11/2012
East
469321.314
Depth
50.13 m
Page No.
3 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.29 33/50
SPT-27
SPT N Value
Description
10 20 30 40
50
24.5
25.0
-9.60
25.00-25.27
SPT-28
36/50
26.00-26.29
SPT-29
37/50
50
27.00-27.27
SPT-30
36/50
50
28.00-28.29
SPT-31
37/50
50
29.00-29.29
SPT-32
39/50
30.00-30.28
SPT-33
32/50
50
31.00-31.29
SPT-34
34/50
50
25.5
26.0
50
26.5
27.0
27.5
28.0
28.5
29.0
12.3
50
29.5
30.0
30.5
31.0
31.5
32.0
32.00-32.42
28/37/50
SPT-35
>>
33.00-33.42
30/39/50
SPT-36
>>
34.00-34.38
27/46/50
SPT-37
>>
32.5
33.0
33.5
34.0
34.5
35.0
35.00-35.28
SPT-38
-19.60
35/50
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
50
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.60 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
36.00-36.25 39/50
SPT-39
BOREHOLE LOG
Borehole No
BH-17
Date
Started
19/11/2012
Coord North
inates 3246891.029
Elevation
15.396 m
Logged By
Nithin
Completed
21/11/2012
East
469321.314
Depth
50.13 m
Page No.
4 of 5
STRATA
SPT N Value
Description
10 20 30 40
50
36.5
37.0
37.00-37.25
SPT-40
39/50
50
38.00-38.13
SPT-41
50
50
39.00-39.14
SPT-42
50
50
40.00-40.10
SPT-43
50
50
41.00-41.12
SPT-44
50
42.00-42.14
SPT-45
50
43.00-43.26
SPT-46
40/50
50
44.00-44.26
SPT-47
42/50
50
45.00-45.28
SPT-48
39/50
46.00-46.25
SPT-49
44/50
47.00-47.28
SPT-50
34/50
37.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
50
50
41.5
42.0
-26.60
42.5
43.0
43.5
44.0
44.5
45.0
14.7
50
45.5
46.0
50
46.5
47.0
-31.60
47.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
50
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-17
Date
Started
19/11/2012
Coord North
inates 3246891.029
Elevation
15.396 m
Logged By
Nithin
Completed
21/11/2012
East
469321.314
Depth
50.13 m
Page No.
5 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
48.00-48.14
50
SPT-51
SPT N Value
Description
10 20 30 40
50
48.5
49.0
49.00-49.12
SPT-52
50
50.00-50.13
SPT-53
50
50
49.5
50.0
-34.73
50
50.5
51.0
51.5
52.0
52.5
53.0
53.5
54.0
54.5
55.0
55.5
56.0
56.5
57.0
57.5
58.0
58.5
59.0
59.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-18
Date
Started
18/11/2012
Coord North
inates 3246909.788
Elevation
14.778 m
Logged By
Nithin
Completed
18/11/2012
East
469355.488
Depth
20.25 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
2/3/3
1.0
1.00-1.45
SPT-2
6/5/7
1.5
1.50-1.95
SPT-3
7/7/8
2.00-2.45
SPT-4
9/12/12
2.50-2.95
SPT-5
13/15/16
3.00-3.45
SPT-6
14/15/17
4.00-4.45
SPT-7
22/25/30 11.4
5.00-5.45
SPT-8
30/32/35
>>
6.00-6.45
SPT-9
33/34/39
>>
7.00-7.41
SPT-10
36/40/50
8.00-8.29
SPT-11
42/50
50
9.00-9.14
SPT-12
50
50
10.00-10.10
SPT-13
50
11.00-11.12
SPT-14
50
2.0
2.5
3.0
13.78
14.8
6
12
15
24
31
11.78
3.5
4.0
32
>>
4.5
5.0
5.5
6.0
6.5
7.0
>>
7.5
8.0
8.5
9.0
9.5
10.0
15.1
4.78
10.5
11.0
50
50
11.5
2.78
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.60 m
63.5 kg/760 mm (Auto)
BH-18
Date
Started
18/11/2012
Coord North
inates 3246909.788
Elevation
14.778 m
Logged By
Nithin
Completed
18/11/2012
East
469355.488
Depth
20.25 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
31/36/45
SPT-15
12.5
13.0
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
>>
13.00-13.45
28/30/40
SPT-16
>>
14.00-14.45
24/28/37
SPT-17
>>
13.5
14.0
14.5
15.0
15.00-15.45
26/31/40
SPT-18
>>
15.5
16.0
16.00-16.45
30/36/43
SPT-19
>>
17.00-17.41
33/40/50 15.9
SPT-20
>>
18.00-18.29
SPT-21
30/50
50
19.00-19.28
SPT-22
35/50
50
20.00-20.25
SPT-23
39/50
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-5.47
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.85 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-19
Date
Started
04/11/2012
Coord North
inates 3246632.153
Elevation
19.142 m
Logged By
Nithin
Completed
04/11/2012
East
469117.687
Depth
20.45 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/4
1.0
1.00-1.45
SPT-2
4/4/4
1.5
1.50-1.95
SPT-3
4/4/5
2.00-2.45
SPT-4
4/4/5
2.50-2.95
SPT-5
5/7/6
13
3.00-3.45
SPT-6
4/6/9
2.0
2.5
3.0
Becomes wet.
7
8
15
3.5
4.0
4.00-4.45
SPT-7
10/11/12 10.5
5.00-5.45
SPT-8
8/10/23
6.00-6.45
SPT-9
6/11/26
7.00-7.45
SPT-10
14/19/28
8.00-8.45
SPT-11
15/23/31
Becomes dense.
23
4.5
5.0
33
5.5
6.0
37
6.5
7.0
47
7.5
8.0
8.5
9.0
9.00-9.45
SPT-12
10.14
17/26/33
9.5
10.0
GIICO_GEN 2012 02 104 PACE.GPJ GIICO1.GDT 19/1/13
>>
>>
10.00-10.45
14/29/38 18.8
SPT-13
>>
11.00-11.45
16/22/29
SPT-14
>>
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.85 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-19
Date
Started
04/11/2012
Coord North
inates 3246632.153
Elevation
19.142 m
Logged By
Nithin
Completed
04/11/2012
East
469117.687
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
19/25/30
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Contd.....]
13.0
13.00-13.45
18/29/34
SPT-16
>>
13.5
14.0
14.00-14.45
22/27/31
SPT-17
>>
15.00-15.45
18/26/36
SPT-18
>>
14.5
15.0
15.5
16.0
16.00-16.45
16/24/33
SPT-19
>>
16.5
17.0
17.00-17.45
13/31/41 14.0
SPT-20
2.14
17.5
18.0
>>
18.00-18.45
19/22/26
SPT-21
48
18.5
19.0
19.00-19.45
20/25/28
SPT-22
>>
19.5
20.0
20.00-20.45
21/20/25
SPT-23
20.5
45
-1.31
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.35 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
BH-20
Date
Started
05/11/2012
Coord North
inates 3246685.691
Elevation
17.451 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
2/3/3
1.0
1.00-1.45
SPT-2
3/3/3
1.5
1.50-1.95
SPT-3
4/4/5
2.00-2.45
SPT-4
4/5/7
2.50-2.95
SPT-5
5/7/8
3.00-3.45
SPT-6
6/8/8
2.0
2.5
3.0
Completed
05/11/2012
East
469177.147
Depth
20.26 m
Page No.
1 of 2
0.6
6
6
9
12
15
16
3.5
4.0
13.45
4.00-4.45
SPT-7
12/15/19
5.00-5.45
SPT-8
17/17/24 12.0
6.00-6.45
SPT-9
15/21/26
7.00-7.45
SPT-10
25/26/32
8.00-8.45
SPT-11
29/32/25
9.00-9.45
SPT-12
24/28/25
4.5
5.0
34
41
5.5
6.0
47
6.5
7.0
>>
7.5
8.0
>>
8.5
9.0
>>
9.5
10.0
10.00-10.45
23/26/27
SPT-13
>>
11.00-11.45
18/22/28
SPT-14
50
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.35 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-20
Date
Started
05/11/2012
Coord North
inates 3246685.691
Elevation
17.451 m
Logged By
Nithin
Completed
05/11/2012
East
469177.147
Depth
20.26 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
21/28/38
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Contd.....]
13.0
13.00-13.39
34/41/50
SPT-16
[Contd.....]
>>
50
13.5
14.0
3.45
14.00-14.28
SPT-17
38/50
15.00-15.14
SPT-18
50
50
16.00-16.11
SPT-19
50
50
17.00-17.27
SPT-20
34/50
50
18.00-18.29
SPT-21
30/50
50
19.00-19.26
SPT-22
36/50
50
20.00-20.26
SPT-23
38/50
13.7
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-2.81
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.30 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
2/2/3
1.0
1.00-1.45
SPT-2
2/3/3
1.5
1.50-1.95
SPT-3
3/4/5
2.00-2.45
SPT-4
4/6/7
2.50-2.95
SPT-5
6/7/7
3.00-3.45
SPT-6
6/7/8
2.0
2.5
3.0
15.34
13.5
14/17/21 12.5
5.00-5.45
SPT-8
15/17/22
5
6
9
13
14
15
6.00-6.45
SPT-9
17/19/24
7.00-7.45
SPT-10
28/29/34
8.00-8.45
SPT-11
32/30/38
9.00-9.45
SPT-12
27/26/27 16.8
38
12.84
39
11.84
6.5
7.0
10 20 30 40
13.84
4.00-4.45
SPT-7
5.5
6.0
SPT N Value
Description
15.84
4.5
5.0
Completed
05/11/2012
East
469206.878
Depth
20.28 m
Page No.
1 of 2
Started
05/11/2012
Coord North
inates 3246712.460
Elevation
17.843 m
Logged By
Nithin
3.5
4.0
BH-21
Date
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
43
>>
7.5
8.0
>>
8.5
9.0
>>
9.5
10.0
10.00-10.45
25/25/29
SPT-13
>>
11.00-11.45
21/24/30
SPT-14
>>
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.30 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-21
Date
Started
05/11/2012
Coord North
inates 3246712.460
Elevation
17.843 m
Logged By
Nithin
Completed
05/11/2012
East
469206.878
Depth
20.28 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
19/25/42
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Contd.....]
13.0
13.00-13.28
SPT-16
36/50
14.00-14.26
SPT-17
41/50
50
15.00-15.11
SPT-18
50
50
16.00-16.13
SPT-19
50
50
17.00-17.28
SPT-20
31/50
18.00-18.26
SPT-21
34/50
50
19.00-19.27
SPT-22
32/50
50
20.00-20.28
SPT-23
35/50
[Contd.....]
50
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
0.84
17.5
18.0
50
18.5
19.0
19.5
20.0
-2.44
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.95 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-22
Completed
13/11/2012
East
469266.338
Depth
20.13 m
Page No.
1 of 2
Date
Started
13/11/2012
Coord North
inates 3246765.998
Elevation
17.22 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/4
1.0
1.00-1.45
SPT-2
3/4/4
1.5
1.50-1.95
SPT-3
4/5/5
10
2.00-2.45
SPT-4
4/4/6
10
2.50-2.95
SPT-5
4/6/6
3.00-3.45
SPT-6
4/4/6
2.0
2.5
3.0
4.3
7
8
12
13.7
10
3.5
4.0
13.22
4.00-4.45
SPT-7
12/15/16
5.00-5.45
SPT-8
12/27/38
6.00-6.29
SPT-9
11/50
50
7.00-7.29
SPT-10
12/50
50
8.00-8.45
SPT-11
13/18/29
9.00-9.45
SPT-12
14/14/19 16.2
4.5
5.0
31
>>
5.5
6.0
6.5
7.0
7.5
8.0
Becomes dense.
47
8.5
9.0
33
9.5
10.0
10.00-10.45
13/21/24
SPT-13
45
10.5
11.0
11.00-11.45
17/27/37
SPT-14
11.5
6.22
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
>>
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.95 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-22
Date
Started
13/11/2012
Coord North
inates 3246765.998
Elevation
17.22 m
Logged By
Nithin
Completed
13/11/2012
East
469266.338
Depth
20.13 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
13/27/44
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Contind....]
13.0
13.00-13.45
15/26/44
SPT-16
[Contind....]
>>
14.00-14.45
21/36/48
SPT-17
>>
13.5
14.0
14.5
15.0
15.00-15.44
28/38/50
SPT-18
>>
16.00-16.43
30/39/50
SPT-19
>>
17.00-17.44
29/42/50
SPT-20
>>
18.00-18.43
31/46/50
SPT-21
>>
19.00-19.27
SPT-22
37/50
50
20.00-20.13
SPT-23
50
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-2.91
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.70 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
2/2/2
1.0
1.00-1.45
SPT-2
2/2/3
1.5
1.50-1.95
SPT-3
3/3/4
2.00-2.45
SPT-4
3/4/6
2.50-2.95
SPT-5
4/4/6
3.00-3.45
SPT-6
6/7/9
2.0
2.5
3.0
BH-23
Date
Started
08/11/2012
Coord North
inates 3246797.217
Elevation
16.276 m
Logged By
Nithin
Completed
08/11/2012
East
469301.011
Depth
20.13 m
Page No.
1 of 2
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
15.28
13.5
SPT N Value
Description
10 20 30 40
4
5
7
10
10
16
3.5
4.0
12.28
4.00-4.45
SPT-7
8/14/19
5.00-5.45
SPT-8
9/16/23
6.00-6.45
SPT-9
11/18/25
7.00-7.45
SPT-10
13/20/27
8.00-8.44
SPT-11
26/13/50
9.00-9.29
SPT-12
39/50
50
10.00-10.13
SPT-13
50
50
11.00-11.12
SPT-14
50
50
12.6
4.5
5.0
33
39
5.5
6.0
43
6.5
7.0
9.28
7.5
8.0
47
>>
8.5
9.0
9.5
10.0
10.5
11.0
11.5
4.28
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.70 m
63.5 kg/760 mm (Auto)
BH-23
Completed
08/11/2012
East
469301.011
Depth
20.13 m
Page No.
2 of 2
Date
Started
08/11/2012
Coord North
inates 3246797.217
Elevation
16.276 m
Logged By
Nithin
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.34
18/43/50
SPT-15
12.5
13.0
BOREHOLE LOG
Borehole No
14.3
SPT N Value
Description
10 20 30 40
>>
50
13.00-13.06
SPT-16
50
14.00-14.08
SPT-17
50
15.00-15.10
SPT-18
50
50
16.00-16.25
SPT-19
43/50
50
17.00-17.11
SPT-20
50
50
18.00-18.25
SPT-21
37/50
19.00-19.23
SPT-22
44/50
20.00-20.13
SPT-23
50
50
13.5
14.0
2.28
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
Becomes yellow.
50
18.5
19.0
50
19.5
20.0
20.5
-3.85
50
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
BH-24
Completed
22/11/2012
East
469325.107
Depth
30.12 m
Page No.
1 of 3
Date
Started
22/11/2012
Coord North
inates 3246819.434
Elevation
16.575 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
2/3/4
1.0
1.00-1.45
SPT-2
3/4/4
1.5
1.50-1.95
SPT-3
4/4/5
2.00-2.45
SPT-4
3/4/5
2.50-2.95
SPT-5
4/3/4
3.00-3.45
SPT-6
3/3/3
4.00-4.45
SPT-7
10/14/23
5.00-5.45
SPT-8
15/21/27 12.0
6.00-6.45
SPT-9
17/22/34
7.00-7.45
SPT-10
20/27/42
>>
8.00-8.45
SPT-11
25/31/44
>>
9.00-9.45
SPT-12
21/26/41
>>
10.00-10.45
19/24/31
SPT-13
>>
11.00-11.45
20/25/30
SPT-14
>>
2.0
2.5
3.0
2.3
7
8
Becomes wet.
9
9
3.5
4.0
37
4.5
5.0
5.5
6.0
48
>>
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-24
Date
Started
22/11/2012
Coord North
inates 3246819.434
Elevation
16.575 m
Logged By
Nithin
Completed
22/11/2012
East
469325.107
Depth
30.12 m
Page No.
2 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
13/26/32
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
19/28/46
SPT-16
>>
14.00-14.45
20/29/38 14.5
SPT-17
>>
15.00-15.45
22/31/42
SPT-18
>>
16.00-16.45
23/34/46
SPT-19
>>
17.00-17.45
31/39/48
SPT-20
>>
18.00-18.29
SPT-21
50
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
36/50
18.5
19.0
19.00-19.44
26/44/50
SPT-22
>>
20.00-20.43
32/47/50
SPT-23
>>
21.00-21.28
SPT-24
37/50
50
22.00-22.27
SPT-25
41/50
50
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.00-23.42
34/39/50
SPT-26
>>
23.5
-7.43
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
BH-24
Date
Started
22/11/2012
Coord North
inates 3246819.434
Elevation
16.575 m
Logged By
Nithin
Completed
22/11/2012
East
469325.107
Depth
30.12 m
Page No.
3 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.40
29/45/50
SPT-27
24.5
25.0
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
>>
25.00-25.27
SPT-28
36/50
26.00-26.26
SPT-29
37/50
50
27.00-27.28
SPT-30
34/50
50
28.00-28.29
SPT-31
38/50
50
29.00-29.13
SPT-32
50
50
30.00-30.12
SPT-33
50
14.9
50
25.5
26.0
26.5
27.0
27.5
28.0
28.5
29.0
29.5
30.0
-13.55
50
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-25
Date
Started
21/11/2012
Coord North
inates 3246845.613
Elevation
16.631 m
Logged By
Nithin
Completed
21/11/2012
East
469355.250
Depth
20.45 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
7/8/10
1.0
1.00-1.45
SPT-2
10/14/17
1.5
1.50-1.95
SPT-3
7/4/5
2.00-2.45
SPT-4
2/4/6
2.50-2.95
SPT-5
3/4/5
Becomes loose.
3.00-3.45
SPT-6
3/4/6
4.00-4.45
SPT-7
7/15/20
5.00-5.45
SPT-8
12/29/30
6.00-6.45
SPT-9
14/22/28 11.7
50
7.00-7.45
SPT-10
15/25/26
>>
8.00-8.45
SPT-11
14/20/21
9.00-9.45
SPT-12
10/17/16
2.0
2.5
3.0
6.8
18
31
9
10
9
10
3.5
4.0
Becomes dense.
35
4.5
5.0
11.63
5.5
6.0
>>
6.5
7.0
7.5
8.0
8.5
9.0
41
33
9.5
10.0
10.00-10.45
17/23/40
SPT-13
11.00-11.25
SPT-14
>>
10.5
11.0
27/50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
50
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-25
Date
Started
21/11/2012
Coord North
inates 3246845.613
Elevation
16.631 m
Logged By
Nithin
Completed
21/11/2012
East
469355.250
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.23 28/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
13.00-13.14
SPT-16
50
50
14.00-14.28
SPT-17
28/50
50
13.5
14.0
14.5
15.0
15.00-15.45
22/25/31 17.9
SPT-18
1.63
15.5
16.0
16.00-16.43
24/28/50
SPT-19
0.63
16.5
17.0
>>
>>
17.00-17.45
26/37/44
SPT-20
>>
17.5
18.0
18.00-18.41
29/35/50
SPT-21
-1.37
18.5
19.0
>>
19.00-19.41
25/36/50
SPT-22
>>
19.5
20.0
20.00-20.45
24/35/41
SPT-23
20.5
>>
-3.82
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.80 m
63.5 kg/760 mm (Auto)
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-26
Date
Started
20/11/2012
Coord North
inates 3246872.867
Elevation
16.628 m
Logged By
Nithin
Completed
20/11/2012
East
469384.819
Depth
20.43 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.5
0.50-0.95
SPT-1
3/4/4
1.0
1.00-1.45
SPT-2
4/4/4
1.5
1.50-1.95
SPT-3
3/4/3
2.00-2.45
SPT-4
4/5/5
10
2.50-2.95
SPT-5
3/5/6
3.00-3.45
SPT-6
6/5/6
4.00-4.45
SPT-7
6/7/8
5.00-5.45
SPT-8
11/17/20
6.00-6.45
SPT-9
13/22/32
7.00-7.45
SPT-10
15/24/37
2.0
2.5
3.0
11
11
3.5
4.0
13.8
15
4.5
5.0
11.63
5.5
6.0
37
Becomes dense.
>>
6.5
7.0
>>
7.5
8.0
8.63
8.00-8.45
SPT-11
14/20/26
9.00-9.45
SPT-12
15/18/25 14.8
8.5
9.0
46
43
9.5
10.0
10.00-10.26
SPT-13
30/50
11.00-11.10
SPT-14
50
Becomes dense.
50
50
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.80 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-26
Date
Started
20/11/2012
Coord North
inates 3246872.867
Elevation
16.628 m
Logged By
Nithin
Completed
20/11/2012
East
469384.819
Depth
20.43 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
12.00-12.09
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
[Contind....]
13.0
13.00-13.14
SPT-16
50
14.00-14.27
SPT-17
29/50
[Contind....]
50
13.5
14.0
50
14.5
15.0
15.00-15.45
23/26/38
SPT-18
1.63
15.5
16.0
>>
16.00-16.45
24/28/40 21.8
SPT-19
>>
17.00-17.45
22/26/38
SPT-20
>>
18.00-18.45
24/30/39
SPT-21
>>
16.5
17.0
17.5
18.0
18.5
19.0
19.00-19.45
22/29/45
SPT-22
>>
19.5
20.0
20.00-20.43
23/34/50
SPT-23
20.5
>>
-3.80
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-27
Completed
04/11/2012
East
469147.314
Depth
20.45 m
Page No.
1 of 2
Date
Started
04/11/2012
Coord North
inates 3246598.145
Elevation
19.455 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/5
1.0
1.00-1.45
SPT-2
6/6/8
1.5
1.50-1.95
SPT-3
7/10/11
2.00-2.45
SPT-4
6/9/10
2.50-2.95
SPT-5
7/8/9
17
3.00-3.45
SPT-6
5/6/12
18
4.00-4.45
SPT-7
8/8/11
5.00-5.45
SPT-8
7/9/14
6.00-6.45
SPT-9
6/10/21
7.00-7.45
SPT-10
9/12/23
8.00-8.45
SPT-11
11/13/25
9.00-9.45
SPT-12
10/12/15
2.0
2.5
3.0
9
14
21
19
3.5
4.0
19
4.5
5.0
12.1
23
5.5
6.0
Becomes dense.
31
6.5
7.0
35
7.5
8.0
38
8.5
9.0
10.46
9.5
10.0
10.00-10.45
12/15/21
SPT-13
27
Becomes dense.
36
10.5
11.0
11.00-11.45
15/19/28
SPT-14
47
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.00 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
12.00-12.45
15/33/44
SPT-15
BOREHOLE LOG
Borehole No
BH-27
Date
Started
04/11/2012
Coord North
inates 3246598.145
Elevation
19.455 m
Logged By
Nithin
Completed
04/11/2012
East
469147.314
Depth
20.45 m
Page No.
2 of 2
STRATA
SPT N Value
Description
10 20 30 40
>>
12.5
[Contd.....]
13.0
13.00-13.45
19/22/27
SPT-16
14.00-14.45
25/28/34
SPT-17
49
13.5
14.0
>>
14.5
15.0
15.00-15.45
29/33/41
SPT-18
>>
16.00-16.45
27/30/36
SPT-19
>>
17.00-17.45
22/25/27
SPT-20
>>
18.00-18.45
19/22/31
SPT-21
>>
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.00-19.45
21/20/26
SPT-22
0.45
19.5
20.0
20.00-20.45
23/24/28
SPT-23
20.5
-1.00
46
>>
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
4.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-28
Completed
03/11/2012
East
469177.479
Depth
20.45 m
Page No.
1 of 2
Date
Started
03/11/2012
Coord North
inates 3246624.433
Elevation
19.039 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/3
1.0
1.00-1.45
SPT-2
3/4/4
1.5
1.50-1.95
SPT-3
5/5/4
2.00-2.45
SPT-4
4/5/6
11
2.50-2.95
SPT-5
5/6/7
3.00-3.45
SPT-6
3/6/8
4.00-4.45
SPT-7
5/7/8
Becomes wet.
5.00-5.45
SPT-8
8/10/12
6.00-6.45
SPT-9
10/15/22
7.00-7.45
SPT-10
12/18/26
8.00-8.45
SPT-11
16/22/30 10.6
9.00-9.45
SPT-12
15/35/45
>>
10.00-10.45
18/33/37
SPT-13
>>
11.00-11.45
16/20/35
SPT-14
>>
2.0
2.5
3.0
2.8
6
8
13
14
3.5
4.0
15
4.5
5.0
22
5.5
6.0
Becomed dense,
37
6.5
7.0
12.04
7.5
8.0
44
Becomes dense.
>>
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
4.00 m
63.5 kg/760 mm (Auto)
BH-28
Date
Started
03/11/2012
Coord North
inates 3246624.433
Elevation
19.039 m
Logged By
Nithin
Completed
03/11/2012
East
469177.479
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
17/22/25
SPT-15
12.5
13.0
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
47
13.00-13.45
15/17/19
SPT-16
36
13.5
14.0
5.04
14.00-14.45
12/15/21
SPT-17
14.5
15.0
15.00-15.45
4/12/25
SPT-18
36
15.6
37
15.5
16.0
16.00-16.45
12/15/27
SPT-19
42
16.5
17.0
17.00-17.45
16/19/30
SPT-20
49
18.00-18.45
20/28/32
SPT-21
>>
19.00-19.45
22/30/39
SPT-22
>>
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.45
24/33/41
SPT-23
20.5
>>
-1.41
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.90 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-29
Date
Started
03/11/2012
Coord North
inates 3246650.921
Elevation
18.538 m
Logged By
Nithin
Completed
03/11/2012
East
469207.530
Depth
20.45 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
6/7/6
1.0
1.00-1.45
SPT-2
8/7/8
1.5
1.50-1.95
SPT-3
8/8/7
2.00-2.45
SPT-4
7/6/7
2.50-2.95
SPT-5
5/6/8
3.00-3.45
SPT-6
7/12/10
4.00-4.45
SPT-7
6/6/8
5.00-5.45
SPT-8
7/10/12
6.00-6.45
SPT-9
10/15/23
7.00-7.45
SPT-10
14/20/26 14.5
8.00-8.45
SPT-11
17/24/31
>>
9.00-9.45
SPT-12
18/26/34
>>
10.00-10.45
22/31/38
SPT-13
>>
11.00-11.45
21/30/36
SPT-14
>>
2.0
2.5
3.0
6.8
13
15
15
13
14
22
3.5
4.0
Becomes wet.
14
4.5
5.0
22
5.5
6.0
Becomes dense.
38
6.5
7.0
11.54
7.5
8.0
46
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.90 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-29
Date
Started
03/11/2012
Coord North
inates 3246650.921
Elevation
18.538 m
Logged By
Nithin
Completed
03/11/2012
East
469207.530
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
19/26/28
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
16/17/20
SPT-16
Becomes dense.
37
13.5
14.0
14.00-14.45
14/17/24
SPT-17
41
14.5
15.0
15.00-15.45
16/22/29
SPT-18
16.00-16.45
15/18/28
SPT-19
Becomes dense.
17.00-17.45
18/20/33 18.1
SPT-20
>>
15.5
16.0
46
16.5
17.0
>>
17.5
18.0
18.00-18.45
22/23/37
SPT-21
>>
19.00-19.45
20/28/39
SPT-22
>>
18.5
19.0
19.5
20.0
20.00-20.45
26/36/44
SPT-23
20.5
>>
-1.91
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.70 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
BH-30
Date
Started
12/11/2012
Coord North
inates 3246703.432
Elevation
17.794 m
Logged By
Nithin
Completed
12/11/2012
East
469267.673
Depth
20.29 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/2/3
1.0
1.00-1.45
SPT-2
3/4/4
1.5
1.50-1.95
SPT-3
4/5/5
2.00-2.45
SPT-4
4/6/7
13
2.50-2.95
SPT-5
5/7/6
13
3.00-3.45
SPT-6
4/3/6
4.00-4.45
SPT-7
8/11/16
5.00-5.45
SPT-8
11/15/15
6.00-6.45
SPT-9
14/19/23
7.00-7.45
SPT-10
17/19/25
8.00-8.45
SPT-11
21/25/31
9.00-9.44
SPT-12
29/38/50
2.0
2.5
3.0
5
8
4.3
10
Becomes loose.
3.5
4.0
27
4.5
5.0
30
5.5
6.0
Becomes dense.
42
6.5
7.0
44
7.5
8.0
>>
8.5
9.0
>>
9.5
10.0
7.79
10.00-10.27
SPT-13
34/50
11.00-11.12
SPT-14
50
13.7
10.5
11.0
50
50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.70 m
63.5 kg/760 mm (Auto)
Borehole No
BH-30
Date
Started
12/11/2012
Coord North
inates 3246703.432
Elevation
17.794 m
Logged By
Nithin
Completed
12/11/2012
East
469267.673
Depth
20.29 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.41
23/36/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Contind....]
13.0
13.00-13.29
SPT-16
[Contind....]
29/50
50
13.5
14.0
14.00-14.45
20/33/46
SPT-17
>>
15.00-15.45
21/28/43
SPT-18
>>
14.5
15.0
15.5
16.0
16.00-16.45
24/36/40 11.8
SPT-19
>>
16.5
17.0
17.00-17.45
21/31/42
SPT-20
>>
18.00-18.45
25/34/44
SPT-21
>>
17.5
18.0
18.5
19.0
19.00-19.43
32/39/50
SPT-22
-1.21
19.5
20.0
20.00-20.29
SPT-23
36/50
>>
-2.50
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.80 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
6/8/8
1.0
1.00-1.45
SPT-2
6/7/7
1.5
1.50-1.95
SPT-3
5/7/8
2.00-2.45
SPT-4
5/5/6
2.50-2.95
SPT-5
5/5/7
3.00-3.45
SPT-6
5/7/7
2.0
2.5
3.0
SPT N Value
Description
10 20 30 40
16
14
Becomes brown.
15
15.43
10.9
14.93
11
12
14
13.43
4.00-4.45
SPT-7
6/10/18
5.00-5.45
SPT-8
9/13/23
6.00-6.45
SPT-9
12/18/26 12.1
7.00-7.45
SPT-10
14/27/29
8.00-8.45
SPT-11
16/28/32
>>
9.00-9.45
SPT-12
18/29/34
>>
10.00-10.45
17/27/38
SPT-13
>>
4.5
5.0
Completed
11/11/2012
East
469297.765
Depth
20.27 m
Page No.
1 of 2
Started
11/11/2012
Coord North
inates 3246729.786
Elevation
17.433 m
Logged By
Nithin
3.5
4.0
BH-31
Date
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
28
Becomes dense.
36
5.5
6.0
44
6.5
7.0
>>
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.00-11.45
21/32/43
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.80 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-31
Date
Started
11/11/2012
Coord North
inates 3246729.786
Elevation
17.433 m
Logged By
Nithin
Completed
11/11/2012
East
469297.765
Depth
20.27 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.44
24/38/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.42
27/44/50
SPT-16
>>
13.5
14.0
14.00-14.08
SPT-17
50
50
15.00-15.27
SPT-18
36/50
50
16.00-16.29
SPT-19
30/50
50
14.5
15.0
15.5
16.0
16.5
17.0
17.00-17.44
32/42/50 15.8
SPT-20
0.43
17.5
18.0
>>
18.00-18.44
37/46/50
SPT-21
>>
19.00-19.28
SPT-22
44/50
50
20.00-20.27
SPT-23
41/50
18.5
19.0
19.5
20.0
-2.84
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.90 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-32
Completed
12/11/2012
East
469327.867
Depth
20.28 m
Page No.
1 of 2
Date
Started
12/11/2012
Coord North
inates 3246756.274
Elevation
16.768 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/4
1.0
1.00-1.45
SPT-2
3/4/4
1.5
1.50-1.95
SPT-3
4/4/6
2.00-2.45
SPT-4
5/6/7
2.50-2.95
SPT-5
5/7/7
3.00-3.45
SPT-6
6/12/15
4.00-4.45
SPT-7
10/21/35
Becomes dense.
>>
5.00-5.45
SPT-8
14/23/32 13.5
>>
6.00-6.45
SPT-9
17/24/29
7.00-7.45
SPT-10
18/27/33
8.00-8.45
SPT-11
21/29/36
9.00-9.25
SPT-12
24/50
10.00-10.22
SPT-13
26/50
2.0
2.5
3.0
0.6
8
8
10
13
14.27
14
27
3.5
4.0
4.5
5.0
5.5
6.0
>>
6.5
7.0
>>
7.5
8.0
>>
8.5
9.0
7.77
9.5
10.0
50
19.6
50
10.5
11.0
11.00-11.45
18/21/37
SPT-14
>>
11.5
4.77
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.90 m
63.5 kg/760 mm (Auto)
BH-32
Date
Started
12/11/2012
Coord North
inates 3246756.274
Elevation
16.768 m
Logged By
Nithin
Completed
12/11/2012
East
469327.867
Depth
20.28 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
16/23/44
SPT-15
12.5
13.0
BOREHOLE LOG
Borehole No
13.00-13.45
24/34/38
SPT-16
SPT N Value
Description
10 20 30 40
>>
>>
13.5
14.0
14.00-14.45
44/46/41
SPT-17
>>
15.00-15.45
48/44/44
SPT-18
>>
14.5
15.0
15.5
16.0
16.00-16.45
34/47/48
SPT-19
>>
16.5
17.0
17.00-17.44
27/42/50
SPT-20
>>
18.00-18.43
29/46/50
SPT-21
>>
19.00-19.26
SPT-22
31/50
50
20.00-20.28
SPT-23
29/50
17.5
18.0
18.5
19.0
19.5
20.0
-3.51
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
3/3/3
1.0
1.00-1.45
SPT-2
4/5/4
1.5
1.50-1.95
SPT-3
5/5/5
2.00-2.45
SPT-4
6/5/6
2.0
2.5
3.0
2.50-2.95
SPT-5
10/12/13 13.9
3.00-3.45
SPT-6
12/15/15
15.59
SPT N Value
Description
10 20 30 40
12.59
6
9
10
11
25
30
4.00-4.45
SPT-7
13/17/20
5.00-5.45
SPT-8
16/24/35
6.00-6.45
SPT-9
14/22/30
>>
7.00-7.45
SPT-10
17/26/35 13.2
>>
8.00-8.45
SPT-11
16/24/33
>>
9.00-9.45
SPT-12
18/26/35
>>
4.5
5.0
Completed
24/11/2012
East
469345.276
Depth
50.13 m
Page No.
1 of 5
Started
22/11/2012
Coord North
inates 3246772.887
Elevation
16.59 m
Logged By
Nithin
14.09
3.5
4.0
BH-33
Date
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
37
>>
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.00-10.45
23/30/38
SPT-13
>>
11.00-11.42
34/37/50
SPT-14
>>
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-33
Date
Started
22/11/2012
Coord North
inates 3246772.887
Elevation
16.59 m
Logged By
Nithin
Completed
24/11/2012
East
469345.276
Depth
50.13 m
Page No.
2 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
26/30/38
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
19/26/35
SPT-16
>>
14.00-14.45
20/25/36 12.7
SPT-17
>>
13.5
14.0
14.5
15.0
15.00-15.45
28/31/38
SPT-18
15.5
16.0
1.59
>>
16.00-16.45
33/38/46
SPT-19
>>
17.00-17.42
34/40/50
SPT-20
>>
18.00-18.39
38/43/50
SPT-21
>>
16.5
17.0
17.5
18.0
18.5
19.0
19.00-19.29
SPT-22
40/50
20.00-20.28
SPT-23
33/50
50
21.00-21.27
SPT-24
38/50
50
22.00-22.26
SPT-25
40/50
50
23.00-23.28
SPT-26
38/50
50
50
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-33
Date
Started
22/11/2012
Coord North
inates 3246772.887
Elevation
16.59 m
Logged By
Nithin
Completed
24/11/2012
East
469345.276
Depth
50.13 m
Page No.
3 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.25 40/50
SPT-27
SPT N Value
Description
10 20 30 40
50
24.5
25.0
25.00-25.29
SPT-28
43/50
50
25.5
26.0
26.00-26.41
37/40/50
SPT-29
>>
27.00-27.42
35/37/50 18.0
SPT-30
>>
28.00-28.39
36/40/50
SPT-31
>>
29.00-29.29
SPT-32
30/50
50
30.00-30.27
SPT-33
33/50
31.00-31.29
SPT-34
35/50
50
32.00-32.28
SPT-35
37/50
50
33.00-33.27
SPT-36
33/50
50
34.00-34.25
SPT-37
39/50
50
35.00-35.14
SPT-38
50
50
26.5
27.0
27.5
28.0
28.5
29.0
29.5
30.0
50
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-33
Date
Started
22/11/2012
Coord North
inates 3246772.887
Elevation
16.59 m
Logged By
Nithin
Completed
24/11/2012
East
469345.276
Depth
50.13 m
Page No.
4 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
36.00-36.13
50
SPT-39
SPT N Value
Description
10 20 30 40
50
36.5
37.0
37.00-37.14
SPT-40
50
50
38.00-38.13
SPT-41
50
50
39.00-39.26
SPT-42
40/50
50
40.00-40.22
SPT-43
46/50
41.00-41.14
SPT-44
50
50
42.00-42.12
SPT-45
50
50
43.00-43.11
SPT-46
50
50
44.00-44.13
SPT-47
50
50
45.00-45.14
SPT-48
50
50
46.00-46.26
SPT-49
39/50
50
47.00-47.24
SPT-50
43/50
50
37.5
38.0
38.5
39.0
39.5
40.0
14.9
50
40.5
41.0
41.5
42.0
42.5
43.0
43.5
44.0
44.5
45.0
45.5
46.0
46.5
47.0
47.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-33
Date
Started
22/11/2012
Coord North
inates 3246772.887
Elevation
16.59 m
Logged By
Nithin
Completed
24/11/2012
East
469345.276
Depth
50.13 m
Page No.
5 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
48.00-48.14
50
SPT-51
SPT N Value
Description
10 20 30 40
50
48.5
49.0
49.00-49.12
SPT-52
50
50.00-50.13
SPT-53
50
50
49.5
50.0
-33.54
50
50.5
51.0
51.5
52.0
52.5
53.0
53.5
54.0
54.5
55.0
55.5
56.0
56.5
57.0
57.5
58.0
58.5
59.0
59.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-34
Date
Started
24/11/2012
Coord North
inates 3246779.482
Elevation
16.468 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
6/6/7
1.0
1.00-1.45
SPT-2
6/6/5
1.5
1.50-1.95
SPT-3
3/4/4
2.00-2.45
SPT-4
3/3/4
2.50-2.95
SPT-5
4/5/6
3.00-3.45
SPT-6
4/4/6
Becomes loose.
2.0
2.5
3.0
Completed
24/11/2012
East
469416.236
Depth
20.4 m
Page No.
1 of 2
13
11
8
7
11
10
3.5
4.0
12.47
4.00-4.45
SPT-7
6/7/10
5.00-5.45
SPT-8
10/11/17
6.00-6.45
SPT-9
18/20/24
Becomes dense.
7.00-7.45
SPT-10
20/33/40
8.00-8.28
SPT-11
25/50
50
9.00-9.26
SPT-12
26/50
50
10.00-10.25
SPT-13
27/50
50
19.5
4.5
5.0
17
28
5.5
6.0
44
6.5
7.0
>>
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.00-11.38
22/36/50
SPT-14
>>
11.5
4.47
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
12.00-12.41
24/35/50
SPT-15
BH-34
Date
Started
24/11/2012
Coord North
inates 3246779.482
Elevation
16.468 m
Logged By
Nithin
Completed
24/11/2012
East
469416.236
Depth
20.4 m
Page No.
2 of 2
STRATA
12.5
13.0
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
>>
13.00-13.13
SPT-16
50
14.00-14.24
SPT-17
33/50
50
15.00-15.25
SPT-18
37/50
50
50
13.5
14.0
14.5
15.0
15.5
16.0
16.00-16.38
24/36/50
SPT-19
>>
17.00-17.40
25/33/50
SPT-20
>>
18.00-18.37
24/37/50
SPT-21
>>
19.00-19.45
22/31/44
SPT-22
>>
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.40
26/33/50 16.0
SPT-23
>>
-3.93
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-35
Completed
18/11/2012
East
469421.715
Depth
20.26 m
Page No.
1 of 2
Date
Started
18/11/2012
Coord North
inates 3246838.850
Elevation
17.015 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/4
1.0
1.00-1.45
SPT-2
4/4/5
1.5
1.50-1.95
SPT-3
4/4/6
2.00-2.45
SPT-4
5/7/6
2.50-2.95
SPT-5
5/6/5
3.00-3.45
SPT-6
4/7/10
4.00-4.45
SPT-7
11/15/19
5.00-5.45
SPT-8
13/17/21 11.9
6.00-6.45
SPT-9
15/18/23
7.00-7.45
SPT-10
16/24/27
8.00-8.45
SPT-11
18/28/36
>>
9.00-9.45
SPT-12
21/34/43
>>
2.0
2.5
3.0
7
9
10
13
11
17
3.5
4.0
34
4.5
5.0
12.02
5.5
6.0
38
41
6.5
7.0
>>
7.5
8.0
8.5
9.0
9.5
10.0
10.00-10.28
SPT-13
32/50
11.00-11.07
SPT-14
50
12.2
50
10.5
11.0
11.5
6.02
50
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-35
Date
Started
18/11/2012
Coord North
inates 3246838.850
Elevation
17.015 m
Logged By
Nithin
Completed
18/11/2012
East
469421.715
Depth
20.26 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
12.00-12.11
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
4.02
13.00-13.14
SPT-16
50
14.00-14.25
SPT-17
21/50
50
15.00-15.27
SPT-18
25/50
50
16.00-16.29
SPT-19
23/50
50
13.5
14.0
50
14.5
15.0
15.5
16.0
16.5
17.0
17.00-17.45
21/29/37
SPT-20
>>
17.5
18.0
18.00-18.45
25/35/42
SPT-21
>>
19.00-19.28
SPT-22
31/50
50
20.00-20.26
SPT-23
36/50
18.5
19.0
19.5
20.0
-3.25
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
6.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
4/4/6
1.0
1.00-1.45
SPT-2
5/6/8
1.5
1.50-1.95
SPT-3
7/8/9
2.00-2.45
SPT-4
7/8/7
2.50-2.95
SPT-5
6/6/7
3.00-3.45
SPT-6
5/5/7
2.0
2.5
3.0
BH-36
Completed
04/11/2012
East
469183.349
Depth
20.45 m
Page No.
1 of 2
Date
Started
04/11/2012
Coord North
inates 3246556.712
Elevation
19.777 m
Logged By
Nithin
STRATA
0.50-0.95
SPT-1
Borehole No
SPT N Value
Description
10 20 30 40
10
14
17
15
13
8.5
12
3.5
4.0
15.78
4.00-4.45
SPT-7
8/7/9
5.00-5.45
SPT-8
8/8/9
6.00-6.45
SPT-9
6/6/8
7.00-7.45
SPT-10
13/21/36
8.00-8.45
SPT-11
15/25/31 10.4
9.00-9.45
SPT-12
20/28/26
4.5
5.0
16
17
5.5
6.0
Becomes wet.
14
6.5
7.0
12.78
7.5
8.0
>>
>>
8.5
9.0
>>
9.5
10.0
10.00-10.45
14/17/23
SPT-13
11.00-11.45
17/21/27
SPT-14
40
10.5
11.0
48
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
6.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-36
Date
Started
04/11/2012
Coord North
inates 3246556.712
Elevation
19.777 m
Logged By
Nithin
Completed
04/11/2012
East
469183.349
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
19/31/41
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
21/24/28
SPT-16
>>
14.00-14.45
23/29/36
SPT-17
>>
13.5
14.0
14.5
15.0
15.00-15.45
31/34/45
SPT-18
>>
15.5
16.0
16.00-16.45
29/35/38
SPT-19
>>
17.00-17.45
25/25/29
SPT-20
>>
18.00-18.45
21/26/30
SPT-21
>>
19.00-19.45
18/23/29
SPT-22
>>
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.45
21/26/32
SPT-23
20.5
>>
-0.67
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.15 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-37
Date
Started
07/11/2012
Coord North
inates 3246610.250
Elevation
18.968 m
Logged By
Nithin
Completed
07/11/2012
East
469242.809
Depth
20.27 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/5
1.0
1.00-1.45
SPT-2
4/6/8
1.5
1.50-1.95
SPT-3
5/9/8
2.00-2.45
SPT-4
6/7/8
2.50-2.95
SPT-5
8/8/11
3.00-3.45
SPT-6
9/10/11
4.00-4.45
SPT-7
8/7/8
5.00-5.45
SPT-8
9/12/17
6.00-6.45
SPT-9
13/19/32
7.00-7.45
SPT-10
14/21/37
>>
8.00-8.45
SPT-11
22/27/35
>>
9.00-9.45
SPT-12
26/25/33 13.9
2.0
2.5
3.0
14
17
15
7.8
19
3.5
4.0
21
15
4.5
5.0
29
5.5
6.0
>>
6.5
7.0
7.5
8.0
8.5
9.0
9.97
9.5
10.0
>>
10.00-10.45
24/31/38
SPT-13
>>
10.5
11.0
11.00-11.45
22/26/31
SPT-14
11.5
7.97
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
>>
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.15 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-37
Date
Started
07/11/2012
Coord North
inates 3246610.250
Elevation
18.968 m
Logged By
Nithin
Completed
07/11/2012
East
469242.809
Depth
20.27 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.42
19/33/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Continud]
13.0
13.00-13.28
SPT-16
[Continud]
39/50
50
13.5
14.0
14.00-14.45
23/32/39
SPT-17
>>
15.00-15.41
27/34/50
SPT-18
>>
16.00-16.45
29/39/44
SPT-19
>>
17.00-17.27
SPT-20
36/50
50
18.00-18.29
SPT-21
34/50
50
19.00-19.25
SPT-22
39/50
50
20.00-20.27
SPT-23
37/50
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-1.30
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
Started
08/11/2012
Coord North
inates 3246637.018
Elevation
18.364 m
Logged By
Nithin
SPT N Value
Description
10 20 30 40
7/8/10
1.0
1.00-1.45
SPT-2
9/11/12
1.5
1.50-1.95
SPT-3
11/13/11
2.00-2.45
SPT-4
8/9/8
2.50-2.95
SPT-5
8/8/10
3.00-3.45
SPT-6
9/9/13
4.00-4.45
SPT-7
7/7/9
5.00-5.45
SPT-8
8/11/14
6.00-6.45
SPT-9
10/14/17
7.00-7.45
SPT-10
14/17/22
8.00-8.45
SPT-11
15/20/29
9.00-9.45
SPT-12
14/22/35 13.8
2.5
3.0
Completed
08/11/2012
East
469272.539
Depth
20.4 m
Page No.
1 of 2
STRATA
0.50-0.95
SPT-1
2.0
BH-38
Date
18
23
24
17
18
9.5
22
3.5
4.0
16
4.5
5.0
25
5.5
6.0
Becomes dense.
31
6.5
7.0
39
7.5
8.0
49
8.5
9.0
>>
9.5
10.0
10.00-10.45
16/23/32
SPT-13
>>
11.00-11.45
20/28/37
SPT-14
>>
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-38
Date
Started
08/11/2012
Coord North
inates 3246637.018
Elevation
18.364 m
Logged By
Nithin
Completed
08/11/2012
East
469272.539
Depth
20.4 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.44
24/32/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Continud]
13.0
13.00-13.13
SPT-16
50
14.00-14.12
SPT-17
50
15.00-15.26
SPT-18
42/50
[Continud]
50
50
13.5
14.0
4.36
14.5
15.0
12.6
50
15.5
16.0
16.00-16.45
29/27/31
SPT-19
>>
17.00-17.45
20/29/42
SPT-20
>>
18.00-18.45
26/33/47
SPT-21
>>
19.00-19.42
29/37/50
SPT-22
>>
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.40
32/39/50
SPT-23
20.5
>>
-2.04
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-39
Date
Started
10/11/2012
Coord North
inates 3246663.787
Elevation
18.012 m
Logged By
Nithin
Completed
10/11/2012
East
469302.269
Depth
20.45 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
5/7/8
1.0
1.00-1.45
SPT-2
7/7/9
1.5
1.50-1.95
SPT-3
9/8/8
2.00-2.45
SPT-4
8/7/9
2.50-2.95
SPT-5
8/7/8
3.00-3.45
SPT-6
7/5/5
4.00-4.45
SPT-7
11/13/16
5.00-5.45
SPT-8
10/14/15 12.9
29
6.00-6.45
SPT-9
12/13/16
29
7.00-7.43
SPT-10
37/45/50
8.00-8.45
SPT-11
36/43/39
>>
9.00-9.45
SPT-12
21/27/41
>>
10.00-10.45
22/34/36
SPT-13
>>
11.00-11.41
31/38/50
SPT-14
>>
2.0
2.5
3.0
3.5
4.0
1.6
15
16
16
16
15
15.01
10
29
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
>>
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-39
Date
Started
10/11/2012
Coord North
inates 3246663.787
Elevation
18.012 m
Logged By
Nithin
Completed
10/11/2012
East
469302.269
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
12.00-12.12
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
[Continud]
13.0
13.00-13.11
SPT-16
50
[Continud]
50
>>
13.5
14.0
14.00-14.45
18/24/29
SPT-17
4.01
14.5
15.0
15.00-15.45
22/28/32
SPT-18
>>
16.00-16.45
21/29/36
SPT-19
>>
15.5
16.0
16.5
17.0
17.00-17.45
24/31/39
SPT-20
>>
17.5
18.0
18.00-18.45
27/34/42
SPT-21
>>
19.00-19.45
25/32/39
SPT-22
>>
20.00-20.45
28/37/44
SPT-23
>>
18.5
19.0
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.80 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
BH-40
Date
Started
11/11/2012
Coord North
inates 3246722.820
Elevation
17.132 m
Logged By
Nithin
Completed
11/11/2012
East
469367.833
Depth
20.41 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
2/3/3
1.0
1.00-1.45
SPT-2
3/3/4
1.5
1.50-1.95
SPT-3
4/4/4
2.00-2.45
SPT-4
5/6/6
2.50-2.95
SPT-5
4/6/6
3.00-3.45
SPT-6
5/5/7
4.00-4.45
SPT-7
10/13/15
28
5.00-5.45
SPT-8
10/13/16
29
6.00-6.45
SPT-9
12/15/18
7.00-7.45
SPT-10
16/16/21
8.00-8.45
SPT-11
18/22/28
9.00-9.42
SPT-12
26/41/50
2.0
2.5
3.0
7
8
12.9
12
12
14.13
3.5
4.0
12
4.5
5.0
5.5
6.0
Becomes dense.
33
6.5
7.0
37
7.5
8.0
50
8.5
9.0
8.13
9.5
10.0
>>
10.00-10.40
28/41/50 14.1
SPT-13
>>
11.00-11.29
SPT-14
50
10.5
11.0
31/50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.80 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-40
Date
Started
11/11/2012
Coord North
inates 3246722.820
Elevation
17.132 m
Logged By
Nithin
Completed
11/11/2012
East
469367.833
Depth
20.41 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.43
16/33/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
[Continud]
13.0
13.00-13.41
25/42/50
SPT-16
[Continud]
>>
13.5
14.0
14.00-14.43
23/37/50
SPT-17
>>
14.5
15.0
15.00-15.45
19/30/43
SPT-18
2.13
15.5
16.0
16.00-16.45
22/32/38 14.3
SPT-19
1.13
16.5
17.0
>>
>>
17.00-17.45
23/35/41
SPT-20
>>
18.00-18.44
29/39/50
SPT-21
>>
19.00-19.42
28/42/50
SPT-22
>>
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.41
31/45/50
SPT-23
20.5
>>
-3.28
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
3/3/4
1.0
1.00-1.45
SPT-2
4/4/6
1.5
1.50-1.95
SPT-3
6/7/7
2.00-2.45
SPT-4
5/5/7
2.50-2.95
SPT-5
4/5/8
3.00-3.45
SPT-6
4/4/8
2.0
2.5
3.0
BH-41
Date
Started
17/11/2012
Coord North
inates 3246745.590
Elevation
16.777 m
Logged By
Nithin
Completed
17/11/2012
East
469391.200
Depth
20.28 m
Page No.
1 of 2
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
1.8
7
10
14
12
14.28
13
12
3.5
4.0
4.00-4.45
SPT-7
11/14/20 12.9
5.00-5.45
SPT-8
12/15/23
6.00-6.45
SPT-9
13/17/25
7.00-7.45
SPT-10
14/20/27
8.00-8.45
SPT-11
15/23/29
9.00-9.45
SPT-12
16/24/32
Becomes dense.
34
4.5
5.0
38
5.5
6.0
10.78
6.5
7.0
42
47
7.5
8.0
>>
8.5
9.0
>>
9.5
10.0
10.00-10.45
19/29/38 14.8
SPT-13
>>
10.5
11.0
11.00-11.26
SPT-14
5.78
26/50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
50
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-41
Date
Started
17/11/2012
Coord North
inates 3246745.590
Elevation
16.777 m
Logged By
Nithin
Completed
17/11/2012
East
469391.200
Depth
20.28 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
12.00-12.12
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
[Contind....]
13.0
13.00-13.13
SPT-16
50
14.00-14.28
SPT-17
34/50
15.00-15.29
SPT-18
36/50
50
13.5
14.0
50
14.5
15.0
20.7
50
15.5
16.0
16.00-16.43
34/44/50
SPT-19
0.78
16.5
17.0
>>
17.00-17.43
31/46/50
SPT-20
>>
18.00-18.42
32/47/50
SPT-21
>>
19.00-19.28
SPT-22
31/50
50
20.00-20.28
SPT-23
28/50
17.5
18.0
18.5
19.0
19.5
20.0
-3.50
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.80 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
5/6/5
1.0
1.00-1.45
SPT-2
7/7/8
1.5
1.50-1.95
SPT-3
6/7/7
2.00-2.45
SPT-4
5/5/4
2.50-2.95
SPT-5
5/5/5
3.00-3.45
SPT-6
7/9/10
2.0
2.5
3.0
BH-42
Completed
17/11/2012
East
469421.306
Depth
20.44 m
Page No.
1 of 2
Date
Started
17/11/2012
Coord North
inates 3246771.837
Elevation
16.682 m
Logged By
Nithin
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
11
15
14
Becomes loose.
11.0
10
19
3.5
4.0
12.68
4.00-4.45
SPT-7
9/11/15
5.00-5.45
SPT-8
10/13/17
6.00-6.45
SPT-9
12/15/17 13.5
7.00-7.45
SPT-10
14/17/18
4.5
5.0
26
30
5.5
6.0
Becomes dense.
32
6.5
7.0
35
7.5
8.0
8.68
8.00-8.45
SPT-11
13/15/20
9.00-9.45
SPT-12
15/16/22
8.5
9.0
35
38
9.5
10.0
10.00-10.40
20/30/50
SPT-13
>>
10.5
11.0
11.00-11.39
26/30/50
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.80 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-42
Date
Started
17/11/2012
Coord North
inates 3246771.837
Elevation
16.682 m
Logged By
Nithin
Completed
17/11/2012
East
469421.306
Depth
20.44 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.23 40/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
[Contind....]
13.0
13.00-13.29
SPT-16
[Contind....]
29/50
50
13.5
14.0
14.00-14.45
17/20/24 16.9
SPT-17
2.68
14.5
15.0
44
15.00-15.45
10/14/20
SPT-18
34
16.00-16.45
7/11/22
SPT-19
33
15.5
16.0
16.5
17.0
17.00-17.45
11/17/24
SPT-20
41
17.5
18.0
18.00-18.45
17/20/34
SPT-21
>>
19.00-19.45
18/26/39
SPT-22
>>
18.5
19.0
19.5
20.0
20.00-20.44
20/29/50
SPT-23
20.5
>>
-3.76
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
6/6/5
1.0
1.00-1.45
SPT-2
4/3/3
1.5
1.50-1.95
SPT-3
3/4/4
2.00-2.45
SPT-4
4/3/2
2.50-2.95
SPT-5
2/3/4
3.00-3.45
SPT-6
3/3/3
4.00-4.45
SPT-7
4/4/5
5.00-5.45
SPT-8
13/20/25
6.00-6.45
SPT-9
14/21/26
7.00-7.45
SPT-10
17/23/29 11.3
8.00-8.45
SPT-11
20/29/32
9.00-9.39
SPT-12
25/36/50
2.5
3.0
BH-43
Completed
17/11/2012
East
469451.380
Depth
20.1 m
Page No.
1 of 2
Date
Started
17/11/2012
Coord North
inates 3246798.113
Elevation
16.292 m
Logged By
Nithin
STRATA
0.50-0.95
SPT-1
2.0
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
11
6
8
5
14.2
7
6
3.5
4.0
4.5
5.0
11.29
5.5
6.0
45
47
6.5
7.0
9.29
7.5
8.0
>>
>>
8.5
9.0
>>
9.5
10.0
10.00-10.26
SPT-13
26/50
50
11.00-11.14
SPT-14
50
50
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-43
Date
Started
17/11/2012
Coord North
inates 3246798.113
Elevation
16.292 m
Logged By
Nithin
Completed
17/11/2012
East
469451.380
Depth
20.1 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
12.00-12.12
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
13.00-13.24
SPT-16
30/50
14.00-14.26
SPT-17
33/50
15.00-15.28
SPT-18
37/50
50
16.00-16.27
SPT-19
29/50
50
17.00-17.29
SPT-20
25/50
18.00-18.26
SPT-21
30/50
19.00-19.23
SPT-22
34/50
20.00-20.10
SPT-23
50
50
13.5
14.0
11.6
50
14.5
15.0
15.5
16.0
16.5
17.0
-0.71
17.5
18.0
50
50
18.5
19.0
50
19.5
20.0
-3.81
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
9.65 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-44
Date
Started
06/11/2012
Coord North
inates 3246497.174
Elevation
19.964 m
Logged By
Nithin
Completed
06/11/2012
East
469183.781
Depth
20.1 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/5/8
1.0
1.00-1.45
SPT-2
9/9/12
1.5
1.50-1.95
SPT-3
11/14/11
2.00-2.45
SPT-4
8/8/7
2.50-2.95
SPT-5
5/6/5
11
3.00-3.45
SPT-6
3/5/7
12
4.00-4.45
SPT-7
7/9/11
5.00-5.45
SPT-8
10/13/16
6.00-6.45
SPT-9
14/29/29
7.00-7.45
SPT-10
17/27/33
8.00-8.45
SPT-11
21/29/37
>>
50
50
2.0
2.5
3.0
0.9
13
21
25
15
3.5
4.0
20
4.5
5.0
29
5.5
6.0
13.96
6.5
7.0
>>
>>
5.6
7.5
8.0
8.5
9.0
9.00-9.13
SPT-12
9.5
10.0
10.00-10.45
20/28/33
SPT-13
10.5
11.0
9.96
>>
11.00-11.45
22/24/23
SPT-14
47
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
9.65 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-44
Date
Started
06/11/2012
Coord North
inates 3246497.174
Elevation
19.964 m
Logged By
Nithin
Completed
06/11/2012
East
469183.781
Depth
20.1 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
13/25/46
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
18/21/37
SPT-16
>>
14.00-14.45
22/25/39 11.6
SPT-17
>>
15.00-15.45
28/36/43
SPT-18
>>
16.00-16.45
25/33/38
SPT-19
>>
17.00-17.42
29/40/50
SPT-20
>>
18.00-18.29
SPT-21
33/50
50
19.00-19.26
SPT-22
37/50
50
20.00-20.24
SPT-23
41/50
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-0.14
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
10.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
BH-45
Completed
03/11/2012
East
469213.861
Depth
20.45 m
Page No.
1 of 2
Date
Started
03/11/2012
Coord North
inates 3246523.307
Elevation
19.596 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
5/8/11
1.0
1.00-1.45
SPT-2
9/12/14
1.5
1.50-1.95
SPT-3
13/14/12
2.00-2.45
SPT-4
9/8/8
2.50-2.95
SPT-5
6/6/6
3.00-3.45
SPT-6
4/5/7
4.00-4.45
SPT-7
8/8/10
5.00-5.45
SPT-8
10/12/14
6.00-6.45
SPT-9
12/13/22
7.00-7.45
SPT-10
15/19/21
8.00-8.45
SPT-11
18/24/29
>>
9.00-9.40
SPT-12
25/38/50
>>
>>
2.0
2.5
3.0
19
26
26
16
12
12
3.5
4.0
3.9
18
4.5
5.0
26
5.5
6.0
Becomes dense.
35
6.5
7.0
40
7.5
8.0
8.5
9.0
9.5
10.0
10.00-10.45
16/22/34 16.0
SPT-13
10.5
11.0
11.00-11.45
19/27/23
SPT-14
50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
10.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-45
Date
Started
03/11/2012
Coord North
inates 3246523.307
Elevation
19.596 m
Logged By
Nithin
Completed
03/11/2012
East
469213.861
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
14/20/28
SPT-15
SPT N Value
Description
10 20 30 40
48
12.5
13.0
13.00-13.45
17/24/31
SPT-16
>>
14.00-14.45
20/27/35
SPT-17
>>
15.00-15.45
26/37/43
SPT-18
>>
16.00-16.45
26/34/36
SPT-19
>>
17.00-17.45
22/26/32
SPT-20
>>
18.00-18.45
23/29/33
SPT-21
>>
19.00-19.45
21/25/28
SPT-22
>>
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.45
24/30/35 18.1
SPT-23
20.5
-0.40
-0.85
>>
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.80 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
1.0
1.00-1.45
SPT-2
3/4/6
1.5
1.50-1.95
SPT-3
4/6/7
2.00-2.45
SPT-4
5/7/9
2.50-2.95
SPT-5
6/8/11
3.00-3.45
SPT-6
6/9/13
4.00-4.45
SPT-7
11/15/18
Becomes dense.
5.00-5.45
SPT-8
14/21/29
6.00-6.45
SPT-9
17/23/31
7.00-7.45
SPT-10
11/18/27
Becomes dense.
8.00-8.45
SPT-11
14/21/33
9.00-9.45
SPT-12
18/23/35
3.0
Completed
29-11-2012
East
469048.925
Depth
20.28 m
Page No.
1 of 2
Started
28-11-2012
Coord North
inates 3246772.084
Elevation
18.6 m
Logged By
Nithin
SPT N Value
Description
2/3/3
2.5
BH-46
Date
STRATA
0.50-0.95
SPT-1
2.0
BOREHOLE LOG
Borehole No
10 20 30 40
6
10
13
16.60
16
19
22
3.5
4.0
33
4.5
5.0
50
5.5
6.0
>>
6.5
7.0
45
7.5
8.0
>>
8.5
9.0
9.60
9.5
10.0
>>
10.00-10.45
15/27/36 16.3
SPT-13
>>
11.00-11.45
18/30/39
SPT-14
>>
10.5
11.0
11.5
6.60
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.80 m
63.5 kg/760 mm (Auto)
BH-46
Date
Started
28-11-2012
Coord North
inates 3246772.084
Elevation
18.6 m
Logged By
Nithin
Completed
29-11-2012
East
469048.925
Depth
20.28 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.41
25/36/50
SPT-15
12.5
13.0
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
>>
13.00-13.43
22/32/50
SPT-16
>>
14.00-14.39
25/43/50 13.9
SPT-17
>>
15.00-15.27
SPT-18
29/50
50
16.00-16.29
SPT-19
26/50
50
17.00-17.26
SPT-20
33/50
50
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.00-18.43
28/36/50
SPT-21
>>
19.00-19.41
34/39/50
SPT-22
>>
18.5
19.0
19.5
20.0
20.00-20.28
SPT-23
41/50
-1.68
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.70 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-47
Completed
29-11-2012
East
469108.385
Depth
20.28 m
Page No.
1 of 2
Date
Started
28-11-2012
Coord North
inates 3246825.622
Elevation
17.44 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
2/3/3
1.0
1.00-1.45
SPT-2
2/3/4
1.5
1.50-1.95
SPT-3
3/4/6
2.00-2.45
SPT-4
4/5/7
2.50-2.95
SPT-5
6/7/8
3.00-3.45
SPT-6
6/8/13
4.00-4.45
SPT-7
8/10/18
5.00-5.45
SPT-8
12/15/19
6.00-6.45
SPT-9
17/21/34
7.00-7.45
SPT-10
16/24/39
>>
8.00-8.42
SPT-11
18/22/50
>>
9.00-9.42
SPT-12
21/27/50
2.0
2.5
3.0
15.94
14.94
13.3
14.44
3.5
4.0
6
7
10
12
15
21
28
4.5
5.0
12.44
9.8
5.5
6.0
11.44
6.5
7.0
34
>>
7.5
8.0
8.5
9.0
8.44
9.5
10.0
>>
10.00-10.45
28/34/38
SPT-13
>>
10.5
11.0
11.00-11.45
31/37/44
SPT-14
11.5
6.44
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
>>
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
0.70 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-47
Date
Started
28-11-2012
Coord North
inates 3246825.622
Elevation
17.44 m
Logged By
Nithin
Completed
29-11-2012
East
469108.385
Depth
20.28 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
24/31/47
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
33/40/44 13.4
SPT-16
>>
14.00-14.45
44/46/41
SPT-17
>>
15.00-15.45
47/43/46
SPT-18
>>
13.5
14.0
14.5
15.0
15.5
16.0
16.00-16.11
SPT-19
50
17.00-17.28
SPT-20
34/50
50
16.5
17.0
50
17.5
18.0
18.00-18.44
29/37/50
SPT-21
>>
19.00-19.43
28/39/50
SPT-22
>>
18.5
19.0
19.5
20.0
20.00-20.43
26/46/50
SPT-23
-2.84
>>
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
4.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-48
Completed
29-11-2012
East
469167.846
Depth
20.44 m
Page No.
1 of 2
Date
Started
29-11-2012
Coord North
inates 3246879.160
Elevation
16.09 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
2/3/3
1.0
1.00-1.45
SPT-2
3/4/6
1.5
1.50-1.95
SPT-3
6/7/8
2.00-2.45
SPT-4
8/11/10
2.50-2.95
SPT-5
7/10/13
3.00-3.45
SPT-6
7/12/14
26
4.00-4.45
SPT-7
10/11/16 13.7
27
5.00-5.45
SPT-8
12/14/13
6.00-6.45
SPT-9
13/16/24
7.00-7.45
SPT-10
16/20/28
8.00-8.45
SPT-11
18/24/30
9.00-9.45
SPT-12
17/28/44
>>
10.00-10.43
20/30/50
SPT-13
>>
2.0
2.5
3.0
13.6
6
10
15
21
23
3.5
4.0
4.5
5.0
27
5.5
6.0
40
6.5
7.0
9.09
7.5
8.0
48
9.3
>>
8.5
9.0
9.5
10.0
10.5
11.0
11.00-11.45
17/20/24
SPT-14
11.5
5.09
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
44
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
4.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-48
Date
Started
29-11-2012
Coord North
inates 3246879.160
Elevation
16.09 m
Logged By
Nithin
Completed
29-11-2012
East
469167.846
Depth
20.44 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
21/26/37
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.29
SPT-16
24/50
50
14.00-14.28
SPT-17
26/50
50
13.5
14.0
14.5
15.0
15.00-15.45
17/24/37
SPT-18
>>
16.00-16.40
20/29/50
SPT-19
>>
17.00-17.39
22/30/50
SPT-20
>>
18.00-18.41
24/31/50
SPT-21
>>
19.00-19.45
20/33/45
SPT-22
>>
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.44
17/30/50
SPT-23
20.5
>>
-4.35
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.25 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-49
Completed
01-12-2012
East
469045.824
Depth
20.43 m
Page No.
1 of 2
Date
Started
29-11-2012
Coord North
inates 3246836.574
Elevation
18.09 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
6/6/7
1.0
1.00-1.45
SPT-2
8/10/13
1.5
1.50-1.95
SPT-3
12/14/14 12.3
28
2.00-2.45
SPT-4
11/13/14
27
2.50-2.95
SPT-5
10/12/15
3.00-3.45
SPT-6
10/11/14
4.00-4.45
SPT-7
8/26/38
5.00-5.45
SPT-8
12/18/26 12.0
6.00-6.45
SPT-9
10/14/20
34
7.00-7.45
SPT-10
13/15/18
33
2.0
2.5
3.0
23
27
15.09
3.5
4.0
13
25
>>
4.5
5.0
44
5.5
6.0
6.5
7.0
7.5
8.0
10.09
8.00-8.42
SPT-11
17/38/50
9.00-9.39
SPT-12
24/49/50
8.5
9.0
>>
>>
9.09
9.5
10.0
10.00-10.41
20/44/50
SPT-13
>>
11.00-11.43
22/47/50
SPT-14
>>
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.25 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-49
Date
Started
29-11-2012
Coord North
inates 3246836.574
Elevation
18.09 m
Logged By
Nithin
Completed
01-12-2012
East
469045.824
Depth
20.43 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.42
19/43/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
20/34/41
SPT-16
>>
13.5
14.0
14.00-14.42
24/37/50
SPT-17
9.6
>>
14.5
15.0
15.00-15.45
22/32/44
SPT-18
>>
16.00-16.45
26/38/47
SPT-19
>>
15.5
16.0
16.5
17.0
17.00-17.45
31/41/49
SPT-20
1.09
17.5
18.0
18.00-18.29
SPT-21
>>
38/50
50
18.5
19.0
19.00-19.44
29/43/50
SPT-22
>>
19.5
20.0
20.00-20.43
32/46/50
SPT-23
20.5
>>
-2.34
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.20 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
BH-50
Date
Started
29-11-2012
Coord North
inates 3246890.111
Elevation
16.16 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/3
1.0
1.00-1.45
SPT-2
4/4/5
1.5
1.50-1.95
SPT-3
6/5/6
2.00-2.45
SPT-4
9/9/13
2.0
2.5
3.0
Completed
29-11-2012
East
469105.285
Depth
20.45 m
Page No.
1 of 2
6
9
11
22
2.50-2.95
SPT-5
11/13/15 12.3
Becomes wet.
3.00-3.45
SPT-6
13/15/17
Becomes dense.
28
32
3.5
4.0
12.16
4.00-4.45
SPT-7
15/17/19
5.00-5.45
SPT-8
19/23/37
6.00-6.45
SPT-9
18/25/30
7.00-7.45
SPT-10
19/26/34
8.00-8.43
SPT-11
17/29/50
>>
9.00-9.45
SPT-12
19/27/35
>>
4.5
5.0
36
>>
5.5
6.0
>>
8.5
6.5
7.0
>>
7.5
8.0
8.5
9.0
9.5
10.0
10.00-10.45
17/25/33
SPT-13
10.5
11.0
6.16
>>
11.00-11.45
15/25/38
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.20 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
12.00-12.38
23/38/50
SPT-15
BOREHOLE LOG
Borehole No
BH-50
Date
Started
29-11-2012
Coord North
inates 3246890.111
Elevation
16.16 m
Logged By
Nithin
Completed
29-11-2012
East
469105.285
Depth
20.45 m
Page No.
2 of 2
STRATA
SPT N Value
Description
10 20 30 40
12.2
>>
12.5
13.0
13.00-13.41
20/34/50
SPT-16
>>
13.5
14.0
14.00-14.29
SPT-17
24/50
15.00-15.28
SPT-18
27/50
50
16.00-16.29
SPT-19
28/50
50
17.00-17.27
SPT-20
30/50
50
50
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.00-18.41
33/37/50
SPT-21
>>
18.5
19.0
19.00-19.43
29/35/50
SPT-22
>>
19.5
20.0
20.00-20.45
30/37/45
SPT-23
20.5
>>
-4.29
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.90 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
1.0
1.00-1.45
SPT-2
4/4/6
1.5
1.50-1.95
SPT-3
4/5/7
2.00-2.45
SPT-4
7/8/14
2.50-2.95
SPT-5
9/15/15
3.00-3.45
SPT-6
9/18/26
4.00-4.45
SPT-7
12/20/22
5.00-5.45
SPT-8
17/24/33 16.3
6.00-6.45
SPT-9
18/22/27
Becomes dense.
7.00-7.45
SPT-10
21/28/38
3.0
Completed
01-12-2012
East
469167.640
Depth
20.28 m
Page No.
1 of 2
Started
29-11-2012
Coord North
inates 3246946.256
Elevation
15.2 m
Logged By
Nithin
SPT N Value
Description
3/3/5
2.5
BH-51
Date
STRATA
0.50-0.95
SPT-1
2.0
BOREHOLE LOG
Borehole No
10 20 30 40
12.2
8
10
12
22
30
44
3.5
4.0
42
4.5
5.0
>>
5.5
6.0
49
6.5
7.0
>>
7.5
8.0
7.20
8.00-8.44
SPT-11
18/31/50
9.00-9.45
SPT-12
16/24/32
>>
10.00-10.45
18/25/35
SPT-13
>>
11.00-11.45
17/29/38 10.9
SPT-14
>>
8.5
9.0
>>
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.90 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-51
Date
Started
29-11-2012
Coord North
inates 3246946.256
Elevation
15.2 m
Logged By
Nithin
Completed
01-12-2012
East
469167.640
Depth
20.28 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.44
22/32/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.43
27/35/50
SPT-16
>>
14.00-14.42
28/39/50
SPT-17
>>
15.00-15.29
SPT-18
33/50
50
16.00-16.26
SPT-19
29/50
50
17.00-17.28
SPT-20
37/50
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
-1.80
17.5
18.0
50
18.00-18.45
32/32/44
SPT-21
>>
19.00-19.39
37/41/50
SPT-22
>>
18.5
19.0
19.5
20.0
20.00-20.26
SPT-23
43/50
-5.08
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-52
Completed
06-12-2012
East
468983.264
Depth
20.43 m
Page No.
1 of 2
Date
Started
06-12-2012
Coord North
inates 3246847.526
Elevation
17.66 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
8/10/11
1.0
1.00-1.45
SPT-2
12/14/14
1.5
1.50-1.95
SPT-3
7/12/20
2.00-2.45
SPT-4
12/15/22
2.50-2.95
SPT-5
15/25/38
3.00-3.40
SPT-6
35/40/50
>>
4.00-4.43
SPT-7
29/36/50
>>
5.00-5.44
SPT-8
16/31/50 10.1
6.00-6.42
SPT-9
22/27/50
>>
7.00-7.44
SPT-10
14/32/50
>>
8.00-8.45
SPT-11
17/30/33
>>
9.00-9.45
SPT-12
20/31/46 15.3
2.0
2.5
3.0
16.16
14.5
21
28
32
37
>>
3.5
4.0
4.5
5.0
12.66
5.5
6.0
>>
6.5
7.0
7.5
8.0
8.5
9.0
8.66
9.5
10.0
10.00-10.42
22/38/50
SPT-13
>>
>>
10.5
11.0
11.00-11.43
19/44/50
SPT-14
11.5
6.66
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
>>
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-52
Date
Started
06-12-2012
Coord North
inates 3246847.526
Elevation
17.66 m
Logged By
Nithin
Completed
06-12-2012
East
468983.264
Depth
20.43 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.37
16/41/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.41
18/43/50
SPT-16
>>
14.00-14.42
21/36/50
SPT-17
>>
15.00-15.42
23/34/50
SPT-18
>>
16.00-16.45
23/34/44
SPT-19
>>
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.00-17.45
26/36/46 13.8
SPT-20
>>
17.5
18.0
18.00-18.43
29/40/50
SPT-21
>>
19.00-19.29
SPT-22
50
18.5
19.0
38/50
19.5
20.0
20.00-20.43
34/47/50
SPT-23
20.5
>>
-2.77
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.10 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-53
Completed
01-12-2012
East
469102.184
Depth
20.28 m
Page No.
1 of 2
Date
Started
01-12-2012
Coord North
inates 3246954.601
Elevation
15.41 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
4/5/6
1.0
1.00-1.45
SPT-2
6/6/8
1.5
1.50-1.95
SPT-3
10/12/15
2.00-2.29
SPT-4
16/50
2.50-2.95
SPT-5
18/30/39
3.00-3.45
SPT-6
17/25/29
4.00-4.45
SPT-7
19/20/26
5.00-5.45
SPT-8
17/19/28
6.00-6.45
SPT-9
15/20/33
7.00-7.45
SPT-10
13/21/39
8.00-8.45
SPT-11
17/25/34 11.5
9.00-9.45
SPT-12
18/20/33
>>
10.00-10.45
13/21/39
SPT-13
>>
11.00-11.45
16/19/39
SPT-14
>>
2.0
2.5
3.0
11
14
13.91
8.5
27
50
>>
>>
3.5
4.0
46
4.5
5.0
10.41
5.5
6.0
47
>>
6.5
7.0
>>
7.5
8.0
>>
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.10 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-53
Date
Started
01-12-2012
Coord North
inates 3246954.601
Elevation
15.41 m
Logged By
Nithin
Completed
01-12-2012
East
469102.184
Depth
20.28 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
20/25/35
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
14/34/40
SPT-16
>>
14.00-14.45
20/37/45
SPT-17
>>
15.00-15.41
25/40/50
SPT-18
>>
13.5
14.0
14.5
15.0
15.5
16.0
-0.59
16.00-16.28
SPT-19
36/50
17.00-17.26
SPT-20
39/50
16.5
17.0
50
50
17.5
18.0
18.00-18.42
30/37/50
SPT-21
>>
19.00-19.29
SPT-22
25/50
50
20.00-20.28
SPT-23
28/50
18.5
19.0
19.5
20.0
-4.87
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-54
Completed
02-12-2012
East
468920.703
Depth
20.27 m
Page No.
1 of 2
Date
Started
02-12-2012
Coord North
inates 3246858.477
Elevation
17.78 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
6/6/6
1.0
1.00-1.45
SPT-2
8/9/8
1.5
1.50-1.95
SPT-3
7/10/12
2.00-2.45
SPT-4
9/15/20
2.50-2.95
SPT-5
8/14/25
3.00-3.45
SPT-6
11/15/29
4.00-4.45
SPT-7
18/30/37
5.00-5.24
SPT-8
43/50
50
6.00-6.45
SPT-9
17/25/25
50
7.00-7.45
SPT-10
14/15/22
8.00-8.45
SPT-11
15/17/19 14.5
9.00-9.45
SPT-12
18/25/31
2.0
2.5
3.0
12
17
22
9.0
35
39
44
3.5
4.0
>>
4.5
5.0
5.5
6.0
6.5
7.0
10.78
7.5
8.0
37
36
8.5
9.0
>>
9.5
10.0
10.00-10.45
16/23/29
SPT-13
>>
11.00-11.44
14/29/50
SPT-14
>>
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-54
Date
Started
02-12-2012
Coord North
inates 3246858.477
Elevation
17.78 m
Logged By
Nithin
Completed
02-12-2012
East
468920.703
Depth
20.27 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.39
20/33/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
18/30/37
SPT-16
>>
13.5
14.0
14.00-14.29
SPT-17
26/50
15.00-15.28
SPT-18
28/50
50
16.00-16.29
SPT-19
25/50
50
13.8
50
14.5
15.0
15.5
16.0
16.5
17.0
17.00-17.42
22/28/50
SPT-20
>>
18.00-18.38
25/34/50
SPT-21
>>
19.00-19.29
SPT-22
29/50
50
20.00-20.27
SPT-23
34/50
17.5
18.0
18.5
19.0
19.5
20.0
-2.49
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.30 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
BH-55
Completed
03-12-2012
East
468980.163
Depth
20.45 m
Page No.
1 of 2
Date
Started
03-12-2012
Coord North
inates 3246912.015
Elevation
16.7 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
4/4/6
1.0
1.00-1.45
SPT-2
5/6/6
1.5
1.50-1.95
SPT-3
8/12/14
2.00-2.45
SPT-4
12/14/14
28
2.50-2.95
SPT-5
11/13/15
28
3.00-3.45
SPT-6
10/12/14
Becomes wet.
4.00-4.45
SPT-7
14/16/19
5.00-5.45
SPT-8
15/18/22
6.00-6.45
SPT-9
17/19/24
7.00-7.45
SPT-10
16/18/21
8.00-8.45
SPT-11
15/20/26
46
9.00-9.45
SPT-12
14/19/28
47
2.0
2.5
3.0
10
12
26
26
3.5
4.0
35
4.5
5.0
40
5.5
6.0
43
6.5
7.0
39
7.5
8.0
8.5
9.0
9.5
10.0
10.00-10.45
17/22/31
SPT-13
>>
10.5
11.0
11.00-11.45
16/25/29
SPT-14
11.5
5.70
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
>>
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.30 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-55
Date
Started
03-12-2012
Coord North
inates 3246912.015
Elevation
16.7 m
Logged By
Nithin
Completed
03-12-2012
East
468980.163
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.44
18/29/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.44
14/28/50
SPT-16
>>
14.00-14.45
17/30/44
SPT-17
>>
15.00-15.28
SPT-18
26/50
50
16.00-16.26
SPT-19
28/50
50
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.00-17.45
19/26/34
SPT-20
>>
18.00-18.45
16/28/38
SPT-21
>>
19.00-19.45
15/23/32
SPT-22
>>
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.45
18/26/28
SPT-23
20.5
>>
-3.75
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-56
Date
Started
02-12-2012
Coord North
inates 3247020.734
Elevation
14.23 m
Logged By
Nithin
Completed
02-12-2012
East
469100.909
Depth
20.14 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/5
1.0
1.00-1.45
SPT-2
4/4/6
1.5
1.50-1.95
SPT-3
4/5/7
2.00-2.45
SPT-4
7/8/14
2.50-2.95
SPT-5
9/15/15
Becomes dense.
3.00-3.45
SPT-6
9/18/26
Becomes wet.
4.00-4.45
SPT-7
12/20/22
Becomes uncemented.
5.00-5.45
SPT-8
17/24/33
6.00-6.45
SPT-9
18/22/27 11.0
Becomes dense.
7.00-7.45
SPT-10
21/28/28
8.00-8.45
SPT-11
17/34/38
>>
9.00-9.45
SPT-12
16/24/32
>>
10.00-10.45
18/25/35
SPT-13
>>
11.00-11.45
17/29/38
SPT-14
>>
2.0
2.5
3.0
12.73
13.8
8
10
12
22
30
44
3.5
4.0
42
4.5
5.0
>>
5.5
6.0
49
6.5
7.0
>>
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dhaba
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-56
Date
Started
02-12-2012
Coord North
inates 3247020.734
Elevation
14.23 m
Logged By
Nithin
Completed
02-12-2012
East
469100.909
Depth
20.14 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
19/30/34
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.41
22/34/50
SPT-16
>>
14.00-14.39
20/36/50
SPT-17
>>
15.00-15.37
19/40/50
SPT-18
>>
16.00-16.28
SPT-19
30/50
50
17.00-17.11
SPT-20
50
50
18.00-18.09
SPT-21
50
50
19.00-19.13
SPT-22
50
50
20.00-20.14
SPT-23
50
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-5.91
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dhaba
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
4.85 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
4/5/6
1.0
1.00-1.45
SPT-2
5/7/9
1.5
1.50-1.95
SPT-3
7/8/11
2.00-2.45
SPT-4
7/9/13
2.50-2.95
SPT-5
10/13/19
3.00-3.45
SPT-6
14/19/23 11.6
2.0
2.5
3.0
BH-57
Date
Started
05-12-2012
Coord North
inates 3246976.505
Elevation
15.86 m
Logged By
Nithin
Completed
05-12-2012
East
468977.062
Depth
20.45 m
Page No.
1 of 2
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
11
16
19
22
Becomes dense.
32
42
3.5
4.0
11.86
4.00-4.45
SPT-7
12/14/17
5.00-5.45
SPT-8
11/13/16
6.00-6.45
SPT-9
14/17/20
Becomes dense.
7.00-7.45
SPT-10
15/18/22 10.9
8.00-8.45
SPT-11
19/21/25
9.00-9.45
SPT-12
17/25/32
4.5
5.0
31
29
5.5
6.0
37
6.5
7.0
8.86
7.5
8.0
40
46
8.5
9.0
>>
9.5
10.0
10.00-10.45
20/29/35
SPT-13
>>
11.00-11.45
15/25/31
SPT-14
>>
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
A. Nabi
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
4.85 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-57
Completed
05-12-2012
East
468977.062
Depth
20.45 m
Page No.
2 of 2
Date
Started
05-12-2012
Coord North
inates 3246976.505
Elevation
15.86 m
Logged By
Nithin
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
13/21/26
SPT-15
SPT N Value
Description
10 20 30 40
Becomes dense.
47
12.5
13.0
13.00-13.45
11/19/25
SPT-16
2.86
13.5
14.0
14.00-14.45
14/25/25
SPT-17
44
50
14.5
15.0
15.00-15.45
17/27/30 18.2
SPT-18
>>
16.00-16.45
19/30/39
SPT-19
>>
17.00-17.44
16/28/50
SPT-20
>>
18.00-18.43
18/26/50
SPT-21
>>
19.00-19.45
15/24/32
SPT-22
>>
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.45
13/21/27
SPT-23
20.5
-4.59
Becomes dense.
48
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
A. Nabi
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.45 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
3/3/4
1.0
1.00-1.45
SPT-2
3/4/4
1.5
1.50-1.95
SPT-3
5/6/7
2.00-2.45
SPT-4
6/7/9
2.50-2.95
SPT-5
6/10/12
3.00-3.45
SPT-6
7/10/13
4.00-4.45
SPT-7
10/11/16
5.00-5.45
SPT-8
12/12/18
6.00-6.45
SPT-9
14/16/23 20.2
7.00-7.45
SPT-10
15/19/27
8.00-8.45
SPT-11
17/22/29
9.00-9.45
SPT-12
19/24/32
2.5
3.0
BH-58
Date
Started
09-12-2012
Coord North
inates 3247030.042
Elevation
14.7 m
Logged By
Nithin
Completed
09-12-2012
East
469036.523
Depth
20.45 m
Page No.
1 of 2
STRATA
0.50-0.95
SPT-1
2.0
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
9.1
7
8
13
16
22
23
3.5
4.0
27
4.5
5.0
Becomes dense.
30
5.5
6.0
8.70
6.5
7.0
39
46
7.5
8.0
>>
8.5
9.0
>>
9.5
10.0
10.00-10.45
21/27/38
SPT-13
Becomes brown.
>>
10.5
11.0
11.00-11.45
18/26/41
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.45 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
12.00-12.45
19/29/46
SPT-15
BOREHOLE LOG
Borehole No
BH-58
Date
Started
09-12-2012
Coord North
inates 3247030.042
Elevation
14.7 m
Logged By
Nithin
Completed
09-12-2012
East
469036.523
Depth
20.45 m
Page No.
2 of 2
STRATA
SPT N Value
Description
10 20 30 40
18.5
>>
12.5
13.0
13.00-13.45
20/31/43
SPT-16
>>
14.00-14.45
21/32/42
SPT-17
>>
13.5
14.0
14.5
15.0
15.00-15.45
22/36/44
SPT-18
>>
15.5
16.0
16.00-16.45
26/34/47
SPT-19
>>
17.00-17.45
31/39/48
SPT-20
>>
18.00-18.29
SPT-21
50
16.5
17.0
17.5
18.0
37/50
18.5
19.0
19.00-19.44
34/43/50
SPT-22
>>
19.5
20.0
20.00-20.43
32/46/50
SPT-23
20.5
>>
-5.75
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-59
Date
Started
03-12-2012
Coord North
inates 3246933.919
Elevation
17.43 m
Logged By
Amini
Completed
03-12-2012
East
468855.041
Depth
20.26 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/3
1.0
1.00-1.45
SPT-2
7/7/8
1.5
1.50-1.95
SPT-3
8/9/10
2.00-2.45
SPT-4
9/12/16
Becomes wet.
2.50-2.95
SPT-5
10/14/18
Becomes dense.
3.00-3.45
SPT-6
9/18/22
4.00-4.45
SPT-7
11/20/26
5.00-5.42
SPT-8
8/20/50
6.00-6.45
SPT-9
19/19/25
7.00-7.45
SPT-10
20/29/36
8.00-8.29
SPT-11
25/50
9.00-9.28
SPT-12
28/50
50
10.00-10.27
SPT-13
25/50
50
11.00-11.25
SPT-14
27/50
2.0
2.5
3.0
7
15
19
28
32
13.1
40
3.5
4.0
46
4.5
5.0
>>
5.5
6.0
11.43
6.5
7.0
44
>>
7.5
8.0
10.2
50
8.5
9.0
9.5
10.0
10.5
11.0
6.43
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
50
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-59
Date
Started
03-12-2012
Coord North
inates 3246933.919
Elevation
17.43 m
Logged By
Amini
Completed
03-12-2012
East
468855.041
Depth
20.26 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.29 28/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
13.00-13.41
22/41/50 15.6
SPT-16
>>
14.00-14.40
18/39/50
SPT-17
>>
13.5
14.0
14.5
15.0
15.00-15.45
22/42/45
SPT-18
2.43
15.5
16.0
>>
16.00-16.41
20/45/50
SPT-19
>>
17.00-17.44
18/35/50
SPT-20
>>
16.5
17.0
17.5
18.0
18.00-18.42
22/40/50
SPT-21
>>
18.5
19.0
19.00-19.29
SPT-22
28/50
20.00-20.26
SPT-23
33/50
50
19.5
20.0
-2.83
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-60
Date
Started
06-12-2012
Coord North
inates 3247040.994
Elevation
15.55 m
Logged By
Nithin
Completed
06-12-2012
East
468973.962
Depth
20.41 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
4/5/7
1.0
1.00-1.45
SPT-2
7/8/14
1.5
1.50-1.95
SPT-3
6/13/16
2.00-2.45
SPT-4
7/14/18
2.50-2.95
SPT-5
8/14/14
3.00-3.45
SPT-6
10/6/4
4.00-4.45
SPT-7
12/20/26
Becomes dense.
5.00-5.45
SPT-8
13/21/47
6.00-6.44
SPT-9
11/26/50 14.0
7.00-7.43
SPT-10
14/28/50
>>
8.00-8.42
SPT-11
16/31/50
>>
9.00-9.41
SPT-12
18/33/50
>>
10.00-10.42
16/38/50
SPT-13
>>
11.00-11.45
18/27/38
SPT-14
>>
2.0
2.5
3.0
12
22
12.6
29
32
28
10
3.5
4.0
46
4.5
5.0
>>
5.5
6.0
9.55
6.5
7.0
>>
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-60
Date
Started
06-12-2012
Coord North
inates 3247040.994
Elevation
15.55 m
Logged By
Nithin
Completed
06-12-2012
East
468973.962
Depth
20.41 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
20/28/34
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
19/30/36
SPT-15
>>
13.5
14.0
14.00-14.41
21/36/50 11.5
SPT-16
>>
15.00-15.39
23/34/50
SPT-17
>>
16.00-16.27
SPT-18
31/50
50
17.00-17.29
SPT-19
37/50
18.00-18.28
SPT-20
41/50
50
19.00-19.29
SPT-21
37/50
50
14.5
15.0
15.5
16.0
16.5
17.0
50
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.41
30/36/50
SPT-22
20.5
>>
-4.86
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-61
Started
03-12-2012
Coord North
inates 3247095.213
Elevation
13.95 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/3
1.0
1.00-1.45
SPT-2
3/4/5
1.5
1.50-1.95
SPT-3
4/4/6
2.00-2.45
SPT-4
9/10/12
2.50-2.95
SPT-5
11/14/16
3.00-3.45
SPT-6
16/19/22
Becomes dense.
2.0
2.5
3.0
Completed
03-12-2012
East
469034.178
Depth
20.36 m
Page No.
1 of 2
Date
9
10
11.95
16.6
22
30
41
3.5
4.0
9.95
4.00-4.45
SPT-7
17/20/26
5.00-5.45
SPT-8
13/24/33
6.00-6.45
SPT-9
19/30/44 16.0
7.00-7.41
SPT-10
18/33/50
8.00-8.36
SPT-11
17/44/50
9.00-9.45
SPT-12
14/30/36
>>
10.00-10.28
SPT-13
11/50
50
11.00-11.28
SPT-14
11/50
50
4.5
5.0
46
>>
5.5
6.0
7.95
6.5
7.0
>>
>>
7.5
8.0
5.95
8.5
9.0
>>
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dahie
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-61
Completed
03-12-2012
East
469034.178
Depth
20.36 m
Page No.
2 of 2
Date
Started
03-12-2012
Coord North
inates 3247095.213
Elevation
13.95 m
Logged By
Nithin
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.44
12/33/44
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
10/30/30
SPT-16
0.95
13.5
14.0
>>
14.00-14.45
13/22/40
SPT-17
>>
15.00-15.45
15/28/50 13.9
SPT-18
>>
16.00-16.39
11/30/50
SPT-19
>>
17.00-17.36
20/40/50
SPT-20
>>
18.00-18.24
SPT-21
22/50
50
19.00-19.13
SPT-22
50
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
-5.05
19.5
20.0
20.00-20.36
30/36/50
SPT-23
50
>>
-6.41
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dahie
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-62
Date
Started
04/12/2012
Coord North
inates 3246998.408
Elevation
17.05 m
Logged By
Nithin
Completed
04/12/2012
East
468851.940
Depth
20.26 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/2/2
1.0
1.00-1.45
SPT-2
2/2/2
1.5
1.50-1.95
SPT-3
3/2/2
2.00-2.45
SPT-4
3/3/4
2.50-2.95
SPT-5
3/4/4
3.00-3.45
SPT-6
4/5/10
4.00-4.45
SPT-7
7/9/13
5.00-5.45
SPT-8
13/19/27
6.00-6.45
SPT-9
31/37/46
7.00-7.43
SPT-10
28/32/50
8.00-8.45
SPT-11
26/34/42 11.9
>>
9.00-9.45
SPT-12
29/37/45
>>
2.0
2.5
3.0
Becomes loose.
4.0
7
8
14.05
13.1
3.5
15
22
4.5
5.0
12.05
5.5
6.0
46
>>
6.5
7.0
10.05
7.5
8.0
>>
8.5
9.0
9.5
10.0
10.00-10.45
22/33/38
SPT-13
10.5
11.0
7.05
>>
11.00-11.45
20/35/46
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Salem
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.80 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-62
Date
Started
04/12/2012
Coord North
inates 3246998.408
Elevation
17.05 m
Logged By
Nithin
Completed
04/12/2012
East
468851.940
Depth
20.26 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.28 30/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
13.00-13.41
22/40/50
SPT-16
>>
13.5
14.0
3.05
14.00-14.28
SPT-17
32/50
15.00-15.29
SPT-18
37/50
16.00-16.26
SPT-19
36/50
17.00-17.29
SPT-20
30/50
50
18.00-18.25
SPT-21
34/50
50
19.00-19.28
SPT-22
32/50
50
20.00-20.26
SPT-23
39/50
14.5
15.0
50
50
15.5
16.0
17.9
50
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-3.21
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Salem
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-63
Completed
05/12/2012
East
468911.401
Depth
20.45 m
Page No.
1 of 2
Date
Started
05/12/2012
Coord North
inates 3247051.946
Elevation
16.12 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/6/6
1.0
1.00-1.45
SPT-2
4/5/6
1.5
1.50-1.95
SPT-3
4/7/10
2.00-2.45
SPT-4
6/11/14
2.50-2.95
SPT-5
4/9/13
3.00-3.45
SPT-6
6/10/16
4.00-4.45
SPT-7
9/14/17
5.00-5.45
SPT-8
7/19/16
6.00-6.45
SPT-9
11/16/20 11.5
7.00-7.45
SPT-10
10/18/26
8.00-8.45
SPT-11
15/16/30
9.00-9.45
SPT-12
13/22/33
2.0
2.5
3.0
12
11
14.62
14.2
17
25
22
26
3.5
4.0
31
4.5
5.0
35
5.5
6.0
10.12
6.5
7.0
36
44
7.5
8.0
46
8.5
9.0
>>
9.5
10.0
10.00-10.45
9/24/44
SPT-13
10.5
11.0
6.12
>>
11.00-11.45
12/19/46
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dahie
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-63
Date
Started
05/12/2012
Coord North
inates 3247051.946
Elevation
16.12 m
Logged By
Nithin
Completed
05/12/2012
East
468911.401
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
11/20/41
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
13/26/44
SPT-16
3.12
13.5
14.0
>>
14.00-14.39
16/30/50 12.8
SPT-17
>>
15.00-15.41
14/33/50
SPT-18
>>
14.5
15.0
15.5
16.0
16.00-16.40
17/40/50
SPT-19
>>
16.5
17.0
17.00-17.45
22/44/43
SPT-20
>>
18.00-18.45
16/22/30
SPT-21
>>
19.00-19.45
19/26/36
SPT-22
>>
17.5
18.0
18.5
19.0
19.5
20.0
20.00-20.45
17/29/34
SPT-23
20.5
>>
-4.33
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dahie
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
2/3/3
1.0
1.00-1.45
SPT-2
3/5/5
1.5
1.50-1.95
SPT-3
4/6/7
2.00-2.45
SPT-4
6/7/7
2.50-2.95
SPT-5
5/6/8
3.00-3.45
SPT-6
7/9/11
2.0
2.5
3.0
BH-64
Date
Started
07/12/2012
Coord North
inates 3247009.360
Elevation
17.57 m
Logged By
Nithin
Completed
07/12/2012
East
468789.380
Depth
20.39 m
Page No.
1 of 2
STRATA
0.50-0.95
SPT-1
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
4.4
6
10
13
Becomes brown.
14
14
Becomes wet.
20
3.5
4.0
13.57
4.00-4.45
SPT-7
10/11/11 17.4
5.00-5.45
SPT-8
13/14/20
6.00-6.14
SPT-9
50
7.00-7.45
SPT-10
20/26/40
8.00-8.43
SPT-11
19/30/50
>>
9.00-9.45
SPT-12
16/24/36
>>
4.5
5.0
22
34
5.5
6.0
50
>>
6.5
7.0
10.57
7.5
8.0
8.5
9.0
9.5
10.0
10.00-10.41
18/33/50
SPT-13
7.57
10.5
11.0
11.00-11.45
15/30/37 14.5
SPT-14
11.5
>>
>>
6.57
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dahie
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-64
Date
Started
07/12/2012
Coord North
inates 3247009.360
Elevation
17.57 m
Logged By
Nithin
Completed
07/12/2012
East
468789.380
Depth
20.39 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
18/26/40
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.40
13/37/50
SPT-16
>>
14.00-14.44
21/36/50
SPT-17
>>
15.00-15.28
SPT-18
50
13.5
14.0
14.5
15.0
19/50
15.5
16.0
16.00-16.41
20/40/50 18.1
SPT-19
1.57
16.5
17.0
>>
17.00-17.44
26/36/50
SPT-20
>>
18.00-18.41
30/44/50
SPT-21
>>
19.00-19.28
SPT-22
50
17.5
18.0
18.5
19.0
24/50
19.5
20.0
20.00-20.39
30/36/50
SPT-23
>>
-2.82
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dahie
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
1.0
1.00-1.45
SPT-2
5/4/5
1.5
1.50-1.95
SPT-3
5/5/6
2.00-2.45
SPT-4
6/7/9
2.50-2.95
SPT-5
6/7/12
3.00-3.45
SPT-6
7/9/14
Becomes moist.
4.00-4.45
SPT-7
12/15/19
5.00-5.45
SPT-8
15/20/24 17.1
6.00-6.45
SPT-9
16/22/28
7.00-7.45
SPT-10
18/21/27
3.0
Started
04/12/2012
Coord North
inates 3247062.898
Elevation
16.73 m
Logged By
Amini
Completed
04/12/2012
East
468848.840
Depth
20.45 m
Page No.
1 of 2
SPT N Value
Description
3/4/4
2.5
BH-65
Date
STRATA
0.50-0.95
SPT-1
2.0
BOREHOLE LOG
Borehole No
10 20 30 40
13.9
8
9
11
16
19
23
3.5
4.0
34
4.5
5.0
11.73
5.5
6.0
44
50
6.5
7.0
48
7.5
8.0
8.73
8.00-8.45
SPT-11
17/24/29
9.00-9.45
SPT-12
15/25/32
>>
10.00-10.45
19/29/35
SPT-13
>>
11.00-11.45
16/28/39
SPT-14
>>
8.5
9.0
>>
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Nabi
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-65
Date
Started
04/12/2012
Coord North
inates 3247062.898
Elevation
16.73 m
Logged By
Amini
Completed
04/12/2012
East
468848.840
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.43
15/30/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.44
13/27/50 14.4
SPT-16
Becomes brown.
>>
13.5
14.0
14.00-14.45
19/33/41
SPT-17
>>
15.00-15.25
SPT-18
28/50
50
16.00-16.28
SPT-19
25/50
14.5
15.0
15.5
16.0
50
>>
16.5
17.0
17.00-17.45
19/25/35
SPT-20
17.5
18.0
18.00-18.45
15/29/39
SPT-21
>>
19.00-19.45
16/24/31
SPT-22
>>
18.5
19.0
19.5
20.0
20.00-20.45
14/22/28
SPT-23
20.5
50
-3.72
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Nabi
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.20 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-66
Date
Started
08/12/2012
Coord North
inates 3247116.435
Elevation
15.5 m
Logged By
Amini
Completed
08/12/2012
East
468908.300
Depth
20.45 m
Page No.
1 of 2
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/4
1.0
1.00-1.45
SPT-2
3/4/5
1.5
1.50-1.95
SPT-3
5/3/3
2.00-2.45
SPT-4
5/4/5
2.50-2.95
SPT-5
6/7/9
3.00-3.45
SPT-6
6/6/10
4.00-4.41
SPT-7
17/29/50
5.00-5.42
SPT-8
16/28/50 12.8
>>
6.00-6.42
SPT-9
16/30/50
>>
7.00-7.44
SPT-10
16/32/50
>>
8.00-8.45
SPT-11
17/34/49
>>
9.00-9.44
SPT-12
15/32/50
2.0
2.5
3.0
3.5
7
9
6
13.00
16
16
3.5
4.0
>>
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
6.50
9.5
10.0
>>
10.00-10.45
18/31/47
SPT-13
>>
11.00-11.44
15/34/50 15.1
SPT-14
>>
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.20 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-66
Date
Started
08/12/2012
Coord North
inates 3247116.435
Elevation
15.5 m
Logged By
Amini
Completed
08/12/2012
East
468908.300
Depth
20.45 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.43
16/32/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.43
19/31/50
SPT-16
>>
14.00-14.45
18/33/44
SPT-17
>>
15.00-15.41
17/29/50
SPT-18
>>
13.5
14.0
14.5
15.0
15.5
16.0
16.00-16.42
20/38/50
SPT-19
-0.50
16.5
17.0
>>
17.00-17.45
18/35/46
SPT-20
>>
18.00-18.45
16/29/44
SPT-21
>>
17.5
18.0
18.5
19.0
19.00-19.45
17/25/34
SPT-22
>>
19.5
20.0
20.00-20.45
14/22/29
SPT-23
20.5
>>
-4.95
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
3/3/4
1.0
1.00-1.45
SPT-2
3/4/4
1.5
1.50-1.95
SPT-3
7/14/13
2.00-2.45
SPT-4
11/14/16
2.50-2.95
SPT-5
16/19/22
3.00-3.45
SPT-6
17/22/26
4.00-4.45
SPT-7
19/20/30
5.00-5.45
SPT-8
17/23/39
6.00-6.36
SPT-9
18/30/50
7.00-7.39
SPT-10
20/44/50
8.00-8.45
SPT-11
16/24/40
9.00-9.45
SPT-12
14/20/33 11.8
2.5
3.0
BH-67
Completed
02/12/2012
East
468967.447
Depth
20.09 m
Page No.
1 of 2
Date
Started
02/12/2012
Coord North
inates 3247169.691
Elevation
13.9 m
Logged By
Nithin
STRATA
0.50-0.95
SPT-1
2.0
Borehole No
SPT N Value
Description
10 20 30 40
4.9
7
8
27
Becomes wet.
30
11.40
41
48
3.5
4.0
8.8
50
4.5
5.0
>>
5.5
6.0
>>
6.5
7.0
6.90
7.5
8.0
>>
>>
8.5
9.0
>>
9.5
10.0
10.00-10.45
13/22/26
SPT-13
Becomes dense.
11.00-11.36
17/30/50
SPT-14
48
10.5
11.0
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dahie
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-67
Date
Started
02/12/2012
Coord North
inates 3247169.691
Elevation
13.9 m
Logged By
Nithin
Completed
02/12/2012
East
468967.447
Depth
20.09 m
Page No.
2 of 2
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.41
16/33/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.44
14/27/50
SPT-16
>>
13.5
14.0
14.00-14.45
11/24/40
SPT-17
>>
14.5
15.0
15.00-15.41
13/30/50
SPT-18
>>
16.00-16.39
14/34/50
SPT-19
>>
17.00-17.41
10/40/50
SPT-20
>>
18.00-18.28
SPT-21
20/50
50
19.00-19.14
SPT-22
50
50
20.00-20.09
SPT-23
50
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-6.19
50
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Dahie
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-68
Date
Started
21/11/2012
Coord North
inates 3246841.439
Elevation
16.285 m
Logged By
Nithin
Completed
21/11/2012
East
469200.676
Depth
29.1 m
Page No.
1 of 3
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
2/2/3
1.0
1.00-1.45
SPT-2
6/7/7
1.5
1.50-1.95
SPT-3
6/10/12
2.00-2.45
SPT-4
7/10/11
2.50-2.95
SPT-5
7/10/13
3.00-3.45
SPT-6
7/10/13
4.00-4.45
SPT-7
10/14/16
5.00-5.45
SPT-8
14/16/23
6.00-6.45
SPT-9
18/24/30
7.00-7.44
SPT-10
24/32/50 11.4
>>
8.00-8.44
SPT-11
31/34/50
>>
9.00-9.45
SPT-12
18/33/44
2.0
2.5
3.0
13.1
5
14
22
21
13.79
14.2
23
23
3.5
4.0
Becomes dense.
30
4.5
5.0
39
5.5
6.0
10.29
6.5
7.0
>>
7.5
8.0
8.5
9.0
>>
9.5
10.0
10.00-10.45
17/36/47
SPT-13
>>
10.5
11.0
11.00-11.45
19/34/45
SPT-14
11.5
5.29
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
>>
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-68
Date
Started
21/11/2012
Coord North
inates 3246841.439
Elevation
16.285 m
Logged By
Nithin
Completed
21/11/2012
East
469200.676
Depth
29.1 m
Page No.
2 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
23/33/43
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
3.29
13.00-13.45
24/34/41
SPT-16
13.5
14.0
>>
14.00-14.27
SPT-17
33/50
15.00-15.08
SPT-18
50
16.00-16.05
SPT-19
50
50
17.00-17.09
SPT-20
50
50
50
14.5
15.0
13.7
50
15.5
16.0
16.5
17.0
17.5
18.0
18.00-18.43
25/46/50
SPT-21
18.5
19.0
-1.72
>>
19.00-19.43
31/48/50
SPT-22
>>
20.00-20.28
SPT-23
39/50
50
21.00-21.27
SPT-24
41/50
50
22.00-22.28
SPT-25
46/50
50
23.00-23.27
SPT-26
38/50
50
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-68
Date
Started
21/11/2012
Coord North
inates 3246841.439
Elevation
16.285 m
Logged By
Nithin
Completed
21/11/2012
East
469200.676
Depth
29.1 m
Page No.
3 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.28 36/50
SPT-27
SPT N Value
Description
10 20 30 40
50
24.5
25.0
25.00-25.26
SPT-28
34/50
50
26.00-26.29
SPT-29
37/50
50
27.00-27.28
SPT-30
39/50
28.00-28.27
SPT-31
41/50
29.00-29.10
SPT-32
50
25.5
26.0
26.5
27.0
50
27.5
28.0
50
28.5
29.0
-12.82
50
29.5
30.0
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.40 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-69
Date
Started
14/11/2012
Coord North
inates 3246658.922
Elevation
17.731 m
Logged By
Nithin
Completed
17/11/2012
East
469147.417
Depth
30.27 m
Page No.
1 of 3
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/4
1.0
1.00-1.45
SPT-2
3/4/6
1.5
1.50-1.95
SPT-3
5/7/7
2.00-2.45
SPT-4
5/5/6
2.50-2.95
SPT-5
6/8/8
3.00-3.45
SPT-6
10/10/11
4.00-4.45
SPT-7
11/14/21
5.00-5.45
SPT-8
12/16/25
6.00-6.45
SPT-9
15/21/26
7.00-7.45
SPT-10
25/28/32
8.00-8.45
SPT-11
29/31/35
>>
9.00-9.45
SPT-12
17/26/42
>>
10.00-10.45
23/28/31
SPT-13
>>
11.00-11.45
20/25/31
SPT-14
>>
2.0
2.5
3.0
10
14
11
10.8
16
14.73
3.5
4.0
21
Becomes dense.
35
4.5
5.0
41
5.5
6.0
11.73
6.5
7.0
47
>>
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.40 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-69
Completed
17/11/2012
East
469147.417
Depth
30.27 m
Page No.
2 of 3
Date
Started
14/11/2012
Coord North
inates 3246658.922
Elevation
17.731 m
Logged By
Nithin
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
17/24/32
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
18/25/33
SPT-16
>>
13.5
14.0
14.00-14.45
20/25/36 14.4
SPT-17
3.73
14.5
15.0
15.00-15.45
21/27/38
SPT-18
>>
>>
15.5
16.0
16.00-16.45
24/31/41
SPT-19
>>
16.5
17.0
0.73
17.00-17.40
32/43/50
SPT-20
17.5
18.0
>>
18.00-18.28
SPT-21
34/50
50
19.00-19.26
SPT-22
38/50
50
20.00-20.28
SPT-23
35/50
21.00-21.29
SPT-24
31/50
22.00-22.27
SPT-25
33/50
18.5
19.0
19.5
20.0
50
20.5
21.0
17.3
50
21.5
22.0
50
22.5
23.0
23.00-23.41
24/37/50
SPT-26
>>
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.40 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-69
Date
Started
14/11/2012
Coord North
inates 3246658.922
Elevation
17.731 m
Logged By
Nithin
Completed
17/11/2012
East
469147.417
Depth
30.27 m
Page No.
3 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.39
27/41/50
SPT-27
SPT N Value
Description
10 20 30 40
>>
24.5
25.0
25.00-25.27
SPT-28
34/50
50
26.00-26.26
SPT-29
37/50
50
27.00-27.29
SPT-30
35/50
50
28.00-28.28
SPT-31
32/50
29.00-29.26
SPT-32
36/50
30.00-30.27
SPT-33
38/50
25.5
26.0
26.5
27.0
27.5
28.0
15.1
50
28.5
29.0
50
29.5
30.0
-12.54
50
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.70 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-70
Started
05/11/2012
Coord North
inates 3246674.739
Elevation
18.209 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
6/5/4
1.0
1.00-1.45
SPT-2
4/5/6
1.5
1.50-1.95
SPT-3
3/5/6
2.00-2.45
SPT-4
3/4/4
Becomes loose.
2.50-2.95
SPT-5
4/4/3
3.00-3.45
SPT-6
5/4/3
4.00-4.45
SPT-7
5/6/6
5.00-5.45
SPT-8
7/6/7
6.00-6.45
SPT-9
11/14/20
7.00-7.45
SPT-10
17/24/37 11.6
2.0
2.5
3.0
Completed
05/11/2012
East
469239.708
Depth
30.27 m
Page No.
1 of 3
Date
17.21
2.8
9
11
11
8
7
7
3.5
4.0
12
4.5
5.0
13
5.5
6.0
Becomes dense.
34
6.5
7.0
11.21
7.5
8.0
8.00-8.28
SPT-11
34/50
9.00-9.25
SPT-12
35/50
>>
50
8.5
9.0
50
9.5
10.0
10.00-10.45
21/28/30
SPT-13
>>
10.5
11.0
11.00-11.45
12/15/20
SPT-14
11.5
7.21
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
35
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.70 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
12.00-12.45
11/17/22
SPT-15
BOREHOLE LOG
Borehole No
BH-70
Date
Started
05/11/2012
Coord North
inates 3246674.739
Elevation
18.209 m
Logged By
Nithin
Completed
05/11/2012
East
469239.708
Depth
30.27 m
Page No.
2 of 3
STRATA
SPT N Value
Description
10 20 30 40
16.5
39
12.5
13.0
13.00-13.45
13/25/33
SPT-16
>>
13.5
14.0
14.00-14.45
12/24/30
SPT-17
4.21
14.5
15.0
>>
15.00-15.45
16/26/34
SPT-18
>>
15.5
16.0
16.00-16.45
15/20/21
SPT-19
41
16.5
17.0
17.00-17.45
14/17/19
SPT-20
36
17.5
18.0
18.00-18.45
15/15/16
SPT-21
31
18.5
19.0
19.00-19.45
17/20/28
SPT-22
48
19.5
20.0
20.00-20.45
20/26/30
SPT-23
>>
20.5
21.0
21.00-21.45
15/33/39
SPT-24
>>
21.5
22.0
22.00-22.45
23/29/37 14.8
SPT-25
22.5
23.0
-3.79
>>
23.00-23.45
22/27/39
SPT-26
>>
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.70 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-70
Date
Started
05/11/2012
Coord North
inates 3246674.739
Elevation
18.209 m
Logged By
Nithin
Completed
05/11/2012
East
469239.708
Depth
30.27 m
Page No.
3 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.45
20/25/44
SPT-27
SPT N Value
Description
10 20 30 40
>>
24.5
25.0
25.00-25.28
SPT-28
24/50
50
26.00-26.25
SPT-29
27/50
50
27.00-27.23
SPT-30
28/50
50
28.00-28.28
SPT-31
26/50
50
29.00-29.26
SPT-32
27/50
50
30.00-30.27
SPT-33
28/50
25.5
26.0
26.5
27.0
27.5
28.0
28.5
29.0
29.5
30.0
-12.06
50
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-71
Completed
14/11/2012
East
469330.976
Depth
30.25 m
Page No.
1 of 3
Date
Started
13/11/2012
Coord North
inates 3246692.559
Elevation
17.378 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
4/6/7
1.0
1.00-1.45
SPT-2
5/7/8
1.5
1.50-1.95
SPT-3
7/8/7
Becomes brown.
2.00-2.45
SPT-4
8/8/9
2.50-2.95
SPT-5
7/9/9
3.00-3.45
SPT-6
6/7/11
2.0
2.5
3.0
0.9
13
15
15
17
18
12.1
18
3.5
4.0
13.38
4.00-4.45
SPT-7
13/17/19
5.00-5.45
SPT-8
14/18/28
6.00-6.45
SPT-9
16/23/34
7.00-7.45
SPT-10
16/25/35
>>
8.00-8.45
SPT-11
17/26/39
>>
9.00-9.45
SPT-12
19/27/46
>>
4.5
5.0
36
46
5.5
6.0
>>
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.00-10.44
21/30/50
SPT-13
>>
10.5
11.0
11.00-11.42
26/38/50
SPT-14
11.5
6.38
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
>>
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-71
Date
Started
13/11/2012
Coord North
inates 3246692.559
Elevation
17.378 m
Logged By
Nithin
Completed
14/11/2012
East
469330.976
Depth
30.25 m
Page No.
2 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.40
29/43/50
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.29
SPT-16
33/50
11.3
50
13.5
14.0
14.00-14.43
27/41/50
SPT-17
>>
14.5
15.0
15.00-15.42
30/38/50
SPT-18
15.5
16.0
16.00-16.24
SPT-19
2.38
>>
37/50
50
16.5
17.0
17.00-17.43
23/32/50
SPT-20
>>
18.00-18.41
26/40/50
SPT-21
>>
19.00-19.39
31/43/50
SPT-22
>>
20.00-20.29
SPT-23
50
17.5
18.0
18.5
19.0
19.5
20.0
35/50
20.5
21.0
21.00-21.38
28/44/50
SPT-24
>>
22.00-22.39
32/46/50
SPT-25
>>
23.00-23.28
SPT-26
50
21.5
22.0
22.5
23.0
36/50
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
3.60 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
24.00-24.29 32/50
SPT-27
BOREHOLE LOG
Borehole No
BH-71
Date
Started
13/11/2012
Coord North
inates 3246692.559
Elevation
17.378 m
Logged By
Nithin
Completed
14/11/2012
East
469330.976
Depth
30.25 m
Page No.
3 of 3
STRATA
SPT N Value
Description
10 20 30 40
50
24.5
25.0
25.00-25.27
SPT-28
34/50
50
26.00-26.25
SPT-29
37/50
50
25.5
26.0
26.5
27.0
27.00-27.37
29/45/50
SPT-30
>>
28.00-28.28
SPT-31
33/50
50
29.00-29.26
SPT-32
37/50
50
30.00-30.25
SPT-33
39/50
27.5
28.0
28.5
29.0
29.5
30.0
-12.87
50
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Sayed
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-72
Completed
01/12/2012
East
468986.364
Depth
30.29 m
Page No.
1 of 3
Date
Started
01/12/2012
Coord North
inates 3246783.036
Elevation
18.6 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
2/2/3
1.0
1.00-1.45
SPT-2
4/5/4
1.5
1.50-1.95
SPT-3
5/6/6
2.00-2.45
SPT-4
7/8/14
22
2.50-2.95
SPT-5
7/10/11
21
3.00-3.45
SPT-6
8/9/10
4.00-4.45
SPT-7
8/10/12
5.00-5.45
SPT-8
11/17/20
6.00-6.45
SPT-9
11/18/22
7.00-7.45
SPT-10
14/20/24
8.00-8.45
SPT-11
16/25/37
9.00-9.45
SPT-12
17/27/42
>>
10.00-10.45
16/25/36
SPT-13
>>
11.00-11.45
18/27/40
SPT-14
>>
2.0
2.5
3.0
17.60
14.0
5
9
12
19
3.5
4.0
22
4.5
5.0
37
5.5
6.0
40
6.5
7.0
44
7.5
8.0
>>
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-72
Date
Started
01/12/2012
Coord North
inates 3246783.036
Elevation
18.6 m
Logged By
Nithin
Completed
01/12/2012
East
468986.364
Depth
30.29 m
Page No.
2 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.29 26/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
13.00-13.45
20/30/44
SPT-16
13.5
14.0
5.60
>>
14.00-14.45
18/27/35
SPT-17
>>
15.00-15.44
20/29/50 14.7
SPT-18
>>
16.00-16.43
22/30/50
SPT-19
>>
17.00-17.25
SPT-20
37/50
50
18.00-18.14
SPT-21
50
50
19.00-19.26
SPT-22
35/50
50
20.00-20.29
SPT-23
36/50
50
21.00-21.26
SPT-24
37/50
50
22.00-22.25
SPT-25
38/50
50
23.00-23.14
SPT-26
50
50
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-72
Date
Started
01/12/2012
Coord North
inates 3246783.036
Elevation
18.6 m
Logged By
Nithin
Completed
01/12/2012
East
468986.364
Depth
30.29 m
Page No.
3 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.41
29/40/50
SPT-27
SPT N Value
Description
10 20 30 40
>>
24.5
25.0
25.00-25.29
SPT-28
30/50
26.00-26.25
SPT-29
33/50
27.00-27.26
SPT-30
40/50
50
28.00-28.25
SPT-31
37/50
50
50
25.5
26.0
16.8
50
26.5
27.0
27.5
28.0
28.5
29.0
29.00-29.42
29/36/50
SPT-32
>>
29.5
30.0
30.00-30.29
SPT-33
30/50
-11.69
50
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
1.0
1.00-1.45
SPT-2
5/5/5
1.5
1.50-1.95
SPT-3
4/6/9
2.00-2.45
SPT-4
7/7/11
2.50-2.95
SPT-5
6/10/10
3.00-3.45
SPT-6
7/9/13
4.00-4.45
SPT-7
9/10/10
5.00-5.45
SPT-8
10/13/16
6.00-6.45
SPT-9
10/12/13 17.2
7.00-7.45
SPT-10
11/13/15
8.00-8.45
SPT-11
12/14/29
Becomes dense.
9.00-9.45
SPT-12
22/33/38
3.0
SPT N Value
10 20 30 40
12.8
9
10
15
18
20
12.52
3.5
4.0
Completed
05/12/2012
East
469039.623
Depth
30.29 m
Page No.
1 of 3
Started
05/12/2012
Coord North
inates 3246965.553
Elevation
15.52 m
Logged By
Nithin
Description
3/5/4
2.5
BH-73
Date
STRATA
0.50-0.95
SPT-1
2.0
BOREHOLE LOG
Borehole No
22
20
4.5
5.0
29
5.5
6.0
25
6.5
7.0
28
7.5
8.0
43
8.5
9.0
>>
9.5
10.0
10.00-10.45
25/36/42
SPT-13
10.5
11.0
5.52
>>
11.00-11.45
30/38/46
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Salem
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-73
Date
Started
05/12/2012
Coord North
inates 3246965.553
Elevation
15.52 m
Logged By
Nithin
Completed
05/12/2012
East
469039.623
Depth
30.29 m
Page No.
2 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.29 32/50
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
13.00-13.45
20/25/36
SPT-16
>>
14.00-14.45
22/31/40
SPT-17
>>
15.00-15.45
17/33/46
SPT-18
>>
16.00-16.44
19/32/50
SPT-19
>>
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.00-17.45
26/40/48 15.6
SPT-20
>>
17.5
18.0
18.00-18.29
SPT-21
30/50
50
19.00-19.27
SPT-22
32/50
50
20.00-20.26
SPT-23
36/50
50
21.00-21.29
SPT-24
40/50
50
22.00-22.25
SPT-25
34/50
18.5
19.0
19.5
20.0
20.5
21.0
21.5
22.0
50
22.5
23.0
23.00-23.45
22/40/47
SPT-26
>>
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Salem
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-73
Date
Started
05/12/2012
Coord North
inates 3246965.553
Elevation
15.52 m
Logged By
Nithin
Completed
05/12/2012
East
469039.623
Depth
30.29 m
Page No.
3 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.42
30/38/50
SPT-27
SPT N Value
Description
10 20 30 40
>>
24.5
25.0
25.00-25.29
SPT-28
35/50
50
26.00-26.27
SPT-29
37/50
50
27.00-27.28
SPT-30
30/50
28.00-28.26
SPT-31
37/50
50
29.00-29.28
SPT-32
40/50
50
30.00-30.29
SPT-33
29/50
25.5
26.0
26.5
27.0
16.1
50
27.5
28.0
28.5
29.0
29.5
30.0
-14.77
50
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Salem
BOREHOLE LOG
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.40 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
Borehole No
BH-74
Completed
01/12/2012
East
468914.501
Depth
30.45 m
Page No.
1 of 3
Date
Started
01/12/2012
Coord North
inates 3246987.456
Elevation
16.4 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
6/6/8
1.0
1.00-1.45
SPT-2
8/10/12
1.5
1.50-1.95
SPT-3
12/17/21 11.2
2.00-2.45
SPT-4
14/21/28
2.50-2.95
SPT-5
17/22/34
3.00-3.45
SPT-6
19/25/38
>>
4.00-4.44
SPT-7
16/32/50
>>
5.00-5.45
SPT-8
14/26/24 12.7
6.00-6.45
SPT-9
12/18/21
7.00-7.45
SPT-10
11/18/23
Becomes uncemented.
8.00-8.45
SPT-11
12/18/26
9.00-9.45
SPT-12
14/19/29
2.0
2.5
3.0
14
22
38
49
>>
3.5
4.0
4.5
5.0
50
5.5
6.0
39
6.5
7.0
41
7.5
8.0
44
8.5
9.0
48
9.5
10.0
10.00-10.45
13/19/28
SPT-13
10.5
11.0
6.40
11.00-11.45
12/17/26
SPT-14
47
43
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.40 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-74
Date
Started
01/12/2012
Coord North
inates 3246987.456
Elevation
16.4 m
Logged By
Nithin
Completed
01/12/2012
East
468914.501
Depth
30.45 m
Page No.
2 of 3
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
13/18/28
SPT-15
SPT N Value
Description
10 20 30 40
Becomes yellow.
46
12.5
13.0
13.00-13.45
14/19/29
SPT-16
48
13.5
14.0
14.00-14.45
18/31/39
SPT-17
>>
14.5
15.0
15.00-15.42
20/38/50
SPT-18
>>
16.00-16.41
21/44/50
SPT-19
>>
17.00-17.45
18/34/41 11.1
SPT-20
>>
18.00-18.45
16/27/43
SPT-21
>>
19.00-19.45
14/24/44
SPT-22
>>
20.00-20.45
17/21/33
SPT-23
>>
21.00-21.45
18/22/30
SPT-24
>>
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.5
21.0
21.5
22.0
22.00-22.45
13/20/27
SPT-25
Becomes dense.
47
22.5
23.0
23.00-23.45
12/18/24
SPT-26
42
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.40 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
24.00-24.45
12/17/25
SPT-27
BOREHOLE LOG
Borehole No
BH-74
Date
Started
01/12/2012
Coord North
inates 3246987.456
Elevation
16.4 m
Logged By
Nithin
Completed
01/12/2012
East
468914.501
Depth
30.45 m
Page No.
3 of 3
STRATA
SPT N Value
Description
10 20 30 40
16.2
42
24.5
25.0
25.00-25.45
13/19/26
SPT-28
45
25.5
26.0
26.00-26.45
15/20/28
SPT-29
48
26.5
27.0
27.00-27.45
16/22/29
SPT-30
>>
27.5
28.0
28.00-28.45
18/23/31
SPT-31
>>
29.00-29.45
16/22/33
SPT-32
>>
28.5
29.0
29.5
30.0
30.00-30.45
18/24/36
SPT-33
30.5
>>
-14.05
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Hassan
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
1.50 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-75
Completed
11/11/2012
East
469144.317
Depth
50.11 m
Page No.
1 of 5
Date
Started
08/11/2012
Coord North
inates 3246723.412
Elevation
18.335 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/3
1.0
1.00-1.45
SPT-2
4/4/4
1.5
1.50-1.95
SPT-3
5/6/7
2.00-2.45
SPT-4
4/6/9
2.50-2.95
SPT-5
6/8/11
3.00-3.45
SPT-6
8/10/14
2.0
2.5
3.0
7
8
13
12.9
15
19
24
3.5
4.0
14.34
4.00-4.45
SPT-7
10/15/20
5.00-5.45
SPT-8
11/16/23
6.00-6.45
SPT-9
13/18/27
7.00-7.45
SPT-10
16/20/29 12.8
49
8.00-8.45
SPT-11
19/23/26
49
9.00-9.45
SPT-12
18/22/27
49
4.5
5.0
35
39
5.5
6.0
45
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.00-10.45
16/19/25
SPT-13
44
10.5
11.0
11.00-11.45
19/23/30
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-75
Date
Started
08/11/2012
Coord North
inates 3246723.412
Elevation
18.335 m
Logged By
Nithin
Completed
11/11/2012
East
469144.317
Depth
50.11 m
Page No.
2 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
22/25/29
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
20/27/35
SPT-16
>>
13.5
14.0
14.00-14.45
21/29/45
SPT-17
14.5
15.0
4.34
>>
15.00-15.29
SPT-18
25/50
50
16.00-16.25
SPT-19
39/50
50
17.00-17.27
SPT-20
35/50
50
15.5
16.0
16.5
17.0
17.5
18.0
18.00-18.44
33/35/50 19.7
SPT-21
>>
19.00-19.45
21/30/45
SPT-22
>>
20.00-20.38
28/39/50
SPT-23
>>
21.00-21.27
SPT-24
37/50
50
22.00-22.29
SPT-25
34/50
50
23.00-23.29
SPT-26
30/50
50
18.5
19.0
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-75
Date
Started
08/11/2012
Coord North
inates 3246723.412
Elevation
18.335 m
Logged By
Nithin
Completed
11/11/2012
East
469144.317
Depth
50.11 m
Page No.
3 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.26 33/50
SPT-27
SPT N Value
Description
10 20 30 40
50
24.5
25.0
25.00-25.25
SPT-28
35/50
26.00-26.27
SPT-29
30/50
50
27.00-27.25
SPT-30
34/50
50
28.00-28.12
SPT-31
50
50
29.00-29.10
SPT-32
50
50
30.00-30.14
SPT-33
50
50
31.00-31.13
SPT-34
50
50
32.00-32.26
SPT-35
33/50
50
33.00-33.26
SPT-36
35/50
50
14.4
50
25.5
26.0
26.5
27.0
27.5
28.0
28.5
29.0
29.5
30.0
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.00-34.41
30/37/50
SPT-37
>>
35.00-35.29
SPT-38
50
34.5
35.0
33/50
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-75
Date
Started
08/11/2012
Coord North
inates 3246723.412
Elevation
18.335 m
Logged By
Nithin
Completed
11/11/2012
East
469144.317
Depth
50.11 m
Page No.
4 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
36.00-36.14
50
SPT-39
SPT N Value
Description
10 20 30 40
50
36.5
37.0
37.00-37.11
SPT-40
50
50
38.00-38.13
SPT-41
50
50
39.00-39.14
SPT-42
50
50
40.00-40.12
SPT-43
50
50
41.00-41.10
SPT-44
50
50
42.00-42.13
SPT-45
50
50
43.00-43.14
SPT-46
50
50
44.00-44.23
SPT-47
40/50
50
45.00-45.24
SPT-48
42/50
50
46.00-46.22
SPT-49
45/50
50
47.00-47.14
SPT-50
50
50
37.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
41.5
42.0
42.5
43.0
43.5
44.0
44.5
45.0
45.5
46.0
46.5
47.0
47.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
1.50 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-75
Date
Started
08/11/2012
Coord North
inates 3246723.412
Elevation
18.335 m
Logged By
Nithin
Completed
11/11/2012
East
469144.317
Depth
50.11 m
Page No.
5 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
48.00-48.12
SPT-51
SPT N Value
Description
10 20 30 40
50
48.5
49.0
49.00-49.13
SPT-52
50
50.00-50.11
SPT-53
50
50
49.5
50.0
-31.78
50
50.5
51.0
51.5
52.0
52.5
53.0
53.5
54.0
54.5
55.0
55.5
56.0
56.5
57.0
57.5
58.0
58.5
59.0
59.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.70 m
1.70 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-76
Date
Started
05/11/2012
Coord North
inates 3246739.229
Elevation
17.003 m
Logged By
Nithin
Completed
07/11/2012
East
469236.608
Depth
50.14 m
Page No.
1 of 5
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/3/3
1.0
1.00-1.45
SPT-2
4/5/4
1.5
1.50-1.95
SPT-3
5/5/6
2.00-2.45
SPT-4
7/6/7
2.50-2.95
SPT-5
5/7/6
3.00-3.45
SPT-6
4/6/5
11
4.00-4.45
SPT-7
5/4/6
10
5.00-5.45
SPT-8
6/7/9
6.00-6.45
SPT-9
12/16/18
7.00-7.45
SPT-10
15/19/25
2.0
2.5
3.0
6
9
11
4.9
13
13
3.5
4.0
4.5
5.0
16
5.5
6.0
11.00
6.5
7.0
34
44
7.5
8.0
9.00
8.00-8.45
SPT-11
17/26/34 13.6
9.00-9.45
SPT-12
19/30/39
8.5
9.0
>>
>>
9.5
10.0
10.00-10.29
SPT-13
25/50
50
10.5
11.0
11.00-11.10
SPT-14
50
50
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.70 m
1.70 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-76
Completed
07/11/2012
East
469236.608
Depth
50.14 m
Page No.
2 of 5
Date
Started
05/11/2012
Coord North
inates 3246739.229
Elevation
17.003 m
Logged By
Nithin
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
12.00-12.10
SPT-15
SPT N Value
Description
10 20 30 40
50
12.5
13.0
13.00-13.06
SPT-16
50
50
14.00-14.06
SPT-17
50
50
15.00-15.08
SPT-18
50
16.00-16.29
SPT-19
30/50
50
17.00-17.28
SPT-20
26/50
50
18.00-18.26
SPT-21
30/50
19.00-19.24
SPT-22
35/50
20.00-20.26
SPT-23
40/50
50
21.00-21.27
SPT-24
42/50
50
22.00-22.29
SPT-25
40/50
50
23.00-23.28
SPT-26
43/50
50
13.5
14.0
14.5
15.0
2.00
15.5
16.0
50
16.5
17.0
17.5
18.0
13.9
50
18.5
19.0
50
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.70 m
1.70 m
63.5 kg/760 mm (Auto)
Sample
SPT N/
Depth (m)
150 mm
& No.
24.00-24.25 33/50
SPT-27
BOREHOLE LOG
Borehole No
BH-76
Date
Started
05/11/2012
Coord North
inates 3246739.229
Elevation
17.003 m
Logged By
Nithin
Completed
07/11/2012
East
469236.608
Depth
50.14 m
Page No.
3 of 5
STRATA
SPT N Value
Description
10 20 30 40
50
24.5
25.0
25.00-25.26
SPT-28
39/50
50
26.00-26.29
SPT-29
30/50
50
27.00-27.27
SPT-30
33/50
25.5
26.0
26.5
27.0
50
27.5
28.0
28.00-28.41
28/39/50
SPT-31
>>
29.00-29.28
SPT-32
30/50
50
30.00-30.29
SPT-33
35/50
50
31.00-31.26
SPT-34
37/50
50
32.00-32.25
SPT-35
40/50
50
33.00-33.14
SPT-36
50
50
34.00-34.13
SPT-37
50
50
35.00-35.25
SPT-38
34/50
28.5
29.0
29.5
30.0
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
34.5
35.0
Becomes yellow.
50
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.70 m
1.70 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-76
Date
Started
05/11/2012
Coord North
inates 3246739.229
Elevation
17.003 m
Logged By
Nithin
Completed
07/11/2012
East
469236.608
Depth
50.14 m
Page No.
4 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
36.00-36.23 44/50
SPT-39
SPT N Value
Description
10 20 30 40
50
36.5
37.0
37.00-37.14
SPT-40
50
50
38.00-38.13
SPT-41
50
50
39.00-39.11
SPT-42
50
50
40.00-40.14
SPT-43
50
50
41.00-41.12
SPT-44
50
50
42.00-42.11
SPT-45
50
50
43.00-43.13
SPT-46
50
50
44.00-44.14
SPT-47
50
50
45.00-45.27
SPT-48
38/50
50
46.00-46.26
SPT-49
40/50
50
47.00-47.23
SPT-50
43/50
50
37.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
41.5
42.0
42.5
43.0
43.5
44.0
44.5
45.0
45.5
46.0
46.5
47.0
47.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
2.70 m
1.70 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-76
Date
Started
05/11/2012
Coord North
inates 3246739.229
Elevation
17.003 m
Logged By
Nithin
Completed
07/11/2012
East
469236.608
Depth
50.14 m
Page No.
5 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
48.00-48.25 40/50
SPT-51
SPT N Value
Description
10 20 30 40
50
48.5
49.0
49.00-49.24
SPT-52
45/50
50.00-50.14
SPT-53
50
50
49.5
50.0
-33.14
50
50.5
51.0
51.5
52.0
52.5
53.0
53.5
54.0
54.5
55.0
55.5
56.0
56.5
57.0
57.5
58.0
58.5
59.0
59.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.10 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-77
Completed
14/11/2012
East
469210.762
Depth
50.12 m
Page No.
1 of 5
Date
Started
12/11/2012
Coord North
inates 3246587.051
Elevation
19.377 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
5/5/6
1.0
1.00-1.45
SPT-2
7/7/9
1.5
1.50-1.95
SPT-3
8/10/12
2.00-2.45
SPT-4
7/8/6
14
2.50-2.95
SPT-5
6/6/8
14
3.00-3.45
SPT-6
4/5/7
4.00-4.45
SPT-7
6/6/8
5.00-5.45
SPT-8
5/5/10
6.00-6.45
SPT-9
10/12/14
7.00-7.45
SPT-10
11/14/17
8.00-8.45
SPT-11
10/13/25
38
9.00-9.45
SPT-12
12/15/23 14.3
38
2.0
2.5
3.0
11
16
22
12
3.5
4.0
8.2
14
4.5
5.0
Becomes wet.
15
5.5
6.0
26
6.5
7.0
12.38
7.5
8.0
31
8.5
9.0
9.5
10.0
10.00-10.45
17/25/34
SPT-13
10.5
11.0
9.38
>>
11.00-11.45
22/30/36
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.10 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-77
Date
Started
12/11/2012
Coord North
inates 3246587.051
Elevation
19.377 m
Logged By
Nithin
Completed
14/11/2012
East
469210.762
Depth
50.12 m
Page No.
2 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
25/35/40
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
22/33/41
SPT-16
>>
13.5
14.0
5.38
14.00-14.45
20/36/42
SPT-17
14.5
15.0
>>
15.00-15.43
17/40/50
SPT-18
>>
16.00-16.44
19/38/50
SPT-19
>>
17.00-17.40
25/40/50
SPT-20
>>
15.5
16.0
16.5
17.0
17.5
18.0
18.00-18.29
SPT-21
35/50
19.00-19.28
SPT-22
39/50
50
20.00-20.26
SPT-23
41/50
50
21.00-21.28
SPT-24
35/50
50
22.00-22.29
SPT-25
37/50
50
23.00-23.27
SPT-26
43/50
50
12.3
50
18.5
19.0
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.10 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-77
Date
Started
12/11/2012
Coord North
inates 3246587.051
Elevation
19.377 m
Logged By
Nithin
Completed
14/11/2012
East
469210.762
Depth
50.12 m
Page No.
3 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.25 46/50
SPT-27
SPT N Value
Description
10 20 30 40
50
24.5
25.0
25.00-25.27
SPT-28
40/50
50
26.00-26.25
SPT-29
43/50
50
27.00-27.23
SPT-30
47/50
50
28.00-28.14
SPT-31
50
50
29.00-29.13
SPT-32
50
50
30.00-30.26
SPT-33
34/50
50
31.00-31.25
SPT-34
38/50
32.00-32.28
SPT-35
44/50
25.5
26.0
26.5
27.0
27.5
28.0
28.5
29.0
29.5
30.0
30.5
31.0
17.2
50
31.5
32.0
50
32.5
33.0
33.00-33.41
25/35/50
SPT-36
>>
33.5
34.0
34.00-34.40
27/39/50
SPT-37
>>
35.00-35.37
29/44/50
SPT-38
>>
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.10 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-77
Date
Started
12/11/2012
Coord North
inates 3246587.051
Elevation
19.377 m
Logged By
Nithin
Completed
14/11/2012
East
469210.762
Depth
50.12 m
Page No.
4 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
36.00-36.29 33/50
SPT-39
SPT N Value
Description
10 20 30 40
50
36.5
37.0
37.00-37.27
SPT-40
37/50
50
38.00-38.14
SPT-41
50
50
39.00-39.13
SPT-42
50
50
40.00-40.11
SPT-43
50
50
41.00-41.14
SPT-44
50
50
42.00-42.12
SPT-45
50
50
43.00-43.14
SPT-46
50
50
44.00-44.25
SPT-47
40/50
50
45.00-45.24
SPT-48
42/50
46.00-46.22
SPT-49
46/50
47.00-47.27
SPT-50
36/50
37.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
41.5
42.0
42.5
43.0
43.5
44.0
44.5
45.0
14.7
50
45.5
46.0
50
46.5
47.0
50
47.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
5.10 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-77
Date
Started
12/11/2012
Coord North
inates 3246587.051
Elevation
19.377 m
Logged By
Nithin
Completed
14/11/2012
East
469210.762
Depth
50.12 m
Page No.
5 of 5
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
48.00-48.29 34/50
SPT-51
SPT N Value
Description
10 20 30 40
50
48.5
49.0
49.00-49.14
SPT-52
50
50.00-50.12
SPT-53
50
50
49.5
50.0
-30.74
50
50.5
51.0
51.5
52.0
52.5
53.0
53.5
54.0
54.5
55.0
55.5
56.0
56.5
57.0
57.5
58.0
58.5
59.0
59.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.00 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-78
Completed
03/12/2012
East
469042.724
Depth
40.13 m
Page No.
1 of 4
Date
Started
03/12/2012
Coord North
inates 3246901.063
Elevation
16.41 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/5
1.0
1.00-1.45
SPT-2
2/36/3
1.5
1.50-1.95
SPT-3
3/3/4
2.00-2.45
SPT-4
5/6/7
2.50-2.95
SPT-5
5/6/6
3.00-3.45
SPT-6
6/7/7
4.00-4.45
SPT-7
7/8/9
5.00-5.45
SPT-8
8/10/11
6.00-6.45
SPT-9
10/13/16 13.9
7.00-7.45
SPT-10
12/17/22
Becomes dense.
8.00-8.45
SPT-11
14/24/30
9.00-9.45
SPT-12
14/34/44
>>
10.00-10.41
15/37/50
SPT-13
>>
11.00-11.44
17/30/50
SPT-14
>>
2.0
2.5
3.0
39
7
14.41
12.7
13
12
14
3.5
4.0
17
4.5
5.0
11.41
5.5
6.0
21
29
6.5
7.0
39
7.5
8.0
>>
8.5
9.0
9.5
10.0
10.5
11.0
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-78
Date
Started
03/12/2012
Coord North
inates 3246901.063
Elevation
16.41 m
Logged By
Nithin
Completed
03/12/2012
East
469042.724
Depth
40.13 m
Page No.
2 of 4
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
18/24/35
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
20/28/40 17.3
SPT-16
3.41
13.5
14.0
>>
14.00-14.45
21/33/39
SPT-17
>>
15.00-15.45
17/35/44
SPT-18
>>
14.5
15.0
15.5
16.0
16.00-16.45
14/29/37
SPT-19
0.41
16.5
17.0
>>
17.00-17.41
19/31/50
SPT-20
>>
17.5
18.0
18.00-18.38
20/35/50
SPT-21
18.5
19.0
-1.59
>>
19.00-19.40
17/27/50
SPT-22
>>
20.00-20.41
20/39/50 14.1
SPT-23
>>
21.00-21.39
22/40/50
SPT-24
>>
22.00-22.40
20/38/50
SPT-25
>>
23.00-23.45
18/35/46
SPT-26
>>
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-78
Date
Started
03/12/2012
Coord North
inates 3246901.063
Elevation
16.41 m
Logged By
Nithin
Completed
03/12/2012
East
469042.724
Depth
40.13 m
Page No.
3 of 4
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.40
30/33/50
SPT-27
SPT N Value
Description
10 20 30 40
>>
24.5
25.0
25.00-25.40
32/39/50
SPT-28
>>
26.00-26.29
SPT-29
34/50
50
27.00-27.27
SPT-30
36/50
50
28.00-28.25
SPT-31
38/50
50
25.5
26.0
26.5
27.0
27.5
28.0
28.5
29.0
29.00-29.44
28/35/50
SPT-32
>>
30.00-30.23
SPT-33
37/50
50
31.00-31.26
SPT-34
34/50
50
32.00-32.24
SPT-35
37/50
50
33.00-33.29
SPT-36
29/50
50
34.00-34.27
SPT-37
34/50
35.00-35.29
SPT-38
30/50
29.5
30.0
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
-17.59
34.5
35.0
50
50
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.00 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-78
Date
Started
03/12/2012
Coord North
inates 3246901.063
Elevation
16.41 m
Logged By
Nithin
Completed
03/12/2012
East
469042.724
Depth
40.13 m
Page No.
4 of 4
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
36.00-36.25 37/50
SPT-39
SPT N Value
Description
10 20 30 40
50
36.5
37.0
37.00-37.14
SPT-40
50
38.00-38.12
SPT-41
50
39.00-39.10
SPT-42
50
40.00-40.13
SPT-43
50
50
37.5
38.0
17.3
50
38.5
39.0
50
39.5
40.0
-23.72
50
40.5
41.0
41.5
42.0
42.5
43.0
43.5
44.0
44.5
45.0
45.5
46.0
46.5
47.0
47.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ibrahim
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
1.0
1.00-1.45
SPT-2
3/6/8
1.5
1.50-1.95
SPT-3
6/9/10
2.00-2.45
SPT-4
7/7/9
2.50-2.95
SPT-5
9/11/13
3.00-3.45
SPT-6
7/8/10
4.00-4.45
SPT-7
9/10/12
5.00-5.45
SPT-8
10/11/14
6.00-6.45
SPT-9
12/13/16 13.2
7.00-7.45
SPT-10
13/13/13
8.00-8.45
SPT-11
12/16/19
Becomes dense.
9.00-9.45
SPT-12
21/30/38
3.0
Started
06/12/2012
Coord North
inates 3246922.967
Elevation
17.13 m
Logged By
Amini
Completed
08/12/2012
East
468917.602
Depth
40.29 m
Page No.
1 of 4
SPT N Value
Description
5/4/5
2.5
BH-79
Date
STRATA
0.50-0.95
SPT-1
2.0
BOREHOLE LOG
Borehole No
10 20 30 40
10.4
9
14
19
16
24
18
3.5
4.0
22
4.5
5.0
25
5.5
6.0
29
6.5
7.0
26
7.5
8.0
35
8.5
9.0
>>
9.5
10.0
10.00-10.45
22/37/40
SPT-13
>>
10.5
11.0
11.00-11.45
19/29/42
SPT-14
11.5
6.13
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
>>
General Remarks
Driller
Rig Used
Salem
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-79
Date
Started
06/12/2012
Coord North
inates 3246922.967
Elevation
17.13 m
Logged By
Amini
Completed
08/12/2012
East
468917.602
Depth
40.29 m
Page No.
2 of 4
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
17/30/47
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
12/26/38
SPT-16
>>
13.5
14.0
14.00-14.45
16/22/35 16.1
SPT-17
>>
14.5
15.0
15.00-15.45
17/28/42
SPT-18
>>
16.00-16.45
13/25/45
SPT-19
>>
17.00-17.45
11/27/43
SPT-20
>>
18.00-18.45
20/32/47
SPT-21
>>
19.00-19.43
18/35/50
SPT-22
>>
20.00-20.41
23/42/50
SPT-23
>>
21.00-21.45
16/39/48
SPT-24
>>
22.00-22.45
19/28/40
SPT-25
>>
23.00-23.41
22/41/50
SPT-26
>>
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
20.5
21.0
21.5
22.0
22.5
23.0
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Salem
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-79
Date
Started
06/12/2012
Coord North
inates 3246922.967
Elevation
17.13 m
Logged By
Amini
Completed
08/12/2012
East
468917.602
Depth
40.29 m
Page No.
3 of 4
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.40
29/46/50
SPT-27
SPT N Value
Description
10 20 30 40
>>
24.5
25.0
25.00-25.26
SPT-28
33/50
50
26.00-26.25
SPT-29
37/50
50
27.00-27.27
SPT-30
30/50
28.00-28.29
SPT-31
33/50
50
29.00-29.25
SPT-32
36/50
50
30.00-30.28
SPT-33
29/50
50
25.5
26.0
26.5
27.0
17.7
50
27.5
28.0
28.5
29.0
29.5
30.0
30.5
31.0
31.00-31.42
22/40/50
SPT-34
>>
32.00-32.26
SPT-35
33/50
50
33.00-33.29
SPT-36
32/50
34.00-34.25
SPT-37
37/50
50
35.00-35.27
SPT-38
30/50
50
31.5
32.0
32.5
33.0
21.3
50
33.5
34.0
34.5
35.0
35.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Salem
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.60 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-79
Date
Started
06/12/2012
Coord North
inates 3246922.967
Elevation
17.13 m
Logged By
Amini
Completed
08/12/2012
East
468917.602
Depth
40.29 m
Page No.
4 of 4
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
36.00-36.28 29/50
SPT-39
SPT N Value
Description
10 20 30 40
50
36.5
37.0
37.00-37.14
SPT-40
33
38.00-38.10
SPT-41
38
39.00-39.11
SPT-42
28
40.00-40.14
SPT-43
36
33
37.5
38.0
38
38.5
39.0
28
39.5
40.0
15.3
36
-23.16
40.5
41.0
41.5
42.0
42.5
43.0
43.5
44.0
44.5
45.0
45.5
46.0
46.5
47.0
47.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Salem
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.20 m
63.5 kg/760 mm (Auto)
0.5
Sample
Depth (m)
& No.
BOREHOLE LOG
Borehole No
BH-80
Started
06/12/2012
Coord North
inates 3247105.484
Elevation
14.85 m
Logged By
Nithin
STRATA
SPT N Value
Description
10 20 30 40
0.50-0.95
SPT-1
3/4/4
1.0
1.00-1.45
SPT-2
6/5/6
1.5
1.50-1.95
SPT-3
7/8/8
2.00-2.45
SPT-4
9/10/8
2.50-2.95
SPT-5
8/7/10
3.00-3.45
SPT-6
9/8/10
4.00-4.45
SPT-7
10/12/13
5.00-5.45
SPT-8
13/15/16 11.5
6.00-6.45
SPT-9
15/17/19
7.00-7.45
SPT-10
17/18/23
2.0
2.5
3.0
Completed
08/12/2012
East
468970.861
Depth
40.14 m
Page No.
1 of 4
Date
8
11
16
12.85
12.5
18
17
18
3.5
4.0
25
4.5
5.0
Becomes dense.
31
5.5
6.0
36
6.5
7.0
41
7.5
8.0
6.85
8.00-8.45
SPT-11
13/15/20
9.00-9.45
SPT-12
15/18/25
8.5
9.0
35
43
9.5
10.0
10.00-10.45
18/18/28 17.0
SPT-13
46
10.5
11.0
11.00-11.45
19/25/31
SPT-14
>>
11.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.20 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-80
Date
Started
06/12/2012
Coord North
inates 3247105.484
Elevation
14.85 m
Logged By
Nithin
Completed
08/12/2012
East
468970.861
Depth
40.14 m
Page No.
2 of 4
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
12.00-12.45
23/28/35
SPT-15
SPT N Value
Description
10 20 30 40
>>
12.5
13.0
13.00-13.45
20/30/34
SPT-16
>>
14.00-14.45
23/36/40
SPT-17
>>
15.00-15.45
20/38/44
SPT-18
>>
16.00-16.43
26/37/50 15.4
SPT-19
>>
17.00-17.44
25/34/50
SPT-20
>>
18.00-18.29
SPT-21
30/50
50
19.00-19.28
SPT-22
33/50
50
20.00-20.29
SPT-23
30/50
21.00-21.27
SPT-24
33/50
50
22.00-22.29
SPT-25
29/50
50
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
50
20.5
21.0
21.5
22.0
22.5
23.0
23.00-23.45
30/36/40 15.9
SPT-26
>>
23.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.20 m
63.5 kg/760 mm (Auto)
BOREHOLE LOG
Borehole No
BH-80
Completed
08/12/2012
East
468970.861
Depth
40.14 m
Page No.
3 of 4
Date
Started
06/12/2012
Coord North
inates 3247105.484
Elevation
14.85 m
Logged By
Nithin
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
24.00-24.45
31/38/45
SPT-27
SPT N Value
Description
10 20 30 40
>>
24.5
25.0
25.00-25.29
SPT-28
35/50
26.00-26.27
SPT-29
36/50
27.00-27.25
SPT-30
39/50
50
28.00-28.26
SPT-31
35/50
50
29.00-29.29
SPT-32
28/50
50
30.00-30.14
SPT-33
50
50
31.00-31.12
SPT-34
50
50
32.00-32.13
SPT-35
50
50
33.00-33.14
SPT-36
50
34.00-34.10
SPT-37
50
35.00-35.14
SPT-38
50
50
25.5
26.0
-11.15
11.4
26.5
27.0
50
27.5
28.0
28.5
29.0
29.5
30.0
30.5
31.0
31.5
32.0
32.5
33.0
-18.15
33.5
34.0
15.9
50
50
34.5
35.0
50
35.5
-21.15
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
Project
Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
Pan Arab Consulting Engineers (PACE)
Location
Jahra, Kuwait
Report Ref.
Method of Drilling
Dia of Hole
2012 02 104
Auger Boring/Rotary Drilling with Bentonite
150 mm
Initial Water Level
Hammer Wt & Drop
Final Water Level
1.20 m
63.5 kg/760 mm (Auto)
BH-80
Date
Started
06/12/2012
Coord North
inates 3247105.484
Elevation
14.85 m
Logged By
Nithin
Completed
08/12/2012
East
468970.861
Depth
40.14 m
Page No.
4 of 4
STRATA
Sample
SPT N/ Water Reduced LegeDepth (m)
Conte- Level
150
mm nt %
nd
& No.
(m)
50
36.00-36.09
SPT-39
36.5
37.0
BOREHOLE LOG
Borehole No
SPT N Value
Description
10 20 30 40
50
37.00-37.11
SPT-40
50
50
38.00-38.14
SPT-41
50
50
39.00-39.12
SPT-42
50
50
40.00-40.14
SPT-43
50
37.5
38.0
38.5
39.0
39.5
40.0
-25.29
50
40.5
41.0
41.5
42.0
42.5
43.0
43.5
44.0
44.5
45.0
45.5
46.0
46.5
47.0
47.5
SPT-1 :
UDS-1 :
RUN-1 :
TCR :
RQD :
SCR :
:
:
General Remarks
Driller
Rig Used
Ameen
APPENDIX # I
Field Test Reports
c) Standpipe Readings
Pz @ BH-17
0.62
BH Ground EL+(PWD) :
Easting:
DATE
15.396
Northing:
TIME,hrs
GWL,m
EL, m (PWD)
17-1-2013
8:50:00 AM
2.25
13.77
17-1-2013
2:40:00 PM
2.25
13.77
19-1-2013
8:30:00 AM
2.24
13.78
19-1-2013
2:30:00 PM
2.24
13.78
20-1-2013
8:00:00 AM
2.22
13.80
20-1-2013
1:30:00 PM
2.22
13.80
21-1-2013
8:00:00 AM
2.24
13.78
21-1-2013
3:00:00 PM
2.24
13.78
22-1-2013
8:45:00 AM
2.20
13.82
22-1-2013
3:30:00 PM
2.20
13.82
23-1-2013
9:50:00 AM
2.22
13.80
23-1-2013
2:00:00 PM
2.22
13.80
24-1-2013
8:15:00 AM
2.21
13.81
Page 1 of 6
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
BH-17
Piezo_read
Pz @ BH-68
0.72
BH Ground EL+(PWD) :
Easting:
DATE
16.285
Northing:
TIME,hrs
GWL,m
EL, m (PWD)
17-1-2013
8:50:00 AM
1.15
15.86
17-1-2013
2:40:00 PM
1.15
15.86
19-1-2013
8:30:00 AM
1.16
15.85
19-1-2013
2:30:00 PM
1.16
15.85
20-1-2013
8:00:00 AM
1.20
15.81
20-1-2013
1:30:00 PM
1.20
15.81
21-1-2013
8:00:00 AM
1.22
15.79
21-1-2013
3:00:00 PM
1.22
15.79
22-1-2013
8:45:00 AM
1.19
15.82
22-1-2013
3:30:00 PM
1.19
15.82
23-1-2013
9:50:00 AM
1.18
15.83
23-1-2013
2:00:00 PM
1.18
15.83
24-1-2013
8:15:00 AM
1.19
15.82
Page 2 of 6
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
BH-68
Piezo_read
Pz @ BH-69
0.68
BH Ground EL+(PWD) :
Easting:
DATE
17.731
Northing:
TIME,hrs
GWL,m
EL, m (PWD)
17-1-2013
8:50:00 AM
2.50
15.91
17-1-2013
2:40:00 PM
2.50
15.91
19-1-2013
8:30:00 AM
2.49
15.92
19-1-2013
2:30:00 PM
2.49
15.92
20-1-2013
8:00:00 AM
2.46
15.95
20-1-2013
1:30:00 PM
2.46
15.95
21-1-2013
8:00:00 AM
2.44
15.97
21-1-2013
3:00:00 PM
2.44
15.97
22-1-2013
8:45:00 AM
2.47
15.94
22-1-2013
3:30:00 PM
2.47
15.94
23-1-2013
9:50:00 AM
2.47
15.94
23-1-2013
2:00:00 PM
2.47
15.94
24-1-2013
8:15:00 AM
2.46
15.95
Page 3 of 6
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
BH-69
Piezo_read
Pz @ BH-71
0.00
BH Ground EL+(PWD) :
Easting:
DATE
17.378
Northing:
TIME,hrs
GWL,m
EL, m (PWD)
17-1-2013
8:50:00 AM
3.30
14.08
17-1-2013
2:40:00 PM
3.30
14.08
19-1-2013
8:30:00 AM
3.29
14.09
19-1-2013
2:30:00 PM
3.29
14.09
20-1-2013
8:00:00 AM
3.27
14.11
20-1-2013
1:30:00 PM
3.27
14.11
21-1-2013
8:00:00 AM
3.25
14.13
21-1-2013
3:00:00 PM
3.25
14.13
22-1-2013
8:45:00 AM
3.25
14.13
22-1-2013
3:30:00 PM
3.25
14.13
23-1-2013
9:50:00 AM
3.26
14.12
23-1-2013
2:00:00 PM
3.26
14.12
24-1-2013
8:15:00 AM
3.26
14.12
Page 4 of 6
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
BH-71
Piezo_read
Pz @ BH-79
0.70
BH Ground EL+(PWD) :
17.13
Easting:
DATE
Northing:
TIME,hrs
GWL,m
EL, m (PWD)
17-1-2013
8:50:00 AM
1.32
16.51
17-1-2013
2:40:00 PM
1.32
16.51
19-1-2013
8:30:00 AM
1.31
16.52
19-1-2013
2:30:00 PM
1.31
16.52
20-1-2013
8:00:00 AM
1.30
16.53
20-1-2013
1:30:00 PM
1.30
16.53
21-1-2013
8:00:00 AM
1.27
16.56
21-1-2013
3:00:00 PM
1.27
16.56
22-1-2013
8:45:00 AM
1.20
16.63
22-1-2013
3:30:00 PM
1.20
16.63
23-1-2013
9:50:00 AM
1.23
16.60
23-1-2013
2:00:00 PM
1.23
16.60
24-1-2013
8:15:00 AM
1.23
16.60
Page 5 of 6
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
BH-79
Piezo_read
Pz @ BH-80
0.62
BH Ground EL+(PWD) :
14.85
Easting:
DATE
Northing:
TIME,hrs
GWL,m
EL, m (PWD)
17-1-2013
8:50:00 AM
0.91
14.56
17-1-2013
2:40:00 PM
0.91
14.56
19-1-2013
8:30:00 AM
0.90
14.57
19-1-2013
2:30:00 PM
0.90
14.57
20-1-2013
8:00:00 AM
0.89
14.58
20-1-2013
1:30:00 PM
0.89
14.58
21-1-2013
8:00:00 AM
0.87
14.60
21-1-2013
3:00:00 PM
0.87
14.60
22-1-2013
8:45:00 AM
0.85
14.62
22-1-2013
3:30:00 PM
0.85
14.62
23-1-2013
9:50:00 AM
0.86
14.61
23-1-2013
2:00:00 PM
0.86
14.61
24-1-2013
8:15:00 AM
0.86
14.61
Page 6 of 6
Project : Geotechnical Investigation Works for Proposed New Jahra Hospital for 1000 Beds Capacity
Client
BH-80
Piezo_read
APPENDIX # II
Laboratory Test Results
a) Laboratory Test Data Summary - Soil
b) Grain Size Distribution Curves
c) Direct Shear Test Results
d) Chemical Analysis of Water Samples
e) Modified proctor Test Results
APPENDIX # II
Laboratory Test Results
Sheet 1 of 8
Borehole
ID
Depth
(m)
Water
Content
(%)
% Gravel
% Sand
% Fines
Liquid
Limit
Plastic
Limit
Plasticity
Index
Classification
Specific
Gravity
BH-01
BH-01
BH-01
BH-02
BH-02
BH-02
BH-03
BH-03
BH-03
BH-04
BH-04
BH-04
BH-05
BH-05
BH-05
BH-06
BH-06
BH-06
BH-07
BH-07
BH-07
BH-08
BH-08
BH-08
BH-09
BH-09
BH-09
BH-10
BH-10
BH-11
BH-11
BH-11
BH-12
BH-12
3.00
6.00
12.00
1.00
4.00
9.00
3.00
9.00
17.00
1.50
3.00
9.00
1.50
4.00
15.00
2.50
4.00
14.00
0.50
4.00
9.00
0.50
3.00
15.00
2.50
9.00
15.00
1.50
7.00
2.50
7.00
12.00
4.00
10.00
16.4
14.8
11.8
2.8
17.3
16.3
12.2
14.6
15.2
12.2
13.7
13.7
13.9
12.7
14.3
11.3
11.7
14.3
13.4
13.7
14.7
14.7
13.4
17.9
13.5
14.1
12.6
2.0
16.4
15.9
15.7
14.6
15.2
16.1
0.0
1.4
0.0
0.0
0.0
0.0
0.0
0.7
1.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
0.4
0.0
0.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
0.0
0.0
0.0
0.0
83.0
79.2
64.2
86.2
88.4
50.2
88.2
82.3
83.0
86.9
85.6
74.8
86.6
77.3
81.2
75.9
77.7
86.4
88.9
70.4
50.4
84.2
76.3
85.3
56.8
79.3
40.6
87.7
75.8
83.7
74.8
80.2
85.3
69.8
17.0
19.4
35.8
13.8
11.6
49.8
11.8
17.0
15.8
13.1
14.4
25.2
13.4
22.7
18.8
24.1
22.3
13.0
10.7
29.6
48.8
15.8
23.7
14.7
43.2
20.7
59.4
12.3
24.2
15.5
25.2
19.8
14.7
30.2
NP
NP
31
NP
NP
42
NP
32
NP
NP
NP
31
NP
27
NP
29
31
NP
NP
33
31
NP
32
NP
31
NP
40
NP
32
NP
33
NP
NP
33
NP
NP
26
NP
NP
16
NP
17
NP
NP
NP
18
NP
22
NP
25
16
NP
NP
22
24
NP
21
NP
17
NP
20
NP
25
NP
26
NP
NP
25
NP
NP
5
NP
NP
26
NP
15
NP
NP
NP
13
NP
5
NP
4
15
NP
NP
11
7
NP
11
NP
14
NP
20
NP
7
NP
7
NP
NP
8
SM
SM
SM
SM
SW-SM
SC
SW-SM
SC
SM
SM
SM
SC
SM
SM
SM
SM
SC
SM
SP-SM
SC
SM
SM
SC
SM
SC
SM
CL
SM
SM
SM
SM
SM
SM
SM
2.52
2.65
Bulk
Density
3
(kg/m )
Cohesion
2
(kN/m )
Angle of
Internal
Friction
(deg)
SO4
(ppm)
Cl
(ppm)
pH
CaCO3
(%)
1872
344
8.03
1.00
1391
287
7.92
2.01
1584
353
8.03
1.00
1495
130
7.90
4.01
2.00
3106
172
7.80
5.01
2.10
2.13
3176
224
7.89
1.00
1098
283
7.83
2.01
2.16
1221
189
7.91
5.01
2.51
2757
550
7.77
7.01
2171
346
7.95
6.01
2834
361
7.99
1.00
2823
360
8.10
1.00
0.0
45.9
2.46
0.0
40.7
2.11
0.0
45.2
2.13
5.0
42.0
2.60
2.28
2.0
39.6
Sheet 2 of 8
Borehole
ID
Depth
(m)
Water
Content
(%)
% Gravel
% Sand
% Fines
Liquid
Limit
Plastic
Limit
Plasticity
Index
Classification
Specific
Gravity
BH-13
BH-13
BH-13
BH-14
BH-14
BH-14
BH-15
BH-15
BH-15
BH-16
BH-16
BH-16
BH-16
BH-17
BH-17
BH-17
BH-17
BH-17
BH-17
BH-17
BH-18
BH-18
BH-18
BH-18
BH-19
BH-19
BH-19
BH-20
BH-20
BH-20
BH-21
BH-21
BH-21
BH-22
1.00
6.00
14.00
4.00
8.00
16.00
0.50
5.00
13.00
0.50
4.00
10.00
14.00
2.00
5.00
10.00
18.00
29.00
36.00
45.00
1.00
4.00
10.00
17.00
4.00
10.00
17.00
0.50
5.00
14.00
2.50
4.00
9.00
1.00
5.4
13.1
15.0
13.2
11.1
13.1
7.5
12.7
20.0
11.1
16.9
13.0
14.3
14.5
11.7
13.0
11.8
12.3
11.7
14.7
14.8
11.4
15.1
15.9
10.5
18.8
14.0
0.6
12.0
13.7
13.5
12.5
16.8
4.3
0.0
0.0
0.0
0.0
0.0
0.0
3.7
0.0
0.0
0.0
0.0
0.0
1.0
0.0
0.0
0.0
11.1
2.4
0.0
0.0
0.0
0.0
0.0
1.6
0.0
0.0
0.0
0.0
0.0
0.8
0.0
0.0
0.0
0.0
88.5
78.7
76.2
80.0
73.0
90.8
79.2
66.9
83.7
85.4
68.4
50.8
87.1
88.8
73.0
32.4
83.3
86.9
83.0
96.4
84.9
76.3
40.0
84.1
83.5
77.0
78.8
91.6
72.1
90.2
87.8
73.2
78.1
76.0
11.5
21.3
23.8
20.0
27.0
9.2
17.1
33.1
16.3
14.6
31.6
49.2
11.9
11.2
27.0
67.6
5.6
10.7
17.0
3.6
15.1
23.7
60.0
14.3
16.5
23.0
21.2
8.4
27.9
9.0
12.2
26.8
21.9
24.0
NP
NP
NP
NP
27
NP
NP
31
NP
NP
40
42
NP
NP
32
33
NP
NP
NP
NP
32
NP
41
NP
NP
28
NP
NP
33
NP
NP
29
NP
NP
NP
NP
NP
NP
21
NP
NP
23
NP
NP
17
21
NP
NP
19
16
NP
NP
NP
NP
17
NP
23
NP
NP
16
NP
NP
21
NP
NP
23
NP
NP
NP
NP
NP
NP
6
NP
NP
8
NP
NP
23
21
NP
NP
13
17
NP
NP
NP
NP
15
NP
18
NP
NP
12
NP
NP
12
NP
NP
6
NP
NP
SW-SM
SM
SM
SM
SC-SM
SW-SM
SM
SM
SM
SM
SC
SC
SW-SM
SP-SM
SC
CL
SP-SM
SP-SM
SM
SP
SC
SM
CL
SM
SM
SC
SM
SP-SM
SC
SW-SM
SM
SM
SM
SM
2.64
2.58
2.66
Bulk
Density
3
(kg/m )
Cohesion
2
(kN/m )
Angle of
Internal
Friction
(deg)
2.24
0.0
46.0
2.08
2.23
0.0
47.0
2.11
26.8
36.5
SO4
(ppm)
Cl
(ppm)
pH
CaCO3
(%)
1446
310
8.09
3.01
2850
533
8.13
3.01
2886
326
8.11
10.02
1286
123
8.03
8.02
1215
237
8.01
1.00
2994
396
7.75
1.00
1579
241
7.83
3.01
2195
138
7.79
7.02
2464
361
7.77
9.02
1511
319
7.86
1.00
1.98
2.21
0.0
40.7
2.23
13.62
32.30
2.17
Sheet 3 of 8
Borehole
ID
Depth
(m)
Water
Content
(%)
% Gravel
% Sand
% Fines
Liquid
Limit
Plastic
Limit
Plasticity
Index
Classification
BH-22
BH-22
BH-23
BH-23
BH-23
BH-24
BH-24
BH-24
BH-24
BH-25
BH-25
BH-25
BH-26
BH-26
BH-26
BH-27
BH-27
BH-27
BH-28
BH-28
BH-28
BH-29
BH-29
BH-29
BH-30
BH-30
BH-30
BH-31
BH-31
BH-31
BH-32
BH-32
BH-32
BH-33
3.00
9.00
1.00
4.00
13.00
1.00
5.00
14.00
25.00
1.50
6.00
15.00
4.00
9.00
16.00
1.50
5.00
12.00
2.50
8.00
15.00
1.50
7.00
17.00
1.50
10.00
16.00
2.00
6.00
17.00
1.00
5.00
10.00
2.50
13.7
16.2
13.5
12.6
14.3
2.3
12.0
14.5
14.9
6.8
11.7
17.9
13.8
14.8
21.8
1.2
12.1
13.4
2.8
10.6
15.6
6.8
14.5
18.1
4.3
13.7
11.8
10.9
12.1
15.8
0.6
13.5
19.6
13.9
0.7
0.0
1.3
0.0
0.0
11.5
0.0
1.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.3
0.0
0.8
0.0
0.0
0.0
0.0
84.8
67.4
86.9
79.1
76.7
74.5
53.4
76.1
90.1
86.0
46.8
93.2
54.4
76.1
88.6
87.4
82.8
81.4
85.4
71.1
86.4
83.6
86.8
73.1
87.4
76.0
72.4
74.7
74.6
88.8
91.3
70.8
41.6
77.0
14.5
32.6
11.8
20.9
23.3
14.0
46.6
22.4
9.9
14.0
53.2
6.8
45.6
23.9
11.4
12.6
17.2
18.6
14.6
28.9
13.6
16.4
13.2
26.9
12.6
24.0
27.6
20.9
25.4
10.4
8.7
29.2
58.4
23.0
NP
32
NP
NP
NP
NP
38
NP
NP
NP
39
NP
33
31
NP
NP
NP
30
NP
36
NP
NP
38
35
NP
32
NP
NP
34
NP
NP
NP
43
NP
NP
19
NP
NP
NP
NP
24
NP
NP
NP
22
NP
20
19
NP
NP
NP
17
NP
17
NP
NP
17
17
NP
17
NP
NP
16
NP
NP
NP
21
NP
NP
13
NP
NP
NP
NP
14
NP
NP
NP
17
NP
13
12
NP
NP
NP
13
NP
19
NP
NP
21
18
NP
15
NP
NP
18
NP
NP
NP
22
NP
SM
SC
SW-SM
SM
SM
SM
SC
SM
SW-SM
SM
CL
SP-SM
SC
SC
SW-SM
SM
SM
SC
SM
SC
SM
SM
SC
SC
SM
SC
SM
SM
SC
SW-SM
SW-SM
SM
CL
SM
Specific
Gravity
Bulk
Density
3
(kg/m )
Cohesion
2
(kN/m )
Angle of
Internal
Friction
(deg)
SO4
(ppm)
Cl
(ppm)
pH
CaCO3
(%)
1866
430
7.81
4.01
1407
313
7.75
7.01
2474
189
7.83
4.01
1430
307
7.80
3.01
133
34
7.89
4.01
1220
155
7.80
10.02
1321
138
8.05
8.02
1124
245
8.09
3.01
3165
310
7.91
6.01
1290
301
7.85
6.02
1345
407
8.06
1.00
2.22
2.23
2.58
2.61
1.65
2.64
2.16
2.15
9.7
0.0
33.3
41.3
2.23
1.95
2.67
11.5
34.6
2.20
Sheet 4 of 8
Borehole
ID
Depth
(m)
Water
Content
(%)
% Gravel
% Sand
% Fines
Liquid
Limit
Plastic
Limit
Plasticity
Index
Classification
BH-33
BH-33
BH-33
BH-33
BH-34
BH-34
BH-34
BH-35
BH-35
BH-35
BH-36
BH-36
BH-37
BH-37
BH-38
BH-38
BH-38
BH-39
BH-39
BH-40
BH-40
BH-40
BH-41
BH-41
BH-41
BH-41
BH-42
BH-42
BH-42
BH-43
BH-43
BH-43
BH-44
BH-44
7.00
14.00
27.00
40.00
4.00
12.00
20.00
1.50
5.00
10.00
3.00
8.00
2.50
9.00
3.00
9.00
15.00
0.50
5.00
3.00
10.00
16.00
1.00
4.00
10.00
15.00
2.50
6.00
14.00
2.50
7.00
14.00
1.00
7.00
13.2
12.7
18.0
14.9
19.5
14.8
16.0
4.5
11.9
12.2
8.5
10.4
7.8
13.9
9.5
13.8
12.6
1.6
12.9
12.9
14.1
14.3
1.8
12.9
14.8
20.7
11.0
13.5
16.9
14.2
11.3
11.6
0.9
5.6
0.0
0.0
0.0
0.0
0.0
1.0
0.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
2.4
0.0
0.0
0.0
1.2
0.8
0.0
0.8
0.0
0.0
0.0
0.0
64.6
70.8
96.1
88.9
74.6
82.2
87.9
90.7
70.8
80.6
83.6
76.6
82.6
47.8
77.6
79.5
73.5
88.4
74.4
73.4
48.9
88.7
85.0
66.8
72.0
85.0
83.9
46.0
86.9
88.7
61.0
78.8
89.8
83.8
35.4
29.2
3.9
11.1
25.4
16.8
11.3
9.3
29.2
19.4
16.4
23.4
17.4
52.2
22.4
20.5
26.5
11.6
25.6
26.6
51.1
10.5
12.6
33.2
28.0
15.0
14.9
53.2
13.1
10.6
39.0
21.2
10.2
16.2
42
45
NP
NP
42
NP
NP
NP
35
NP
NP
NP
NP
33
NP
NP
NP
NP
NP
NP
35
NP
NP
NP
32
NP
26
37
NP
NP
32
NP
NP
27
22
22
NP
NP
17
NP
NP
NP
20
NP
NP
NP
NP
22
NP
NP
NP
NP
NP
NP
24
NP
NP
NP
19
NP
21
21
NP
NP
18
NP
NP
21
20
23
NP
NP
25
NP
NP
NP
15
NP
NP
NP
NP
11
NP
NP
NP
NP
NP
NP
11
NP
NP
NP
13
NP
5
16
NP
NP
14
NP
NP
6
SC
SC
SP
SW-SM
SC
SM
SP-SM
SP-SM
SC
SM
SM
SM
SM
CL
SM
SM
SM
SW-SM
SM
SM
CL
SW-SM
SM
SM
SC
SM
SC-SM
CL
SM
SP-SM
SC
SM
SW-SM
SC-SM
Specific
Gravity
2.59
2.60
2.34
6.7
Angle of
Internal
Friction
(deg)
47.5
2.51
0.0
39.7
Bulk
Density
3
(kg/m )
2.19
2.11
Cohesion
2
(kN/m )
0.0
SO4
(ppm)
Cl
(ppm)
pH
CaCO3
(%)
2137
410
8.11
2.01
1604
223
7.89
2.01
1667
460
8.00
7.00
114
120
7.96
1.00
453
138
7.88
Nill
140
69
7.86
6.01
2487
396
8.02
1.00
1319
401
8.05
5.01
1228
190
8.00
6.01
685
292
7.87
1.00
739
52
7.79
5.01
33.7
2.24
2.15
0.0
41.4
2.17
2.20
2.9
11.5
42.4
41.4
Sheet 5 of 8
Borehole
ID
Depth
(m)
Water
Content
(%)
% Gravel
% Sand
% Fines
Liquid
Limit
Plastic
Limit
Plasticity
Index
Classification
BH-44
BH-45
BH-45
BH-45
BH-46
BH-46
BH-46
BH-47
BH-47
BH-47
BH-48
BH-48
BH-48
BH-49
BH-49
BH-49
BH-50
BH-50
BH-50
BH-51
BH-51
BH-51
BH-52
BH-52
BH-52
BH-52
BH-53
BH-53
BH-54
BH-54
BH-54
BH-56
BH-56
BH-57
14.00
4.00
10.00
20.00
1.50
10.00
14.00
2.50
5.00
13.00
1.00
4.00
8.00
1.50
5.00
14.00
2.50
6.00
12.00
1.00
5.00
11.00
1.50
5.00
9.00
17.00
2.00
8.00
2.00
8.00
14.00
1.50
6.00
3.00
11.6
3.9
16.0
18.1
13.6
16.3
13.9
13.3
9.8
13.4
13.6
13.7
9.3
12.3
12.0
9.6
12.3
8.5
12.2
12.2
16.3
10.9
14.5
10.1
15.3
13.8
8.5
11.5
9.0
14.5
13.8
13.8
11.0
11.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.7
0.0
0.0
0.0
0.0
2.0
0.0
0.0
0.0
87.2
90.6
84.1
80.7
89.3
89.2
69.4
72.8
81.1
73.5
66.4
45.8
71.2
75.0
65.6
81.1
75.8
64.6
84.2
77.0
64.4
75.7
73.7
69.2
72.9
85.9
73.2
81.1
61.0
88.7
84.9
65.3
73.9
69.2
12.8
9.4
15.9
19.3
10.7
10.8
30.6
27.2
18.9
26.5
33.6
54.2
28.8
25.0
34.4
16.7
24.2
35.4
15.8
23.0
35.6
24.3
26.3
30.8
27.1
12.4
26.8
18.9
39.0
11.3
13.1
34.7
26.1
30.8
NP
NP
NP
33
NP
NP
30
32
28
NP
38
38
33
27
NP
NP
38
NP
NP
NP
38
32
28
NP
33
NP
34
NP
38
NP
NP
28
27
NP
NP
NP
NP
16
NP
NP
16
18
17
NP
18
17
18
16
NP
NP
17
NP
NP
NP
18
18
16
NP
18
NP
24
NP
23
NP
NP
16
18
NP
NP
NP
NP
17
NP
NP
14
14
11
NP
20
21
15
11
NP
NP
21
NP
NP
NP
20
14
12
NP
15
NP
10
NP
15
NP
NP
12
9
NP
SM
SW-SM
SM
SC
SW-SM
SW-SM
SC
SC
SC
SM
SC
CL
SC
SC
SM
SM
SC
SM
SM
SM
SC
SC
SC
SM
SC
SM
SM
SM
SC
SW-SM
SM
SC
SC
SM
Specific
Gravity
Bulk
Density
3
(kg/m )
2.61
1.94
Cohesion
2
(kN/m )
4.4
Angle of
Internal
Friction
(deg)
SO4
(ppm)
Cl
(ppm)
pH
CaCO3
(%)
46.3
90
70
7.92
4.01
1137
239
7.83
6.01
1219
165
7.89
4.01
1149
184
7.92
7.02
1432
317
8.07
5.01
1325
228
7.79
3.00
1257
246
8.00
8.03
1340
99
8.03
2.01
1409
307
7.80
5.02
1189
215
7.85
7.03
1265
197
7.76
8.04
1250
189
7.84
6.02
2.64
2.70
2.19
2.29
8.3
37.0
2.26
15.4
36.7
2.10
19.6
36.1
1.96
2.28
2.21
2.63
2.27
2.49
27.2
11.2
31.9
37.9
10.5
37.7
5.7
37.0
2.65
2.23
1.96
10.1
2.65
2.16
2.05
38.4
Sheet 6 of 8
Borehole
ID
Depth
(m)
Water
Content
(%)
% Gravel
% Sand
% Fines
Liquid
Limit
Plastic
Limit
Plasticity
Index
Classification
Specific
Gravity
Bulk
Density
3
(kg/m )
BH-57
BH-57
BH-58
BH-58
BH-58
BH-59
BH-59
BH-59
BH-60
BH-60
BH-60
BH-61
BH-61
BH-61
BH-62
BH-62
BH-62
BH-63
BH-63
BH-63
BH-64
BH-64
BH-64
BH-64
BH-65
BH-65
BH-65
BH-66
BH-66
BH-66
BH-67
BH-67
BH-67
BH-68
7.00
15.00
2.00
6.00
12.00
3.00
8.00
13.00
1.50
6.00
14.00
2.00
6.00
15.00
3.00
8.00
16.00
1.50
6.00
14.00
1.50
4.00
11.00
16.00
1.50
5.00
13.00
1.00
5.00
11.00
0.50
4.00
9.00
1.00
10.9
18.2
9.1
20.2
18.5
13.1
10.2
15.6
12.6
14.0
11.5
16.6
16.0
13.9
13.1
11.9
17.9
14.2
11.5
12.8
4.4
17.4
14.5
18.1
13.9
17.1
14.4
3.5
12.8
15.1
4.9
8.8
11.8
13.1
0.0
0.9
0.0
0.0
0.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.2
0.0
0.0
0.9
0.0
0.0
0.0
0.0
67.2
86.4
70.0
83.7
87.2
75.0
60.4
37.2
71.0
91.4
81.7
80.8
89.7
95.5
63.8
87.6
85.4
54.9
74.2
89.1
85.8
76.2
70.8
82.8
60.0
76.6
90.3
83.7
85.1
74.0
85.6
70.2
84.1
69.2
32.8
12.7
30.0
16.3
12.1
25.0
39.6
62.8
29.0
8.6
18.3
19.2
10.3
4.5
36.2
12.4
13.9
45.1
25.8
10.9
14.2
23.8
29.2
17.2
40.0
23.4
8.5
16.3
14.9
25.1
14.4
29.8
15.9
30.8
33
NP
39
NP
NP
27
29
NP
29
NP
NP
36
NP
NP
27
NP
NP
29
NP
NP
NP
NP
NP
NP
31
NP
NP
NP
NP
NP
NP
NP
NP
30
18
NP
24
NP
NP
16
17
NP
16
NP
NP
17
NP
NP
21
NP
NP
22
NP
NP
NP
NP
NP
NP
23
NP
NP
NP
NP
NP
NP
NP
NP
18
15
NP
15
NP
NP
11
12
NP
13
NP
NP
19
NP
NP
6
NP
NP
7
NP
NP
NP
NP
NP
NP
8
NP
NP
NP
NP
NP
NP
NP
NP
12
SC
SM
SC
SM
SM
SC
SC
ML
SC
SP-SM
SM
SC
SW-SM
SP
SC-SM
SM
SM
SC-SM
SM
SP-SM
SM
SM
SM
SM
SM
SM
SW-SM
SM
SM
SM
SM
SM
SM
SC
2.65
1.94
2.64
2.52
2.30
Cohesion
2
(kN/m )
Angle of
Internal
Friction
(deg)
16.9
34.4
2.28
3.4
37.0
2.32
5.8
37.4
SO4
(ppm)
Cl
(ppm)
pH
CaCO3
(%)
1193
194
8.10
7.02
1307
242
7.90
5.01
1501
222
7.87
4.01
1269
320
7.81
3.01
3160
323
8.05
13.03
3130
1020
8.10
8.02
2800
327
7.89
12.03
3179
1394
7.80
18.04
3145
221
7.93
6.01
2188
136
7.77
4.01
1150
198
7.79
4.01
2.06
2.59
2.09
2.14
14.6
35.2
Sheet 7 of 8
Borehole
ID
Depth
(m)
Water
Content
(%)
% Gravel
% Sand
% Fines
Liquid
Limit
Plastic
Limit
Plasticity
Index
Classification
BH-68
BH-68
BH-68
BH-69
BH-69
BH-69
BH-69
BH-70
BH-70
BH-70
BH-70
BH-71
BH-71
BH-71
BH-71
BH-72
BH-72
BH-72
BH-73
BH-73
BH-73
BH-73
BH-74
BH-74
BH-74
BH-74
BH-75
BH-75
BH-75
BH-75
BH-76
BH-76
BH-76
BH-76
3.00
7.00
15.00
2.50
14.00
21.00
28.00
1.00
7.00
12.00
22.00
0.50
3.00
13.00
24.00
3.00
15.00
26.00
1.50
6.00
17.00
27.00
1.50
5.00
17.00
24.00
2.00
7.00
18.00
25.00
2.00
8.00
18.00
24.00
14.2
11.4
13.7
10.8
14.4
17.3
15.1
2.8
11.6
16.5
14.8
0.9
12.1
11.3
14.6
14.0
14.7
16.8
12.8
17.2
15.6
16.1
11.2
12.7
11.1
16.2
12.9
12.8
19.7
14.4
4.9
13.6
13.9
14.4
0.0
0.0
3.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.7
0.0
0.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
0.9
0.0
0.8
0.0
0.0
0.0
0.0
0.7
0.0
0.0
0.0
1.6
3.9
71.8
70.9
88.4
86.4
70.2
92.3
93.4
88.2
76.0
72.4
89.1
90.6
92.3
53.4
95.7
77.6
88.9
86.2
64.0
80.7
87.4
86.8
59.2
80.4
97.0
96.7
91.0
73.2
79.9
92.1
90.9
72.4
91.1
86.1
28.2
29.1
8.3
13.6
29.8
7.7
6.6
11.8
24.0
27.6
10.3
9.4
7.7
46.6
3.3
22.4
11.1
13.8
36.0
19.3
12.6
12.3
40.8
18.8
3.0
3.3
9.0
26.8
19.4
7.9
9.1
27.6
7.3
10.0
31
NP
NP
NP
33
NP
NP
NP
30
31
NP
NP
NP
42
NP
NP
NP
NP
29
NP
NP
NP
31
NP
NP
NP
NP
NP
27
NP
NP
35
NP
NP
19
NP
NP
NP
20
NP
NP
NP
18
20
NP
NP
NP
21
NP
NP
NP
NP
23
NP
NP
NP
23
NP
NP
NP
NP
NP
22
NP
NP
18
NP
NP
12
NP
NP
NP
13
NP
NP
NP
12
11
NP
NP
NP
21
NP
NP
NP
NP
6
NP
NP
NP
8
NP
NP
NP
NP
NP
5
NP
NP
17
NP
NP
SC
SM
SW-SM
SM
SC
SP-SM
SP-SM
SP-SM
SC
SC
SW-SM
SP-SM
SP-SM
SC
SP
SM
SW-SM
SM
SM
SM
SM
SM
SM
SM
SP
SP
SP-SM
SM
SM
SP-SM
SW-SM
SC
SP-SM
SP-SM
Specific
Gravity
Bulk
Density
3
(kg/m )
Cohesion
2
(kN/m )
Angle of
Internal
Friction
(deg)
2.20
SO4
(ppm)
Cl
(ppm)
pH
CaCO3
(%)
1310
410
8.03
1.00
1137
120
7.78
11.02
1231
187
7.87
7.02
2666
510
7.86
1.00
3173
1105
8.09
9.02
3110
850
8.00
13.03
1666
447
7.95
7.01
122
602
7.91
7.01
2.03
1.88
2.14
2.23
15.2
36.8
2.00
2.22
Sheet 8 of 8
Borehole
ID
Depth
(m)
Water
Content
(%)
% Gravel
% Sand
% Fines
Liquid
Limit
Plastic
Limit
Plasticity
Index
Classification
BH-77
BH-77
BH-77
BH-77
BH-77
BH-78
BH-78
BH-78
BH-78
BH-78
BH-79
BH-79
BH-79
BH-79
BH-79
BH-79
BH-80
BH-80
BH-80
BH-80
BH-80
BH-80
BH-80
4.00
9.00
18.00
31.00
45.00
2.00
6.00
13.00
20.00
38.00
1.00
6.00
14.00
27.00
33.00
40.00
2.00
5.00
10.00
16.00
23.00
26.00
34.00
8.2
14.3
12.3
17.2
14.7
12.7
13.9
17.3
14.1
17.3
10.4
13.2
16.1
17.7
21.3
15.3
12.5
11.5
17.0
15.4
15.9
11.4
15.9
0.0
0.0
1.8
2.1
0.0
0.0
0.0
0.0
0.8
1.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.2
0.0
0.0
0.0
79.3
79.8
88.0
92.8
89.4
80.2
71.0
71.0
91.1
85.0
72.2
64.6
79.5
84.7
83.0
74.6
70.6
78.6
90.7
83.8
95.2
75.7
97.6
20.7
20.2
10.2
5.1
10.6
19.8
29.0
29.0
8.2
13.9
27.8
35.4
20.5
15.3
17.0
25.4
29.4
21.4
9.3
14.9
4.8
24.3
2.4
NP
27
NP
NP
NP
NP
NP
NP
NP
NP
NP
29
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
16
NP
NP
NP
NP
NP
NP
NP
NP
NP
24
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
11
NP
NP
NP
NP
NP
NP
NP
NP
NP
5
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
NP
SM
SC
SW-SM
SP-SM
SW-SM
SM
SM
SM
SP-SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SW-SM
SM
SP
SM
SP
Specific
Gravity
Bulk
Density
3
(kg/m )
Cohesion
2
(kN/m )
Angle of
Internal
Friction
(deg)
SO4
(ppm)
Cl
(ppm)
pH
CaCO3
(%)
1409
215
7.99
4.01
3090
272
8.03
8.02
2996
239
7.84
7.01
2743
680
7.90
1.00
3086
527
7.87
5.01
1.80
APPENDIX # II
Laboratory Test Results
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-01
3.00
6.00
BH-01
12.00
BH-01
BH-02
1.00
4.00
BH-02
Specimen Identification
BH-01
3.00
BH-01
6.00
BH-01
12.00
BH-02
1.00
BH-02
4.00
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
WELL-GRADED SAND with SILT(SW-SM)
D100
D60
D30
D10
2
0.502
0.263
9.5
0.532
0.192
4.75
0.234
4.75
0.5
0.183
4.75
0.46
0.254
fine
coarse
LL
PL
NP NP
NP NP
31
26
NP NP
NP NP
%Gravel %Sand
0.0
83.0
1.4
79.2
0.0
64.2
0.0
86.2
0.0
88.4
COBBLES
PI
Cc
Cu
NP
NP
5
NP
NP 2.40 7.84
%Silt
%Clay
17.0
19.4
35.8
13.8
11.6
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-02
9.00
3.00
BH-03
9.00
BH-03
BH-03
17.00
1.50
BH-04
Specimen Identification
BH-02
9.00
BH-03
3.00
BH-03
9.00
BH-03
17.00
BH-04
1.50
SAND
fine
medium
GRAVEL
coarse
Classification
CLAYEY SAND(SC)
WELL-GRADED SAND with SILT(SW-SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY SAND(SM)
D100
D60
D30
D10
4.75
0.191
0.002
4.75
0.442
0.2
9.5
0.51
0.239
9.5
0.503
0.252
2
0.53
0.215
fine
coarse
LL
PL
42
16
NP NP
32
17
NP NP
NP NP
%Gravel %Sand
0.0
50.2
0.0
88.2
0.7
82.3
1.1
83.0
0.0
86.9
COBBLES
PI
Cc
Cu
26
NP 1.38 6.72
15
NP
NP
%Silt
%Clay
12.4
37.4
11.8
17.0
15.8
13.1
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-04
3.00
9.00
BH-04
1.50
BH-05
BH-05
4.00
15.00
BH-05
Specimen Identification
BH-04
3.00
BH-04
9.00
BH-05
1.50
BH-05
4.00
BH-05
15.00
D100
4.75
4.75
4.75
4.75
4.75
SAND
fine
medium
Classification
SILTY SAND(SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
D60
D30
0.62
0.334
0.359
0.151
0.468
0.198
0.314
0.12
0.423
0.163
GRAVEL
coarse
D10
0.002
fine
coarse
LL
PL
NP NP
31
18
NP NP
27
22
NP NP
%Gravel %Sand
0.0
85.6
0.0
74.8
0.0
86.6
0.0
77.3
0.0
81.2
COBBLES
PI
Cc
Cu
NP
13 29.76 167.99
NP
5
NP
%Silt
%Clay
14.4
10.9
14.3
13.4
22.7
18.8
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-06
2.50
4.00
BH-06
14.00
BH-06
BH-07
0.50
4.00
BH-07
Specimen Identification
BH-06
2.50
BH-06
4.00
BH-06
14.00
BH-07
0.50
BH-07
4.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
SILTY SAND(SM)
29
25
31
16
CLAYEY SAND(SC)
NP NP
SILTY SAND(SM)
POORLY GRADED SAND with SILT(SP-SM)
NP NP
CLAYEY SAND(SC)
33
22
D100
D60
D30
D10
%Gravel %Sand
2
0.36
0.132
0.0
75.9
2
0.375
0.148
0.0
77.7
9.5
0.667
0.302
0.7
86.4
9.5
0.7
0.399
0.4
88.9
4.75
0.283
0.077
0.0
70.4
COBBLES
PI
Cc
Cu
4
15
NP
NP 3.84 11.80
11
%Silt
%Clay
24.1
22.3
13.0
10.7
9.2
20.4
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-07
9.00
0.50
BH-08
3.00
BH-08
BH-08
15.00
2.50
BH-09
Specimen Identification
BH-07
9.00
BH-08
0.50
BH-08
3.00
BH-08
15.00
BH-09
2.50
D100
9.5
4.75
2
4.75
2
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
SANDY LEAN CLAY(CL)
D60
D30
D10
0.142
0.041
0.003
0.613
0.359
0.365
0.147
0.482
0.221
0.108
0.012
fine
coarse
LL
PL
31
24
NP NP
32
21
NP NP
31
17
%Gravel %Sand
0.8
50.4
0.0
84.2
0.0
76.3
0.0
85.3
0.0
42.0
COBBLES
PI
Cc
Cu
7
4.47 53.67
NP
11
NP
14
%Silt
%Clay
34.1
14.7
15.8
23.7
14.7
36.0
22.0
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-09
9.00
15.00
BH-09
1.50
BH-10
BH-10
7.00
2.50
BH-11
Specimen Identification
BH-09
9.00
BH-09
15.00
BH-10
1.50
BH-10
7.00
BH-11
2.50
D100
4.75
4.75
4.75
4.75
9.5
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
SANDY LEAN CLAY(CL)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
D10
D60
D30
0.648
0.191
0.078
0.011
0.001
0.484
0.203
0.387
0.158
0.434
0.204
fine
coarse
LL
PL
NP NP
40
20
NP NP
32
25
NP NP
%Gravel %Sand
0.0
79.3
0.0
40.6
0.0
87.7
0.0
75.8
0.7
83.7
COBBLES
PI
Cc
Cu
NP
20 1.10 55.87
NP 1.32 7.50
7
NP
%Silt
%Clay
20.7
39.1
20.3
12.3
24.2
15.5
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-11
7.00
12.00
BH-11
4.00
BH-12
BH-12
10.00
1.00
BH-13
Specimen Identification
BH-11
7.00
BH-11
12.00
BH-12
4.00
BH-12
10.00
BH-13
1.00
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
WELL-GRADED SAND with SILT(SW-SM)
D100
D60
D30
D10
2
0.338
0.122
2
0.348
0.152
4.75
0.52
0.25
2
0.349
2
0.528
0.214
fine
coarse
LL
PL
33
26
NP NP
NP NP
33
25
NP NP
%Gravel %Sand
0.0
74.8
0.0
80.2
0.0
85.3
0.0
69.8
0.0
88.5
COBBLES
PI
Cc
Cu
7
NP
NP
8
NP 1.26 7.70
%Silt
%Clay
25.2
19.8
14.7
30.2
11.5
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-13
6.00
14.00
BH-13
4.00
BH-14
BH-14
8.00
16.00
BH-14
Specimen Identification
BH-13
6.00
BH-13
14.00
BH-14
4.00
BH-14
8.00
BH-14
16.00
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY, CLAYEY SAND(SC-SM)
WELL-GRADED SAND with SILT(SW-SM)
D100
D60
D30
D10
4.75
0.335
0.14
2
0.367
0.139
4.75
0.443
0.172
2
0.37
0.117
4.75
0.626
0.308
0.086
fine
coarse
LL
PL
NP NP
NP NP
NP NP
27
21
NP NP
%Gravel %Sand
0.0
78.7
0.0
76.2
0.0
80.0
0.0
73.0
0.0
90.8
COBBLES
PI
Cc
Cu
NP
NP
NP
6
NP 1.76 7.25
%Silt
%Clay
21.3
23.8
20.0
27.0
9.2
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-15
0.50
5.00
BH-15
13.00
BH-15
BH-16
0.50
4.00
BH-16
Specimen Identification
BH-15
0.50
BH-15
5.00
BH-15
13.00
BH-16
0.50
BH-16
4.00
D100
9.5
4.75
4.75
4.75
4.75
SAND
fine
medium
Classification
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
D60
D30
0.523
0.178
0.302
0.314
0.177
0.41
0.18
0.301
0.068
GRAVEL
coarse
D10
fine
coarse
LL
PL
NP NP
31
23
NP NP
NP NP
40
17
%Gravel %Sand
3.7
79.2
0.0
66.9
0.0
83.7
0.0
85.4
0.0
68.4
COBBLES
PI
Cc
Cu
NP
8
NP
NP
23
%Silt
%Clay
17.1
33.1
16.3
14.6
12.1
19.5
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-16
10.00
14.00
BH-16
2.00
BH-17
BH-17
5.00
10.00
BH-17
Specimen Identification
BH-16
10.00
BH-16
14.00
BH-17
2.00
BH-17
5.00
BH-17
10.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
CLAYEY SAND(SC)
42
21
WELL-GRADED SAND with SILT(SW-SM)
NP NP
POORLY GRADED SAND with SILT(SP-SM)
NP NP
CLAYEY SAND(SC)
32
19
SANDY LEAN CLAY(CL)
33
16
D100
D60
D30
D10
%Gravel %Sand
4.75
0.129
0.02
0.0
50.8
9.5
0.609
0.263
1.0
87.1
4.75
0.669
0.375
0.0
88.8
2
0.358
0.113
0.0
73.0
4.75
0.06
0.006
0.0
32.4
COBBLES
PI
Cc
Cu
21
NP 1.99 10.68
NP 4.23 13.48
13
17
%Silt
%Clay
29.5
19.7
11.9
11.2
27.0
38.1
29.5
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-17
18.00
29.00
BH-17
36.00
BH-17
BH-17
45.00
1.00
BH-18
Specimen Identification
BH-17
18.00
BH-17
29.00
BH-17
36.00
BH-17
45.00
BH-18
1.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
POORLY GRADED SAND with SILT(SP-SM)
NP NP
NP NP
POORLY GRADED SAND with SILT(SP-SM)
SILTY SAND(SM)
NP NP
POORLY GRADED SAND(SP)
NP NP
CLAYEY SAND(SC)
32
17
D100
D60
D30
D10
%Gravel %Sand
9.5
1.462
0.537
0.253
11.1
83.3
9.5
0.973
0.43
2.4
86.9
4.75
0.458
0.225
0.0
83.0
4.75
1.185
0.678
0.378
0.0
96.4
4.75
0.572
0.329
0.0
84.9
COBBLES
PI
Cc
Cu
NP 0.78 5.77
NP 3.16 16.14
NP
NP 1.03 3.14
15
%Silt
%Clay
5.6
10.7
17.0
3.6
15.1
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-18
4.00
10.00
BH-18
17.00
BH-18
BH-19
4.00
10.00
BH-19
Specimen Identification
BH-18
4.00
BH-18
10.00
BH-18
17.00
BH-19
4.00
BH-19
10.00
D100
2
4.75
9.5
4.75
2
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
SANDY LEAN CLAY(CL)
SILTY SAND(SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
D10
D60
D30
0.388
0.131
0.075
0.013
0.001
0.659
0.32
0.515
0.228
0.336
0.155
fine
coarse
LL
PL
NP NP
41
23
NP NP
NP NP
28
16
%Gravel %Sand
0.0
76.3
0.0
40.0
1.6
84.1
0.0
83.5
0.0
77.0
COBBLES
PI
Cc
Cu
NP
18 1.59 51.97
NP
NP
12
%Silt
%Clay
23.7
41.7
18.3
14.3
16.5
23.0
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-19
17.00
0.50
BH-20
5.00
BH-20
BH-20
14.00
2.50
BH-21
Specimen Identification
BH-19
17.00
BH-20
0.50
BH-20
5.00
BH-20
14.00
BH-21
2.50
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
SILTY SAND(SM)
NP NP
NP NP
POORLY GRADED SAND with SILT(SP-SM)
CLAYEY SAND(SC)
33
21
WELL-GRADED SAND with SILT(SW-SM)
NP NP
SILTY SAND(SM)
NP NP
D100
D60
D30
D10
%Gravel %Sand
4.75
0.383
0.171
0.0
78.8
4.75
0.534
0.203
0.082
0.0
91.6
2
0.325
0.091
0.0
72.1
9.5
0.641
0.334
0.092
0.8
90.2
4.75
0.409
0.167
0.0
87.8
COBBLES
PI
Cc
Cu
NP
NP 0.94 6.53
12
NP 1.90 6.99
NP 1.01 6.07
%Silt
%Clay
21.2
8.4
27.9
9.0
12.2
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-21
4.00
9.00
BH-21
1.00
BH-22
BH-22
3.00
9.00
BH-22
Specimen Identification
BH-21
4.00
BH-21
9.00
BH-22
1.00
BH-22
3.00
BH-22
9.00
D100
2
2
4.75
9.5
2
SAND
fine
medium
Classification
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
D60
D30
0.317
0.099
0.369
0.165
0.417
0.131
0.644
0.329
0.335
0.045
GRAVEL
coarse
D10
fine
coarse
LL
PL
29
23
NP NP
NP NP
NP NP
32
19
%Gravel %Sand
0.0
73.2
0.0
78.1
0.0
76.0
0.7
84.8
0.0
67.4
COBBLES
PI
Cc
Cu
6
NP
NP
NP
13
%Silt
%Clay
26.8
21.9
24.0
14.5
11.6
21.0
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-23
1.00
4.00
BH-23
13.00
BH-23
BH-24
1.00
5.00
BH-24
Specimen Identification
BH-23
1.00
BH-23
4.00
BH-23
13.00
BH-24
1.00
BH-24
5.00
SAND
fine
medium
GRAVEL
coarse
Classification
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
D100
D60
D30
D10
9.5
0.615
0.269
4.75
0.381
0.161
4.75
0.366
0.161
25
0.617
0.275
4.75
0.195
0.005
fine
coarse
LL
PL
NP NP
NP NP
NP NP
NP NP
38
24
%Gravel %Sand
1.3
86.9
0.0
79.1
0.0
76.7
11.5
74.5
0.0
53.4
COBBLES
PI
Cc
Cu
NP 1.90 9.91
NP
NP
NP
14
%Silt
%Clay
11.8
20.9
23.3
14.0
15.2
31.4
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-24
14.00
25.00
BH-24
1.50
BH-25
BH-25
6.00
15.00
BH-25
Specimen Identification
BH-24
14.00
BH-24
25.00
BH-25
1.50
BH-25
6.00
BH-25
15.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
SILTY SAND(SM)
NP NP
NP NP
WELL-GRADED SAND with SILT(SW-SM)
NP NP
SILTY SAND(SM)
SANDY LEAN CLAY(CL)
39
22
NP NP
POORLY GRADED SAND with SILT(SP-SM)
D100
D60
D30
D10
%Gravel %Sand
9.5
0.706
0.318
1.4
76.1
4.75
1.338
0.398
0.076
0.0
90.1
4.75
0.461
0.173
0.0
86.0
4.75
0.152
0.006
0.0
46.8
4.75
0.561
0.313
0.124
0.0
93.2
COBBLES
PI
Cc
Cu
NP
NP 1.56 17.65
NP
17
NP 1.41 4.53
%Silt
%Clay
22.4
9.9
14.0
27.8
25.4
6.8
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-26
4.00
9.00
BH-26
16.00
BH-26
BH-27
1.50
5.00
BH-27
Specimen Identification
BH-26
4.00
BH-26
9.00
BH-26
16.00
BH-27
1.50
BH-27
5.00
SAND
fine
medium
GRAVEL
coarse
Classification
CLAYEY SAND(SC)
CLAYEY SAND(SC)
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
SILTY SAND(SM)
D100
D60
D30
D10
4.75
0.202
0.022
4.75
0.359
0.159
2
0.358
0.216
2
0.51
0.19
4.75
0.415
0.203
fine
coarse
LL
PL
33
20
31
19
NP NP
NP NP
NP NP
%Gravel %Sand
0.0
54.4
0.0
76.1
0.0
88.6
0.0
87.4
0.0
82.8
COBBLES
PI
Cc
Cu
13
12
NP 2.68 7.38
NP
NP
%Silt
%Clay
24.7
20.9
23.9
11.4
12.6
17.2
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-27
12.00
2.50
BH-28
8.00
BH-28
BH-28
15.00
1.50
BH-29
Specimen Identification
BH-27
12.00
BH-28
2.50
BH-28
8.00
BH-28
15.00
BH-29
1.50
D100
2
4.75
2
4.75
4.75
SAND
fine
medium
Classification
CLAYEY SAND(SC)
SILTY SAND(SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY SAND(SM)
D60
D30
0.383
0.184
0.47
0.169
0.312
0.082
0.447
0.232
0.527
0.187
GRAVEL
coarse
D10
fine
coarse
LL
PL
30
17
NP NP
36
17
NP NP
NP NP
%Gravel %Sand
0.0
81.4
0.0
85.4
0.0
71.1
0.0
86.4
0.0
83.6
COBBLES
PI
Cc
Cu
13
NP
19
NP
NP
%Silt
%Clay
18.6
14.6
28.9
13.6
16.4
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-29
7.00
17.00
BH-29
1.50
BH-30
BH-30
10.00
16.00
BH-30
Specimen Identification
BH-29
7.00
BH-29
17.00
BH-30
1.50
BH-30
10.00
BH-30
16.00
D100
4.75
4.75
4.75
2
4.75
SAND
fine
medium
Classification
CLAYEY SAND(SC)
CLAYEY SAND(SC)
SILTY SAND(SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
D60
D30
0.482
0.265
0.373
0.124
0.473
0.213
0.327
0.125
0.349
0.108
GRAVEL
coarse
D10
0.002
0.002
fine
coarse
LL
PL
38
17
35
17
NP NP
32
17
NP NP
%Gravel %Sand
0.0
86.8
0.0
73.1
0.0
87.4
0.0
76.0
0.0
72.4
COBBLES
PI
Cc
Cu
21
18
NP
15 21.00 144.44
NP 13.40 140.77
%Silt
%Clay
13.2
26.9
12.6
10.1
13.9
12.8
14.8
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-31
2.00
6.00
BH-31
17.00
BH-31
BH-32
1.00
5.00
BH-32
Specimen Identification
BH-31
2.00
BH-31
6.00
BH-31
17.00
BH-32
1.00
BH-32
5.00
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
CLAYEY SAND(SC)
WELL-GRADED SAND with SILT(SW-SM)
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
D10
D100
D60
D30
12.5
0.557
0.177
2
0.343
0.105
0.003
9.5
0.669
0.344
4.75
0.507
0.206
0.08
2
0.305
0.08
0.003
fine
coarse
LL
PL
NP NP
34
16
NP NP
NP NP
NP NP
%Gravel %Sand
4.3
74.7
0.0
74.6
0.8
88.8
0.0
91.3
0.0
70.8
COBBLES
PI
Cc
Cu
NP
18 9.35 99.24
NP 2.56 9.64
NP 1.04 6.30
NP 6.99 101.17
%Silt
%Clay
20.9
12.6
12.8
10.4
8.7
17.1
12.1
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-32
10.00
2.50
BH-33
7.00
BH-33
BH-33
14.00
27.00
BH-33
Specimen Identification
BH-32
10.00
BH-33
2.50
BH-33
7.00
BH-33
14.00
BH-33
27.00
D100
2
4.75
4.75
4.75
4.75
SAND
fine
medium
GRAVEL
coarse
Classification
SANDY LEAN CLAY(CL)
SILTY SAND(SM)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
POORLY GRADED SAND(SP)
D60
D30
D10
0.081
0.012
0.411
0.151
0.003
0.277
0.046
0.002
0.291
0.078
0.003
0.488
0.313
0.172
fine
coarse
LL
PL
43
21
NP NP
42
22
45
22
NP NP
%Gravel %Sand
0.0
41.6
0.0
77.0
0.0
64.6
0.0
70.8
0.0
96.1
COBBLES
PI
Cc
Cu
22
NP 21.42 158.04
20 4.17 154.15
23 6.94 96.31
NP 1.17 2.84
%Silt
%Clay
37.1
21.3
10.0
13.0
17.9
17.5
17.1
12.1
3.9
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-33
40.00
4.00
BH-34
12.00
BH-34
BH-34
20.00
1.50
BH-35
Specimen Identification
BH-33
40.00
BH-34
4.00
BH-34
12.00
BH-34
20.00
BH-35
1.50
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
WELL-GRADED SAND with SILT(SW-SM)
NP NP
42
17
CLAYEY SAND(SC)
SILTY SAND(SM)
NP NP
POORLY GRADED SAND with SILT(SP-SM)
NP NP
POORLY GRADED SAND with SILT(SP-SM)
NP NP
D100
D60
D30
D10
%Gravel %Sand
2
0.396
0.251
0.0
88.9
4.75
0.362
0.116
0.0
74.6
9.5
0.486
0.187
1.0
82.2
9.5
0.687
0.434
0.8
87.9
4.75
0.451
0.268
0.091
0.0
90.7
COBBLES
PI
Cc
Cu
NP 2.65 6.58
25
NP
NP 4.92 12.33
NP 1.74 4.94
%Silt
%Clay
11.1
25.4
16.8
11.3
9.3
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-35
5.00
10.00
BH-35
3.00
BH-36
BH-36
8.00
2.50
BH-37
Specimen Identification
BH-35
5.00
BH-35
10.00
BH-36
3.00
BH-36
8.00
BH-37
2.50
D100
4.75
4.75
4.75
2
4.75
SAND
fine
medium
Classification
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
D60
D30
0.369
0.086
0.42
0.208
0.458
0.263
0.374
0.144
0.386
0.18
GRAVEL
coarse
D10
fine
coarse
LL
PL
35
20
NP NP
NP NP
NP NP
NP NP
%Gravel %Sand
0.0
70.8
0.0
80.6
0.0
83.6
0.0
76.6
0.0
82.6
COBBLES
PI
Cc
Cu
15
NP
NP
NP
NP
%Silt
%Clay
29.2
19.4
16.4
23.4
17.4
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-37
9.00
3.00
BH-38
9.00
BH-38
BH-38
15.00
0.50
BH-39
Specimen Identification
BH-37
9.00
BH-38
3.00
BH-38
9.00
BH-38
15.00
BH-39
0.50
SAND
fine
medium
GRAVEL
coarse
Classification
SANDY LEAN CLAY(CL)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
WELL-GRADED SAND with SILT(SW-SM)
D100
D60
D30
D10
4.75
0.165
4.75
0.371
0.158
4.75
0.4
0.183
2
0.352
0.14
4.75
0.48
0.227
fine
coarse
LL
PL
33
22
NP NP
NP NP
NP NP
NP NP
%Gravel %Sand
0.0
47.8
0.0
77.6
0.0
79.5
0.0
73.5
0.0
88.4
COBBLES
PI
Cc
Cu
11
NP
NP
NP
NP 1.69 7.54
%Silt
%Clay
52.2
22.4
20.5
26.5
11.6
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-39
5.00
3.00
BH-40
10.00
BH-40
BH-40
16.00
1.00
BH-41
Specimen Identification
BH-39
5.00
BH-40
3.00
BH-40
10.00
BH-40
16.00
BH-41
1.00
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
SILTY SAND(SM)
SANDY LEAN CLAY(CL)
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
D100
D60
D30
D10
4.75
0.338
0.121
2
0.345
0.109
4.75
0.131
9.5
0.577
0.324
9.5
0.534
0.25
fine
coarse
LL
PL
NP NP
NP NP
35
24
NP NP
NP NP
%Gravel %Sand
0.0
74.4
0.0
73.4
0.0
48.9
0.7
88.7
2.4
85.0
COBBLES
PI
Cc
Cu
NP
NP
11
NP 2.78 8.82
NP
%Silt
%Clay
25.6
26.6
51.1
10.5
12.6
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-41
4.00
10.00
BH-41
15.00
BH-41
BH-42
2.50
6.00
BH-42
Specimen Identification
BH-41
4.00
BH-41
10.00
BH-41
15.00
BH-42
2.50
BH-42
6.00
D100
2
4.75
2
9.5
9.5
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY, CLAYEY SAND(SC-SM)
SANDY LEAN CLAY(CL)
D60
D30
D10
0.251
0.057
0.326
0.098
0.004
0.226
0.163
0.567
0.261
0.109
0.005
fine
coarse
LL
PL
NP NP
32
19
NP NP
26
21
37
21
%Gravel %Sand
0.0
66.8
0.0
72.0
0.0
85.0
1.2
83.9
0.8
46.0
COBBLES
PI
Cc
Cu
NP
13 7.18 79.71
NP
5
16
%Silt
%Clay
12.8
20.4
16.3
11.7
15.0
14.9
22.6
30.6
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-42
14.00
2.50
BH-43
7.00
BH-43
BH-43
14.00
1.00
BH-44
Specimen Identification
BH-42
14.00
BH-43
2.50
BH-43
7.00
BH-43
14.00
BH-44
1.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
SILTY SAND(SM)
NP NP
POORLY GRADED SAND with SILT(SP-SM)
NP NP
CLAYEY SAND(SC)
32
18
SILTY SAND(SM)
NP NP
WELL-GRADED SAND with SILT(SW-SM)
NP NP
D100
D60
D30
D10
%Gravel %Sand
4.75
0.416
0.219
0.0
86.9
9.5
0.396
0.232
0.8
88.7
4.75
0.303
0.046
0.0
61.0
4.75
0.338
0.154
0.0
78.8
4.75
0.544
0.212
0.0
89.8
COBBLES
PI
Cc
Cu
NP
NP 1.98 5.78
14
NP
NP 1.11 7.36
%Silt
%Clay
13.1
10.6
15.3
23.7
21.2
10.2
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-44
7.00
14.00
BH-44
4.00
BH-45
BH-45
10.00
20.00
BH-45
Specimen Identification
BH-44
7.00
BH-44
14.00
BH-45
4.00
BH-45
10.00
BH-45
20.00
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY, CLAYEY SAND(SC-SM)
SILTY SAND(SM)
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
D100
D60
D30
D10
4.75
0.493
0.251
2
0.384
0.214
4.75
0.508
0.297
0.081
4.75
0.394
0.23
4.75
0.403
0.202
fine
coarse
LL
PL
27
21
NP NP
NP NP
NP NP
33
16
%Gravel %Sand
0.0
83.8
0.0
87.2
0.0
90.6
0.0
84.1
0.0
80.7
COBBLES
PI
Cc
Cu
6
NP
NP 2.15 6.30
NP
17
%Silt
%Clay
16.2
12.8
9.4
15.9
19.3
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-46
1.50
10.00
BH-46
14.00
BH-46
BH-47
2.50
5.00
BH-47
Specimen Identification
BH-46
1.50
BH-46
10.00
BH-46
14.00
BH-47
2.50
BH-47
5.00
SAND
fine
medium
GRAVEL
coarse
Classification
WELL-GRADED SAND with SILT(SW-SM)
WELL-GRADED SAND with SILT(SW-SM)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
D100
D60
D30
D10
4.75
0.518
0.224
4.75
0.468
0.251
4.75
0.344
0.073
0.003
2
0.303
0.093
4.75
0.423
0.192
fine
coarse
LL
PL
NP NP
NP NP
30
16
32
18
28
17
%Gravel %Sand
0.0
89.3
0.0
89.2
0.0
69.4
0.0
72.8
0.0
81.1
COBBLES
PI
Cc
Cu
NP 1.37 7.34
NP 2.05 7.11
14 4.91 108.70
14
11
%Silt
%Clay
10.7
10.8
19.3
11.3
12.1
15.1
18.9
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-47
13.00
1.00
BH-48
4.00
BH-48
BH-48
8.00
1.50
BH-49
Specimen Identification
BH-47
13.00
BH-48
1.00
BH-48
4.00
BH-48
8.00
BH-49
1.50
D100
4.75
4.75
2
4.75
4.75
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
CLAYEY SAND(SC)
SANDY LEAN CLAY(CL)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
D10
D60
D30
0.386
0.137
0.288
0.056
0.165
0.377
0.089
0.294
0.105
0.005
fine
coarse
LL
PL
NP NP
38
18
38
17
33
18
27
16
%Gravel %Sand
0.0
73.5
0.0
66.4
0.0
45.8
0.0
71.2
0.0
75.0
COBBLES
PI
Cc
Cu
NP
20
21
15
11 7.30 57.41
%Silt
%Clay
26.5
12.4
21.2
15.9
38.3
11.9
16.9
15.1
9.9
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-49
5.00
14.00
BH-49
2.50
BH-50
BH-50
6.00
12.00
BH-50
Specimen Identification
BH-49
5.00
BH-49
14.00
BH-50
2.50
BH-50
6.00
BH-50
12.00
D100
2
9.5
4.75
4.75
4.75
SAND
fine
medium
Classification
SILTY SAND(SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY SAND(SM)
D60
D30
0.289
0.913
0.318
0.424
0.147
0.255
0.059
0.421
0.21
GRAVEL
coarse
D10
0.002
fine
coarse
LL
PL
NP NP
NP NP
38
17
NP NP
NP NP
%Gravel %Sand
0.0
65.6
2.2
81.1
0.0
75.8
0.0
64.6
0.0
84.2
COBBLES
PI
Cc
Cu
NP
NP
21
NP 5.77 108.55
NP
%Silt
%Clay
34.4
16.7
24.2
19.6
15.8
15.8
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-51
1.00
5.00
BH-51
11.00
BH-51
BH-52
1.50
5.00
BH-52
Specimen Identification
BH-51
1.00
BH-51
5.00
BH-51
11.00
BH-52
1.50
BH-52
5.00
D100
2
4.75
4.75
4.75
2
SAND
fine
medium
Classification
SILTY SAND(SM)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
SILTY SAND(SM)
D60
D30
0.388
0.152
0.307
0.056
0.39
0.158
0.338
0.104
0.329
GRAVEL
coarse
D10
fine
coarse
LL
PL
NP NP
38
18
32
18
28
16
NP NP
%Gravel %Sand
0.0
77.0
0.0
61.0
0.0
75.7
0.0
73.7
0.0
69.2
COBBLES
PI
Cc
Cu
NP
20
14
12
NP
%Silt
%Clay
23.0
19.7
19.3
24.3
26.3
30.8
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-52
9.00
17.00
BH-52
2.00
BH-53
BH-53
8.00
2.00
BH-54
Specimen Identification
BH-52
9.00
BH-52
17.00
BH-53
2.00
BH-53
8.00
BH-54
2.00
D100
4.75
9.5
2
2
4.75
SAND
fine
medium
Classification
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY SAND(SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
D60
D30
0.394
0.125
0.732
0.326
0.364
0.099
0.417
0.19
0.271
0.052
GRAVEL
coarse
D10
0.004
fine
coarse
LL
PL
33
18
NP NP
34
24
NP NP
38
23
%Gravel %Sand
0.0
72.9
1.7
85.9
0.0
73.2
0.0
81.1
0.0
61.0
COBBLES
PI
Cc
Cu
15
NP 3.10 15.65
10
NP
15 2.27 62.70
%Silt
%Clay
27.1
12.4
26.8
18.9
26.0
13.0
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-54
8.00
14.00
BH-54
1.50
BH-56
BH-56
6.00
3.00
BH-57
Specimen Identification
BH-54
8.00
BH-54
14.00
BH-56
1.50
BH-56
6.00
BH-57
3.00
SAND
fine
medium
GRAVEL
coarse
Classification
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
SILTY SAND(SM)
D100
D60
D30
D10
2
0.411
0.223
9.5
0.586
0.307
2
0.279
2
0.359
0.132
4.75
0.256
0.073
fine
coarse
LL
PL
NP NP
NP NP
28
16
27
18
NP NP
%Gravel %Sand
0.0
88.7
2.0
84.9
0.0
65.3
0.0
73.9
0.0
69.2
COBBLES
PI
Cc
Cu
NP 1.93 6.54
NP
12
9
NP
%Silt
%Clay
11.3
13.1
34.7
26.1
15.2
15.6
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-57
7.00
15.00
BH-57
2.00
BH-58
BH-58
6.00
12.00
BH-58
Specimen Identification
BH-57
7.00
BH-57
15.00
BH-58
2.00
BH-58
6.00
BH-58
12.00
D100
2
9.5
4.75
4.75
9.5
SAND
fine
medium
Classification
CLAYEY SAND(SC)
SILTY SAND(SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY SAND(SM)
D60
D30
0.257
0.666
0.373
0.337
0.075
0.423
0.241
0.509
0.275
GRAVEL
coarse
D10
fine
coarse
LL
PL
33
18
NP NP
39
24
NP NP
NP NP
%Gravel %Sand
0.0
67.2
0.9
86.4
0.0
70.0
0.0
83.7
0.8
87.2
COBBLES
PI
Cc
Cu
15
NP
15
NP
NP 3.85 13.22
%Silt
%Clay
32.8
12.7
30.0
16.3
12.1
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-59
3.00
8.00
BH-59
13.00
BH-59
BH-60
1.50
6.00
BH-60
Specimen Identification
BH-59
3.00
BH-59
8.00
BH-59
13.00
BH-60
1.50
BH-60
6.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
CLAYEY SAND(SC)
27
16
CLAYEY SAND(SC)
29
17
SANDY SILT(ML)
NP NP
CLAYEY SAND(SC)
29
16
POORLY GRADED SAND with SILT(SP-SM)
NP NP
D100
D60
D30
D10
%Gravel %Sand
2
0.298
0.102
0.003
0.0
75.0
4.75
0.169
0.05
0.004
0.0
60.4
4.75
0.071
0.029
0.001
0.0
37.2
4.75
0.28
0.081
0.003
0.0
71.0
2
0.428
0.263
0.093
0.0
91.4
COBBLES
PI
Cc
Cu
11 11.07 94.31
12 3.51 39.93
NP 8.21 48.39
13 7.38 88.55
NP 1.74 4.58
%Silt
%Clay
12.7
12.3
27.4
12.2
45.5
17.3
15.0
14.0
8.6
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-60
14.00
2.00
BH-61
6.00
BH-61
BH-61
15.00
3.00
BH-62
Specimen Identification
BH-60
14.00
BH-61
2.00
BH-61
6.00
BH-61
15.00
BH-62
3.00
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
CLAYEY SAND(SC)
WELL-GRADED SAND with SILT(SW-SM)
POORLY GRADED SAND(SP)
CLAYEY SAND(SC)
D100
D60
D30
D10
4.75
0.412
0.202
2
0.372
0.194
4.75
0.534
0.311
4.75
0.652
0.369
0.186
4.75
0.217
fine
coarse
LL
PL
NP NP
36
17
NP NP
NP NP
36
18
%Gravel %Sand
0.0
81.7
0.0
80.8
0.0
89.7
0.0
95.5
0.0
63.8
COBBLES
PI
Cc
Cu
NP
19
NP 2.58 7.63
NP 1.12 3.50
18
%Silt
%Clay
18.3
19.2
10.3
4.5
36.2
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-62
8.00
16.00
BH-62
1.50
BH-63
BH-63
6.00
14.00
BH-63
Specimen Identification
BH-62
8.00
BH-62
16.00
BH-63
1.50
BH-63
6.00
BH-63
14.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
SILTY, CLAYEY SAND(SC-SM)
26
20
NP NP
SILTY SAND(SM)
CLAYEY SAND(SC)
38
18
SILTY SAND(SM)
41
26
POORLY GRADED SAND with SILT(SP-SM)
NP NP
D100
D60
D30
D10
%Gravel %Sand
4.75
0.513
0.273
0.0
87.6
9.5
0.496
0.261
0.7
85.4
2
0.202
0.0
54.9
4.75
0.373
0.124
0.0
74.2
4.75
0.562
0.334
0.0
89.1
COBBLES
PI
Cc
Cu
6
3.06 10.83
NP
20
15
NP 3.55 10.03
%Silt
%Clay
12.4
13.9
45.1
25.8
10.9
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-64
1.50
4.00
BH-64
11.00
BH-64
BH-64
16.00
1.50
BH-65
Specimen Identification
BH-64
1.50
BH-64
4.00
BH-64
11.00
BH-64
16.00
BH-65
1.50
D100
4.75
4.75
4.75
4.75
4.75
SAND
fine
medium
Classification
SILTY SAND(SM)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY SAND(SM)
D60
D30
0.544
0.213
0.368
0.156
0.357
0.083
0.3
0.173
0.21
0.033
GRAVEL
coarse
D10
fine
coarse
LL
PL
NP NP
29
16
29
17
NP NP
NP NP
%Gravel %Sand
0.0
85.8
0.0
76.2
0.0
70.8
0.0
82.8
0.0
60.0
COBBLES
PI
Cc
Cu
NP
13
12
NP
NP
%Silt
%Clay
14.2
23.8
29.2
17.2
20.0
20.0
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-65
5.00
13.00
BH-65
1.00
BH-66
BH-66
5.00
11.00
BH-66
Specimen Identification
BH-65
5.00
BH-65
13.00
BH-66
1.00
BH-66
5.00
BH-66
11.00
SAND
fine
medium
GRAVEL
coarse
Classification
CLAYEY SAND(SC)
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
D100
D60
D30
D10
4.75
0.369
0.142
9.5
0.707
0.372
0.115
2
0.436
0.17
4.75
0.678
0.334
9.5
0.769
0.234
fine
coarse
LL
PL
27
17
NP NP
NP NP
27
16
33
17
%Gravel %Sand
0.0
76.6
1.2
90.3
0.0
83.7
0.0
85.1
0.9
74.0
COBBLES
PI
Cc
Cu
10
NP 1.71 6.17
NP
11
16
%Silt
%Clay
23.4
8.5
16.3
14.9
25.1
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-67
0.50
4.00
BH-67
9.00
BH-67
BH-68
1.00
3.00
BH-68
Specimen Identification
BH-67
0.50
BH-67
4.00
BH-67
9.00
BH-68
1.00
BH-68
3.00
D100
2
4.75
4.75
2
2
SAND
fine
medium
Classification
SILTY SAND(SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
D60
D30
0.44
0.203
0.287
0.076
0.493
0.228
0.305
0.313
0.086
GRAVEL
coarse
D10
0.006
fine
coarse
LL
PL
NP NP
31
17
NP NP
30
18
31
19
%Gravel %Sand
0.0
85.6
0.0
70.2
0.0
84.1
0.0
69.2
0.0
71.8
COBBLES
PI
Cc
Cu
NP
14 3.44 48.39
NP
12
12
%Silt
%Clay
14.4
21.2
8.6
15.9
30.8
8.7
19.5
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-68
7.00
15.00
BH-68
2.50
BH-69
BH-69
14.00
21.00
BH-69
Specimen Identification
BH-68
7.00
BH-68
15.00
BH-69
2.50
BH-69
14.00
BH-69
21.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
SILTY SAND(SM)
NP NP
NP NP
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
NP NP
CLAYEY SAND(SC)
33
20
POORLY GRADED SAND with SILT(SP-SM)
NP NP
D100
D60
D30
D10
%Gravel %Sand
2
0.336
0.086
0.0
70.9
12.5
1.395
0.482
0.147
3.3
88.4
4.75
0.511
0.212
0.0
86.4
4.75
0.388
0.078
0.0
70.2
4.75
0.609
0.397
0.135
0.0
92.3
COBBLES
PI
Cc
Cu
NP
NP 1.13 9.48
NP
13
NP 1.93 4.53
%Silt
%Clay
29.1
8.3
13.6
29.8
7.7
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-69
28.00
1.00
BH-70
7.00
BH-70
BH-70
12.00
22.00
BH-70
Specimen Identification
BH-69
28.00
BH-70
1.00
BH-70
7.00
BH-70
12.00
BH-70
22.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
POORLY GRADED SAND with SILT(SP-SM)
NP NP
POORLY GRADED SAND with SILT(SP-SM)
NP NP
CLAYEY SAND(SC)
30
18
CLAYEY SAND(SC)
31
20
WELL-GRADED SAND with SILT(SW-SM)
NP NP
D100
D60
D30
D10
%Gravel %Sand
4.75
0.592
0.383
0.176
0.0
93.4
4.75
0.465
0.166
0.0
88.2
2
0.335
0.117
0.004
0.0
76.0
2
0.335
0.109
0.0
72.4
9.5
0.492
0.288
0.7
89.1
COBBLES
PI
Cc
Cu
NP 1.41 3.37
NP 0.86 6.74
12 9.07 74.77
11
NP 2.34 6.85
%Silt
%Clay
6.6
11.8
13.5
10.5
27.6
10.3
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-71
0.50
3.00
BH-71
13.00
BH-71
BH-71
24.00
3.00
BH-72
Specimen Identification
BH-71
0.50
BH-71
3.00
BH-71
13.00
BH-71
24.00
BH-72
3.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
POORLY GRADED SAND with SILT(SP-SM)
NP NP
POORLY GRADED SAND with SILT(SP-SM)
NP NP
CLAYEY SAND(SC)
42
21
POORLY GRADED SAND(SP)
NP NP
CLAYEY SAND(SC)
29
19
D100
D60
D30
D10
%Gravel %Sand
4.75
0.608
0.206
0.077
0.0
90.6
4.75
0.503
0.218
0.088
0.0
92.3
4.75
0.159
0.034
0.0
53.4
9.5
0.686
0.395
0.19
1.0
95.7
2
0.251
0.107
0.0
77.6
COBBLES
PI
Cc
Cu
NP 0.90 7.85
NP 1.08 5.74
21
NP 1.19 3.60
10
%Silt
%Clay
9.4
7.7
28.6
18.0
3.3
22.4
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-72
15.00
26.00
BH-72
1.50
BH-73
BH-73
6.00
17.00
BH-73
Specimen Identification
BH-72
15.00
BH-72
26.00
BH-73
1.50
BH-73
6.00
BH-73
17.00
SAND
fine
medium
GRAVEL
coarse
Classification
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
SILTY SAND(SM)
SILTY SAND(SM)
D100
D60
D30
D10
4.75
0.579
0.284
4.75
0.471
0.237
4.75
0.31
2
0.34
0.166
4.75
0.474
0.237
fine
coarse
LL
PL
NP NP
NP NP
41
24
NP NP
NP NP
%Gravel %Sand
0.0
88.9
0.0
86.2
0.0
64.0
0.0
80.7
0.0
87.4
COBBLES
PI
Cc
Cu
NP 2.27 9.44
NP
17
NP
NP
%Silt
%Clay
11.1
13.8
36.0
19.3
12.6
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-73
27.00
1.50
BH-74
5.00
BH-74
BH-74
17.00
24.00
BH-74
Specimen Identification
BH-73
27.00
BH-74
1.50
BH-74
5.00
BH-74
17.00
BH-74
24.00
D100
9.5
4.75
9.5
4.75
4.75
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
CLAYEY SAND(SC)
CLAYEY SAND(SC)
POORLY GRADED SAND(SP)
POORLY GRADED SAND(SP)
D10
D60
D30
0.473
0.24
0.205
0.021
0.001
0.627
0.303
2.631
1.27
0.442
1.062
0.577
0.316
fine
coarse
LL
PL
NP NP
34
17
30
20
NP NP
NP NP
%Gravel %Sand
0.9
86.8
0.0
59.2
0.8
80.4
0.0
97.0
0.0
96.7
COBBLES
PI
Cc
Cu
NP 2.48 9.58
17 1.52 140.41
10
NP 1.39 5.95
NP 0.99 3.36
%Silt
%Clay
12.3
19.6
21.2
18.8
3.0
3.3
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-75
2.00
7.00
BH-75
18.00
BH-75
BH-75
25.00
2.00
BH-76
Specimen Identification
BH-75
2.00
BH-75
7.00
BH-75
18.00
BH-75
25.00
BH-76
2.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
POORLY GRADED SAND with SILT(SP-SM)
NP NP
NP NP
SILTY SAND(SM)
27
22
SILTY SAND(SM)
POORLY GRADED SAND with SILT(SP-SM)
NP NP
NP NP
WELL-GRADED SAND with SILT(SW-SM)
D10
%Gravel %Sand
D100
D60
D30
4.75
0.643
0.215
0.08
0.0
91.0
2
0.322
0.096
0.002
0.0
73.2
9.5
0.475
0.185
0.7
79.9
4.75
0.709
0.366
0.118
0.0
92.1
2
0.587
0.225
0.079
0.0
90.9
COBBLES
PI
Cc
Cu
NP 0.90 8.08
NP 18.63 210.08
5
NP 1.59 5.98
NP 1.10 7.45
%Silt
%Clay
9.0
12.1
14.7
19.4
7.9
9.1
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-76
8.00
18.00
BH-76
24.00
BH-76
BH-77
4.00
9.00
BH-77
Specimen Identification
BH-76
8.00
BH-76
18.00
BH-76
24.00
BH-77
4.00
BH-77
9.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
CLAYEY SAND(SC)
35
18
POORLY GRADED SAND with SILT(SP-SM)
NP NP
POORLY GRADED SAND with SILT(SP-SM)
NP NP
SILTY SAND(SM)
NP NP
CLAYEY SAND(SC)
27
16
D100
D60
D30
D10
%Gravel %Sand
4.75
0.334
0.099
0.002
0.0
72.4
9.5
0.873
0.409
0.147
1.6
91.1
9.5
0.749
0.413
0.075
3.9
86.1
4.75
0.363
0.154
0.0
79.3
4.75
0.315
0.146
0.004
0.0
79.8
COBBLES
PI
Cc
Cu
17 15.96 182.04
NP 1.30 5.93
NP 3.03 9.98
NP
11 15.52 72.47
%Silt
%Clay
12.7
14.9
7.3
10.0
20.7
10.0
10.3
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-77
18.00
31.00
BH-77
45.00
BH-77
BH-78
2.00
6.00
BH-78
Specimen Identification
BH-77
18.00
BH-77
31.00
BH-77
45.00
BH-78
2.00
BH-78
6.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
WELL-GRADED SAND with SILT(SW-SM)
NP NP
NP NP
POORLY GRADED SAND with SILT(SP-SM)
WELL-GRADED SAND with SILT(SW-SM)
NP NP
SILTY SAND(SM)
NP NP
SILTY SAND(SM)
33
24
D100
D60
D30
D10
%Gravel %Sand
12.5
0.758
0.365
1.8
88.0
12.5
0.701
0.425
0.197
2.1
92.8
4.75
0.503
0.242
0.0
89.4
4.75
0.396
0.166
0.0
80.2
2
0.309
0.083
0.0
71.0
COBBLES
PI
Cc
Cu
NP 2.42 10.46
NP 1.31 3.56
NP 1.63 7.07
NP
9
%Silt
%Clay
10.2
5.1
10.6
19.8
29.0
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-78
13.00
20.00
BH-78
38.00
BH-78
BH-79
1.00
6.00
BH-79
Specimen Identification
BH-78
13.00
BH-78
20.00
BH-78
38.00
BH-79
1.00
BH-79
6.00
SAND
fine
medium
GRAVEL
coarse
fine
coarse
Classification
LL
PL
CLAYEY SAND(SC)
28
16
NP NP
POORLY GRADED SAND with SILT(SP-SM)
NP NP
SILTY SAND(SM)
CLAYEY SAND(SC)
29
16
SILTY SAND(SM)
NP NP
D100
D60
D30
D10
%Gravel %Sand
4.75
0.259
0.079
0.0
71.0
9.5
0.655
0.361
0.141
0.8
91.1
9.5
0.417
0.239
1.0
85.0
4.75
0.296
0.087
0.0
72.2
4.75
0.266
0.047
0.0
64.6
COBBLES
PI
Cc
Cu
12
NP 1.41 4.64
NP
13
NP
%Silt
%Clay
29.0
8.2
13.9
27.8
12.2
23.2
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-79
14.00
27.00
BH-79
33.00
BH-79
BH-79
40.00
2.00
BH-80
Specimen Identification
BH-79
14.00
BH-79
27.00
BH-79
33.00
BH-79
40.00
BH-80
2.00
D100
2
4.75
4.75
4.75
2
SAND
fine
medium
GRAVEL
coarse
Classification
SILTY SAND(SM)
SILTY, CLAYEY SAND(SC-SM)
SILTY SAND(SM)
SILTY SAND(SM)
CLAYEY SAND(SC)
D60
D30
D10
0.398
0.18
0.509
0.25
0.402
0.188
0.434
0.158
0.355
0.083
fine
coarse
LL
PL
34
24
28
22
NP NP
NP NP
31
15
%Gravel %Sand
0.0
79.5
0.0
84.7
0.0
83.0
0.0
74.6
0.0
70.6
COBBLES
PI
Cc
Cu
10
6
NP
NP
16
%Silt
%Clay
20.5
15.3
17.0
25.4
29.4
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-80
5.00
10.00
BH-80
16.00
BH-80
BH-80
23.00
26.00
BH-80
Specimen Identification
BH-80
5.00
BH-80
10.00
BH-80
16.00
BH-80
23.00
BH-80
26.00
SAND
fine
medium
GRAVEL
coarse
Classification
CLAYEY SAND(SC)
WELL-GRADED SAND with SILT(SW-SM)
SILTY SAND(SM)
POORLY GRADED SAND(SP)
SILTY SAND(SM)
D100
D60
D30
D10
4.75
0.622
0.215
4.75
0.646
0.362
0.096
9.5
0.618
0.305
4.75
0.674
0.431
0.239
4.75
0.416
0.156
fine
coarse
LL
PL
39
24
NP NP
NP NP
NP NP
NP NP
%Gravel %Sand
0.0
78.6
0.0
90.7
1.2
83.8
0.0
95.2
0.0
75.7
COBBLES
PI
Cc
Cu
15
NP 2.12 6.74
NP
NP 1.15 2.82
NP
%Silt
%Clay
21.4
9.3
14.9
4.8
24.3
HYDROMETER
100
50 40 30 20 16 14 10 8
60
1.5 2
3 4
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0.001
0.01
0.1
10
100
SILT
CLAY
Specimen Identification
BH-80
34.00
Specimen Identification
BH-80
34.00
SAND
fine
medium
GRAVEL
coarse
Classification
POORLY GRADED SAND(SP)
D100
4.75
D60
1.145
D30
0.595
D10
0.362
fine
coarse
LL
NP
PL
NP
%Gravel %Sand
0.0
97.6
COBBLES
PI
NP
Cc
Cu
0.85 3.16
%Silt
%Clay
2.4
APPENDIX # II
Laboratory Test Results
DATE :
BOREHOLE NO. :
BH-01
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
51.071
3.125
1.829
0.448
14.786
45.9
B
100.000
103.114
5.000
1.829
0.448
14.786
Degree
C
150.000
154.672
7.500
1.829
0.448
14.786
175.0
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-02
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
42.802
3.750
1.791
0.480
17.267
40.7
B
100.000
86.091
5.000
1.791
0.480
17.267
Degree
C
150.000
128.893
8.750
1.791
0.480
17.267
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-03
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
44.261
2.500
1.833
0.446
14.590
45.2
B
100.000
98.251
5.000
1.833
0.446
14.590
Degree
C
150.000
149.808
6.250
1.833
0.446
14.590
175.0
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-04
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
5.03
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
50.098
3.125
1.878
0.411
13.730
42.0
B
100.000
94.846
5.000
1.878
0.411
13.730
Degree
C
150.000
140.080
8.750
1.878
0.411
13.730
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-12
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
1.95
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
43.289
3.750
1.822
0.454
15.249
39.6
B
100.000
84.632
5.000
1.822
0.454
15.249
Degree
C
150.000
125.975
7.500
1.822
0.454
15.249
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-13
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
49.612
2.500
1.980
0.338
13.121
46.0
B
100.000
102.628
5.000
1.980
0.338
13.121
Degree
C
150.000
155.158
6.250
1.980
0.338
13.121
175.0
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-14
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
31.615
2.500
1.806
0.467
15.249
33.2
B
100.000
65.663
5.000
1.806
0.467
15.249
Degree
C
150.000
97.764
6.250
1.806
0.467
15.249
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-15
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
26.75
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
63.717
3.125
1.868
0.419
12.723
36.5
B
100.000
100.683
5.000
1.868
0.419
12.723
Degree
C
150.000
137.648
8.750
1.868
0.419
12.723
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-19
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
39.923
6.250
2.004
0.322
10.472
40.7
B
100.000
84.589
9.250
2.004
0.322
10.472
Degree
C
150.000
128.465
12.500
2.004
0.322
10.472
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-20
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
13.62
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
45.721
2.500
1.992
0.331
11.998
32.3
B
100.000
75.877
5.000
1.992
0.331
11.998
Degree
C
150.000
108.951
7.500
1.992
0.331
11.998
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-23
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
9.73
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
42.316
3.125
1.930
0.373
12.595
33.3
B
100.000
75.877
3.750
1.930
0.373
12.595
Degree
C
150.000
107.978
4.375
1.930
0.373
12.595
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-27
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
43.289
6.250
1.913
0.385
12.098
41.3
B
100.000
87.550
9.250
1.913
0.385
12.098
Degree
C
150.000
131.811
12.500
1.913
0.385
12.098
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-30
Sample:
Remoulded
Dry
Cohesion
kPa
At
Failure
Initial
Soil
Properties
11.51
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
46.207
1.875
1.735
0.528
12.098
34.6
B
100.000
80.254
3.125
1.735
0.528
12.098
Degree
C
150.000
115.274
5.000
1.735
0.528
12.098
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-33
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
6.65
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
61.771
3.750
1.826
0.451
13.195
47.5
B
100.000
114.301
7.750
1.826
0.451
13.195
Degree
C
150.000
170.723
8.750
1.826
0.451
13.195
175.0
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-34
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
39.884
3.750
1.757
0.508
19.523
39.7
B
100.000
80.741
7.000
1.757
0.508
19.523
Degree
C
150.000
124.516
10.000
1.757
0.508
19.523
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-36
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
32.413
3.750
1.909
0.388
10.375
33.7
B
100.000
66.011
6.000
1.909
0.388
10.375
Degree
C
150.000
100.005
8.750
1.909
0.388
10.375
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-38
Sample:
Remoulded
Dry
Cohesion
kPa
At
Failure
Initial
Soil
Properties
0.00
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
28.211
5.000
1.963
0.350
9.479
31.9
B
100.000
60.799
5.750
1.963
0.350
9.479
Degree
C
150.000
92.900
6.250
1.963
0.350
9.479
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-39
Sample:
Remoulded
Dry
Cohesion
kPa
At
Failure
Initial
Soil
Properties
2.92
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
48.639
5.000
1.924
0.378
12.917
42.4
B
100.000
94.359
7.500
1.924
0.378
12.917
Degree
C
150.000
140.080
11.250
1.924
0.378
12.917
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-40
Sample:
Remoulded
Dry
Cohesion
kPa
At
Failure
Initial
Soil
Properties
11.51
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
55.448
3.125
1.949
0.360
12.945
41.4
B
100.000
99.710
5.000
1.949
0.360
12.945
Degree
C
150.000
143.485
7.500
1.949
0.360
12.945
175.0
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-45
Sample:
Remoulded
Dry
Cohesion
kPa
At
Failure
Initial
Soil
Properties
4.38
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
56.421
3.125
1.863
0.422
3.902
46.3
B
100.000
109.438
4.500
1.863
0.422
3.902
Degree
C
150.000
160.995
6.250
1.863
0.422
3.902
175.0
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-47
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
8.27
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
46.207
3.750
1.899
0.396
9.800
37.0
B
100.000
83.173
7.750
1.899
0.396
9.800
Degree
C
150.000
121.597
8.750
1.899
0.396
9.800
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-48
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
15.40
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
52.530
3.750
1.881
0.409
9.800
36.7
B
100.000
89.982
7.750
1.881
0.409
9.800
Degree
C
150.000
126.948
8.750
1.881
0.409
9.800
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-49
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
19.62
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
55.935
3.750
1.913
0.386
9.800
36.1
B
100.000
92.900
7.750
1.913
0.386
9.800
Degree
C
150.000
128.893
8.750
1.913
0.386
9.800
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-51
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
27.24
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
58.367
3.750
1.685
0.573
16.300
31.9
B
100.000
89.496
7.750
1.685
0.573
16.300
Degree
C
150.000
120.624
8.750
1.685
0.573
16.300
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-51
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
11.19
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
50.584
3.750
1.993
0.330
10.900
37.9
B
100.000
88.036
7.750
1.993
0.330
10.900
Degree
C
150.000
128.407
8.750
1.993
0.330
10.900
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-52
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
10.54
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
49.125
3.750
1.873
0.415
15.300
37.7
B
100.000
88.036
7.750
1.873
0.415
15.300
Degree
C
150.000
126.461
8.750
1.873
0.415
15.300
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-53
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
5.67
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
43.775
3.750
2.060
0.286
11.500
37.0
B
100.000
80.254
7.750
2.060
0.286
11.500
Degree
C
150.000
119.165
8.750
2.060
0.286
11.500
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-56
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
10.05
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
49.125
3.750
1.946
0.362
11.000
38.4
B
100.000
90.468
7.750
1.946
0.362
11.000
Degree
C
150.000
128.407
8.750
1.946
0.362
11.000
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-58
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
9.08
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
47.180
3.750
1.747
0.517
20.200
36.8
B
100.000
82.686
7.750
1.747
0.517
20.200
Degree
C
150.000
122.084
8.750
1.747
0.517
20.200
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-59
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
16.86
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
51.071
3.750
1.795
0.476
13.100
34.4
B
100.000
85.604
7.750
1.795
0.476
13.100
Degree
C
150.000
119.652
8.750
1.795
0.476
13.100
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-60
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
3.40
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
41.343
3.750
1.754
0.511
14.000
37.0
B
100.000
78.309
7.750
1.754
0.511
14.000
Degree
C
150.000
116.733
8.750
1.754
0.511
14.000
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-61
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
5.84
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
44.748
3.750
1.756
0.509
14.000
37.4
B
100.000
80.741
7.750
1.756
0.509
14.000
Degree
C
150.000
121.111
8.750
1.756
0.509
14.000
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-66
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
14.59
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
50.584
3.750
1.685
0.573
12.756
35.2
B
100.000
83.659
7.750
1.685
0.573
12.756
Degree
C
150.000
121.111
8.750
1.685
0.573
12.756
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
DATE :
BOREHOLE NO. :
BH-74
Sample:
Remoulded
Wet
Cohesion
kPa
At
Failure
Initial
Soil
Properties
15.24
Specimen
Normal Stress, kPa
Shear Stress, kPa
Horizontal Displacement, mm
Dry Density, Mg/m3
Void Ratio
Moisture Content, %
A
50.000
53.503
3.750
1.753
0.512
12.738
36.8
B
100.000
88.523
7.750
1.753
0.512
12.738
Degree
C
150.000
128.407
8.750
1.753
0.512
12.738
150.0
125.0
100.0
75.0
50.0
25.0
0.0
0.0
25.0
50.0
75.0
NORMAL STRESS
PROJECT:
100.0
125.0
150.0
175.0
(kN/m2)
Geotechnical Investigation Works for Proposed New Jahra Hospital For 1000 Beds
Capacity
APPENDIX # II
Laboratory Test Results
Location
: Jahra, Kuwait
: 2012 02 104
: BS 1377 Part-3
BH No.
pH
Cl (ppm)
SO4 (ppm)
BH-02
BH-05
BH-09
BH-13
BH-19
BH-22
BH-25
BH-31
BH-36
BH-42
BH-49
BH-56
BH-61
BH-68
BH-74
BH-80
7.87
7.81
7.84
7.99
7.86
7.92
7.88
8.09
8.04
7.99
8.15
7.82
7.89
7.94
8.11
8.10
329
293
627
439
324
367
294
348
526
308
604
351
524
390
804
621
1420
2720
2456
1702
1637
1688
2639
3511
1597
1668
1690
1499
1627
1997
3299
3614
Tested By:
Mhmd. Atef
Chemist
APPENDIX # II
Laboratory Test Results
Curve No.
Test Specification:
2013
Preparation Method
1993
10 lb.
Hammer Wt.
18 in.
Hammer Drop
Number of Layers
five
25
.93672 liters
Mold Size
1973
1953
NP
PI
0.0
%>No.4
USCS
1933
NV
LL
Sieve
SP-SM
Date Sampled
0.0
2.5
5.0
7.5
10.0
Water content, %
12.5
10.9
%<No.200
A-1-b
AASHTO
27/12/2012
29/12/2012
15.0 Date Tested
Tested By Yakub Ali
TESTING DATA
WM + WS
1
5213.1
2
5275.4
3
5342.8
4
5404.9
5
5406.1
WM
3338.5
3338.5
3338.5
3338.5
3338.5
WW + T #1
128.50
130.90
131.20
132.20
136.40
WD + T #1
126.10
126.40
124.10
122.90
124.10
32.60
33.20
33.00
33.40
30.10
WW + T #2
118.80
130.10
137.60
130.10
133.20
WD + T #2
116.80
124.50
130.00
121.00
122.10
TARE #2
32.40
30.10
33.80
33.50
33.50
MOISTURE
2.5
5.4
7.8
10.4
12.8
1953
1962
1984
1998
1957
TARE #1
DRY DENSITY
Material Description
TEST RESULTS
Remarks:
Project No. 2012 02 104 Client: Pan Arab Consulting Engineers (PACE)
Project: Geotechnical Investigation Works for Proposed New Jahra Hospital for
1000 Beds Capacity
Source: BS/BH-01
Sample No.: 1
Elev./Depth: 1.5m
Curve No.
Test Specification:
1945
Preparation Method
1925
10 lb.
Hammer Wt.
18 in.
Hammer Drop
Number of Layers
five
25
.93672 liters
Mold Size
1905
1885
NV
LL
Sieve
0.0
%>No.4
%<No.200
1865
NP
PI
Date Sampled
9
11
Water content, %
13
A-3
27-12-2012
29-12-2012
15 Date Tested
Tested By Abbas Ali
TESTING DATA
WM + WS
1
5218.5
2
5267.6
3
5311.4
4
5359.2
5
5380.5
WM
3338.5
3338.5
3338.5
3338.5
3338.5
WW + T #1
121.00
128.20
145.40
145.90
157.90
WD + T #1
116.60
121.80
135.90
134.50
143.30
32.00
32.20
32.10
32.00
32.20
WW + T #2
120.50
132.50
141.20
143.80
157.20
WD + T #2
116.00
125.60
132.00
132.60
142.70
TARE #2
31.60
31.70
32.00
31.90
32.20
MOISTURE
5.3
7.2
9.2
11.1
13.1
1886
1899
1908
1920
1906
TARE #1
DRY DENSITY
Material Description
TEST RESULTS
Remarks:
Project No. 2012 02 104 Client: Pan Arab Consulting Engineers (PACE)
Project: Geotechnical Investigation Works for Proposed New Jahra Hospital for
1000 Beds Capacity
Source: BS/BH-03
Sample No.: 1
Elev./Depth: 1.5m
Curve No.
Test Specification:
1945
Preparation Method
1925
10 lb.
Hammer Wt.
18 in.
Hammer Drop
Number of Layers
five
25
.93672 liters
Mold Size
1905
1885
PI
NP
0.0
%>No.4
USCS
1865
NV
LL
Sieve
8
10
Water content, %
12
A-2-4(0)
AASHTO
18-12-2012
Date Sampled
13.0
%<No.200
SM
19-12-2012
14 Date Tested
Tested By Abbas Ali
TESTING DATA
WM + WS
1
5206.2
2
5241.1
3
5288.8
4
5345.9
5
5355.0
WM
3338.5
3338.5
3338.5
3338.5
3338.5
WW + T #1
130.50
132.90
127.30
138.00
138.60
WD + T #1
126.30
127.20
120.20
128.10
127.20
32.20
31.90
31.90
32.00
32.20
WW + T #2
117.30
122.50
132.30
142.70
141.00
WD + T #2
113.50
117.40
124.90
132.30
129.30
TARE #2
32.10
32.20
31.90
31.60
32.20
MOISTURE
4.6
6.0
8.0
10.3
12.0
1886
1895
1907
1921
1900
TARE #1
DRY DENSITY
Material Description
TEST RESULTS
Silty sand
Remarks:
Project No. 2012 02 104 Client: Pan Arab Consulting Engineers (PACE)
Project: Geotechnical Investigation Works for Proposed New Jahra Hospital for
1000 Beds Capacity
Source: BS/BH-04
Sample No.: 1
Elev./Depth: 1.5m
Curve No.
Test Specification:
2109
Preparation Method
2009
10 lb.
Hammer Wt.
18 in.
Hammer Drop
Number of Layers
five
25
.93672 liters
Mold Size
1909
1809
NV
LL
Sieve
0.0
%>No.4
Date Sampled
0.0
2.5
5.0
7.5
10.0
Water content, %
12.5
8.5
%<No.200
1709
NP
PI
A-1-b
26/12/2012
27/12/2012
15.0 Date Tested
Tested By Yakub Ali
TESTING DATA
WM + WS
1
5183.1
2
5235.7
3
5301.8
4
5389.4
5
5326.9
WM
3338.5
3338.5
3338.5
3338.5
3338.5
WW + T #1
114.10
125.10
140.10
129.40
133.00
WD + T #1
112.40
120.10
132.80
120.70
122.90
32.40
33.40
33.90
31.40
31.00
WW + T #2
119.40
136.90
117.90
135.40
139.40
WD + T #2
117.00
131.80
112.40
126.20
128.60
TARE #2
32.40
30.10
33.00
33.50
33.50
MOISTURE
2.5
5.4
7.2
9.8
11.2
1922
1922
1956
1993
1909
TARE #1
DRY DENSITY
Material Description
TEST RESULTS
Remarks:
Project No. 2012 02 104 Client: Pan Arab Consulting Engineers (PACE)
Project: Geotechnical Investigation Works for Proposed New Jahra Hospital for
1000 Beds Capacity
Source: BS/BH-10
Sample No.: 1
Elev./Depth: 1.5m
Curve No.
Test Specification:
2018
Preparation Method
1998
10 lb.
Hammer Wt.
18 in.
Hammer Drop
Number of Layers
five
25
.93672 liters
Mold Size
1978
1958
PI
NP
0.0
%>No.4
USCS
1938
NV
LL
Sieve
SM
Date Sampled
8
10
Water content, %
12
%<No.200
A-2-4(0)
AASHTO
04-01-2013
05-01-2013
14 Date Tested
Tested By Mohd. John
TESTING DATA
WM + WS
1
5279.5
2
5332.3
3
5380.8
4
5403.3
WM
3338.5
3338.5
3338.5
3338.5
WW + T #1
141.60
200.00
151.00
208.90
WD + T #1
136.90
189.20
140.80
191.00
25.70
31.60
25.40
25.50
WW + T #2
127.40
182.60
199.80
194.80
WD + T #2
122.50
172.90
185.80
178.40
TARE #2
24.70
31.80
26.60
26.10
MOISTURE
4.6
6.9
8.8
10.8
1959
1970
1982
1968
TARE #1
DRY DENSITY
Material Description
TEST RESULTS
Silty sand
Remarks:
Project No. 2012 02 104 Client: Pan Arab Consulting Engineers (PACE)
Project: Geotechnical Investigation Works for Proposed New Jahra Hospital for
1000 Beds Capacity
Source: BS/BH-14
Sample No.: 1
Elev./Depth: 1.5m
Curve No.
Test Specification:
1963
Preparation Method
1943
10 lb.
Hammer Wt.
18 in.
Hammer Drop
Number of Layers
five
25
.93672 liters
Mold Size
1923
1903
NP
PI
0.0
%>No.4
USCS
1883
NV
LL
Sieve
SP-SM
Date Sampled
10
12
Water content, %
14
10.8
%<No.200
A-2-4(0)
AASHTO
27-12-2012
29-12-2012
16 Date Tested
Tested By Abbas Ali
TESTING DATA
WM + WS
1
5253.9
2
5301.4
3
5371.4
4
5380.9
WM
3338.5
3338.5
3338.5
3338.5
WW + T #1
128.90
139.60
157.50
158.60
WD + T #1
123.20
131.60
145.60
145.00
32.00
31.50
32.20
31.80
WW + T #2
128.80
134.20
145.90
153.10
WD + T #2
123.10
126.40
135.10
140.10
TARE #2
32.00
31.70
31.90
31.90
MOISTURE
6.3
8.1
10.5
12.0
1903
1917
1943
1925
TARE #1
DRY DENSITY
Material Description
TEST RESULTS
Remarks:
Project No. 2012 02 104 Client: Pan Arab Consulting Engineers (PACE)
Project: Geotechnical Investigation Works for Proposed New Jahra Hospital for
1000 Beds Capacity
Source: BS/BH-37
Sample No.: 1
Elev./Depth: 1.5m
APPENDIX # III
Bearing Capacity Tables
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacit
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, kuwait
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
Note:
-4.43
-5.43
-6.43
-7.43
-8.43
-9.43
-10.43
-11.43
-12.43
-13.43
50
50
89
95
50
50
50
50
50
50
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
Note:
16.09
15.59
15.09
14.59
14.09
13.59
12.59
11.59
10.59
9.59
8.59
7.59
6.59
5.59
4.59
3.59
2.59
1.59
0.59
-0.41
-1.41
-2.41
-3.41
-4.41
-5.41
-6.41
-7.41
-8.41
-9.41
-10.41
-11.41
-12.41
-13.41
-14.41
-15.41
-16.41
-17.41
-18.41
-19.41
-20.41
-21.41
-22.41
-23.41
-24.41
-25.41
-26.41
-27.41
-28.41
-29.41
-30.41
-31.41
-32.41
-33.41
BH EL (m) +
GWL (m)+
16.590
2.50
SPT- N
Value
6
9
10
11
25
30
37
59
52
61
57
61
68
87
68
61
61
69
84
90
93
50
50
50
50
50
50
50
90
87
90
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
1.00
1.5
2.5
2.8
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
10.00
0.8
1.2
1.4
1.6
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for 1000
Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Jahra, Kuwait
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
Note:
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
Note:
-4.72
-5.72
-6.72
-7.72
-8.72
-9.72
-10.72
-11.72
-12.72
50
50
50
50
50
50
50
50
50
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
: Jahra, Kuwait
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
Note:
-3.27
-4.27
-5.27
-6.27
-7.27
-8.27
-9.27
-10.27
-11.27
-12.27
50
50
87
91
50
50
50
50
50
50
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
Note:
-2.79
-3.79
-4.79
-5.79
-6.79
-7.79
-8.79
-9.79
-10.79
-11.79
72
66
66
69
50
50
50
50
50
50
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
Note:
-3.62
-4.62
-5.62
-6.62
-7.62
-8.62
-9.62
-10.62
-11.62
-12.62
94
96
50
50
50
50
95
50
50
50
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
Note:
-2.40
-3.40
-4.40
-5.40
-6.40
-7.40
-8.40
-9.40
-10.40
-11.40
50
50
50
90
50
50
50
50
86
50
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
Note:
-5.48
-6.48
-7.48
-8.48
-9.48
-10.48
-11.48
-12.48
-13.48
-14.48
50
50
87
88
50
50
50
50
50
50
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
Note:
-4.60
-5.60
-6.60
-7.60
-8.60
-9.60
-10.60
-11.60
-12.60
-13.60
52
47
42
42
45
48
51
54
55
60
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values.
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
Note:
17.84
17.34
16.84
16.34
15.84
15.34
14.34
13.34
12.34
11.34
10.34
9.34
8.34
7.34
6.34
5.34
4.34
3.34
2.34
1.34
0.34
-0.66
-1.67
-2.67
-3.67
-4.67
-5.67
-6.67
-7.67
-8.67
-9.67
-10.67
-11.67
-12.67
-13.67
-14.67
-15.67
-16.67
-17.67
-18.67
-19.67
-20.67
-21.67
-22.67
-23.67
-24.67
-25.67
-26.67
-27.67
-28.67
-29.67
-30.67
-31.67
BH EL (m) +
GWL (m)+
18.335
1.50
SPT- N
Value
7
8
13
15
19
24
35
39
45
49
49
49
44
53
54
62
74
50
50
50
85
75
89
50
50
50
50
50
50
50
50
50
50
50
50
50
87
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
1.00
1.7
2.2
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
10.00
0.9
1.1
1.8
2.1
2.7
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
Note:
16.50
16.00
15.50
15.00
14.50
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
-8.00
-9.00
-10.00
-11.00
-12.00
-13.00
-14.00
-15.00
-16.00
-17.00
-18.00
-19.00
-20.00
-21.00
-22.00
-23.00
-24.00
-25.00
-26.00
-27.00
-28.00
-29.00
-30.00
-31.00
-32.00
-33.00
BH EL (m) +
GWL (m)+
17.003
1.70
SPT- N
Value
6
9
11
13
13
11
10
16
34
44
60
69
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
89
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
1.00
1.5
2.5
3.0
3.0
3.0
3.0
2.8
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
10.00
0.8
1.2
1.5
1.8
1.9
1.6
1.5
2.5
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
Note:
18.88
18.38
17.88
17.38
16.88
16.38
15.38
14.38
13.38
12.38
11.38
10.38
9.38
8.38
7.38
6.38
5.38
4.38
3.38
2.38
1.38
0.38
-0.62
-1.62
-2.62
-3.62
-4.62
-5.62
-6.62
-7.62
-8.62
-9.62
-10.62
-11.62
-12.62
-13.62
-14.62
-15.62
-16.62
-17.62
-18.62
-19.62
-20.62
-21.62
-22.62
-23.62
-24.62
-25.62
-26.62
-27.62
-28.62
-29.62
-30.62
BH EL (m) +
GWL (m)+
19.377
5.10
SPT- N
Value
11
16
22
14
14
12
14
15
26
31
38
38
59
66
75
74
78
90
88
90
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
85
89
94
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
1.00
2.7
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
10.00
1.5
2.2
3.0
2.0
2.0
1.7
2.1
2.3
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
Note:
15.91
15.41
14.91
14.41
13.91
13.41
12.41
11.41
10.41
9.41
8.41
7.41
6.41
5.41
4.41
3.41
2.41
1.41
0.41
-0.59
-1.59
-2.59
-3.59
-4.59
-5.59
-6.59
-7.59
-8.59
-9.59
-10.59
-11.59
-12.59
-13.59
-14.59
-15.59
-16.59
-17.59
-18.59
-19.59
-20.59
-21.59
-22.59
-23.59
-24.59
-25.59
-26.59
-27.59
-28.59
-29.59
-30.59
-31.59
-32.59
-33.59
BH EL (m) +
GWL (m)+
16.410
1.00
SPT- N
Value
9
39
7
13
12
14
17
21
29
39
54
78
87
80
59
68
72
79
66
81
85
77
89
90
88
81
83
89
50
50
50
85
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
1.00
2.2
3.0
2.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
10.00
1.2
3.0
1.0
1.8
1.7
2.0
2.6
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
Note:
16.63
16.13
15.63
15.13
14.63
14.13
13.13
12.13
11.13
10.13
9.13
8.13
7.13
6.13
5.13
4.13
3.13
2.13
1.13
0.13
-0.87
-1.87
-2.87
-3.87
-4.87
-5.87
-6.87
-7.87
-8.87
-9.87
-10.87
-11.87
-12.87
-13.87
-14.87
-15.87
-16.87
-17.87
-18.87
-19.87
-20.87
-21.87
-22.87
BH EL (m) +
GWL (m)+
17.130
1.60
SPT- N
Value
9
14
19
16
24
18
22
25
29
26
35
68
77
71
77
64
57
70
70
70
79
85
92
87
68
91
96
50
50
50
50
50
50
90
50
50
50
50
50
33
38
28
36
1.00
2.2
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
10.00
1.2
1.9
2.6
2.3
3.0
2.6
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
Note:
14.35
13.85
13.35
12.85
12.35
11.85
10.85
9.85
8.85
7.85
6.85
5.85
4.85
3.85
2.85
1.85
0.85
-0.15
-1.15
-2.15
-3.15
-4.15
-5.15
-6.15
-7.15
-8.15
-9.15
-10.15
-11.15
-12.15
-13.15
-14.15
-15.15
-16.15
-17.15
-18.15
-19.15
-20.15
-21.15
-22.15
-23.15
-24.15
-25.15
BH EL (m) +
GWL (m)+
14.850
1.20
SPT- N
Value
8
11
16
18
17
18
25
31
36
41
35
43
46
56
63
64
76
82
87
84
50
50
50
50
50
76
83
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
1.00
2.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
10.00
1.1
1.5
2.2
2.5
2.4
2.6
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Lowest value to used at respective with due consideration of any weak layer below that level.
Refer the relevant sections of the report for recommended values
Project : Soil Investigation works for Construction of New Jahra Hospital for
1000 Beds Capacity
Client :Pan Arab Consulting Engineers (PACE)
APPENDIX # IV
Settlement Calculations for Mat
Structure ID:
6months
5 yrs
25yrs
Remarks
100
12.0
14.1
15.60
Df=5m
200
29.9
35.2
38.90
250
39.0
45.9
50.70
48.2
56.6
62.50
300
Structure ID:
100
13.8
16.2
17.90
200
34.6
40.7
45.00
Df=5m
250
45.3
53.3
58.80
BxL = 95 x 95m
300
56.1
66.0
72.90
Structure ID:
100
17.2
20.2
22.30
200
43.4
51.0
56.30
Df=5m
250
56.8
66.7
73.70
BxL = 50 x 100m
300
70.4
82.7
91.40
20-Jan-13
Input
Type of footing
Width of footing
Length of footing
Depth of footing
Groundwater level (GWT)
Unit weight of soil above GWT
Unit weight of soil below GWT
RE
117
128
5
1
18
21
SQ, RE, ST
m
m
m
m
kN/m^3
kN/m^3
0.5 years
300 kN/m^2
Calculations
Total influence depth
Peak influence depth
Vertical effective stress at footing depth
Vertical effective stress at peak influence depth
Peak Influence Factor
Depth factor
Shape Factor
Secondary creep factor
S. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
468
122
62.76
1373.2
m
m
kN/m^2
kN/m^2
0.546741
0.8954
0.997179
1.139794
RESULTS
Net Pressure
300 kPa
Settlement
48.2 mm
APPENDIX # V
Pile Capacity Estimates
(Assumed)
Depth
Unit Wt
Sub Unit
Angle of
Top
Bottom
kN/m3
Wt, kN/m3
friction
5.00
10.00
20.00
10.19
32.00
10.00
15.00
20.50
10.69
36.00
15.00
20.00
21.00
11.19
40.00
20.00
25.00
21.50
11.69
40.00
25.00
30.00
21.50
11.69
40.00
Note: Depth 5.0 is the aasumed bottom of Foundation level
Notes:
1
2
3
4
5
6
Zone:
Ovr Pressure, kPa
Top
Bottom
50.95
101.90
101.90
155.35
155.35
211.30
211.30
269.75
269.75
328.20
Ks
Coeff. of friction
0.70
0.70
0.70
0.70
0.70
0.62
0.73
0.84
0.84
0.84
33.43
65.42
107.68
141.28
175.61
Unit skin friction is limited to 190kPa (FHWA manual limits to max of 200kPa for cohesionless soils)
Unit end bearing is limited to 11Mpa ( Ref: Pile design & construction Practice, 5th Edn - M.Tomlinson & J. Woodward)
High quality installation methods are assumed
(power augering or reverse circulation methods which causes less disturbance to soil)
High slump concrete (>150mm) are assumed
Augerd pile diameter is maximum 60cm
Drilled piers are over 70cm dia
Sufficient number of pile load tests on TEST PILE & WORKING PILES should be carried out to
validate all assumptions, factor of safety & potential punching failure etc
Page :
1 of 4
1393
3235
6864
7436
8367
1701
3990
8536
9190
10253
2036
4818
10381
11116
12313
2398
5720
12399
13216
14545
3204
7743
16953
17933
19528
667
1794
4235
4235
4235
871
2343
5531
5531
5531
1102
2966
7001
7001
7001
1361
3661
8643
8643
8643
1960
5272
12446
12446
12446
726
1441
2629
3201
4132
830
1647
3005
3658
4722
933
1853
3380
4116
5312
1037
2059
3756
4573
5902
1245
2470
4507
5487
7083
2.20
0.39
0.7
2.51
0.50
2.83
3.14
0.64
0.79
Drilled Shaft Dia,m
0.8
0.9
1.0
3.77
1.13
1.2
Page :
2 of 4
776
1516
2729
3311
4257
895
1745
3135
3802
4885
1.2
1016
1977
3546
4298
5519
1139
2212
3960
4798
6158
1392
2691
4801
5811
7450
FOS
2.6
L,m
0.7
0.8
0.9
1.2
10
15
20
22
25
329
629
1111
1341
1714
384
731
1286
1551
1980
442
837
1466
1765
2250
501
945
1649
1984
2525
626
1171
2028
2434
3092
FOS=
2.3
0.7
0.8
0.9
1.2
606
1407
2984
3233
3638
739
1735
3711
3996
4458
885
2095
4513
4833
5353
1043
2487
5391
5746
6324
1393
3366
7371
7797
8491
Page :
3 of 4
Note:
Project:
Client:
Uplift
kNs
384
731
1286
1551
1980
1.0
Comp
kNs
1043
2487
5391
5746
6324
1.2
Uplift
kNs
501
945
1649
1984
2525
Comp
kNs
1393
3366
7371
7797
8491
Uplift
kNs
626
1171
2028
2434
3092
Location: Jahra
Page :
4 of 4