Sei sulla pagina 1di 12

BILL OF QUANTITIES

Widening& lmprovement
Upgradation,
of QilaSaifullah- Loralai- WaigumRud Section
of NationalHighwayN -70(|CB-N-7O)
Lot # 1: Qila Saifullahto Loralai

Section
Forms
4 - Bidding

Widening& lmprovementof
Upgradation,
QilaSaifullah- Loralai- WaigumRud Sectionof
NationalHighwayN-70(ICB-N-70)
Lot # 1: Qila Saifullahto Loralai(Km 0+000to 67+900)

BILL OF QUANTITIES

SUMMARY
OF BILLS
Bitl
No.

DESCRIPTION

EARTHWORK

ANDBASECOURSE
SUB-BASE

SURFACE
COURSES
ANDPAVEMENT

4A

SUBSTRUCTURE

48

SUPERSTRUCTURE

4C

OF E X IS TING
BRIDGES
R E H A B IL IT A ION

4D

CULVERTS

& EROSION
DRAINAGE
WORKS

ANCILLARYWORKS

ITEMS
GENERAL

AMOUN T
(RS.}

Total

(Rupees

: Two-Envelope
Single-Stage

Procurement
of Works

ADB/ICB-N-70

+40

Seclion4- BiddingFoms

Upgradation,Widening& lmprovementof Qila Saifullah- Loralai-Waigum Rud secuon of Nafonal HighwayN-70(lcB-N-7o)


Lot# l: QilaSaifullahto Lo.alai(Km 0+000to 67+900)
BILL OF QUANTITIES

BILL NO. 1 : EARTHWORK


Item
No.

Description

Unit

Quantity

SM

683,529

Rate(Rs.in
Fiqures)
sdfsdfsdf

101

Clearing& Grubbing

102a

Removalof trees 150- 300mmqirth

Each

367

xvxcvcxvxc

102b Removalof trees300 - 600mmqirth

Each

220

xcvxcvxc

102c Removalof trees601or over

Each

147

Compactionof naturalground

SM

683,529

106bi Excavateunsuitablehard rock material

CM

112,319

104

108a

Formation of embankment from roadway excavation ir


commonmaterial.

CM

281,150

108bi

Formatlonof embankment
from roadwayexcavationin harc
rockmaterial-

CM

289,122

108bii

Formation of embankment from roadway excavation ir


mediumrock material

CM

168,831

108c

Formationof embankmentfrom borrow excavationin


commonmaterial

CM

1,317,127

108d

Formationof embankmentfrom Structuralexcavationir


commonmaterial

CM

1,104

Single-Stage: Two-Envelope

sdsdasdasdasdasd

Amount
(Rs-)
213123
123123
123123

TOTAL OF BILL NO. 1 : EARTHWORK

':":3.'*

6,

RATE (Rs. in Words)

Ll.s\

"Ytr

Procurement
of Works

ADB/JCB_N-70

Section4 - BiddingForms

44'l

Upgradation,Widening & lmprovementof Qila Saifullah- Loralai - Waigum Rud Section of NationalHighway N-70(|CB-N-7O)
Lot # 1: Qila Saifullahto Loralai (Km 0+000to 67+900)
BILL OF QUANTITIES
BILL NO.2 : SUBBASE& BASECOURSE
Item
No.

Description

Unit

Quantity

201

Granular
Subbase

CM

160,473

202

AggregateBase

CM

296,000

203b AsphalticBaseCourse-PlantMix (ClassB)

CM

44,695

209b Scarification
of existingroadpavement

SM

337,563

Rate (Rs. in
Fiqures)

Amount
(Rs.)

RATE (Rs. in Words)

TOTALOF BILLNO.2 : SUBBASE


& BASECOURSE

Single-Stage: Two-Envelope

Procurement
of Works

ADB/ICB-N-70

Section4 - BiddingForms

442

Upgradation,Widening& lmprovementof QilaSaifullah- Loralai- WaigumRud Sectionof NationalHighwayN-70(|CB-N-7o)


Lot # 1: Qila Saifullahto Loralai(Km 0+000to 67+9001
BILLOFQUANTITIES
BILLNo.3: SURFACE
COURSE
& PAVEITIENT
Item
No.

Unit

Quantity

3O2a BituminousPrimecoat

SM

545,239

303a BituminousTack coat

SM

545,239

305b Asphalticwearingcourse (Class B)

CM

27,449

304b DoubleSurfaceTreatment
on shoulders

SM

319,660

Description

Rate (Rs. in
Fiqures)

RATE(Rs.in Words)

Amount
(Rs.)

TOTAL OFBILL NO.3 : SURFACECOURSE& PAVEMENT

Single-Stage: Two-Envelope

Procurementof Works

ADB/ICB_N-70

443

Seclion4- BiddingForms

Upgradation,Widening& lmprovementof Qila Saifullah- Loralai- WaigumRud Sectionof NationalHighwayN-70(|CB-N-7o)


Lot# 1: Qilasaifullahto Loralai(Km 0+000to 67+9001
BILL OF QUANTITIES
BILL NO. 4A : SUBSTRUCTURE
Item
No.

Description

Unit

Quantity

4079

Test piles of 1000 mm. dia. lncludingBoringand concrete


class43 includingreinforcement.

60

60

Cast-in-placeconcrete piles includingconcrete class A3 bu:


excludingreinforcement.
407d2.Boringonly(760mmdia)

7BB

407d4.Boringonly(1000mmdia)

315

401a.Concreteclass43 in oiles

CM

605

Each

4O7m confirmatory
boringincluding
testreports
407d

4071 Pile LoadTest (Designload240 Ton)

CM

107e Commonbackfill in structures

CM

676

401t Lean concrete


401a ConcreteclassA2 in
a) Pilecaps(underground)

CM

40

CM

373

b) Abutment(on ground)

CM

381

c) Transoms(elevated)

CM

125

Concreteclass43 in
d) Piers (elevated)

CM

91

Concreteclass,A1in
e) ApproachSlab (on ground)

CM

B6

Reinforcement
pilesas perAASHTC
in substructure
including
M31.
404b.Grade60

Ton

239

406e

Elastomericbearingpads as shown in the drawings.

SP-6

Permanent
steelliner(Bmmthick)

,,,':,r.,-iilr'.;1.

i' 1,1t- ;r ' l \

TOTALOF BILLNO.4A: SUBSTRUCTURE

:1, \\

\'

'Il1r\ ,,-*. ,l
.l'" --i,

rt-:'

Single-Stage: Two-Envelope

564,732

'.i-',,

,.{

Cu.Cm
Ton

Fiquresl

Amount
(Rs-)

RATE (Rs. in Words)

1,305

107a Structuralexcavationin common material.

404

Rate (Rs. in

r\*-,i..::-:Llj

Procurement
of Works

ADB/ICB-N-70

Section4 - BiddingForms

Upgradation,Widening & lmprovementof Qila Saifullah- Loralai - Waigum Rud Section of NationalHighway N-70(|CB-N-7O)
Lot # 1: Qila Saifullahto Loralai (Km 0+000to 67+900)
BILL OF QUANTITIES
BILL NO.48 : SUPERSTRUCTURE

Item
No.

Unit

Quantity

CM

3BB

TON

968

401a ConcreteClass43 in deck slabsand diaphragms

CM

499

401a ConcreteClassAl in barrier

CM

107

113

Ton

190

Description

40'1gv ConcreteClassD2 in precastprestressed


concretegirders.

405b

SP-2

404

Launchingof P.C.Girders

Manufactured trade mark expansion joints WoSD 50 by


Freyssinetor Verdu ET-50(Spanish)or Equivalent

Reinforcement
in superstructure
as perAASHTOM31.
404b.Grade60

SP-3

PVC servicepipes.('150mm diameter,2mmthick).

427

SP-4

G.l.drainpipesfor drainageincluding
all fixtures,bendsanc
grates(100mm diameter)

52

Rate (Rs. in
Fioures)

Amount
(Rs.)

RATE (Rs. in Words)

Prestressing
strand 112"dia includingall sheaths(Pipes5C
4O5a mm Dia Wall thickness2 mm), trumpets,block,stressing Ton

13

anchorage,
etc.andgrouting,
allcomplete
TOTAL OF BILL NO.48 : SUPERSTRUCTURE

Single-Stage: Two-Envelope

ilffi+
'ttft#

Procurementof Works

ABD/ICB-N.70

445

Sciion4- BiddingForms

lJpgradation,Widening& lmprovementof Qila Saifullah- Loralai- WaigumRud Sectionof NationalHighwayN-70(|CB-N'701


Lot # l: Sila Saifullahto Loralai(Km 0+000to 67+900)
BILL OF QUANTITIES

OF EXISTINGBRIDGES
BILL NO.4C : REHABILITATION
Item
No.

Unit

Quantity

CM

1,187

CM

712

401f Lean concrete

CM

40

411d Stone masonarydresseduncoursedwith mortar.

CM

348

4 O 1 a ConcreteClass A2 in Pad beams & abutments.

CM

290

401a ConcreteClassA3 in deck slabsand R.C.Cbeams.

CM

776

4 O 1 a ConcreteClass41 in barrier

CM

132

401a ConcreteClass42 in approachslab

CM

157

Cu.Cm

174,993

126

Ton

310

Description

in commonmaterial.
107a Structural
excavation
107e

406e
SP_2
404

Commonbackfill in structures

Elastomericbearingpads as shown in the drawings.

Manufacturedtrade mark expansionjoints WoSD 50 by


Freyssinet
or VerduET-50(Spanish)
or Equivalent
per
Reinforcement
in as
AASHTOM31.
404b.Grade60

SP-3

PVC servicepipes.(150 mm diameter,2mm thick).

527

SP-4

G.l. drain pipes for drainageincludingall fixtures,bendsanc


grates (100 mm diameter)

101

CM

1,873

510

Dismantlingof Structureand obstructions

Er:.THlf|."

Rate (Rs. in
Fiqures)

Amount
(Rs.)

RATE(Rs.in Words)

BRIDGES
TOTALOF BILLNO.4C: REHABILITATION
OF EXISTING

Procurement
of Works

ABD/ICB-N-70

Section4 - BiddingForms

Upgradation,Widening& lmprovementof Qila Saifullah- Loralai-Waigum Rud Sectionof NationalHighwayN-70(|CB-N-7o)


Lot # 1: QilaSaifullahto Loralai(Km 0+000to 67+9001
BILL OF QUANTITIES

BILL NO.4D: CULVERTS


Item
No.

Unit

Description

Quantity

1 0 7 a Structuralexcavationin common material

CM

12,396

1O7ci Structuralexcavationin hard rock material

CM

13,945

107cii Structuralexcavationin medium rock material

CM

4,649

CM

1,413

CM

7,749

CM

145

CM

7,274

TON

908

CM

9,344

526

SM

494

401t Leanconcrete
401aii Concrete
& etc)
ClassAl (culvertsi/cwingwall,approns
401b

ConcreteClassB (forbedding)

411d Stonemasonary
withmortar.
dresseduncoursed
404b

Reinforcementsteel as per AASHTO M31 grade 60

107d Granularbackfilling

5 0 1p

R.C.CPipeculvert
AASHTOM170ClasslV dia 1070mm

joint filler
joint fillerwith bitumastic
4OGa Premoulded
406d

Waterstops6"

100

509b

RiprapclassB

CM

534

SP-5 Plasterwork

5 1 0 Dismantling
of structureandobstructions

SM

3,850

CM

7,967

,,sffihN
ii

Single-Stage: Two-Envelope

Fiqures)

Amount
(Rs.)

RATE (Rs. in Words)

TOTALOF BILLNO.4D: CULVERTS

\b\ rg
Si

'',\E,

\4

-/.
'rr!ffi!-'.'rz

{,\ I

Rate (Rs. in

;\

Procurement
of Works

ABD/ICB-N-70

SecUon
4- Bidding
Foms
upgr.dation, Widening & lmprovement of Qila Saifullah - Loralai - Waigum Rud Section of National Highway N-70 (|CB-N-?o)
Lot# 1: Oila Saifullah to Loralai (Km 0+000to 67+9001

447

BILL OF QUANTITIES
WORKS
BILL NO.5: DRAINAGE,EROSION& PROTECTION

Item
No.

Unit

Description

Quantity

107a Structuralexcavationin common material

CM

13,604

in mediumrock material
1O7cii Structuralexcavation

CM

9,069

411b Stone masonaryrandomwith mortarfor debrieswall

CM

16,800

509b RiprapclassB ( for slopeprotection


& appron)

CM

22,489

509e GroutedRiprapclassB ( for bridges& culverts)

CM

18,171

509h Filterlayerof granularmaterial

CM

1,714

Rate (Rs. in
Fiqures)

RATE(Rs.in Words)

Amount
(Rs.)

TOTAL OF BILL NO.5: DRAINAGE,EROSION& PROTECTIONWORKS

w
r',i !

Single-Stage: Two-Envelope

Procurement
of Works

ABD/ICB_N-70

Seclion
4 - Bidding
Forms

448

UpgEdation, Widening & lmprovement of Qila Saifullah - Loralai - Waigum Rud Section of National Highway N-70 (|CB-N-?o)
Lot # 1: Qila Saifullah to Lolai (Km 0+000to 67+900)
BILL OF OUANTITIES
BILL NO.6 : ANCILLARYWORKS
Item
No.

Unit

Quantity

CM

3.672

CM

22,274

607a Trafficroad signs category1.

Each

227

607b

Traffic road signs category2.

Each

94

607c

Traffic road signs category3a

Each

401t

Description
LeanConcrete

4 1 1 d Stonemasonary
dresseduncoursed
withmortar.(Guard)

607e Trafficroadsignscategory3c

SM

1,796

608h,1

PavementMarkingin ReflectiveCR paint for lines of 15 cm


width.

168,053

60Bjl

Pavement
Markingin Reflective
CR paintfor 4 metersarrows.

Each

20

609c

Reflectorizedpavementstud (Raisedprofiletype single)

Each

9,336

609d

Reflectorizedpavementstud (Raisedprofiletype double)

Each

4,668

401f

Lean Concrete

CM

464

401aii ConcreteClass41 median

CM

365

Reinforcing
SteelGrade60.

Ton

1B

803

CM

194

Each

69

Each

404b

6 0 1 d i i PrecastConcretekerbs

a01si(1
)
Precast
ConcreteConcreteClass41
610c

kilometerpost( 0.610x0.114 x 1.5 )

610d

post
ren kilometer

",;..rjl=o**.

'ipT*;N

;h{ \}a }r
Single-Stage::Two-E
Two-Envelope

* ']-.U
\ NJ
:3 \*-d4:.i1,-rfi1
,t_./.,t.,ti1:..
''

1::::.:.-'-

Rate (Rs. in
Fiorrresl

RATE (Rs. in Words)

Amount
(Rs.)

TOTAL OF BILL NO. 6 : ANGILLARYWORKS

-,/ rit",.1
'

-,r-

Procurement
of Works

ABD/ICB_N-70

Sedion4- BiddingForms
Upgradation, Widening & lmprovement of Qila Saifullah - Loralai -Waigurn Rud Section of National Highway N-70 (lcB-N-7o)
Lot # l: Qila Saifullah to Loralai (Km 0+000 to 67+9001

449

BILL OF OUANTITIES
Bill No.7: Generalllems
Item
No.

Description

Unit

7Ah

Providesurveying
& Alliedequipment

P.S

701b Maintainsurveyingequipmentand provideteamsfor survey


Provide equipment & furnish Employer's/Engineer's
Office
floorarea(372SM).minimum
Provide,furnish and Equip ResidentialAccommodationfor
7O2ati
(350SM)
Emplover's/Enoineer's
7O2ai

702bi MaintainEngineer's/Employer'sRepresentative
Office
Maintain
Residential
Accommodation
for
Emplover's/Enoineer's.
Provideequipment& furnishprojectlaboratoryin base camp
7O3a (160
SM)

702bii

703c Maintainprojectlaboratory

Month

Quantity

Rate (Rs. in
Fiorrresl

RATE(Rs. in Words)

Amount
(Rs.)

2.000.000
24

P.S

5.000.000

P.S

4,000,000

Month

27

Month

27
1.500.000

P.S
Month

27

Each

Sp-709aProvidetransportfor Engineer's
I

4WD DoubleCabin(Pickup)(axa) withA.C

4WD SingleCabinpickupwithA.C
Each
ProvideRun and Maintaintransportfor Employer's/Engineer'sVeh./
Sp-709b
representative
Month
Sp-709cProvidetransportfor Employer'sRep
tl

4
135

4 WD DoubleCabinPickup withA.C

Each

'l

tl

4 x 2 SingleCabinwithA.C

Each

1
1

fo

Each
Veh./
Month

EmployeeTrainee Engineer'sincludingBoarding,Lodginganc
food.

Man/
Month

iii

Car 1300CCwithA/C
Running
Maintenance of
and
Sp-709d
Employer's/Enqineer's
representative
Sp-712

transport

S P - 1 3 SportsFacilitiesas per NHA Policey

81

24x3
1,000,000

P.S
TOTALOFB|llNo.7:Generalltems

i"iifrl--dF'
\:
1il

Single-Stage: Two-Envelope

Jb

>t

ci
SJ
:"'
ABD/ICB_N-70

Potrebbero piacerti anche