REQUEST FOR NEW PRODUCT DEVELOPMENT

No :
Customer Name

( Local / Export )

Sales Volume Projection

Pcs/Annum - Other Remarks

Expected Production Date :


Description of Product

Size

Existing Stock Information *

(Filled by PPC)
Item

Quantity

Covered by
PO
SO

Solution to Stock
(Filled by Sales)

Finish Good
WIP (P/Sheet-Component-etc)
Alu/Tin Plate
Lacquers

Customer Specification
Coating

Material

Components

Specification

Inside

Quantity of

Outside

Printing Colour

1.
2.
3.
4.
5.
Product to be Filled

Customer Process

Forward : (please tick)

* To be Filled if the product to be developed

Samples . Pcs

is from old customer (progress) and wants


to change the existing product with the
new one

Pictures
Customer Drawings and Specifications
Customer Process

REQUESTED BY
SALES STAFF

NAME

* Use another paper if needed

SIGNATURE

DATE

SALES MANAGER
Masa Kadaluarsa : -

Revisi ke : 5

Nomor Dokumen : SLS-FM-04-02-05

Plan Manufacturing Proses

RFD No :
Customer :
Product :

A. Availability of Machine and Capacity


Machine/Line available
Investment Required (Please List Below) :

( in USD )

B. Availability of Tooling
Tooling available
Investment Required (Please List Below) :

Test Pack Requirement :

Yes

No

( in USD )

Estimate Time of Development :


(Including Tools, Machine and Materials)

- Sample :

Check & Approved by

- Produksi :

NAME

SIGNATURE

DATE

Pro Dev Supervisor


R & D Manager *
Note : * Filled if this project need some investment
Approval could be done via email
Masa Kadaluarsa : -

Revisi ke : 5

Nomor Dokumen : SLS-FM-04-02-05


RFD No :

Customer :
Product :

Product Cost Calculation


in USD per 1000 pcs
COST ITEM

Metal Cost
Protective & Decorative
Other Material
Packaging
Labour
Factory Overhead
Sub Total Mfg. Cost
Sales Cost
General & Adm Cost
Others
TOTAL COST GENERAL
Price Proposed

Contribution Margin (%)


Gross Profit Margin (%)
Net Profit Margin (%)
Price Proposed
Investment Calculation (if any)

Total Price Proposed


Total Investment Need
IRR
NPV
Payback (months)

COMPONENT ITEM

TOTAL

Check & Approved by

NAME

SIGNATURE

DATE

Cost Accountant
Finance Controller
Masa Kadaluarsa : -

Revisi ke : 5

Nomor Dokumen : SLS-FM-04-02-05


RFD No. :

Customer :
Product :

Samples/Proof Print Development Request


NAME

SIGNATURE

DATE

Requested by
Sales Manager
Approved by
GM Sales & Marketing *
Approved by
GM Operation Division *
Note : * Approval could be done via email
1. Preparation
Item Controlled

Date Of

Product Drawing Spec.


Tooling Drawing Spec.

Issued
Issued

Tooling Preparation

Start
Finish

Remarks

2. Summary Product Test


a. Printing Test

A. Cross Cut

B. Mechanical Scratch

C. Aceton Rub Test

D.

E.

b. Dimension and Visual Test


Component

Result to Product
Drawing Specification

c. Performance/Function/Assembly Test

d. Condition of Run Production Test

e. Result of Incubation Test Related To The Product

Remarks

NAME

SIGNATURE

DATE

Issued & Check by


Prod Dev Supervisor
Approved by
R & D Manager
Masa Kadaluarsa : -

Revisi ke : 5

Nomor Dokumen : SLS-FM-04-02-05


RFD No. :

Customer :
Product :

REQUEST FOR PRE PRESS SERVICE (RPS)


RPS No.:
New Design

: Y / N,

Issued Date :

Dec No :
By:

Description:
Customer :
Dia.:
Finished Can Height :
Blanks Size :
Content Of Can :
Need Pasteurisasi : Y / N
Need Proof Print before price approval : Y / N
Color Reference :
Attachment :

Remark :

NOTES :
1

TARGET PENYELESAIAN ARTWORK = 1 MINGGU, PAPER PRINT = 1 MINGGU, PROOFPRINT = 2 MINGGU


DARI TANGGAL RRS

PENENTUAN MATERIAL ET/TFS/ALU & COATING MENGACU KEPADA PRINTING LAYOUT DAN TECHNICAL
SPECIFICATION

JUMLAH PEMBUATAN PAPER PRINT ADALAH 3 LEMBAR, JIKA SALES MEMBUTUHKAN LEBIH AGAR
DICANTUMKAN PADA REMARK

JUMLAH PEMBUATAN PROOFPRINT DAPAT DILIHAT PADA DAFTAR SPESIFIKASI PROOFPRINT &
COLOUR TOLERANCES

5 *F/C = FULL COLOR , B/W = BLACK & WHITE

Masa Kadaluarsa : -

Revisi ke : 5

Nomor Dokumen : SLS-FM-04-02-05


RFD No. :

Customer :
Product :

Customer Test Pack Request


Contact Person at Customer

Address

Phone / Fax No.

Quantity Samples Required

:
NAME

SIGNATURE

DATE

Requested by
Sales Manager
Approved by
R & D Manager *
Note : * Approval could be done via email

Test Pack Record


Date of Customer Test

Quantity of Product Tested

Item Test

Result of Test

Remarks

Dimentional Test
Visual Test
Assembly Test
Functional Test
Incubation Test
Conclusion of Customer Test

Good

Fail

Additional Comment

1. Test pack has been done with standard product content/ingridients and production process as stated on attached
customer process data.
2. Test pack samples should be kept by customer and PT. Ancol Terang MPI as a test pack evidence.

3. If there is any changes on standard product content/ingridients or product process, then customer should inform
PT. Ancol Terang MPI for evaluation purpose and test pack if required.
NAME

SIGNATURE

DATE

Issued by
ATP Staff
Approved by
Customer
Approved by
ATP R&D Manager
Masa Kadaluarsa : -

Revisi ke : 5

Nomor Dokumen : SLS-FM-04-02-05

ORDER TYPE
1a

F/C Paper Print

1b

B/W Paper Print

CTP Group Besar

Proofprint

Finished Good Sample

5a

Soft copy File Aktif

5b

Soft copy File tidak Aktif


EMAIL
CD

Others

REQUEST CONFIRM BY