Part 1 of 7
1 Name of School District
Avoca CSD
57020104
3 Building Name
Main Bldg
4 Building ID:
0002
11/18/2009
Avoca,N.Y.
14809
06/01/13
ANNUAL
1922
13 No. of Floors
14 How many full-time and part-time custodians are employed at the school (or work in the building)?
A) Full-time Custodians9
B) Part-time Custodians
0
Building Users
17 How many students were registered to receive instruction in this building as of October 1,
2005? (Does not include evening class students.)*
607
18 Of these registered students, how many receive most of their instruction in:
a Permanent Instructional Spaces (i.e. Regular Classrooms):
607
b Temporary Instructional Spaces (i.e., Portable or Demountable
Classrooms) Attached to the Building
d If the number of non-instructional spaces used as instructional spaces is greater than zero, which types of non-instructional
spaces were being used for instructional purposes on October 1, 2009? (check all that apply)
Cafeteria
Gymnasium
Lobby
Stairwell
Administrative Space
Library
Storage Space
Other
Comments
19 Grades Housed:K,1,2,3,4,5,6,7,8,9,10,11,12
20 For how many instruction days during the 2009-10 school year(July 1 through June30), was the building
closed due to facilities failures, system malfunctions, structural problems, etc.?
21 Is the building used for instructional purposes in the summer?
Yes
22 Have there been renovations or construction in the building during the past tweleve months?
No
Program Spaces
23 Number of Instructional Classrooms
31
26170
Gymnasium
Health Suite
Pre-K
Remedial Room
Art
Audio Visual
Home Careers
Kitchen
Resource Room
Science Lab
Auditorium
Cafeteria
Lg.group instruction
Library
Special Education
Swimming Pool
Computer Roo
Guidance
Multipurpose Rooms
Music
Teacher Resource
Technology/Shop
Other
Describe:
Site Utilities
26 Water (H)
a. Does the facility have water service?
No
c. Condition
2000
30
30
g. Comments 0
Site Sanitary (H)
a. Does the facility have site sanitary?
Yes
OTHER
c. Condition *:
Excellent
2000
20
g. Comments
Excellent
2007
35
f. Comments:
Site Fuel Oil (H)
a. Does the facility have fuel oil tanks? No
Fuel Tanks
b Number Above Ground:
f. Condition:
g. Year of Last Major Reconstruction and/or Replacemen
h. Expected Remaining Useful Life in Years:
i. Cost of Reconstruction and/or Replacement:
j. Comments
Site Electrical, Including Exterior Distribution (H)
a Does the facility have site electrical, including exterior distribution?
Yes
b. Service Provider(s)
Utility Provided
BEL
d. Condition*:
Excellent
2000
30
Yes
b. Condition *
Satisfactory
2007
30
f. Comments:
Open Drainage Stormwater Management System
a. Does the facility have a open stormwater system (ditch)?
No
b. Condition *
c. Year of Last Major Reconstruction and/or Replacement
d. Expected Remaining Useful Life in Years:
e. Cost of Reconstruction and/or Replacement:
f. Comments:
Part 2 of 7
33 Catch Basins Drop Inlets/Manholes
a. Does the facility have catch basins/drop inlets/manholes?
Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
Satisfactory
2007
25
0
f. Comments:
34 Culverts
a. Does the facility have culverts?
Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
Satisfactory
2008
15
0
f. Comments:
35 Outfalls
a. Does the facility have outfalls?
Yes
Surface Water
b Comment:
c Outfall reconnaissance inventory. Were all stormwater outfalls inspected
No
during dry weather for signs of non-stormwater discharge?
d. Condition
Satisfactory
e. Year of Last Major Reconstruction and/or Replacement
f. Expected Remaining Useful Life In Years:
1990
15
36 Infiltration basins/chambers
a. Does the facility have infiltration basins/chambers?
b. Condition
No
No
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
d. Expected Remaining Useful Life In Years:
e. Cost of Reconstruction and/or Replacement
f. Comments:
38 Wetponds
a. Does the facility have wetponds?
No
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
d. Expected Remaining Useful Life In Years:
e. Cost of Reconstruction and/or Replacement
f. Comments:
39 Manufactured stormwater proprietary units
a. Does the facility have proprietary units?
No
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
d. Expected Remaining Useful Life In Years:
e. Cost of Reconstruction and/or Replacement
f. Comments:
Yes
2007
10
Satisfactory
Yes
c. Condition
d. Year of Last Major Reconstruction and/or Replacement
Satisfactory
2000
10
0
g. Comments
42 Playgrounds
a. Does the facility have playgrounds?
b. Condition
Yes
Excellent
2008
15
43 Athletic Fields, Play Fields, and Related Structures such as press boxes, stadiums, ect
a. Does the facility have atheltic fields, play fields, or related structures? Yes
b. Condition
Satisfactory
c. Year of Last Major Reconstruction and/or Replacement*
d. Expected Remaining Useful Life In Years:
1985
5
Substructure
44 Foundation (S)
a.Type
Reinforced Concrete
No
No
No
No
No
No
h. Condition
i. Year of Last Major Reconstruction and/or Replacement*:
Satisfactory
2010
75
0
l. Comments:
Interior Spaces
45 Interior bearing walls and fire walls (S)
a. Does the facility have Interior bearing walls or fire walls?
Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
Satisfactory
2010
75
0
f. Comments:
46 Other Interior Walls
a.Does the facility have other interior walls?
b. Condition
Yes
Satisfactory
1938
40
0
f. Comments: Minor plastic cracks in some clsrms and corr walls $2,000; Brkn wall tile at south end vest in
Part 3 of 7
47 Ceilings (H)
a Does the facility have a ceiling?
b. Condition
Yes
Satisfactory
2009
10
No
Satisfactory
2002
3
Yes
Satisfactory
Unsatisfactory
2002
10
0
g. Comments Inst closers on so stairwell doors. Adjust hinges for pos closure on corr doors outside Roo
50 Interior Stairs (S)
a Does the facility have interior stairs?
b. Condition
Yes
Satisfactory
2009
50
0
f. Comments: Strwl so end corr nr Rm 230 not prvde for rtd enc diff to rctfy bsd on loc avl area. Crct if area
51 Elevator, lifts and escalators (H)
a Does the facility have elevators, lifts, or escalators?
Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
Satisfactory
1987
10
0
f. Comments:
52 Interior Electrical Distribution (H)
a Does the facility have interior electrical distribution?
Yes
Yes
Satisfactory
2008
28
Yes
Satisfactory
2000
10
Yes
Yes
c. Condition
d. Year of Last Major Reconstruction and/or Replacement
Satisfactory
2000
10
0
g. Comments mstr clck failing rplc complete sys w Wireless GPS mstr clck sys $30000; Aud Snd reinforce
55 Swimming Pool and Swimming Pool Systems
a Does the facility have a swimming pool?
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
d. Expected Remaining Useful Life In Years:
e. Cost of Reconstruction and/or Replacement
No
f. Comments:
Yes
c. Condition
d. Year of Last Major Reconstruction and/or Replacement
Satisfactory
2002
10
0
g. Comments
57 Resilient tiles or sheet flooring
a Does the facility have resilient tiles or sheet flooring?
Yes
b Where located?
c. Condition
Satisfactory
INSTRUCT,COMMON
2002
10
0
g. Comments Rpl flr tls Room 220 $200; VCT rplc Rms 232 233 234 238 and 240 6055 sf at $5 sf $31,000; Rp
58 Hard flooring (concrete; ceramic tile; stone etc.)
a Does the facility have hard flooring?
No
b Where located?
c. Condition
Satisfactory
COMMON
2008
40
59 Wood Flooring
a Does the facility have wood flooring?
Yes
b Where located?
c. Condition
Satisfactory
INSTRUCT,COMMON
2010
20
0
g. Comments Bsmnt sev wood walls withing area used for strg. Remve walls or rplce walls w rated partitio
Building Envelope
60 Structural Floors (S)
a Type Reinforced Concrete Slab on Grade,Concrete/Metal Deck/Metal Joists,OTHER
a Comment struct slab w strcut clay tile. conc metal mesh metal joists
Evidence of structural Concerns with Support System (Beams/Joists/Trusses,etc.):
b Structural Cracks:
No
c Unsupported Ends:
d Rot/Decay/Corrosion:
No
No
f Deflection:
No
g Seriously Damaged/Missing Components No
h Other Problems:
Evidence of Structural Concerns with Structural Floor Deck:
i Cracks
j:Deflection
k:Rot/Decay/Corrosion
c. Condition
No
No
No
Satisfactory
2010
75
0
g. Comments
Part 4 of 7
61 Exterior Walls/Columns (S)
a Material MASONRY,STEEL
Evidence of Structural Concerns with Support System
b Structural Cracks:
No
c Rot/Decay/Corrosion:
No
d Other Problems:
2nd flr wndw lntls rusting at 1938 bldg; CMU cracks 1st and 2nd flr wndws 2000 addn
Evidence of Concerns with Exterior Cladding:
e Cracks/Gaps
No
f Inadequate Flashing
g Efflorescence
h:Moisture Penetration
No
No
No
i:Rot/Decay/Corrosion
j Other Problems:
No
k. Condition
Satisfactory
2010
75
0
o. Comments
62 Chimneys (S)
a Does the facility have a chimney?
b Construction Type METAL
Yes
c. Condition
d. Year of Last Major Reconstruction and/or Replacement
Excellent
2010
75
0
g. Comments
63 Parapets (S)
a Does the facility have parapets?
b Construction Type
Yes
MASONRY
c. Condition
d. Year of Last Major Reconstruction and/or Replacement
Satisfactory
2010
75
0
g. Comments
64 Exterior Doors
a Overall condition of exterior door units:
b.Overall condition of exterior door hardware:
Satisf
Satisfactory
No
Yes
2007
15
Yes
Satisfactory
2009
2
No
No
g. Comments
67 Windows
a Does the facility have windows?
Yes
a Type of windows
b. Condition:
Satisfactory
ALUMINUM,VINYL
Y
2009
20
0
g. Comments:
Wndw rescu
68 Roof (S)
a Type of roof
Metal deck on metal,Concrete on metal deck on metal
construction
b Type of roofing
SINGLEPLY
material
Evidence of Structural Concerns with Support System
c Structural Cracks:
No
d Unsupported Ends:
e Rot/Decay/Corrosion:
No
No
f Deflection
g Seriously Damaged/Missing Components
No
No
h Other Problems:
Evidence of Structural Concerns with Structural Roof Deck:
i Cracks
j:Decay
No
No
k:Rot/Decay/Corrosion
No
Evidence of concerns with roofing, flashing, and drains:
l Failures/Splits/Cracks
m: Rot/Decay/Corrosion
No
No
No
No
No
r. Condition
Satisfactory
2009
20
Yes
2009
20
Satisfactory
Yes
c. Condition
Satisfactory
2007
37
Yes
IRON
c. Condition
d. Year of Last Major Reconstruction and/or Replacement
Satisfactory
2007
37
0
Part 5 of 7
72 Hot Water Heaters (H)
a Does the facility have hot water heaters?
b Type of fuel
NAT_GAS
Yes
c. Condition
Satisfactory
1995
5
Yes
Excellent
2007
27
HVAC Systems
74 HVAC Systems Type
a Does this building have a central HVAC system?
No
Yes
c. Condition
d. Year of Last Major Reconstruction and/or Replacement
Excellent
2007
20
0
g. Comments
76 Heating Fuel/Energy Systems (H)
a Does the facility have heating fuel/energy system?
Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
Excellent
2007
20
0
f. Comments:
77 Cooling / Air Conditioning Generating Systems
a Does the facility have cooling / air conditioning system?
Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
Excellent
2007
15
0
Yes
Satisfactory
2007
20
79 Piped Heating and Cooling Distribution Systems: Piping, Pumps, Radiators, Convectors, traps, Insulation, etc. (H)
a Does the facility have piped heating and cooling distribution systems? Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
Satisfactory
2007
20
0
f. Comments: Repair minor leaks at fittings and valves in crawlspace insulate all hangers and shields $100
80 Ducted Heating and Cooling Distribution Systems: Ductwork, Control Dampers, Fire/Smoke Dampers, VAVs, Inuslation,
etc. (H)
aDoes the facility have ducted heating and cooling distribution systems?
Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
d. Expected Remaining Useful Life In Years:
Satisfactory
2007
20
Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
Satisfactory
2007
15
0
f. Comments: Integrate 1987 clsrm wing controld into bldg energy mgmt control sys. $12000; relocate vavl
Yes
b. Condition
c. Year of Last Major Reconstruction and/or Replacement*
Satisfactory
2000
10
0
f. Comments: Prov aud vis notify dev in all occ spcs. $30000; Relct and reinstl all man pull statns to compl
83 Smoke Detection Systems (H)
a Does the facility have a smoke detection system?
b. Condition
Yes
Satisfactory
2000
10
Yes
Satisfactory
2000
15
Yes
Satisfactory
2008
15
No
f. Comments:
Part 6 of 7
Accessibility
87. Exterior Route (H)
People with disabilities should be able to arrive on site, approach the building, and enter as freely as everyone else. At least
one route of travel should be safe and accessible for everyone, including people with disabilities. This route must include
handicapped parking, curb cuts, ramps, and automatic door operators as necessary to enter the building. Is there an
accessible exterior route as specified above?
Yes
88. Exterior Route (H)
The layout of the building should allow people with disabilities to obtain materials or services and use the facilities without
assistance. This should include access to general purpose and specialized classrooms, public assembly spaces (such as
libraries, gymnasiums, auditoriums), nurse s office, main office, and restroom facilities. Services include drinking fountains,
telephones, and other amenities. Is there an accessible interior route as specified above?
Yes
89. Additional Information on Accessibility
a If the building lacks accessible interior or exterior routes: Cost of improvements needed to provide accessible exterior and
interior routes as specified above.
36000
b Comments
Tlt Rms TR3 TR4 TR5 not access make access $30000; ADA signage not prevalent thru school $5000;
Fire ext signage not prevalent thru school $1000
Environment/Comfort/Health
90 General Appearance
a Overall rating:: GOOD
b Comment
91 Cleanliness
a Overall rating:: GOOD
b Comment
92 Matts/Grills
a If Yes: at least 6 Ft. Long?:
No
No
93 Acoustics
a Overall rating:: GOOD
b Comment
94 Lighting Quality
a Types of lighting in general purpose classrooms DAYLIGHT,Fluorescent
b Overall rating:: GOOD
c Comments
95 Evidence of Vermin
a Is there evidence of active infestations of Rodents
b Is there evidence of active infestations of Wood-boring or wood-eating insects
No
No
No
No
96 Rifle Range
a Does this facility have a rifle range ? (include rifle ranges that have been
converted from a range to any other purpose)
b is the range active or inactive?
No
No
b If yes, where?
b Comment
c Are there any noticeable moldy odors?
No
d If yes, where?
d Comment
e Are interior surfaces constructed of any Paper-faced products?
Yes
f Are interior surfaces constructed of any Cellulose products (typical ceiling tiles)?
g Estimated cost of necessary improvements: $
Yes
0
h Comment
98 Humidty/Moisture
a Are Active leaks in the roof found in the classroom?
No
No
No
No
No
No
GOOD
No
No
c Are there fresh air intakes near the garbage storage/disposal areas?
d Is there accumulated dirt, dust, or debris around fresh air intakes?
No
No
Yes
No
Yes
GOOD
Yes
GOOD
k Comment
100 Indoor air quality (IAQ) plan
a Does the school district use EPA s Tools for Schools program?
b If not, is some other IAQ management plan used?
c Has the District assigned IAQ responsibilities to a designated individual?
No
Yes
Yes
No
No
c Are crevices and holes in walls, floors and pavement sealed or eliminated?
d Are pesticides used in the buildings and on grounds?
Yes
No
No
103 Radon
a Has this facility been tested for the presence of Radon?
b If this facility been tested for the presence of Radon. Has a passive mitigation
system been installed?
Yes
No
c Are crevices and holes in walls, floors and pavement sealed or eliminated?
No
Yes
Yes
No
FULL PREPARATION
No
Yes
No
Part 7 of 7
Space Adequacy
GOOD
4244513
Satisfactory
108 Was overall building rating established after consultation with health and
safety committee?
Yes
Elton Badeau
10 Brown Road
607-566-2221
607-277-7100
Jineen Geffers
112 E-mail
info@tetratech.com
607-566-2221
Susan Mehr
Maurice Mullen
018634
1003-7743B
115 You have now completed the building condition survey. By continuing with
the button below, you will be submitting your data to the data base. Once
submitted, it can only be changed by re-entering the entire survey. Please
enter I ACCEPT in the text box below.
I ACCEPT