(Note - always refer to the Cooper Standard Supplier Portal for the latest PPAP Checklist version)
NO
N/A
x
x
x
x
x
x
YES
YES
YES
YES
NO
NO
NO
NO
N/A
A. Are there any changes authorized that are not yet captured by the current print?
Comments:
Customer specific documents will be included as applicable.
N/A
x
x
A. Are CS or Customer Engineering Approvals Required? ECR - Engineering Change Request, SREA, Forever Req, etc.
B. Are Approved Customer specific documents included?
Comments: Customer specific documents will be included as applicable. (e.g. Alerts, concerns, notices, SREAs, EWO, TWO, GM3660
[Engineering Source Approval], GM1411 [PPAP Worksheet] DV [Design Verification] and PV [Production Validation] forms)
N/A
x
x
x
x
A. If design responsible, is a Design Failure Mode & Effects Analysis (DFMEA) present and in the latest AIAG format?
B. Is he DFMEA UP-TO-DATE with a current revision?
C. Are SEV 5-8 and OCC 4-10 identified as Key Characteristic? If none, is there evidence of redesign to reduce SEV or OCC?
D. Is the document linked to the Drawing ? Part Number / Revision Level or Process/Part Name.
Comments:
If the DFMEA is Proprietary, include a blank DFMEA with a Proprietary Information Statement.
N/A
x
x
x
x
Page 1 of 37
(Note - always refer to the Cooper Standard Supplier Portal for the latest PPAP Checklist version)
NO
N/A
x
x
A. Is a Process Failure Mode & Effects Analysis (PFMEA) present and in the latest AIAG format?
B. Is PFMEA up-to-date with a current revision?
C. Are SEV 5-8 with and OCC 4-10 identified as PHIC? If none, is there evidence of actions to reduce OCC?
D. Are Sev 9 and 10 identified as CC?
E. Is in agreement with PFD, Control Plan and WI's/SOP's? Key characteristics must be listed at specific operation/sequence.
F. Are SEV Ratings Appropriate per the AIAG guidelines?
G. Are DET Ratings Appropriate per the AIAG guidelines?
H. Is the document linked to the Drawing (i.e. P/N, Release Date, Revision Date)?
I. If no Actions are identified, is None indicated in each row/field?
J. Are failures at one process step identified as the cause of failures at the appropriate subsequent step?
K. Are the RPN's calculated correctly?
Comments: If PFMEA contains proprietary information, a blank PFMEA is to be included in package with a Proprietary Information Sheet.
x
x
x
x
x
x
x
x
YES
NO
N/A
x
x
x
x
x
x
x
x
YES
NO
N/A
x
x
x
x
x
x
x
x
x
Page 2 of 37
(Note - always refer to the Cooper Standard Supplier Portal for the latest PPAP Checklist version)
NO
N/A
x
x
A. Variable measurements for every (except reference) dimensions on part print are to recorded?
B. Dimensional results required for every unique manufacturing process?
C. Is the AIAG Dimensional results form used? Part print information to be recorded on dimen. report, including level, date , org name,. part #,
etc.
D. Are there 6 pieces for all cells or production lines. For multiple cavities, molds, patterns and dies, 1 per cavity at least 6 parts to be
measured. Individual data readings and master(s) sample provided?
E. Is tracing included for Optical Comparator required for inspection?
F. If measured by CMM, reports included?
G. Results indicate that dimensional verifications required by print and control plan have been completed and results indicate compliance?
Comments:
x
x
x
x
x
YES
NO
N/A
A. Is the AIAG Material and Performance Test Results form are used?
B. Are records of each specified test included?
C. Part print information to be recorded on Material/Performance Reports? Including engr. Level, date, p/n, etc.
D. Any authorized engineering change documents not yet incorporated into the design record, but present in the part?
E. Number, date and change level of specification to which part was tested?
F. Date on which testing took place?
G. Qty. tested if not stated within specification?
H. Actual results?
I. Material supplier's name (req'd) and code (if applicable)?
J. Ford Specific: Is the DVP&R included?
Comments:
x
x
x
x
x
x
x
x
x
YES
NO
N/A
x
x
x
x
x
x
x
x
x
x
x
YES
NO
A. Per AIAG, all Special Characteristics need to show acceptable initial process capability prior to submission based on 125 pcs. Minimum? If
non-normal data set, reason are supplied to support acceptability?
B. Supplier shall obtain concurrence from the customer on which index is to be used? Use PpK (1.67 PpK)
C. Gage R&R is to be performed in order to understand how measurement error impacts the study measurements?
D. Initial studies will be provided in accordance with the Important Characteristics Summary sheet or Engineering designed drawing?
E. Initial process studies are summarized with capability or performance indices?
F. Studies were evaluated using these common techniques? Ie. Xbar Chart, Capability Histogram, R Chart, Normal Prob. Plot, Last 25
Subgroups, Capability Plot. (MiniTab software provides all of theses.)
G. Is the P Value >5%, if not has the study been evaluated for improvements?
H. Raw data is included in PPAP?
I. Electronic data format to be submitted either in Minitab, or the Raw Data provided in an Excel File.
J. If initial process studies are not satisfactory, is control plan modified for 100% inspection and Corrective action plan submitted to become
capable?
Comments:
N/A
x
x
x
x
A. Testing performed by external qualified laboratory need to be certified to ISO/IEC 17025 or national equivalent?
B. Scope of laboratory is Defined (whether internal or 3rd party lab)?
C. If tested externally to supplier, results to be submitted on independent lab letterhead or their normal lab report?
D. If tested externally to supplier, Name of lab, date of tests and standards used to run the tests need to be enclosed?
Comments:
Page 3 of 37
(Note - always refer to the Cooper Standard Supplier Portal for the latest PPAP Checklist version)
NO
N/A
x
x
A. For parts having an appearance requirement on design record, a AAR must be completed for each part or series of parts?
B. AAR and representative parts to be submitted to customer for disposition?
C. AAR w/disposition and authorized customer signature to accompany PSW at time of submission?
D. AIAG form CFG-1002.(AAR) to be used for submission?
Comments:
x
x
YES
NO
N/A
x
x
YES
NO
N/A
x
x
A. Master sample supplied and retained meeting PPAP requirements per AIAG?
B. Master sample is properly identified and stored?
C. Include a note in the PPAP package referencing supplier's internal procedure governing master samples and their storage?
Comments:
YES
NO
N/A
A. Supplier to certify all aspects of checking aid to agree with dimensional requirements?
B. Supplier to certify all released changes have been incorporated into checking aid?
C. Supplier to provide for Preventive Maintenance on any checking aid for the life of the part?
D. MSA to be conducted in accordance with AIAG and customer requirements?
E. Checking Aids can include fixtures either variable and attribute gages, models, templates, Mylar's, etc. specific to the product being
submitted?
Comments:
x
x
x
x
YES
NO
N/A
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Page 4 of 37
(Note - always refer to the Cooper Standard Supplier Portal for the latest PPAP Checklist version)
NO
N/A
A. Supplier shall submit the required AIAG's Forth Edition PSW form?
B. Is the PPAP ready for submission?
C. Has the warrant been signed by an authorized supplier representative?
D. Does the part name exactly match the print included in the Design Record?
E. Do the part numbers exactly match the print included in the Design Record?
F. Is there a unique customer part number?
G. Does Change Level and Date exactly match the print included in the Design Record?
H. Note any Additional Engineering changes not included in the released level?
I. Is supplier IMDS included?
J. Is supplier P.O. included?
K. Is the correct supplier and site code included?
L. Is the correct Buyer and Buyer code included (as available)?
M. Is the weight identified in Kg to 4 decimal places?
N. Is the Customer and the Division appropriately identified?
O. Is the correct submission level identified?
P. Is the production rate per hour included?
Q. Does the data to support the Production Rate exist in customer specifics?
R. Has the mold/cavity/processes been included?
S. All fields have been completed. N/A has been inserted if any field is non-applicable?
Comments:
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
ACC
REJ
Supplier:
CS Plant:
Reviewed By:
Christina Raynak
07/17/12
Reviewed By:
Date
'
Date
At a minimum, the Supplier PPAP should be reviewed and dispositioned by the CS Supplier Quality Engineer or the CS Business Unit Engineer
Page 5 of 37
Not Applicable
DFMEA
NOT APPLICABLE
OPERATION
DESCRIPTION
Receiving Inspection
of 1032131 Valve
Move Valves to
Machining Area
Maching Op
Move Valves to
Washing Area
Wash Valves to
remove any
Deburring
Contamination
PRODUCT AND
PROCESS
CHARACTERISTICS
6/21/2012
#1
Christina Raynak
ITEM #
DATE:
ECL:
PREPARED BY:
ITEM #
STORE
MOVE
INSPECT
STEP
FABRICATION
PART NUMBER:
1032130
PART DESCRIPTION:
Machined Valve, Ball 3 port
CONTROL
METHODS
Correct Valve in
Package
Visual
Machine Radius on
Valve
(1.7345 +/- .005)
1032130 Machine
Cutting Program,
Operator Instructions,
First Piece Approval,
Inprocess Audit every
5 pcs.
No residue on Valves
Operator Instruction,
Dish Washer Cycle
Compressed Air
Blow-Off
Move Valves to
Packaging & Shipping
Area
Operator Instruction
Parts to be packed
and labeled per
Operator Instruction
Operator Instruction,
Verification Form
10
Ship Product
No damage when
loaded
Visual
Page 11 of 37
POTENTIAL
FAILURE MODE AND EFFECTS ANALYSIS
(PROCESS FMEA)
Item:
1032130
Model Year(s)/Program(s)
2013 DS/DJ
Dave Weber
6/21/2012
1ST PIECE
CHECK AT SETUP
INPROCESS
CHECKS
84
None
VERIFY
CORRECT TOOL
SET IN MACHINE
AT START UP
1ST PIECE
APPROVAL,
INPROCESS
CHECKS
96
None
VERIFY
PROGRAM TOOL
COMPENSATION
IN PROGRAM AT
SET-UP
1ST PIECE
APPROVAL,
INPROCESS
CHECKS
96
None
VERIFY
CORRECT
PROGRAM AT
SET-UP
1ST PIECE
APPROVAL,
INPROCESS
CHECKS
96
None
96
None
SUPPLIER SHIPPED
PARTS OUT OF
SPECIFICATION
WRONG PROGRAM
BEING USED
3 EXCESSIVE WEAR ON
TOOL
Prevention
Detection
Recommended
Action
5 / WASH
VALVES
CONTAMINATION
FROM DEBURRING
PROCESS ON
VALVE
OPERATOR FAILED TO
COMPLETE THE WASH
PROCESS
OPERATOR
TRAINING,
VERIFICATION
FORM, ROUTER
VISUAL
128 None
7/
COMPRESSED
AIR BLOW-OFF
CHIPS FROM
MACHINING
PROCESS ON
PARTS
OPERATOR FAILED TO
COMPLETE BLOW-OFF
OPERATION
OPERATOR
TRAINING,
VERIFICATION
FORM, ROUTER
PARTS ARE
PLACED IN A
GREEN BIN
AFTER BLOWOFF OPERATION
128 None
Page 12 of 37
Actions Taken
& Effective Date
RPN
Action Results
Responsibility
& Target
Completion
Date
Detection
RADIUS NOT
MACHINED TO
PRINT
Current
Process
Controls
Occurrence
Potential
Causes(s)
of Failure
Severity
DIFFICULTY IN
PROCESSING
Current
Process
Controls
RPN
3 / MACHINING
RADIUS ON
VALVE
7/1/2012
Detection
Severity
PARTS OUT OF
SPECIFICATION
Occurrence
Potential
Effect(s)
of Failure
Potential
Failure
Mode
Requirements
1 / RECEIVING
1032130
Process Step
/ Function
Prepared by:
P&L DEVELOPMENT
Key Date
Classification
Core Team:
Process Responsibility
FMEA Number:
POTENTIAL
FAILURE MODE AND EFFECTS ANALYSIS
(PROCESS FMEA)
Item:
1032130
Model Year(s)/Program(s)
2013 DS/DJ
Prepared by:
P&L DEVELOPMENT
7/1/2012
Key Date
Dave Weber
6/21/2012
MISLABELED, OLD
TAGS NOT REMOVED
OPERATOR
INSTRUCTION,
VERIFICATION
FORM
SHIPPING
PERSONNEL TO
VERIFY
PRODUCT PRIOR
TO SHIPPING
80
None
10 / SHIPPING
PRODUCT
DAMAGED WHILE
HANDLING
SCRAP/REWORK/
SORTING OF
PRODUCT
SHIPPER FAILED TO
FOLLOW PROCEDURES
OPERATOR
INSTRUCTION
SHIPPING
PERSONNEL TO
VERIFY
PRODUCT PRIOR
TO SHIPPING
64
None
Prevention
Page 13 of 37
Detection
Recommended
Action
Responsibility
& Target
Completion
Date
Actions Taken
& Effective Date
RPN
Requirements
Potential
Causes(s)
of Failure
Detection
INCORRECT PART
NUMBER RECEIVED
AT CUSTOMER
Severity
INCORRECT
LABELING OF
CONTAINER
Potential
Effect(s)
of Failure
Occurrence
Action Results
9 / LABELING &
PACKAGING
FINAL AUDIT
Potential
Failure
Mode
Severity
Current
Process
Controls
RPN
Current
Process
Controls
Detection
Occurrence
Process Step
/ Function
1032130
Core Team:
Process Responsibility
FMEA Number:
CONTROL PLAN
Prototype
Control Plan Number
Pre-Launch
Production
Key Contact/Phone
Date (Orig.)
Core Team
1032130 / #1
Part Name/Description
Supplier/Plant Approval/Date
P & L Development
PART/
PROCESS NAME/
PROCESS
OPERATION
NUMBER
DESCRIPTION
Supplier Code
PLDE01
MACHINE,
DEVICE
JIG, TOOLS
FOR MFG.
CHARACTERISTICS
NO.
PRODUCT
PROCESS
METHODS
SPECIA
L
PRODUCT/PROCESS EVALUATION/
SAMPLE
CHAR.
SPECIFICATION/ MEASUREMENT
CLASS
SIZE
FREQ.
TOLERANCE
TECHNIQUE
RECEIVING
INSPECTION OF
1032131 VALVE
CORRECT VALVE IN
PACKAGING
MACHINING
CNC
TURNING
CENTER
VALVE WASH
COMPRESSED
AIR BLOW-OFF
MACHINE
RADIUS ON
VALVE
1032130
CUTTING
PROGRAM
PART
WASHER
REMOVE
DEBURRING
CONTAMINATION
WASHER
CYCLE
BLOW-OFF
STATION
VISUAL
MICROMETER
NO RESIDUE ON
VALVES
VISUAL, PART
ROUTER
REMOVE
CHIPS FROM
PARTS
NO CHIPS ON
PARTS
PROPER
LABEL AND
PACKAGING
PARTS TO BE
PACKED AND
LABELED PER
OPERATOR
INSTRUCTION
Page 14 of 37
CONTROL
METHOD
REACTION
PLAN
QUARANTINE
PRODUCT,
CONTACT
SUPPLIER FOR
RESOLUTION
1ST
CUTTING
PIECE,
PROGRAM,
EVERY 5
OPERATOR
PCS
INSTRUCTION,
IN-PROCESS
CHECKS
QUARANTINE
PRODUCT,
CONTACT
SUPERVISOR
FOR
RESOLUTION
100%
PER LOT
VISUAL
QUARANTINE
PRODUCT,
CONTACT
SUPERVISOR
FOR
RESOLUTION
VISUAL, PART
ROUTER
100%
PER LOT
OPERATOR
INSTRUCTION,
IN-PROCESS
CHECKS
QUARANTINE
PRODUCT,
CONTACT
SUPERVISOR
FOR
RESOLUTION
VISUAL
CARTON
OPERATOR
INSTRUCTION
VERIFICATION
FORM
QUARANTINE
PRODUCT,
CONTACT
SUPERVISOR
FOR
RESOLUTION
LABELING &
PACKAGING
FINAL AUDIT
Date (Rev.)
6/21/2012
CONTROL PLAN
Prototype
Control Plan Number
Pre-Launch
Production
Key Contact/Phone
Date (Orig.)
Core Team
1032130 / #1
Part Name/Description
Supplier/Plant Approval/Date
P & L Development
PART/
PROCESS NAME/
PROCESS
OPERATION
NUMBER
DESCRIPTION
SHIPPING
Date (Rev.)
6/21/2012
Customer Engineering Approval/Date (If Req'd.)
Customer Quality Approval/Date (If Req'd.)
Supplier Code
PLDE01
MACHINE,
DEVICE
JIG, TOOLS
FOR MFG.
CHARACTERISTICS
NO.
PRODUCT
SHIP
PRODUCT
PROCESS
METHODS
SPECIA
L
PRODUCT/PROCESS EVALUATION/
SAMPLE
CHAR.
SPECIFICATION/ MEASUREMENT
CLASS
SIZE
FREQ.
TOLERANCE
TECHNIQUE
NO DAMAGE WHEN
LOADED
10
Page 15 of 37
VISUAL
PER LOT
CONTROL
METHOD
SHIPPER
PROCEDURE
REACTION
PLAN
QUARANTINE
PRODUCT,
CONTACT
SUPERVISOR
FOR
RESOLUTION
Page 21 of 37 Pages
ORGANIZATION:
PART NUMBER:
1032130
PART NAME:
#1 27SE11
ITEM
DIMENSION /
SPECIFICATION
22.04mm (1.7354)
2
3
4
5
Surface Roughness
Make from molded
Break sharp
Significant
SPECIFICATION /
LIMITS
TEST
DATE
QTY.
TESTED
5/7/12
5/7/12
ORGANIZATION MEASUREMENT
RESULTS (DATA)
1.7342
1.7345
1.7348
1.7341
1.7342
1.7340
Pass
Noted
Noted
Noted
OK
NOT
OK
x
x
x
x
x
x
x
x
x
x
C. Raynak
March CFG-1003
2006
TITLE
QA Manager
DATE
5/7/2012
NOT APPLICABLE
QUALIFIED LABORATORY
NOT APPLICABLE
NOT APPLICABLE
TAINED
CHECKING AIDS
NOT APPLICABLE
Rev - 2
SUPPLIER
ADDRESS:
PART INFORMATION
DIMENSIONS
PART NUMBER:
NAME:
REVISION LEVEL:
PACKAGING INFORMATION
CONTAINER
CONTAINER TYPE
IF EXPENDABLE
RETURNABLE
TRIPLE WALL
OTHER
OUTSIDE LENGTH
CONTAINER STYLE
PALLET BIN - SOLID SIDES
BREAK AWAY
CARTON
STACKING STRENGTH
OUTSIDE WIDTH
CONTAINER FEATURES
PALLET BOX
x DOUBLE WALL
18"
18"
18"
27
17.75
17.75
17.75
WEIGHT:
IF RETURNABLE
SINGLE WALL
DIMENSIONS (INCHES)
WIDTH:
HEIGHT:
CORRUGATED CONTRUCTION
x EXPENDABLE
2"
2"
2"
.0157kg
LENGTH:
1032130
Machined Valve, Ball 3 Port
#1
(BURST OR ECT)
HAND HOLES
OTHER
OUTSIDE HEIGHT
OTHER
CONTAINER STYLE
REGULAR SLOTTED
ADDITIONAL INFORMATION
OWNERSHIP
PICTURES ON PAGE 2
INSIDE WIDTH
x HALF SLOTTED
INSIDE HEIGHT
PALLET BOX
AND MAINTAINED
OTHER
PALLET
DIMENSIONS (Inches)
LOAD CONFIGURATION
PALLET MATERIAL
PALLET STYLE
LENGTH (RUNNER)
SINGLE WING
DOUBLE WING
HEIGHT
PAPER
FLUSH WING
WEIGHT
PLASTIC
BLOCK
METAL
OTHER
(INCLUDING PALLET)
OTHER
0.002
COST
TRANSPORTATION INFORMATION
UPS
CARRIER TO BE USED:
FREIGHT CHARGES:
COLLECT
PREPAID
BI-WEEKLY
MONTHLY
x TUESDAY
x WEDNESDAY
x THURSDAY
x FRIDAY
WEEKLY
BI-MONTHLY
SUPPLIER TO COMPLETE
Reviewed by
5/30/12
C. Raynak
Signature
Date
Signature
Date
Signature
Date
Signature
Date
Approved Packaging
Approved Transportation
Approved Purchasing
OTHER:
Part Name
1032130
1032130
1032130
#1
N/A
Yes
N/A
N/A
Dated
Purchase Order No.
No
C256000038
N/A
27SE11
Dated
0.0157
Weight (kg)
N/A
Dated
1PLDE01
Customer Name/Division
Street Address
Buyer/Buyer Code
Oscoda
MI
City
48750
Region
USA
Postal Code
2013 DS/DJ
Country
Application
MATERIALS REPORTING
Yes
No
n/a
n/a
Yes
No
Initial submission
Engineering Change(s)
Correction of Discrepancy
Level 3 - Warrant with product samples and complete supporting data submitted to customer.
Level 4 - Warrant and other requirements as defined by customer.
Level 5 - Warrant with product samples and complete supporting data reviewed at organization's manufacturing location.
SUBMISSION RESULTS
dimensional measurements
material and functional tests
appearance criteria
statistical process package
(If "NO" - Explanation Required)
Yes
NO
CNC Machining
Mold / Cavity / Production Process
The results for
DECLARATION
I affirm that the samples represented by this warrant are representative of our parts, which were made by a process that meets all
Production Part Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the production
rate of _300_/_1_ hours. I also certify that documented evidence of such compliance is on file and available for your review. I have noted
any deviation from this declaration below.
EXPLANATION/COMMENTS:
Yes
No
n/a
Christina Raynak
Christina Raynak
Phone No.
Quality Manager
Date
989-739-5203
Fax No.
craynak@pl-dev.com
Approved
Rejected
Other
Customer Signature
Print Name
March
2006
CFG-1001
Date
Customer Tracking Number (optional)
7/17/12
989-739-5205