Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Students must apply to the Training Coordinator in the prescribed format given in Annexure-I to this
notice indicating his/her choice of organization where he/she would like to undergo Industrial
Training. The students must keep the following points in mind, while approaching any organization
for pursuing their IOHE
a. The organisation should be of repute and must have been in existence for at least five years.
b. Organization in principle should agree to engage students in a meaningful Live Engineering
Project for the full stipulated period of training as mentioned above and also help the university in
conducting periodic evaluations of the students which includes submission of monthly progress report
on training to the University and visit by the faculty to the site.
c. Once approved, the students are not permitted to change their training organisation without
prior permission from the university.
2.
Based on the information provided by the student in Annexure-I, university would scrutinize
the details of the organization and will give its approval. Students in their own interest and to avoid
rejection of their requests should approach only those organizations, which fulfil the criteria of
selection laid down by the university.
Page 1 of 15
3.
Thereafter, students may collect formal request letter/NOC for the approved organisation (draft
provided in Annexure 2) to be submitted to his / her prospective training organisation from
Training Co-ordinator, Civil Engineering Department.
4.
The student should obtain a consent letter (As per draft provided in Annexure 3) from the training
organization and submit it to the Office of Training and Placement, Civil Engineering Department as a
proof of acceptance by the organisation.
5.
MONITORING
6.
Each student has to submit a joining report intimating the date of his/her joining training as per
Annexure-IV. The students have to ensure that the joining reports are received by the university
within 15 days of joining the organisation by hand/registered post. Delays in submission are liable to
attract academic penalties.
7.
For effective monitoring of training each student has to obtain a progress report for each month from
the industry coordinator/ immediate supervisor/ Project Manager as per Annexure-V and submit the
same during Mid Term/End Term Evaluations.
8.
The students are required to maintain a Daily Diary to keep a record of their daily work, which they
have to present during the Mid Term/ End Term evaluations.
EVALUATION
9.
10.
a) Total Credits: 25 Credits
b)
Component
Mid Term Evaluation I
Schedule
First week of March
Credits
2 credits
3 credits
20 credits
Details
Students have to give a brief
presentation
of
the
work
accomplished during the period and
present the monthly progress reports
and daily diary to the evaluator
Feedback from Industry/ Monthly
Reports
Feedback from faculty coordinator
Project Report/ Daily Diary
Presentation/Viva
25 credits
Total
Note: The students will be informed well in advance about the exact dates of evaluation through
chalkpad notice. Therefore the students are advised to check their chalkpad account regularly
during the training period.
11. On successful completion of INDUSTRY ORIENTED HANDS ON EXPERIENCE (IOHE),
students are required to submit a Project Report to the university within a week of completion
Page 2 of 15
Due date
1.
2.
Students submit the filled Performa as provided in Annexure 1 to the 31st Oct 2014
Training coordinator, Civil Engineering Department
Last date for approval /disapproval of IOHE places by University
10th Nov 2014
3.
4.
5.
Notified
6.
7.
Start of IOHE
End of IOHE
8.
Cc:
VC and Registrar for their kind information
Dean Civil for his information please
HOD & Faculty Members of Department of Civil Engineering
Chalkpad Notice Board
All Notice boards in Academic block
Page 3 of 15
Annexure - I
To
The Training Coordinator,
Civil Engineering Department
Chitkara University, Himachal Pradesh
Sub: Request for issue of formal request letter/NOC for pursuing IOHE
Dear Sir,
I .. Name, ID No. would like to pursue my
Industry Oriented Hands on Experience (IOHE) Course at the organization mentioned below:
a. Name of the Organization :
b. Address of the organisation
c. Name & designation of the person to whom the
formal request letter/ NOC is to be addressed:
d. Website of the organization :
e. No. of years of existence of organization :
f. Project where you are aspiring to pursue your training:
I request you to accord your kind approval and issue me formal request letter/ NOC to enable me to
pursue my IOHE.
Yours sincerely,
Page 4 of 15
Annexure II
Chitkara University
Atal Shiksha Kunj, Atal Nagar,Barotiwala,
Distt - Solan - 174 103 Himachal Pradesh, India.
Phone: 01795-661011
www.chitkara.edu.in
Chitkara remains one of the top choices for engineering aspirants in North India every year and has been growing
very fast on Pan India basis, so as to produce engineering professionals of the highest standards.
IOHE is a 25 credit course, where a student is expected to work on a live engineering project. The project being
pursued by the student is to be jointly evaluated by the host organization of the Industry and the University.
Therefore, the faculty from this university may please be permitted to visit your work site/ premises with prior
permission to evaluate the students periodically. The evaluation criteria adopted by us is placed at Appendix to
this letter. If any modifications are desired they can be considered.
I am sure our students shall contribute to productivity in your organisation and will in turn gain valuable
hands-on experience.
Through this letter, I would request you to enrol our student(s) in your esteemed organization for a six months
IOHE (01 Jan 20-- to 30 Jun 20--), with their detail (s) as mentioned below:
Name of student ----------------------------ID no. -----------------------------------------Sincerely yours,
Coordinator,
Training Programs
Page 5 of 15
Component
Mid Term Evaluation I
Schedule
First week of March
Credits
2 credits
3 credits
20 credits
Total
Details
Students have to give a brief
presentation of the work accomplished
during the period and present the
monthly progress reports and daily
diary to the evaluator
Feedback from Industry/ Monthly
Reports
Feedback from faculty coordinator
Project Report/ Daily Diary
Presentation/Viva
25 credits
3.
4.
The students are required to submit a monthly progress report of their training from their training
organisation signed by the immediate supervisor and the project manager to the university by 10th
of each month.
5.
Visit by the faculty to the worksite with prior permission from the training organisation at mutual
convenience for evaluating the students.
Page 6 of 15
Annexure-III
Sincerely yours
Name:
Designation:
Email id
(Mandatory):
Contact No (Mandatory) :
Page 7 of 15
Annexure-IV
JOINING REPORT
(To be sent by student within a week of joining by Registered Post to Training Coordinator, Civil
Engineering Department).
1.
Student I D
__________________________
2.
Name
__________________________
3.
__________________________
4.
__________________________
__________________________
__________________________
5.
Telephone No.
__________________________
E-mail :
__________________________
__________________________
__________________________
__________________________
6.
Telephone No.
__________________________
E-mail :
__________________________
__________________________
__________________________
__________________________
Telephone No.
__________________________
E-mail :
__________________________
I hereby inform that I have joined the organization on _____________________ for the Project
Semester in the industry.
Dated :
Certified that the above-mentioned student has joined our organization for the project semester in the industry.
Dated :
Annexure-V
Page 8 of 15
E-mail ....
DETAILS OF PROJECT
Stipend (if any) ... Accommodation/Meals
i) Topic/Title of the Project ..
Name .
Designation
Name
Designation
Page 9 of 15
Annexure-VI
FEEDBACK FROM INDUSTRY ON PROJECT SEMESTER
Name of the Organization
PROJECT SEMESTER: January . To June
Student ID:___________________
Student Name:_____________________
1.
2.
Yes / No
3.
Yes / No
4.
5.
6.
Do you think that the Institute can interact with the industry /
organization in some other way also? If Yes, Please specify.
7.
8.
Yes / No
9.
Yes / No
10.
Overall Grading
Name:
__________________
____________________
Designation: ____________________
A
B
C
D
Excellent
Very Good
Satisfactory
Marginal
Page 10 of 15
Yes / No
Signature:
Annexure-VII
Date:
CERTIFICATE OF COMPLETION OF TRAINING
This is to certify that Mr./Ms. Name of student student of B. Tech. (specify branch) of Chitkara
University (Himachal Pradesh) has successfully completed six months industrial training from
Date to Date at this organisation. During this training, he/she worked on Assigned Job in
Department under the guidance of Name of the guide. His / Her overall performance during
the training period was Comments.
(Signature)
Name
Designation
Department
(Authorized Signatory with company seal)
Page 11 of 15
Annexure-VIII
GUIDELINES FOR PROJECT REPORT
CONTENTS OF THE PROJECT REPORT
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Please note the case of letters in the cover page. The 3rd line is 16 pt bold and other lines
are 12 pt. The page is centered. Department and Institute names are bold.
The matter contained in the report should be typed in MS word (1.5 spacing) Times New
Roman, 12 pt or equivalent with other software. Subject matter should be typed on both
sides of paper and the alignment of paragraphs should be justified
Text and Numbering Scheme to be followed
Order
Font
Numbering
Size
B
Main Heading
Arial
X
12
Sub Headings
Arial
X.1
12
Sub Points
Arial
X.1.1
12
Body Text
Times New Roman
-12
X
Numbering of the Figures: X.1, X.2, X.3,so on.
I
X
X
X
X
U
X
X
X
X
Annexure-IX
PROJECT REPORT
(Project Semester January-June 2015)
BACHELOR OF ENGINEERING
IN
CIVIL ENGINEERING
(Name of student)
Student I D..
Annexure-X
DECLARATION
I hereby declare that the project work entitled (Title of the project) is an authentic record of my own
work carried out at (Place of work) as requirements of six months project semester for the award of
degree of B.E. (Civil Engineering), Chitkara University, Himachal Pradesh, under the guidance of
(Name of Industry coordinator) and (Name of Faculty coordinator), during ________to _______, 2015).
(Signature of student)
Name of Student
Student I D
Date: ___________________
Certified that the above statement made by the student is correct to the best of our knowledge and
belief.
Page 14 of 15
Annexure-XI
2.
Students name
3.
Are you satisfied with the manner the department did your:
(i)
Placement in various industrial units
Satisfied
Unsatisfied
(ii)
Registration & Orientation
Satisfied
Unsatisfied
(iii)
Evaluation
Satisfied
Unsatisfied
If not satisfied, please give your suggestions overleaf.
5.
Was the technical assistance/guidance received from the Institute satisfactory? If not, identify the areas where
assistance was lacking?
_____________________________________________________________________________________________
_____________________________________________________________
6.
7.
8.
What additional subjects did you study in order to successfully complete the projects in the Industry?
PROJECT
SUBJECT
9.
i)
ii)
iii)
iv)
v)
Student I D
Branch: Civil
Single
No. of
Projects
10.
I
Has the Project Semester proved to be an exercise that has enhanced your
Personal Attributed at work:
i)
Communications Skills
ii)
Confidence level
iii)
Creativity
iv)
Planning skills
v)
Adaptability
vi)
Being methodical
vii)
Organizational skills
II
Technical Aspects
Knowledge
Skill at work
11.
Were you provided the following
i)
Stipend
ii)
Accommodation
iii)
Conveyance
12. Any additional information/suggestion for further improvement of the project:
YES
No
YES
No
______________________________________________________________________________________
A-Excellent
B-Good
C-Fair
Page 15 of 15